papilla company introduction
TRANSCRIPT
![Page 1: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/1.jpg)
+
Company Introduction
Widening the Horizon
![Page 2: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/2.jpg)
+ Content
Company Background
Safety Policy
Engineering Services
Clientele
Maintenance Services
Projects Completed
![Page 3: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/3.jpg)
+ Company Background
Founded in 1985
Managing Director – Lau Pon Lee
Started in Johor Port Berhad – Maintenance Contractor for 26 yrs
90 over permanents employees
Offices in Malaysia, Singapore and Indonesia
Served clients in South East Asia, China, Japan, India, USA and Caribbean region
![Page 4: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/4.jpg)
+ Safety Policy
We are committed to provide a safe, healthy and clean working environment.
We are committed to take measures to ensure our own safety and health and of all other workers at work.
We are committed to periodically review and evaluate Papilla’s policy and programs on HSE.
![Page 5: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/5.jpg)
+ Engineering Services
Heavy Machinery - Pre-Construction
Heavy Machinery Construction
Engineering and Technical Services
![Page 6: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/6.jpg)
+ Heavy Machineries - Pre-Construction
Oversee all aspects of client’s project
Estimating, scheduling, engineering, contracting, labour, cost control and coordination with owner & architect
Composed of both project management and site supervision professionals
![Page 7: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/7.jpg)
+ Heavy Machineries Construction
Assist clients to realize their visions
Customize services to fit into client’s requirements
Cater for projects of varying scope, budget, schedule and complexity
![Page 8: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/8.jpg)
+ Engineering and Technical Services
Construction reviews
Technical site surveys
Condition assessment
Operation and maintenance services
Emergency repair
Modernization and retrofitting
![Page 9: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/9.jpg)
+ Clienteles and Associates
![Page 10: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/10.jpg)
+ Projects Papilla Completed with MHI
Northport and Johor Port, Malaysia – Supply of ship to shore cranes and rubber tyre gantry cranes.
Northport, Malaysia – Repair for ship to shore crane gantry device crack
Johor Port, Malaysia – Repair for ship to shore crane portal beam accident
Chittagong Port, Bangladesh – Residential engineer by Papilla
![Page 11: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/11.jpg)
+ Projects Completed PTP
2011 - Replacement of all Gantry wheels and gearbox and install additional wheels for 3 units IMPSA STS crane
2008 - Reconstruct 3 units IMPSA STS crane trolley drive mechanism and Boom alignment work
2008 - 4 units Noell STS crane boom hinge boring and pin replacement
2002 - Off loading 5 units Noell STS crane
1999 - 2002 - 36 units Hanjung RTG and 6 units Favelle Favco RTG erection work ( 1999 - 2002 )
![Page 12: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/12.jpg)
+ Complex Projects Completed
2012 - Favalle Favco Level Luffing Crane E&I installation
2010 - Technip Sub-Sea Flexible Pipe Manufacturing Plant Installation Work
2009 - National Oilwell Varco 3,000 tonne Super Marine Crane
2008 - STS crane A Frame repair ( Westport)
2007 – 5 units MHI STS crane equalizer crack repair ( North port )
2007 - 2 units IMPSA STS crane Erection ( Penang Port )
2007 – 3 units IMPSA STS crane electrical Installation work (North Port)
![Page 13: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/13.jpg)
+ Offloading 5 Units Noell STS Crane - PTP
![Page 14: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/14.jpg)
+ IMPSA STS Crane Erection Work – Penang Port (2007)
![Page 15: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/15.jpg)
+ IMPSA STS Crane Erection Work – Penang Port (2007)
![Page 16: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/16.jpg)
+ IMPSA STS Crane Gantry Wheel and Gearbox Replacement – (PTP)
![Page 17: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/17.jpg)
+ IMPSA STS Crane Gantry Wheel and Gearbox Replacement – (PTP)
![Page 18: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/18.jpg)
+ IMPSA STS Crane Gantry Wheel and Gearbox Replacement – (PTP)
![Page 19: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/19.jpg)
+ IMPSA STS Crane Boom Hinge Boring and Pin Replacement
![Page 20: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/20.jpg)
+ IMPSA STS Crane Boom Hinge Boring and Pin Replacement
![Page 21: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/21.jpg)
+ STS Crane A-Frame Repair – Westport
Special temporary support
![Page 22: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/22.jpg)
+ A-Frame Repair – STS Crane (Westport)
![Page 23: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/23.jpg)
+ Equaliser Crack Repair - Northport
![Page 24: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/24.jpg)
+ Gearbox Overhaul - JPB
![Page 25: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/25.jpg)
+ Gearbox Replacement – BICT
![Page 26: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/26.jpg)
+ Gearbox Replacement - BICT
![Page 27: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/27.jpg)
+ Favelle Favco Level Luffing Crane (2012)
![Page 28: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/28.jpg)
+ Favelle Favco Level Luffing Crane (2012)
![Page 29: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/29.jpg)
+ Favelle Favco Pedestal Crane (2000)
![Page 30: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/30.jpg)
+ Favelle Favco Pedestal Crane (2002)
![Page 31: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/31.jpg)
+ Kapar Energy Ventures – Stacker Reclaimer Repair Works
![Page 32: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/32.jpg)
+ Kapar Energy Ventures – Stacker Reclaimer Repair Works
![Page 33: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/33.jpg)
+ National Oilwell Varco 3,000 Tonne Super Marine Crane
![Page 34: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/34.jpg)
+ Mechanical Work
Bull gear installation
Chain assembly
Rail – mid post
Rail – upper pedestal
Sheave and bearing – Top bail
Slewing bearing
Slewing motor – Top bail
Erection Work
![Page 35: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/35.jpg)
+ Bull Gear Installation
![Page 36: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/36.jpg)
+ Chain Assembly
![Page 37: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/37.jpg)
+ Rail – Mid Post
![Page 38: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/38.jpg)
+ Rail – Upper Pedestal
![Page 39: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/39.jpg)
+ Sheave and Bearing - Top Bail
![Page 40: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/40.jpg)
+ Slewing Bearing
![Page 41: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/41.jpg)
+ Slewing Motor – Top Bail
![Page 42: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/42.jpg)
+ Erection Work
![Page 43: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/43.jpg)
+ Erection Work
![Page 44: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/44.jpg)
+ Electrical Work
Installation of electrical cable support systems
Wiring of control systems
Installation of control room
Installation of slip ring
![Page 45: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/45.jpg)
+ Installation of Electrical Cable Support Systems
![Page 46: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/46.jpg)
+ Wiring of Control Systems
![Page 47: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/47.jpg)
+ Installation of Control Room
![Page 48: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/48.jpg)
+ Installation of Slip Ring
![Page 49: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/49.jpg)
+ Completed Components
![Page 50: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/50.jpg)
+ Monadelphous Muhibbah Marine Shiploader -Wiggins Island Coal Export Terminal, Australia
![Page 51: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/51.jpg)
+ Installation of Pin And Sheave
![Page 52: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/52.jpg)
+ Installation of Cabble Ladder and Conduit
![Page 53: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/53.jpg)
+ Installation of Mast
![Page 54: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/54.jpg)
+ Installation of Boom
![Page 55: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/55.jpg)
+ Technip Sub-Sea Flexible Pipe Manufacturing Plant (2009-2012)
![Page 56: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/56.jpg)
+ Electrical And Mechanical Installation Work
![Page 57: Papilla Company Introduction](https://reader036.vdocuments.us/reader036/viewer/2022062302/588989851a28ab461b8b73a9/html5/thumbnails/57.jpg)
+
Thank you
Widening the Horizon