PAVING HIGH TRAFFIC

GRAVEL ROADS

(With Average Daily Traffic Over 400)

Page 3: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Today’s Presentation

• Several years ago, the county paved high traffic gravel roads on a fairly regular basis

• This presentation describes how we are planning to renew this procedure

• The program differs from the LID and CAPP processes

• LID and CAPP programs are paid with full or partial funding from adjacent landowners and are used to pave low traffic gravel roads

• The following program is designed as a process for paving high traffic gravel roads with county funds

• Commissioner input is desired

Page 4: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Purpose of the Program

• Certain gravel roads in the county have high traffic counts and high maintenance costs

• Many of our road maintenance service requests come from high traffic gravel roads

• Over time, paving these roads will save tax dollars, improve safety, and reduce complaints

• This program prioritizes which roads should be paved and in what order they should be paved

Page 5: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Process and Criteria

• This process will establish an ongoing list to provide the public with some resolution to the question: “When will my road be paved?”

• Public meetings and surveys will be conducted to assure there is support from a majority of the adjacent residents before proceeding

• All of the roads identified have traffic counts over 400 ADT which is the national standard set by ASHTO to designate very low volume roads

• The list of eligible roads will change over time as traffic increases on roads throughout the county

Page 6: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

HIGH TRAFFIC GRAVEL ROADS 24 Hour Bi-directional

Traffic Count (ADT) Limits Length

Street Name Count Date Start Stop Linear Feet

Ponderosa Drive 862 May 2013 Lost Canyon Trail Woodland Trail 8,500

Flintwood Road 712 Sept. 2013 Singing Hills Road Chinook Road 5,180

Winchester Way 609 July 2013 Ranger Road Roseridge Road 4,132

Bronco Drive 580 June 2013 Piney Lake Road Roundup Road 1,715

Boothill Drive 546 June 2013 Roundup Road Buckboard Road 1,833

Roundup Road 519 June 2013 Bronco Drive Boothill Drive 1,932

Heidemann Avenue 515 Sept. 2011 Russellville Road Elbert Co. Line 7,524

Buckboard Road 467 June 2013 Boothill Drive Delbert Road 3,040

Best Road 461 July 2013 Andrews Road Spring Valley Road 22,176

Pine Creek Road 415 June 2011 S. County Hwy 67 Hill Drive 7,192

Total Miles 11.98

Page 7: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Annual Maintenance Costs (10 Year Average)

Road Name Maintenance Costs Annual Cost per Mile

Ponderosa Drive $56,232 $40,455

Flintwood Road $27,931 $16,145

Winchester Way $27,461 $23,471

Bronco Drive $9,915 $24,788

Boot Hill Drive $9,093 $45,465

Roundup Road $18,902 $17,876

Heidemann Avenue $72,132 $47,455

Buckboard Road $13,608 $27,216

Best Road $77,067 $17,357

Pine Creek Road $127,931 $41,135

Page 8: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Asphalt Paving Costs

Road Name Project Cost Engineering / PWOPs

Ponderosa Drive $336,590 PWOPS

Flintwood Road $205,122 PWOPS

Winchester Way $163,622 PWOPS

Bronco Drive $67,912 PWOPS

Boothill Drive $72,585 PWOPS

Roundup Road $76,505 PWOPS

Heidemann Avenue $934,224 Engineering

Buckboard Road $120,380 PWOPS

Best Road $2,753,502 Engineering

Pine Creek Road $893,001 Engineering

$5,623,442

Page 9: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Proposed Paving Budget High Traffic Gravel Roads

Road Name Project Cost Budget Year

Ponderosa Drive $336,590 2016

Flintwood Road $205,122 2016

Winchester Way $163,622 2017

Bronco Drive $67,912 2017

Boothill Drive $72,585 2017

Roundup Road $76,505 2017

Buckboard Road $120,380 2017

Heidemann Avenue $934,224 2018

Best Road $2,753,502 2019

Pine Creek Road $893,001 2020

Page 10: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Paving Project Locations

Page 11: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Roundup 519 ADT

Ponderosa Drive 862 ADT

Page 12: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Flintwood Road 712 ADT

Page 13: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Roundup 519 ADT

Winchester Way 862 ADT

Page 14: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Bronco Drive 580 ADT

Page 15: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Boothhill Drive 546 ADT

Page 16: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Roundup Road 519 ADT

Page 17: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Heidemann Avenue 515 ADT

Page 18: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Buckboard Road

467 ADT

Page 19: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Best Road 461 ADT

Page 20: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Pine Creek Road 415 ADT

Page 21: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

• A county representative will coordinate and arrange a venue to conduct a public informational meeting

• County staff will provide a formal meeting notification to the property owners adjacent to the proposed paving project

• Notifications will be sent via first-class mail to property owners as they are listed on the County’s assessment records

• The notification will contain a description of the proposed project, the meeting location, the meeting date, and the meeting time

Public Process

Page 22: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Public Meeting Agenda

• Input from the public will be received (the project will be required to have the support of 70% of the affected property owners)

• Project parameters will be presented

• Possible road improvement considerations will be reviewed

• Information on project costs will be presented

• An anticipated paving schedule will be proposed

Page 23: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Petition Process

• If proponents wish to proceed with the process after the neighborhood informational meeting, a county representative will circulate a petition to property owners immediately adjacent to the paving project

• The petition will contain a description of the proposed project and the cost of construction for which the county will be financially responsible

• Those owners in support of the project will sign the petition

Page 24: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Petition Process (Cont.)

• The petition must have the support of at least seventy percent (70%) of the property owners within the proposed project area

• Each individual lot within the area, as recognized by the County Assessor’s Office, will receive one vote in the petition process

• All owners on the property deed must be in support of the project in order for the property to be considered in support

• County staff will contact those property owners who have signed the petition to verify the vote

Page 25: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

County Approval

• Verification of adequate budget resources to proceed with the project will be required prior to approval

• It will be the responsibility of the Douglas County Manager to provide final approval of the project

Page 26: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Final Notification Prior to Construction

• Upon approval of the project, a second notification letter containing the project schedule and additional project information shall be sent to all property owners of record within the proposed area and to the neighborhood association representative (when applicable)

Page 27: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Benefits of Paving High Traffic Gravel Roads

• Less routine maintenance

• Reduced maintenance costs

• More efficient snow removal

• Improved air and water quality

• Better driving surface (not muddy)

• Improved skid resistance

• Less wear on vehicles

• Potential increase in property values

Page 28: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Questions?

Page 29: PAVING HIGH TRAFFIC - Douglas County, Colorado€¦ · Asphalt Paving Costs Road Name Project Cost Engineering / PWOPs Ponderosa Drive $336,590 PWOPS Flintwood Road $205,122 PWOPS

Calculations

Labor &

24 Hour Bi-directional Limits Length Asphalt ABC Material Costs Drainage Erosion Control Traffic Equipment Project

Street Name Traffic Count Asphalt ABC Costs Costs Costs Costs Costs

Count Date Start Stop (Linear Feet) (Tons) (Tons) ($43/ton - $86/ton)

($12/ton - $24/ton) Subtotal {10% - 20%} {2% - 10%} {1% - 5%} {5% - 50%} Totals

1 Ponderosa Drive 862 May-13 Lost Canyon Trail Woodland Trail 8,500 6,233 1,434 $ 268,033 $ 17,213 $ 285,246 $ 28,525 $ 5,705 $ 2,852 $ 14,262 $ 336,590

3 Flintwood Road 712 September-13 Singing Hills Road Chinook Road 5,180 3,799 874 $ 163,343 $ 10,490 $ 173,832 $ 17,383 $ 3,477 $ 1,738 $ 8,692 $ 205,122

2 Winchester Way 609 July-13 Ranger Road Roseridge Road 4,132 3,030 697 $ 130,296 $ 8,367 $ 138,663 $ 13,866 $ 2,773 $ 1,387 $ 6,933 $ 163,622

4 Bronco Drive 580 June-13 Piney Lake Road Roundup Road 1,715 1,258 289 $ 54,080 $ 3,473 $ 57,553 $ 5,755 $ 1,151 $ 576 $ 2,878 $ 67,912

5 Boothill Drive 546 June-13 Roundup Road Buckboard Road 1,833 1,344 309 $ 57,801 $ 3,712 $ 61,512 $ 6,151 $ 1,230 $ 615 $ 3,076 $ 72,585

6 Roundup Road 519 June-13 Bronco Drive Boothill Drive 1,932 1,417 326 $ 60,922 $ 3,912 $ 64,835 $ 6,483 $ 1,297 $ 648 $ 3,242 $ 76,505

7 Heidemann Avenue * 515 September-11 Russellville Road Elbert Co. Line 7,524 5,518 1,270 $ 474,514 $ 30,472 $ 504,986 $ 100,997 $ 50,499 $ 25,249 $ 252,493 $ 934,224

8 Buckboard Road 467 June-13 Boothill Drive Delbert Road 3,040 2,229 513 $ 95,861 $ 6,156 $ 102,017 $ 10,202 $ 2,040 $ 1,020 $ 5,101 $ 120,380

9 Best Road * 461 September-13 Andrews Road Spring Valley Road 22,176 16,262 3,742 $ 1,398,566 $ 89,813 $ 1,488,379 $ 297,676 $ 148,838 $ 74,419 $ 744,190 $ 2,753,502

10 Pine Creek Road * 415 September-11 S. County Hwy 67 Hill Drive 7,192 5,274 1,214 $ 453,575 $ 29,128 $ 482,703 $ 96,541 $ 48,270 $ 24,135 $ 241,352 $ 893,001

$ 5,623,442