patrick evans, p.e. senior advisory pre-sales technical support rep superelevation in the roadway...

27
Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Upload: linda-purser

Post on 02-Apr-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Patrick Evans, P.E.Senior Advisory Pre-Sales Technical Support Rep

Superelevation in the Roadway Designer

Page 2: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Agenda

Examples

Rollover Locks

Editing Superelevation

Superelevation Sections

Superelevation Input Methods

Page 3: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Superelevation in the Roadway Designer

Key Concepts• Superelevation is a Point Control in the Roadway

Designer.

• All Point Controls are applied to a specific point name.

• Point Controls are subject to point constraints

• Superelevation presented as a Superelevation diagram.

• Multiple methods to compute and apply Superelevation

• Easy to edit/adjust Superelevation

Page 4: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Creating Superelevation

• Superelevation – Created and applied in the

Roadway Designer

– Saved in the Roadway Design file ~ ITL file

– Create Superelevation Wizard steps you through the process (Automatically creates vertical point Controls of Superelevation Type)

– Automatically overrides existing template point constraints

Page 5: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Superelevation Input Methods

• Wizards– AASHTO– Fixed Length– Table

• Creating a Single Control Line (Manual edit)

• Importing Superelevation (from ASCII)

• Importing Superelevation from INP file (for bringing older super data forward)

Page 6: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Why Use the Wizard?

– Automated– Creates Control Lines– Assigns Point Constraints to Control Line

Points – Creates Superelevation Point Controls– Establishes Relationships Between Control

Lines (You can Use Edit Curve Set Station)

Page 7: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Things to Be Aware of

– Wizard is Used to Build Initial Superelevation Definition

– Once you exit the Wizard, you cannot “jump” back in the middle to edit an existing section

– Using the Wizard has many more benefits than manually defining control lines or importing from ASCII

Page 8: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Superelevation Sections

• What is a Superelevation section? – Specifies the sections of

pavement to superelevate– Super sections define a

“Range of Interest” for superelevation control lines

– Think of it as Start and stop station and left and right range points

• Controls lines in different sections cannot be constrained to one another.

• No hard and fast rules for section creation, just a way to manage related control lines

Page 9: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Superelevation Sections

Section 1 Section 2

Page 10: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Naming Sections and Control lines

• Create names that can be easily understood

• The default naming attempts to give the control line a meaningful name, but is probably not what a user would choose.

• Keep names as short and concise as possible to make them easier to find in lists and combo boxes.

Page 11: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Resolving Overlaps

• Fix Superelevation Overlap Dialog– Use to resolve

superelevation overlaps

• Two solutions– Shift the transition onto

curve– Reduce the transition

length

• Basic Workflow– Key-in the Length of the

Shift or,– Key-in the Reduced

Transition Length– Click Apply and Next>– Repeat for all overlaps

Page 12: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Creating Superelevation

• After Superelevation is created, selecting the Display Superelevation button changes the Roadway Designer windows to show superelevation data

Page 13: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Slide 13

Creating Superelevation

• Superelevation Diagram View Window– Displays superelevation control lines– Displays different colors for each control line,

which are not related to slope– Edit superelevation points here– Superelevation points are constrained

Page 14: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Editing Superelevation

• Move/Delete/Edit point commands

• Constraints– Use them to maintain superelevation integrity

or to precisely locate a point without needing to calculate the location.

• Edit Curve Set Stations command– Only available when super placed using

wizards.– Allows for tabular display and edit of super

points.

• Delete Points command

Page 15: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Creating Single Control lines

• Can start with a flat line or copy information from an existing line

• Must manually enter all station and cross slope information

• Must manually create point control(s) associated with the control line

Page 16: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Inserting/Modifying Points

• Right Click on the control line to insert a point

• Right click on a point to modify

• Use the dynamic settings for precision placement

Page 17: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Adding Point Constraints

• Right Click and add constraints

• Point Properties

• Points cannot be constrained to points belonging to a different section!

Page 18: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Point Controls

• Superelevation Point Controls

– When defining Single Controls lines manually, Point controls must be defined for each control line

Page 19: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Apply Shoulder Rollover Lock• Basic Workflow

– Create Superelevation using the Wizard

– Select Superelevation > Apply Shoulder Rollover Lock command

– Select Process All and review the design

– Save the Roadway Design

Page 20: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Template Shoulder Rollover

• Easy to define and change

• Does not create additional control lines

• Useful for satisfying standard shoulder requirements that are not project specific

Page 21: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Import Superelevation (from ASCII)• Import up to two control lines from a text file that contains

station and left and right cross slope information.

• Imports pipe delimited format using the first three values only-Station|Finished Grade Left|Finished Grade Right|

• Creates the control lines and associated point controls.

• Constraints are not assigned

• Cannot use Edit Curve Set Stations

Page 22: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Import Superelevation from INP

• Method to get import traditional GEOPAK superelevation data

• Creates two controls lines (Left and Right)

• User must manually create point controls.

• User must manually assign point constraints

• Cannot use Edit Curve Set Stations

Page 23: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Slide 23

Using superelevation in end conditions

• Yes, you can!

• Using super to control end condition slopes

• Avoid ROW Encroachments, etc.

• No End Condition Transitions/Overrides required

Page 24: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Slide 24

Independent Subgrade Superelevation

• Workflow– Create two templates

• Top Component Only• Subgrade Components Only

– Use the Wizard to define the superelevation for the top points of the template

– “Swap” the complete template with the subgrade only template.

– Use the Wizard again to define the superelevation control lines

– Edit control lines as necessary– Finally, “Swap the subgrade only

template with the complete template.

– Remember: Point names should match for both templates!!!

Page 25: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Summary

• There are six ways to define Superelevation in Roadway Designer, both automated and manual including 3 AASHTO methods

• There are benefits and drawbacks of each method

• There are many ways to edit superelevation in the Roadway Designer

• Superelevation can also be used in an unconventional way to satisfy special design requirements

Page 26: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Questions?

Page 27: Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer

Thank you for your attendance

Making IT Strategic to Your Business