pal gov.tutorial1.session15 16
DESCRIPTION
TRANSCRIPT
أكاديمية الحكومة ا�لكترونية الفلسطينية
The Palestinian eGovernment Academy
www.egovacademy.ps
Tutorial 1:Process and Data Modeling
Session 15 -16
Business Process ManagementBusiness Process Management
1PalGov © 2011
Business Process ManagementBusiness Process Management(best practices and BP Re-engineering)
Dr. Mahmoud H. M. Saheb
Reviewed by
Prof. Marco Ronchetti, Trento University, Italy
About
This tutorial is part of the PalGov project, funded by the TEMPUS IV program of the Commission of the European Communities, grant agreement 511159-TEMPUS-1-
2010-1-PS-TEMPUS-JPHES. The project website: www.egovacademy.ps
University of Trento, Italy
Vrije Universiteit Brussel, Belgium
Birzeit University, Palestine (Coordinator )
Palestine Polytechnic University, Palestine
Project Consortium:
2PalGov © 2011
University of Namur, Belgium
Vrije Universiteit Brussel, Belgium
TrueTrust, UK
Palestine Polytechnic University, Palestine
Palestine Technical University, PalestineUniversité de Savoie, France
Ministry of Local Government, Palestine
Ministry of Telecom and IT, Palestine
Ministry of Interior, Palestine
Coordinator: Dr. Mustafa JarrarBirzeit University, P.O.Box 14- Birzeit, PalestineTelfax:+972 2 2982935 [email protected]
© Copyright Notes
Everyone is encouraged to use this material, or part of it, but should properly cite the project (logo and website), and the author of that part.
No part of this tutorial may be reproduced or modified in any form or by any means, without prior written permission from the project, who have the full
copyrights on the material.
3PalGov © 2011
Attribution-NonCommercial-ShareAlikeCC-BY-NC-SA
This license lets others remix, tweak, and build upon your work non-commercially, as long as they credit you and license their new creations under the identical terms.
Tutorial Map
Topic Time
Module I: Conceptual Data Modeling
Session 0: Outline and Introduction
Session 1.1: Information Modeling 1
Session 1.2: Conceptual Data Modeling using ORM 1
Session 1.3: Conceptual Analyses 1
Session 2: Lab- Conceptual Analyses 3
Session 3.1: Uniqueness Rules 1.5
Intended Learning Objectives
Module 1 (Conceptual Date Modeling)
A: Knowledge and Understanding
11a1: Demonstrate knowledge of conceptual modeling notations and concepts
11a2: Demonstrate knowledge of Object Role Modeling (ORM) methodology.
11a3: Explain and demonstrate the concepts of data integrity & business rules
B: Intellectual Skills
11b1: Analyze application and domain requirements at the conceptual level,
and formalize it using ORM.
4PalGov © 2011
Session 3.1: Uniqueness Rules 1.5
Session 3.2: Mandatory Rules 1.5
Session 4: Lab- Uniqueness & Mandatory Rules 3
Session 5: Subtypes and Other Rules 3
Session 6: Lab- Subtypes and Other Rules 3
Session 7.1: Schema Equivalence &Optimization 1.5
Session 7.2: Rules Check &Schema Engineering 1.5
Session 8: Lab- National Student Registry 3
Module II: Business Process Modeling
Session 9: BP Management and BPMN: An Overview 3
Session 10: Lab - BP Management 3
Session 11: BPMN Fundamentals 3
Session 12: Lab - BPMN Fundamentals 3
Session 13: Modeling with BPMN 3
Session 14: Lab- Modeling with BPMN 3
Session 15: BP Management & Reengineering 3
Session 16: Lab- BP Management & Reengineering 3
and formalize it using ORM.
11b2: Analyze entity identity at the application and domain levels.
11b4: Optimize, transform, and (re)engineer conceptual models.
11b5: Detect &resolve contradictions & implications at the conceptual level.
C: Professional and Practical Skills
11c1: Using ORM modeling tools (Conceptual Modeling Tools).
Module 2 (Business Process Modeling)
A: Knowledge and Understanding
12a1: Demonstrate knowledge of business process modeling notations and concepts.
12a2: Demonstrate knowledge of business process modeling and mapping.
12a3: Demonstrate understand of business process optimization and re-engineering.
B: Intellectual Skills
12b1: Identify business processes.
12b2: Model and map business processes.
12b3: Optimize and re-engineer business processes.
C: Professional and Practical Skills
12c1: Using business process modeling tools, such as MS Visio.
Business Process Management
Session ILOs
After completing this session students will be able to:
1. Demonstrate knowledge of BP
5PalGov © 2011
1. Demonstrate knowledge of BP
management, re-engineering
2. Optimize and re-engineer business
process.
3. Use BP modeling tools.
Outline
• BP Management
– BP Re-engineering
– Best practices
– Lean six sigma and BPM (read)
6PalGov © 2011
– Lean six sigma and BPM (read)
• Summary
What is BPR
Reengineering is the fundamental rethinking
and redesign of business processes to
achieve dramatic improvements in critical,
contemporary measures of performance,
such as cost, quality, service and speed.
7PalGov © 2011
such as cost, quality, service and speed.
(Hammer & Champy, 1993)
Change is a “struggle”; BPR is a “war”
(Jessica keyes)
BPR Versus Process Simplification
Process Simplification
Incremental Change
Process Reengineering
Radical Transformation
8PalGov © 2011
Process-Led
Assume Attitudes & Behaviours
Management-Led
Various Simultaneous Projects
Radical TransformationVision-Led
Change Attitudes & BehavioursDirector-Led
Limited Number of Initiatives
(Coulson-Thomas, 1992)
BPR Versus Continuous Improvement
Process Reengineering
Radical Transformation
Continuous Improvement
Incremental Change
9PalGov © 2011
Radical TransformationPeople & Technology Focus
High InvestmentRebuild
Champion Driven
Incremental ChangePeople Focus
Low InvestmentImprove ExistingWork Unit Driven
BPR Characteristics
Systems Philosophy
Global Perspective on Business Processes
Radical Improvement
10PalGov © 2011
Integrated Change
People Centred
Focus on End-Customers
Process-Based
Framework For Assessing Reengineering
Part A
Assessing the Organization’s Decision to Pursue Reengineering
1: Has the Agency Reassessed Its Mission and
11PalGov © 2011
1: Has the Agency Reassessed Its Mission and Strategic Goals?
2: Has the Agency Identified Performance Problems and Set Improvement Goals?
3: Should the Agency Engage in reengineering?
Part B
Assessing the New Process' Development
4: Is the Reengineering Project Appropriately
Managed?
12PalGov © 2011
5: Has the Project Team Analyzed the Target
Process and Developed Feasible Alternatives?
6: Has the Project Team Completed a Sound
Business Case for Implementing the New
Process?
Part C
Assessing Project Implementation and Results
7: Is the Agency Following a Comprehensive
Implementation Plan?
13PalGov © 2011
8: Are Agency Executives Addressing Change
Management Issues?
9: Is the New Process Achieving the Desired
Results?
BPM Best practices
From:
BPM Center of Excellence
Business Process Management (BPM)
Best Practices
14PalGov © 2011
Best Practices
August 31, 2009
http://www.ftb.ca.gov/aboutFTB/Projects/ITSP/BPM_Best_Practices.pdf
BPM Best practices
From:
BPM Center of Excellence
Business Process Management (BPM)
Best Practices
15PalGov © 2011
Best Practices
August 31, 2009
http://www.ftb.ca.gov/aboutFTB/Projects/ITSP/BPM_Best_Practices.pdf
BPM Best practices
From:
BPM Center of Excellence
Business Process Management (BPM)
Best Practices
16PalGov © 2011
Best Practices
August 31, 2009
http://www.ftb.ca.gov/aboutFTB/Projects/ITSP/BPM_Best_Practices.pdf
BPM Best practices
From:
BPM Center of Excellence
Business Process Management (BPM)
Best Practices
17PalGov © 2011
Best Practices
August 31, 2009
http://www.ftb.ca.gov/aboutFTB/Projects/ITSP/BPM_Best_Practices.pdf
BPM Best practices
From:
BPM Center of Excellence
Business Process Management (BPM)
Best Practices
18PalGov © 2011
Best Practices
August 31, 2009
http://www.ftb.ca.gov/aboutFTB/Projects/ITSP/BPM_Best_Practices.pdf
BPM Best practices
From:
BPM Center of Excellence
Business Process Management (BPM)
Best Practices
19PalGov © 2011
Best Practices
August 31, 2009
http://www.ftb.ca.gov/aboutFTB/Projects/ITSP/BPM_Best_Practices.pdf
Best Practices List
1. A Strong Partnership With IT2. Create a BPM Enterprise Implementation Team
3. Use Tools Based on Industry Standards
4. Select a Process Methodology 5. Secure Executive Sponsorship
6. Select the Right Project
7. Lead With the Right People8. Manage Expectations
20PalGov © 2011
8. Manage Expectations9. Benchmark the Current Process
10. Define Key Performance Indicators (KPIs)
11. Foster Cultural Change12. Focus on Your Customer
13. Focus on Your Process Workers
14. Take a Board View of Training
15. Profit from Experience16. Develop a Robust Governance Framework
1- A strong Partnership with IT
• IT is an enabler not a leader of a BPM effort – It is business.
• A BPM project is not an IT project but a business management modification business management modification that can be enhanced by the use of technology.
• A strong partnership between business and IT will ensure a smoother project.
e-Government Lifelong Learning
21
2- Create a BPM Enterprise Implementation Team (EIT)
Create a BPM EIT that is:
• cross-functional organization
• comprised of committed
To:
22PalGov © 2011
To:
develop and implement a Pilot project enabling the delivery of a quick solution to an immediate problem and proves the overall approach.
3- Use Tools Based on Industry Standards
Utilizing tools based on industry standards allows for the following benefits:
• Decreased implementation and maintenance costs
• Increased ability to consolidate
23PalGov © 2011
• Increased ability to consolidate • Increased availability of talented
resources • Decreased education and training costs• Simplification of modifications• Increased flexibility to migrate to another
technology
4- Select a Process Methodology
It is the methodology not the technologythat provide the success.
BPM is primarily a management discipline that requires a guiding
24PalGov © 2011
discipline that requires a guiding methodology or set of methodologies.
It provides common language, and it must cover the whole process life cycle.
5- Secure Executive Sponsorship
As all projects executive sponsorship is mandatory for a BPM effort to be successful.
25PalGov © 2011
successful.
6- Select the Right Project
Selecting the first project is critical.The following are characteristics of a Right
BPM Project:• Small /manageable
• One business process
• Large impact on a small number of people
26PalGov © 2011
• Large impact on a small number of people
• Measurable
• Significant impact
• Visible
• Visible benefit
• Good ROI
• Clear scope
• Extendable
• Connected to a strategic or operational objective
• Well documented with knowledgeable subject matters
Select the Right Project Cont.
Projects with the following usually offer strong potential for initial BPM projects:
• Processes that are manual, paper-intense, ad hoc, inconsistent, etc.
• Processes that need to be integrated with several different systems
27PalGov © 2011
different systems
• Processes with immediate & recognizable pain points
• Processes that map directly to a key organizational objective
• Processes that are critical to the business
• Processes with confirmed executive sponsorship
7- Lead With the Right People
The following are a few of the characteristics of BPM leaders:
• Thinking differently • Understand both the business and the
technology
28PalGov © 2011
technology• People respected by their peers • Embody best practices. • Focused on business first then IT• Communicate/translate effectively Patient• Maintain effective change management
skill
8- Manage Expectations
• Manage expectations and understand why people are involved and their “personal wins”
• Success criteria to successful MBP
29PalGov © 2011
• Success criteria to successful MBP should be agreed on and documented
9- Benchmark the Current Process
Begin the BPM process by selecting a few metrics that are of high value in the short term then progress to long term measures. Metrics are classified in three ways: customer, financial, and operational. To accurately define your baseline:
• Fully document the current processeso Identify key activities
o Who does it - Map out individual roleso When is it done
30PalGov © 2011
o When is it doneo How often is it done
o How long does it take to do it
o Define flows of work
• Interview key stakeholders and process participants • Identify process origins and rationale behind how things are
done• Identify the “gaps” between activities, people, and systems - as
these are areas of opportunity for BPM
10- Define Key Performance Indicators (KPIs)
KPI: is a measure of performance.
• Don’t start without KPI.
• Identify BPM Center of Excellence specific metrics that are measurable
31PalGov © 2011
specific metrics that are measurable and can be mapped to business goals and objectives.
• Developing a ROI model will assist in the analysis of the success of BPM.
11- Foster Cultural Change
• Different cultures need different approaches
• People will need to be encouraged to come with ideas
32PalGov © 2011
with ideas
• Management will need to lead by example
12- Focus on Your Customer
• Again, it is not using technology what will make the change. It is the management and the customer satisfaction.
33PalGov © 2011
the customer satisfaction.
• BPM has been more successful than previous ‘process oriented’ approaches because it blends technology with management best practice
13- Focus on Your Process Workers
• Shield the business users from the infrastructure.
• Use technology to simplify processes.
• Use friendly graphical user interfaces.
34PalGov © 2011
• Use friendly graphical user interfaces.
• Listen to the business users.
14- Take a Broad View of Training
Training is critical to success with
Training
35PalGov © 2011
Training
Methodology Tools
15- Profit from Experience
Document you experience, this will be use to develop a methodology for repeatable BPM delivery.
A methodology is a series of steps.
36PalGov © 2011
A methodology is a series of steps.
16- Develop a Robust Governance Framework
Governance Framework are: rules, policies and communication mechanisms that control how people make decisions and initiate change.
37PalGov © 2011
For success this framework should be built.
• ARTICLES (READING ACTIVITY)
The Marriage of BPM and Six Sigma
By: Marvin M. Wurtzel, President,
Course Activity
38PalGov © 2011
By: Marvin M. Wurtzel, President, Marvin M. Wurtzel & AssociatesTuesday October 30, 2007
• http://www.bpminstitute.org/articles/article/article/the-marriage-of-bpm-and-six-sigma/news-browse/13.html
Session 16: Lab Activity
1- use Bonita to define data and forms.
2- Assignment 4:
Use:
Business Process Re-engineering Assessment
Guide, United States General Accounting
Office, May 1997.
To develop guide lines for BP Re-engineering,
then use these guide lines for re-engineer
one of your processes in your organization.
39
Summary
• In this session we have discussed:
– BPR
– BPM Best practices
40PalGov © 2011
References
1. BPM Center of Excellence, Business Process Management (BPM), Best Practices, August 31, 2009
http://www.ftb.ca.gov/aboutFTB/Projects/ITSP/BPM_Best_Practices.pdf .
2. Business Process Re-engineering Assessment Guide,
United States General Accounting Office, May 1997.
41PalGov © 2011
United States General Accounting Office, May 1997.http://www.gao.gov/special.pubs/bprag/bprag.pdf
3. How to use BPMN for modeling Business processes, Alexander Samarin,
http://www.slideshare.net/samarin/how-to-use-bpmn-for-modelling-business-
processes
Thanks
Dr. Mahmoud H. Saheb
42PalGov © 2011