partial roof replacement osborn hill ......list of drawings middletown, connecticut 06457 hibbard...

7
LIST OF DRAWINGS MIDDLETOWN, CONNECTICUT 06457 HIBBARD & ROSA ARCHITECTS, L.L.C. 100 RIVERVIEW CENTER (860) 346-1809 COMM. NO. 2020-12 APRIL 22, 2020 PARTIAL ROOF REPLACEMENT FOR OSBORN HILL ELEMENTARY SCHOOL TOWN OF FAIRFIELD, CT LOCATION MAP SITE MAP SUITE 272 STATE PROJECT NO. 051-0151 RR

Upload: others

Post on 16-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PARTIAL ROOF REPLACEMENT OSBORN HILL ......LIST OF DRAWINGS MIDDLETOWN, CONNECTICUT 06457 HIBBARD & ROSA ARCHITECTS, L.L.C. 100 RIVERVIEW CENTER (860) 346-1809 COMM. NO. 2020-12 APRIL

LIST OF DRAWINGSMIDDLETOWN, CONNECTICUT 06457

HIBBARD & ROSA ARCHITECTS, L.L.C.100 RIVERVIEW CENTER

(860) 346-1809

COMM. NO. 2020-12

APRIL 22, 2020

PARTIAL ROOF REPLACEMENTFOR

OSBORN HILL ELEMENTARY SCHOOL

TOWN OF FAIRFIELD, CT

LOCATION MAP

SITE MAP

SUITE 272

STATE PROJECT NO. 051-0151 RR

Page 2: PARTIAL ROOF REPLACEMENT OSBORN HILL ......LIST OF DRAWINGS MIDDLETOWN, CONNECTICUT 06457 HIBBARD & ROSA ARCHITECTS, L.L.C. 100 RIVERVIEW CENTER (860) 346-1809 COMM. NO. 2020-12 APRIL

ARCHITECTS, LLC

HIBBARD & ROSA

Page 3: PARTIAL ROOF REPLACEMENT OSBORN HILL ......LIST OF DRAWINGS MIDDLETOWN, CONNECTICUT 06457 HIBBARD & ROSA ARCHITECTS, L.L.C. 100 RIVERVIEW CENTER (860) 346-1809 COMM. NO. 2020-12 APRIL

ARCHITECTS, LLC

HIBBARD & ROSA

Page 4: PARTIAL ROOF REPLACEMENT OSBORN HILL ......LIST OF DRAWINGS MIDDLETOWN, CONNECTICUT 06457 HIBBARD & ROSA ARCHITECTS, L.L.C. 100 RIVERVIEW CENTER (860) 346-1809 COMM. NO. 2020-12 APRIL

ARCHITECTS, LLC

HIBBARD & ROSA

Page 5: PARTIAL ROOF REPLACEMENT OSBORN HILL ......LIST OF DRAWINGS MIDDLETOWN, CONNECTICUT 06457 HIBBARD & ROSA ARCHITECTS, L.L.C. 100 RIVERVIEW CENTER (860) 346-1809 COMM. NO. 2020-12 APRIL

ARCHITECTS, LLC

HIBBARD & ROSA

Page 6: PARTIAL ROOF REPLACEMENT OSBORN HILL ......LIST OF DRAWINGS MIDDLETOWN, CONNECTICUT 06457 HIBBARD & ROSA ARCHITECTS, L.L.C. 100 RIVERVIEW CENTER (860) 346-1809 COMM. NO. 2020-12 APRIL

ARCHITECTS, LLC

HIBBARD & ROSA

Page 7: PARTIAL ROOF REPLACEMENT OSBORN HILL ......LIST OF DRAWINGS MIDDLETOWN, CONNECTICUT 06457 HIBBARD & ROSA ARCHITECTS, L.L.C. 100 RIVERVIEW CENTER (860) 346-1809 COMM. NO. 2020-12 APRIL

ARCHITECTS, LLC

HIBBARD & ROSA

KUEGLER

cons

ultin

g en

gine

ers

Con

nect

icut

Offi

ce51

Dep

ot S

t., S

uite

104

, Wat

erto

wn,

CT 0

6795

Phon

e: (8

60) 9

45-6

955

Mas

sach

uset

ts O

ffice

203

Kend

all R

d., T

ewks

bury

, MA

018

76Ph

one:

(860

) 945

-695

5

ww

w.k

uegl

eras

soci

ates

.com

AutoCAD SHX Text
CAFETORIUM
AutoCAD SHX Text
STAGE
AutoCAD SHX Text
MECHANICAL/ELEC ROOM
AutoCAD SHX Text
TLT.
AutoCAD SHX Text
TLT.
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
SPRINKLER
AutoCAD SHX Text
TLT.
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
RECVD
AutoCAD SHX Text
RM
AutoCAD SHX Text
SWEEPS TO BE CONVERTED TO LB'S OR JUNCTION BOX PHOTO C
AutoCAD SHX Text
FEEDERS ON ROOF TO BE REPLACED/RELOCATED TO HIGHER POSITION, PHOTO B
AutoCAD SHX Text
JUNCTION BOX TO BE UPSIZED PHOTO A
AutoCAD SHX Text
AutoCAD SHX Text
FAX: (860) 704-8248
AutoCAD SHX Text
PHONE: (860) 346-1809
AutoCAD SHX Text
MIDDLETOWN, CT
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
363 MAIN STREET
AutoCAD SHX Text
04/22/2020
AutoCAD SHX Text
REVISED:
AutoCAD SHX Text
PROJ. #
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
A43-21
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
PARTIAL ROOF REPLACEMENT OSBORN HILL ELEMENTARY SCHOOL 760 STILLSON ROAD FAIRFIELD, CT 06
AutoCAD SHX Text
PERMIT/BID SET
AutoCAD SHX Text
E100
AutoCAD SHX Text
ELECTRICAL PARTIAL ROOF PLAN
AutoCAD SHX Text
PARTIAL ROOF PLAN
AutoCAD SHX Text
1
AutoCAD SHX Text
E100
AutoCAD SHX Text
0
AutoCAD SHX Text
8'
AutoCAD SHX Text
16'
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
4'
AutoCAD SHX Text
PHOTO C, SWEEPS TO BE REPLACED
AutoCAD SHX Text
4
AutoCAD SHX Text
E100
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
PHOTO B, FEEDER TO BE MOVED
AutoCAD SHX Text
3
AutoCAD SHX Text
E100
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
PHOTO A, JUNCTION BOX ABOVE ELECTRIC RM
AutoCAD SHX Text
2
AutoCAD SHX Text
E100
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
ELECTRICAL NOTES & SPECIFICATIONS: PART 1 GENERAL: 1. PROVIDE A COMPLETE AND OPERATIONAL ELECTRICAL SYSTEM PROVIDE A COMPLETE AND OPERATIONAL ELECTRICAL SYSTEM INCLUDING ALL NECESSARY MATERIAL, LABOR, EQUIPMENT AND TESTING REQUIRED. 2. ELECTRICAL PLANS, DETAILS, AND ONE-LINE DIAGRAMS SHOW ELECTRICAL PLANS, DETAILS, AND ONE-LINE DIAGRAMS SHOW THE GENERAL LOCATION AND ARRANGEMENT OF THE ELECTRICAL SYSTEM. THEY ARE DIAGRAMMATIC AND DO NOT SHOW ALL CONDUIT BODIES, CONNECTORS, BENDS, FITTINGS, HANGERS, AND ADDITIONAL PULL AND JUNCTION BOXES WHICH THE CONTRACTOR MUST PROVIDE TO COMPLETE THE ELECTRICAL SYSTEM. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BY FIELD MEASUREMENTS. 3. ELECTRICAL PLANS AND DETAILS DO NOT SHOW ALL ELECTRICAL PLANS AND DETAILS DO NOT SHOW ALL INTERFERENCE'S AND CONDITIONS, VISIBLE AND/OR HIDDEN, THAT MAY EXIST, THUS REQUIRING THE CONTRACTOR TO INSPECT AND SURVEY THE SPACE BEFORE PERFORMING THE WORK. 4. ALL EQUIPMENT AND MATERIAL SHALL BE LABELED AND LISTED, ALL EQUIPMENT AND MATERIAL SHALL BE LABELED AND LISTED, AND INSTALLED IN ACCORDANCE WITH THEIR LISTING. 5. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND ARRANGE FOR ALL REQUIRED INSPECTIONS IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL GOVERNING AUTHORITIES. 6. ALL WORK SHALL BE DONE WITH LICENSED WORKMEN IN ALL WORK SHALL BE DONE WITH LICENSED WORKMEN IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL GOVERNING AUTHORITIES AND CODES. 7. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CONNECTICUT BUILDING CODE, AND FIRE CODE WITH REFERENCES AND AMENDMENTS TO THE NATIONAL ELECTRIC CODE (NEC) ANSI/NFPA 70 2017 EDITION. 8. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE (NEC) ANSI/NFPA 70 2017 EDITION. 9. PROVIDE SEISMIC RESTRAINT AND VIBRATION ISOLATION IN PROVIDE SEISMIC RESTRAINT AND VIBRATION ISOLATION IN ACCORDANCE WITH THE BUILDING CODE AND CONTRACT DOCUMENTS. ALL WIRING AND EQUIPMENT SHALL BE ATTACHED TO BUILDING STRUCTURE OR UNDERGROUND. 10. INSTALLATION OF EMERGENCY LIGHTING AND EXIT SIGNS SHALL INSTALLATION OF EMERGENCY LIGHTING AND EXIT SIGNS SHALL MEET ALL APPLICABLE CODES AND REGULATIONS INCLUDING BUILDING CODES, NEC AND ADA. 11. THE DEFINITION OF ELECTRICAL TERMS USED SHALL BE AS THE DEFINITION OF ELECTRICAL TERMS USED SHALL BE AS DEFINED IN THE 2017 EDITION OF THE NATIONAL ELECTRICAL CODE (NEC). 12. THE TERM "INDICATED" SHALL MEAN, "AS SHOWN ON THE TERM "INDICATED" SHALL MEAN, "AS SHOWN ON CONTRACT DOCUMENTS (SPECIFICATIONS, DRAWINGS, AND RELATED ATTACHMENTS)". 13. THE TERM "PROVIDE" SHALL MEAN, "TO FURNISH, INSTALL, THE TERM "PROVIDE" SHALL MEAN, "TO FURNISH, INSTALL, AND CONNECT COMPLETELY". 14. THE TERM "SIZE" SHALL MEAN ONE OR MORE OF THE THE TERM "SIZE" SHALL MEAN ONE OR MORE OF THE FOLLOWING: "LENGTH, CURRENT AND VOLTAGE RATING, NUMBER OF POLES, NEMA SIZE, AND OTHER SIMILAR ELECTRICAL CHARACTERISTICS". 15. THE TERM "SPACE" ON PANELBOARD AND SWITCHBOARD THE TERM "SPACE" ON PANELBOARD AND SWITCHBOARD SCHEDULES SHALL MEAN, "PROVIDE SPACE TO INSTALL THE NUMBER OF POLES AND SIZE OF THE PROTECTIVE DEVICE INDICATED WITH ALL THE NECESSARY SPACE ON THE BUSBAR AND FITTINGS TO INSTALL THE DEVICE AT SOME FUTURE DATE". 16. THE TERM "COORDINATE" SHALL MEAN ONE OR MORE OF THE THE TERM "COORDINATE" SHALL MEAN ONE OR MORE OF THE FOLLOWING: "TO MANAGE, INTERFACE, COMMUNICATE, MAKE ARRANGEMENT, BRING INTO ORDER, ADMINISTER AND HANDLE COMPLETELY". 17. WRITTEN REQUESTS FOR APPROVAL FOR PLANNED SHUTDOWNS WRITTEN REQUESTS FOR APPROVAL FOR PLANNED SHUTDOWNS OR INTERRUPTION OF OWNER'S ELECTRIC SERVICE AND EQUIPMENT SHALL BE MADE 72 HOURS PRIOR TO THE START OF THE REQUESTED SHUTDOWN PERIODS. 18. COORDINATE ELECTRICAL WORK WITH OWNER AND ARCHITECT. COORDINATE ELECTRICAL WORK WITH OWNER AND ARCHITECT. 19. COORDINATE ELECTRICAL WORK WITH OTHER DIVISIONS OF COORDINATE ELECTRICAL WORK WITH OTHER DIVISIONS OF THIS PROJECT. PART 2 PRODUCTS AND EXECUTION 20. THE CONTRACTOR SHALL VISIT THE SITE OF WORK AND THE CONTRACTOR SHALL VISIT THE SITE OF WORK AND FAMILIARIZE HIMSELF WITH ALL AVAILABLE INFORMATION CONCERNING THE NATURE OF THE INSTALLATION AND CONDITIONS. FAILURE OF THE CONTRACTOR TO ACQUAINT HIMSELF WITH ALL AVAILABLE INFORMATION CONCERNING THE ABOVE CONDITIONS WILL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY FOR ESTIMATING THE DIFFICULTIES AND COSTS FOR SUCCESSFULLY PERFORMING THE COMPLETE WORK UNDER THIS PROJECT. 21. WHERE ELECTRICAL CABLES AND RACEWAYS PASS THROUGH WHERE ELECTRICAL CABLES AND RACEWAYS PASS THROUGH FIRE RATED WALLS AND FLOORS, PENETRATIONS IN WALLS AND FLOORS SHALL BE FIRE SEALED WITH U.L. RATED PRODUCTS SUITABLE FOR CONDITIONS ENCOUNTERED AND RATING REQUIRED TO MAINTAIN THE RATING OF THE U.L. FIRE RATED ASSEMBLY INVOLVED. 22. THE RIGHT IS RESERVED BY THE ENGINEER OR OWNER TO THE RIGHT IS RESERVED BY THE ENGINEER OR OWNER TO MAKE REASONABLE CHANGES IN LOCATIONS OF EQUIPMENT, OUTLETS, OR WIRING PRIOR TO THE INSTALLATION WITHOUT INVOLVING ADDITIONAL COST OR EXPENSE TO THE OWNER. 23. WHEN A MANUFACTURER RECOMMENDS AN OPTION OR WHEN A MANUFACTURER RECOMMENDS AN OPTION OR ACCESSORY ITEM FOR THE INSTALLED CONDITION, OPERATION, OR ENVIRONMENT THAT IS TO BE EXPERIENCED, SUCH ITEM SHALL BE SUPPLIED AT NO ADDITIONAL COST TO THE OWNER. 24. BEFORE SELECTING MATERIAL, EQUIPMENT AND PROCEEDING BEFORE SELECTING MATERIAL, EQUIPMENT AND PROCEEDING WITH WORK, INSPECT AREAS WHERE MATERIAL AND EQUIPMENT ARE TO BE INSTALLED TO INSURE SUITABILITY, AND CHECK NEEDED SPACE FOR PLACEMENT, CLEARANCES AND INTERCONNECTIONS. 25. BEFORE CUTTING OR DRILLING INTO BUILDING ELEMENTS, BEFORE CUTTING OR DRILLING INTO BUILDING ELEMENTS, INSPECT AND LAYOUT WORK TO AVOID DAMAGING STRUCTURAL ELEMENTS AND BUILDING UTILITIES. MOTOR AND PHASE ROTATION: 26. CONTRACTOR SHALL MAINTAIN THE EXISTING SYSTEM PHASE CONTRACTOR SHALL MAINTAIN THE EXISTING SYSTEM PHASE ROTATION. CONTRACTOR SHALL MARK DOWN STREAM EQUIPMENT WITH THE PHASE ROTATION PRIOR TO DISASSEMBLE. 27. ONCE FINAL PHASE ROTATION IS CONFIRMED CONTRACTOR ONCE FINAL PHASE ROTATION IS CONFIRMED CONTRACTOR SHALL PERMANENTLY MARK ALL EQUIPMENT WITH THE PHASE ROTATION OF ITS MAIN INCOMING BUS. REMOVALS 28. DEMOLITION OF INDICATED ELECTRICAL ITEMS INCLUDES THE DEMOLITION OF INDICATED ELECTRICAL ITEMS INCLUDES THE REMOVAL AND PROPER DISPOSAL OF THOSE ITEMS AND ALL ASSOCIATED WIRING AND HANGERS. ELECTRICAL BRANCH, CONTROL, TELEPHONE, AND ALARM WIRING SHALL BE REMOVED BACK TO PANELBOARDS OR RELATED SYSTEM PANELS OR BACKBOARDS. ALSO, WORK TO INCLUDE CAPPING OF CONDUITS AND DUCTS AND CUTTING AND PATCHING FLUSH WITH FLOOR FOR SLAB ON GRADE CONCRETE FLOORS. WIRING 29. UNLESS OTHERWISE INDICATED, FEEDERS, BRANCH AND UNLESS OTHERWISE INDICATED, FEEDERS, BRANCH AND CONTROL WIRING TO BE RUN IN RSC OR IMC RACEWAYS. 30. ALL CONDUCTORS TO BE COPPER DUAL RATED THWN / THHN, ALL CONDUCTORS TO BE COPPER DUAL RATED THWN / THHN, UNLESS OTHERWISE INDICATED. 31. ALL CONDUCTORS THAT ARE EXTENDED SHALL MATCH EXISTING ALL CONDUCTORS THAT ARE EXTENDED SHALL MATCH EXISTING CONDUCTOR TYPE AND SIZE. 32. THE TEMPERATURE RATING OF CONDUCTORS SHALL BE A THE TEMPERATURE RATING OF CONDUCTORS SHALL BE A MINIMUM OF 75 DEGREES CENTIGRADE FOR WET CONDITIONS AND 90 DEGREES CENTIGRADE UNDER DRY CONDITIONS, UNLESS OTHERWISE INDICATED.
AutoCAD SHX Text
ELECTRICAL NOTES & SPECIFICATIONS
AutoCAD SHX Text
ELECTRIC WORK ITEMS GENERAL: A) ELECTRIC FEEDER TO BE RELOCATED TO SUPPORT ROOF ELECTRIC FEEDER TO BE RELOCATED TO SUPPORT ROOF REPLACEMENT. CONTRACTOR SHALL REMOVE AND REPLACE A 500AMP FEEDER IN DIFFERENT LOCATION TO SUPPORT THE THICKER EXPECTED ROOF AND ROOF INSULATION. DUE TO ROOF AND INSULATION GROWING IN THICKNESS THE FEEDERS WILL NEED TO BE RAISED ABOVE THE ROOF. B) THE CONTRACTOR SHALL STOP WORK IF ANY DIFFERENCES IN THE CONTRACTOR SHALL STOP WORK IF ANY DIFFERENCES IN THE EXISTING WIRING THAT DIFFER FROM WHAT IS DESCRIBED IN THESES GENERAL OR SPECIFIC WORK ITEMS. CONTRACTOR SHALL SUBMIT AN RFI IMMEDIATELY AND IN SUFFICIENT TIME TO THE ATTENTION OF THE ENGINEER. IN THE RFI THE CONTRACTOR SHALL DESCRIBE THE SPECIFIC ISSUE AND ANY PROPOSED SOLUTIONS THAT THEY MAY HAVE TO CORRECT ISSUES. C) IT IS PROPOSED TO SAVE THE MAJORITY OF CONDUCTORS AND IT IS PROPOSED TO SAVE THE MAJORITY OF CONDUCTORS AND REPLACE THE EXISTING CONDUIT AND JUNCTION BOX ON THE ROOF. THE EXISTING CONDUITS AND CONDUCTORS ARE BELIEVED TO BE A PARALLEL SET OF CONDUCTORS FOR A 500AMP FEEDER. CONTRACTOR SHALL VERIFY AT START OF THE PROJECT IF THIS IS THE CASE. D) ADDITIONAL CONDUCTOR LENGTH AND SPLICING WILL BE ADDITIONAL CONDUCTOR LENGTH AND SPLICING WILL BE REQUIRED. SINCE THE TWO SETS OF CONDUIT AND CONDUCTORS ARE POSSIBLY IN PARALLEL THE EXTENDING OF CONDUIT AND CONDUCTORS SHALL BEEN DONE IN A MANNER TO MAINTAIN CONDUCTOR LENGTHS AND TYPE THAT ARE EQUAL AND SIMILAR ELECTRICALLY. THE WIRING SHALL MEET THE NATIONAL ELECTRIC CODE ARTICLE 310.10(H) CONDUCTORS IN PARALLEL. E) ALL JUNCTION BOXES SHALL BE SIZED TO NATIONAL ELECTRIC ALL JUNCTION BOXES SHALL BE SIZED TO NATIONAL ELECTRIC CODE ARTICLE 314.28 PULL AND JUNCTION BOXES. ALL JUNCTION BOXES SHALL BE ENCLOSED AND GASKETED. ALL CONDUIT CONNECTIONS TO JUNCTION BOXES SHALL USE WATER PROOF HUBS OR DIRECT CONDUIT CONNECTIONS WITH SEALS. F) IT IS PROPOSED TO PULL THE CONDUCTORS BACK TO THE IT IS PROPOSED TO PULL THE CONDUCTORS BACK TO THE POINT BELOW THE SWEEPS DESCRIBED IN WORK ITEM 3 BELOW BY DISCONNECTING THEM FROM THERE BREAKER FEED AND PULLING THEM BACK, AND REINSTALLING THEM IN THE RELOCATED CONDUITS TO THE JUNCTION BOX ABOVE THE ELECTRIC ROOM. THIS REQUIRES THE CONTRACTOR TO UNSCREW OR CUT CONDUITS OFF WITHOUT DAMAGING THE EXISTING CONDUCTORS. THE ADDITIONAL CONDUCTOR LENGTH NEED CAN BE SPLICED IN TO MAKE THE 25' DROP TO THE ELECTRIC GEAR. ALL SPLICES SHALL BE MADE IN A SPLICE OR JUNCTION BOX. THERE SHALL NOT BE ANY SPLICES IN ANY CONDUIT. ELECTRIC WORK ITEMS NUMBERED 1) TWO HORIZONTAL CONDUITS WITH CONDUCTORS WILL NEED TO TWO HORIZONTAL CONDUITS WITH CONDUCTORS WILL NEED TO BE REMOVED AND REPLACED FROM THE JUNCTION BOX ALL THE WAY TO VERTICAL WALL SECTION INCLUDING THE (2) 90-DEGREE SWEEPS TO THE VERTICAL SECTION RUNNING DOWN THE WALL ON THE OTHER END OF THE ROOF. REPLACEMENT CONDUITS SHALL BE SAME SIZE OR LARGER. IF EXISTING CONDUIT ARE REUSED THE CONTRACTOR SHALL TAKE ALL RESPONSIBILITY WITH THE INSTALLATION AS NEW. CONTRACTOR SHALL PROVIDE CONDUITS SUPPORTS COMPATIBLE WITH THE REPLACEMENT ROOF. ALL CONDUIT SPORTS SHALL BE NEW. 2) THE JUNCTION BOX IS TO BE REPLACED WITH JUNCTION BOX THE JUNCTION BOX IS TO BE REPLACED WITH JUNCTION BOX THAT IS LARGER IN SIZE TO ACCOMMODATE SPLICING AND EXTENSION OF THE EXISTING CONDUCTORS. 3) THE TWO 90 DEGREE SWEEPS FROM VERTICAL SECTION TO THE TWO 90 DEGREE SWEEPS FROM VERTICAL SECTION TO THE ROOF SHALL BE REPLACED WITH A JUNCTION /PULL BOX THAT MOUNTS OFF THE BUILDING AND EXTENDS ABOVE THE ROOF, LB'S WITH VERTICAL CONDUIT EXTENSIONS CAN ALSO BE USED FOR THIS SECTION.
AutoCAD SHX Text
ELECTRICAL WORK ITEMS