part: 1 coe iti details - iti pardi home pageitipardi.org/pdfs/presentation of iti pardi dated as on...
TRANSCRIPT
UPGRADATION DETAILS (wherever only upgradation is taken up)
Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate %
1 Aug-06 62 81 130%
2 Aug-07 64 84 131%
3 Aug-08 80 84 105%
4 Aug-09 68 90 132%
TOTAL 274 339 124%
Admission Rate % = Filled Seats/Sanctioned Seats * 100 2
BBBT DETAILS
Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate
%
1 Aug-06 96 114 119%
2 Aug-07 96 120 125%
3 Aug-08 96 144 150%
4 Aug-09 96 132 137%
TOTAL 384 510 139%
Admission Rate % = Filled Seats/Sanctioned Seats * 100 3
ADVANCE MODULE DETAILS
Filled Seats Admission rate %Sr. No. YEAR Sanctioned
Seats August February August February
1 Aug-07 / Feb-08 96 65 20 67% 21%
2 Aug-08 / Feb-09 96 73 15 76% 15%
3 Aug-09 / Feb-10 96 94 31 98% 32%
TOTAL 288 232 66 81% 23%
Admission Rate % = Filled Seats/Sanctioned Seats * 100 4
INDUSTRY SPECIFIC MODULE DETAILS
Sr. No. YEAR Filled Seats No. of Industries Admission rate %
1 Aug-07 / Feb-08 0 0 0
2 Aug-08 / Feb-09 0 0 0
3 Aug-09 / Feb-10 0 0 0
TOTAL 0 0 0
Admission Rate % = Filled Seats/Sanctioned Seats * 100 5
APPRENTISE TRAINING
Sr. No. YEAR DESIGNATED TRADE
NO. OF TRAINEES ENGAGED
1 2007-08 NA NA
2 2008-09 NA NA
3 2009-10 NA NA
4
TOTAL
6
TRANSITION RATE
Sr. No. YEAR BBBT to ADVANCE (X) Transition rate
1 Aug-07 / Feb-08 65/20 46%
2 Aug-08 / Feb-09 73/15 40%
3 Aug-09 / Feb-10 94/31 48%
TOTAL 232/66 45%
Note: How Many Students joined Advance Module from the lot of X ( X = BBBT Passed Out - Students who got the Job )
Transition Rate = 100 * No. of Students Admited in Advance Module / X
7
TRANSITION RATE
Sr. No. YEARADVANCE to
INDUSTRY SPECIFIC (X)
Transition rate
1 Aug-07 / Feb-08 0 0
2 Aug-08 / Feb-09 0 0
3 Aug-09 / Feb-10 0 0
TOTAL 0 0
Note: How Many Students joined Specific Module from the lot of X( X = Advance Module Passed Out - Students who got the Job )
Transition Rate = 100 * No. of Students Admitted in Specific Module / X
8
PASSOUT RATE - BBBT (NCVT Pattern)Sr. No. YEAR Total Appeared Total Passout
1 Jul-07 85 77
2 Jul-08 97 95
3 Jul-09 108 106
TOTAL 290 278
PASSOUT RATE - ADVANCE MODULESr. No. YEAR Total Appeared Total Passout
1 Feb-08 55 50
2 Feb-09 73 68
3 Feb-10 88 59
TOTAL 21 6 177
PASSOUT RATE - For ITI taken up for upgradation (NCVT Pattern)Sr. No. YEAR Total Appeared Total Passout
1 Jul-07 59 59
2 Jul-08 61 59
3 Jul-09 35 35
TOTAL 134 1339
PLACEMENT
EMPLOYMENT
Sr. No. YEAR
TOTAL
PASSED
EMPLOYMENT IN INDUSTRY
SELF EMPLOY
MENT
NO. OF REGISTRATION
WITH EMPLOYMENT
EXCHG.
NO. OF CAMPUS
INTERVIEW HELD
1
2006 – 072007 – 082008 - 09
463522517
210240225
NIl 398475435
152023
10
EARNINGS PER MONTH
Sr. No. YEAR AVERAGE MONTHLY SALARY
1 2006-07 Nil
2 2007-08 3350
3 2008-09 3600
Total Average 3475
11
PROCUREMENT OF GOODSITI's (FOR 6 BBBT + 3 ADVANCE + 6 UPGRADED TRADES)
NAME Total No. of Unit
Total Required Qty.
Total Available Qty. % Availability
Fundamentals of elect. & comp.
1 172 161 94 %
Basic fitting 1 668 633 95 %Basic mechanical process
1 818 778 95 %
Fundamentals of general chemistry
1 769 763 99 %
Basic Instrumentation
1 818 785 96 %
BBBT
Basic unit operation
1 342 329 96 %
Advance aocp 1 510 489 96 %Advance Im 1 595 486 82 %AMAdvance lacp 1 250 141 57 %FT 2 1041 943 91 %WD 1 678 648 95 %IT 1 171 141 83 %AOCP 1 1379 1329 96 %LACP 1 4609 4539 98 %
TRADE (Trade
taken for Upgradati IMCP 1 970 940 97 %
12
COUNSTRUCTION OF CIVIL WORKS
Sr. No. ADDITION AND ALTERATION / NEW WORK
1 Total Progressive Expenditure incurred Rs. 68.63 lacs.
2 Expected Date of Completion : work completed
SET UP OF ADVANCE MODULE WORKSHOP
1 Expected Date of Completion : Work completed
CONSTRUCTION PHOTOGRAPHS REQUIRED
13
STAFF VACANCY (To be filled by November-2009)
Sr. No. ITEM No. of Sanctioned No. of Filled No. of Vacant
1 Principal 01 0 01
2 Teaching Staff 54 44 11
3 Other 20 15 05
Total 75 59 17
14
Training of Trainers
Sr. No.
Total Instructors No of Instructor Completed training
No. of Instructor
CTI Training 1 Year
CTI Training
POT Training 3 Months
CTI Engineering Technology
3 Month
CTI Trade Technology
6 MonthBBBT AM
Other Training
more than 7 Days
1 55 12 02 - -
01 02 03
15
REVENUE GENERATION
Sr. No. ACTIVITY Revenue Generated (Rs.)
1
Budget I ncome of institute 0230Labour & employment
4.60
(Please attach detail sheet of Revenue Generation)
16
PLACEMENT BEREAU ACTIVATION
Sr. No. YEAR
Total Trainee Pass out
Bio Data Placed on Website
Registered With
Employment Exchange
No. of Campus
Interview Held
No. of Trainee got Job
Avg. Salary / Month
123
2006-072007-0820008-09Total
77169191437
77169191437
35117162314
-100919
---
17
BUDGET - EXPENDITURE DETAILS (Year2009-2010)
Sr. No.
Component Budget Provision Expenditure Remaining Expenditure
Plan Non Plan Total Plan Non
Plan Total Plan Non Plan Total
1 Miscellaneous - 19.20 19.20 - 19.20 19.20 - - -
2
Machinery & Equipment
- 6.00 6.00 - 5.98 5.98 - - -
3 Civil 32.42 - 32.42 - - - 32.42 - 32.42
TOTAL
18
WOMAN PARTICIPATION
Sr. No. STEPS TAKEN TO INCREASE PARTICIPATION RESULTS
11. Jagruti abhiyan .
2. Seminar in school.3. Advertisement
Will be seen in Aug. 2010
ACTION TAKEN FOR ALLUMNI ASSOCIATION
Sr. No. STEPS TAKEN TO ASSOCIATE THE ALLUMNI RESULTS
1 Nil
Nil
19
ACTIVITY FOR DISADVANTAGE GROUP
Sr. No. STEPS TAKEN RESULTS
1
1. Jagruti abhiyan .2. Seminar in school.
3. Advertisement
Will be seen in Aug. 2010
ORIENTATION PROGRAM FOR IMC
Sr. No. STEPS TAKEN RESULTS
1 MeetingContacts
IMC formed & Expenditure for COE to develop COE sector.
20
RAISING AWARENESS AMONG POTENTIAL STUDENTS & INDUSTRY
Sr. No. STEPS TAKEN RESULTS
1 Industrial visit - About 200 students visited several Industry.
2 Campus Interview
-06 Companies have arranged campus Interview.
- 187 Students attended & 89 students selected.
3 On Job Training - 40 trainees will go for on job training during April – 2010.
21
ENTRANCE GATE OF ITI
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Before After
SIGN BOARD NEAR GATE OF ITI
I.T.I. PARDI
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Before After
ENTRANCE ROAD TO ITI
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
COE BUILDING
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Before After
LANDSCAPING & FRONTAGE
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Before After
ENTRANCE OF BUILDINGLATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.
PARDI, DIST. VALSADPARDI, DIST. VALSAD
Before After
ENTRANCE OF BUILDINGBLOCK B
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
BUILDING & WORKSHOP CORRIDORS
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
THEORY & AUDIO VISUAL ROOM
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
CONFERENCE ROOM
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
Existing workshop for CHBT
• Mod.1 - Fundamental of Electronics & Computers• Mod.2 - Basic Fittings and Measurements• Mod.3 - Basic Mechanical Processes• Mod.4 - Fundamental of General Chemistry & Physics• Mod.5 - Basic Instrumentation• Mod.6 - Basic unit Operations and Processes
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
CHBTCHBT--1 Electronics & Computers1 Electronics & Computers
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
CHBTCHBT-- 2 Basic Fitting Lab2 Basic Fitting Lab..
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
CHBTCHBT-- 3 3 Mech.ProcessMech.Process Lab.Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
After
Before
CHBTCHBT-- 4 Chemistry Lab.4 Chemistry Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
CHBT CHBT –– 5 Instrumentation Lab.5 Instrumentation Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
CHBT CHBT –– 6 Unit Operation Lab.6 Unit Operation Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
CHAT 01 ADV. AOCHAT 01 ADV. AO
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
CHAT 03 ADV. IMCHAT 03 ADV. IM
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
ELECTRONICS LABELECTRONICS LAB
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
IT LABIT LAB
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
Plastic Processing OperatorPlastic Processing Operator
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
WiremanWireman
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
Mechanic DieselMechanic Diesel
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
COPA Lab.COPA Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
AfterBefore
APPAREL PARK
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
COE STAFF DRESS CODECOE STAFF DRESS CODEAfterBefore
Website of ITI
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Training Materials for each COE ModuleM-1 Fundamental of Electronics & Computer
Lesson No.. Lesson Name
1 Atomic theory
2 Active & Passive components
3 Integrated circuits
4 Logic Gates
5 MS- Word
6 MS- Excel
7 MS - powerpoint8 AutoCAD
Training Materials for each COE Module
M- 2Basic Fittings and Measurements
Lesson No. Lesson Name
1 Vernier Caliper
2 Micrometer
3 Dial Gauge
4 Hand Tools
5 Drilling Machine
6 Limit- Fit7 Taps & Die
8 File, Hackshaw, Bench vice
Training Materials for each COE ModuleM - 3 Basic Mechanical Processes
Lesson No. Lesson Name
1 Lathe machine
2 Cutting tool material
3 Tapper turning
4 Welding
5 Metal joining process
6 Thread cutting
7 Safety precaution
Training Materials for each COE Module
M -4Fundamental of General Chemistry & Physics
Lesson No. Lesson Name
1 Units & Measurement
2 Viscocity & Density
3 Acid , baise solution
4 Metal & Non metal
5 Transformers
6 Volumetric Analysis
7 Physical dimension
Training Materials for each COE Module
M -5Basic Instrumentation
Lesson No. Lesson Name
1 Pressure measurement equipments
2 Temperature measurement equipments
3 Level Indicators
4 Purge systems
5 Flow meters
6 PH meter
7 Hygro meter, Hydro meter
8 Anemometer
Training Materials for each COE Module
M -6Basic unit Operations and Processes
Lesson No. Lesson Name
1 Fluid flow operation
2 Extraction & leaching
3 Absorption & Adsorption
4 Lagging material
5 Distillation
6 Fertilizers
7 Mfg. processes Urea, Soap, Nitric acid etc.
8 Screening
9 Filteration
Training Materials for each COE ModuleAdv. AOCP
Lesson No. Lesson Name
1 Fluid Transportation
2 Valves
3 Pumps
4 Heat transfer
5 Evaporation
6 Distilation & its types
7 Centirifugation
8 Crystalisation
9 Water & Air polution
Energy Saving
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Status of ISO Certification
• ISO Consultant has been selected and order to be given to Ahmedabad neboulous.
• ISO training has been conducted on dated 5th Jan. 2010, 22nd
Feb. 2010, 19th March. 2010.
• ISO audit will be conducted on 16th April 2010.
Civil Work under Civil Work under CoECoEFor New BuildingFor New Building
• Rs. 32 Lac. Sanctioned for new building.
• T.S. approved tendering process by PWD. Will be carried out.
•• For New Existing BuildingFor New Existing Building
• Electrification compeleted.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
•Provision for current year 2009- 2010 Rs. 19.20 lacs.
• How many tender issued
• How many order placed
• Amount of Expenditure incurred upto 31st March 2010
•How much expenditure is to be incurred up to March - 2010
Nil
Nil
Rs. 19.20 lacs.
Rs. 19.20 lacs.
Miscellaneous Expenditure
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
•Provision for current year 2009- 2010 Rs. 6 lacs.
• How many tender issued
• How many order placed
• Amount of Expenditure incurred upto 31st March 2010.
•How much expenditure is to be incurred up to March - 2010
Nil
Nil
Rs. 5.98 lacs.
Rs. 5.98 lacs.
Machinery Equipment
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
•On Roll BBBT 132
•Advanced AOCP 11
•Advanded IMCP 11
•Advanced LACP•Total
10164
Status of On roll in BBBT/ Advance Module
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
• Open land available in sq. mt. 86821 sq.mt.• Perimeter of Boundary wall in meter of compund
1200 mts.
•How many plants planted in July 2009 5000 Nos.• How many plants survived as on 31st March 2010.
4500 + (984 grown up trees till June 09)
• Which different type of plants planted in ITI in July 2009
Boganvel, Neem, Saptapadi, Asopalav& others.
Plantation
Plantation Survival
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Seminar on E.M.F.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD
Staff Meeting
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE.PARDI, DIST. VALSADPARDI, DIST. VALSAD