Project: Hewlett Packard - Data Storage and Distribution Facility (12,000 m2) Eastern Creek
Client: Laing O’Rourke
Contract Value: $640,000 Contract Duration: 12 weeks
Project complete on time and within budget
Scope of Work: The SoW required the building to be cleaned to a Level 2 standard of handover.
(Level 1 being the highest standard projects such as biohazard labs)
Key Elements: Cleaning high level tunnel like A/C ducts (crawl spaces) forming part of the air recycling system.
This space had to be completely dust free. Cleaning thousands of metres of cable racking to a
hospital standard clean.
Client Testimonial: The level of clean required for this project was extremely demanding with much of the
areas / services in difficult to access areas. Redclean completed the cleaning work on time and
within budget. Great effort. Johnathon Richard (Proj Mgr)
RL 61.000
57100
53440
CAPICURE DR
ROBE
RTS R
OAD
TURNINGAREA FORREJECTEDVEHICLES
STAFF / VISITOR CARPARK (28 SPACES)
LOADING DOCKAREA
FUTUREDATA CENTRE DATA CENTRE
CELL 2
ADMIN AREA
ELECTRICAL AIS SWITCH STATION
DATA CENTRECELL 1
FUTUREDATA CENTRE
FUTUREDATA CENTRE
UNDERGROUNDIRRIGATION TANK
BATTER
PERIMETER ACCESS ROAD
PERIMETER ACCESS ROAD BATT
ER
BATTER
BATTER
BATT
ER
BATTER
PERIMETER ACCESS ROAD
PERIMETER ACCESS ROAD
FUTURE ACCESS ROAD
EXISTINGDETENTION BASIN
ACCESS ROAD
3.00°
3.00°
3.00°
3.00°
FUTURE ACCESS ROAD
30500
30.5m SETBACK TOBOUNDARYHP REQUIREMENT
3m SETBACK TO BOUNDARYCOUNCIL REQUIREMENT
GATEHOUSE
TREES TO BERETAINED
FUTURE ABOVE GROUND DIESELTANKS AND GENERATORS IN
ACOUSTIC ENCLOSURE
SLIDING SECURITYGATES TO SITEENTRY / EXIT
RETAINING WALL
RETAINING WALL
FENCE TOSWITCHING YARDSECURITY FENCETO BOUNDARY
SERVICE BUILDING TO INTEGRALENERGY REQUIREMENTS
SERVICE BUILDING TOHP REQUIREMENTS
SECURITY FENCETO BOUNDARY
SECURITY FENCETO BOUNDARY
SECURITY FENCETO BOUNDARY
SEPARATE ACCESS TO HV SWITCHSTATION AS PER INTEGRAL
ENERGY REQUIREMENTS
HVAC PUMP ROOM
UNDER GROUNDHVAC TANK
ABOVE GROUND DIESEL TANKS ANDGENERATORS IN ACOUSTICENCLOSURE
SECURITY FENCETO BOUNDARY
30.5m SETBACK TOBOUNDARY
HP REQUIREMENT
3m SETBACK TO BOUNDARYCOUNCIL REQUIREMENT
SLIDING SECURITY GATESTO SITE ENTRY / EXIT
SECURITY FENCETO PERIMETER OFSWITCHING YARD
INTERNAL FENCETO SWITCHINGYARD
FUTURE UNDERGROUND HVAC TANK
FUTURE HVACTANKS
SPRINKLER ANDHYDRANT TANK
SPRINKLER AND HYDRANTPUMP ROOM
NEW SEPARATEACCESS ROAD TO HVSWITCH STATION AS
PER INTEGRAL ENERGYREQUIREMENTS
RETAINING WALL
FUTURE DETENTIONBASIN
343 Pacific HighwayNorth Sydney NSW 2060T +612 9964 9500F +612 9964 9683ABN 61 007 747 748www.woodhead.com.au
Drawing Number Issue
ScaleDrawing TitleProject Number
Project Description
Drawing Coordinated
Checked
Architects
Client
Landscape Architect
BCA Consultant
Quantity Surveyor
Project Management
Issue Revision Description Date
Key Plan.
NOTESThis drawing is copyright and the property of WOODHEAD and must not be usedwithout written authorisation. Do not scale this drawing. All dimensions are to beverified on site and any discrepancies reported before commencement of any work orshop drawings.
Drawing Director Approval
Engineering
As indicated
M7 BUSINESS HUBCAPICURE DRIVE
EASTERN CREEK, NSW
HC:\Project\HP_DATA\2121-A-MM-LF.rvt17/09/2010 5:11:24 PM
W1002
SITE PLAN - GROUND FLOOR10212102 AR
EC DATA CENTRE
Checker
HP Critical Facilities Services303 Second St. | Suite 500
South Tower San Francisco | CA 94107-6003
TBC
TBC
TBC
PRELIMINARY
AECOMLevel 11, 44 Market Street, Sydney,NSW 2000
SK06 1 : 10001 Proposed Site Plan - Ground Floor
FUTURE SITE AREA SCHEDULE (F.E.C.A.)Number Name Area
2.1 Future Data Centre 11852 m²2.2 Future Diesel Tanks Area 2022 m²3.1 Future Data Centre 6072 m²
19946 m²
SITE AREA SCHEDULE (F.E.C.A.)Number Name Area
1.1 Admin Area 3203 m²1.3 Data Centre Cell 1 & 2 11528 m²1.3 Electrical Switch Station 11239 m²1.4 Gate House 30 m²1.5 HVAC Pump Room 87 m²1.6 Sprinkler Pump Room 84 m²1.7 Diesel Tanks Area 2248 m²
28419 m²
PROPERTY SCHEDULEName Area
HP DATA CENTRE EASTERN CREEK 145119 m²
STAGE 1 SITE COVERAGE IS AT 19.5%
PARKING SCHEDULESIZE
5500 x 260028
STAGE 2 SITE COVERAGE (INCL STAGE 1) IS AT 33.3%
STAGE 1 BUILT AREA =
STAGE 2 BUILT AREA =
SITE AREA SCHEDULE (ROAD STAGE 1)Number Name Area
1.01 Road 2385 m²1.02 Road 14818 m²
17203 m²
A FOR INFORMATION 30/08/2010B FOR INFORMATION 01/09/2010C FOR INFORMATION 02/09/2010D FOR INFORMATION 07/09/2010E FOR INFORMATION 08/09/2010F FOR INFORMATION 10/09/2010G FOR INFORMATION 13/09/2010H EA ISSUE 17/09/2010
Project: “The Residence” College Street, Sydney
Client: Hutchinson Builders
Contract Value: $300,000 Contract Duration: 12 weeks
Project complete on time and within budget
Scope of Work: The SoW required the detailed cleaning of up market residential apartments commanding
magnificent views over Hyde Park and the city of Sydney.
Key Elements: Kitchen and bathroom finishes in particular required a great attention to detail.
Leisure areas including lap pool and spa, sauna, steam room and gymnasium.
Common areas including entry lobbies, lifts and corridors and external paved areas.
Client Testimonial: Redclean did a fantastic job cleaning all elements of the building and their meticulous
attention to detail ensured the building and apartments looked first class at handover. Their
Communication Book process proved invaluable. Andrew Gulliford (Proj Mgr)