Engineering Design Sync R&D, with its partners, is imminently qualified to work with various industries. Our staff has many years of experience designing electro-mechanical systems of all types and sizes. Where specific technical knowledge is not already in-house, we have identified partners who have demonstrated history of high quality, high performance solutions to guarantee that our proposed system is the best possible system for its money on the planet. Our customers and industries vary widely, but the skills that each employee brings from their diverse backgrounds have enabled Sync R&D to successfully deliver profitable solutions. Following are several examples of projects in which Sync R&D and its partners have participated. www.sync - rnd.com PASTS EXPERIENCES PAST EXPERIENCES sync r&d engineering solution provider

Upload: aidimac

Post on 20-Jul-2016

15 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: Past Experience Final

Engineering Design

Sync R&D, with its partners, is imminently qualified to work with

various industries. Our staff has many years of experience designing

electro-mechanical systems of all types and sizes. Where specific

technical knowledge is not already in-house, we have identified

partners who have demonstrated history of high quality, high

performance solutions to guarantee that our proposed system is

the best possible system for its money on the planet. Our customers

and industries vary widely, but the skills that each employee brings

from their diverse backgrounds have enabled Sync R&D to

successfully deliver profitable solutions. Following are several

examples of projects in which Sync R&D and its partners have

participated.

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider

Page 2: Past Experience Final

Engineering Design

SCOMI Rail Berhad.

Description : Gen2 Monorail Prototype

Contracting Activity : SCOMI Rail Berhad, Malaysia

Contract # : MTrans# LOA01 – 20 Oct 2006.

Contract Type : Fixed Cost

Total Contract Value : RM2,000,000+ (~USD580,000+)

Contracting Officer : Johnny Boulianne

+60 (017) 880-0896

[email protected]

Summary of Work:

Sync R&D and its partners, MRDC and San Diego Composites

(SDC) designed, analyzed, and observed fabrication and testing of

the first Gen2 prototype of the world’s first structural composite

body monorail.

SDC designed and analyzed the composite body while Sync R&D

and MRDC designed the welded, stainless steel chassis and

composite interior structures using SolidWorks and Nastran.

The load cases for the vehicle included normal quasi-steady state

loads as well as fatigue assessments per BS7608

(similar to AWS D1.1) and dynamic loads for shock and vibration

situations.

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider

Page 3: Past Experience Final

Engineering Design

Standards to comply with:

There were also several standards that we have to comply with during

the design of the monorail train which include:

ASCE 21-98 (Part II)

Covers load cases for various chassis, exterior and interior parts.

Examples for interior parts are stanchions loads, wheel-chair space

and load requirements, ergonomic of passengers (size of seat,

standing area, etc), electrical safety, lighting requirement and flooring.

NFPA 130 –

Standard for Fixed Guideway Transit and Passenger Rail Systems

Fire rating for trains

Covers minimum requirement for fire worthiness of interior

components, and methods and best practices to ensure fire worthiness.

BS7608 –

Code of Practice for Fatigue Design and Assessment of Steel Structures

Weld classifications of steel

Fatigue criteria of welded steel sections

Vandal proof material needs to be used to avoid too frequent

refurbishment of the interior. Typically, interior of trains needs to be

refurbished a least every 7.5 years.

Solicitation Relevance:

The work performed for Scomi is relevant because it required a

comprehensive analysis of a very large structure comprised of composite,

steel, aluminum and various other materials represented as 1D, 2D and

3D elements.

Problems & Corrections:

No known problems with this effort.

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider

Page 4: Past Experience Final

Engineering Design

SCOMI Rail Berhad.

3P Prototype Switch

Description : 3-point prototype switch for full passenger

loading (AW3) train.

Contracting activity : Scomi Rail Berhad

Contract # : 3PS00002

Contract type : Fixed cost

Total Contract Value : RM250,000

Contract Officer : Khutubu R. Arrifin

+6019 316 0171

[email protected]

Summary of work:

Sync R&D design, integrate and observed fabrication and

installation of the hydraulic actuator and electrical control systems

of the 3-point prototype monorail switch. The engineering

drawing package is also managed and updated to ensure latest in

formation is available among the team members. As-built drawing

package is delivered at the end of the project to reflect all changes

and modifications made to the final design during fabrication phase.

Apart from design, Sync R&D also develops installation document,

inspection and testing plan, operation and maintenance manual and

training document. During inspection and testing phase, engineers

from Sync R&D are placed on-site to observed and provide

support for the tasks.

Solicitation Relevance:

The work performed for Scomi Rail Berhad is relevant because

the hydraulic actuator and electrical control system were designed, fabricated and installed on a tight budget and time

constraints. The systems fully comply with the performance

specification and other requirements set by the customer.

Problems and Corrections:

There were no known problems with this effort.

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider

Page 5: Past Experience Final

Engineering Design

SCOMI Rail Berhad.

2, 2Y, 3, 4, 5 and crossover switches

Description, contracting activity, contract number, etc as per

comments in original doc.

Contract # 3 PS 00002

Contract Type : Fixed Cost

Total Contract Value : RM800,000

Contract Officer : Khutubu bin Arifffin

Summary of work:

Sync R&D designed and participated in initial fabrication planning for

the 2-point, 2-point Y, 3-point, 4-point, 5-point and crossover depot

switches. Designs of these switches were based on the 3-point prototype

(AW3-loaded switch) switch developed by Scomi Rail Berhad. The

switches were optimized to carry trains within the depot area

(AW0 load). Changes include modifications of the beams, link beams and

trucks. New hydraulic actuator and electrical control systems are also

developed for the longer stroke 4-point and 5-point switches.

The whole information package including engineering drawings, bill of

material, installation document, testing & inspection plan, operation &

maintenance manual and training instructions are developed and delivered

by Sync R&D. These steel switches are part equipment supplied to the

Mumbai Monorail Project by Scomi Rail Berhad.

Solicitation Relevance:

This project is relevant because it demonstrate Sync R&D’s capabilities to

evolve an existing design to meet new criteria and requirements.

Modification, optimization and good problem-solving skills are applied to

ensure fully operational end product that meets the customer’s

specifications.

Problems and corrections:

There were no known problem with this effort.

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider

Page 6: Past Experience Final

Engineering Design

CMI, Inc.

Description : Concrete Paving Kit

Contracting Activity : CMI, Inc., OK

Contract # : N/A

Contract Type : Time & Materials

Total Contract Value : USD500,000+

Contracting Officer : Chapin Sipherd

(405) 787-6020

[email protected]

Summary of Work:

SRD and its partner led an engineering team that designed an updated

version of the Series I paving kit and some components of the tractor

leg structure to improve surface smoothness, integrate new actuation

methods to enhance performance range, incorporate features to

simplify machine maintenance and repair, identify cost reductions in

hydraulic and purchased parts components, and incorporate design

For manufacturability and assembly concepts to reduce manufacturing

cost.

Solicitation Relevance:

The work performed for CMI is relevant to this project because this

project required engineering design, analysis, and documentation

support for the fabrication of a welded steel structure using American

Welding Society (AWS) D1.1 standards which are similar in scope and

application to BS7608. The framework was made from stock structural

steel shapes, included many welded and fastened assemblies while also

requiring a fairly high degree of manufacturing accuracy.

Problems & Corrections:

There were no known problems with this effort.

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider

Page 7: Past Experience Final

Engineering Design

Motive Power Industries

Description : Passenger Locomotive Fuel Tank

Design & Analysis

Contracting Activity : MotivePower, ID

Contract # : N/A

Contract Type : Firm Fixed Price

Total Contract Value : USD380,000+

Contracting Officer : Norman Anderson

(208) 947-4882

Summary of Work:

SRD and its partner designed and analyzed a passenger

locomotive fuel tank to meet USA Code of Federal Regulations

regarding operational and crash safety.

Solicitation Relevance:

The work performed for MotivePower is relevant because the

structure is a welded tank which had to meet Federal Railroad

Administration regulations defining the design and analysis

procedures and evaluation criteria similar to those anticipated

for the off-shore oil platform. The fuel tank was designed in

Pro/E and analyzed in I-deas and NASTRAN.

Problems & Corrections:

There were no known problems with this effort.

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider

Page 8: Past Experience Final

Engineering Design

SCP Global Technologies

Description : Wafer Drying Process

Summary:

Wafers not evenly drying

Needed low cost solution to improve wafer drying time & uniformity

Used design of experiments & CFD to optimize design

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider

Page 9: Past Experience Final

Engineering Design

Coherent Technology’s

Description : Airborne Laser Scanning System

Contract Type : Time and Materials

Total Contract Value : USD500,000

Summary of Work:

Sync R&D and its partner designed, analyzed, and coordinated

fabrication of components for an airborne laser scanning system.

The scope of work included designing the laser optical benches,

designing and analyzing the thermal management system, designing

and analyzing the vibration isolation system, and designing and

analyzing the aircraft mounting system.

Solicitation Relevance:

The work performed for Coherent Technologies is relevant

because the entire structure had to be designed an analyzed to

comply with USA Federal Aviation Administration regulations

regarding airworthiness and crashworthiness. The system was

designed in Pro/E and structurally analyzed in I-deas and

NASTRAN. Fluid flow and thermal management was analyzed

using CFDesign. The structure was comprise of steel and

aluminum components; some of which were welded items.

Problems & Corrections:

There were no known problems with this effort.

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider

Page 10: Past Experience Final

Engineering Design

Various other analysis projects with Sync R&D

technical partner:

Value Plastics; Contract 4988-1

Value: USD5k; Aug – Nov 2006

Study, model & propose methods to eliminate failures in plastic

medical devices.

USAF 846TS/46TG; Contract: FA9200-04-C-0319;

Value: USD850k; Aug 04 – Aug 07; Phase I & II SBIRs to design, fabricate

& test a 60’ long, high altitude simulation chamber for use with rocket sleds.

USAF 846TS/46TG; Contract: FA9200-06-C-0321

Value: USD850k; Apr 06 – Jan 09; Phase I & II SBIRs to design, analyze,

fabricate & demonstrate a machine to measure metal on metal sliding wear

including all ancillary lifting & motion generating equipment.

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider

Page 11: Past Experience Final

Engineering Design

Aker Solutions

Sdn. Bhd.

Description : Heat Transfer Thermal Profiling

Analysis on Subsea Well Equipment

Contracting Activity : Aker Solutions Sdn. Bhd.

Contract # : N/A

Contract Type : Firm Fixed Price

Total Contract Value : RM 63,000+

Contracting Officer : Mr. Frazer Crombie

Summary of Work:

SRD and its partner analyzed the thermal profile of the well equip-

ment components on those areas of the structure that exceed

121°C with particular concern on the seal area.

Solicitation Relevance:

The work performed involved design and analysis procedures and

evaluation criteria for off-shore oil platform.

The analysis was done using Nei Nastran as the solver and Femap

as the pre and post processor.

Problems & Corrections:

There were no known problems with this effort.

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider

Page 12: Past Experience Final

Engineering Design

Aker Solutions

Sdn. Bhd.

Description : Structural Analysis of Production and

Pigging Flowloop

Contracting Activity : Aker Solutions Sdn. Bhd.

Contract # : N/A

Contract Type : Firm Fixed Price

Total Contract Value : RM 9,000+

Contracting Officer : Mr. Chan Yok Tien

Summary of Work:

SRD and its partner did a linear static analysis on both the

Production and Pigging flowloops to determine the stresses and

safety factor on both of the flowloops.

Solicitation Relevance:

The work performed involved design and analysis procedures and

evaluation criteria for off-shore oil platform.

The analysis was done using Nei Nastran as the solver and Femap

as the pre and post processor.

Problems & Corrections:

There were no known problems with this effort.

www.sync

-rnd.com

PASTS EXPERIENCES

PA

ST E

XPER

IEN

CES

sync r&d engineering solution provider