Passive House Object Documentation © TE Studio, Ltd. 2017 1 MinnePHit Passive House Retrofit, Brazelton Residence – Minneapolis, MN (USA) (Passive House project database ID 2069) http://www.passivhausprojekte.de/#d_2069 Technical drawings in this document are not drawn to scale. 1 ABSTRACT

Upload: others

Post on 22-Apr-2020

22 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 1

MinnePHit Passive House Retrofit, Brazelton Residence – Minneapolis, MN (USA) (Passive House project database ID 2069) http://www.passivhausprojekte.de/#d_2069 Technical drawings in this document are not drawn to scale. 1 ABSTRACT

Page 2: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 2

1.1 Data of Building The MinnePHit Passive House Retrofit is a single-family home located in Minneapolis, Minnesota (USA) that was gut & retrofit to the (at the time) new EnerPHit standard. Based on the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design included demolition and reconstruction of a small part of the footprint, a small addition, many different wall sections, a fully updated and upgraded building envelope, and new interior finishes throughout. Construction was completed in 2011-2012. The project is North America’s first certified EnerPHit project & the first certified Passive House Retrofit in a very cold climate in the world. Special features Working with the structure of the existing house Fully updated home fits within historic neighborhood fabric Earth-friendly interior and exterior finishes throughout Automated continuous ventilation system with over 90% efficiency Successfully fit complex client program into small amount of space Year of construction 2011-2012 U-value exterior wall (avg.) 0,11 W/(m²K) U-value basement slab 0,17 W/(m²K) U-value roof 0,073 W/(m²K) U-value window 0,77 W/(m²K) Effective heat recovery 89%

PHPP annual heating demand 27 kWh/(m²a)

PHPP primary energy demand 120 kWh/(m²a)* Pressure test n50 0.65 h-1

Page 3: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 3

1.2 Brief Description The MinnePHit House is a 5-bedroom, 3-bath, 185m2 home that began as a 3-bedroom, 2-bath, 128m2 home in Minneapolis MN. Commissioned by a private client, this home is the first certified Passive House EnerPHit in a very cold climate on the planet. It sits on an urban lot in an established neighborhood, near parks and trails and the historic Minnehaha Falls. With solid structural underpinnings but significant performance and size challenges for a family of five and two large dogs, the existing home was a prime candidate for a Passive House EnerPHit pilot. It demonstrates the amazing potential of high-efficiency retrofit design for existing homes in a cold climate. Find more about this project at http://testudio.com/projects/minnephit-house/.

Page 4: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 4

1.3 Responsible Project Participants Project Designer, Implementation Planning, Building Systems, Building Physics, Passive House Project Planning, Construction Management

Dipl.-Ing. Tim Delhey Eian - TE Studio, Ltd. (http://testudio.com)

Structural Engineering Certifying Body Certification ID

Erik Bunkers, Mattson Macdonald Young (http://www.mattsonmacdonald.com) Passivhaus Institut Darmstadt 2069

Author of Project Documentation Date, Signature

Janneke Schaap, Intern Architect – TE Studio, Ltd. (http://testudio.com) 25 May 2017

Page 5: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 5

2 PROJECT ELEVATIONS AND PHOTOS 2.0 Existing Conditions

West elevation, before

Southwest perspective, before

Page 6: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 6

2.1 Exterior

West elevation (covered entry and street facade)

5

6

33 3 9

2

4

1 1

1

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

26'-2

"

DECORATIVE CHIMNEY

RIDGEVENT

W2.3 W2.2 W2.1

W1.2 W1.1

RETROFITRECONSTRUCTION

7

1. Sidewall flashing 2. Standing seam metal roofing 3. Cement board lap siding 4. Stone veneer 5. Sheetmetal cap 6. Timberframe entry canopy 7. Pier footing 8. Egress well 9. Functional shutters

Page 7: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 7

East elevation (rear patio entrance)

2

3 3

2

5

1

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

E1.3

E1.2

E2.3 E2.2 E2.1

E1.1

RECONSTRUCTIONRETROFIT

1. Sidewall flashing 2. Standing seam metal roofing 3. Cement board lap siding 4. Stone veneer 5. Sheetmetal cap 6. Timberframe entry canopy 7. Pier footing 8. Egress well 9. Functional shutters

Page 8: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 8

North elevation

South elevation

A

1

1

4

4

2

2

2

33

5

6

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

RIDGEVENT

N1.3

N2.2 N2.1

N1.1 N1.2

RETROFIT ADDITION

7

1. Sidewall flashing 2. Standing seam metal roofing 3. Cement board lap siding 4. Stone veneer 5. Sheetmetal cap 6. Timberframe entry canopy 7. Pier footing 8. Egress well 9. Functional shutters

A

3

5

2

8 8

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

1'-0

"

5'

RIDGEVENT

CRICKET

S1.1 S1.2 S1.3

S1.4 S1.5

S2.1 S2.2 S2.3

S0.1 S0.2

ADDITIONRETROFIT

1. Sidewall flashing 2. Standing seam metal roofing 3. Cement board lap siding 4. Stone veneer 5. Sheetmetal cap 6. Timberframe entry canopy 7. Pier footing 8. Egress well 9. Functional shutters

Page 9: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 9

Southwest perspective Northeast

Page 10: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 10

2.2 Interiors Living room Kitchen

Page 11: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 11

3 BUILDING SECTIONS

S-N Building Section @ Retrofit S-N Section @ Addition N-S Section @ Entry

E-W Building Section @ Stair The building envelope of the MinnePHit house is more diverse than most in effort to work seamlessly between new and existing assemblies. The basement slab was removed to insulate underneath a new concrete slab with rigid EPS foam. South and West below-grade exterior walls were excavated and insulated with rigid EPS applied to the exterior and closed cell spray foam from the interior for air barrier, while North and East below-grade walls received closed cell spray foam from the interior only for both insulation and air barrier, as excavation at these walls was not feasible. All new and existing above-grade exterior walls received new sheathing and i-joist framing added to the outside with dense-packed cellulose insulation, and the home has a completely new roof truss package that was meticulously air-sealed and insulated with loose-fill cellulose. New durable fiber-cement siding and Passive House windows complete the exterior package, and the result is a continuously air-sealed and insulated envelope that provides an efficient and comfortable interior in a cold climate year-round.

SHEET TITLE

DESCRIPTION

PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT

EPH-01 Brazelton for Presentation.pln

MARK DATE

A-3.1

TE Studio, Ltd.

5/9/17 Date printed

A-201101

BID SET6/13/116/29/11 PERMIT SET

/Use

rs/te

stud

io/D

ropb

ox/T

E St

udio

Tea

m F

olde

r/Pro

ject

s/ 0

- Pr

ojec

t Arc

hive

/A-2

0101

201

Braz

elto

n/5

- Bra

zelto

n Do

cum

enta

tion

(DO

CU)/B

raze

lton

PHI S

ubm

ittal

/EPH

-01

Braz

elto

n fo

r Pre

sent

atio

n.pl

n

CLIENTSDesiree and Paul Brazelton612-208-8197

BUILDING SECTIONS

BRAZELTONRESIDENCE

TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418

612-246-4670 office612-605-3200 fax

testudio.com

Holistic design for sustainable homes.

PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418

CONSULTANTS

TE S

tudi

o pr

ints

on

recy

cled

post

-con

sum

er p

aper

. Ple

ase

recy

cle.

TDE, JCCTDE, JCC

1

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

1

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

1

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

TRUSSED HIP ROOF

TRUSSED ROOF

A

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

3'-1

3/4

"

RAILING

WALL AT STAIR

ADDITION RETROFIT

BASEMENT STAIR(11) 10" TREADS/ (12) 7-3/4" RISERS

MAIN STAIR(13) 10" TREADS/ (14) 7-3/4" RISERS

SCALE: 1/8" = 1'-0"1 S-N SECTION @ RETROFITSCALE: 1/8" = 1'-0"2 S-N SECTION @ ADDITION

SCALE: 1/8" = 1'-0"3 N-S SECTION @ ENTRY

SCALE: 1/4" = 1'-0"4 E-W SECTION @ STAIR

SHEET TITLE

DESCRIPTION

PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT

EPH-01 Brazelton for Presentation.pln

MARK DATE

A-3.1

TE Studio, Ltd.

5/9/17 Date printed

A-201101

BID SET6/13/116/29/11 PERMIT SET

/Use

rs/te

stud

io/D

ropb

ox/T

E St

udio

Tea

m F

olde

r/Pro

ject

s/ 0

- Pr

ojec

t Arc

hive

/A-2

0101

201

Braz

elto

n/5

- Bra

zelto

n Do

cum

enta

tion

(DO

CU)/B

raze

lton

PHI S

ubm

ittal

/EPH

-01

Braz

elto

n fo

r Pre

sent

atio

n.pl

n

CLIENTSDesiree and Paul Brazelton612-208-8197

BUILDING SECTIONS

BRAZELTONRESIDENCE

TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418

612-246-4670 office612-605-3200 fax

testudio.com

Holistic design for sustainable homes.

PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418

CONSULTANTS

TE S

tudi

o pr

ints

on

recy

cled

post

-con

sum

er p

aper

. Ple

ase

recy

cle.

TDE, JCCTDE, JCC

1

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

1

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

1

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

TRUSSED HIP ROOF

TRUSSED ROOF

A

-7'-10"BSMNT PLAN

±0"1 FLOOR PLAN

+8'-11"2 FLOOR PLAN

+17'-6 1/2"ROOF PLAN

3'-1

3/4

"

RAILING

WALL AT STAIR

ADDITION RETROFIT

BASEMENT STAIR(11) 10" TREADS/ (12) 7-3/4" RISERS

MAIN STAIR(13) 10" TREADS/ (14) 7-3/4" RISERS

SCALE: 1/8" = 1'-0"1 S-N SECTION @ RETROFITSCALE: 1/8" = 1'-0"2 S-N SECTION @ ADDITION

SCALE: 1/8" = 1'-0"3 N-S SECTION @ ENTRY

SCALE: 1/4" = 1'-0"4 E-W SECTION @ STAIR

Page 12: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 12

4 FLOOR PLANS

Basement floor plan – before Basement floor plan - after The basement level houses the kids’ play room, which may double as a guest room with egress to the South when needed. A combination workout – mechanical room is used for exercise, equipment and storage. All below grade spaces are accessed from the North via a reconstructed stairway traveling through all levels. Two unexcavated areas flank the usable space – one existing to the North, one new under the addition to the East.

Main level floor plan – before Main level floor plan - before The main level holds the existing living area, as well as the expanded kitchen dining area, new mudroom and front entry with a walk-through powder room between.

SHEET TITLE

DESCRIPTION

PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT

EPH-01 Brazelton for Presentation.pln

MARK DATE

A-7.2

TE Studio, Ltd.

5/9/17 Date printed

A-201101

BID SET6/13/116/29/11 PERMIT SET

/Use

rs/te

stud

io/D

ropb

ox/T

E St

udio

Tea

m F

olde

r/Pro

ject

s/ 0

- Pr

ojec

t Arc

hive

/A-2

0101

201

Braz

elto

n/5

- Bra

zelto

n Do

cum

enta

tion

(DO

CU)/B

raze

lton

PHI S

ubm

ittal

/EPH

-01

Braz

elto

n fo

r Pre

sent

atio

n.pl

n

CLIENTSDesiree and Paul Brazelton612-208-8197

DESIGN PLANS

BRAZELTONRESIDENCE

TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418

612-246-4670 office612-605-3200 fax

testudio.com

Holistic design for sustainable homes.

PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418

CONSULTANTS

TE S

tudi

o pr

ints

on

recy

cled

post

-con

sum

er p

aper

. Ple

ase

recy

cle.

UP

WORKOUT/ ME RMA: 181.55 sq ft

H: 7'

KID'S ROOMA: 210.39 sq ft

H: 7'

BSMT STRA: 22.90 sq ft

UNEXCAVATED

EXISTING UNEXCAVATED

RE

F

D W

LIVING ROOMA: 240.43 sq ft

H: 8'

ENTRY VESTA: 52.06 sq ft

H: 8'

KITCHENA: 199.00 sq ft

H: 8'

FAM/DIN ROOMA: 315.70 sq ft

H: 8'

MUD ROOMA: 106.87 sq ft

H: 8'

PWDRA: 28.65 sq ft

H: 8'

LDGA: 13.75 sq ft

STRA: 37.24 sq ft

H: 7'-9"

BEDROOM 1A: 145.84 sq ft

H: 8'

BEDROOM 2A: 150.99 sq ft

H: 8'

MASTER BRA: 145.17 sq ft

H: 8'

M HALLA: 82.49 sq ft

H: 8'

M BATHA: 53.07 sq ft

H: 8'

WCA: 22.46 sq ft

H: 8'

FULL BATHA: 69.02 sq ft

H: 8'

BEDROOM 3A: 150.25 sq ft

H: 8'

UP STRA: 36.77 sq ft

UPSTAIRS HALLA: 63.51 sq ft

H: 8'

SOFFIT

BRICK CHIMNEY,SEAL AIRTIGHT

DEMO EXIST. SOFFIT

REMOVE AND SALVAGEWNDWS, TYP.

REMOVE AND SALVAGEDOORS AS INDICATED

DEMO LANDING

DEMO STAIRS,UP AND DOWN

UPDN

DN

DN

DN

2x10sV.I.F.

2x10sV.I.F.

2x V.I.F

.

LIVING ROOM

KITCHEN- DEMO ALL BUILT-INS- DEMO & SALVAGE EQUIPMENT

DINING ROOM

KID'S ROOM

ENTRY VEST.

DEMO FLOOR SYSTEMABOVE SLAB

DEMO FLOOR SYSTEMABOVE SLAB

First Floor Plan

SHEET TITLE

DESCRIPTION

PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT

EPH-01 Brazelton for Presentation.pln

MARK DATE

A-7.2

TE Studio, Ltd.

5/9/17 Date printed

A-201101

BID SET6/13/116/29/11 PERMIT SET

/Use

rs/te

stud

io/D

ropb

ox/T

E St

udio

Tea

m F

olde

r/Pro

ject

s/ 0

- Pr

ojec

t Arc

hive

/A-2

0101

201

Braz

elto

n/5

- Bra

zelto

n Do

cum

enta

tion

(DO

CU)/B

raze

lton

PHI S

ubm

ittal

/EPH

-01

Braz

elto

n fo

r Pre

sent

atio

n.pl

n

CLIENTSDesiree and Paul Brazelton612-208-8197

DESIGN PLANS

BRAZELTONRESIDENCE

TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418

612-246-4670 office612-605-3200 fax

testudio.com

Holistic design for sustainable homes.

PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418

CONSULTANTS

TE S

tudi

o pr

ints

on

recy

cled

post

-con

sum

er p

aper

. Ple

ase

recy

cle.

UP

WORKOUT/ ME RMA: 181.55 sq ft

H: 7'

KID'S ROOMA: 210.39 sq ft

H: 7'

BSMT STRA: 22.90 sq ft

UNEXCAVATED

EXISTING UNEXCAVATED

RE

F

D W

LIVING ROOMA: 240.43 sq ft

H: 8'

ENTRY VESTA: 52.06 sq ft

H: 8'

KITCHENA: 199.00 sq ft

H: 8'

FAM/DIN ROOMA: 315.70 sq ft

H: 8'

MUD ROOMA: 106.87 sq ft

H: 8'

PWDRA: 28.65 sq ft

H: 8'

LDGA: 13.75 sq ft

STRA: 37.24 sq ft

H: 7'-9"

BEDROOM 1A: 145.84 sq ft

H: 8'

BEDROOM 2A: 150.99 sq ft

H: 8'

MASTER BRA: 145.17 sq ft

H: 8'

M HALLA: 82.49 sq ft

H: 8'

M BATHA: 53.07 sq ft

H: 8'

WCA: 22.46 sq ft

H: 8'

FULL BATHA: 69.02 sq ft

H: 8'

BEDROOM 3A: 150.25 sq ft

H: 8'

UP STRA: 36.77 sq ft

UPSTAIRS HALLA: 63.51 sq ft

H: 8'

REPLACE GLASS BLOCKW/ EGRESS WNDWS

DEMO GLASS BLOCK& FILL TO MATCH

FND. WALL

PERIMETER OF STRUCTURE ABOVE

CHIMNEY ABOVE

DEMO STAIR

DEMO AND REPLACELOAD BEARING WALL

& FOUNDATIONTEMP. BRACE FLOOR

UP

2x10s@ 16" O.C.

2x10s@ 16" O.C.

UNEXCAVATED

DEMO FLOOR SLAB& EXCAVATE FOR NEWASSEMBLY

LAUNDRY ROOM WORKOUT ROOM

BATH- DEMO & SALVAGE FIXTURES

Basement Floor Plan

Page 13: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 13

`

Upper level floor plan – after Upper level floor plan - before The upper floor contains the more private bedrooms and bathrooms. Space for two bedrooms was gained over the dining room addition below at the East, including that for a true master suite with walk-through closet and en-suite bathroom with shower. The existing bath was remodeled and is primarily used as a dedicated kid’s bath, with a separate water closet moved to the hallway to accommodate multiple users at once.

SHEET TITLE

DESCRIPTION

PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT

EPH-01 Brazelton for Presentation.pln

MARK DATE

A-7.2

TE Studio, Ltd.

5/9/17 Date printed

A-201101

BID SET6/13/116/29/11 PERMIT SET

/Use

rs/te

stud

io/D

ropb

ox/T

E St

udio

Tea

m F

olde

r/Pro

ject

s/ 0

- Pr

ojec

t Arc

hive

/A-2

0101

201

Braz

elto

n/5

- Bra

zelto

n Do

cum

enta

tion

(DO

CU)/B

raze

lton

PHI S

ubm

ittal

/EPH

-01

Braz

elto

n fo

r Pre

sent

atio

n.pl

n

CLIENTSDesiree and Paul Brazelton612-208-8197

DESIGN PLANS

BRAZELTONRESIDENCE

TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418

612-246-4670 office612-605-3200 fax

testudio.com

Holistic design for sustainable homes.

PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418

CONSULTANTS

TE S

tudi

o pr

ints

on

recy

cled

post

-con

sum

er p

aper

. Ple

ase

recy

cle.

UP

WORKOUT/ ME RMA: 181.55 sq ft

H: 7'

KID'S ROOMA: 210.39 sq ft

H: 7'

BSMT STRA: 22.90 sq ft

UNEXCAVATED

EXISTING UNEXCAVATED

RE

F

D W

LIVING ROOMA: 240.43 sq ft

H: 8'

ENTRY VESTA: 52.06 sq ft

H: 8'

KITCHENA: 199.00 sq ft

H: 8'

FAM/DIN ROOMA: 315.70 sq ft

H: 8'

MUD ROOMA: 106.87 sq ft

H: 8'

PWDRA: 28.65 sq ft

H: 8'

LDGA: 13.75 sq ft

STRA: 37.24 sq ft

H: 7'-9"

BEDROOM 1A: 145.84 sq ft

H: 8'

BEDROOM 2A: 150.99 sq ft

H: 8'

MASTER BRA: 145.17 sq ft

H: 8'

M HALLA: 82.49 sq ft

H: 8'

M BATHA: 53.07 sq ft

H: 8'

WCA: 22.46 sq ft

H: 8'

FULL BATHA: 69.02 sq ft

H: 8'

BEDROOM 3A: 150.25 sq ft

H: 8'

UP STRA: 36.77 sq ft

UPSTAIRS HALLA: 63.51 sq ft

H: 8'

BRICK CHIMNEY

DEMO STAIR &LANDINGS

DEMOBALCONY

REMOVE AND SALVAGEWNDWS, TYP.

REMOVE AND SALVAGEDOORS AS INDICATED

DN

DN

DN

DN

MASTER BEDROOM BEDROOM

BATH- DEMO & SALVAGE FIXTURES

OFFICEDEMO ROOF SYSTEMABOVE ENTRY

Second Floor Plan

Page 14: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 14

5 CONSTRUCTION DETAILS

5.1 Typical retrofit assemblies section

EX

IST.

WA

LL

RE

TRO

FIT

WA

LL

20"

10 3/4"

5 1/

2"

± 9

1/4"

1 1/

2"

9 1/

4"7"

24"

+1'-8"

0'-0"

-0'-3"

+0'-0 1/2"

EXIST. ROOF FRAMINGTO BE DEMO'D

INSECT SCREEN

VENT CHUTES

GUTTER

MAINTAIN CONT. AIR BARRIER W/ SIGABRAND TAPE AT SHEATHING TO TOP PLATE

MAINTAIN CONT. AIR BARRIER W/ SIGABRAND TAPE AT SHEATHING TO TOP PLATE

CONT. VENTING

BACKFILL

RETROFIT ABOVE-GRADE WALL, TYPE 1

INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING, EXISTING DENSE-PACK WITH CELLULOSE (3.5 LBS/ CU FT), OR FIBERGLASS BATT INSULATION• 3/4" T&G EXTERIOR SHEATHING, EXISTING• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ EXIST. STUDS WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR

RETROFIT BELOW-GRADE WALL, TYPE 4

INTERIOR• 5/8" WALL BOARD• 3-1/2" STEEL FRAMING @ 24" O.C. WITH MIN. 2-1/2" CLOSED-CELL SPRAYFOAM INSULATION VAPOR BARRIER & AIRTIGHTNESS LAYER• 11-5/8" CMU WALL, EXISTING• (2) 3" EXTERIOR GRADE EPS INSULATION (EIFS)• STO FLEXYL (EIFS) WEATHER RESISTANT BARRIER & FINISH (TIE TO FACE OF FOOTING)EXTERIOR

FLOOR SLAB RETROFIT, TYPE FS1

NOTE: REMOVE EXISTING SLAB & EXCAVATE TOACCOMODATE RETROFIT ASSEMBLY

INTERIOR• 4" CONCRETE SLAB WITH RADIANT IN-FLOOR HEATING SYSTEM• 6-MIL POLY VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT ALL JOINTS AND PROTRUSIONS• 6" BELOW GRADE EPS INSULATION BOARD, COMPRESSIVE STRENGTH PER SE• MIN. 2" GRAVELEXTERIOR

MAIN VENTED COLD ROOF

NOTE: REMOVE EXISTING ROOF STRUCTURE,BUILD PERIMETER KNEE WALL AND SET NEWTRUSSED HIP ROOF PER STRUCTURAL DRAWINGS

EXTERIOR• STANDING SEAM METAL ROOFING @ 16" O.C.• GRACE ICE & WATER SHIELD HT ROOFING UNDERLAYMENT, WEATHER RESISTANT BARRIER• 3/4" STRUCTURAL PLYWOOD SHEATHING• ATTIC AIRSPACE, OR VENT CHUTES• STRUC. TRUSSES @ 24" O.C. WITH MIN. 22" CELLULOSE INSULATION• 5/8" OSB SHEATHING, SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 5-1/2" INSTALLATION CAVITY, 2X6 FURR-FRAMING OR SUSPENSION SYSTEM• 5/8" WALLBOARD CEILINGINTERIOR

WEATHER RESISTANT BARRIER (WRB)

AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR)

RETROFIT FRAMING

EXIST. WALL

TRU

SS

BE

AR

ING

210

T.O. KNEEWALL

T.O. EXISTING WALL

T.O. EXISTING R.O.

T.O. ADDITION R.O.s

CLE

AR

@ O

UTS

IDE

OF

STU

DW

ALL

SNOW GUARDS PER MANUF.

Page 15: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 15

The building envelope of the MinnePHit house comprises a combination of existing and new assemblies. Connection details at interior walls and floors do not present a protrusion of the airtightness or insulation layers. Above grade walls, typical All existing 2x4 walls are insulated with batt insulation. OSB sheathing is added to the existing sheathing, which is taped at seams and transition details to provide the air barrier. 9 ¼” [235mm] I-Joists are fastened to the existing studs. The newly created cavities are dense packed with cellulose providing an overall R-Value of 44 [Usi =0.128 W/(m2K)]. Permeable fiberboard sheathing allows for drying potential to the outside. The new fiber cement board siding is mounted to furring strips (ventilated rainscreen) and gives the house a durable new façade that fits well with the historic original house and surrounding neighborhood. Below grade walls, typical 6” [152mm] of EPS is added to the outside of the existing 11 5/8” CMU walls where accessible (South and West sides). On the inside 2” [51mm] of closed cell spray foam provide the air barrier. On the North and East sides excavation is not possible, thus 4 ½” closed cell spray foam on the inside provide the air barrier and insulation in these areas. The below grade walls offer an R-value from 32 [Usi =0.176 W/(m2K)] to 41 [Usi =0.138 W/(m2K)]. Basement stair wall Due to space restrictions at interior and inability to excavate at exterior, the below grade wall adjacent basement stair is insulated to the inside with Vacuum Insulated Panels glued to the block wall, taped at seams to provide the air barrier and covered with drywall. The R-value for this assembly is 26.9 [Usi =0.211 W/(m2K] and is factored into the typical below grade average above. Slab The existing slab was removed and ground excavated to the bottom of the footing. A new 4” concrete slab sits over 6” [152mm] of EPS insulation and two layers of 6 mil polyethylene membrane—taped at seams and transition details, which provide the air barrier. The new slab offers an R-value of 26 [Usi =0.219 W/(m2K)]. Footing Existing footings are insulated with rigid EPS to the exterior where excavation occurred, and new footings have rigid EPS at interior and exterior as well as underneath. Roof The existing roof was removed. The new roof is a cold roof finished with asphalt roofing. The 2nd story ceiling is insulated with 22” [559mm] of loose fill cellulose providing an R-value of 76 [Usi =0.074 W/(m2K]. The underside of the trusses is sheathed with OSB taped at seams and transition details providing the air barrier. A suspended ceiling houses lighting and the ventilation ducts.

Page 16: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 16

5.2 Typical transitions and assemblies

Typical corner at retrofit Existing to addition connection Typical corner at addition

1" 3 1/2"

MATCH HEIGHT OF EXISTING BASEMENT WALL

SEAL AIRTHIGHT WITH SPRAYFOAM

NEW ABOVE-GRADE WALL, TYPE 2

INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING @ 24" O.C. WITH 3-1/2" DENSE-PACK (3.5 LBS/ CU FT) OR FIBERGLASS BATT INSULATION• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ 24 O.C. WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR

TYPICAL STEMWALL

INTERIOR• 11-5/8" CMU WALL TO FROST FOOTING• 3" EXTERIOR GRADE EPS INSULATION (EIFS)• STO FLEXYL (EIFS) WEATHER RESISTANT BARRIER & FINISH (TIE TO FACE OF FOOTING)EXTERIOR

FLOOR SLAB ADDITION, FS3

INTERIOR• 3/4" FINISHED FLOORING, TIME OUT WITH EXISTING FLOORING• 1-1/2" SELF-LEVELING OVERPOUR• 8-1/2" EPS INSULATION (> 1.8 LBS/ CU FT) TOP LAYER WITH IN-FLOOR HEATING PIPES• (2) 6 MIL POLYETHYLENE, VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT JOINTS AND PROTRUSIONS• 4" STRUCTURAL SLAB• MIN. 2" GRAVELGRADE

EXISTINGFIRST FLOOR

EASTADDITION

EXISTINGBASEMENT

AADDITIONRETROFIT

RETROFIT BELOW-GRADE WALL, TYPE 5

INTERIOR• 5/8" WALL BOARD• 3-1/2" STEEL FRAMING @ 24" O.C. WITH MIN. 4-1/2" CLOSED-CELL SPRAYFOAM INSULATION VAPOR BARRIER & AIRTIGHTNESS LAYER• 11-5/8" CMU WALL, EXISTING• EXTERIOR

SHEET TITLE

DESCRIPTION

PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT

EPH-01 Brazelton for Presentation.pln

MARK DATE

A-4.2

TE Studio, Ltd.

5/10/17 Date printed

A-201101

BID SET6/13/116/29/11 PERMIT SET

/Use

rs/te

stud

io/D

ropb

ox/T

E St

udio

Tea

m F

olde

r/Pro

ject

s/ 0

- Pr

ojec

t Arc

hive

/A-2

0101

201

Braz

elto

n/5

- Bra

zelto

n Do

cum

enta

tion

(DO

CU)/B

raze

lton

PHI S

ubm

ittal

/EPH

-01

Braz

elto

n fo

r Pre

sent

atio

n.pl

n

CLIENTSDesiree and Paul Brazelton612-208-8197

WALL SECTIONS

BRAZELTONRESIDENCE

TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418

612-246-4670 office612-605-3200 fax

testudio.com

Holistic design for sustainable homes.

PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418

CONSULTANTS

TE S

tudi

o pr

ints

on

recy

cled

post

-con

sum

er p

aper

. Ple

ase

recy

cle.

TDE, JCCTDE, JCC

42"

8"

4"

MATCH HEIGHT OF SIDINGON OTHER FACADES

BOND BEAM,SEE STRUCT NOTES

REMOVE LANDING SHEATH.& MATCH FINISH HEIGHT W/EXISTING FIRST FLOOR

PROPOSED CMU BLOCK

1" EPS

SILL SEAL

TAPE POLY TO SHEATHING

PROPOSED CMU BLOCK

LAP STO FLEXYLOVER CONC.

SEAL AIRTIGHT WITH SPRAYFOAM

TYPICAL SECTIONEAST & WEST SIDE(R-47)

INSIDE- 3/4" FINISHED FLOORING, TIME OUT WITH EXISTING FLOORING- 1-1/2" SELF LEVELING OVERPOUR- MIN. 9" EPS INSULATION TOP LAYER WITH IN-FLOOR HEATING PIPES- SAND FILL TO EXISTING SLAB- 6 MIL POLYETHYLENE, VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT JOINTS AND PROTRUSIONS- EXISTING SLABGRADE@ EXISTING

FIRST FLOORLANDING

EXISTINGBASEMENT

NOTE:

@ WEST WALL A STEM WALL EXISTSSIMILAR TO NORTH WALL BUT ALIGNMENT W/ADDITIONAL PROPOSED CMU BLOCK MATCHESEAST WALL CONDITIONS.

ONLY EAST WALL REQUIRES A BOND BEAM.

7-1/2" TRIM

RETROFIT ABOVE-GRADE WALL, TYPE 1

INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING, EXISTING DENSE-PACK WITH CELLULOSE (3.5 LBS/ CU FT), OR FIBERGLASS BATT INSULATION• 3/4" T&G EXTERIOR SHEATHING, EXISTING• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ EXIST. STUDS WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR

CONTINUOUS 5/8" SHEATHINGCONNECTS EXISTING AND NEW CONSTRUCTIONVAPOR BARRIER & AIRTIGHTNESS LAYER

NEW ABOVE-GRADE WALL, TYPE 2

INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING @ 24" O.C. WITH 3-1/2" DENSE-PACK (3.5 LBS/ CU FT) OR FIBERGLASS BATT INSULATION• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ 24 O.C. WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR

LINE UP BLOCK WALL WITH OUTLINEOF FIRST LAYER OF EXTERIOR INSULATION

OUTLINE OF WALL ABOVE

STO FLEXYL, W.R.B.

EXISTING BASEMENT UNEXCAVATED @ ADDITION

SCALE: 1 1/2"= 1'-0"5 TYP. NORTH ADDITION STEMWALL & BASEMENT CONNECTION

SCALE: 1 1/2"= 1'-0"1 TYPICAL CORNER @ RETROFITSCALE: 1 1/2"= 1'-0"2 EXIST. TO ADDITION CONNECTION

SCALE: 1 1/2"= 1'-0"3 TYPICAL CORNER @ ADDITIONSCALE: 1 1/2"= 1'-0"4 BASEMENT TRANSITION

WEATHER RESISTANT BARRIER (WRB)

AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR)

Page 17: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 17

Basement transition

Typical North addition stemwall and basement connection

SHEET TITLE

DESCRIPTION

PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT

EPH-01 Brazelton for Presentation.pln

MARK DATE

A-4.2

TE Studio, Ltd.

5/10/17 Date printed

A-201101

BID SET6/13/116/29/11 PERMIT SET

/Use

rs/te

stud

io/D

ropb

ox/T

E St

udio

Tea

m F

olde

r/Pro

ject

s/ 0

- Pr

ojec

t Arc

hive

/A-2

0101

201

Braz

elto

n/5

- Bra

zelto

n Do

cum

enta

tion

(DO

CU)/B

raze

lton

PHI S

ubm

ittal

/EPH

-01

Braz

elto

n fo

r Pre

sent

atio

n.pl

n

CLIENTSDesiree and Paul Brazelton612-208-8197

WALL SECTIONS

BRAZELTONRESIDENCE

TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418

612-246-4670 office612-605-3200 fax

testudio.com

Holistic design for sustainable homes.

PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418

CONSULTANTS

TE S

tudi

o pr

ints

on

recy

cled

post

-con

sum

er p

aper

. Ple

ase

recy

cle.

TDE, JCCTDE, JCC

42"

8"

4"

MATCH HEIGHT OF SIDINGON OTHER FACADES

BOND BEAM,SEE STRUCT NOTES

REMOVE LANDING SHEATH.& MATCH FINISH HEIGHT W/EXISTING FIRST FLOOR

PROPOSED CMU BLOCK

1" EPS

SILL SEAL

TAPE POLY TO SHEATHING

PROPOSED CMU BLOCK

LAP STO FLEXYLOVER CONC.

SEAL AIRTIGHT WITH SPRAYFOAM

TYPICAL SECTIONEAST & WEST SIDE(R-47)

INSIDE- 3/4" FINISHED FLOORING, TIME OUT WITH EXISTING FLOORING- 1-1/2" SELF LEVELING OVERPOUR- MIN. 9" EPS INSULATION TOP LAYER WITH IN-FLOOR HEATING PIPES- SAND FILL TO EXISTING SLAB- 6 MIL POLYETHYLENE, VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT JOINTS AND PROTRUSIONS- EXISTING SLABGRADE@ EXISTING

FIRST FLOORLANDING

EXISTINGBASEMENT

NOTE:

@ WEST WALL A STEM WALL EXISTSSIMILAR TO NORTH WALL BUT ALIGNMENT W/ADDITIONAL PROPOSED CMU BLOCK MATCHESEAST WALL CONDITIONS.

ONLY EAST WALL REQUIRES A BOND BEAM.

7-1/2" TRIM

RETROFIT ABOVE-GRADE WALL, TYPE 1

INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING, EXISTING DENSE-PACK WITH CELLULOSE (3.5 LBS/ CU FT), OR FIBERGLASS BATT INSULATION• 3/4" T&G EXTERIOR SHEATHING, EXISTING• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ EXIST. STUDS WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR

CONTINUOUS 5/8" SHEATHINGCONNECTS EXISTING AND NEW CONSTRUCTIONVAPOR BARRIER & AIRTIGHTNESS LAYER

NEW ABOVE-GRADE WALL, TYPE 2

INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING @ 24" O.C. WITH 3-1/2" DENSE-PACK (3.5 LBS/ CU FT) OR FIBERGLASS BATT INSULATION• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ 24 O.C. WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR

LINE UP BLOCK WALL WITH OUTLINEOF FIRST LAYER OF EXTERIOR INSULATION

OUTLINE OF WALL ABOVE

STO FLEXYL, W.R.B.

EXISTING BASEMENT UNEXCAVATED @ ADDITION

SCALE: 1 1/2"= 1'-0"5 TYP. NORTH ADDITION STEMWALL & BASEMENT CONNECTION

SCALE: 1 1/2"= 1'-0"1 TYPICAL CORNER @ RETROFITSCALE: 1 1/2"= 1'-0"2 EXIST. TO ADDITION CONNECTION

SCALE: 1 1/2"= 1'-0"3 TYPICAL CORNER @ ADDITIONSCALE: 1 1/2"= 1'-0"4 BASEMENT TRANSITION

WEATHER RESISTANT BARRIER (WRB)

AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR)

42"

8"

4"

MATCH HEIGHT OF SIDINGON OTHER FACADES

BOND BEAM,SEE STRUCT NOTES

REMOVE LANDING SHEATH.& MATCH FINISH HEIGHT W/EXISTING FIRST FLOOR

PROPOSED CMU BLOCK

1" EPS

SILL SEAL

TAPE POLY TO SHEATHING

PROPOSED CMU BLOCK

LAP STO FLEXYLOVER CONC.

SEAL AIRTIGHT WITH SPRAYFOAM

TYPICAL SECTIONEAST & WEST SIDE(R-47)

INSIDE- 3/4" FINISHED FLOORING, TIME OUT WITH EXISTING FLOORING- 1-1/2" SELF LEVELING OVERPOUR- MIN. 9" EPS INSULATION TOP LAYER WITH IN-FLOOR HEATING PIPES- SAND FILL TO EXISTING SLAB- 6 MIL POLYETHYLENE, VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT JOINTS AND PROTRUSIONS- EXISTING SLABGRADE@ EXISTING

FIRST FLOORLANDING

EXISTINGBASEMENT

NOTE:

@ WEST WALL A STEM WALL EXISTSSIMILAR TO NORTH WALL BUT ALIGNMENT W/ADDITIONAL PROPOSED CMU BLOCK MATCHESEAST WALL CONDITIONS.

ONLY EAST WALL REQUIRES A BOND BEAM.

Page 18: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 18

5.4 Window Details

Typical window head and sill Typical window head and sill, basement

Typical window jamb Typical window jamb, basement

8 7/8" (225 MM)

4" 5 1/2"

RO

UG

H O

PE

NIN

GR

OU

GH

OP

EN

ING

EPS WEDGE

EPS INFILL

AIRTIGHTCONNECTION

AIRTIGHTCONNECTION

COMPRESSIONTAPE

DRIP EDGE

OPT. 2X4

L-SECTIONEND CAP

8 7/8" (225 MM)

1 3/

4"3/

4"

STO FINISH PROFILE

STO DRIP EDGE

WINDOW R.O.

BLOCK R.O.

EXIST. R.O.WINDOW R.O.

U-SECTIONEND CAP

REFERENCE DETAILS:- STO W 710- STO W 425-2

4"4"5

1/2"

ROUGH OPENING

WINDOW SET POINT

OPT. 2X4

L-SECTION SILL END CAP

EXTERIOR ALUMINUM SILL

INTERIOR WOOD SILL

EPS FOAM STRIP

PLYWOOD STRIP

FILL VOID WITH EPS FOAM

MIN

. 1-3

/8"

1 3/4"

EXIST. ROUGH OPENING

WINDOW SET POINT

1" POLYISOCYANURATE FOAM BOARD

3/4" PLYWOOD BUCK

STO GUARD WET-FLASHING SYSTEM

STO FINISH PROFILE

AIR TIGHT CONNECTIONDOUBLE SIDED BUTYL TAPEPER MANF.

RETROFIT ROUGH OPENING

REFERENCE DETAILS:- STO W 425-1- STO W 501

NOTE:VERIFY DIMENSIONSWITH ACTUAL PRODUCT

INTERIOR

EXTERIOR

Page 19: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 19

The MinnePHit house has all new German-made Optiwin windows that are built into the insulation layer of the walls and eliminate thermal bridges. Frame: Optiwin, Alu2Wood

Aluminum-clad wood frame with cork insulation and Passive House certified at wall installation

Uf = 0.93 W/(m2K) Glazing: Glas Trösch TRII 0,5 triple pane,

4mmm Eurofloat/ TRIII-/ Eurowhite 4mm/ Ar 95Lu5 18mm TRIII/ Eurofloat Ug = 0.5 W/(m2K) g = 52 %

The windows deliver an installed overall Uw of 0.76 W/(m2K).

Page 20: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 20

Air sealing at window

Air sealing at sheathing

Air sealing at slab

Air tightness test in progress

6 DESCRIPTION OF THE AIRTIGHTNESS LAYER; INCLUDING TEST RESULTS Two layers of polyethylene membrane, which are sealed and taped at connections and protrusions, provide the airtightness of the basement slab. Below grade exterior walls’ airtightness is achieved with between 2-1/2” and 4-1/2” of closed cell spray foam insulation applied to the interior side. Above-grade exterior walls both new and existing are clad in a layer of OSB sheathing, taped at seams and transition details, which provides the airtightness. The underside of the new roof trusses is clad with OSB taped at seams and transition details, again providing the air barrier. Windows and doors are sealed with tape. Protrusions are caulked and foamed. The Energy Conservatory with the help of the Tectite software using the prescribed DIN EN 13829 protocol performed the pressure test. The building averaged 195 CFM50, for depressurization and 197 CFM50 for pressurization for an average of 196 CFM50 or 0.65 ACH50.

Page 21: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 21

6"6"

UP

VE

NT

EX

HA

US

TV

EN

TILA

TOR

VE

NT

INTA

KE

ADDITIONRETROFIT

18

18

12

GA

S

CL

RE

CO

NS

TRU

CTI

ON

RE

TRO

FIT

BOILER

WORKOUT/ ME RMA: 182 sq ft

H: 7'

KID'S ROOMA: 210 sq ft

H: 7'

BSMT STRA: 23 sq ft

UNEXCAVATED

EXISTING UNEXCAVATED

1

A

7 VENTILATION LAYOUT The ventilation system in the MinnePHit House revolves around a Paul Novus 300 HRV from Zehnder. It provides balanced ventilation with a rated heat recovery rate of 93%. An electric resistance pre-heater keeps the ventilator frost-free. The duct system is home run. Outside air is supplied to living spaces and bedrooms, exhaust air returned from the kitchen, baths, and mechanical space. Adjustable diffusors are used to control air volumes. A common wall in the center of the home is used to keep vertical runs and overall duct lengths short. The ventilation machine is installed in the Workout / Mechanical room in the basement level adjacent the common wall that runs through all levels. Air intake and exhaust pipes connect straight through the wall. Basement level ventilation plan

Page 22: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 22

RE

F

D W

6"

6"

3'-8"

ADDITIONRETROFIT

12

36

24

12

12

CL

CL

RE

CO

NS

TRU

CTI

ON

RE

TRO

FIT

LIVING ROOMA: 240 sq ft

H: 8'

ENTRY VESTA: 52 sq ft

H: 8'

KITCHENA: 199 sq ft

H: 8'

FAM/DIN ROOMA: 316 sq ft

H: 8'

MUD ROOMA: 107 sq ft

H: 8'

PWDRA: 29 sq ft

H: 8'

LDGA: 14 sq ft

STRA: 37 sq ft

H: 7'-9"

1

A

2'

8"

3'-2"

8"

ADDITIONRETROFIT

12

24

12

12

12

CL

CL

CL

CL

CL

CL

RE

CO

NS

TRU

CTI

ON

RE

TRO

FIT

BEDROOM 1A: 146 sq ft

H: 8'

BEDROOM 2A: 151 sq ft

H: 8'

MASTER BRA: 145 sq ft

H: 8'

M HALLA: 82 sq ft

H: 8'

M BATHA: 53 sq ft

H: 8'

WCA: 22 sq ft

H: 8'

FULL BATHA: 69 sq ft

H: 8'

BEDROOM 3A: 150 sq ft

H: 8'

UP STRA: 37 sq ft

UPSTAIRS HALLA: 64 sq ft

H: 8'

1

A

12

12

24

Main level ventilation plan Upper level ventilation plan

Page 23: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 23

Zehnder Paul Novus 300 HRV Zehnder ComfoDuct insulated exhaust

Zehnder ComfoTube supply and return ducts The ventilation system was laid out by TE Studio and commissioned by Zehnder. The ventilation machine offers a summer bypass to maximize passive cooling when available. Central Unit: Zehnder Paul Novus 300 Type: HRV Specific Values: 93% heat recovery/ 0.24Wh/m3 electric efficiency

Page 24: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 24

8 HEATING STRATEGY The heat load for the home (approx. 4 kW) is delivered by an existing natural gas boiler connected to hydronic in-floor heat and the domestic hot water (DHW) system. It’s efficiency is rated at 84%. The roof is engineered to receive a Solar thermal or PV system at a later date to further reduce the primary energy demand. The DHW system is home run.

Existing boiler: space heating and DHW In-floor heat and DWH distribution system

Page 25: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 25

9 PHPP AND ENERPHIT 9.1 PHPP Verification Page

PHPP, Verification 20121219_PHPP_2069.xls

EnerPHit verification

Photo or Drawing

Building: "MinnePHit House", Brazelton ResidenceStreet: 5605 Bloomington Avenue S.

Postcode/City: Minneapolis, MN 55417Country: USA

Building Type: Single Family DetachedClimate: Minneapolis

Home Owner(s) / Client(s): Paul & Desiree BrazeltonStreet: 5605 Bloomington Avenue S.

Postcode/City: Minneapolis, MN 55417

Architect: Tim Eian - TE Studio, Ltd.Street: 212 2nd St.SE #222

Postcode/City: Minneapolis, MN 55414

Mechanical System: TE Studio, Zehnder USA, Paul BrazeltonStreet:

Postcode/City:

Year of Construction: 2011-2012 Interior Temperature: 20.0 °CNumber of Dwelling Units: 1 Internal Heat Gains: 2.1 W/m2

Enclosed Volume Ve: 795.4Number of Occupants: 5.9

Specific building demands with reference to the treated floor area use: Monthly method

Treated floor area 207.3 m² Requirements Fulfilled?*

Space heating Annual heating demand 27 kWh/(m2a) - -

Heating load 20 W/m2 - -

Space cooling Overall specific space cooling demand kWh/(m2a) - -

Cooling load W/m2 - -Frequency of overheating (> 25 °C) 4.5 % - -

Primary EnergySpace heating and

dehumidification, DHW, Auxiliary Electricity and

cooling, household electricity. 120 kWh/(m2a) 134 kWh/(m²a) yes

DHW, space heating and auxiliary electricity 80 kWh/(m2a) - -Specific primary energy reduction through solar electricity 0 kWh/(m2a) - -

Airtightness Pressurization test result n50 0.7 1/h 1 1/h yes

EnerPHit (retrofit): according to component quality

Building envelope Exterior insulation to ambient air 0.11 W/(m²K) - -

average U-Values Exterior insulation underground 0.17 W/(m²K) - -

Interior insulation to ambient air W/(m²K) - -

Interior insulation underground 0.17 W/(m²K) - -

Thermal bridges ΔU 0.01 W/(m²K) - -

Windows 0.77 W/(m²K) - -

External doors 0.79 W/(m²K) - -

Ventilation System Effective heat recovery efficiency 89 % - -* empty field: data missing; '-': no requirement

EnerPHit building retrofit (acc. to component quality)? PILOT CERTIFICATE FOR COLD CLIMATE yes

We confirm that the values given herein have been Name: Registration number PHPP:determined following the PHPP methodology and basedon the characteristic values of the building. The PHPP Surname: Issued on:calculations are attached to this application.

Company: Signature:

Page 26: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 26

9.2 EnerPHit Certificate

Page 27: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 27

10 BUILDING COST Withheld per owner request.

Page 28: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 28

11 DESIGN OVERVIEW The building was designed from the outset to solve programmatic and spatial challenges while meeting EnerPHit criteria. The first PHPP was completed during schematics as a tool to explore the bounds of the retrofit and present potential opportunities to the clients, and was subsequently kept current with design evolutions. The construction methods were selected specifically with airtightness in mind, as the local building industry does not have a lot of experience with airtight buildings, especially in a retrofit application. Fenestration and glazing were fine-tuned using the PHPP. In an effort to deliver a holistic and sustainable design, specifications were guided by their impact to indoor environmental quality and occupant health, water conservation, resource efficiency, site and community impact as well as comfort and energy performance. The home was designed by Dipl.-Ing. Tim Delhey Eian of TE Studio, Ltd. with the help of Barbara Schmidt of Studio BStyle (interior design). 11.1 Technical Design The technical systems were designed by Dipl.-Ing. Tim Delhey Eian of TE Studio, Ltd. 11.2 PHPP Modeling & Calculation The PHPP modeling was done by Dipl.-Ing. Tim Delhey Eian of TE Studio, Ltd. The Passive House Institute of Darmstadt, Germany certified the building. Wolfgang Feist of the Passive House Institute in Darmstadt issued the EnerPHit certificate on 10 January 2013. 11.3 Structural Engineering Eric Bunkers, P.E. of Mattson Macdonald Young provided structural engineering for the project.

Page 29: Passive House Object Documentation...the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design

Passive House Object Documentation

© TE Studio, Ltd. 2017 29

12 REFERENCES • Project on architect website: http://testudio.com/projects/minnephit-house/