Tack Coat ing
What is the Goal for Tack Coating?
To provide an evenly distributed liquid asphalt for the purpose of bonding asphalt or rock chips to a new or existing road surface.
The purpose of tack is to provide an adequate bond between the two products for adhesion purposes.
Proper preparation of the paving/chipping surface prior to application is critical.
Paving
1
2
3
3/12/2019
2
Chip Sealing
Chip Sealing
4
5
6
3/12/2019
3
Distributor Truck or Tack Tank
Tack Coating Safety
Truck DecalsDistributor
Tack Coating Truck Safety
Tires Fuel & DEF Brakes Engine Oil Coolant Belts Hoses
Regen Status Beacons Running LightsWork Lights Back Up Camera Parking Break Visibility
7
8
9
3/12/2019
4
Distributor Safety
Tack Coating Decal Safety
Tack Coating Decal Safety
ConditionLocationsClear and ReadableClassificationCaution, Warning, or DangerMost Important No Smoking or Open Flames In or Around the Distributor
10
11
12
3/12/2019
5
Personal Protective Equipment
Face Shield Hard Hat Gloves Long Paints Long Sleeve Shirts Safety Glasses Work Boots Emergency
Numbers
NAPA Emergency Information
Types AsphaltsAsphalt Cement
Asphalt ProductionEmulsions (Liquid Asphalt)
Asphalt productionTacking for Laying AsphaltChip SealingDust Coating
Cutbacks (Liquid Asphalt)Asphalt productionTacking for Laying AsphaltChip SealingDust Coating
13
14
15
3/12/2019
6
Asphalt Plant
MSDS Sheets
Asphalt Temp Chart
Type & Grade SprayingTemp Storage Temp MinFlash Point
°C °F °C °F °C °F
Asphalt Cements
AC 10 140+ 280+ 174 345 219 425
AC 20 145+ 295+ 177 350 232 450
Emulsified Asphalts
RS‐2 50‐85 125‐185 50‐85 125‐185
MS‐2 20‐70 70‐160 50‐85 125‐185
CRS‐2 50‐85 125‐185 50‐85 125‐185
Cutback Asphalts
MC‐30 30+ 80+ 54 130 38 100
RC‐ 70 50+ 120+ 71 160 ‐ ‐
SC‐250 75+ 170+ 91 195 79 175
16
17
18
3/12/2019
7
Asphalt Cement
Pug Mills Asphalt Plants Hot Asphalt Mixes Cold Asphalt Mixes Slurry Seals Construction of Roads & Highways Pavement Overlays
Spraying Emulsions
Emulsified Asphalts
Two Types Anionic (‐) & Cationic (+) Magnetic ChargedNever Mix Anionic and Cationic EmulsionsCuring Characteristics
SS=Slow Set, MS=Medium Set, RS=Rapid SetCRS‐2CRS‐2hRS‐2p
What does these indicators tell you?
19
20
21
3/12/2019
8
Defining the Type of Emulsified Asphalt
PrefixRS = rapid setSS = slow setQS = quick setMS = medium setHFRS = high float rapid setC = Cationic Emulsion
AE = Anionic Emulsion
Nomenclature
NOMENCLATUREHFRS‐2
High Float, Rapid Setting, High ViscosityCRS‐2P
High Viscosity, Cationic, Rapid Setting, Polymer Modified
CSS‐1hCationic Slow Setting, Low Viscosity Hard Asphalt
Defining the Type of Emulsified Asphalt
Suffix90,150, or 300 = penetration rangesh = hard penetrationP,M or L = modified with polymer or latex1 = low viscosity, stored @ cooler temps2= high viscosity, stored @ higher temps
22
23
24
3/12/2019
9
Specialized Liquid Asphalts
Polymer AsphaltLatex AsphaltsRubberized AsphaltsTrackless TackEach have different specifications
Storage Temperatures
Store Same as WaterAt the Specified TempDo Not Store Above 185 F°Do Not Let the Emulsion FreezeDo Not Heat Above 212 F°Do Not use Forced Air to Agitate the EmulsionAC Cutback Liquid Asphalt
Emulsion Min F° Max F°
RSA‐1 70 140
RS‐2 125 185
HFRS‐2 125 185
SS‐1h 50 140
AE‐90 125 185
MS‐2 125 185
CQS‐1h 50 140
CSS‐1hM 50 140
CRS‐2 125 185
CRS‐2P 125 185
Trackless Tack
NTSS‐1HM Trackless Tack (Anionic) Storage Temp 50°F to 130°F Spraying Temp 160°F to 180°F Preparing the Distributor Cleaning the Distributor Do Not Over Agitate or Circulate
25
26
27
3/12/2019
10
Application Rate Calculations
How to Calculate the Rate & Coverage(1 Mile @ 20 Feet Wide) & (6000 gallons (1 Tanker))
Gallons ÷ Total Square Yards = Applications Rate
6000 ÷ 11733 = .51 Rate GPSY
How far will a 6000 gallon tanker go at .25 GPSY?
5280 X 20 X .25 ÷ 9 = 2,933
6000 ÷ 2933 = 2.04 Miles
Control Panel
Computerized Screen
28
29
30
3/12/2019
11
Spray Bar Control Switches
Computerized Controller Functions
Spray/Bar Circulate Tank Circulate Hand Spray Load Transfer Hand Spray Unload Reverse Suction Clean Out Off
Nozzles Size Specifications
Nozzles Size Each Nozzle has a GPM Rating Angle of Nozzles Effects Coverage Height of Nozzle Determines Overlap Do Not Mix Nozzle Sizes Do Not Mix Manufacture Nozzles
31
32
33
3/12/2019
12
Nozzle Chart & Reference
Slide Chart for Application Rate
Example Slide Card Usage
34
35
36
3/12/2019
13
Nozzle Size Reference
Example to Determine Maximum GPM. #1 Nozzle Capable of 4 GPM 3 Nozzles Per Foot X 12 Foot Spray Bar 36 Total Nozzles 36 X 4 = 144 Total GPM Your Application Should Be In This Range of
Asphalt Pump GPM
Asphalt Tank Preparation
Heating Asphalt Precautions
37
38
39
3/12/2019
14
Set Up Computer for Heating Asphalt
Temperature Set Point & Burner Controls
Select Tank Circulate to Heat the Asphalt
When Asphalt Becomes Hot Enough to Circulate
Manual Mode Set Controller to Tank Circulate Set Pump Speed in Manual 50 to 75 GPM
40
41
42
3/12/2019
15
Spraying Hot Asphalt
When Asphalt Reaches Desired Spraying Temp Select Auto Mode, Go to Spray Bar Circulate To Pre‐Heat Bar Before Spraying.
Liquid Asphalt Application Rates
Sprayed in Gallon’s Per Square YardAsphalt Tacking .05 to .10 GPSYChip Sealing .10 to 1.0 GPSYDefining Factors
Truck Speed (FPM) (Radar Horn or GPS)Spray Bar Width (Width of Spray Pattern)Pump Speed (GPM)Individual Nozzles (Size)
Example of .25 Application Rate
43
44
45
3/12/2019
16
Spray/Bar Circulate Switch and Spray Bar Switches
Spray Bar Master Switch
Spray Bar SwitchesHeight/In/Out Switches
Monitor Your Operation Screen
Reverse Suction Mode
Select Manual Mode Select Reverse Suction Suck Material from the Spray Bar & Pump
into the Main Tank Follow Manufacture Instructions for
Pump Rotation for Reverse SuctionMove to Clean Out Mode
46
47
48
3/12/2019
17
Final Clean Out
Follow Manufacture’s Manual on How to Perform the Proper Clean Out Of the Pump and Spray Bar.
The Distributor Can Be Stored Until The Next Job
Miscellaneous Components
49
50