Page 1: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Scrum Master Certified

Passing Score: 800Time Limit: 120 minFile Version: 1

Scrum Master Certified

https://www.gratisexam.com/

Page 2: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Exam A

QUESTION 1A town has begun a project that involves keeping track of the buses traveling on the roads of the town. Which of the following is NOT a characteristic of this projectif it is managed according to Scrum Framework?

A. Detailed upfront planning will be done to ensure that risks are identified early on.B. The team working on this project will meet every day for 15 minutes to list impediments to completing their tasks.

https://www.gratisexam.com/

C. The Product Owner will prioritize the tasks that deliver maximum business value.D. The customer does not have to be able to define very concrete requirements early on.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 2The Chief Scrum Master facilitates the Scrum of Scrums Meeting. Which of the following statements about a Scrum of Scrums Meeting is true?

A. This meeting can be conducted at any time without any pre-determined intervals.B. This meeting can be scaled up.C. This meeting is always time-boxed.D. This meeting is relevant only for high-investment projects.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference: https://www.smartsheet.com/blog/5-stages-creating-successful-scrum-scrums#the-importance-of-project-management-soft-skills-in-scrum-of-scrums

Page 3: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

QUESTION 3At the end of each Sprint the Scrumboard is _________.

A. Updated with new tasks and completed tasks.B. Placed besides the new one to compare team velocities in Sprints.C. Analyzed by the Scrum master to understand the project progress in that particular sprint.D. Reset or wiped off.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference: https://fitsmallbusiness.com/what-is-a-scrum-board/?__cf_chl_jschl_tk__=f53936a02af8b13a6c789509a9e50d80caf9db68-1579965118-0-AX8DQIwPUTwHssRinUC0HBs1y0G4cueRRcNpGOdv3upGebf3xhz6sZtrd3r_e8p-2LCAKsOhNtvMe1BjqhYqPiFFr1H832NeKyU9aTS7hOHZLRq68r12ibXnfqveWkOuTmmkUy0lhkGM2jWr8w-7OODeTjry5BdCU0qCXv-ci8Kv6-QAHh8LizLiiZ9a7f-BSzwcw15OkMbF6N6O3GdgjoKH48pvA7BxNqQIfxXxSaAPc7PSgiP4JNyrYhJsGWryQdu6msOKQ-Xrxt4sa0Dl9UEwRyjyGzD_Nyzy7_qmwi5z

QUESTION 4To enable the Product Owner to successfully deploy the product release as a part of the Ship Deliverables process, the Scrum Master should ensure that:

A. The Scrum Team creates Deliverables as agreed uponB. The Release Plan and Prioritized Product Backlog are updatedC. The Scrum Team creates the Release Planning ScheduleD. The Scrum team Accepts/Rejects the deliverables during Demonstrate and Validate Sprint process

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/what-is-the-role-of-the-scrum-product-owner/

QUESTION 5Program Stakeholders, the Program Product Owner, Program Scrum Master, and Chief Product Owner have gathered together to create the Project Vision. Theyare trying to determine and document the difference between current business capabilities and the final desired set of capabilities. Which one of the followingshould they use to arrive at a conclusive decision?

Page 4: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

A. Trial Project.B. JAD Session.C. Gap Analysis.D. SWOT Analysis.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/tools-to-create-project-vision/

QUESTION 6Collaboration within a team is an important principle of Scrum. All of the following activities constitute collaboration EXCEPT:

A. The Scrum Team decides which User Stories are important and assigns which Sprint they should be worked on.B. The Scrum Team discusses the best approach to creating deliverables during a Sprint.C. A Scrum Team member is facing difficulties in one of his tasks and another team member pitches in to help him.D. The Scrum Team interacts with the Product Owner to obtain clarification on User Stories.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: https://www.oreilly.com/library/view/head-first-agile/9781491944684/ch04.html

QUESTION 7While creating the Sprint Backlog, the Scrum Team along with the Scrum Master and Product Owner must consider which of the following as inputs?

A. Length of Sprint, Agreed Actionable Improvements, Done Criteria, Team Calendar.B. Assigned Action Items, Business Improvements, Dependencies, Team Calendar.C. Length of Sprint, Previous Sprint Velocity, Dependencies, Team Calendar.D. Proof of Concept, Previous Sprint Velocity, Done Criteria, Team Calendar.

Correct Answer: CSection: (none)Explanation

Page 5: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Explanation/Reference:

QUESTION 8Which of the following methods helps estimate the value provided by projects?

A. Internal Rate of ReturnB. Net Rate of ReturnC. Present Rate of ReturnD. Estimated Rate of Return

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:The value to be provided by business projects can be estimated using various methods such as Return on Investment (ROI), Net Present Value (NPV) and InternalRate of Return (IRR).

Reference: http://blog.scrumstudy.com/estimating-project-value-in-scrum/

QUESTION 9Suppose you are a Scrum Master or a Scrum Team that is progressing through Tuckman's model of Group Dynamics. In which of the following stages will you bemost actively involved?

A. FormingB. StormingC. NormingD. Performing

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: https://project-management.com/the-five-stages-of-project-team-development/

QUESTION 10

Page 6: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

The Scrum Master can help the Product Owner update business justification in the Project Vision statement and ensure continuous value justification for projects byfacilitating which of the following processes?

A) Conduct Daily StandupB) Groom Prioritized Product BacklogC) Retrospect ProjectD) Sprint Deliverables

A. B and DB. A and ВC. А, B, and СD. Only А

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/business-justification-in-scrum-2/

QUESTION 11While assisting the Product Owner in developing a Prioritized Product Backlog, the Scrum Master must consider the primary factors on which the Prioritized ProductBacklog is based-on. Which of the following are those primary factors?

A) ValueB) DependenciesC) RiskD) Deliverables

A. A, В, and СB. AC. A, C, and DD. С

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

Page 7: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

The Prioritized Product Backlog contains a prioritized list of business and project requirements written in the form of Epic(s), which are high level User Stories. ThePrioritized Product Backlog is based on three primary factors: value, risk or uncertainty, and dependencies. It is also referred to as the Risk Adjusted ProductBacklog since it includes identified and assessed risks related to the project.

Reference: http://blog.scrumstudy.com/prioritized-product-backlog-the-backbone-of-a-scrum-project/

QUESTION 12You are the Scrum Master for a team that is working on a project for a chemical engineering company. During one of the Sprints, the Product Owner suggestschanges to the Acceptance Criteria on the basis of new requirements by the stakeholders. Which of the following best describes the steps that should be taken nextin this situation?

A. You will direct the Scrum team to re-work the User Story in the same Sprint.B. The Scrum Team will not re-work an already developed deliverable; however, the Product Owner will reject the deliverable in Demonstrate and Validate Sprint.C. The deliverable is rejected on the basis of the changed requirements, and added to the Prioritized Product Backlog with the new Acceptance Criteria to be

worked on in a subsequent Sprint.D. You should inform the Product Owner that the Scrum Team does not have the bandwidth to re-work the already created deliverable.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 13As a Scrum Master how will you coordinate with the Product Owner to ensure Value-Driven Delivery on Scrum projects?

A. By ensuring that requirements are prioritized based on opportunity for investmentB. By ensuring that customers realize the value at the end of projectC. By ensuring that requirements are reprioritized after every SprintD. By understanding what adds value to customers and ensuing that stakeholders are closely involved throughout the project

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:In order to provide Value-driven Delivery, it is important to meet a few requirements. First, those involved in a project should understand what adds value tocustomers and users, and should prioritize the high value requirements in the Prioritized Product Backlog. Second, those involved in a project should decrease

Page 8: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

uncertainty and constantly address risks that can potentially decrease value if they materialize; it is important to show product increments to project stakeholders atthe end of each Sprint, enabling effective management of changes. Third, those involved in a project should create deliverables by producing potentially shippable,value-based product increments during each Sprint so that customers start realizing value early in the project.

Reference: http://blog.scrumstudy.com/scrum-delivers-value-driven-delivery/

QUESTION 14Collaboration is one of the Scrum principles. Which of the following are the three dimensions of this principle?

A. Awareness, articulation, and appropriation

https://www.gratisexam.com/

B. Transparency, precision, and coordinationC. Perfection, cooperation, and comprehensionD. Honesty, responsiveness, and adaptability

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:The core dimensions of collaborative work are as follows:

1. Awareness — Individuals working together need to be aware of each other's work.2. Articulation — Collaborating individuals must partition work into units, divide the units among team members, and then after the work is done, reintegrate it.3. Appropriation — Adapting technology to one's own situation; the technology may be used in a manner completely different than expected by the designers.

Reference: https://www.scrumstudy.com/whyscrum/scrum-collaboration

QUESTION 15One of the responsibilities of the Scrum Master is to ensure that the Product Owner does not change the Acceptance Criteria of a committed User Story in themiddle of a Sprint. In this regard, which of the following statements about Acceptance Criteria is correct?

A. User Story Workshops are held as part of Sprint Review.

Page 9: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

B. Acceptance Criteria provide the objectivity required for the User Story to be considered as Done or not Done.C. The Scrum Master defines and communicates the Acceptance Criteria to the Scrum Team.D. During the Sprint Retrospect Meeting, the Acceptance Criteria provide context for the Product Owner to decide if a User Story has been completed satisfactorily.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference: https://blog.teamtreehouse.com/when-is-a-user-story-done-acceptance-criteria-definition-done

QUESTION 16Impediments are a part of any project. Which of the following is NOT true about impediments in Scrum?

A. They reduce the productivity of a Scrum team.B. Impediments can be both internal and external.C. Impediments should be documented only by the team members in the Impediment Log.D. Impediments faced are brought up by the Scrum Team during the Daily Standup Meeting.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference: https://study.com/academy/lesson/impediments-in-scrum-project-management.html

QUESTION 17Which of the following events does NOT help the Scrum Team in identifying or resolving risks?

A. Daily Standup MeetingB. Sprint Planning MeetingC. Financial Planning MeetingD. Prioritized Product Backlog Review Meeting

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

Page 10: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Reference: http://blog.scrumstudy.com/risk-management-in-scrum/

QUESTION 18You are the Scrum Master on a project to develop machine parts for automobile manufacturing. The Product Owner on your project proposes to use Utility Functionto find out the stakeholders' risk tolerance level. Which of the following is NOT a risk tolerance classification?

A. Risk Averter.B. Risk Seeker.C. Risk Mitigator.D. Neutral Risk Taker.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/how-to-identify-risk/

QUESTION 19Which of the following is NOT a Scrum Master's responsibility?

A. Groom the Prioritized Product Backlog.B. Coordinate creation of Release Planning Schedule.C. Facilitate Prioritized Product Backlog Review Meetings.D. Represent the Scrum Core Team to provide lessons from the project.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:The prime responsibilities of a Scrum Master are:

Removes the obstacles/impediments that affect productivity.Shields the people from external disturbance.Responsible if the scrum process is correctly applied.Facilitate daily stand-ups, other ceremonies, schedule meetings, demo and other meetings.Help product owner in prioritizing the backlog and any feedback from the team.Facilitation of Retrospective meetings

Page 11: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Workshops for planning, estimation, prioritization, issue resolution, performance improvements

Reference: https://www.knowledgehut.com/interview-questions/scrum

QUESTION 20Which of the following statements is NOT true of an Impediment Log?

A. Impediment Log can be discussed during Daily Standup.B. Internal impediments from within the team are never recorded in the Impediment Log, and only brought up during the Daily Standups.C. Transparency in Scrum ensures swift and easy identification of impediments.D. Scrum Master maintains and updates the Impediment Log.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/scrumstudy-scrum-video-on-daily-standup-meeting-and-its-importance-to-a-scrum-team/

QUESTION 21Scrum Masters have to solve both internal and external impediments for the Scrum team during the Create Deliverables process. To do so, they record theimpediments in the Impediment Log during _________________________.

A) Daily Standup Meetings.B) Sprint Review Meetings.C) Release Planning Meetings.D) Sprint Planning Meetings.

A. A and ВB. AC. A and DD. A, B, and C

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: http://www.cs.vsu.ru/~svv/spm/SBOK_Guide_3rd_edition_English_Sample.pdf (45)

Page 12: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

QUESTION 22Who among the following can directly approve changes recommended in the project?

A. Product OwnerB. Scrum Guidance BodyC. Scrum MasterD. Senior Management

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:The Scrum Guidance Body usually defines a process for approving and managing changes throughout the organization. In the absence of a formal process, it isrecommended that small changes that do not have a significant impact on the project be directly approved by the Product Owner. The tolerance for such smallchanges could be defined at an organizational level or by the sponsor for a particular project. In most projects, 90% of Change Requests could be classified assmall changes that should be approved by the Product Owner. So, the Product Owner plays a very important role in managing changes in a Scrum Project.

Reference: http://blog.scrumstudy.com/how-to-handle-request-for-change-or-change-requests-in-a-scrum-project-2/

QUESTION 23During a Scrum of Scrums Meeting certain questions are answered. Which of the following are the questions answered?

A) What has my team been working on since the last meeting?B) What will my team do until the next meeting?C) What were other teams counting on our team to finish that remains undone?D) What is our team planning on doing that might affect other teams?

A. C and D.B. A and ВC. А, B, and D.D. All of the above.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

Page 13: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Reference: http://www.cs.vsu.ru/~svv/spm/SBOK_Guide_3rd_edition_English_Sample.pdf (59)

QUESTION 24Which one of the following statements about the history of Scrum is NOT correct?

A. The idea of Scrum was derived from a “rugby” approach, in which “a team tries to go the distance as a unit, passing the ball back and forth.”B. Takeuchi and Nonaka proposed that product development should be like a sequential relay race.C. Scrum was based on a flexible and all-inclusive product development strategy where the development team works as a unit to reach a common goal.D. Takeuchi and Nonaka based their approach on manufacturing case studies from various industries.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

Page 14: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Explanation:Takeuchi and Nonaka proposed that product development should not be like a sequential relay race, but rather should be analogous to the game of rugby wherethe team works together, passing the ball back and forth as they move as a unit down the field. The rugby concept of a “Scrum” (where a group of players formtogether to restart the game) was introduced in this article to describe the authors’ proposal that product development should involve “moving the Scrum downfield”.

Reference: http://blog.scrumstudy.com/the-story-behind-origin-of-scrum/

QUESTION 25Which of the following statements about Release Planning Session is/are Correct?

A) Release Planning Sessions are conducted to develop a plan that defines when various sets of usable functionality or products will be delivered to the customer.B) Release Planning Sessions enable the Scrum Team to have an overview of the releases and delivery schedule for the product they are developing.C) Whether the releases will follow a phased deployment pattern or a continuous deployment pattern depends on the stakeholder requirements.D) Release Planning Sessions should produce a detailed Release Plan for the entire project.

A. AB. A and ВC. В and СD. A and D

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:Release Planning Sessions are conducted to develop a Release Plan. The plan defines when various sets of usable functionality or products will be delivered to thecustomer. In Scrum, the major objective of a Release Planning Meeting is to enable the Scrum Team to have an overview of the releases and delivery schedule forthe product they are developing so that they can align with the expectations of the Product Owner and relevant stakeholders (primarily the project sponsor).

Reference: http://blog.scrumstudy.com/release-planning-sessions-in-scrum/

QUESTION 26The Scrum Team along with the Scrum Master adopted the Fist of Five technique to arrive at accurate estimations for the prioritized User Stories. The results of thevote of each team member are as follows: three members: 2 fingers; four members: 3 fingers; and two members: 5 fingers. Which of the following options is inplurality?

A. I am not sure and would like to go with the group's consensus conclusion.B. I agree with the group's conclusion and would like to discuss some minor issues.C. I disagree with the group's conclusion and have major concerns.

Page 15: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

D. I wholeheartedly agree with the group's conclusion.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference: https://ryanripley.com/5-reasons-a-scrum-master-should-use-fist-of-five-voting/

QUESTION 27The table given below presents some Scrum roles that play an important part in business justification and their responsibilities. Choose the option that correctlymatches each role in the left hand column to its action in the right hand column.

A. I-b, II-c, III-a, IV-dB. I-a, II-c, III-b, IV-dC. I-c, II-d, III-b, IV-aD. I-d, II-b, III-c, IV-a

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 28Which of the following is true about Scrum?

Page 16: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

A. Continuous feedback is provided through the Groom Prioritized Product Backlog processB. Deliverables are improved progressively by time-boxing non-essential workC. The Conduct Daily Standup process leads to greater levels of motivation among team members.D. Emphasis on risk mitigation and detailed planning ensures a customer-oriented framework.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/advantages-of-using-scrum-listed-down-by-scrumstudy/

QUESTION 29One of the responsibilities of the Scrum Master is to facilitate timely identification of all risks faced by the Scrum Team. As the Scrum Master for a team working ona banking application project, which of the following techniques would you suggest for comprehensive risk identification?

A. Risk Appetite.B. Probability Impact Grid.C. Risk Checklists.D. Risk Meeting.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference: https://scrumstudy.wordpress.com/2014/08/27/scrum-master-how-are-risks-assessed-in-a-scrum-project/

QUESTION 30What is Quality Assurance?

A. The evaluation of processes and standards that govern quality management in a project to ensure that they continue to be relevant.B. Identification and definition of the product required from a Sprint and the project along with the Acceptance Criteria, any development methods to be followed,

and the key responsibilities of Scrum Team members in regards to quality.C. The execution of the planned quality activities by the Scrum Team in the process of creating deliverables that are potentially shippable.D. A Scrum approach in which the team learns from experience and stakeholder engagement to constantly keep the Prioritized Product Backlog updated with any

changes in requirements.

Page 17: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:Quality is required not only in products, but also in processes. Quality assurance refers to the evaluation of processes and standards that govern qualitymanagement in a project to ensure that they continue to be relevant. Quality assurance activities are carried out as part of the work. In fact, quality assurance is asignificant factor of the definition of Done. The deliverable isn’t complete if appropriate quality assurance has not been conducted. Often, quality assurance isdemonstrated during the Sprint Review Meeting.

Reference: http://blog.scrumstudy.com/quality-control-and-quality-assurance-in-scrum/

QUESTION 31Which one of the following INCORRECTLY matches a type of Scrum Team and a corresponding communication facilitator?

A. Colocated Team : War RoomsB. Colocated Team: Wall displaysC. Distributed Team: Video ConferencingD. Distributed Team : Manual Scrumboard

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference: https://www.atlassian.com/agile/teams/remote-teams

QUESTION 32The Scrum Master coordinates with the Product Owner and other stakeholders to ensure benefits from the project are realized. Which of the following is true aboutBenefits Realization?

A. Benefits from Scrum projects are realized during Demonstrate and Validate Sprint, Conduct Release Planning, Create Deliverables and Retrospect Sprintprocesses.

B. Benefits from Scrum projects are realized during Demonstrate and Validate Sprint, Retrospect Sprint, Ship Deliverables and Retrospect Project processes.C. Benefits from Scrum projects are realized during Demonstrate and Validate Project, Retrospect Sprint, Grooming Product Backlog and Retrospect Project

processes.D. Benefits from Scrum projects are realized during Demonstrate and Validate Project, Conduct Release Planning, Verify Deliverables and Retrospect Sprint

processes.

Page 18: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:The Product Owner confirms the achievement of organizational benefits throughout the project, aswell as upon completion of the User Stories in the Prioritized Product Backlog. Benefits from Scrumprojects are realized during Demonstrate and Validate Sprint, Retrospect Sprint, Ship Deliverablesand Retrospect Project processes.

Reference: http://www.cs.vsu.ru/~svv/spm/SBOK_Guide_3rd_edition_English_Sample.pdf

QUESTION 33Scrum Master is the 'servant leader' of Scrum Team. In this context, which of the following is a key responsibility of the Scrum Master?

A. Help create Project Vision StatementB. Identify key stakeholders of the projectC. Ensure back-up resources are availableD. Define Acceptance Criteria for User Stories

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 34All of the following events and activities are examples of adaptation, EXCEPT:

A. Seeking help from team membersB. Experienced team members mentoring new membersC. Recording Lessons learned to improve processes and address problemsD. Using information radiators to track the project progress

Correct Answer: DSection: (none)Explanation

Page 19: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Explanation/Reference:

QUESTION 35Which of the following about User Story Acceptance Criteria is true?

A. User Stories are objective, and the Acceptance Criteria provides the subjectivity required for the User Story to be considered as Done.B. In the Sprint Review Meetings, the Acceptance Criteria provides the context for the Scrum Master to decide if a User Story has been completed satisfactorily.C. It is the Scrum Master who has to ensure that the Acceptance Criteria for a User Story are not changed by the Product Owner in the middle of a Sprint.D. It is the Scrum Team's responsibility to keep track of what changes are being made to the Acceptance Criteria even during the Sprint.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:User Story is Done according to the agreed upon Acceptance Criteria. Thus, the role of Acceptance Criteria in maintaining quality is critical and needs to be clearlyunderstood by the team. It is the responsibility of the Scrum Master to ensure that the Acceptance Criteria for a User Story are not changed by the Product Owner inthe middle of a Sprint. Partially completed User Stories are rejected as not Done and moved back into the Prioritized Product Backlog.

Reference: http://blog.scrumstudy.com/scrumstudy-scrum-video-on-acceptance-criteria-and-prioritized-product-backlog/

QUESTION 36You are working in a $50 million project to remove weeds from National monument areas. You are responsible for achieving maximum business value for theproject, and represent the Voice of the Customer. What role do you play in this project?

A. Scrum Master.B. Product Owner.C. Sponsor.D. Scrum Guidance Board.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:The Product Owner is the person responsible for achieving maximum business value for the project. He or she is also responsible for articulating customerrequirements and maintaining business justification for the project. The Product Owner represents the Voice of the Customer.

Page 20: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Reference: https://www.quora.com/When-is-the-product-owner-identified-in-a-scrum-project

QUESTION 37While performing a cost-benefit analysis, the Product Owner of a project determined that the project has 45% probability of incurring a loss of $800,000 due to thelatest Land Reform Bill. Which of the following techniques is being used by the Product Owner to perform cost-benefit analysis?

A. Expected Monetary Value.B. Probability Impact Grid.C. Pareto Analysis.D. Risk Breakdown Structure.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference: https://pmstudycircle.com/2015/01/a-short-guide-to-expected-monetary-value-emv/

QUESTION 38Which of the following statements on Risk Management in a Scrum project is INCORRECT?

A. The iterative nature of Scrum with its rapid turnaround time and feedback cycles allows for early detection of failures.B. Risks can be managed only at the project level, even if they are related to or originate in portfolios or programs.C. Risk Burndown Charts aye an important tool for communicating information related to risks to the Stakeholders.D. Risk is largely minimized in Scrum due to the flexibility in adding or modifying requirements at any time in the project lifecycle.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/how-scrum-framework-minimizes-risks-threats-in-projects-2/

QUESTION 39Which of the following Scrum Master's responsibilities are correct?

A) Define the strategic objectives and priorities for projects.B) Ensure that Scrum processes are correctly followed by all team members including the Product Owner.C) Ensure transparency and clarity of Prioritized Product Backlog Items.

Page 21: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

D) Oversee Release Planning Meeting and schedule other meetings.

A. ВB. В, С, and DC. В and DD. A and В

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/responsibilities-of-various-scrum-roles-in-an-organization/

QUESTION 40On a hydroelectric power project, damage to life and property due to floods and landslides has been identified as a potential risk. Which of the following RiskAssessment Techniques can be used by the Scrum Team to assess the potential risk, and its impact on project objectives?

A. Probability Impact Grid.B. Probability Trees.C. Pareto Analysis.D. Expected Monetary Value.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: https://scrumstudy.wordpress.com/2014/08/27/scrum-master-how-are-risks-assessed-in-a-scrum-project/

QUESTION 41The Chief Scrum Master is a part of the Scrum Core Team that assembles to retrospect the project and to identify, document, and internalize the lessons learned.There are various tools to Retrospect Project during the Retrospect Project Meeting. Which of the following tools can be used in this process?

A. Gap analysis.B. SWOT analysis.C. Proof of Concept.D. Speed Boat.

Page 22: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/retrospect-scrum-project-the-lessons-to-be-learnt/

QUESTION 42The Scrum Master is attending a meeting in which the Scrum Team is estimating the effort required to develop the functionality described in each User Story. Theteam wants to adopt an estimation technique through which they will be able to quickly estimate a large number of User Stories. Which of the following techniquesdo you think they should adopt?

A. Planning Poker.B. Wideband Delphi.C. Affinity Estimation.D. Relative Sizing.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:Affinity estimation is a technique used to quickly estimate a large number of User Stories. Using sticky notes or index cards or tape, the team places User Storiedon a wall or other surface, in order from small to large. For this, each team member begins with a subset or User Stories from the overall Prioritized ProductBacklog to place by relative size. This initial placement is done in silence. Once everyone has placed their User Stories on the wall, the team reviews all theplacements and may move User Stories around as appropriate. The second part of the exercise involves discussion. Finally, the Product Owner will indicate somesizing categories on the wall. These categories can be small, medium or large, or they may be numbered using story point values to indicate relative size. The teamwill then move User Stories into these categories as the final step in the process. Some key benefits of this approach are that the process is very transparent,visible to everyone, and is easy to conduct.

Reference: http://blog.scrumstudy.com/estimation-techniques-in-scrum/

QUESTION 43A large software company has 8 Scrum teams with each team having a Scrum Master. After the Daily Standup everyday with their respective teams, all ScrumMasters meet for a Scrum of Scrums. What are they likely to do during this meeting?

A. Discuss ways to resolve technical impediments faced by development teams, especially if two or more teams face the same issue.B. Discuss what each individual development team member has worked on since the last time all Scrum Masters met.C. Discuss actions of a team that could potentially affect another team.

Page 23: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

D. Share a status update on all individual team member' tasks.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 44Which of the following best defines the team velocity metric used to measure team performance?

A. Team velocity is the total number of hours the team has worked during a Sprint.B. Team velocity is the total number of story points completed in a given Sprint.C. Team velocity is the percentage of story points that have been Done versus those committed.D. Team velocity is the actual time spent on delivering User Stories.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:Velocity measures how many user stories were completed by the team, on average, in previous sprints. It assists in estimating how much work the team is able toaccomplish in future sprints.

Reference: https://www.sealights.io/software-development-metrics/11-scrum-metrics-and-their-value-to-scrum-teams/

QUESTION 45To enable collaboration, the Product Owner, the Scrum Master, and the Scrum Team collaborate with each other and the stakeholders to create deliverables thatprovide the greatest possible value to the customer. This ensures realization of all the following project benefits, EXCEPT:

A. The customer can easily request changes and get things done by interacting closely with the team. Thus collaboration ensures efficient management of largenumbers of Change Requests.

B. The team will be able to identify, and assess risks. Also, due to the collaborative approach they are able to implement risk responses to high-priority risks.C. Even if a team member has missed a task deadline, the team members can align themselves collaboratively to meet the targets agreed to for completing the

Sprint.D. The Scrum Master can work with the team to rework and improve the processes for the next scheduled Sprint. Thus, collaboration leads to the practice of

continuous improvement.

Page 24: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/benefits-of-collaboration-in-scrum/

QUESTION 46The Product Owner on a project, on which you are the Scrum Master, has identified disaster situations, such as earthquakes and tsunamis, as potential risks to theunderwater transnational communication sea link. The Stakeholders have suggested that steps to safeguard the foundations of the ocean infrastructure be taken atthe earliest, and also have recommended that a contingency reserve be created, which could be used in case of disaster situations. This is an example of:

https://www.gratisexam.com/

A. Risk Mitigation.B. Risk Prioritization.C. Risk Avoidance.D. Risk Assessment.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/risk-management-in-scrum-2/

QUESTION 47Maria is one of the Scrum Master for a rail-road reservation system program. She facilitates the Daily Standup Meetings to enable the Scrum Team to discussissues faced by individual members, and seek solutions to motivate the team. Which of the following represents the mandatory outputs of Conduct Daily Standupprocess?

A. Updated Sprint Burndown chart and Impediment log.B. Updated Scrumboard and Unapproved Change Requests.

Page 25: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

C. Updated Sprint Burndown chart and Motivated Scrum Team.D. Updated Scrumboard and Dependencies.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: http://www.cs.vsu.ru/~svv/spm/SBOK_Guide_3rd_edition_English_Sample.pdf (62)

QUESTION 48A Scrum Team wants to conduct a meeting in which they plan to deliberate on ways to improve team collaboration and effectiveness in future. This can be identifiedas which type of meeting?

A. Sprint Planning meeting.B. Review Sprint meeting.C. Retrospect Project meeting.D. Review Project meeting.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: https://thedigitalprojectmanager.com/sprint-planning-meeting/

QUESTION 49Suppose you are a Scrum Master on a project to design a metro rail system for a city. It has been brought to your attention that the Product Owner wants to changethe Acceptance Criteria for one of the User Stories committed to for the current Sprint because the customer has changed a critical business requirement. Whichone of the following statements presents the best solution for such a situation?

A. You should direct the Scrum team to stop working on the current Sprint Backlog, and to start working on the latest business requirements.B. The Product Owner should add this requirement to the overall Prioritized Product Backlog, and the team would work on it in a future Sprint.C. You should tell the Product Owner to inform the stakeholders that this business requirement cannot be worked on as the Scrum Team has no bandwidth in the

current Sprint.D. The Product Owner should cancel the current Sprint, and should start planning a new Sprint for the team to be able to develop the deliverable as per the latest

business requirement.

Correct Answer: B

Page 26: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Section: (none)Explanation

Explanation/Reference:

QUESTION 50Which of the following is a process in the initiate phase of Scrum?

A. Identify Scrum Master and Stakeholder(s)B. Estimate User StoriesC. Conduct Daily StandupD. Commit User Stories

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: https://www.scrumstudy.com/whyscrum/scrum-initiate

QUESTION 51You are the Scrum Master of a project to construct an IT Tech Park. This project requires adhering to stringent quality standards at every stage of development. AScrum Core Team is formed for this project in which the Scrum Master is supposed to facilitate a “team first” mentality when it comes to quality. You must ensure allof the following to maintain quality in Scrum, EXCEPT:

A. Any quality related error must be fixed only at the end to ensure that the deliverable is Done.B. Iterative Product development, repetitive testing, and documentation help ensure quality is inherent in each Done deliverable.C. Any quality requirement must consider the capacity and willingness of the organization to meet the business need.D. The changing needs of the customers must be incorporated during the increments.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 52

Page 27: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

One of the core principles of Scrum is Empirical Process Control. As a Scrum Master, which of the following statements would you recognize as the best descriptionof the Empirical Process Control?

A. Empirical Process Control model helps make decisions based on inputs and requirements that are clearly defined and sorted out.B. Empirical Process Control model helps make decisions based on a particular input that will always provide a specific output.C. Empirical Process Control model helps make decisions based on processes that generate unpredictable and unrepeatable outputs.D. Empirical Process Control model helps make decisions based on observation and experimentation rather than on detailed upfront planning.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:Transparency allows all facets of any Scrum process to be observed by anyone. This promotes an easy and transparent flow of information throughout theorganization and creates an open work culture. In Scrum, transparency is depicted through:

1. Artifactsi. Project Vision Statementii. Prioritized Product Backlogiii. Release Planning Schedule2. Meetingsi. Sprint Review Meetingsii. Daily Standup Meetings3. Information Radiatorsi. Burndown Chartii. Scrumboard

Reference: https://www.scrumstudy.com/whyscrum/scrum-empirical-process-control

QUESTION 53A User Story is considered complete only when the which of the following is/are satisfied?

A) Acceptance CriteriaB) Done criteriaC) Demo to the product ownerD) Non-functional criteria

A. A and ВB. A, В and C

Page 28: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

C. C and AD. D and A

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: https://apple-brook.com/definition-of-done-user-stories/

QUESTION 54A project on developing quality testing equipment for an agro-based industry will start with the Create Deliverables process. Which of the following are NOT inputsto the current process?

A) Scrum Core TeamB) Acceptance CriteriaC) Impediment logD) Length of Sprint

A. A and ВB. B and DC. A and CD. В and C

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference: https://katherinemichel.gitbooks.io/agile-sprint-playbook/project-management/scrum-body-of-knowledge-phases.html

QUESTION 55Which of the following statements about non-core Scrum roles is correct?

A. Non-core roles are mandatorily required for the Scrum project to be successful.B. Non-core roles are supportive roles indirectly responsible for the success or failure of the project.C. Non-core roles are involved with the project, but do not have any interest in the project.D. Non-core roles have a formal stature on the project team and are continuously involved in the Scrum process.

Page 29: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: https://pdtraining.com.au/assets/pdf/SBOK-Chapter-1-Introduction.pdf

QUESTION 56Listed below are some responsibilities of a Scrum Master. Identify the one that is NOT correct.

A. Coordinates with Product Owner in creation of the Prioritized Product Backlog.B. Facilitates Prioritized Product Backlog Review Meetings.C. Resolves the issues affecting the Scrum Team.D. Identifies risks and implements risk mitigation actions.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: http://www.cs.vsu.ru/~svv/spm/SBOK_Guide_3rd_edition_English_Sample.pdf

QUESTION 57Scrum can easily be scaled for effective use in large projects with multiple small teams working on the project. Which of the following facilitates coordination amongscrum teams?

A. Scrum of Scrums MeetingB. Daily Standup MeetingC. Sprint Review MeetingD. Sprint Planning Meeting

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:There are a lot of people who say “Scrum can be used to improve the team productivity but is not scalable”. In fact, it can easily be scaled for effective use in largeprojects. Multiple Scrum Teams can be formed to work on the project where the Scrum Team size exceeds ten people. The Convene Scrum of Scrums process

Page 30: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

facilitates coordination among the Scrum Teams, enabling effective implementation in larger projects. Multiple Scrum Teams work in parallel in large projects,making it necessary to synchronize and facilitate the flow of information and enhance communication. The Convene Scrum of Scrums is the process ensuring thissynchronization. The various Scrum Teams are represented in this meeting and the objectives are to provide updates about progress, discuss challenges facedduring the project, and coordinate activities.

Reference: http://blog.scrumstudy.com/scalability-of-scrum-scrum-of-scrums/

QUESTION 58Which of the following activities is NOT a part of the implementation phase in Scrum?

A. Daily Standup Meeting.B. Updating the Product Backlog.C. Release Planning Meeting.D. Creating deliverables.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/exploring-the-implement-phase-of-a-scrum-project/

QUESTION 59Which of the following is a tool that can be used for communicating information related to risks?

A. Risk Burnup chart.B. Risk Burndown chart.C. Risk Progress chart.D. Risk Tracking chart.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:An important tool which can be used for communicating information related to risks is the Risk Burndown Chart.

Reference: http://blog.scrumstudy.com/risk-prioritization-and-communication-in-scrum/

Page 31: Passing Score : 800 Time Limit : 120 min File Version : 1

https://www.gratisexam.com/

QUESTION 60Which of the following is/are role(s) of a Chief Scrum Master, not of a Chief Product Owner?

A) Addresses impediments that impact more than one Scrum Team.B) Prepares and maintains the overall Prioritized Product Backlog for the large project.C) Facilitates the Scrum of Scrums meetings.D) Interfaces with the Program Product Owner to ensure alignment of the large project with the goals and objectives of the Program.

A. A and CB. A and DC. A, B, and CD. C

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference: http://blog.scrumstudy.com/role-of-a-chief-scrum-master/

https://www.gratisexam.com/