palo alto high school, tolbert design architects photography, sketchup, v-ray … · r ay t m work...

10
| Work Samples www.raytam.net RAY TAM Palo Alto High School, Tolbert Design Architects Photography, Sketchup, V-Ray, Photoshop

Upload: others

Post on 11-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Palo Alto High School, Tolbert Design Architects Photography, Sketchup, V-Ray … · R AY T M Work Samples Palo Alto High School, Tolbert Design Architects Photography, Sketchup,

| Work Sampleswww.raytam.net RAYTAM

Palo Alto High School, Tolbert Design ArchitectsPhotography, Sketchup, V-Ray, Photoshop

Page 2: Palo Alto High School, Tolbert Design Architects Photography, Sketchup, V-Ray … · R AY T M Work Samples Palo Alto High School, Tolbert Design Architects Photography, Sketchup,

| Work Sampleswww.raytam.net RAYTAM

San Diego Square, BASISPhotography, Sketchup, V-Ray, Photoshop

Page 3: Palo Alto High School, Tolbert Design Architects Photography, Sketchup, V-Ray … · R AY T M Work Samples Palo Alto High School, Tolbert Design Architects Photography, Sketchup,

| Work Sampleswww.raytam.net RAYTAM

KITCHEN

A8.2

1,2,3,4

A8.2

1,2,3,4

A8.2

1,2,3,4

SEE A0.3 DETAIL SHEETFOR DISABLED ACCESSIBLESITE & CONCRETE WORK

SEE A0.3 DETAIL SHEETFOR DISABLED ACCESSIBLESITE & CONCRETE WORK

WTRHTR

MENWOMEN

COMMUNITY ROOM

LAUNDRY

COVERED PATIO

WASH DRY

DRY

DRY

WASH

WASH

(E)CONC RAMPSLOPE DN 7%

(E)HANDRAILSBOTH SIDES

MAIL

N) DRY N)WASH

KITCHEN

SCALE: 3/16" = 1'-0"PHASE II COMMUNITY BUILDING - PROPOSED PLAN 1

(N)

SCALE: 3/16" = 1'-0"WEST ELEVATION - PHASE II COMMUNITY BUILDING

(N)

5

(N) STANDING SEAMMETAL ROOF, TYP

(N) CEMENT FIBER CORNER TRIM,TYP.

(N) CEMENT FIBER LAP SIDING-8 INCH EXPOSURE

(N) VINYL CLAD FRENCH DOORS, TYP.WITH CEMENT FIBER TRIM

(N)(N)

(N)(N)(N)

SCALE: 3/16" = 1'-0"SOUTH ELEVATION - PHASE II COMMUNITY BUILDING

(N)(N)(N)

4(N) VINYL CLAD FRENCH DOORS, TYP.WITH CEMENT FIBER TRIM

(N) CEMENT FIBER CORNER TRIM,TYP.

(N) CEMENT FIBER LAP SIDING-8 INCH EXPOSURE

(N) STANDING SEAMMETAL ROOF, TYP

(N)(N)(N)(N)(N)

SCALE: 3/16" = 1'-0"EAST ELEVATION - PHASE II COMMUNITY BUILDING

(N)(N)(N)(N)(N)

3

(N) STANDING SEAMMETAL ROOF, TYP

(N) CEMENT FIBER CORNER TRIM,TYP.

(N) CEMENT FIBER LAP SIDING-8 INCH EXPOSURE

(N) VINYL WINDOWS WITHCEMENT FIBER TRIM

(N)(N)(N)

SCALE: 3/16" = 1'-0"NORTH ELEVATION - PHASE II COMMUNITY BUILDING

(N)(N)(N)(N)

2

(N) STANDING SEAMMETAL ROOF, TYP

(N) CEMENT FIBER CORNER TRIM,TYP.

(N) CEMENT FIBER LAP SIDING-8 INCH EXPOSURE

(N) VINYL WINDOWS WITHCEMENT FIBER TRIM

SHEET TITLE:

FALKIRK HOUSE1408 MISSION AVENUE

P.O. BOX 150539SAN RAFAEL, CA 94915PHONE (415) 457-6035

FAX (415) 457-6036

BELL MANORAPARTMENTS

RENOVATION

PROJECT LOCATION:

PROJECT NAME:

8780 BELL ROADWINDSOR, CA

95492

DRAWING REVISION LOG

LEGEND

CHARLES PICK, ARCHITECT

Copyright 2012 by Charles Pick, Architect and Basis Architecture & Consulting Inc.

SCALE AS NOTED

PLANNING SET 6/5/2012

* *

* *

(N) DIRECTIONAL SIGNAGE

X PATH OF TRAVEL FORSECTION 504 COMPLIANCE

(N)CONCRETE ANTICIPATED,VERIFY IN FIELD

(N) GRADING & ORLANDSCAPE

(E) WALL TO REMAIN

(E) WALL TO BE REMOVED

(N) INTERIOR PARTITION

(N) 1 HOUR RATED WALL

COMMUNITY BUILDINGPLAN &

EXTERIOR ELEVATIONS(BUILDING #22)

P4

NORTH

Page 4: Palo Alto High School, Tolbert Design Architects Photography, Sketchup, V-Ray … · R AY T M Work Samples Palo Alto High School, Tolbert Design Architects Photography, Sketchup,

| Work Sampleswww.raytam.net RAYTAM

Page 5: Palo Alto High School, Tolbert Design Architects Photography, Sketchup, V-Ray … · R AY T M Work Samples Palo Alto High School, Tolbert Design Architects Photography, Sketchup,

| Work Sampleswww.raytam.net RAYTAM

KEY PLAN

15

13

11

8

10

12

12205 12209 1221512203 12211 12213

12202 12204 12206 12208 12210 12212 12216

ELEVCAR

BLDG 10

HALL

ADJACENT NEW WELLNESS BLDG.

(N) EXTERIOR EXIT DOOR, TYP.

(N) EXTERIOR STAIRS

12-200A 12-200B

FH/FHCFH/FHC EP 12-22600/500

CORRIDOR12-200

12214

12207

CORRIDOR10-12_202

CORRIDOR10-12_200

AR2.13BUILDING 12 - SECOND FLOOR PARTIALLY REMODELED PLANSCALE: 1/8" = 1'-0"

2

ROOF BELOW

LAUNDRY19-12_201

ELEVATOR MACHINE ROOM10-12_203

D

TRASH

EXISTING DSTO REMAIN

EXISTING DSTO REMAIN

EXISTING DSTO REMAIN

EXISTING DSTO REMAIN

EXISTING DSTO REMAIN

EXISTING DSTO REMAIN

EXISTING DSTO REMAIN

AR4.12

4

4

AR3.14

2

AR4.14

3

AR3.14

AR3.14

1

ROOFBELOW

EXTEND(E)BALCONY

CA

CA

CA CA

CA

CD

CB

RELOCATE (E) DS

CENTER BALCONY ENDBETWEEN WINDOWS. SEEBAR SHEET 3.3 TO MATCH (E)

(N) RELOCATED DS

12105 12107 12109 1211512103 12111 12113

12102 12104 12106 12108 12110 12114

12116

EQUIP

ELEVCAR

JAN.

BLDG 10

HALL

ADJACENT NEW WELLNESS BLDG.

(N) EXTERIOR STAIRS

12-100A 12-100B

FH/FHCFH/FHC EP 12-21600/500

12112

CORRIDOR12-100

COMPUTER ROOM10-12_104

EQUIPMENT10-12_105

CORRIDOR10-12_102

JANITOR10-12_103

CORRIDOR10-12_100

TRASH10-12_101

AR2.13BUILDING 12 - FIRST FLOOR REMODELED PLANSCALE: 1/8" = 1'-0"

1

EXISTING DSTO REMAIN

REMOVE AND REPLACEDOWNSPOUT

REMOVE AND REPLACEDOWNSPOUT

REMOVE AND REPLACEDOWNSPOUT

EXISTING DSTO REMAIN

EXISTING DSTO REMAIN

EXISTING DSTO REMAIN

EXISTING DSTO REMAIN

EXISTING DSTO REMAIN

REMOVE AND REPLACEDOWNSPOUT

DOWNSPOUTREMOVE AND REPLACE

REMOVE AND REPLACE DS

REMOVE

AND

REP

LACE

DOW

NSPO

UT

EXISTING DSTO REMAIN

AR4.12

4

AR4.11

1

CA

CA

CACA

CA

CA

CD

(N) INFILL WALL

DO

WN

1

AR4.14

RELOCATE (E) DS

(N) BALCONYFOOTING & POST

(E) SLAB

D R AW N B Y

C

P

H E C K E D B Y

R O J E C T NO

D A T E I S S U E

10028

3.28.13 PERMIT SET

The

Redw

oods

Mill

Val

ley,

Cal

ifor

nia

AR2.13

BUILDING PLANBUILDING 12

1/8" = 1' - 0"

\\BA

SISS

VR\c

lient

s\EA

H R

edw

oods

-Mill

Val

ley\

CON

STRU

CTIO

N D

RAW

ING

S\AR

1.10

-AR2

.15

THE

RED

WO

OD

S BL

DG

PLA

NS.

dwg,

4/1

2/20

13 9

:03:

54 P

M

KEY PLAN

15

13

11

8

10

12

12

GROUND FLOOR

SECOND FLOOR

CEILING

ADJACENT NEWWELLNESS BUILDING

GROUND FLOOR

SECOND FLOOR

CEILING

GROUND FLOOR

SECOND FLOOR

CEILING

GROUND FLOOR

SECOND FLOOR

CEILING

NEW ROOF CAPS WITHBACKDRAFT DAMPER

NEW PREFINISHED METALDOWNSPOUT FROM EXISTING GUTTER

SEE BAR SHEET A1.42DETAIL ELEVATION OF TRELLIS

EAST ELEVATION - BUILDING 12SCALE: 1/8" = 1'-0"

1

SOUTH ELEVATION - BUILDING 12SCALE: 1/8" = 1'-0"

3 NORTH ELEVATION - BUILDING 12SCALE: 1/8" = 1'-0"

4

WEST ELEVATION - BUILDING 12SCALE: 1/8" = 1'-0"

2

REMODELED 2 BEDROOM APARTMENT SEE SHEET AR4.11

COMPUTER ROOM

NEW PREFINISHED METALDOWNSPOUT FROM EXISTING GUTTER

SEE SHEET AR0.00 FORDETAIL ELEVATION OF TRELLIS

NEW PREFINISHED METALDOWNSPOUT FROM EXISTING GUTTER

NEW PREFINISHED METALDOWNSPOUT FROM EXISTING GUTTER

CORRIDOR TO BUILDING 12

PLANNORTH

CORRIDOR TO BUILDING 12

(N) WELLNESS BUILDINGSEE BAR A3.03

RELOCATED DS

NEWEL CAP(N) SHAPED

AT POST

DOORS & STAIRSBEYOND

(E) TANK CLOSET TO BE REMODELED FOR STORAGE

(N) BALCONY EXTENSION W/POST & FOOTING, MATCH (E)

B

AR3.30

(N) DOOR & INFILL FRAMEAT STORAGE CLOSET

(N) WELLNESSBUILDINGSEE BAR A3.03

(N) STAIR

(N) EXTENDEDOVERHANG

D R AW N B Y

C

P

H E C K E D B Y

R O J E C T NO

D A T E I S S U E

10028

3.28.13 PERMIT SET

The

Redw

oods

Mill

Val

ley,

Cal

ifor

nia

AR3.14

EXTERIOR ELEVATIONSBUILDING 12

1/8" = 1' - 0"

12

AR4.14

3

\\BA

SISS

VR\c

lient

s\EA

H R

edw

oods

-Mill

Val

ley\

CON

STRU

CTIO

N D

RAW

ING

S\AR

3.10

TH

E RE

DW

OO

DS-

EXT

ERIO

R EL

EVAT

ION

S RE

SID

ENTA

IL B

UIL

DIN

GS.

dwg,

4/1

2/20

13 9

:46:

32 P

M

KEY PLAN

15

13

11

8

10

12

12

GROUND FLOOR

SECOND FLOOR

CEILING

ADJACENT NEWWELLNESS BUILDING

GROUND FLOOR

SECOND FLOOR

CEILING

GROUND FLOOR

SECOND FLOOR

CEILING

GROUND FLOOR

SECOND FLOOR

CEILING

NEW ROOF CAPS WITHBACKDRAFT DAMPER

NEW PREFINISHED METALDOWNSPOUT FROM EXISTING GUTTER

SEE BAR SHEET A1.42DETAIL ELEVATION OF TRELLIS

EAST ELEVATION - BUILDING 12SCALE: 1/8" = 1'-0"

1

SOUTH ELEVATION - BUILDING 12SCALE: 1/8" = 1'-0"

3 NORTH ELEVATION - BUILDING 12SCALE: 1/8" = 1'-0"

4

WEST ELEVATION - BUILDING 12SCALE: 1/8" = 1'-0"

2

REMODELED 2 BEDROOM APARTMENT SEE SHEET AR4.11

COMPUTER ROOM

NEW PREFINISHED METALDOWNSPOUT FROM EXISTING GUTTER

SEE SHEET AR0.00 FORDETAIL ELEVATION OF TRELLIS

NEW PREFINISHED METALDOWNSPOUT FROM EXISTING GUTTER

NEW PREFINISHED METALDOWNSPOUT FROM EXISTING GUTTER

CORRIDOR TO BUILDING 12

PLANNORTH

CORRIDOR TO BUILDING 12

(N) WELLNESS BUILDINGSEE BAR A3.03

RELOCATED DS

NEWEL CAP(N) SHAPED

AT POST

DOORS & STAIRSBEYOND

(E) TANK CLOSET TO BE REMODELED FOR STORAGE

(N) BALCONY EXTENSION W/POST & FOOTING, MATCH (E)

B

AR3.30

(N) DOOR & INFILL FRAMEAT STORAGE CLOSET

(N) WELLNESSBUILDINGSEE BAR A3.03

(N) STAIR

(N) EXTENDEDOVERHANG

D R AW N B Y

C

P

H E C K E D B Y

R O J E C T NO

D A T E I S S U E

10028

3.28.13 PERMIT SET

The

Redw

oods

Mill

Val

ley,

Cal

ifor

nia

AR3.14

EXTERIOR ELEVATIONSBUILDING 12

1/8" = 1' - 0"

12

AR4.14

3

\\BA

SISS

VR\c

lient

s\EA

H R

edw

oods

-Mill

Val

ley\

CON

STRU

CTIO

N D

RAW

ING

S\AR

3.10

TH

E RE

DW

OO

DS-

EXT

ERIO

R EL

EVAT

ION

S RE

SID

ENTA

IL B

UIL

DIN

GS.

dwg,

4/1

2/20

13 9

:46:

32 P

M

Page 6: Palo Alto High School, Tolbert Design Architects Photography, Sketchup, V-Ray … · R AY T M Work Samples Palo Alto High School, Tolbert Design Architects Photography, Sketchup,

| Work Sampleswww.raytam.net RAYTAM

Conceptual RendersRevit, Photoshop

Revit Model

Page 7: Palo Alto High School, Tolbert Design Architects Photography, Sketchup, V-Ray … · R AY T M Work Samples Palo Alto High School, Tolbert Design Architects Photography, Sketchup,

| Work Sampleswww.raytam.net RAYTAM

Phasing DiagramRevit, Illustrator

Page 8: Palo Alto High School, Tolbert Design Architects Photography, Sketchup, V-Ray … · R AY T M Work Samples Palo Alto High School, Tolbert Design Architects Photography, Sketchup,

| Work Sampleswww.raytam.net RAYTAM

DOOR

BATTINSULATION

HOLLOWMETALFRAME

3/4" HATCHANNEL

GYP. BD.

EXTINT

GSMFLASHING

WEATHERBARRIER

2" RIGIDINSULATION

PANELINGMTL STUDHEADER

SEALANT

GYP. BD.

DOOR

INSULATION

HOLLOWMETAL FRAME

1/2"1/2"

CMU BONDBEAM S.S.D.

HOLLOWMETAL FRAME

CONT. SEALANT &BACKER-ROD, BOTHSIDES

DOOR

DOOR

HOLLOWMETAL FRAME

CONT. SEALANT &BACKER-ROD, BOTHSIDES

CMU

MASONRY ANCHOR

ADJACENT WALLWHERE OCCURS

3" MIN.

METAL STUD

DOOR

ADJACENT WALLWHERE OCCURS

HM FRAME

GYP. BOARD

FRAME ANCHOR

3" U.O.N.

1/2"

1/2"

DOOR

BATTINSULATION

HOLLOWMETAL FRAME

3/4" HATCHANNEL

GYP. BD.

EXT

INT

WEATHERBARRIER

2" RIGIDINSULATION

PANELING

SEALANT

FRAMEANCHOR

KCLICENSEDARCHITECT

STATEOF

CALIFORNIA

MARYE.

ONI

DO

UGHERTY

RE

N.OCT.31,20

15

NO.

C-9825

LE

DEFGHJKLM C B A

10

9

7

6

5

4

3

2

1

COPYRIGHT © 2014 DOUGHERTY + DOUGHERTY A R C H I T E C T S L L P

DOUG

HERT

YDO

UGHE

RTY

A R C H I T E C T SL L P

F T

AIRPORT LOOP DRIVECOSTA MESA, CA. 92626

714 . 427 . 0288 714 . 427 . 0277

JOBSCALE

PMDATE

3194 - D

KEYPLAN

8

AC

DIV. OF THE STATE ARCHITECTIDENTIFICATION STAMP

DATE

FILE NO:

FLS SS

00-00

00-00000

3" = 1'-0"

A521

21117.10

G.D.FEBRUARY 25, 2014

ORAN

GE C

OAST

COL

LEGE

REC

YCLI

NG C

ENTE

R

2701

FAI

RVI

EW R

OAD

CO

STA

MES

A, C

A 92

628-

5005

DOOR

DET

AILS

CO

AST

CO

MM

UN

ITY

CO

LLEG

E D

ISTR

ICT

3" = 1'-0"

A6EXT. HM DR. HEADER 3" = 1'-0"

E6INT. HM DR. HEAD 3" = 1'-0"

C6CMU HM DR. HEAD

3" = 1'-0"

C8CMU HM DR. JAMB 3" = 1'-0"

E8INT. HM DR. JAMB 3" = 1'-0"

A8EXT. HM DR. JAMB

DetailsRevit

Page 9: Palo Alto High School, Tolbert Design Architects Photography, Sketchup, V-Ray … · R AY T M Work Samples Palo Alto High School, Tolbert Design Architects Photography, Sketchup,

| Work Sampleswww.raytam.net RAYTAM

Resident’s Lounge, BASISPhotography

Palo Alto Residence, Studio KarliovaPhotography

Page 10: Palo Alto High School, Tolbert Design Architects Photography, Sketchup, V-Ray … · R AY T M Work Samples Palo Alto High School, Tolbert Design Architects Photography, Sketchup,

| Work Sampleswww.raytam.net RAYTAM

San Jose Residence, Studio KarliovaPhotography