Melnoronrdum of Colloborotion{Under PAN llT - ONGC Collaborationl
f
ur
fo,
"Develo p me nt of Polyme r/Biopolymer Viscosifier(Like Xanthum Gum) for Temperature Stability
upto 2500C in Drilling Fluid"
Bet'u:een
lnstitute of Drilling Technology,Oil and Natural Gas Corporation Limited
Dehradun, Uttarakhand, lndia
lndian lnstitute mf Technology-RoorkeeRoorkee, Uttarakhand, lndia
. srqqq {qtGertificate No.
Certificate lssued Date
Account Reference
Unique Doc. Re{erence
Purchased bY
DescriPtion of Document
PropertY DescriPtion
Consideration Price (Rs')
First PartY
Second PartY
StamP DutY Paid BY
StamP.DutY Arnount(Rs')
'1.
frr*Yd:{\V
Pleasr: writeortypebelowthis line-' ' '--' ---- -tr'--"- '- -
INDIA NON JUDICIAL
Government of Uttarakhand
e-StamP
lN-uK47887224601 891 Q
05-Jan-2018 10:21 AM
NONACC (SV)/ uk1 2oOIo4IDEHRADUN/ UK-DH
suBlN-UKUKl 2001 0496530880580421 Q
VINAY KUMAR GUPTA
Arlicle Miscellaneous
NA
0(Zero1
VINAY KUMAR GUPTA
NA
VINAY KUMAR GUPTA
100(One Hundred onlY)
:!*. ia, , :
:.!::t'a-': t:1,
,,:i :f,...:t. -lt
,,,,;:;'t:r1
. '-;, rl :r:n li'nt 1...j'1.,1,". l::;:iii.'. iil
,,..- 'r,-;l iE ,i:lr:,,"1i'li
:i,1:t;..;,'.-ll n J.,;-i
r.:t:.,:l l:':i:;i:iirli I i*.?;:rr'
l;, 't',,i'
'ti,.til '.
li.{i;;;,'.. .
ug@-
ltl,-,.
.+ i. 't iirl
i;;,:"q-:"''+t I
i;' j1
hnfu,*,;;
.
/a
Title: Agreement for Collaborative R&D project titled "Development of polymer/biopolymerviscosifier (like Xanthan gum) for temperature stability up to 250o C for use in drilling fluid"between ONGC (IDT, Dehradun), and Indian Institute of Technology, Roorkee.This agreement is made and entered into on this the ( lOtl'January 2018) by and between Oil and NaturalGas Corporation Limited, a company registered under Companies Act, 1956, having its Registered
office at Pandit Deen Dayal Upadhyay, Urja Bhavan, 5-A, Nelson Mandela Marg, Vasant Kunj, NewDelhi- I 10070 and one of its office named as ONGC (lDT, Dehradun), Kaulagarh Road, Dehradun-248195, (here in after referred to as "ONCC" which expression shall unless repugnant to the contextor meaning thereof include all its successors, administrators, executors and assignees) of the FirstPart-v.
AND
Indian Institute of Technology Roorkee and having it registered office at Roorkee-247667,(hereinafterreferred to as "llT-Roorkee" which expression shall unless repugnant to the context or meaning thereofinclude all its successors, administrators, executors and assignees) of the Second Party.
The First pafty and Second Party hereafter being collectively referred to as the "Parties" and
individually as the "Party";
Whereas IlT-Roorkee has represented to ONGC (lDT, Dehradun) that it has capability in undertakingthe oDevelopment of polymer/triopolymerviscosifier (like Xanthan gum) for temperature stabilityup to 250'C for use in drilling fluid' and has submitted a Project Proposal appended to thisAGREEMENT as Annexure-l
AND
Whereas, IIT-Roorkee represents that it has the necessary experience and expertise for carrying but and
agrees to undertake R&D Project entitled "Development of polymer/biopolymer viscosifier (likeXanthan gum) for temperature stability up to 2500C for use in drilling fluid" in collaboration withONGC (lDT, Dehradun) as defined in this ACREEMENT
AND
Whereas, ONGC (lDT, Dehradun) desires that, IlT-Roorkee should undertake the assignedCollaborative R&D Project more explicitly defined in the sections below in this AGREEMENT.
AND
Whereas, IlT-Roorkee agrees to provide all the necessary facilities to the Principal Investigator (PI) ofthe project to perform the Collaborative R&D Project as defined in this AGREEMENT.
Now therefore it is agreed by and between the parties as under:
I
l
MM-1-
I
I
1.0 DEFINITIONS
Unless inconsistent with or otherwise indicated by the context, the following terms stipulatedin this AGREEMENT shall have the meaning as defined hereunder.AGREEMENT: This AGREEMENT together with the Schedules, Parts, Annexure and
Appendices attached hereto and will include any modifications, amendments or alterationsthereof as agreed between the parties fronr time to time.MEMORANDUM OF COLLABORATION (MOC):The Memorandum of Collaboration(MOC) between ONGC (lDT, Dehradun) and Indian Institutes of Technology-Roorkee signedon lOtl' January 2018THEMATIC RESEARCH AREA (TRA): The jointly identified areas of Research matchingthe ONGC needs and expertise available with IITs as defined in the MOC.PROGRAM ADVISORY COMMITTEE (PAC): Apex body having members from ONGCand IITs as defined in the MOC to review the activities of the program and recommend release
of funds. The composition and functions of PAC are described in the MOC.THEMATIC RESEARCH COMMITTEE (TRC): The nodal body for all research and
related activities in the respective Thematic Area represented by ONGC and IITs as defined in
the MOC.The composition and functions of TRC are described in the MOC.PRINCIPAL INVESTGATOR (PI): The person or persons who may be appointed /nominated by IlT-Roorkee; who shall be responsible for the overall execution of Project Workas defined in this AGREE,MENT.CO-PRINCIPAL INVESTIGATOR(S) (Co-PI): The person or persons who may be
appointed I nominated by IlT-Roorkee, if deemed necessary, to assist PI in the overall executionof Project Work, as defined in this AGREEMENT.PROJECT CO-ORDINATOR (PC): The First Person Responsible designated by Institute ofDrilling Technology to interact, monitor / review the Project Work carried out by PrincipalInvestigator and his/her Project Team.
1.9 RESEARCH FELLOW: Persons with requisite qualifications appointed by IlT-Roorkeespecifically for this project work to carry out research under 'ONGC Scholar Program' definedin the MOC. The Research Fellows will get fellowship in accordance with the remunerationmentioned in this AGREEMENT.
1.10 PROJECT PERSONNEL: Persons with requisite qualifications appointed by IlT-Roorkee,for engagement in this research project, for technical help in execution of the Project Work. TheProject Personnel will get remuneration in accordance with this AGRE,EMENT.
1.11 PROJECT WORK: Shallmean overall mutually agreed scope of work which is given in thisAGREEMENT and also defined in the Project proposal at Annexure-I relating to theCollaborative R&D work to be performed by IIT-Roorkee jointiy with ONGC (lDT, Dehradun).
l.l2 DESIGN: "Design" shall include an industrial design, drawing sand iayouts.1.13 INTELLECTUAL PROPERTY: Includes patent, copyright, design, trade secret and property
in discoveries, inventions, improvements, designs, data or information and materials created inpursuance of the research/technology development activities under the project whether or notsuch intellectual property will be capable of patent, copyright or similar infringement protection
or recognition and includes knowledge and information described as Confidential under thisAGREEMENT.
l.l4 INVENTION: "lnvention" shall bear the meaning assigned thereto in the lndian Patents Act,1970 (including any re-enactment thereof) as amended from time to time.
1"3
1"4
1.1
1.2
1.5
1.6
1.7
1.8
Vira'*"'l)"'^
I/
t,-
I
t.I5 ONGC GROUP OF COMPANIES: All subsidiary and joint venture companies of the oil and
Natural Gas Corporation Limited and ONCC group of companies.
1.16 PARENT ORGANIZATION: The Oil and Natural Gas Corporation Limited, ("ONGC')'a company incorporated and registered under "Companies Act - 1956" and having its Registered
office at pandit Deen Dayal Upadhyay, Urja Bhawan, 5-A, Nelson Mandela Marg, Vasant
Kunj, New Delhi- 110070
l.l7 pATENT: ,,patent" shall bear the meaning assigned under the Patents Act, 1970 (including any
re-enactment thereof) as amended from time to time'
2.0 PROJECT DETAILSZ.l Title of the Project: Development of polymer/biopolymer viscosifier (like Xanthan gum) for
temperature stability up to 250o C for use in drilling fluid.Z.Z Cost of the project' Rr. 70,49,500.00/- (Seventy Lakhs Forty Nine Thousands Five Hundred
only)2.3 Full Name of the PI: Prof. Yuvraj Singh Negi, Professor, Department of Polymer and Process
Engineerirrg2.4 Full Name of Co-PI: Dr. Garima Agrawal, DST Inspire Faculty, Department of Polymer and
Process Engineering2.5 Name of Project Coordinator: Mr. A. K.
2.6 Project Duration: I Yryears (18 months)
2.7 Objective of the Project
Joshi, GM (Chem) & Mr. Ratan Singh, DGM (Chem)
-l'o develop a viscosi{'ier tlraterial lvith tlterttlal stability up to 250o C for use in drilling fluid.
Scope of Work'fhe broad scope of ivork is as 1'ollows;
l. To develop a polyrncr/ bio polymer viscosificr (like Xattthatt-gum) whic'[r is stairle up to 250n
C in ternrs of its perfcrllance. rvhen usecl in preparatiori o1'drilling t'luid with selectcd ancl
coordi rrated add itives.2. IIT Rgorkee to carry,oilt lab experiments to develop a polyrrreri bio polyrner viscosifier (like
XanlSap-gum) whicir is stablc up to 2500 C in terrns of its performance. 1'he product developed
byllT1(oorkeetobeevaluatedasviscosifierwithnominal dose(arotrnd 1%)inpreparationof
drilli,g fluid. The fluids preparecl with the above product shall be stat'rle up to 2500 Cl
tetnpe ratLlres.
2.8 DeliverablesPro.iect SPecifi c OutPLrt
. We ainr to syrrthesize a pol,v-nrcrl biopolyrrrer (copolynrer) which can be used as viscosifier in
drilling {luid should be stablc up to 2500 C in ternts of perfonnance.
2.g.1 fhe other deliverables during / at the encl of the pro.iect. other things as applicable shall itlcludc:
a) Details of'Research Papers/T'eclinical Documents;
b) Pro.iect RePorts (QuarterlY);
c) IpIl/patcnts etc-.. inclucling supply of samples of product/matcrials, essential ft;r
demonstration of process/protectiotl oi' IPR or validatiotr.
2.8.2 On completion of the pro.iect. other deliverables sllall include:
a) Final Proiect RePort;
b) Detailed l)ocurneritation on proposed'l'eohnology/ Krrow-horv on the Process/ product and
Saf,ety protocols rvhich are prercquisite for furthcr scaling Llp or pilot production (i1'
applicable).I
lI
l
ai
I
v@^
t
II
c) Audited llnancial docutnents:d) Audited Iist of assets.
3.0 DURATION, EFFECTIVF] DATE AND T]XTENSION OI'THE AC;ITEEMI'NT'3.1 This AGREE,MENT rvill be valicl for a period of 18 months (proiect duration) {iom the date
of sigrring of this AGRIIEMIIN"I' with a provision to extcnd the AGREtiMflNT' for maximum
sub"iect to nrutual conserrt of both parties in writing at no adclitional cost. Request for extension
in the prescribed fornrat (Annexure-lX of this AGREEMENT') should he sent two months
in atlvance bcfore the expirv of the AGREEMENT.3.2 'fhc AGREEMENTshall bc ellbctive fionr tlte date of signing of tlic AGI{lrEMl-,N'l'by both
tlre Parties.
4.0 REMUNERATION FOR PRO.]ECT PI',RSONNEL & COST CONSIDERATIONS4.1 The following corrsolidated fellorvships per montlr will be paid to scholars cngaged l'or proiects:
o Maxinturl of RLrpees 30,000i- per trtontlr 1br first 1.5 vears fbr I']ro.icct Associate,
. Maxirnum of llr"rpees 35,000/- per month fbr subsequent period ftlr Project Associate,
. Maximurrr of Rupees 18,000/- per month for flrst 1.5 years lbr ['hD scholars,
. Maximum o1'Rupees tt.000/- per nrortth for MSc.l MS & M. 'fech stltdents
. Maxirtrum of Rupees 5"000/- per nronth for Llndergraduate students
The above t'ellowships will be applicable for rvorking in arcas idcntified jointly by ONGC and
llTs. Engagemeltt of Project Associate or PhD scholars will be up to the cornpletion of pro.iect.
Iingage rnerrt of Postgraduate/ Ciraduate scholars will be based on Pro.lect schedulei requirement
and rvould continue to be in operation up to rhe duratiolt/ curretlcy of the prcrject.
4.2 If the pro.lect requirernent necessitates engagenrent of manpo\ryer in other categories. the same
ntay be co6sidcrcci olt case to case basis by'a Committec contprisiltg olONGLI (lDT" Dehradun)"
Co6rdinator olrespective'l'hentatic Area and Pl o1'the projcct.'flre Cotnmittee will consider
the remuneration through negotiation.
4.3 Rateol-lnstituteOverheadsrvill beapplicableatuttil'ornr rateof l5'%of'total projectcost.
4.4 "l'[re expencliture on travel will be as per actual limited to budgetar.v provisiolt or Rs" 2 l,ac per
year. rvhichever is less {br eacli project"
4.S 'lhe contingency rvill bc as per actual lirnited to lrLrdgetary provisiorl or Rs. I [-ac per year.
whichever is less for eaclr pro-iect.
5.0 T'AXES AND DUTII'S5.-1 II'l'-Roorkee. unless specified othenvise in thc AGI{EEMENT'. shall bear and pay all tax
liahilities. duties and Govt. levies. including GST, Corporate ancl persottnel taxes levied or
inrposecl on the IlT-Roorkee and/or ONCiC (lDT, Dehradurr) on account o1'payments received
b_v it frorn the ONGCI (lDT. I)ehradr-rn) fbr the Project work done under this AGREIIMITNT. Itshall be the responsibility of'IIT-Roorkee to subrnit to the cottccrned Indian authorities" tlle
rerurns arrcl all other concerrred docurnents required for this purpose and to comply in all rcspects
rvith the requircments of the laws iri this regard, in tintc"
5.2 The asreecl sum payable to llT-Roorkcc under clausc 6.1 of this AGREF,MFTNI shall be
irrclusivc o1'all taxes inclucling GST, il'any. duties, corporate and pcrsonal tax. as applicable. Ifany taxes & duties are requirccl to be paid hy Institute of Drilling Technology which is re lated
to tfte work being clclne by III--Roorkee. it rvill lre recoverec'l fiom II'l'-Roorkee" Any ret'und ol'
iJuties, taxes. on any expenditurc incurt'ed. fbr the project work, rcceived by IlT-l{oorkce even
afler tlre expirl, of tfte approved date of cotnpletion ol'Pro.iect Work. will lre refuttcled by IIT-
Roorkee to ONGC (lD'f. Dehradun).
\^ry@
t
4
6.06.1
FINANCIAL COMMITMENTS & MODE OF PAYMENTONGC (lDT, DehruOrn) *itt puy a total sum of Rs. 70,49,500.00/- (Seventy Lakhs Forty Nine
Thousands Five Hundr"d oniyj to llT-Roorkee for the Project Work, as per the following
details:-
Note:* (iategory-wise Rer,uneration per rnontir for nrarlpower as indicatccl fol Proiect Associate r? Ils' 30'0001- per
ruronth.**'l'olal cost o1-project nlay vary as per prevailing rate of taxes' GS-I'l]ot applicable
"Maxitnutrr 30 sanrples pei month iir) I{s'3000i- per satnple for TGA/DSC'
Amount in
Lac
(Rs.)
Major Heading of ExPenditure
10,80,000.00-X4*p,*i",ttt f OZ- Pro.iect Associate) (60, 000 x I 8:10'80 Lac)
3,00,000"00T*r"l ('"s pet a"tual limited to Rs 2 Lakhs per annum)
1,50,000.00e"ntrrg"n"y ("t p"r actual, limited to Rs I Lakh per annum)
4,00,000.00'sarrples
testing charges (ltrr TGA/DSC)
27,30,000.00
4,09,500.00Lrrtit,rti"*l overheads (15 % of Subtotal )31,39,500.00Subrotal (l-5)
**GS'f
31.39,500.00Total (A)
Non-Recurring34,00,000.00Eqr,ripmerrt
5,10,000.00i)verhead on equiptt.ient ( I 5 7o of equipment)
** GSI'on overhead
Total (B)
Grand Total (A+B)
vryv:4Y
r tI
Sl. No.
A
l.
,
l
Recurring
Consumables 8,00,000.00
4.
.5.
6.
1
Sulilolal
NA
l]
8
n
l0 NA
39,10,000.00
70.49,500.00
Equipment:Estirnated Cost in
Lac
(l{s.)
Name of the EquiPment
To remove the solvents/water
from the solution mixtureI-yophilize r
To separate the PolYmerCooling Cerrtrifuge
To synthesi ze the PolYmerReactor 1-or Scale uP
Synthesis
Dispcrsion/SusPensiott o1'Probe Sonicator
Purification of monomers and5,00.000I-ligh Pressurc Vacuum
Purnp(up to 0.05 mili bar
pressure) with RotarY
Evaporator
6.2
Manpower:Nos. Rate per
Month
No. ofMonths
Amount
Pro.iect
Associate
Year I 2 30,000.00 t2 7.20.000.0t)
Year 2
(6-rrronths)
2 30,000.00 06 3,60,000.00
f i:i 10,80,000.00
Note: ..tlt cote gories lo be irtdicttted
All the payments shall tre made to IlT-Roorkee. IlT-Roorkee will be responsible for proper
custody of equipment/materials and expenditure on the Project Work as defined in this
AGREEMENT.ONGC (lDT, Dehradun) shall make payment in installments on milestone achievement basis'
The payment shall be released against completion of milestones mentioned in the table below'
The payment shall be made based on actual subject to the upper limit mentioned in the budget'
W
6.3
VM
I
;-.-!
Estimated AmountRequirement (Including
overhead)
Cumulative Periodfrom start ofthe
project
Details of deliverables
l0 9zo of Recurring and
Clonsultation fee and taxes
(without overheads)
Rs. 2.73"000.00
Withirr 15 daYs fronr
signing ol'Agreementa. Signing of Aqreetnenl
b. Basic dcsign and SYnthcsis of
Xartthan-gutr basccl (irafted
polyrnerl biopolynrcr (copolymer)
I't Milestone
l00o/o of non-recurring
expenditure (CaPital
Expenditure without
overheads) Rs.
34,00,000.00
Orr or before
completion of Znd
lnonths fiolr.r the clate
o1' signing ofAgreement.
a. I'inalizatiorl of ecluiPment
specificatiorrs"
b. pre-bicl qtlotations allcl
c. preparation ot-the NIQ
2n'r Milestone
33 .33 o/o of Recurring cost
(without overheads)
Rs.9.09.909.00
On completion of 6th
nronths frorrr tlre date
of signirrg olAgreetnent.
alkrrnpletion oI pttrchase process
ancl placing ol'thc POs
b. Recruitment of research sclrtllar
and stafl'
c. Stucly of Xatlthan gtllll based
Gralled biopoll'rner/copolylner for
the desircd ranges ol temperature
and visct-rsit,v.
d.lnitial characterizatiotr o[' graliecl
b i opo I ynr e ri co!19 I Yll o
3'd Milestone
13.65 o/o of Recurring and
others (without overheads)
Amount : Rs.3,72,645.00l2th rnonths lionr the
clate of signing of,Agreement.
O, conlpletion of
based on the subrnissiot.t clf invoice
ancl sirnctiotl order lequired
e-pttrt E-P.rditure**As Per need
19.01 % of Rectrrring and
others (without overheads)
Auroutrt :Rs.5, I 8,973.00
On - corrrPletion ofl5th ntonths frorn the
date of signing ol'
Agreenrent.
Xarttharr gurn gratlecl copolynler
h"'l'esting of Xarlthan gurn based
Grafted copolytler lor drilling Iluid'
..co,,rrfrf .rc charactcrizatiorl ul'5th Milestone
19.01 9/o of l{ectrning and
others (lvithout overheads)
Amount - Rs"-5, I 8'973.00
On conrPletion ofl Sth nronths from the
date of signirrg ofAgreenrent.
f**rng of Xanthan gunr based
Grafted copolvt'tler for different
requirentents ol' thernlal statrility"
vrscositl attd otltcr propcrlies
Preparation of Pro.iect rePod
(rtl' Milestone
5 Ya of Recurring and
others and all overheads
Amount Rs. I 0,56,000.00
AI1er strbmission of F-irral report
Rs.70,49,500.00
ri,l;+ r* t,*i,i.; ,rn,:Nrikrk;r;;irtt b, ,;irt*ii,,l,risM' ,,"1 ho''"'l n" re'strlts mitestones sholl be
ahove.
\^sU^
I
/
I
I
6.4
6.5
6.6
Approval of the Project Work and the financial support by ONGC (lDT, Dehradun) is for this
pioject and the amount received by llT-Roorkee shall be exclusively spent for the project
woik/activities undertaken in terms of this AGREEMENT and within the approved time
duration. IlT-Roorkee is not permitted to seek or utilize funds from any other organization
(government, semi-government, autonomous and private bodies) for this project approved by
iistitute of Drilling technology, except in cases, where a project is approved for joint funding
with/by trnstitute of Drilling TechnologyIlT-Roorkee will be responsible for expenditure incurred on the project and shall maintain
separate accounts and records for the project to be implemented under this AGREEMENT.
Ail payments will be made by ONGC (lDT, Dehradun) to IlT-Roorkee by Electronic clearing
system (ECSY RTGS/NEFT.IiT-Roorkee is required to inform ONGC (lDT, Dehradun) if they are recognized as a R&D
institute, which is eligible for exemption from Tax Deduction at Source (TDS) and is also
required to produce financial year wise certificates from the competent Tax Authority in this
regard. Normally, TDS rules shatl be applicable in respectof all payments made by Institute
oin1.illing Technology, unless IlT-Roorkee is able to produce in advance applicable Tax
Exernption Certificate towards such receipts, issued by competent Tax Authorities. It will be
the soie responsibility of IlT-Roorkee to inform ONGC (lDT, Dehradun) in advance about
availing of tax Exemption and also to ensure timely submission of Tax Exemption Certificate
to rece."ive full payment of amount of the instalments. In case of delay in submission ofcertificate and consequent delay in release of payments, ONGC (lDT, Dehradun) will not be
responsible for any delay in implementation schedule of the project on account of such delays.
If no prior ,"qu.rt is received, ONGC (lDT, Dehradun),will deduct TDS as per applicable
rates. in case IIT-Roorkee is desirous of receiving the amount of instalment from ONGC (lDT,
Dehradun) without aly TDS deduction and it expects delay in receiving the Tax Exemption
ceftificate from conceined Tax authority, it should provide funds for the project work from its
own resources in the interirn period and ensure that project work is not hampered. In case the
Tax Exemption certificate is not provided by IIT Roorkee their payment shall be
released after deduction of TDS and they shall be liable to provide fund utilisation
certificate for the full amount including the amount of TDS.
IIT-Roorkee will submit the request for release of milestone based payment, in the prescribed
format (Annexure-lV of this AGREEMENT) along with the progress report and the latest
statement of expenditure in the prescribed format including Committed Expenditure, duly
audited by external auditorAll rnilestone based payments will be released by ONGC (lDT, Dehradun) only after the
satisfactory completion of each previous milestone-wise tasks/goals by IlT-Roorkee and their
acceptance by ONCC (lDT, Dehradun). The next milestone based payment will be released
onlyafter receipt of documents on utilization of funds released under previous payment
and other related documents as per prescribed format (Annexure-Vl). In case ofprocurement of equipment for the project, instalment will be paid by ONGC (lDT, Dehradun),
after completion of ull p."-p.o"urement actions, as per laid down procedures of IlT-Roorkee
for such procurement and submission of invoice and sanction order for the purchase ofequipmeni as supporting document for release of instalment. The Pl/institute will submit
details of the item, quantity, price and delivery schedule. Whenever, the delivery period is
over, the PI should confirm receipt of equipment, its commissioning and the extent of payment
(full or paft payment) made. In case, the equipment delivery period, for which instalment has
6.7
5.8
fi,
t
I
been released, is not over before the next milestone based instalment becomes due, the PI mustconfirm giving requisite details and justifications. Any delay in delivery or commissioning ofthe equipment or release of payments for equipment must be explained with fulljustificationwhile making request for next instalment. In all cases, the required financia! documents must
be audited as per clause 6.7 of the AGREEMENT.6.9 On cornpletion of all steps relating to the purchase of capital equipment, the equipment must
be entered into asset register to be maintained by IIT-Roorkee for this project.
6.10 lf a request for release of milestone based instalment is made in second quarter of the financialyear, the PI should enclose the audited statement of the accounts along with the UtilizationCertificate for the previous financial year duly audited by external auditor in the prescribed
format (Annexure-V and VI of this AGREEMENT).6.ll On completion of the Projectand submission of the final reportand other related documents
etc. IIT-Roorkee shall render the final audited accounts/ statement of expenditure in theprescribed format (Annexure-V of this AGREEMENT), duly certified by authorised
representative of the University/Head of Institute/Organisation for release of the finalinstalment by ONGC (lDT, Dehradun).
6.12 IIT Roorkee is allowed to utilise funds under different heads of expenditure as
earmarked and detailed in Clause 6.1 above and any cross utilisation of funds from onehead to other should be avoided. In case such cross utilisation is absolutely necessary itshould be done with the approval of the competent authority i.e. Head IDT, ONGC. Anyunspent amount left with IIT-Roorkee will be immediately returned by way of credit throughECS/RTGS/NEFT to the SBI account of tDT - ONGC. IDT Bank Account No.:10392853355 and IFSC CODE: S8IN0001576 payable at Dehradun, but not later than 30
days of acceptance of finalaudited utilization certificate by ONGC.6.13 On completion of the project, IlT-Roorkee shall submit full details of Assets acquired under
the project utilising ONGC (lDT, Dehradun) funds in the prescribed format (Annexure-VlI ofthis AGREEMENT) and copies of sanction orders and invoices of all Assets, along with Finalaudited Statement of Accounts (Annexure-V of this AGREEMENT).
6.14 In case llT-Roorkee is not in a position to implement or complete the project due to validreasons accepted by ONGC (lDT, Dehradun) it should, forthwith, refund to ONGC (lDT,Dehradun) the total funds received by it or balance, thereof.
6.15 ONGC (lDT, Dehradun) and its authorised representatives shall have the right of access to the
books and accounts of IlT-Roorkee maintained in respect of this project and funds received
from ONGC (lDT, Dehradun). IlT-Roorkee will provide all assistance to the ONGC (lDT,Dehradun) team to inspect the books of accounts and give suitable reply to theirobservations/findings in atime bound manner. All corrective actions required, if any, in thisregard will be implemented by the PI and llT-Roorkee.
7,O RESPONSIBILITIES AND ACTIVITIES7.1 llT-Roorkee shall undertake to perform the Project Work under this AGREEMENT with all
reasonable skill, diligence and care in accordance with prudent scientific practice to the
satisfaction of tnstitute of Drilling Technology and accept full responsibility for the satisfactoryquality of such services as performed by them.
7.2 As per the project proposal, Dr. Yuvraj Singh Negi, Professor, Department of,Polymer and
Process Engineering of llT-Roorkee shall be the Principal Investigator who shall be leading and
guiding the project team for achieving the objectives and deliverables, as per agreed scope ofwork. A Co-Principal Investigator shall be (Dr. Garima Agrawal, DST Inspire Faculty,
\,Afu"f*
I
Department of polymer and process Engirreering) identified to prevent loss to the project and
ONGC (lDT, Dehradun), and in ""ltuil event,"both shall be responsible for carrying out the
assigned project work. tn" co-pl shall function as PI in the absence of PI and should be
totally in knowledge of the activities of the Project work' If the PI to whom the project has
been sanction"o uyinrtitute of Driliing rechnology, Dehradun wishes to leave llr-Roorkee, the
IIT-Roorkee will either appoint u n"*11 or designate the Co-PI as the PI and inform the same to
ONGC (lDT, Dehradun) in advance and in corisultation with ONGC (lDT, Dehradun) evolve
steps to "nrur*u""essful
completion of the project' r .- r^--^ rL^ ^-^i^n{7.3 In case, the research scholar "ngug.a
by lti-ntorkee abandons the project/ leaves in between
without completing the project, the IIT-Roorkee shall substitute with another research scholar(s)
to complete the project. In such "ur"r,IlT-Roorkee
shall ensure that the scholar to document the
work carried oui and its outcome in the form of a repgrt'
7.4 IlT-Roorkee slrall ensure that the PhDs will be made co-terminus with the projects' however'
short project time lines will be compensated. through IITs own scholarships'
7.5 ONGC (lDT, Dehradun) on its pu.ihu, designateJ Mr' A'K'Joshi GM (Chem') and Shri Ratan
SinghDGM(Chem')ofONGC(IDT,Dehradun)astheProjectCoordinators(PC).7.6 All required administrative support and infrastructure faciiities by way of provision of desired
qualityofworkspace,water,electricity,communicationandotherrequiredinfrastructurefacilities etc. for smooth implementation lithe Project Work shall be provided by llT-Roorkee
7.7
to the PI and the Project team.
IlT-Roorkee shall undertake to carry out the Project Work and related studies' as per the scope
of work and deliverables etc. defined in this AdnE,E1ABNT within the agreed time frame and
budget by employing competent personnel'
IlT-Roorkee shall dlploy qualifiLd research personnel for achieving all the goals set out under
the project, in accordance with laid down procedure for recruitment followed by llT-Roorkee'
Ail the personner including Research personnel, appointed by the IlT-Roorkee under the project,
for full/part duration of the project, are to be treatei as project personnel of IlT-Roorkee and will
be governed by the Administrative rules of llT-Roorkee. They are not to be treated as employees
of the ONGC (lDT', Dehradun) under any circumstances and ONGC (lDT' Dehradun) will have
no liability, whatsoever, for the Project Personnel, during and after completion of the project
duration.7.10 For the expeditious implementation of the project work, IlT-Roorkee will provide full support
to the PI in the pro""r, of selection and appointment of project personnel/staff and shall make
payment to them in accordance with the guidelines given in this AGREEMENT'
7.11 llT-Roorkee shall not engage or sub-contract or assign the technical work or studies
concerning the project, either wholly or in part to any other institute/organization or any
third party without prior permission in writing from, ONGC, IDT, Dehradun' ln case' it is
considered necessary in the interest of the Project work, the PI will request to ONGC (lDT'
Dehradun) in writing giving full justification including its financial and IPR implications'
However,mereapplyingforpermissiontosub-contractthesaidprojectwork/studieswillnotamount to grant of permission and ONGC (lDT, Dehradun) reserves the right to disagree to such
request for any sub-contracting or consultancy'
7.12 Either party shall not assign this agreement without prior written consent of other party'
7.r3 The parties agree.that during the existence of the terms of this agreement, neither party shall
solicit directly or indirectly the employees of other party'
7.8
7.9
10
J
I
t lgrrrtt^
8.0 REVTEW OF PROGRESS & SUBMISSION OF REPORTS8.1 The Principal Investigator (PI) or in his absence the Co-Pl will regularly submit to ONGC (lDT,
Dehradun) quarterly progress reports (two hard copies and one copy in electronic format) in the
prescribed format (Annexure-ll of this AGREEMENT). The report among other things willinclude physical and financial status including but not limited to (a) Project Work accomplished
against the set targets (b) reasons for the short fall, if any, and proposed remedial measures (c)
oiher scientific achievements made during the period, (d) publications, (e) placement ofmanpower, (f) procurement of equipment etc. and (g) planned targets for the next month.
B.Z ONGC (lDT, Dehradun) will regularly review the progress of the work through visits to IIT-Roorkee or by inviting the Pl to ONGC (lDT, Dehradun) facilities/office. ONGC (lDT,
Dehradun) may, if considered neiessary by ONGC (lDT, Dehradun) depute a team pf experts
to review the progress of the project. IlT-Roorkee shall extend all required facilities and fullsupport for such visits to facilitate effective monitoring and implementation of the project. The
travel budget of the project wilt include cost towards visits of the PI and others for attending
such review meetings. No extra fund will be provided by ONGC (lDT, Dehradun) for such
visits.8.3 ONGC (lDT, Dehradun) will provide a copy of the report on the review of the project to the PI,
for implementation. The Pt and IlT-Roorkee will take into account the suggestions made by the
reviewing team on mid-term correctionslmodifications in the project work, while formulating
necessary corrective/remedial actions for implementation, subject to feasibility ofimplementation of such suggestions/actions within the approved project budget. PI will provide
action taken repoft to ONGC (lDT, Dehradun) on the report of review of the project.
8.4 On completion of the project, the PI will submit a draft'Project Completion Report' on the
work done under the project for review to Institute of Drilling Technology, Dehradun.
Comments/suggestions, if any, will be incorporated by the PI as appropriate and thereafter, 5
copies of the final consolidated 'Project Completion Report' will be submitted to ONGC
1tOf, Dehradun) in the prescribed format (Ahnexure-lll of the AGREEMENT)" One copy in
electronic form will also be submitted to ONGC (lDT, Dehradun).
B.S The 'Project Completion Repoft' must include full details of objectives and work plan for the
project, work/studies undertaken by PI/llT-Roorkee, as per the approved objectives/work plan,
discussions & inferences of the results of the research, outcome of project and achievements,
all relevant technical details/specifications/process flow diagrams, working drawings for
designing of the systems/equipment for further work on demonstration/scale up, as the case may
be, along with inventory of required materials, specifications etc. All items covered under the
head "deliverables" of the project must be covered in this report.
9.0 TECHNOLOGY TRANSFER9.1 At the completion of the Project Work, the developed technology shall be transferred to
Institute of Drilling Technology, Dehradun /ONCC and ONGC group of companies or any
agency to be specified by the Institute of Drilling Technology, Dehradun for Demonstration
and/ or fi eld applic ationl commercialization'g.2 IlT-Roorkee shall also provide samples of all the used chemicals optimised for the process
and other detailed information on the process to Institute of Drilling Technology, Dehradun
for safe deposition and preservation for protection of tPR and subsequent use.
1O.O OWNERSHIP OF IMMOVABLE & MOVABLE ASSETS
10.1 For permanent, semi-permanent assets acquired solely or mainly out of the project budget, an
audited record in the form of a register in the prescribed format (Annexure-Vll of this
1.L
_)
I
AGREEMENT) shall be maintained by llT-Roorkee. The term "Assets" include (a) the
immovable property acquired out of the funds; and (b) movable property of capital nature, IIT-
Roorkee i, ,"quir"j to send to the ONGC (lDT, Dehradun), a list of assets acquired under the
project on annual basis. A consolidated list of assets will be submitted on completion of the
project, as a part of the Project Completion Report'
lO.Z ONGC (IDT; Dehradun) ,hull hur" Sole Ownership of all Assets acquired under the
project for which ONGC (IDT, Dehradun) has made the payments to-IlT-Roorkee,' These
assets should not tre disposed off or encumbered or utilized by IlT-Roorkee for any
purpose other than those for which the budget had been sanctioned, without the prior
written permission from ONGC (IDT, Dehradun)'
10.3 llT-Roorkee, shall undertake to pioperly maintain and upkeep the capital assets/equipment
purchased using ONGC (lDT, n"i1rudrnj funds and also to provide all suitable infra-structure,
like working ,[u"", "nrironrn"nt,
air conditioning and other required facilities, for smooth
operation oflquipment, as per procedures recommended by oEM.
10.4 In order to facilitate the continued usage of infrastructure, by students and researchers at IIT-
Roorkee, created under ONGC-PAN-ll-T initiative, the capital items/ equipment procured under
the ONGC-pan-llT Collaborative Research Program may be retained by the IlT-Roorkee,
however, ONGC (IDT, Dehradun) reserves the right to call back the equipment at any
point of time at its discretion. oNcc will have no liability whatsoever after completion of the
project towards the procured items and the services of the infrastructure so created will be made
available on priority to ONGC (lDT, Dehradun) in future at no cost'
10.S If the Capital equipment/other assets are allowed to be retained by the IlT-Roorkee, after
completion of the project, IIT-Roorkee, will give an undertaking to maintain the assets from its
own resources'11,0 PUBLICATIONS, INTELLECTUAL PROPERTY RIGHTS & OWNERSHIP
1l.l If the results of Research are to be legally protected under IPR, the results shall not be published
or relied upon or referred to, prior to its registration i . ., .,publication of the research-results in journalsi conferences shall be jointly authored by IIT-
Roorkee and ONGC (lDT, Dehradun). th. Itt-Roorkee, / PI shall seek prior approval of ONGC
(tDT, Dehradun) for puUiistring technical/ scientific papers based on the research work done
under the project. The IIT-Rooikee/ pt snatt submit copy of the manuscript of paper at the time
of seeking approval from ONGC (lDT, Dehradun). The investigator(s) should. acknowledge the
assistance received from ONGC (lDT, Dehradun). The PI shall submit 5-copies of the paper to
11.2
ONGC (lDT, Dehradun) after it is published
11.3 If the result is in the form of a suivey report / product performance. evaluation or other such
activities which have commercial implications, IlT-Roorkee shall no-t publish the results
without specific written approval of ONGC (lDT, Dehradun). Such reports/product
performance evaluation etc. will be the sole property of ONGC (lDT, Dehradun)'
ll.4 IIT-Roorkee/pl shall send copy/copies in advanCe of all application forms,^containing summary,
detailed specifications, drawing, .t"., as required by appropriate PaGnt office, along with all
other relevant details to 0NGC (tn'i, oetriadun)in the prescribed format (Annexure-VllI of
this AGREEMENT) for filing of patents by ONGC'
ll.s The intellectual property arislng out of this work shall be jointly held in the name of the IIT-
RoorkeeanooNcc(lDT,Dehradun),whereinONGC(IDT'Dehradun),willbethefirstpars,mentioninginventorsfrombothsides.ONGC(lDT,Dehradun)willberesponsibletofile, maintain and defend the IP against any claims and/or possible encroachment using its own
1,2
' ,0,uVryY'"
I
rcsolrrces. Hurvever. tcclruical support to cic{cpd an1, clairn and /or possible encroaclrnterrt willbe proviclecl by II'l'-Roorkee. II'l-Roorkee shall retairr the rights for tcaching attd to cotrtinue
research in the specificd area using thc lP tlius cleveloped.
ll"6 'fhc right t9 llrst use of IPR/ Patenr/'l'echnology developed through this collaboration for its
corlrnercial exploitatiol slrall rest with ONGC (lD'l', Dehradrrn) and its group companies'
Ilowcver. in caic of the generarion of profit by i1s uses fiom thirci party will be shared with llT-Roorkce. The extent ol'sLrch sharing will be ntutually decided oll a case to case basis. II'l'-
Iloorkec pay share thc amount so generatecl. with the inventor(s) l'rom the lll--ftoorkee as per
the existiltg llorl'l-ls of IIT-li.oorkee'll.1 ONGC (lDT'. Delrradurr) shall have full right to transflerring/ assigning/ licensirrg/ prodr"rct/
prrgcess/ tcchnology devcloped to third party with art intirnation to IlT-lloorkee. ONGC (lD1'.
behradLrn). shall equally share any benefit accruing frotr assigntnents/ sale/ licensing/ or arry
other mantrer with llTs.t l.g All rigSts a1d obligatiols relating to.ioint IPR. if'any. shall survive the tcrnrittation of the pro.iect
tbr any reasolt.
12,0 CONFIDEN'TIALII'YlZ.1 Thc parties shall cluring the terrure of the Agrccntent and at anv time thcreafter rnaitttain in the
strictest cop{ldence. all infornlation acquired in pursuance of tlrc Agreetnent and shall not.
unless aLrthorizecl ip rvriting h,v the Other Party, clivulge or grant aocc:ss to atly information
acquirecl in pursu:utcc of'the Agreetncttt or the resttlts thereof and shall prcvent allyonc
beconring acquailted with any, such inibrmation. Il1--Roorkee shall not also clestroy any report.
pote arrcl tcclutical data relating to the operationi rvork altd not requircd by the ONGC (lD'l'.
Delrraclyn). ONGg (lDT', Dehradurr) shall be bound by similar obligations w.r.t. cont-identiality
ol' infbrtnatiott"'l'h13 obligation is a continuing onc tbr the Parties and sliall survive afler tlrecotnpletion/tenrination of this Agreemetlt.'fhc provisions of this Cllausc shall not apply to informatiort that:
(a) is acquired/developed by the Parties independerrt of this Agreetnenl or is rightfully
receiricd free of restriction fi'om anotlrer solrrce having the right to so firnish such
ittlilrtlatiott: or(h) is in i'}ublic domain: or(c) al the tipre of disclosure. tltc information was knorvn to citlrer
companies, free of restrictions, as evidenced by documentation
is disclosed with prior consent of the Other Pafty; or
is requircclto be furnished or reporled under any LawiOrder of a Court or is required by
Govt. Ministriesiagencies iregulatory agettcies, Court ol'Law or thc law of land or likc
Authorities havingiurisdiction as regards suclt inlormation. or itl accordanc'.e with the
rules. by-lau,s. policies. clisclosure standards or codes of prof"essiottal conduct or ethics
that rnay be applicatrle to such intbrrnation" Provided, however, that as soott as the
Disclosing Party learns titat it is or mav- be required 1o clisclose ariy Conlidential
Irrtonnatiorr under thc above-ntentioncd circunrstances, it shalI:
(i) Take reasonable stcps as prornptl-v as possible to notily the Other Party ol'the
clisclgsure recluirerncnt so that the Othcr Party. if it dcenrs Iit. may scek a protcctivc
order or other appropriate re lief .
(ii) provide such c6operation arrd assistancc as the Other Party nray rcasonably recluest
in any ef.fort by ttre Other Party to obtain such relief"
Parties or its affiliatedin its possessions; or
(d)(e)
L3 vry;A""
13.0 RETURN OF DATA, LITERATURE AND DOCUMENTSThe data, literature and documents supplied by ONGC (IDT, Dehradun), to the IIT-Roorkee, during the course of the Project will always remain tljr p-ro-perty of ONGC_(IDT,
Dehradun), undthe same shall be handed over to ONGC (IDT, Dehradun), immediately
after the submission of final report. ONGC (lDT, Dehradun), may, at any time during the
execution of the AGREEMENT demand return of the data, literature and documents, not
withstanding whether project Work has been completed or not IlT-Roorkee shall be obliged to
return the same immediately on demand of Institute of Drilling Technology, Dehradun, without
reiaining a copy.,14.0 TERMINATION
This agreement will automatically be terminated after the expiry of period of Project unless
t4.lextended otherwise by the parties.The AGREEMENT may be terminated at any time by mutual agreement between the parties.
Unspent money on the date of termination after deduction of committed expenses shall be
retuined to Institute of Drilling Technology, Dehradun by the llT-Roorkee. The committed
expenses shall mean the payment to be made by Institute of Drilling Technology,.Dehradun to
IIT-Roorkee for the works iompleted and accepted by ONGC till the date of termination.
SURVML OF TERMS: Clause 9, 10, ll, 12, 13, 16,19 and 20 of this AGREEENT shall
survive the termination of this AGREEMENT.FORCE MAJEUREIn the event of either party being rendered unable by Force Majeure to perform.any obligation
required to be performed 6y them under the AGREEMENT, the relative obligation of the party
affected by such Force Majbure shall be suspended for the period during whigh such cause lasts.
The term iFor". Majeure""as employed heriin shall mean acts of God, including but not limited
to War, Civil Riots, Fire directly aifecting the performance of the AGREEMENT, Flood and
Acts and Regulations of government.
Upon tlre o"Jrr."n"" of such cause and upon its-termination, the party alleging that it has been
re-ndered unable as aforesaid thereby, shail notify the other party in writing, the beginning ofthe cause amounting to Force Majeure as also the ending of the said clause by giving notice
to the other party *itt',in 72 hours of the ending of the cause respectively. If performance^
is suspended 'by
force Majeure conditions lasting for m.o1e than 2 (two) months, lnstitute ofDrilling Technology shall fiave the option of cancelling this AGREEMENT in whole or part at
its discretion without any liability on its part.
Time for performance of the relative obiigation suspended by Force Majeure shall then stand
extended by the period for which such cause lasts'
APPLICABLE LAW AND JURISDICTIONThe AGREEMENT, including all matters connected with this AGREEMENT shall be governed
by the Indian law both subslantive and procedural, for the time being in force and shall be
subject to the exclusive jurisdiction of Indian Courts at Dehradun.
COiMPLIANCE WITH LAWS: IlT-Roorkee shall perform the duties under this
AGREEMENT and undertake the Project Work and its related activities in due compliance with
all applicable laws in India, along with rules and regulations, if any, of. duly constituted
Covernmental Authorities in Indiaind shall obtain, if applicable, any such licenses, consents,
registrations and other governmental approvals, etc., if ^any,
required by laws in India in
co-nnection with this AGREEMENT and-for the conduct of the Project Work. The parties shall
t4.Z TERMINATION ON ACCOUNT OF FORCE MAJEURE: Either party shall have the right
to terminate this AGREEMENT on account of Force Majeure, as set forth in Clause l5 of this
AGREEMENT.14.3
15.015.1
15.2
15.3
ts.4
16.0
17,0
1.4 VA'*il^
I
indemnify and hold harmless the other party from and.against an1.cl.aimlloss/damages suffered
on account of the failure of the party to comply with the applicable laws'
18.0 MODIFICATION AND WAVERS IN AGREEMENTlg-1 All modifications leading to changes in the AGREEMENT with respect to technical and/or
commercial aspects, inciuding teims of deliverables, methodology and work plan shall-be
considered valid only when aciepted in writing by Institute of Drillilg-Technology, Dehradun
and if considered n"i"ttu.y, by issuing amendment to the AGREEMENT'
lg.2 Any other changes in the-AGREEMENT shall only be binding on the Parties when duly
executed in *iitl"ng by way of an amendment to the AGREEMENT. The amendment shall be
effective from the date of signing.19.0 INDEMNITY
IIT-Roorke" ugr""u to indemnify and hold ONGC (lDT, Dehradun) harmless from any claim
for damager ur"iring from IlT-Roorkee and its employees, representatives'will full act and gross
negligenJe and/or 6riminal act and / or non-compiiance with applicable laws in execution of the
Project Work under this AGREEMENT.2O.O RESOLUTION OF DISPUTES
All disputes regarding the interpretation of contents of this AGREEMENT or its
implementation sf,all be-resolved biiaterally by the Director of Coordinating IlT-Roorkee and
CMD, ONGC.Except as otherwise provided elsewhere in the contract, if any dispute, difference, question or
disagreement arises between the parties hereto or their respective representatives or assignees,
at ariy time, in connection with construction, meaning, operation . effect, interpretation of the
contract or breach thereof, which parties are unable to settle mutually, the same shall be referred
to Arbitration as provided hereunder.
2O.I ARBITRATION2AJ.l In ttre event of any dispute or difference relating to the interpretation and application of the
provisions of the contiacts, such dispute or difference shall be referred by either party.for
Arbitration to the sole Arbitrator in the Department of Public Enterprises to be nominated by
the Secretary to the Government of India in-charge of the Department of Public Enterprises.
The Arbitrjion and Conciliation Act, 1996 shalI not be applicable to arbitration under this
clause. The award of the Arbitrator shall be binding upon the parties to the dispute, provided,
however, any party aggrieved by such award may make a further reference for setting aside
or revision of in" i*una to the Law Secretary, Department of Legal Affairs, Ministry of Law
& Justice, Government of India. Upon such reference the dispute shall be decided by the Law
Secretary or the Special Secretary/Additional Secretary, when so.authorized by the Law
Secretary, whose dbcision shall bind the Parties finally and conclusively. The Parties to the
dispute *itt rhu." equally the cost of arbitration as intimated by the Arbitrator.
Z0.Z tf any dispute, difference, question or disagreement arises between the parties hereto or their
respective repiesentatives or assignees, in ionnection with construction, meaning, operation,
effect, interpretation of the coniract or breach thereof which parties are unable to settle
mutually, the same may first be referred to conciliation through Outside Expert Committee
(,.OEC,) to be constituted by CMD, ONGC as provided hereunder:
z0.z.l The party desirous of resoriing to conciliation-shall send a notice of 30 (thirty) days to the
othei partyoiitr intention of leferring the dispute for resolution through OEC. The-notice
invoking conciliation shall specify all tlhe points of disputes.with detaitsof the amount claimed
to be referred to OEC and the party concerned shall not raise any new issue thereafter.
21.O CONTINUANCE OF THE AGREEMENTNotwithstanding the factthat settlement of dispute(s) (if any) underarbitration may be pending,
the parties herei-o shall continue to be gou"rn.d by and perform the Project Work in accordance
15 \A^,,ry
with the provisions under this AGREEMENT.
22,0 NOTICES AND ADDRESSES:For the purposes of this AGREEMENT, the addresses of the parties will be as follows and allcorrespondence and notices in relations to the present Agreement sent to the parties at the
addresses mentioned below-By Fax/Courier/Registered post/Mail/Hand Delivery shall be
deemed to be sufficient service of notice on the parties. All such notices as well as reports,
invoices and other relevant material shall be addressed to the par-ties as per the address given
hclorv:For Head of Institute For IlT-Roorkee
Mr. Vinay Kumar Gupta, GGM (D),Head Institute of Drilling TechnologyONGC,9-KaulagarhRoadDehradun 248195
Professor Manish Shirkhande, Dean SRIC,Indian Institute of Technology- Roorkee,Uttarakhand ,247667
23.0 ENTIRE AGREEMENTThis AGREEMENT supersedes all prior AGREEMENTs and commitments, whether oral orin writing between the parties concerning the subject matters thereof. The right of eitherparty to require strict performances will not be affected by any previous waiver or course ofdealing. Neither this AGREEMENT nor any modification will be binding on a party unless
signed by an authorized representative of llT-Roorkee and Institute of Drilling Technology,Dehradun.In witness where off, the Parties through its authorized officer has set its hand and stamp on
this at Dehradun.
18',
'.'ywnIr-or & on behall of InstitLrtc o1'Drilling'l'e clrnologDate: l6j 2olE)
(Signature)
For & on behalf of IIT-RoorkeeDate: 1O \a,n zblg
M
o
WITNESSNO. I s ,
A /^'\ K^^""=Y :\'t-|l^' ---rls/snat\rict ta I 'l > tt[.F'ull narne and official address
Mr. Ajay Kumar.loshi, GM (Chem)
IDT. ONCC, Kaulagarh Roacl
Dehradun 248 1 9 5 " Uttarakhancl
WITNESS NO. I
Polymer And Process Engineering, IndianInstitute of Technology Roorkee, 247667-Uttarakhand
WITNESS NO.
(Signature)
Mr. Ratan Singh DGM (Chem)IDT, ONGC, Kaulagarh RoadDehradun 248 19 5, Uttarakhand
WITNtrSS NO.2
(Signature)Full name and official addressDr.Garima Agarwal, Deptt. Of Polymer AndProcess Engineering, Indian Institute ofTechnology Roorkee, 247 667 - Uttarakhand
1.6
(Signature) ,
Full name and offi-cial m
Professor Yuvraj Singh Negi,-