Q3 Prepare an e-mail message:to be sent to [email protected] copied to [email protected] with a blind carbon copy to [email protected] with the subject line ICTCOREX
The body text of the message should include:
your name your centre number your candidate number the text: Here is the requested file.
Q3 Before you send the email, you must print it out with the
following details.
To print this email :
End of Task A Tutorial
-
8/3/2019 Paper 2Guide
2/25
TASK B DOCUMENT PRODUCTION
Q6 Open the .rtf file and save it as .doc
Q9 Check to make sure your computers measurement unit is in centimeters.
Q9 Change the margins in page setup; note that the left and right margins are now 2cm.
Q10 Type your name, centre number and candidate number together.
Q10 Move the center tab to the middle of the page
Q10 Place the cursor after your name and press tab, it should go straight to the center.
Q10 Now use the tab key to place the candidate number to the right of the header.
-
8/3/2019 Paper 2Guide
3/25
Q10 Use the right indent to make sure that the candidate number is exactly on the right.
Q11 On the menu bar select format columns.
Q11 Change the columns to three, the spacing to 4mm and select apply to as whole document.
Q12 Set the text to a serif font.
Q13 Set the text to 1.5 line spacing.
Q14Q15
Make the text fully justified.
Set the text size to 10 point
Select all the text press (ctrl+A)
If he needs a
line between
the columns
Check it
-
8/3/2019 Paper 2Guide
4/25
Q16 Insert a page break before the first paragraph.
Q17
Change a serif font.
Change a 10 point
Click Here
to ustified
1.5(line spacing)
Format ONLY the first page of the document as a single column.
Q18to26
Go to the beginning of the page break and press enter to make a new line, then type the details
asked in the question. The font used in the mark scheme is Arial Black, so when you have
finished it should look similar to the image below.
-
8/3/2019 Paper 2Guide
5/25
Q27 Copy the paragraph.
Q27 Paste it after the first paragraph.
-
8/3/2019 Paper 2Guide
6/25
Q28. Select bullets and numbering, and using the numbered tab select the roman numeral bullets.
Q29
Copy the style sheet excerpt and paste it into notepad (not Microsoft word), then use FrontPage
style sheets (if you know how)
Q33 Highlight the column with packaging and right-click on it to insert a column.
Q33 Type the new details in the empty column.
6
-
8/3/2019 Paper 2Guide
7/25
You must add a pound sign at the beginning of the numbers. You can copy and paste the sign
from the other columns or use
insert symbol as shown below.
Q33.
Highlight the row with size 2, right-click and select delete rows.
Q34
Q34. Now do the same for the other row which has size 2.
7
-
8/3/2019 Paper 2Guide
8/25
Q35 Highlight the first paragraph, keep your finger pressed on the CTRL key on the keyboard andhighlight the rest of the paragraphs. Select format - paragraph from the file menu and under
indentation Special, select First line: and make By: 2cm. It should look like the image below.
Check that ALL paragraphs have changed.
Q37 Insert the image of a tree as normal, 2click on the image select Square and Left.
8
-
8/3/2019 Paper 2Guide
9/25
Q37 Make the image cover the whole column and arrange it so that it looks like the picture in c).
End of Task B Tutorial
9
-
8/3/2019 Paper 2Guide
10/25
TASK C DATA MANIPULATION
Q39. Create a blank database
Chose New from objects Table and Import Table Search forSites. CSV
10
-
8/3/2019 Paper 2Guide
11/25
Choose Delimited Choose Comma Select First row contains field names Select In a new table
11
-
8/3/2019 Paper 2Guide
12/25
Click the Advancedbutton in the next step seen below
You should leave the field name Owned as it is shown above
Make the Data type: Yes/No
ClickOK and then NEXT
On the next screen:
Choose No primary key
12
-
8/3/2019 Paper 2Guide
13/25
ClickNEXT FINISH - OK
Right-click the Sites table and select Design view
Q39 ContinuedClick the Data type where it has Owned
Make sure you are in the GENERAL tab and select FORMATOn the right select the Yes/No option (see below)
13
-
8/3/2019 Paper 2Guide
14/25
ClickSAVE VIEW DATASHEET VIEW
You should now have a table with the OWNED column showing YES and NO values
Q40 Go back to the design view and take a screen-shot, as shown below.
14
-
8/3/2019 Paper 2Guide
15/25
Q41 Now enter the three records
When you have finished, close the Table and run the Query Wizard
Q43 After you finish the Query Wizard make a new column and add the following details;Under the CODE column add the Criteria as OC
Under the CODE column add the Or as AS
Then make a new column with the following details;Field: Growth: [Potential Area]-[Current Area]
Table: SITES
Sort: Do the ascending in the report
Show: Place a TICK
Now untick the columns Reference and Owned
Check it in the Design View and then produce the Report how you normally would using the Report
Wizard.
Note: Make sure that 0 is located at the top of the Growth column and the report title is Far East Sites,with your name on the right of the Footer
15
-
8/3/2019 Paper 2Guide
16/25
16
-
8/3/2019 Paper 2Guide
17/25
Note: The finished report should look like the screen-shot below
Sherif adel,eg901,1234
Q45 The next steps show the second query result and the report wizard
17
-
8/3/2019 Paper 2Guide
18/25
Note: The finished report should look like the screen-shot below
18
-
8/3/2019 Paper 2Guide
19/25
Q47 Create a new query using the wizard and follow the screen-shots belowa) Only use the two field names Code and Potential Area
Sherif adel,eg901,1234
b) Click next and select Summary & click the Summary Optionsbutton. Click Next
19
-
8/3/2019 Paper 2Guide
20/25
c) Place a tick in Sum and a tick in Count records in sites, then clickOK
d) Name the query as in question 47, then clickFINISHbecause there is no need to change anything
in the design view.
e) The query should look like the screen-shot below
Q48 Save this data in a form which can be imported into a text document.
20
-
8/3/2019 Paper 2Guide
21/25
Export this data into a form that can be opened by your graph/charting package.
End of Task C Tutorial
21
-
8/3/2019 Paper 2Guide
22/25
TASK D INTERGRATION
Q50 a) Open the .csv file which you saved from question 48.
Q51.
a) Open the file Regions.csv,
b) It should look similar to the picture below
Now insert a new column before column B and give it the field name Region Names
d) Now use the lookup function to find out what each code stands for, for example AF = Africa.
Dont forget to drag down the region names.
Q52 a) Highlight the columns which hold the Region Names and Count of sites, then select the charticon. Click Next twice to go to step 3 of 4 in the chart wizard.
22
-
8/3/2019 Paper 2Guide
23/25
Q53 In step number 3, type the chart title Number of potential sites in each region.
Q54 a)Label the Category (x) axis as Region and label the Value (y) axis as Number of sites.
b) Click on the Legend tab and un-tickShow legend.
23
-
8/3/2019 Paper 2Guide
24/25
c) Click Next and finally click Finish
Q54 d) When you click Finish your chart should look similar to the screen-shot below.
24
-
8/3/2019 Paper 2Guide
25/25
Q55. You can simply save the new spreadsheet and then copy the chart only and follow the
instructions on question 56.
Q56. Copy the chart and paste it where you are asked to in question 56.
Q57. There are a number of spelling errors in the document, but ignore the English/American
spelling/grammar differences.
End of Task D Tutorial