past meetings > yonge street subway extension > january 20 ...€¦ · cemetery langstaff go...

28
Yonge subway extension: concept plan and profile F.P.O. 11.2008 GARDEN AVENUE R E D M A P L E R O A D Finch Station existing Cummer/Drewry Station Steeles Station Clark Station Royal Orchard Station Richmond Hill Station Service road right-of-way Thornhill Heritage District Holy Cross Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge UTILITY CORRIDOR C.N.R. BALA SUBDIVISION (RICHMOND HILL LINE) MEADOWVIEW AVENUE L O N G B R I D G E R O A D Langstaff/Longbridge Station 407 Transitway preliminary routes under study Legend Hydro corridor Community connector Existing GO parking Proposed Park & Ride

Upload: others

Post on 01-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Yonge subway extension: concept plan and profile

F.P.O.11.2008

GA

RD

EN A

VEN

UE

RED MAPLE ROAD

FinchStation

existing

Cummer/DrewryStation

SteelesStation

ClarkStation

Royal OrchardStation

Richmond HillStation

Service roadright-of-way

ThornhillHeritage District

Holy CrossCemetery

LangstaffGO station

Viva RHCbus terminal

Pedestrianbridge

UTILITYCORRIDOR

C.N.R. BALA SUBDIVISION

(RICHMOND HILL LINE)

MEA

DO

WV

IEW A

VEN

UE

LON

GBRID

GE RO

AD

Langstaff/LongbridgeStation

407 Transitway preliminaryroutes under study

Legend

Hydro corridor

Community connector

Existing GO parking

Proposed Park & Ride

Page 2: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

The yonge subway extension is part of a GTA-wide transit system

Toronto Transit CityLight Rail Plan

Viva Rapid Transit GO Transit

GO

GOGO

Hig

hw

ay

40

0

Hig

hw

ay

50

Yo

rk D

urh

am

Lin

e

GO

GO

to Mississauga

to PeelRegion

to PearsonAirport

Waterfront West

Transit City

EglintonCrosstown

ScarboroughMalvern

toDurhamRegion

Jan

e

Do

n M

ills

Yo

ng

e

Y O R K

T O R O N T O

UnionStation

407 Transitway

Highway 407

Highway 7Unionville

Station

Yo

ng

e

Steeles WestStation

DownsviewStation

Finch Station

SheppardStation

Don Mills Station

CornellTerminal

Sheppard East Sheppard West

Steeles

Lesl

ie

Hig

hw

ay

40

4

Ke

nn

ed

y

RHCTerminal

ConcordTerminal

MacTierSubdivision

Steeles Etobicoke-Finch West

HavelockSubdivision

toPickeringAirport

Page 3: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

StouffvilleStouffville

GeorgetownGeorgetown

BradfordBradford

BarrieBarrie

Bolton

BloomingtonRoad

Bolton

BloomingtonRoad

Cambridge

Guelph

Kitchener/Waterloo

to Niagara

Ancaster

Waterdown

Bowmanville

Cambridge

Guelph

Kitchener/Waterloo

to Niagara

to Cambridgeto Cambridge

to Guelph/Kitchener-Waterlooto Guelph/Kitchener-Waterloo

Ancaster

Waterdown

Bowmanville

to Peterborough *to Peterborough *

SeatonSeaton

MississaugaCity Centre

VaughanCorporateCentre

DowntownBrampton

EtobicokeCentre

RichmondHill /

LangstaffGateway

Yonge-EglintonCentre

North YorkCentre

ScarboroughCentre

DowntownPickeringMidtown

Oakville

DowntownBurlington

Downtown Hamilton

Toronto Pearson Airport Markham

Centre

DowntownOshawa

DowntownMilton

NewmarketCentre / YorkRegionalHospital

DowntownToronto

MississaugaCity Centre

VaughanCorporateCentre

DowntownBrampton

EtobicokeCentre

RichmondHill /

LangstaffGateway

Yonge-EglintonCentre

North YorkCentre

ScarboroughCentre

DowntownPickeringMidtown

Oakville

DowntownBurlington

Downtown Hamilton

Toronto Pearson Airport Markham

Centre

DowntownOshawa

DowntownMilton

NewmarketCentre / YorkRegionalHospital

DowntownToronto

ScarboroughScarboroughScarboroughScarboroughScarboroughScarboroughScarboroughScarboroughScarboroughScarboroughScarboroughScarboroughScarboroughScarboroughScarboroughScarboroughScarborough

Pearson Pearson Pearson Pearson Pearson Pearson

18

17

19

20

21

1

4

232

2627

28

31

15

29

25

24

8

33

16

32

35

14

361

5

34

7

39

40

41

42

30

3

6

9

13

11

37

12

2210

38

Top 15 PrioritiesWithin the first 15 years of the Regional Transportation Plan’s implementation, the top 15 priorities for early implementation are: Yonge subway extension to Richmond Hill Centre Eglinton rapid transit from Pearson Airport to Scarborough Centre Upgrade/extension of Scarborough rapid transit line Finch/Sheppard rapid transit from Pearson Airport to Scarborough Centre and Meadowvale Express Rail on Lakeshore line from Hamilton to Oshawa Rapid transit in Hamilton from McMaster University to Centennial Parkway Hurontario rapid transit from Port Credit to Brampton 403 Transitway from Mississauga City Centre to Renforth Gateway Rail link between Union Station and Pearson Airport Rapid transit service along Hwy 2 in Durham Improvements/extension of GO Rail service to Bowmanville Early phases of bus rapid transit service on Dundas St in Halton and Peel Viva rapid transit on Hwy 7 and Yonge St through York Region Brampton’s Queen St Acceleride Spadina subway extension to Vaughan Corporate Centre

Yonge subway extension ~ a key priority

The information displayed on this map is conceptual only. It represents projects proposed for full or substantial completion within 25 years of the Regional Transportation Plan's adoption.

Recommended alignments and technologies will be developed during the project-level benefits case analysis that Metrolinx will carry out in partnership with municipalities and transit

agencies, as part of the funding approval process for individual projects.

This map is not to scale, and it does not accurately reflect approved land-use or planning boundaries or actual transportation routes or alignments.

* Subject to the Peterborough Rail Study led by Metrolinx as part of theBuilding Canada Plan agreement

Major Port

Proposed International Airport

International Airport

Highway

Anchor Hub

Urban Growth Centre

Transportation Corridor Under Study

New Highway Corridor

Approved 2006 Settlement Area (Conceptual)

Greenbelt Area

Rapid Transit

Mobility Hubs

Express Rail

SubwayRegional Rail (peak)Regional Rail (full-day, 2-way)

Other Rapid Transit (BRT / LRT / AGT)Possible Regional Rail extensionsbeyond the GTHA

15-Year Plan for Regional Rapid Transit and Highway Improvements

Gateway Hub

Final Art SAS 24in h x 35in w

Metrolinx | the big move

Page 4: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

To develop recommendations for the Yonge subway extension project, we assessed options and obtained public input for:

Alignment

Numbers and locations of stations

How the subway will cross the East Don River

The location of the terminus of the subway at Highway 7, its features and how it works

What we studied

Vaughan Corporate CentreHighway 407

Steeles WestYork University

Finch WestSheppard West

Downsview

EglintonWest

Eglinton

Union

BloorSt. George

Finch

Richmond Hill CentreLangstaff / Longbridge Royal OrchardClarkSteeles

Yonge-University-Spadina Subway

Cummer/Drewry

35” x 24”

Page 5: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Where are we today?

2008 2009

Notice of study commencement

Project approval: In time for consideration

with provincial budget

Toronto report to Commission/Council

Submit project report

Visit vivayork.com for updates

be involved

Public Review

Prepare project report MOE review

Design and Construction

PCC PCC PCC PCC

October November December January February March April

Page 6: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

Complete Functional Design

Provincial Project Approval[6 months duration] October 2008 − April 2009

Project Notice To Proceed/Initial CapitalizationMay 2009

Project Management/Governance/AFPSet-up: 1 year, mid 2010

Property | CEAA [12 months duration ] 2009-2011

Design/Engineering [48 months overall duration]2010-2013 [multiple projects starts and completion]

Construction [66 months overall duration]2012-2016 [multiple projects starts and completion]

Subway System Commissioning [1 year duration] Throughout 2016

In-service2016/2017

2008 2010 2011 2012 2013 2014 2015 2016 20172009

project begins: 2009 design/engineering: 2009 construction: 2012 open: 2016/2017

Key targets

What are the major phases of planning and building a subway?

Page 7: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

What comes with a subway?

pedestrianentrance

busterminal

passengerpick up and

drop off

substation

emergency exitbuilding

parkingfacility

35” x 24”

Page 8: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

new parking spaces on Spadina Subway extension

Final Art SAS 24in h x 35in w

1 2 3 4 5 6 7 7th car added to train

1 2 3 4 5 61 2 3 4 5 6closer spacing

between trains

1 2 3 4 5 61 2 3 4 5 6 fulltrain

*empty train

transfer to Spadina Subway2,300 riders

2,900

1 2 3 4 5 6 new subway cars have increased capacity

% increase

Yonge subway capacity improvements

* Every other train makes a short turn at Finch station in morning peak period.

+4%

n/a

n/a

+10%

+36%

+10%

Page 9: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Final Art SAS 24in h x 35in w

Funding of new signalling system for YUS line

Timeline for yonge subway capacity/ridership milestones

Yonge subway EPR to MOE

Toronto Rocket cars in service (10% increase in Yonge capacity)

ATO complete Eglinton/Union

ATO complete Finch/Union

Don MillsLRT opens

JaneLRT opens

Subway railyard needs study complete

Yonge Bloor station capacity study complete

Sheppard East LRT opens

Etobicoke Finch West LRT opens

Eglinton LRT opens (Stage 1)

Scarborough Malvern LRT opens

Earliest possible opening of Yonge subway extension to Richmond Hill Centre

ATO complete Finch/Downsview (10% increase in Yonge subway speeds/capacity

Spadina subway opens to Vaughan Corporate Centre with ATO (diversion of 4% of peak hour Yonge riders to Spadina)

Downtown relief line (future)

Improved headways to 105 seconds with full ATO in place

Increased GO service levels on Richmond Hill, Stouffville and Barrie GO lines

New signalling for Yonge-University-Spadina line

Transit City initiatives

Yonge subway extension

Toronto-York Spadina subway extensioin

Toronto Rocket cars

Related studies

ATO: Automatic Train Operation

EPR: Environmental Project Report

LRT: Light Rail Transit

MOE: Ministry of Environment

YUS: Yonge University Spadina line

Legend

Page 10: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

AM peak hour/peak direction subway volumes

1985 –2007, with selected modal splits

35,000

30,000

25,000

20,000

15,000

10,000

5,000

1985

Sources: TTC subway count surveys, Cordon Count surveys

1987 1991 20011990 1995 2000 2005 2006

0

54% 51%

Central Business District bound TTC modal split for AM peak period

48% 49% 46%

Yonge line passenger volumessouthbound to Wellesley Station

University-Spadina line passenger volumessouthbound to Museum Station

1996 –2007, projected to 2031

45,000

40,000

35,000

30,000

25,000

20,000

15,000

10,0001996 2001 2006 2011 2016 2021 2026 2031

Yonge line passenger volumessouthbound to Wellesley Station

37,000

42,000

to 2031

Page 11: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

Yonge-Bloor station

Key to improving Yonge Subway capacity Bottleneck to adding more trains, with existing or new signalling system Must cut train ‘dwell’ time in half Add a third platform at Yonge Subway level

- Train doors will open on both sides- Unload to new centre platform- Load from relocated side platform- Unloading/loading at the same time- Will cut theoretical dwell time by 50%

Could also add platforms on BD level

Capacity Study Initiated in January 2009 To be completed by Fall 2009 Confirm previous concepts for expansion Identify other operational strategies to increase capacity $450 million project Currently not funded 4-5 years to design/construct Station will be operational throughout construction

Third platform concept(interim)

Third platform concept(ultimate)

Page 12: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

RIV

ER

OF LIG

HTSR

IVE

R O

F LI

GH

TS

removal of decking/street restoration

RIV

ER

OF LIG

HTSR

IVE

R O

F LI

GH

TS

construction of subway structure

RIV

ER

OF LIG

HTSR

IVE

R O

F LI

GH

TS

installation of decking

StormSewer

SanitarySewer

RIV

ER

OF LIG

HTSR

IVE

R O

F LI

GH

TS

excavation and soil removal

RIV

ER

OF LIG

HTSR

IVE

R O

F LI

GH

TS

utility location and piling

StormSewer

SanitarySewer

Final Art SAS 24in h x 35in w

How is a subway built?

Page 13: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

transit benefitsjust ahead

Construction principles

Our goal is to minimize disruption and inconvenience to the community during subway construction. Every effort will be made to:

Use tunnelling, wherever possible

Ensure the design of subway related structures is sensitive to existing neighbourhoods

Maintain property access at all times

Ensure appropriate number of lanes of traffic are always available in the peak direction

Minimize the size of construction work areas

Contain work areas to maintain community and pedestrian safety

Provide timely construction updates to the community

Complete construction as quickly as possible

Page 14: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

ClarkSteeles Royal Orchard Richmond Hill Centre

Longbridge/Langsatff

Cummer/Drewry

Finch x

x

xv v

v v

v v

1100m900m1000m1200m850m 1900m

13-bay TTC busterminal[existing];

6-bay after subway

extension**

17-bay Regional bus terminal

[existing]; 4-bay after

subwayextension

28-baybus terminal

Approx.2000 to 2500park-n-ride

ProposedFinch West

LRTRichmond Hill

GO Rail

Proposed 407 Transitway

PPUDOPPUDOPPUDOPPUDO

Substation SubstationSubstation

* Some reconstruction of existing tail tracks will be required** 4-bay after Finch LRT is completed† Persons and jobs per hectare Not to scale

Tail track:

Cross track:

80

80 30 4085 110

100 - 130 144 - 266 295 - 550145 - 180280 - 520110 - 120

Substation Substation

3214park-n-ride

(existing)

25-bay underground bus terminal

Existingdensities

Planneddensities†

Transportation connection

Natural environment

Cultural environment

Screening criteria

Cut & CoverCut & CoverCut & CoverCut & CoverCut & CoverExisting* C&C Cut & CoverTunnelTunnelTunnelTunnelTunnel Bridge Cut & Cover

Sur

face

fac

ilit

ies/

conn

ecti

ons

Con

stru

ctio

nm

etho

dS

tati

ons

busturn-around

loop

Yonge subway extension: station planning

Page 15: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

While significant lengths of the subway extension will be tunnelled, the construction of subway stations and special track work structure is done using the cut and cover method.

Preliminary construction methodology

LegendSubway station

Cut and cover

Tunnelling

Bridge construction

Tail tracks

Launch shaft

Exit shaft

Matchline – Section 2 -

Mat

chlin

e –

Sect

ion

1 -

1

2

Finch StationClark StationSteeles StationCummer/Drewry

Station

Royal OrchardStation

Richmond Hill Centre

Service road right of way

Drew

ry Ave.C

umm

er Ave.

Highw

ay 407

Royal O

rchard Boulevard

Steeles Ave.

Clark Ave.

Potential TBMlaunch site

Potential TBMlaunch site

East Don R

iver

500kV transmission line

500kV transmission line230kV transmission line

Langstaff/LongbridgeStation

ES

ES ES

LS

ES

LS LS

LS

N

Page 16: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

Cummer/Drewry station

Subway station

Subway line

Entrance

Limit of surface elements

Underground walkway

Full property acquisition

Partial property acquisition forsurface elements only

Bus loop

Vent structure

Legend

Page 17: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

Steeles station

Page 18: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

1 station overview all levels

2 street level

3 bus platform 1 level below street

4 subway level 2 levels below street

Steeles station | level by level

Future Connections

Subway Platform Level

Vertical Movement

Fare Paid Zone

Street Level

Entrance

Bus Platform Level

Concourse Level

Legend

Page 19: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

Clark station

Subway station

Subway line

Electrical substation

Entrance

Limit of surface elements

Underground walkway

Full property acquisition

Partial property acquisition for surface elements only

Vent structure

Legend

Page 20: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

East Don River crossing

Heritage features will be designed into the bridge in consultation with the community.

RO

YAL

OR

CH

AR

D

CE

NTR

E

LEGENDFuture RoadExisting RoadSubway TunnelRiver Valley

Bridge

Page 21: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

East Don River proposed traffic staging

1 stage 1 temporary lanes to the west

2 stage 2 temporary northbound lanes on partially constructed bridge

3 stage 3 final bridge in service

Careful removal of existing culvert and embankments will minimize local disruption.

Southbound traffic

Northbound traffic

Partially constructed bridge

Bridge in service

Legend

Page 22: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

Crossing the East Don River

1 Restore the valley to its natural state

2 Level Yonge Street to provide continued access to adjacent sites

3 Ensure the bridge design includes heritage features in context with the community

4 Ensure lighting is designed to be sensitive to adjacent uses in the community

5 Provide a safe pedestrian environment to cross between the heritage community north and south of the bridge

6 Meet Ministry of Environment guidelines for attenuating traffic and subway noise

South aerial view from York Condominium 300Artists rendering ~ concept only

1

5

36

4

2

Page 23: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

Royal Orchard station

Subway station

Subway line

Electrical substation

Entrance

Limit of surface elements

Underground walkway

Full property acquisition

Partial property acquisition forsurface elements only

Vent structure

Legend

Page 24: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

Langstaff / Longbridge station

Subway station

Subway line

Electrical substation

Entrance

Limit of surface elements

Underground walkway

Full property acquisition

Partial property acquisition forsurface elements only

Vent structure

Legend

Limit of PPUDO, Park ‘n’ Ride,and associated roads.

Page 25: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Park N Ride

Design features that address community concerns:

Noise buffers

Maintaining a green corridor connection

Bio swales

Sustainable treatments for the parking area

Final Art SAS 24in h x 35in w

Langstaff/Longbridge parking

Langstaff/Longbridge station works in conjunction with Richmond Hill Centre Terminal

N

Conceptual design, to be further developed in consultation with the community.

Legend

High-rise residential

Mid-rise residential

Low-rise residential

Main street retail

Elementary School

Elementary School

Open space woodlot

Green roof

Site boundary

Site boundary

Office

Civic

Image courtesy of Calthorpe

Page 26: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

scale: 1:2000

11.2008

Richmond Hill Centre Terminal works in conjunction with Langstaff/Longbridge station

Richmond Hill Centre alignment

407 Transitway preliminaryroutes under study

Legend

Hydro corridor

Community connector

Existing GO parking

Limits of PPUDO, PNR and associated roads

Bus terminal

407 transitway station

Bus terminal

Image courtesy of Calthorpe

Page 27: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Final Art SAS 24in h x 35in w

Major project costs

major project elements cost M$

stations and area facilities $650

Finch improvements $5

Cummer/Drewry $70

Steeles $195

Clark $70

Royal Orchard $65

Langstaff/Longbridge $85

Richmond Hill Centre $160

tunnels, special structures and operating systems $600

subway trains $240

storage and maintenance facilities for subway trains $110

engineering and other costs $675

property $125

project cost estimate, 2008 dollars $2.4 billion

Page 28: Past Meetings > Yonge Street Subway Extension > January 20 ...€¦ · Cemetery Langstaff GO station Viva RHC bus terminal Pedestrian bridge ... Proposed Park & Ride. The yonge subway

Next steps

January / February 2009 Issue Notice of Completion Submit Environmental Project Report to Ministry of the Environment for 30-day public review Ministry of the Environment review period [up to 35 days]

March / April 2009 Issue Statement of Completion

Spring 2009 Project ready to proceed