part 1 of 2, r. e. ginna nuclear power plant - revision to
TRANSCRIPT
l f A Subsidiary of RGS Energy Group, Inc.
ROCHESTER GAS AND ELECTRIC CORPORATION * 89 EAST AVENUE, ROCHESTER, N.Y 14649-0001 0 716 546-2700 www.rge.com
June 11,2002
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Mr. Robert Clark (Mail Stop O-8-E9)
Project Directorate I-1
Subject: Revision to Emergency Plan Implementing Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244
Gentlemen:
In accordance with 10 CFR 50.4(b)(5), enclosed are revisions to Ginna Station Emergency Plan
Implementing Procedures (EPIP).
We have determined, per the requirements of 10 CFR 50.54(q), that these procedure changes do
not decrease the effectiveness of our Nuclear Emergency Response Plan.
Very truly yours,
Richard J. Watts
Manager, Nuclear Training Department
Enclosures
xc: USNRC Region 1 (2 copies of letter and 2 copies of each procedure)
Resident Inspector, Ginna Station (1 copy of letter and 1 copy of each procedure)
RG&E Nuclear Safety and Licensing (1 copy of letter) Dr. Robert C. Mecredy (2 copies of letter only)
PSP/jtw
U.S. Nuclear Regulatory Commission June 11,2002 Page 2 of 2
PROCEDURE REVISION NUMBER
3EPIP 1-18
EPIP 4-7
EPIP 5-7
20
36
ROCHESTER GAS & ELECTRIC CORPORATION
GINNA STATION
CONTROLLED COPY NUMBER ),5
PROCEDURE NO. EPIP 1-18 REV. NO. 3
DISCRETIONARY ACTIONS FOR EMERGENCY CONDITIONS
RESPObN9BLE9 GER
EFFECTIVE DATE
Category 1.0
This procedure contains 14 pages
EPIP 1-18:1
EPIP 1-18
DISCRETIONARY ACTIONS FOR EMERGENCY CONDITIONS
1.0 PURPOSE
1.1 The purpose of this procedure is to provide additional measures to be
considered along with those pre-planned actions that are identified in the NERP
and Implementing Procedures. This procedure can be implemented due to
severe weather, HAZMAT events, security events or any other unforeseen event
where actions need to be taken to protect employees or equipment.
2.0 RESPONSIBILITY
2.1 Emergency Planning will be available to assist in coordinating
recommendations to the Nuclear Operations Group (NOG).
2.2 The Shift Supervisor, Management or TSC responders can implement this
procedure.
3.0 REFERENCES
3.1 Developmental References
3.1.1 Effect of Hurricane Andrew on the Turkey Point Nuclear Generating Station from
August 20-30, 1992 - NRC/INPO.
3.1.2 Industry Guidance for Responding to the NRC's October 6, 2001, Safeguards
Advisory - NEI, dated November 16, 2001.
3.2 Implementing References
3.2.1 EPIP 1-0, Ginna Station Event Evaluation and Classification.
3.2.2 EPIP 1-5, Notifications
3.2.3 EPIP 1-6, Site Evacuation
3.2.4 EPIP 1-7, Accountability of Personnel
3.2.5 EPIP 1-8, Search and Rescue Operations
3.2.6 EPIP 1-9, TSC Activation
3.2.7 EPIP 1-11, Survey Center Activation
EPIP 1-18:2
3.2.8 EPIP 3-1, EOF Activation
3.2.9 EPIP 3-3, Immediate Entry
3.2.10 EPIP 4-7, Public Information Organization Staffing
3.2.11 EPIP 5-7, Emergency Organization
3.2.12 ER-SC.9, Security Event Plan
3.2.13 SAG-4, Inject Into Containment
3.2.14 SAG-5, Reduce Fission Product Release
3.2.15 SAG-6, Control Containment Conditions
3.2.16 SAG-7, Reduce Containment Hydrogen
3.2.17 S-9 Series Procedures (relative to the Spent Fuel Pool)
4.0 PRECAUTIONS
None.
5.0 PREREQUISITES
5.1 Events which pose a threat, or possible threat, of hazardous conditions to
employee or public safety are imminent or in progress.
6.0 ACTIONS
NOTE: THE RECOMMENDATIONS ARE POSSIBLE ACTIONS TO BE TAKEN.
SINCE EACH EVENT IS UNIQUE, NOT ALL RECOMMENDATIONS HAVE
TO BE IMPLEMENTED.
6.1 Notifications
6.1.1 To staff the facilities, notify Emergency Preparedness per EPIP 1-5, Attachment
6, to contact the appropriate responders.
6.1.2 For events involving offsite assistance (e.g., fire, law enforcement, EMS,
HAZMAT), notifications will be made using EPIP 1-5, Attachment 5.
6.2 Communications
6.2.1 Internal
EPIP 1-18:3
6.2.1.1 Use the plant page to inform the plant employees of conditions.
6.2.1.2 Refer to EPIP 1-5 "Notifications" for notifications of NERP responders, offsite
notifications and specialized notifications.
6.2.1.3 Refer to EPIP 1-6 for "Site Evacuation" notifications.
6.2.1.4 Use Lotus Note (email) to inform specific groups (e.g., G-Ops, NOG Dist,
Nuclear Emergency Responders) of events or conditions.
6.2.1.5 Responders with Alpha Pagers (Operations Management, Emergency
Preparedness) can also be notified via Lotus Notes.
6.2.1.6 Use the RG&E telephone directory, Ginna telephone directory and E-Plan
telephone directory to assist in contacting various responders, management
and support personnel.
6.2.1.7 Fax machines can also be used to relay information to groups of individuals at
specific locations (e.g. TSC, EOF, JENC)
6.2.1.8 Radio communication from the Control Room can be used to contact the TSC,
EOF, Survey Center, Operators, Security and the Fire Brigade. Additional radio
communications are available through local law enforcement, fire departments
or ambulance companies.
6.2.1.9 If radio communications to the Energy Control Center (ECC) is the only means
to communicate outside Ginna, have the ECC notify Emergency Preparedness
per EPIP 1-5, Attachment 6, and have EP conduct notifications.
6.2.1.10 Alternate communication is available in the TSC, Survey Center and EOF via
radio, commercial phone, cell phone and Corporate Desktop.
6.2.1.11 Alternate notification methods can be delegated EP personnel, managers) who
carry copies of EPIP 1-5, 5-7, 4-7 and laminated "emergency contact cards".
6.3 External
6.3.1 EPIP 1-5 "Notifications" provides instruction for notification to Wayne County,
Monroe County, New York State and the NRC. Actions taken are normally
coordinated from the Control Room via RECS line or commercial telephone
(including fax).
6.3.2 Alternate external communication systems are available in the TSC, Simulator,
Survey Center and EOF via RECS line, commercial phone and cell phone.
EPIP 1-18:4
6.3.3 Alternate notification methods can be delegated to EP personnel who carry
copies of EPIP 1-5 and laminated "emergency contact cards". Information to
contacted personnel should also include specific contacts for fire and
emergency services support and reporting location (in coordination with
Security and Fire/Safety).
6.4 Assembly/Accountability Process
6.4.1 Consider implementing EPIP 1-6 "Site Evacuation", to evacuate employees
from the site. Security will implement EPIP 1-7 "Accountability" to ensure that all
employees are accounted for.
6.4.2 If employees need to be moved off plant property, notify the Wayne County 911
Dispatcher at (315) 946-5304 to contact the Ontario Fire Chief. They will make
available the Ontario Fire Dept Exempt Hall located on Route 104 between
Route 350 and Knickerbocker Road.
6.4.3 If hazardous conditions prevent employees and emergency responders from
responding directly to the site, direct them to respond to the Ontario Fire Dept
Exempt Hall. It is located on Route 104 between Route 350 and Knickerbocker
Road. After assembling at the Exempt Hall, TSC assessment functions can be
directed to the EOF if the site will be inaccessible for a long period of time.
6.4.3.1 When the situation is stable and it is safe for responders to report to the site,
personnel at the staging area (Ontario Fire Department Exempt Hall) should
contact the EOF for direction.
6.4.3.2 Consider reporting to the Survey Center and initiate EPIP 3-3, Immediate Entry,
to access the site.
6.4.4 Consider designation of alternate supervision to perform accountability if
Security is unable to perform this function due to the event.
6.5 Command and Control
6.5.1 Refer to EPIP 1-9 "TSC Activation" and EPIP 3-1 "EOF Activation" for facility
activation and transfer of command and control.
6.5.2 A near-site incident "command post" may need to be established to allow
coordination of onsite response activities such as communications, accident
assessment/mitigation, accountability, search and rescue, coordination with fire
and medical services, and staging should the Control Room, TSC, OSC or
other facilities become inaccessible.
6.5.3 Wayne county Emergency Management has a mobile command post that may
be utilized.
EPIP 1-18:5
6.5.4 If a near-site incident "command post" is established, communication with the
EOF should be established to provide resources to the site.
6.5.5 Access to the plant protected area is described in procedure EPIP 3-3,
"Immediate Entry'.
6.6 Search and Rescue
6.6.1 Implement EPIP 1-8, "Search and Rescue Operations" to find missing
individuals.
6.7 Plant Assessment and Mitigation
6.7.1 Consider the following procedures to address assessment and mitigation of an
event:
* AP-CR.1 * EOPs * ER-Fire series * ER-SC series * EPIPs * SAMGs
6.7.2 Remote accident assessment may depend upon the availability of PPCS data
and/or communication with the site. Computer terminals are located in the
following areas to assist with assessment:
0 Training Center • Warehouse * EOF 0 JENC
6.7.3 Consider the use of fax machines located in various RG&E locations as well as
town offices, fire halls, ambulance halls and local businesses.
6.8 Dose Assessment/PARs
6.8.1 EPIP 2-series procedures provide instruction for obtaining meteorological data
from multiple sources for performing dose assessment and protective action
recommendations.
6.8.2 Dose Assessment can be performed in the CR, TSC or EOF with support from
environmental survey teams deployed from the Survey Center or EOF.
EPIP 1-18:6
6.8.3 Consider staging survey team personnel at the designated staging area (e.g.,
Ontario Fire Dept Exempt Hall, 89 East Avenue) if the Survey Center is
unavailable.
6.9 Public Information
6.9.1 EPIP 4-series procedures provide instruction on Joint Emergency News Center
(JENC) operation and Public Information.
6.9.2 Security will be further pressured by media requests to approach the site.
Offsite agencies will be required to restrict access to plant area. Public
Relations and government agencies are to stress the JENC as the central
clearinghouse for public information.
6.9.3 Consider activation of the Public Inquiry and Media Monitoring portion of the
JENC. Provide information to the JENC to provide information to the public and
spouses of RG&E/Ginna personnel.
6.10 Relocation
6.10.1 Consider the establishment of alternate work locations for "non-essential" site
personnel (e.g., 89 East Avenue, West Avenue, Eastern Monroe).
6.10.2 Contact Corporate Information Services (IS) to provide communications to the
newly established work locations.
6.10.3 Consider relocation of Survey Team Equipment, in accordance with EPIP 1-11,
to the Ontario Fire Department Exempt Hall or EOF if the Survey Center is
unuseable. Contact a Maintenance Assessment Manager listed in EPIP 5-7 to
make arrangements to transport equipment to the alternate location.
6.10.4 Each NOG department should consider identification of business critical
information and equipment needed for recovery such as drawings, procedures,
vendor manuals, survey equipment.
6.11 Alternate AC and DC Power
6.11.1 Implement existing ER series procedures to the extent practical to restore power.
6.11.2 Technical Assessment Manager refer to Attachment 1, Alternate AC and DC
Power Supplies and Table 1, Equipment Ratings.
6.11.3 Technical Assessment Manager and Operations Assessment Manager discuss
options and impact on 1 OCFR50.54(x).
6.11.4 Provide recommendations to the Emergency Coordinator for implementation.
EPIP 1-18:7
6.12 Back-up Mechanical Pump Capability
6.12.1 Implement existing ER series procedures to the extent possible to restore equipment.
6.12.2 Implement existing SC series procedures to the extent possible to respond to
the event and enlist offsite support.
6.12.3 Technical Assessment Manager refer to Table 1, Equipment Ratings, and
Table 2, Back-up Mechanical Pump Capability.
6.12.4 Technical Assessment Manager and Operations Assessment Manager discuss
options for use of onsite vs. Offsite pumping capabilities and the impact on
1 OCFR50.54(x).
6.12.5 Provide recommendations to the Emergency Coordinator for implementation.
6.13 Fission Product Scrubbing from a Failed Containment
6.13.1 Reference existing Severe Accident Management Guidelines (SAMGs) SAG-4,
SAG-5, SAG-6 and SAG-7 to the extent practical.
6.13.2 Technical Assessment Manager refer to Attachment 2, Fission Product
Scrubbing From A Failed Containment, and Table 2, Back-up Mechanical
Pump Capability.
6.13.3 Technical Assessment Manager and Operations Assessment Manager discuss
options, reactivity monitoring requirements and the impact on 1OCFR50.54(x).
6.13.4 Provide recommendations to the Emergency Coordinator for implementation.
6.14 Emergency Spent Fuel Pit Cooling
6.14.1 Implement existing S-9 series procedures to the extent practical to restore SFP
cooling.
6.14.2 Technical Assessment Manager refer to Attachment 3, Emergency Spent Fuel Pool Cooling.
6.14.3 Technical Assessment Manager and Operations Assessment Manager discuss
options and impact on 1OCFR 50.54(x).
6.14.4 Provide recommendations to the Emergency Coordinator for implementation.
7.0 Attachments
EPIP 1-18:8
1. Alternate AC and DC Power Supplies
2. Fission Product Scrubbing From A Failed Containment
3. Emergency Spent Fuel Pool Cooling
4. Table 1, Equipment Ratings
5. Table 2, Back-up Mechanical Pump Capability
EPIP 1-18:9
Attachment 1, Rev. 3 Page 1 of 2
ALTERNATE AC AND DC POWER SUPPLIES
Following is a list of possible first response actions that could be taken to mitigate loss of power
to equipment on site. Level of response varies depending on the magnitude of the loss of
existing on-site power supplies, availability of distribution equipment (buses, panels, etc.), and
what equipment needs to be supplied.
At this time, contacts have been made with outside suppliers (RG&E or otherwise) to determine
potential availability, but no arrangements have been made with them to provide the backup
equipment. An evaluation of the timeliness of our needs must be completed, and then we can
recommend specific actions to put a plan in place. Costs associated with having generators,
cable, and transformers available on demand can be determined at that time, and those costs
will vary with response time required.
Alternate AC Power Supplies:
1. Diesel Generators can be cross-tied between systems depending on where the need
is and what is available. Cable to run directly to motor loads or buses, again
depending on condition and need, would be taken from our warehouse or brought
from Jefferson Road facility. Attached equipment data provides equipment ratings
of existing generators, and the requirements of loads that may need to be supplied.
b. 480 volt power may be supplied from the 12 kv overhead distribution line that comes
onto the site from the east. A small transformer exists (300 kva rating) near the
steam generator building, and a separate transformer could be brought on-site from
RG&E transmission and distribution group to provide power if the line was still
energized.
c. Bring separate diesel generator(s) on site, and connect at buses or directly to loads
as conditions and needs warrant. A 1000 kw size is assumed to be adequate for a
first response action, which would allow a combination of loads as selected by
Operations from the attached list. Portable units can be made available on short
notice, depending on immediate availability from: Wegmans (1300 kw unit), Aggreko
out of Albany, Penn-Detroit out of Syracuse. Wegmans, if available, could be here in
an hour or two, Aggreko or Penn would take up to eight hours.
d. For 120 VAC instrument loads, portable generators of 5 kw available at local retail
stores would be adequate to power up individual instrument buses, racks, or the
ABELIP and IBELIP racks locally if needed. This would supply a minimum amount of
instrumentation to monitor shutdown parameters.
Alternate DC Power Supplies:
1. Using existing on-site DC, capability to cross-tie to TSC battery/TSC battery charger.
However, condition of interties or SR DC distribution system may preclude this.
Cables can be run from TSC batteries to required loads or load centers.
2. Use of Security UPS battery is not recommended as it should be reserved for
security systems.
EPIP 1-18:10
Attachment 1, Rev. 3 Page 2 of 2
ALTERNATE AC AND DC POWER SUPPLIES (Continued)
3. Portable DC power supplies used by maintenance are AC powered and can provide enough DC to supply individual panels locally.
4. Larger DC power supplies, or battery chargers, can be obtained from substations, fossil-hydro stations, or suppliers and set up where needed, assuming 480 VAC supply power available.
5. Movement of a 125 VDC battery string of adequate size would most likely be impractical. However, such batteries exist and would be available from substations or Russell Station, could be moved here in approximately 8 hours as a last resort.
Other Equipment:
Valves can be hand operated. It would not normally be reasonable to run power to individual valves. If a panel or MCC can be picked up, then the valve would be powered.
Offsite Power Equipment Supplier Contacts:
480 Volt Diesel Generators Wegmans 1300 kw generator Contact: Mike Adams, RG&E - Account Manager for Wegmans - 724-8462
Aggreko, Inc. (Albany area) 1250 kw - 1750 kw Contact: Randy Curtis - (518) 235-9604
Penn-Detroit Diesel 60 kw - 1400 kw Contact: Kurt Schultz - (315) 451-3840
120 VAC Power Grounds Maintenance 5kva generator Contact: Keith Merkel
Chase Pitkin Webster 2.5 kva - 10 kvs portable generators 872-4010
125 VDC Power Supplies JM Schaeffer (Syracuse) Contact: Carl Phillips - (315) 463-5223
Cable or Transformers not on-site Contact RG&E Energy Control Center
Prepared By: Paul Swift 10/31/01
EPIP 1-18:11
Attachment 2, Rev. 3 Page 1 of 1
FISSION PRODUCT SCRUBBING FROM A FAILED CONTAINMENT
With respect to fission product scrubbing from a failed containment, SAMGs SAG-4, SAG5, SAG-6 and SAG-7 provide instructions to inject into containment, reduce releases, control conditions and reduce hydrogen. If they unsuccessful, then an external pump and water source, such as a fire truck, will be used but it is not always prudent to spray water into an area if the core has melted. In addition, if the core hasn't melted but there is a loss of cooling accident (LOCA), you're now spraying unborated water into the sump, which may cause reactivity issues.
The TSC Technical Assessment Manager will provide some guidance for Scrubbing A Failed Containment, with increased monitoring of reactivity.
For the scenario where there is a hole in the outside of containment and an accident (LOCA) going on inside, we would want the pumper truck to cover the opening with a "light rain type" of spray pattern similar to what comes out of the containment spray nozzles. We would not want just a concentrated stream directed at the opening.
If guidance on drop size is desired, UFSAR 6.2.2.2.2.6 specifies 1000 microns or about .04" diameter drops.
Depending on the hole size and orientation on the structure, we would like to aim the spray to minimize to the extent practical direct water entry into the containment so as not to potentially cause sump boron concentration concerns.
EPIP 1-18:12
Attachment 3, Rev. 3 Page 1 of 1
EMERGENCY SPENT FUEL POOL COOLING
NOTE: IF ACCESS IS LIMITED INTO THE AUXILIARY BUILDING AND EMERGENCY MAKE-UP WATER INTO THE SPENT FUEL POOL (SFP) IS
DESIRED, THE FOLLOWING STEPS WILL SUPPLY FIRE WATER INTO
THE SFP VIA THE SFP SKIMMER PIPING LOCATED IN THE INTERMEDIATE BUILDING HOT SIDE.
NOTE: USE OF THE FOLLOWING METHOD OF MAKE-UP TO THE SFP IS FOR
EMERGENCY CONDITIONS ONLY. IT HAS THE POTENTIAL TO
VIOLATE ITS LCO 3.7.12 REQUIREMENTS AND, HENCE, 10CFR505.54(X) SHOULD BE CONSIDERED IF TAKING THIS ACTION.
1. Notify fitters to supply fittings to connect 1-1/2" fire hose to a 2" - 150 pound
flange.
2. Ensure SFP skimmer pump is secured.
3. Close V-788B.
4. Remove blank flange from piping immediately upstream of V-788B (IB Hot Side near door to Auxiliary Building).
5. Connect the fire hose from an available supply (Hose Reel 21 on the North wall
of the Primary Sample Room is preferred if available) to flange immediately upstream of V-788B using fittings previously obtain by fitters.
6. Open fire water supply valve (V-5199T if using Hose Reel 21) slowly to supply water to SFP.
7. Verify fire water pump running.
8. If possible, visually verify water make-up to SFP directly or via security camera 30.
Monitor available remote SFP indication (i.e., R-5, AR-K-29).9.
EPIP 1-18:13
Attachment 4, Rev. 3 Page 1 of 2
TABLE 1 - EQUIPMENT RATINGS
Diesel Generator A and B 1950 KW (Continuous) (480 Volt) 2250 KW (2 hours)
2300 KW (1/2 hour)
TSC Diesel Generator 260 KW (480 Volt)
Security Diesel Generator 135 KW (480 Volt)
Motor Rated HP Max. Loading KW
Safety Injection Pumps 350 HP 368 HP 291
RHR Pumps 200 173 139
Containment Fans 300 256 205
Service Water Pumps 300 308 246
Containment Spray Pumps 200 220 183
CCW Pumps 150 150 124
Aux. Feedwater Pumps 250 280 223
Standby AFW Pumps 300 300 249
Charging Pumps 150 150 124
Spent Fuel pool Pump B 100 100 75
Spent Fuel Pool Pump Spare Skid 50 57 42
(600 gpm @ 65# D/P)
120 VAC Instrument Power
Equipment Rating Max. Load
Instrument Bus feed (Inverters, CVTs) 7.5 kva 6.4 kw
Twinco Panels (fed from Twinco CVTs) 2 kva 1.7 kw
EPIP 1-18:14
Attachment 4, Rev. 3 Page 2 of 2
TABLE 1 - EQUIPMENT RATINGS (Continued)
Equipment Capacity Normal Load A Normal Load B
Battery Charges Al, B1 200 amps 55 amps 50 amps
Battery Chargers A2, B2 150 amps 50 amps 30 amps
TSC Battery Charger 500 amps 95 amps
Vital Batteries BYCA, BYCB 1495 amp-hrs N/A
TSC Battery 2880 amp-hrs N/A
Security Battery 250 amp-hrs N/A
(EPIP 1-18:15
Attachment 5, Rev. 3 Page 1 of 1
TABLE 2 - BACK-UP MECHANICAL PUMP CAPABILITY
UTILIZATION & DEMAND
Source GPM TDAFWP SBAFWP Containment Spent CCW Hx D/G Hx Fission Product
Oil Hx (GPM) Recirc Fan Fuel Pool (GPM) (GPM) Scrubbing (GPM)
(GPM) (GPM) Hx "A" (GPM)
Onsite Fire Pump 2,000 25 200 1,050 600 3,500 277/400 500/1,000 (onsite
(3) (2) ( monitor nozzles)
Ontario Water Authority (D/G 1,500 back-up)
Available through Wayne (1) DA-ME-98-138 County 911 Center (2) Maximum flow as per design basis. Actual GPM may be significantly less. Refer to SC-3.3.2, Attachment C, for 3 Assumption both pumps in service (1) one dedicated for fire suppression only. complete resource list
Fire Dept. Drafting Discharge 1,250
Canal (limited to one pumper)
Portable Pumps (discharge canal) 500
Tanker Truck Relay portable Pond 1,250
Portable Hydrant/Relay 1,000
j,[
ROCHESTER GAS & ELECTRIC CORPORATION
GINNA STATION
CONTROLLED COPY NUMBER 3
PROCEDURE NO. EPIP 4-7 REV. NO. 20
PUBLIC INFORMATION ORGANIZATION STAFFING
EFFECTIVE DATE
Category 1.0
This procedure contains 7.6 pages
EPIP 4-7:1
EPIP 4-7
PUBLIC INFORMATION ORGANIZATION STAFFING
1.0 PURPOSE:
The purpose of this procedure is to define the: Positions; Organizational Structure; Responsibilities; and Functions of each position in the Joint Emergency News Center for which RG&E is responsible.
2.0 RESPONSIBILITY:
2.1 It is the responsibility of each responder to review and implement their checklist for the
position being filled.
3.0 REFERENCES:
3.1 Developmental References
3.1.1 Nuclear Emergency Response Plan
3.1.2 NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency
Response Plans and Preparedness in Support of Nuclear Power Plants"
3.1.3 New York State "Ginna Joint News Center Procedures"
3.2 Implementing References
None.
3.2.1 A-52.14 Fitness For Duty Verification for unscheduled work tours.
4.0 PRECAUTIONS:
None.
5.0 PREREQUISITES:
None.
6.0 ACTIONS:
6.1 Refer to Attachments 1 and 2 for organizational charts.
6.2 Refer to Attachment 3 for duties and responsibilities for each position.
EPIP 4-7:2
At an Alert or higher, all emergency facilities are activated. Each position within these facilities, with the exception of those positions listed below, are staffed by one (1) qualified responder:
Title
6.3
Number Contacted
3 6 6
Qualified personnel are listed in the position checklists found in the body of this procedure.
6.4 Qualified individuals individuals meet the training requirements of TRC.22, "Nuclear Emergency Response Plan Training Programs".
6.5 Qualified individuals identified as primary responders can only be primary responders for a single position. Individuals maybe back-up responders on more than one list.
Responders shall meet the fitness for duty requirements in A-52.14.
ATTACHMENTS:
1. RG&E Emergency Response Organization (ERO) Chart
2. Joint Emergency News Center Organization Chart
3. Emergency Positions-Functions and Responsibilities
JENC Technical Advisor JENC Administrative Support Public Inquiry Staff
6.6
7.0
(EPIP 4-7:3
RG&E EMERGENCY RESPONSE ORGANIZATION
EMERGENCY OPERATIONS FACILITY
TECHNICAL SUPPORT CENTER
ENGINEERING SUPPORT CENTER
JOINT EMERGENCY NEWS CENTER
II OFFSITE I I AGENCIES L-----------------
II SURVEY OPERATIONS CONTROL CENTER SUPPORT CENTER ROOM
ATTACHMENT 1, REV. 20 Page 1 of 1
(
EPIP 4-7:4
EPIP 4-7:4
I - 1 I OFF SITE AGENCIES I
WAYNE COUNTY PIO I MONROE COUNTY PIO NEW YORK STATE PIO I
NYS POLICE PIO FEDERAL AGENCY POs I
L . . . . . .
HP CONSULTANT I
ATTACHMENT 2, REV. 20 Page 1 of 1
JENC ORGANIZATION
(, (
EPIP 4-7:6
Attachment 3, Rev. 20
PROCEDURE PAGE NUMBER(S)
7-18
19-20
21-24
25-32
33-36
37-40
41-48
49-52
53-54
55-56
57-60
61-70
71-72
73-74
75
76
JENC POSITION
News Center Manager
Assistant News Center Manager
Corporate Spokesperson
Assistant to the Corporate Spokesperson
Facilities and Materials Coordinator
Media Monitoring and Public Inquiry Manager
Technical Advisor
News Writer
Graphic Artist
JENC Administrative Support Manager
JENC Administrative Support
Media Monitoring and Public Inquiry Staff
Spouse Phone Staff
Video/Sound Engineer
Sign Language Interpreter
Spanish Interpreter
EPIP 4-7:7
Attachment 3, Rev. 20
NEWS CENTER MANAGER
Reports to: EOF Recovery Manager
Supervises: Assistant News Center Manager, Corporate Spokesperson and Offsite
Agencies
Function: Direct operation of the Joint Emergency News Center (JENC)
Responsibilities:
1. Log in with JENC Security upon arrival.
2. Sign in on JENC activation board.
3. Obtain a name tag with your name and position.
4. Contact the EOF Recovery Manager upon your arrival at JENC and obtain a
briefing on the event. Exchange pager numbers with the EOF/Recovery Manager.
5. Implement EPIP 4-6, JENC Activation.
6. If Corporate Spokesperson if unavailable, receive status sheets from
Technical Advisor and approve for distribution to JENC and media.
7. Review all RG&E, County State and Federal press releases. Have the
JENC Administrative Support Manager arrange for distribution of press
releases within the JENC and fax the press releases to the emergency
facilities according to their checklist.
8. A Media Briefing should be held within 15 minutes of an emergency event
classification or other significant event. The News Center Manager should
make a brief announcement to the media representatives at the JENC when
the emergency classification changes and provide information as to why the
emergency classification changed. No questions should be answered, but
the scheduled time for the next full Media Briefing should be given to the media.
EPIP 4-7:8
Attachment 3, Rev. 20
NEWS CENTER MANAGER (Continued)
10. Inform the Facilities and Materials Coordinator of the times for press conferences. The Facilities and Materials Coordinator will update the "Next Press Conference" clocks in the JENC
11. Ensure support services are available to local, state and federal agency Public Information Officers (PlOs).
12. Ensure that Emergency Alert System (EAS) support is available and operational for county PIO supervision and staff.
13. When the Ginna sirens are going to be activated for the EAS message, notify the EOF Dose Assessment Manager so he can inform the survey teams.
14. After an EAS message, ensure counties provide additional, follow-up information to the media using the EAS Follow Up checklist following this position description.
15. Maintain media briefing schedule and ensure:
Current news announcement is available at the start of each media briefing. Adequate time is available for JENC staff briefing prior to media briefing Adequate time is available for MC and W.C. PIO's briefing prior to media briefing
If the emergency classification is changed:
Make an announcement to the media at the JENC giving them the new classification level and a brief event description from the EAL reference manual.
* DO NOT answer questions from the media * INFORM the media that the details are being obtained and will be
provided at the next briefing CONFIRM to the media the next media briefing
EPIP 4-7:9
Attachment 3, Rev. 20
NEWS CENTER MANAGER (Continued)
16. Contact a Health Physics consultant to respond to the JENC from the following sources:
a. Bernard Quinn (U of R)
b. Andrew Karam (U of R)
c. Dr. David Maillie
d. Dr. James Wierowski
Work: (585) 275-1478 (585) 275-3781
Home: (315) 524-5201 Pager: (585) 220-3497
Work: (585) 275-1473 (585) 275-3781
Pager: (585) 220-1362
Home: (585) 334-2428
Work: Home
(585) 631-8291 (585) 787-9798
17. Call to confirm that the following PlOs have been notified:
a. Wayne County PIO
1. Sharon Lilla
2. Kay Groover
Work: Home:
Work: Home:
(315) 946-5919 (315) 483-8657
(315) 946-5400 (315) 331-8572
b. Monroe County PIO
1. Bob Nolan
2. Steve Bartlett
Work: Home: Pager: Cellular:
Work: Home: Pager:
(585) 428-3270 (585) 248-2477 (585) 529-0614 (585) 734-2393
(585) 760-6306 (585) 586-6828 (585) 529-0613
EPIP 4-7:10
Attachment 3, Rev. 20
NEWS CENTER MANAGER (Continued)
3. Marilyn Lingberry Work: Home: Pager:
c. New York State (SEGO) PIO
1. Dennis Mikulski
2. Don Macer
Work: Home: Pager:
(585) 428-5675 (585) 621-1125 (585) 529-1819
(518) 485-5666 (518) 869-7969 (518) 484-0212
Work: (518) 485-6011 Home: (518) 273-2606 Pager: (518) 453-7047
3. NY State Warning Point (24 Hour Response Number)
(518) 457-2200
d. New York State Police PIO
1. Robert Captain
2. Jim SDL
3. Sandra King
Work: Home: Pager: Cellular:
(585) 398-3200 (585) 381-0959 (585) 747-2930 (585) 389-3515
Work: (585) 398-3200
Work: Home: Pager:
(585) 398-3200 (585) 544-4713 (585) 464-4580
EPIP 4-7:11
Attachment 3, Rev. 20
NEWS CENTER MANAGER (Continued)
18. For continuous staffing, consult the list of qualified personnel for this position:
List of Qualified Personnel for this position:
Joe Rizzo*
Lee Loomis*
Mike Adams*
Home: Work: Pager: Cellular: Summer:
Home: Work: Pager: Cellular: Summer:
Home: Work: Pager: Cellular:
(585) 889-7347 (585) 724-8165 (585) 527-5617 (585) 315-1070 (585) 243-4291
(585) 248-0219 (585) 724-8169 (585) 528-2893 (585) 738-3079 (585) 237-3796
(585) 461-1166 (585) 724-8462 (585) 783-8512 (585) 315-0580
* = Primary responder for position.
EPIP 4-7:12
Attachment 3, Rev. 20
Date: Time: Message:
Decision Time: Siren Time: EAS Activation Time:
EMERGENCY ALERT SYSTEM MESSAGE
We interrupt this program THIS ISATEST I THIS ISNOTATEST
Repeating THIS ISATEST I THIS ISNOTATEST
The Emergency Alert System has been activated by Chief Elected Officials, due to a technical malfunction at the Ginna Nuclear Power Station, located in the Town of Ontario, Wayne County, New York. Listen to this entire announcement before taking any action.
This message applies only to the 10 mile area surrounding Ginna. When this message ends, locate your Ginna Emergency Planning calendar. It contains detailed information that you will need.
A(n) Unusual Event I Alert I Site Area Emergency I General Emergency Has been declared.
There has been I There has not been a release of radioactive materials to the environment.
Officials direct you to take the following actions:
These Emergency Response Planning Areas (ERPAs) are directed to EVACUATE:
In Wayne County: W-1, W-2, W-3, W-4, W-5, W-6, W-7, None, All ERPAs W-1 through W-7
In Monroe County: M-1, M-2, M-3, M-4, M-5, M-6, M-7, M-8, M-9, None, All ERPAs M-1 through M-9
Repeating, Emergency Response Planning areas directed to EVACUATE are: W-1, W-2, W-3, W-4, W-5, W-6, W-7, M-1, M-2, M-3, M-4, M-5, M-6, M-7, M-8, M-9
None, All Monroe and Wayne County ERPAs
Information about evacuation routes, bus pick-up points and designated reception centers is located in your Ginna Emergency Planning calendar. If you do not have transportation to a reception center, buses are being provided. Transients are directed to check Emergency Planning Guides located in transient accommodations.
- CONTINUED -
EPIP 4-7:13
Date:
Decision Time:
Time:__ _ _ _ _ _
Siren Time:
Attachment 3, Rev. 20
Message:
EAS Activation Time:
EMERGENCY ALERT SYSTEM MESSAGE I
These Emergency Response Planning Areas (ERPAs) are directed to SHELTE
In Wayne County: W-1, W-2, W-3, W-4, W-5, W-6, W-7, None, All ERPAs W-1 through W-7
In Monroe County: M-1, M-2, M-3, M-4, M-5, M-6, M-7, M-8, M-9, None, All ERPAs M-1 through M-9
Repeating, Emergency Response Planning areas directed to SHELTER are:
W-1, W-2, W-3, W-4, W-5, W-6, W-7, M-1, M-2, M-3, M-4, M-5, M-6, M-7, M-8, M-9 None, All Monroe and Wayne County ERPAs
You are directed to go inside and remain indoors. Refer to your calendar for additional steps
needed to reduce infiltration of outside air. Detailed information about sheltering is located in
your Ginna Emergency Planning calendar. Please refer to it now.
There are no evacuation or sheltering recommendations for any portions of the 10 mile
emergency planning zone around Ginna. Local emergency response personnel are monitoring
the situation and consulting with RG&E officials.
Please stay tuned to this EAS station for further information.
THIS ISATEST I THIS ISNOTATEST
MESSAGE ENDS
EAS APPROVALS
Wayne County Monroe County
New York State RG&E
EPIP 4-7:14
Attachment 3, Rev. 20
EAS FOLLOW-UP NEWS CONFERENCE CHECK LIST
WHAT~ TH ULCNES TOKO
INSTRUCTIONS
10 CURRENT EMERGENCY ACTION LEVEL I
Unusual Event: Alert: __ Site Area Emergency: __ General Emergency:
1D PROTECTIVE ACTIONS IMPLEMENTED: I
No: Yes: _ If YES, identify below:
1D ERPA INFORMATION I
ERPAs evacuated:
Wayne County
Monroe County
ERPAs sheltered:
Wayne County
Monroe County
10 PLANT CONDITION I
Stable: Degrading: Improving:
Have as many items completed prior to the news conference as you can. The goal is to hav( a news conference within 15 minutes of the end of an EAS broadcast, but no later than 30 minutes. The following checklist will help you organize the desired information before the news conference. Official sources of information include: County EOC, Part 2 Form, Utility JENC Technical Advisor, Utility Calendar, State or County plan.
EPIP 4-7:15
Attachment 3, Rev. 20
EAS FOLLOW-UP NEWS CONFERENCE CHECK LIST (Cont'd.)
10 WEATHER INFORMATION
Wind Direction __ Wind Speed Any special conditions, roads, weather ...
10 RECEPTION I SCHOOL INFORMATION
Reception Centers - opened and operational: Yes __ No
Location of Open Reception Centers:
Wayne:
Monroe:
ID SCHOOLS EVACUATED
Location where schools were evacuated to:
Home District: Reception School:
Home District: Reception School:
Home District: Reception School:
Home District: Reception School:
Home District: Reception School:
What to take: SEE CALENDAR
What not to take: SEE CALENDAR
o0 ANIMAL INFORMATION
Pets - Refer to Calendar
Farm animals - stored feed & water - Refer to Calendar
Department of Agriculture information - NYS PIO information
-2-
EPIP 4-7:16
Attachment 3, Rev. 20
EAS FOLLOW-UP NEWS CONFERENCE CHECK LIST (Cont'd.)
1D GENERAL INFORMATION I
DEFINE: Shelter and Evacuate
SAY: Stay tuned to EAS stations for further information
REMIND: People of calendars for detailed information about bus pick up points and geographic boundaries of ERPAs.
Description of current emergency conditions at the nuclear power plant with reference to both
the potential for or actual release of radioactivity and the current emergency action level (EAL).
How to maximize protection when sheltering - use text from calendar.
1D TRANSIENT INFORMATION I
Instruction for transients without shelter
What to leave behind and what to take along when evacuating
Evacuation routes
Location of reception centers where evacuees register and can be monitored for contamination if necessary.
Location of congregate care centers
Use of potassium iodide (KI)
Information and instructions for parents of students regarding protective actions for students
Information for transportation-dependent individuals
Information for special populations
Information and instructions on protective actions for ingestion
Relocation, re-entry or return
-3-
EPIP 4-7:17
Attachment 3, Rev. 20
EAS FOLLOW-UP NEWS CONFERENCE CHECK LIST (Cont'd.)
oD PUBLIC INQUIRY TELEPHONE NUMBERS I
Information to address false or misleading rumors
Use of public information brochures
Other (Specify)
EPIP 4-7:18
Attachment 3, Rev. 20
Appendix 4
Media Monitoring - Public Inquiry - Media Response
Public Inquiry Announcement
Note: At the first news briefing, the following announcement will be made by the moderator of
the PlO panel.
"To Assist The Public With Receiving Clarification On
Information That May Be In Conflict With Official
Announcements, The Public May Call:
(585) 724-8147 (585) 724-8148
The public may call this number to obtain clarification
of the information carried either
in the media or circulating in the community
that is in conflict
with the official information
being announced either by
the Emergency Alert System or
in the news media.
Again the number for the general public to call is:
(585)724-8147 (585)724-8148
EPIP 4-7:19
Attachment 3, Rev. 20
ASSISTANT NEWS CENTER MANAGER
Reports to: News Center Manager
Supervises: Facilities and Materials Coordinator, JENC Administrative Support Manager
and Media Monitoring and Public Inquiry Manager
Function: Assist as the overall coordinator of personnel, work shifts and staff
assignments. In the absence of the News Center Manager, fulfill the responsibilities of the News Center Manager.
Responsibilities:
1. Log in with JENC Security upon arrival.
2. Sign in on JENC activation board.
3. Obtain a name tag with your name and position.
4. Assist the News Center Manager, manage JENC Public Information, media
and technical support function efforts ensuring staff are directed, and
coordination between county, state and federal agencies is maintained.
5. Fulfill the duties of the News Center Manager when required.
6. Coordinate with the JENC Administrative Support Manager, Facilities &
Material Coordinator and Media Monitoring and Public Inquiry Manager to
ensure that all personnel requirements are met.
7. Review and confirm that staff log-in is current.
8. Perform other duties as directed by the News Center Manager.
EPIP 4-7:20
Attachment 3, Rev. 20
ASSISTANT NEWS CENTER MANAGER (Continued)
9. For continuous staffing, consult the list of qualified personnel for this position:
List of Qualified Personnel for this position:
Dennis Money*
Sharon Mangione*
Beth King
John Smith
Brian Stanfield*
Home: Work: Pager: Cellular
Home: Work: Pager: Cellular:
Home: Work: Pager: Cellular:
Work: Pager: Cellular:
Home: Work: Pager:
(585) 394-1287 (585) 771-2113 (585) 783-9489 (585) 315-0076
(585) 381-0575 (585) 724-8358 (585) 528-3544 (585) 315-0606
(585) 482-2578 (585) 724-8032 (585) 528-3574 (585) 748-8653
(585) 771-3525 (585) 463-9716 (585) 315-0353
(585) 385-9953 (585) 771-3168 (585) 529-6041
* = Primary responder for position.
EPIP 4-7:21
Attachment 3, Rev. 20
CORPORATE SPOKESPERSON
Reports to: News Center Manager
Supervises: Technical Advisor and Graphic Artist
Function: Serve as primary public point of contact from RG&E to the media and public. Present pertinent information at press conferences, respond to media questions, provide information on current and potential plant conditions and radiological information. Primary public point of contact for RG&E senior management.
Responsibilities:
1. If you are arriving from the Ginna site, go to the small conference room on 89/1 East Avenue and perform a whole body frisk to check for contamination.
2. Log in with JENC Security upon arrival.
3. Sign in on JENC activation board.
4. Obtain a name tag with your name and position.
5. Receive status sheets from Technical Advisor and approve for distribution to JENC and media.
6. Serve as principal liaison between the EOF/Recovery Center and the Joint Emergency New Center.
7. Prepare and release the "Initial media Phone Contact/News Announcement #1" following this checklist. Give to EOF News Writer for preparation and approvals.
8. Ensure that the Technical Advisor begins to complete their copy of the Technical Advisor Quick Checklist as soon as they arrive. (A copy of the checklist follows their list of responsibilities.)
9. Maintain regular contact with the Recovery Manager. Contact the Technical Advisor for information from their Quick Checklist to acquire event information.
EPIP 4-7:22
Attachment 3, Rev. 20
CORPORATE SPOKESPERSON (Continued)
10. Using the Corporate Spokesperson Job Aide (following this checklist) as a
guide, schedule news conferences.
11. Acquire new information from EOF management and staff based on
questions and concerns raised at the JENC.
12. Have the Spokesperson's Technical Advisor continue to acquire all necessary data.
13. Provide input and suggestions to EOF / Recovery Manager based on
questions from press conferences.
14. For continuous staffing, consult the list of qualified personnel for this position:
List of Qualified Personnel for this position:
Mike Power*
Doug Mandelaro
Frank Maciuska*
Robert Bergin
Clyde Forbes
Home: Work: Pager: Cellular:
Home: Work: Pager: Cellular
Home: Work: Pager: Cellular:
Home: Work: Cellular:
Home: Work: Cellular:
(585) 244-3218 (585) 724-8828 (585) 527-5952 (585) 315-0560
(585) 377-7733 (585) 724-8258 (585) 464-2998 (585) 315-0559
(315) 986-3839 (585) 771-6651 (585) 463-9730 (585) 315-12-03
(585) 377-4399 (585) 771-2294 (585) 315-0040
(585) 436-8656 (585) 724-8110 (585) 315-1303
* = Primary responder for position.
EPIP 4-7:23
Attachment 3, Rev. 20
CORPORATE SPOKESPERSON - JOB AIDE
Media briefings should be scheduled periodically, for example, approximately one hour between Media Briefings or at a frequency to support the information flow during an emergency.
= A Media Briefing can be held to address incorrect or misleading information that is being provided to the public as reported by the Media Monitoring and Public Inquiry functions.
* A briefing should be conducted concerning new information for JENC staff, PIO's, and spokespersons for Federal, State and Counties before it is announced to the media. Conducting a Media Briefing: - DO start the media briefing at the scheduled time. Media may be more negative if
the briefing begins late. - DO control the media briefing, it is your briefing. - DO speak loudly and clearly. - Each Spokesperson and PIO will provide current information about their
organizations' activities. - Media representatives should identify themselves and news organization that they
represent before asking questions. - Each question will be limited to one follow-up question. - The Media Briefing will be interrupted if there is a change in emergency classification
or a significant change in plant status. - DO NOT speculate on consequences of a plant emergency. Just give the facts about
the emergency. - DO NOT release the names of injured plant workers until their families are notified. If
injured personnel are transported to a hospital, you may name the hospital. - DO NOT compare this emergency to other accidents such as Three Mile Island or
Chernobyl. - DO NOT use technical jargon. - DO NOT answer, "I don't know", when you should say, "I don't know, but I'll find out."
* The Corporate Spokesperson should recap or provide a chronology of events to terminate the Media Briefing.
• The Media Briefing should be terminated with: After this briefing our Technical Advisor and Health Physics Spokesperson will be available to answer general questions. The next Media Briefing is schedule to start at "
EPIP 4-7:24
Attachment 3, Rev. 20
INITIAL MEDIA PHONE CONTACT/NEWS ANNOUNCEMENT #1
DATE:
HOUR:
(SAMPLE)
THIS IS A: (Check One)
DRILL/EXERCISE [
ACTUAL EVENT [
(Check one of the boxes above.) THIS IS AN EXERCISE - ACTUAL EVENT.
ROCHESTER, NY (DATE) -- DUE TO EMERGENCY CONDITIONS AT THE RG&E
GINNA NUCLEAR PLANT, A(N) HAS BEEN DECLARED.
THE JOINT EMERGENCY NEWS CENTER (JENC) AT ROCHESTER GAS AND
ELECTRIC HAS BEEN OPENED. IT IS LOCATED AT 89 EAST AVENUE IN
DOWNTOWN ROCHESTER. FURTHER INFORMATION WILL BE AVAILABLE AT
THIS LOCATION FOR MEDIA REPRESENTATIVES.
EPIP 4-7:25
Attachment 3, Rev. 20
ASSISTANT TO THE CORPORATE SPOKESPERSON
Reports to: Technical Advisor in the JENC
Supervises: Not applicable
Function: Provides support to Corporate Spokesperson
Responsibilities:
1. Log in with JENC Security upon arrival.
2. Sign in on JENC activation board.
3. Obtain a name tag with your name and position.
4. Channel information internally when the Corporate Spokesperson is unavailable.
5. Maintain logs and other records for the Corporate Spokesperson.
6. Receive approved news announcements from EOF Writers via a Lotus Notes
message with an attached Word document. Obtain approval of Corporate
Spokesperson. Obtain acknowledgment of News Center Manager, Monroe
County PIO, Wayne County PIO and New York State PIO. Use the stamp
located next to your computer and stamp the back of the press release to
document these approvals/acknowledgments.
7. Transmit news release to PR Newswire and ERIN when approved by the
Corporate Spokesperson and News Center Manager by using the attached
job aide. If any changes are made to the news announcement prior to
release, you are responsible for sending changes back to the EOF Writer via
Lotus Notes to ensure they have the most current copy (not for additional
approvals). Contact EOF News Writer to notify them of any shift in personnel.
Give approved news release to Administrative Support Manager to distribute
internally to the JENC responders and to the media when directed by the
News Center Manager.
EPIP 4-7:26
Attachment 3, Rev. 20
ASSISTANT TO THE CORPORATE SPOKESPERSON (Continued)
8. Ask the News Center Manager if they would like the local media informed of
the emergency. If they do, contact the following media informing them, "An
emergency has been declared at the RG&E Ginna Nuclear Plant. The Joint
Emergency News Center at RG&E has been opened. It is located at 89 East
Avenue in downtown Rochester. Further information will be available at this location for media representatives."
Local Press/Wire Service
Gannett Newspapers (Democrat & Chronicle-Metro Desk)
(585) 232-7100 (585) 258-2214 (585) 258-2237 (FAX)
Television
WROC - TV 8 (Assignment Editor) News Hotline
WHEC - TV 10 (Assignment Editor) News Hotline
WOKR - TV 13 (Assignment Editor and Newsroom)
R - NEWS Cable 9 (Assignment Editor)
UHF FOX 31
(585) 288-8400 x703 (585) 288-4998 (585) 288-1505 (FAX)
(585) 232-1874 (585) 232-1010 (585) 546-5688 (FAX)
(585) 334-8743 (585) 334-8719 (FAX)
(585) 756-2424 (585) 756-1673 (FAX)
(585) 232-3700 (585) 232-3005 (FAX)
Radio
WHAM - AM (585) 454-5759 (585) 262-2334 (FAX)
EPIP 4-7:27
Attachment 3, Rev. 20
ASSISTANT TO THE CORPORATE SPOKESPERSON (Continued)
WVOR - FM
WXXI - FM
WACK-AM (Newark) (Station Manager)
(585) 454-5759 (585) 262-2334 (FAX)
(585) 325-7500 (585) 258-0339 (FAX)
(315) 331-7100 (315) 331-7101 (FAX)
4. Maintain a chronological log book containing key events and actions taken by the JENC during the emergency event.
5. For continuous staffing, consult the list of qualified personnel for this position:
List of Qualified Personnel for this position:
Lori Lootens*
Laurie Picardo*
Lisa Padilla*
Kim Geer
Home: Work:
Home: Work:
Home: Work
Home: Work: Pager: Cellular:
(585) 352-6037 (585) 724-8883
(585) 594-1065 (585) 724-8063
(585) 338-1081 (585) 724-8498
(585) 352-8458 (585) 724-8398 (585) 529-7683 (585) 315-0586
* = Primary responder for position
EPIP 4-7:28
Attachment 3, Rev. 20
ASSISTANT TO THE CORPORATE SPOKESPERSON- JOB AIDE
These instructions are for the use of PRN DIRECTwhen sending a news release over the wire through PRNEWSWIRE.
1. Save file in any format (preferably Word).
2. Using Internet Explorer (IE) or Netscape, open https://prndirect.prnewswire.com/.
3. RG&E'S account number is: 762301
4. RG&E'S password is: power (lower case).
5. Select "Press Release" upload.
6. Select "Immediately, etc." when release should go out.
7. Select distribution "New York State Newsline".
8. To add additional distribution or special instructions, select "See My Instructions Below". (Example: Investor Research Wire).
9. Select "Browse".
10. Select file name.
11. Enter your name and phone number.
12. Select "Continue".
13. Verify information.
14. Submit release.
15. Write down the reference number of your submission.
16. Wait five minutes and call 1-800-776-8090.
17. PRN will call back with a clear time.
EPIP 4-7:29
Attachment 3, Rev. 20
Rochester Gas & Electric Information Systems Database Procedure
04/03/2001 Document Type: Procedure
Procedure Number: ERIN-01 Created By: Picardo
Procedure Title: Lotus Notes ERIN Procedure
OVERVIEW:
New method of distributing ERIN messages in Lotus Notes.
INSTRUCTIONS:
* Copy the message to the clipboard.
* Switch location to ERIN in the lower right hand corner of the Lotus Notes screen. Enter the password
for the ERIN Notes ID.
* The database icon is shown below.
ERINW4
Database -Icon ERIN on DISS-1
The interior of the database looks like this:
EPIP 4-7:30
Attachment 3, Rev. 20
-WIN
.Rapi WRI Information 08/03/99 CUSTOMER CHOICE MESSAGE
Networ'k 08/02/99 1999 Safety Day - August 19th
08/02/99 EMERGENCY STORM RESPONSE
07/30/99 Reshictions on Internet Access has been Removed
* 07/30/99 ERIN - Information Services Announces Promotion
S. .07/30/99 2nd Quartet PPP Results
07/29/99 Message Ilom the Information Security Group and Corporate Desktop Team
07/29/99 Internet Termination
07/28/99 1999 Family Picnic - Seabreeze Park
: 07/27/99 ERIIN - New York Power Pools' hansition to the Independent System Operator
. - 07/26/99 -ERIN.
07/22/99 RG&E REPORTS 1999 SECOND QUARTER EARNINGS
07/21/99 RG&E WILL FORM HOLDING COMPANY CALLED RGS ENERGY GROUP. IN(
07/16/99 We need you....
•.07/16/99 4 New Card Reader System
07/16/99 Internet Access
07/15/99 ERIN'= Louis H. Latimer Annual Membership Drive and Picnic
"07/13/99 RG&E DECLARES UNUSUAL EVENT AT GINNA PLANT; NO HAZARD TO PU
* Select the 'Create ERIN' button.
* A prompt will request the subject of the message.
. Click the arrow in the 'Category" field to select ERIN or ESIN.
EPIP 4-7:31
Attachment 3, Rev. 20
* Paste the message. Click the 'Save and 'Close' button when done. * When ready to distribute the message, click on the 'Send ERIN' or 'Send ESIN' button, and the
doc-link will be sent to all Lotus Notes clients.
Doc-link -
.- ERIN 03/15/99 02:29 PM
To: cc: Subject
Mia Unix/RG&E@RG&E
ERIN Message
* When the doc-link is selected, it will display the ERIN message
EPIP 4-7:32
Attachment 3, Rev. 20
Category: :rýRIN j
•RGS ENERGY GROUP, INC.
EMPLOYEE RAPID INFORMATION NETWORK- ERIN
THIS ISAN ERIN MESSAGE MESSAGE SEQUENCE NUMBER 083-CORPORATE COMMUNICATIONS MARCH 29, 2001
The company this week has filed a formal petition with the New York State Public Service Con
agreement to merge with Energy East Corp.. the parent company of New York State Electric and GE
PSC approval is necessary for the merger to occur. We also must secure the approval of seYv
Our petition, called an Artide 70 filing, contains several sections explaining why we believe thiE
Among these are evidence that the merger will:
Achieve operational efficiencies and synergies that will benefit customers.
Support continued development of competitive markets. Comply with the PSC's guidelines regarding market power. Not impair either RG&E's or NYSEG's ability to finance its operations. Preserve the utilities' commitments to the community and economic development. Protect emnlovees_
The individual does not have to save the document because it will be in the ERIN database which will
be automatically added to your work space the first time the doc-link is selected. This ERIN database
will contain all the ERIN messages and can beaccessd to review or print any ERIN message.
ERIN _ Database " Icon E RIN on DISS-1
EPIP 4-7:33
Attachment 3, Rev. 20
FACILITIES AND MATERIAL COORDINATOR
Reports to: Assistant News Center Manager
Supervises: Office Maintenance Coordinator, Video and Sound Engineer, and Building Services and coordinates with food service provider to ensure appropriate meals are provided.
Function: Ensures the continuous operation of the Joint Emergency News Center.
Responsibilities:
1. If you are arriving from the Ginna site, go to the small conference room on 89/1 East Avenue and perform a whole body frisk to check for contamination.
2. Log in with JENC Security upon arrival.
3. Sign in on JENC activation board.
4. Obtain a name tag with your name and position.
5. Unlock all cabinets and direct the Video/Sound Engineer to ensure that all wall speakers for the public address system are turned on. Ensure that a functional test of the system is performed.
6. Contact Building Services to have clocks reset to plant computer time:
Paul Nilsson
David Fingado
Jim Langlois
Home: Work: Pager: Cellular:
Home: Work: Pager:
Home: Work: Pager: Cellular:
(585) 225-2124 (585) 724-8824 (585) 528-7757 (585) 733-3340
(585) 671-3341 (585) 724-8108 (585) 783-8314
(585) 334-0605 (585) 724-8627 (585) 528-0947 (585) 748-1864
EPIP 4-7:34
Attachment 3, Rev. 20
FACILITIES AND MATERIAL COORDINATOR (Continued)
NOTE: BUILDING SERVICES SHOULD BE IN YOUR PRESENCE PRIOR TO THE CONTACTING EOF FACILITIES AND PERSONNEL MANAGER.
7. Contact the EOF Facilities and Personnel Manager and obtain the current time from the Ginna plant computer.
1. Have Building Services reset all clocks to the plant computer time. (in Bull Pen area; 1 in County/State Room; 1 in Public Inquiry Area)
2. Reset time on all fax machines (3 in County/State Room; 2 in Bull Pen area)
8. The EOF Facilities and Personnel Manager contacts the Help Desk (I.S) to
inform them of the activation of the facilities and to assure I.S. support if necessary.
9. Turn on copier and ensure that it is filled with paper.
* If you should need extra paper, go to the Quick copy area, located in
the Mail Room on 89/2.
* If the copier should break down, inform the JENC Administrative Support Manager to direct the support staff to use the copier in the Mail Room located on 89/2. Place a service call to Xerox at (800) 822-2979 (Model # 5626, Serial # 5WT 127249).
10. In the Media Monitoring Room:
* Unlock the media monitoring cabinet and the television cabinet (lock combination 2265) and place the televisions on the proper monitoring channels (8, 10, 13, 31).
* Place radios on the table and place on proper monitoring channels (WVOR 100.5 FM and WHAM 1370 AM). Ensure all are working properly.
EPIP 4-7:35
Attachment 3, Rev. 20
FACILITIES AND MATERIAL COORDINATOR (Continued)
11. Place all press telephones (located in wooden cabinet) in the large conference room on 89/1 and connect to proper phone jack. Ensure they are all working properly.
771-4077 771-4180 771-4080 771-4231 771-4178 771-4246 771-4179
12. Assist the News Center Manager and/or Assistant News Center Manager with staffing using EPIP 4 -7 to notify additional responders.
13. Assist the Graphic Artist and Video/Sound Engineer with set-up.
14. Attend all bull pen sessions and news conferences.
15. When the News Center Manager and/or Assistant News Center Manager informs you of the time for the next press conference, update all of the "Next Press Conference" clocks in the JENC. (1 in auditorium; 1 in general area; 1 in County/State area; and 1 in Public Inquiry area)
16. Contact Staples Office Supplies at (800) 724-0110 for any office supplies not available in the JENC or 89 East Avenue.
17. Contact the communications group (Dept. 70) at extension 8994 to obtain cellular telephones, pagers or problems with the telephones as requested by the emergency organization.
18. Contact Information Services at extension 4357 for any network or computer problem.
19. Using the yellow pages, contact restaurants and food service suppliers to meet the food needs of the JENC. Coordinate this with the Facilities and Personnel Manager in the EOF at extension 8593. (They are responsible for the food requirements for all of the emergency facilities.)
EPIP 4-7:36
Attachment 3, Rev. 20
FACILITIES AND MATERIAL COORDINATOR (Continued)
20. Contact the Purchasing Department at extension 8033 (or page at
716585-527-2540) for expediting equipment needed for the emergency response.
Note: Use the following account numbers for any of the above items, if necessary:
1. Cost Center 50D00, G/L Account # 590600, WBS Element NNEPOOO for general items; and
2. Cost Center 50D00, G/L Account #590600, WBS Element NNEP003 for equipment items.
21. If the JENC is to be staffed longer than one shift, assist the News Center
Manager and/or Assistant News Center Manager using the Continuous
Staffing schedule in EPIP 4-6.
22. For continuous staffing, consult the list of qualified personnel for this position.
List of Qualified Personnel for this position:
Sharon Miller* Home: (585) 624-4609 Work: (585) 771-3548 Cellular: (585) 738-2303
Al Pitts* Home: (585) 872-1242 Work: (585) 771-3600 Pager: (585) 528-4470 Cellular: (585) 315-0517
Jan McGlynn* Home: (585) 265-3825 Work: (716)724-8117 Pager: (585) 528-0395
*= Primary responder for position
EPIP 4-7:37
Attachment 3, Rev. 20
MEDIA MONITORING AND PUBLIC INQUIRY MANAGER
Reports to: Assistant News Center Manager
Supervises: Media Monitoring and Public Inquiry staffs, Spouse Phone staff, Spanish Interpreter and Sign Language Interpreter
Function: Responsible for overall public inquiry and media monitoring. Supervises the proactive monitoring of TV and Radio broadcasts to determine if any inaccurate information is being disseminated. Takes immediate steps to get accurate information to media.
Responsibilities:
1. If you are arriving from the Ginna site, go to the small conference room on 89/1 East Avenue and perform a whole body frisk to check for contamination.
2. Log in with JENC Security upon arrival.
3. Sign in on JENC activation board.
4. Obtain a name tag with your name and position.
5. For adequate Media Monitoring and Public Inquiry staff, consult position checklist in EPIP 4-7.
6. Maintain a log book of your activities for your position.
7. When you have sufficient staff to handle incoming calls, call the Corporate Switchboard Supervisor at 389-9898 and inform them to forward all calls to Public Inquiry at 724-8147 or 724-8148.
8. Contact the Customer Call Center Manager, Stephen Smythe, at the numbers below, inform him of the Ginna emergency and direct him to inform the call center representatives. Inform him of your contact numbers should he require additional information.
Stephen Smythe Work: (585) 771-2246 Home: (585) 394-8791 Pager: (585) 528-3121 Fax: (817) 724-8880
EPIP 4-7:38
Attachment 3, Rev. 20
MEDIA MONITORING AND PUBLIC INQUIRY MANAGER (Continued)
9. Maintain awareness of current plant status through status sheets and press statements.
10. Obtain copies of all the approved news releases and distributes them to Media Monitoring and Public Inquiry staffs.
11. Attend all pre-press conference meetings. The Interim Information Sheet following this checklist may be used to brief the Media Monitoring, Public Inquiry and Spouse Phone staffs.
12. Attend all press conferences.
13. Circulate between Media Monitoring and the Public Inquiry area to provide timely accurate information to staff.
14. Maintain current awareness of trends in public inquiries reported, so immediate corrective actions can be taken to quell any incorrect information. Any persistent mis-information by the media should be discussed in the bull pen sessions for appropriate response by the Corporate Spokesperson.
15. Report misinformation and trends to state and county PlOs.
16. Pro-actively seek correct information through News Center Manager and other sources.
17. Ensure that staff completes the appropriate logs and paper work necessary to track misinformation trends and their sources.
18. Ensure (in conjunction with the administrative staff) that public inquiry staff have calendars, phone books, press releases and other resource material.
19. Ensures that media monitors have sufficient supplies of audio and video tapes and that all tapes are labeled and logged.
EPIP 4-7:39
Attachment 3, Rev. 20
MEDIA MONITORING AND PUBLIC INQUIRY MANAGER (Continued)
20. For continuous staffing, consult the list of qualified personnel for this position:
List of Qualified Personnel for this position:
Jim Gashlin* Home: (585) 425-4351 Work: (585) 771-4098 Pager: (585) 528-3287
John Zabliski Home: (585) 398-2213 Work: (585) 724-8972
Jackie Bell Home: (585) 229-4426 Work: (585) 771-4681
* = Primary responder for position.
EPIP 4-7:40
Attachment 3, Rev. 20
PUBLIC INQUIRY - INTERIM INFORMATION
Date: Press Conference Started: a.m. __ p.m.
This information is approved (if initialed below) for Public Inquiry people to use until they
receive official press releases regarding the same:
THIS IS / IS NOT A DRILL (Circle one)
0
0
0
0
0
0
0
Joint News Center Manager:
Corporate Spokesperson:
Technical Advisor:
0
Approval:
EPIP 4-7:41
Attachment 3, Rev. 20
TECHNICAL ADVISORS
Reports to: Corporate Spokesperson
Supervises: JENC/EOF News Writers, Assistant to the Corporate Spokesperson and Health Physics Consultants
Function: Acts as a resource to advise JENC staff on correct use of technical terms and appropriate ways to communicate technical information simply and clearly. Act as a resource for individual reporters to help clarify technical issues.
Responsibilities:
1. If you are arriving from the Ginna site, go to the small conference room on 89/1 East Avenue and perform a whole body frisk to check for contamination.
2. Log in with JENC Security upon arrival.
3. Sign in on JENC activation board.
4. Obtain a name tag with your name and position.
5. Upon arrival of all three Technical Advisors, determine who will fill the EOF Technical Advisor position.
6. Obtain all incoming New York State Part 1 forms (EPIP 1-5, Att. 3a) and fill out status sheets (following this checklist). Give to Corporate Spokesperson. If Corporate Spokesperson is not available, give to the News Center Manager. Assure both the Corporate Spokesperson and News Center Manager coordinate the timing of information to the media.
7. Support Corporate Spokesperson, federal, state and county PlOs' technical information requirements.
8. Upon the arrival of the HP Consultant, provide them with the HP Consultant Job Aide following this checklist.
9. Attend all pre-press conference meetings to ensure technical accuracy and assess impact of statements on public comprehension of plant status and/or radiological conditions.
10. Attend all press conferences and support Corporate Spokesperson, PlOs and technical consultants when requested.
EPIP 4-7:42
Attachment 3, Rev. 20
TECHNICAL ADVISORS (Continued)
11. Communicate effectively technical information about the Ginna plant design and operations to required audience and act as general resource person for the Corporate Spokesperson and PlOs.
12. Using the Technical Advisor Quick Check List, acquire up-to-date information on plant operations/condition and radiological conditions.
13. Respond to media inquires about the plant and emergency, while remaining aware of these precautions:
* DO NOT speculate about what might happen other than describing established plant emergency response and recovery processes (i.e., system response and the flow of EOPs.)
0 DO NOT compare this incident to other accident such as Three Mile Island or Chernobyl
0 DO NOT participate in on camera or radio interviews except in the course of providing general information about the plant or emergency event status to the media
* DO NOT talk about Protective Action Recommendations (PARs) made to the Counties by RG&E.
0 EXPLAIN how systems that are involved in the emergency normally function.
14. For continuous staffing, consult the list of qualified personnel for this position:
List of Qualified Personnel for this position:
Terry Fulkerson* Home: (585) 265-4630 Work: (585) 771-6636 Pager: (585) 528-8971
Tim Laursen* Home: (585) 396-1149 Work: (585) 771-6185 Pager: (585) 528-5982 Cellular: (585) 330-4017
* = Primary responder for position.
EPIP 4-7:43
Attachment 3, Rev. 20
TECHNICAL ADVISORS (Continued)
List of Qualified Personnel for this position: (Cont'd.)
Bob McMahon*
Steve Carter
Norm Meaker
Home: Work: Pager:
Home: Work: Pager:
Home: Work: Pager:
(585) 248-3601 (585) 771-3338 (585) 783-7279
(585) 223-3546 (585) 771-6664 (585)528-3454
(315) 524-2340 (585) 771-6680 (585) 528-6755
R.E. GIl
Information as of: Date
This is:A: Not an exercise
Classification: (Lowest) A. Unusual Event C. Site Area Emergency
Release of radioactive materials:
Reactor shutdown:
Wind speed
Wind direction
WNW
W 270o
WSW
EPIP 4-7:44
Attachment 3, Rev. 20 4NA NUCLEAR POWER STATION
-_Time
B: An exercise
B. Alert D. General Emergency (Highest)
A. No release B. Release in progress C. Release Terminated
A. Not shutdown B. Shutdown at Date Time
miles per hour
H NNW e°NNE
4s° NE
ENE
a l It.
SSW ISo, SSE S
News Center ManagerTechnical Advisor
EPIP 4-7:45
Attachment 3, Rev. 20 Page 1 of 3
TECHNIAL ADIO QUIC CHCLS
Date: Time: Briefina Number
RG&E Corporate Spokesperson Name:
THIS IS A: [ ] DRILL / EXERCISE [ ]NOT A DRILL OR EXERCISE
11. PUBLIC RESPONSE
I. Emergency Action Level a. [ ] NUE [ ] Alert [ ] Site Area Emergency [ ] General Emergency b. Declared at:
Protective Actions a.[ ]No b. [ ] Yes. If Yes - What are the recommended actions (see below). Check both the
ERPA and S (for shelter) or E (for evacuate).
These are recommended actions by the utility. The counties, which have legal responsibility, may take any action they deem necessary.
ACTIONS RECOMMENDED TO COUNTIES BY THE UTILITY*
ACTIONS TAKEN BY COUNTIES
Wayne County W1[ ]S[ ] E[ W2[ ]S[ ] E[ W3[ ]S[ ] E[ W4[ ]S[ ] E[ W5[ ]S[ ] E[ W6[ ]S[ ] E[ W7[ ]S[ ] E[
Monroe County M1[ ]S[ ] E[ ] M2[ ]S[ ] E[ ] M3[ ]S[ ] E[ ] M4[ ]S[ ] E[ M5[ ]S[ ] E[ ] M6[ ]S[ ] E[ M7[ ]S[ ] E[ M8[ JS[ J E[
Wayne County W1[ ] S[ ] E[ ] W2[ ] S[ ] E[ ] W3[ ] S[ ] E[ W4[ ] S[ ] E[ W5[ I S[ I E[ W6[ ] S[ ] E[ ] W7[ ] S[ ] E[ ]
Monroe County MI[ IS [ ] E[ ] M2[ ]S[ ] E[ ] M3[ ]S[ ] E[ M4[ ]S[ ] E[ M5[ 1S[ ] E[ ] M6[ ]S[ ] E[ ] M7[ ]S[ ] E[ M8[ ]S[ ] E[ ]
Day
] ] ] ] ] ] ]
EPIP 4-7:46
Attachment 3, Rev. 20 Page 2 of 3
(Continued)
12. METEOROLOGICAL DATA
Forecast:
13. PLANT EMPLOYEE STATUS
I. Workers on site have been evacuated: [ No [ I Yes
a. Time of evacuation and location of evacuees now: (Training Center, etc.) : _ AM/PM
(Location)
b. Average number of workers on site: during this shift.
I1 Identify any injuries / fatalities to plant personnel:
14. RADIOLOGICAL STATUS
I. Is a release in progress:
No[ ] Yes[ ] a. If yes, source of release is b. Release point c. Form of release
II
III
IV
V
VI
VII
Dose rate at plant boundary
Anticipated duration of release
Survey teams sent out: Yes ] No[ ]
Remind audience about radiological experts (if they are here) and their names:
Barriers intact: Yes[ ] No[ ]
Primary System Yes [ ] No [
Containment Integrity Yes [ ] No [
EPIP 4-7:47
Attachment 3, Rev. 20 Page 3 of 3
TECNIAL ADVSO QUIC CHCLS
(Continued)
Dose: Dose Rate: Total Dose: Contamination: Plant Boundary: Natural Background Annual Exposu REM:
Terms to Keep In Mind mrem (milli rem) 1/1 00th of a rem mrem per hour Dose x duration of exposure Radioactive material where it's not wanted S1500 feet rom reactor center of containment
ire: 300 mrem/year Roentgen Equivalent Man- a unit used in measuring the impact of radiation on human cells
5. PLANT STATUS
I Primary System Concerns:
11 Secondary System Concerns:
III Electrical Output: Gross megawatts (if in operation)
IV Systems / Components Out Of Service
V Special information regrading problem (i.e., no part currently available on site)
EPIP 4-7:48
Attachment 3, Rev. 20
HP CONSULTANT - JOB AIDE
DISCUSS the health effects of radiation when asked
COMPARE dose rates to everyday items familiar to the public. (e.g., a chest x-ray provides a dose of 10-50 millirem in a short period of time)
DO NOT speculate on any aspect of the emergency or the way RG&E, NYS or the counties are handling and responding to the emergency
DO NOT comment on whether you agree with the Protective Actions taken by the counties, since only the counties should discuss Protective Actions that have been decided for the general public. You can comment on WHY Protection Actions are implemented.
EPIP 4-7:49
Attachment 3, Rev. 20
NEWS WRITER
Reports to: Technical Advisor
Supervises: N/A
Function: Writes and develops news announcements as required by the Corporate Spokesperson.
Responsibilities:
1. If you are arriving from the Ginna site, go to the small conference room on
89/1 East Avenue and perform a whole body frisk to check for contamination.
2. Log in with EOF Security upon arrival.
3. Sign in on EOF activation board.
4. Obtain a name tag with your name and position.
5. Prepare press statements and related background material using the EAL Reference book and the EAL number.
6. Prepare specialized messages that may require research and development.
7. Press statements should be generated when significant events have occurred. Examples are (but are not limited to):
* Change of emergency classification * Release of radioactive materials * Injuries
8. To assist in the preparation of press statements and specialized messages, refer to the News Writer's Job Aide following this checklist.
9. When a press release has been written, obtain the following approvals:
* EOF/Recovery Manager or Nuclear Operations Manager for technical content; and
EPIP 4-7:50
Attachment 3, Rev. 20
NEWS WRITER (Continued)
* Corporate Spokesperson to ensure information is included in press conference and that it does not contradict information that has been previously released. If Corporate Spokesperson is not available, have the Assistant to the Corporate Spokesperson in JENC obtain approvals.
Once you obtain someone's approval, you do not have to obtain their approval again if someone else make additional changes.
Contact Assistant to Corporate Spokesperson. Send approved news announcement to the Assistant to the Corporate Spokesperson (all qualified position participants) via Lotus Notes. The News Center Manager will distribute the press release internally to the JENC responders and externally to the emergency facilities. Include in the Lotus Notes message the approvals that you have obtained.
10. Keep the Corporate Spokesperson informed of pertinent public concerns
which should be addressed in press conferences and/or press statements, based on EOF announcements and meetings.
11. For continuous staffing, consult the list of qualified personnel for this position:
List of Qualified Personnel for this position:
Kathleen Howe* Home: (585) 461-2948 Work: (585) 771-6616 Cellular: (585) 732-2025
Chris Kulwicki* Home: (585) 589-9149 Work: (585) 771-3126 Pager: (585) 529-6470
Mary Czech Home: (585) 288-2397 Work: (585) 771-4685 Pager (585)783-0727
EPIP 4-7:52
Attachment 3, Rev. 20
NEWS WRITER - JOB AIDE
These guidelines should be used when authoring and reviewing news
announcements or other news statements during an emergency at RG&E.
Layout and Style - Use the attached template appropriate for the emergency level declared - Double space all news announcements - Place at the top of each news bulletin:
o Contact telephone number o Date o Time [a.m./p.m.] [EDT/EST] (after final approval is obtained) o For immediate distribution
- Use this dateline: Rochester, New York - Arrange information from most important to least important - Use short sentences - Capitalize Unusual Event, Alert, Site Area Emergency and General
Emergency - Use a.m./p.m. clock time with EST (Eastern Standard Time) or EDT (Eastern
Daylight Time). Do not use military time. Content - Describe the latest event or change in emergency status. Focus on one
primary item, then add new secondary information. - Use a new lead for each News Bulletin. - DO NOT rehash prior News Bulletins. Use information from prior News
Bulletins and Media Briefings in Chronology of Events. - DO NOT use industry jargon or technical terms. - DO NOT release the names of any plant workers injured during the
emergency until it is verified that their families have been notified. - If injured personnel were transported to a hospital, the name of the hospital
may be released. - End each News Bulletin with a closing statement such as: "More details will
follow as they become available." - Use this phrase when appropriate: "The public is advised to stay tuned to a
local Emergency Alert System (EAS) radio station for the latest information and official instructions."
- If a release of radioactive materials occurs, provide projected doses in Rem
and compare to radiation health effects in the press kits. - A Loss of Coolant Accident (LOCA) can involve either a small break or large
break in a pipe connected to the reactor. Find out which one before including
information in a News Bulletin. DO NOT use the term "LOCA."
EPIP 4-7:53
Attachment 3, Rev. 20
GRAPHIC ARTIST
Reports to: Corporate Spokesperson
Supervises: Not applicable
Function: Providing graphics support during emergencies. Provides visuals for demonstration purposes during press briefings.
Responsibilities:
1. If you are arriving from the Ginna site, go to the small conference room on 89/1 East Avenue and perform a whole body frisk to check for contamination.
2. Log in with JENC Security upon arrival.
3. Sign in on JENC activation board.
4. Obtain a name tag with your name and position.
5. Upon receipt of status sheet update, modify, and display status sheets in auditorium using Power Point on T:\ drive\Ginna Emergencies\Ginna Drill Folder\Site Event Map.ppt when authorized by New Center Manager.
6. Updates ERPA maps with protective actions when directed by the News Center Manager.
7. Ensures proper placement of diagrams, training aids, models and other resource material in the Press Conference Area.
8. DO NOT display power point graphics before they are approved for use by
the Corporate Spokesperson or News Center Manager.
9. DO remove visual aids from view when they are no longer going to be used.
10. For continuous staffing, consult the list of qualified personnel for this position:
List of Qualified Personnel for this position:
Pat Francis* Home: (585) 544-3142 Work: (585) 771-2252 Pager: (585) 464-2385 Cellular: (585) 315-1206
EPIP 4-7:54
Attachment 3, Rev. 20
GRAPHIC ARTIST
List of Qualified Personnel for this position (Cont'd.)
Maria Manley*
Stephanie Lee*
Home: Work:
Home: Work: Pager: Cellular:
(585) 328-1298 (585) 771-4847
(585) 546-2224 (585) 771-6670 (585) 783-8022 (585) 755-6079
* = Primary responder for position.
EPIP 4-7:55
Attachment 3, Rev. 20
JENC ADMINISTRATIVE SUPPORT MANAGER
Reports to: Assistant News Center Manager
Supervises: Courier and Support Staff
Function: Supervises all support staff in the JENC, helping to respond to phone calls or
direct them to appropriate professional staff members in the JENC. Ensures
that the support needs of the News Center Manager are met.
Handles routine decision-making duties to aid RG&E personnel, state, county
and federal PIOs in the performance of their duties.
Responsibilities:
1. Log in with JENC Security upon arrival.
2. Sign in on JENC activation board.
3. Obtain a name tag with your name and position.
4. Test both fax machines and copiers in JENC.
5. Ensure your staff has logged in on the Activation Board and are wearing their
name badges.
NOTE: IN THE CASE OF A DRILL/EXERCISE, ENSURE ALL
DOCUMENTS ARE STAMPED "THIS IS A DRILL/EXERCISE" PRIOR TO DISTRIBUTION.
6. Direct Support Staff in the performance of their duties, such as reproducing
and distributing press statements, status sheet, etc., to ensure timely and
accurate distribution of critical information.
7. If requested by New Center Manager, assign Admin. Person to attend
Bullpen Sessions/Press Conferences and document in New Center Manager log.
8. Contact Graphic Artist for location of blue bin for distributions. Inform support
staff of location.
9. Ensure staff distributes status sheets or press releases faxed from offsite
agencies to appropriate JENC personnel using the flowchart in the JENC
Administrative Support checklist.
EPIP 4-7:56
Attachment 3, Rev. 20
JENC ADMINISTRATIVE SUPPORT MANAGER (Continued)
10. Give all originals and faxes to News Center Manager for filing.
11. Ensure/double check that news releases are signed off as required.
12. Ensure News Center Manager and Technical Advisor have approved status sheets prior to distribution.
13. Ensure all press releases generated in the JENC are faxed to emergency
facilities by using the group button on the outgoing fax machine. (See Support Staff checklist for flowchart.)
13. Ensure logs are maintained.
14. Ensure all office machines, telephones and support equipment is operational, and initiate repair requests when necessary.
15. For continuous staffing, consult the list of qualified personnel for this position:
List of Qualified Personnel for this position:
Betty Weis* Home: (585) 266-6527 Work: (585) 771-2163 Pager: (585) 783-6931 Cellular (585) 315-0571
Julie Schwan* Home: (315) 986-8427 Work: (585) 724-8700 Pager: (585) 463-9732
Mary Sterling* Home: (585) 538-2616 Work: (585) 724-8153 Pager: (585) 528-6766 Cellular: (585) 315-0585
* = Primary responder for position.
EPIP 4-7:57
Attachment 3, Rev. 20
JENC ADMINISTRATIVE SUPPORT STAFF
Reports to: JENC Administrative Support Manager
Supervises: Not applicable
Function: In addition to messenger duties, the support staff personnel are available to operate office copiers, fax machines, and perform other general duties as requested.
Responsibilities:
1. If you are arriving from the Ginna site, go to the small conference room on 89/1 East Avenue and perform a whole body frisk to check for contamination.
2. Log in with JENC Security upon arrival.
3. Sign in on JENC activation board.
4. Obtain a name tag with your name and position.
5. Send test fax to EOF, TSC, Survey Center, ESC, Wayne County, Monroe County and New York State by pressing the group fax button on the fax machine and request confirmation of receipt. Individual fax numbers are:
Wayne County Monroe County New York State TSC EOF Survey Center Engineering Support Center
9-1-315-946-9721 9-473-6116 9-1-518-457-9930 3927 9-262-5788 3612 3774
6. If no confirmation is received, use the following numbers to contact the
facility(s) to obtain a verbal confirmation:
Wayne County Monroe County TSC EOF Survey Ctr. ESC
315-946-5663 585-473-0710 3502 2176 3331 3679
EPIP 4-7:58
Attachment 3, Rev. 20
JENC ADMINISTRATIVE SUPPORT STAFF (Continued)
11. Perform fax operations as requested by Wayne and Monroe County representatives stationed in the JENC.
13. Respond to phone calls, routing to appropriate individuals.
14. Acquire and distribute office supplies as needed.
15. Ensure that support materials, calendars, procedures, phone books, log sheets and other forms are in place at each desk.
16. Other duties as requested by the JENC Administrative Support Manager or News Center Manager.
17. For continuous staffing, consult the list of qualified personnel for this position.
List of Qualified Personnel for this position:
Bonnie Wright Home: (585) 328-9986 Work: (585) 771-6762 Pager: (585) 525-1149
Everlene Thompson Home: (585) 328-2477 Work: (585) 724-8332'
Donna Wilchenski Home: (315) 483-8537 Work: (585) 771-3319
Karen Zeller Home: (585) 377-7094 Work: (585) 771-4864
Jodi Johnston Home: (585) 720-1737 Work: (585) 724-8324 Pager: (585) 463-9219
EPIP 4-7:59
Attachment 3, Rev. 20
Joint Emergency News Center - Press Release Distribution
MONROE COUNTY
(9- 473-7087)
EMERGENCY OPERATIONS
FACILITY (9-262-5788)
I TECHNICAL SUPPORT CENTER
(ext. 3927)
PRESS RELEASE GENERATED BY
RG&E OR OTHER AGENCY
PRESS RELEASES FAXED TO:
WAYNE COUNTY
(9-1-315-946-9721)
SURVEY CENTER
(ext. 3612)
NEW YORK STATE
(9-1-518-457-9930)
ENGINEERING SUPPORT CENTER
(ext. 3774)
EPIP 4-7:60
Att.3, Rev. 20
Distribution of Information inside the JENC
Status Sheet Original in
OR No JENC Manager
Press Release Event Notebook
News Center Manager
Assistant News Center Manager
Corporate Spokesperson
Public Inquiry Manager & Staff
(14 copies)
Technical Advisors (2 copies)
Assistant to the Corporate
Spokesperson
Magazine Racks
Status Boards - 4
-• Wayne County
-• Monroe County
- G New York State
_• Federal Emergency
- Management Agency
SNuclear Regulatory
Commission
-• Graphic Artist
EPIP 4-7:61
Reports to:
Supervises:
Function:
Responsibilit
ALL
Attachment 3, Rev. 20
MEDIA MONITORING AND PUBLIC INQUIRY STAFF
Media Monitoring and Public Inquiry Manager
Not applicable
Respond to calls from the public during an event at Ginna Station. Provide
known information and Identify caller trends that indicate that updated and
correct information should be released to the media at upcoming briefs.
ies:
1. If you are arriving from the Ginna site, go to the small conference room on 89/1 East Avenue and perform a whole body frisk to check for contamination.
2. Log in with JENC Security upon arrival.
3. Sign in on JENC activation board.
4. Obtain a name tag with your name and position.
5. First arriving staff member should make additional copies of this section for other members of the group.
PUBLIC INQUIRY STAFF
6. Provide only approved, written information.
7. Use Public Inquiry Response Log following this checklist to document each phone call.
8. Answer the telephone in a courteous and professional manner such as:
"This is the Joint Emergency News Center Public Inquiry Center. How can I help you?
9. If a caller identified themselves as a member of the media, inform them that the JENC is open for all media inquiries.
I
EPIP 4-7:62
Attachment 3, Rev. 20
MEDIA MONITORING AND PUBLIC INQUIRY STAFF (Continued)
10. Respond to telephone inquiries about the emergency using information provided in News Announcements, approved reference materials or approved status boards. DO NOT speculate about anything. Give only the facts that you have.
11. Maintain an accurate timely log on Appendix 3 of this checklist
12. Seek assistance from the Media Monitoring and Public Inquiry Manager if you
receive a question that cannot be answered with available information.
13. Inform the Media Monitoring and Public Inquiry Manager if there appears to
be a trend of questions that could be answered for a large number of people
at a press conference. Provide input (based upon the public's need for information) to the appropriate utility, state, county or federal PIO.
14. If a caller has a concern that you cannot address from information provided,
tell the caller you will make note of it and give it to your supervisor. DO NOT say that you will get back to the caller.
15. Use the Public Inquiry Job Aide following this checklist to provide background information on emergencies and the emergency response organization.
MEDIA MONITORING
16. Tune television monitors to the following stations and record local and
national news programs and news bulletins about the emergency:
1. WOKR - Channel 13 ABC 2. WHEC - Channel 10 NBC 3. WROC - Channel 8 CBS 4. WUHF - Channel 31 FOX
17. Tune radios to the following stations and record local and national news programs and news bulletins about the emergency:
° WHAM - 1180 AM WVOR - 100.5 FM
EPIP 4-7:63
Attachment 3, Rev. 20
MEDIA MONITORING AND PUBLIC INQUIRY STAFF (Continued)
18. Check the following websites for information in the event:
0
0
0
0
0
0
www. rochesterDandC.com www. rochestertoday.com www.nei.org www.nrc.gov/opa www. 1Onbc.com www.cnn.com www. rnews.com
Also, perform a search for "Ginna Nuclear".
19. Maintain a list of discrepancies or misleading information carried on radio or television about the emergency, including station, time, description of incorrect or misleading information. Alert the Media Monitoring and Public Inquiry Manager of these items.
20. Place recorded tapes in the "Audio Visual Monitor Log" envelopes located in the Media Monitoring area and log pertinent information listed on envelope.
21. For continuous staffing, consult the list of qualified personnel for this position.
List of Qualified Personnel for this position:
Julie Bergstrom
Karen Gingello
Gary DeWilde
Lynn Russell
Home: Work: Pager:
Home: Work:
Home: Work:
Home: Work:
(585) 383-0026 (585) 771-4712 (585) 783-3464
(585) 225-9131 (585) 771-4865
(585) 586-7390 (585) 724-8836
(585) 594-4610 (585) 771-4745
EPIP 4-7:64
Attachment 3, Rev. 20
MEDIA MONITORING AND PUBLIC INQUIRY STAFF (Continued)
List of Qualified Personnel for this position:
Tim Miller
Ronni Camiolo
Richard DeSarra
Jorge Saavedra
Laurel Parzych
Jim Giffi
Mary Goodenough
Amy Catalano
David George
Mary Smith
Linda Goldthrite
Cheryl Graff
Home: Work:
Home: Work:
Home: Work:
Home: Work: Pager:
Home: Office: Cellular:
Home: Work:
Home: Work:
Home: Work:
Home: Work:
Home: Work:
Home: Work:
Home: Work:
(585) 266-1796 (585) 771-6133
(585) 227-4376 (585) 771-4646
(585) 266-6088 (585) 771-4771
(315) 986-7150 (585) 771-6779 (585) 783-6827
(585) 762-4650 (585) 771-2992 (585) 329-9869
(585) 271-4654 (585) 771- 4726
(315) 524-3194 (585) 771-4043
(315) 524-0233 (585) 771-4784
(585) 467-0995 (585) 771-4765
(585) 265-0869 (585) 771-3603
(585) 594-2579 (Unlisted) (585) 724-8846
(315) 524-7551 (585) 771-3495
EPIP 4-7:65
Attachment 3, Rev. 20
MEDIA MONITORING AND PUBLIC INQUIRY STAFF (Continued)
List of Qualified Personnel for this position:
Nilda Morales Home: (585) 581-2781 Work: (585) 771-6952
Anita Hadcock Home: (585) 227-5031 Work: (585) 771-4868 Pager: (585) 525-7559
EPIP 4-7:66
Attachment 3, Rev. 20APPENDIX 3
Public Inquiry- Media Response Inquiry and Off Air Monitor Form
NOTE: FOR ADDITIONAL INFORMATION, TUNE INTO THE EMERGENCY ALERT SYSTEM NETWORKS: WHAM 1180; WVOR 100.5 FM; AND WHEC TV-10.
Type of call:
[ ]Public Inquiry [ ]Professional Inquiry [ ]Media Inquiry [ ]Media Monitor Report
Date of Call / Broadcast: Time of Call / Broadcast:
Name of responder / monitor:
Media Name / Location:
Caller's / Reporter's Name: Phone:
Question(s) Asked / Inaccurate Information:
Response Given / Correct Information and Source:
Was the call referred: (-) Yes (. ) No If yes, to w
Further action required: (-) Yes (. ) No
Was this action completed? (-) Yes (-) No By:
Reported to Media Monitoring and Public Inquiry Manager at
Media Monitoring/ Public Inquiry Manager Notes:
hom?
Return completed for the Media Monitoring and Public Inquiry Manager Public Inquiry - Media Monitoring - Media Response
EPIP 4-7:67
Attachment 3, Rev. 20
PUBLIC INQUIRY STAFF - JOB AIDE
Overview of Response
RG&E is responsible for keeping federal, State and local authorities informed on the status of the
emergency as it relates to protection of the public health and safety. RG&E will recommend to
federal, State and local authorities specific protective actions to limit the danger to the public,
including evacuation.
RG&E understands that it is the Nuclear Regulatory Commission's policy that the emergency
should be managed by the licensee. The NRC staff at the Region 1 Operations Center is limited
in its ability to provide detailed recommendations to plant personnel or plant managers at the site.
RG&E understands that the NRC Operations Center will be the primary location where this
agency will monitor and evaluate licensee actions. During that time, the normal response roles
for the NRC Operations Center will be to monitor, inform, and, upon request, advise licensees
and other federal, State and local authorities. The authority for managing the NRC's emergency
response efforts will be transferred to a senior onsite NRC representative when the NRC
Regional Administrator is confident the onsite representatives are prepared to receive that
authority. Their role will continue to be monitoring, advising and informing plant and local
authorities.
Emergency Classification Levels - Four Emergency Classification Levels have been
established by the NRC and incorporated into the NERP and State and county plans. Each class
requires a different degree of response actions by the state, counties and RG&E. The four
classes are:
Unusual Event - an extremely low level event which poses no threat to public safety but which
warrants an increased awareness on the part of RG&E and offsite agency personnel. No release
of radioactive material requiring offsite response or monitoring is expected.
Alert - low level condition which poses no threat to public safety, but for which precautionary
mobilization of certain response functions is appropriate in case conditions degrade. Any
radioactive materials released from the plant would be a small fraction of the limits established by
the Environmental Protection Agency.
Site Area Emergency - Although protective actions for the general public are not indicated at this
level, conditions have degraded to a point warranting the full activation of response functions. Any
radioactive materials released from the plant in excess of the limits established by the
Environmental Protection Agency would occur within the site boundary.
-1-
EPIP 4-7:68
Attachment 3, Rev. 20
PUBLIC INQUIRY STAFF - JOB AIDE (Continued)
General Emergency - Conditions have degraded to a point where actual or imminent substantial
reactor damage and loss of containment threaten public safety and for which some form of
protective actions will be initiated. A radioactive release in excess of the limits established by the
Environmental Protection Agency may occur beyond the site boundary.
Emergency Planning Zone (EPZ) - An area around Ginna Station divided into Emergency
Response Planning Areas (ERPAS) for which preplanned actions to meet possible hazards have
been developed. Actions to meet site hazards are the responsibility of RG&E. Protective actions in
the Plume Exposure Zone (approximately 10 miles) are the responsibility of the county organiz
ations. New York State is responsible for actions to limit ingestion exposure in the zone out to
approximately 50 miles.
Local State of Emergency - May be declared by a county executive in the event that public safety
is imperiled by a disaster or public emergency. Following such a declaration, the county executive
issue local emergency orders to protect life and property or to bring the emergency under control.
Actions may include for example, prohibition or control of vehiculartraffic, closing of public facilities
and suspension of local ordinances. (Further details provided in NYS Executive Law Article 2-B)
Alert Classification Actions
* All RG&E Emergency Response facilities are activated at the plant and East Ave.
* No evacuations of the public are anticipated • No evacuations of site personnel are anticipated * RG&E Survey teams will be monitoring the area around the plant for radioactivity releases
* County and State emergency facilities will be activating
* RG&E is required to notify County and State officials of the Alert within 15 minutes over a
dedicated hotline. RG&E is required to notify the Nuclear Regulatory Commission of the Alert within one hour
over a dedicated hotline. The NRC, NYS, Monroe County and Wayne Countywill receive plant information from Ginna
over dedicated computer lines.
-2-
EPIP 4-7:69
Attachment 3, Rev. 20
PUBLIC INQUIRY STAFF - JOB AIDE (Continued)
Site Area Emergency Classification Actions
0 All RG&E Emergency Response facilities are activated at the plant and East Ave. * No evacuations of the public are anticipated * Plant personnel are normally evacuated from the plant to an area outside the Ginna
security fence but, on company property. * RG&E Radiation Monitoring and Survey teams will be monitoring the area within five miles
of the plant for radioactivity releases. 0 Monroe County and Wayne County will be performing radiation surveys between 5 and 10
miles from the plant in their respective counties * County and State emergency facilities will activate * RG&E is required to notify County and State officials of the Site Area Emergency within 15
minutes over a dedicated hotline. * RG&E is required to notify the Nuclear Regulatory Commission of the Site Area
Emergency within one hour over a dedicated hotline. * The NRC, NYS, Monroe County and Wayne County will receive plant information from
Ginna over dedicated computer lines.
General Emergency Classification Actions
* All RG&E Emergency Response facilities are activated at the plant and East Ave. • The public within 10 miles of the plant should standby for evacuation or sheltering
recommendations from Monroe and Wayne County officials * Plant personnel are normally evacuated from the plant to an area outside the Ginna
security fence but still on company property. * RG&E Radiation Monitoring and Survey teams will be monitoring the area within five miles
of the plant for radioactivity releases. * Monroe County and Wayne County will be performing radiation surveys between 5 and 10
miles from the plant in their respective counties 0 County and State emergency facilities will activate * RG&E is required to notify County and State officials of the General Emergency within 15
minutes over a dedicated hotline. * RG&E is required to notify the Nuclear Regulatory Commission of the General Emergency
within one hour over a dedicated hotline. 0 Refer to your Ginna calendar for emergency information 0 School children in Monroe County will be taken to Monroe Community College (MCC) * The NRC, NYS, Monroe County and Wayne County will receive plant information from
Ginna over dedicated computer lines.
-3-
EPIP 4-7:70
Attachment 3, Rev. 20
PUBLIC INQUIRY STAFF - JOB AIDE (Continued)
General Emergency Classification Actions (Cont'd.)
* RG&E, Wayne County and Monroe County each send out radiation monitoring teams * RG&E performs surveys within 5 miles of the Ginna plant • Wayne & Monroe Counties perform surveys between 5 & 10 miles from the plant in their
respective portion of the 10 miles Emergency Planning Zone (EPZ) around Ginna * The survey teams have radiation meters and air samplers to detect and measure releases
from the Ginna plant.
Notification of the Public
a The public will hear the Ginna sirens activated for 3 to 5 minutes. This signals that the
public should tune to an Emergency Alert System (EAS) station. • The EAS stations are WHAM (1180-AM), WVOR (100.5-FM) and WHEC (TV-1 0) • The Counties will provide sheltering or evacuation information * The Ginna calendars have all of the required information.
Evacuation and Sheltering of the General Public * Refer all callers to the Ginna calendars. Have a calendar handy to provide information to
the public. • Lake Ontario will be evacuated by a marine radio announcement and patrols by the Wayne
County Marine Unit and the Monroe County Marine Unit. Additional assistance may be
requested from the U.S. Coast Guard. * Wayne County reception centers for evacuated residents are:
- Palmyra-Macedon High School - Newark High School
* Monroe County reception centers for evacuated residents are:
- Greece Olympia High School - Pittsford-Mendon High School - Rush-Henrietta High School
* Residents and their vehicles will be monitored for radioactivity at the reception centers 0 If any radioactive contamination is detected they and their vehicles will be washed to
remove the radioactivity • The American Red Cross will be available at the reception centers to provide housing or
other services. • Evacuation of the entire 10 miles EPZ will take between 3 to 5 hours.
-4-
EPIP 4-7:71
Attachment 3, Rev. 20
SPOUSE PHONE STAFF
Reports to: Media Monitoring and Public Inquiry Manager
Supervises: N/A
Function: Provides direct line of communication to families of RG&E employees during a Ginna emergency.
Responsibilities:
If you are arriving from the Ginna site, go to the small conference room on 89/1
East Avenue and perform a whole body frisk to check for contamination.
Log in with JENC Security.
3. Sign in on JENC activation Board.
4. Obtain a name tag with your name and position.
5. Report to the Media Monitoring and Public Inquiry area.
6. Ensure that you have the most recent news announcements.
7. Provide information to families of RG&E (Ginna Station) employees.
8. Provide only approved, written and accurate information to family members.
9. In some cases, it may be necessary to locate a Ginna employee.
1. Call the TSC Administrative/Communications area at extension 3502.
2. Ask the Administrative/Communications Manager to assist in locating the individual and relaying the message to contact you at your specific phone extension.
10. Request assistance from the Media Monitoring and Public Inquiry manager as necessary.
11. For continuous staffing, consult the checklist for Media Monitoring and Public Inquiry Staff.
List of Qualified Personnel for this position:
Lynn Hauck Home: (585) 544-3960 Work: (585) 724-8600 Pager: (585) 783-0938
1
V
EPIP 4-7:72
Attachment 3, Rev. 20
SPOUSE PHONE STAFF (Continued)
List of Qualified Personnel for this position (Cont'd.):
Bonnie Gilbert Home: (585) 248-2292 Work: (585) 771-2281 Pager: (585) 783-3549
Theresa Warner Home: (315) 597-2288 Work: (585) 771-4617
Alysse Kulikowski Home: (585) 787-0942 Work: (585) 771-3279
EPIP 4-7:73
Attachment 3, Rev. 20
VIDEO/ SOUND ENGINEER
Reports to:
Supervises:
Function:
Responsibilitic
Facilities and Material Coordinator
Not applicable
Operates company video equipment during press briefings.
es:
1. If you are arriving from the Ginna site, go to the small conference room on 89/1 East Avenue and perform a whole body frisk to check for contamination.
2. Log in with JENC Security.
3. Sign in on JENC activation Board.
4. Obtain a name tag with your name and position.
5. Set up and operate video camera, lights and video recorder in the Press Conference Area of the JENC.
6. Video tape all press conferences.
7. Set up the following equipment:
1. Video tape deck and two full length video tapes 2. Video camera and associated cables 3. Microphones, associated cables and stands
8. Operate audio equipment, microphones, recorders and media junction box in the Press Conference Area of the JENC.
9. Ensure that all wall speakers for the public address system are turned on and that a functional test has been performed.
10. For continuous staffing, consult the list of qualified personnel for this position.
List of Qualified Personnel for this position:
Mark Stellman
Bob Hulbert
Home: Work: Cellular
Home: Work: Cellular:
(315) 986-9437 (585) 771-2268 (585) 315-0731
(585) 442-0885 (585) 771-6392 (585) 315-0732
EPIP 4-7:74
Attachment 3, Rev. 20
VIDEO/SOUND ENGINEER (Continued)
List of Qualified Personnel for this position: (Cont'd.)
Pete Munding
Dan Gatto
Home: Work: Pager:
Home: Work: Pager: Cellular:
(585) 872-6557 (585) 771-3329 (585) 525-3095
(585) 227-5133 (585)771-6013 (585) 525-5338 (585) 315-1151
* = Primary responder for position.
EPIP 4-7:75
Attachment 3, Rev. 20
SIGN LANGUAGE INTERPRETER
Reports to: Media Monitoring and Public Inquiry Manager
Supervises: N/A
Function: Provides Sign Language Support in the News Center during news conferences, especially for televised events where hearing impaired members of the public require emergency information.
NOTE: RG&E WILL UTILIZE MONROE COUNTY OFFICE OF EMERGENCY
PREPAREDNESS' LIST TO SECURE QUALIFIED INTERPRETERS AND SIGN
LANGUAGE SPECIALISTS FOR SPECIAL NEED POPULATIONS.
Responsibilities:
1. Log in with JENC Security.
2. Sign in on JENC activation Board.
3. Obtain a name tag with your name and position.
4. Attend all news conferences and sign for the PlOs and spokespersons as they
present emergency information. This is especially important when the public is
required to take any action or observe precautions.
5. Attend briefings in the "bullpen" area with the PIOs and Spokespersons and
ascertain which presentations will require the support of sign language.
6. When specific direction or action steps are identified the interpreter must convey
exactly what is being said. In general discussion, it is permissible for the interpreter
to make adjustments in the interest of clarity or speed.
EPIP 4-7:76
Attachment 3, Rev. 20
Reports to:
Supervises:
Function:
ResponsibilitiE
NOTE:
SPANISH INTERPRETER
Media Monitoring and Public Inquiry Manager
Not applicable
Handles calls from the Spanish speaking public.
£s:
RG&E WILL UTILIZE MONROE COUNTY OFFICE OF EMERGENCY PREPAREDNESS' LIST TO SECURE QUALIFIED INTERPRETERS AND SIGN LANGUAGE SPECIALISTS FOR SPECIAL NEED POPULATIONS.
1. If you are arriving from the Ginna site, go to the small conference room on 89/1
East Avenue and perform a whole body frisk to check for contamination.
2. Log in with JENC Security.
3. Sign in on JENC activation Board.
4. Obtain a name tag with your name and position.
5. Attend press conferences and summarize the key points for the Spanish speaking public.
6. Attend briefings in the "bull pen" area by the PlOs.
7. Be available in the event that the PlOs or media request assistance in making
information available through the electronic media to the Spanish speaking public.
8. For continuous staffing, consult the list of qualified personnel for this position.
List of Qualified Personnel for this position:
Lissette Andino* Home: (585) 266-5494 Work: (585) 771-3277 Pager: (585) 525-6946
* = Primary responder for position.