*patent pending - cdn.enfsolar.com system/5b3acb6ebcf91.pdf · m upr ssm ground mount system patent...

2
TM JUPITER I SYSTEM: Ground Mount System *Patent Pending ©2015 Orion Solar Racking, www.orionracking.com T: (310) 409-4616 F: (310) 409-4617 TM Orion’s Jupiter I System integrates locally sourced schedule 40 pipes with Orion’s signature rails to create a ground mount system adaptable for any terrain. Minimal parts and simple installation results in a sturdy mount for your solar needs Rails are made from 6005 Aluminum Caps are made from galvanized steel Features: Product Detail: YEAR WARRANTY UL Listed UL2703 ARA Buy American Act Compliant 20 Year Warranty Twice the protection offered by competitors. Integral Grounding Streamlines equipment grounding. 20 Rugged Construction High strength galvanized structure. Simple Assembly Modular system adapts to most terrain. Rail Connection Detail Angle Brace Sch 40 Pipe Orion Rail Steel Cap Engineer Certified We offer complete engineering resources and pre-stamped certified letters.

Upload: vuongdieu

Post on 11-Aug-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: *Patent Pending - cdn.enfsolar.com System/5b3acb6ebcf91.pdf · M UPR SSM Ground Mount System Patent Pending 2015 Orion Solar Racking, T: 310 40-4616 310 40-4617 M Ground Mount Components

TM

JUPITER I SYSTEM: Ground Mount System*Patent Pending

©2015 Orion Solar Racking, www.orionracking.com T: (310) 409-4616 F: (310) 409-4617

TM

Orion’s Jupiter I System integrates locally sourced schedule 40 pipes with Orion’s signature rails to create a ground mount system adaptable for any terrain. Minimal parts and simple installation results in a sturdy mount for your solar needs

• Rails are made from 6005 Aluminum• Caps are made from galvanized steel

Features:

Product Detail:

YEARWARRANTY

UL ListedUL2703

ARABuy American Act Compliant

20 Year WarrantyTwice the protection offered by competitors.

Integral GroundingStreamlines equipment grounding.

20

Rugged ConstructionHigh strength galvanized structure.

Simple AssemblyModular system adapts to most terrain.

Rail Connection DetailAngle Brace

Sch 40 Pipe

Orion Rail

Steel Cap

Engineer CertifiedWe offer complete engineering resources and pre-stamped certified letters.

Page 2: *Patent Pending - cdn.enfsolar.com System/5b3acb6ebcf91.pdf · M UPR SSM Ground Mount System Patent Pending 2015 Orion Solar Racking, T: 310 40-4616 310 40-4617 M Ground Mount Components

TM

JUPITER I SYSTEM: Ground Mount System*Patent Pending

©2015 Orion Solar Racking, www.orionracking.com T: (310) 409-4616 F: (310) 409-4617

TM

Ground Mount Components

Raking Components

Schedule 40 PipesLocally sourced Schedule 40 Pipes create the ground mount structure and provide stability.

Steel CapsSteel caps are fitted with U-Bolts and connect pipes and angle braces together.

Orion RailsMade from 6005 Aluminum, these rails are the backbone of the system. Available in Mill, Clear anodized, or black anodized.

Angle Splice KitsThese kits mount and support the Rails to the Pipes. Think of them as the bridge between rails and pipes.

ClampsGrounding clamps mount and ground modules to the rails.

U-BoltsU-Bolt hardware fits perfectly with the schedule 40 Pipes

Angle BraceAluminum Extruded braces provide seismic support for the ground mount arrays.

ITEM DESCRIPTION1234

2" SCHEDULE 40 STEEL PIPE (HORIZ.)ALUMINUM L 1.5 x 1.5 x 1/8 (DIAG.)

2" SCHEDULE 40 STEEL PIPE (VERT.)ALUMINUM RT 1.5 x 1.5 x 1/8 (DIAG.)

1 TYP

3 TYP

3 TYP

1 TYP

2 TYP

4 TYP

CIDH PIER, TYP

5 TYP 2" STEEL PIPE COUPLER5

Grounding and Accesories

Adjustable LegsThese legs can adjust your tilt to 10-60 degrees. Works easily with our system.

Grounding LugComplete the grounding with our smart ground clip.

Microinverter AttachmentsMount and ground your microinverter to our system with our Star Washer Assembly.

Wire ClipsAvailable in Stainless Steel or Black Plastic for all your wire management needs.