Retrofit PJ Procedure
FS/Planning
Basic Design
Detail Design
Procurement
Construction
Commissioning
EPC Contractor
BID
M/C Hand Over
Owner
FEEDBenchmark
0 0
![Page 3: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/3.jpg)
Typical Procedure of Retrofit
① Recognition
② Targeting
③ Feasibility Study
④ Basic Planning
⑤ FEED/EPC- Installing New Equip.- Retrofit(=Process Modification)
- Subsidy
STEP 1(BENCHIMARKING)
STEP 2(PLANNING)
STEP 3(DOING)
What Kind of Supports ?
![Page 4: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/4.jpg)
Retrofit Procedure
FS/Planning
Basic Design
Detail Design
Procurement
Construction
Commissioning
EPC Contractor
BID
M/C Hand Over
Owner
FEEDBenchmark
0 0
Step-1 Step-2 Step-3 EPC
![Page 5: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/5.jpg)
Singapore Specific Regulatory Challenge
![Page 6: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/6.jpg)
Retrofit Procedure
FS/Planning
Basic Design
Detail Design
Procurement
Construction
Commissioning
EPC Contractor
BID
M/C Hand Over
Owner
FEEDBenchmark
0 0
Step-1
![Page 7: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/7.jpg)
STEP 1- BENCHIMARKING -
Monitoring / Visualization / Detection / Targeting / Recognition / Measuring / Awareness
![Page 8: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/8.jpg)
STEP 2- PLANNING -
![Page 9: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/9.jpg)
STEP 3- DOING -
![Page 10: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/10.jpg)
Retrofit Procedure
FS/Planning
Basic Design
Detail Design
Procurement
Construction
Commissioning
EPC Contractor
BID
M/C Hand Over
Owner
FEEDBenchmark
0 0
Step-2
![Page 11: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/11.jpg)
Singapore Specific Regulatory Challenge
![Page 12: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/12.jpg)
Subsidy
![Page 13: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/13.jpg)
Retrofit Procedure
FS/Planning
Basic Design
Detail Design
Procurement
Construction
Commissioning
EPC Contractor
BID
M/C Hand Over
Owner
FEEDBenchmark
0 0
Step-3 EPC
![Page 14: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/14.jpg)
AssociationName
RING(Research Association of
Refinery Integration for Group-operation)
SII(Sustainable open Innovation
Initiative)
Relevant Government Office
METI(Petroleum Refining and
Reserve Division)
METI(Energy Efficiency Division)
Purpose • Strengthencompetitiveness of refineries and industrial complexes
• Promotion of energy saving
• Optimization of energy supply and demand
Target Company
Multiple operators including Refiners
All domestic businesses
Target Expenses
① Design cost② Equipment cost③ Construction cost
① Design cost② Equipment cost③ Construction cost
Subsidy Ratio 1/2 1/4~1/3
Maximum Amount
1 billion ¥ / year(Rules for 2018)
1 .5 billion ¥ / year
Subsidy Overview
![Page 15: Panel Discussion - asiaeec-col.eccj.or.jp · Panel Discussion. Retrofit PJ Procedure FS/Planning Basic Design Detail Design Procurement Construction Commissioning EPC Contractor BID](https://reader034.vdocuments.us/reader034/viewer/2022050611/5fb24195430b261e8b432a7c/html5/thumbnails/15.jpg)
AssociationName
RING(Research Association of
Refinery Integration for Group-operation)
SII(Sustainable open Innovation
Initiative)
Application Requirements
① Optimization of processed crude oil(Heavy, high acid value)
② Bottom-less measures (Heavy oil production reduction)
③ High value addedpetroleum products
④ Shift to chemicals⑤ Strengthening export
capacity⑥ Operational reliability
① Energy saving rate 1% or more
② Energy saving amount is over 1,000 KL(in a
crude oil equivalent)
③ Cost effectivenessMore than 200KL(in a
crude oil equivalent) / 10 million yen
④ Energy unit improvement rate 1% or more
Subsidy Overview