pakwell pe

11
Citations: Judge name: Phrases: Counsel In The Case: Details of Judgment: 1. In these proceedings the plaintiff seeks an order for specific performance of a tenancy agreement they claim was made with the defendant in 1999 in respect of premises in Nan Fung Centre, Tsuen Wan, and damages in lieu or in addition. At the commencement of this hearing, Mr Chow for the plaintiff, conceded that specific performance was no longer a practical proposition, the premises now having been relet to others, and said that the plaintiff now only sought damages. Having granted leave to the defendant to put in, hopelessly out of time, a surveyors' report, served shortly before the hearing date, I ordered that the trial should proceed as to liability only, with damages if any to be dealt with at a later stage. Status: Positive or Neutral Judicial Treatment PAKWELL INVESTMENT LTD v CRC DEPARTMENT STORE LTD 23 January 2002 Court of First Instance CFI High Court Action No. 13181 of 1999 HCA 13181/1999 [2002] HKEC 112 English Judgment Deputy Judge Woolley Contract terms "subject ot contract" terms Land law proprietary estoppel Mr Anderson Chow, instructed by Messrs Sit, Fung, Kwong & Shum, for the Plaintiff Mr C Y Li, instructed by Messrs Gallant Y T Ho & Co., for the Defendant

Upload: ppp

Post on 06-Dec-2015

215 views

Category:

Documents


2 download

DESCRIPTION

pe

TRANSCRIPT

Page 1: Pakwell Pe

Citations:

Judge name:

Phrases:

Counsel In The Case:

Details of Judgment:

1. In these proceedings the plaintiff seeks an order for specific performance of a

tenancy agreement they claim was made with the defendant in 1999 in respect of

premises in Nan Fung Centre, Tsuen Wan, and damages in lieu or in addition. At the

commencement of this hearing, Mr Chow for the plaintiff, conceded that specific

performance was no longer a practical proposition, the premises now having been

relet to others, and said that the plaintiff now only sought damages. Having granted

leave to the defendant to put in, hopelessly out of time, a surveyors' report, served

shortly before the hearing date, I ordered that the trial should proceed as to liability

only, with damages if any to be dealt with at a later stage.

Status: Positive or Neutral Judicial Treatment

PAKWELL INVESTMENT LTD v CRC DEPARTMENT STORE LTD

23 January 2002

Court of First Instance

CFI

High Court Action No. 13181 of 1999

HCA 13181/1999

[2002] HKEC 112 English Judgment

Deputy Judge Woolley

Contract -­ terms -­ "subject ot contract" -­ terms

Land law -­ proprietary estoppel

Mr Anderson Chow, instructed by Messrs Sit, Fung, Kwong &

Shum, for the Plaintiff

Mr C Y Li, instructed by Messrs Gallant Y T Ho & Co., for the

Defendant

Page 2: Pakwell Pe

2. The premises concerned are a small part of the 1st floor, and a much larger part of the 2ndfloor, of Nan Fung Centre, owned by the defendant who, at the commencement of the eventsleading to this action, operated a department store there. It was then their intention to reducethe size of the department store and let the space thereby made free, amounting to some17,500 square feet. In about February 1999, the availability of the premises came to theattention of Mr Philip Wong, a director of the plaintiff, through an estate agency calledHighwin International Property Consultants (Highwin), a company managed by a Miss KittyWu, but owned and operated by Highwin Development Company Limited. The twoshareholders and directors of the latter are Mr Wong himself and his younger brother, a factnot revealed by Mr Wong in his witness statements, where he appears to seek to distancehimself from the estate agency. However, on his instructions, and on behalf then of another ofhis companies, Guangjian (Holdings) Limited (Guangjian), Miss Wu, by a letter dated 25February 1999, made an offer to China Resources Retail (Group) Limited, the defendant'sholding company and agent, to rent the premises for a term of four years, with option for twofurther terms of the same length, at a rent of $500,000.00 a month for the first four years, with10% increases for each of the optional renewals, a rent free period of 6 months and a right tosublet. Mr Wong then intended to convert the premises into a shopping mall or arcade, with alarge number of small shops separately let. The project was also intended to be a jointventure with others in the name of another company which would be nominated to take up thelease, and negotiations commenced through a Mr Wang Chun of the defendant.

3. Mr Wong put forward proposals for the premises in letters to Mr Wang in March 1999,including an offer to undertake the renovation of the defendant's own portion to be retained bythem. These were accompanied by plans prepared by Mr Wong's own architect. A meetingtook place on 23 March, attended by Mr Wong, his architect Mr Christopher Leung, and MrWilson Nei Kin Hung, another associate of Mr Wong, although incorrectly described incorrespondence as a director of Guangjian, when their proposals for the premises and for theterms of a lease were discussed. Following that meeting, a further offer was made by MrWong in a letter dated 30 March, and this in turn was followed by a third offer on 15 April1999 of which, after further upwards revision of the proposed rent, the defendant, by their MrChen Zhen Yu, indicated their approval by countersigning the letter on 22 April 1999.However, this letter, as well as those preceding it, included a term which I am told translatesas: "The above terms shall be subject to the final contract to be mutually signed", and whichMr Wong in evidence conceded was equivalent to the well known phrase, "subject tocontract". A preliminary deposit equivalent to one month's rent was then paid to thedefendant, a payment which Mr Wang Chun said, and I accept, was to show Mr Wong'ssincerity, and following which they ceased any negotiations with any other interested parties.On 26 April the parties agreed to substitute as proposed tenant a company called FartechInvestment Limited, and the defendant further agreed to pay Highwin an agency fee of

Page 3: Pakwell Pe

$316,000.00 upon their signing of the formal lease. This, as we shall see, never in facthappened, but the fee payable to his own company may well be the reason Mr Wong was soreluctant to reveal his connection with it.

4. In early May 1999 Mr Wong appointed a Mr Hung of Messrs Gallant Y T Ho & Co as hissolicitor and Mr Wang told him that the defendant's solicitor would be from the same firm butin their Mongkok office. A draft tenancy agreement was sent to Mr Hung who passed it to MrWong. A number of amendments were made to this, principally by Mr Wilson Nei, for MrWong, and many of these were incorporated into the final version of the agreement in July1999, and the commencement date, originally agreed orally between Mr Wong and Mr Wangas 1 July 1999, was changed to 16 August 1999, with a rent-­free period of three months. InJune 1999, the parties agreed to substitute the plaintiff as tenant, the project having becomea joint venture between Mr Wong, Mr Nei and a company called Kee Shing (Holdings)Limited, with whom Mr Wong was also associated and which became the major shareholder,and Messrs Sit, Fung, Kwong & Shum were appointed the plaintiff's solicitors. A further drafttenancy agreement was sent to the plaintiff's solicitors for approval, and they returned thiswith amendments on 5 July 1999. Another draft was sent to the plaintiff's solicitors on 9 July,and, the terms of this being accepted, the defendant's solicitors sent an engrossed formalagreement to the plaintiff's solicitors on 13 July. This was returned duly executed by theplaintiff on 14 July but has never been executed by the defendant.

5. Meanwhile, in the course of June 1999, in anticipation of the tenancy, and to seek theapproval of the defendant of their renovation plans for the portion to be retained by them, theplaintiff had proceeded to draw up plans for the premises and consulted with their architectand contractors. On 19 June they accepted a quotation from Hang Foong M & E ConsultingCo. Ltd in respect of electrical, air-­conditioning and fire services installation, and received aninvoice for $56,000.00 as first stage payment, and on 2 July a further invoice for the next$168,000.00. Neither of these has been paid. They appointed a Mr Lung Tze Ming as aconsultant for the shopping centre project for the period from 2 July to 31 October at a fee of$150,000.00, and a Mr David Wong as property manager also from 2 July at a salary of$30,000.00 per month. However, it was only revealed in cross-­examination of Mr Philip Wongthat Mr Lung was already his employee, and had been for eight years, and Mr David Wong ishis brother, and both were fellow directors in Guangjian. There is no evidence that anythinghas been paid to them in respect of their appointments. The plaintiff also confirmed MrChristopher Leung as architect for the project and paid him a first stage payment of$50,000.00, and the defendant signed the requisite form giving notice to the BuildingAuthority of his appointment as authorised person for the proposed building works.

6. On 29 June 1999 the defendant notified the plaintiff that they intended to cease business atthe department store on 30 June and requested them to erect hoardings at the escalators

Page 4: Pakwell Pe

from 1st to 3rd floors to allow access and a fire escape route during the alterations for thoseusing the 3rd floor, and on 30 June approved the plaintiff's plans for the renovation work. Thehoardings were erected by the plaintiff's contractor on 5th July, and another contractorattended on 7 July to turn off a water control switch for the air-­conditioning so that thedefendant could proceed with demolition of their store facilities. There is no evidence that theplaintiff paid anything for either of these matters. It appears that the intention of the partieswas that the plaintiff would be allowed into possession of the defendant's retained part of thepremises to commence the renovations on 15 July. The plaintiff continued to makepreparations in arranging banking facilities with Kwong On Bank, and on 10 July entered intoa contract with Hope Seng Construction Ltd both for the renovation for the defendant andtheir own shopping arcade project, and on 11 July received an invoice for the first stagepayment of $3,353,800.00. This too has not been paid. A number of other matters were dealtwith by both parties, clearly anticipating that a formal tenancy would be entered into and thework would proceed.

7. However, changes had meanwhile been taking place in the management of thedefendant's holding company, as a result of which the person hitherto in charge, Mr ChenZhen Yu, was replaced by a Mr Lau Pak Shing, whose brief seems to have been to reviewthe profitability of the defendant and its properties. As a result of this, the defendant decidednot to proceed with the proposed tenancy, and to develop the premises themselves into ashopping arcade, which has since been done. The plaintiff's solicitors were notified of thisdecision by a letter dated 14 August 1999 from the defendant's solicitors who also returnedthe sums paid by the plaintiff by way of deposit, charges, rates and stamp duty.

8. Mr Chow puts the case for the plaintiff on two bases: the first is that there was a concludedcontract between the parties, notwithstanding the cover of the "subject to contract" nature ofthe correspondence prior to 14 July 1999, and evidenced, for the purposes of section 3 of theConveyancing and Property Ordinance, Cap.219 by the tenancy agreement itself executed bythe plaintiff;; the second is proprietary estoppel, in that the plaintiff incurred expense, andotherwise acted to its detriment, on the assurances of the defendant that the tenancy wouldbe granted, and it is now unconscionable for the defendant not to grant the tenancy. I will lookat these separately.

Contract

9. As I have already observed, until 14 July 1999, all correspondence, from the original offerof 15 April, was marked "subject to contract" or qualified by similar wording. Indeed, this wasfurther reinforced by the defendant's solicitors in their letter of 17 June 1999, sending the drafttenancy agreement to the plaintiff solicitors, where they added:

"Without prejudice to any agreements reached between our respective clients, nothing herein

Page 5: Pakwell Pe

or in our draft tenancy agreement shall be binding on our client unless and until the said

formal tenancy agreement shall have been signed by our client."

10. Mr Chow accepts that, up to and including 13 July 1999, the "subject to contract" nature

of the correspondence prevents any concluded contract being in place. It is the events of the

next day, and those following which, he says, show that a final contract was entered into, and,

either the "subject to contract" qualification was intentionally removed, or the fact of a

concluded contract rendered it meaningless.

11. The sequence of events the plaintiff relies on commences on 13 July 1999. On that day

the defendant's solicitors, having been advised that the plaintiff agreed all their amendments

to the draft tenancy agreement, sent an engrossed copy of the agreement to the plaintiff's

solicitors for their client's execution, with a covering letter, marked "subject to contract",

requesting a copy of a board resolution authorising the execution, a bank guarantee in

respect of the security deposit, and a cheque for management and air-­conditioning charges

and rates for the first month of the tenancy, and their share of the stamp duty and registration

fee. This letter also referred to the last paragraph of their letter of 17 June set out above. The

plaintiff's solicitors replied by letter the next day, sending the agreement executed by their

client, and the board resolution and cheque requested, and including the following statement:

"The above documents and cheque are sent to you subject to your firm's personal

undertaking to:-­

(1) let us have a copy of the said Tenancy Agreement duly executed by your client and

attested by you together with the plans attached thereto duly signed by your client within the

next two working days from the date hereof;;

(2) stamp and register the said Tenancy Agreement within the prescribed time period;; and

(3) return to us one original counterpart of the said Tenancy Agreement duly stamped and

registered within 5 days from the date of your receipt of the same from the relevant Land

Registry and in any event, within 60 days from the date hereof."

The defendant's solicitors sent two letters after that to the other side;; the first sending a copy

bank guarantee in terms acceptable to them, again marked "subject to contract", and the

second, clearly referring to the letter accompanying the agreement, and in response to the

request for an undertaking, but not marked "subject to contract", stating, inter alia:

"As regards Points No. (1) and (3) of the 2nd paragraph of the said letter, please be informed

that we are only prepared to:-­

1. let you have a copy of the Tenancy Agreement duly executed by our client and attested by

Page 6: Pakwell Pe

us as soon as possible (and not within the next two working days from the date of your letter);;

2. return to you one original counterpart of the said Tenancy Agreement duly stamped and

registered within 5 days from the date of receipt of the same from the relevant Land Registry

(and not within 60 days from the date of your said letter)."

12. Mr Chow submits that the letter from the plaintiff's solicitors was intended to be an open

offer which was accepted by the defendant's solicitors by replying by letter also not marked

"subject to contract", by stating that they would return the executed agreement as soon as

possible, and by clearing the cheque for charges, rates and stamp duty. He also adds the

silence on the part of the defendant from then until 14 August, but I cannot see that the

circumstances here provide any exception to the principle that a contract cannot be accepted

by silence.

13. I regret that I find no merit in Mr Chow's submissions. It is clear to me that the dealings

between the parties were still subject to contract on 14 July 1999, and would continue to be

until the agreement had been signed by the defendant. It is a basic and well known principle

in cases such as this that negotiations which begin under the umbrella of "subject to contract"

continue to be so qualified even if subsequent letters do not expressly use the phrase, until

the formula is expunged either expressly or by necessary implication. As Cumming-­Bruce LJ

said in Cohen v. Nessdale [1982] 2 All ER 97, at page 103:

"The starting point, as counsel for the tenant recognises, is really the statement of the law

recited in this court in Sherbrooke v Dipple (1980) 41 P & CR 173 and in particular the

judgments in this court. Lord Denning MR said (at 176):

'But there is this overwhelming point: Everything in the opening letter was "subject to

contract". All the subsequent negotiations were subject to that overriding initial condition. We

were referred by counsel for the plaintiffs to a decision of Brightman J. in 1972. It is Tevanan

v Norman Brett (Builders) Ltd (223 EG 1945 at 1947). Brightman J. said that "parties could

get rid of the qualification of 'subject to contract' only if they both expressly agreed that it

should be expunged or if such an agreement was to be necessarily implied"

Lord Denning MR went on to deal with the application of that principle to the facts of the case

before him.

Templeman LJ quoted (41 P & CR 173 at 176) the whole of the passage to which Lord

Denning MR had referred from the judgment of Brightman J, and I quote it:

'.....when parties started their negotiations under the umbrella of the "subject to contract"

formula, or some similar expression of intention, it was really hopeless for one side or the

other to say that a contract came into existence because the parties became of one mind

Page 7: Pakwell Pe

notwithstanding that no formal contracts had been exchanged. Where formal contracts wereexchanged, it was true that the parties were inevitably of one mind at the moment before theexchange was made. But they were only of one mind on the footing that all the terms andconditions of the sale and purchase had been settled between them, and even then theoriginal intention still remained intact that there should be no formal contract in existence untilthe written contracts had been exchanged.

Templeman LJ went on to say (41 P & CR 173 at 176):

'Mr Justice Brightman thought parties could get rid of the qualification of "subject to contract"only if they both expressly agreed that it should be expunged or if such an agreement was tobe necessarily implied.'

14. I can see no reason why the situation is any different here. The negotiations had beensubject to contract throughout, with the necessary consequence of that, that either party couldwalk away from those negotiations at any time before both parties had signed a formalagreement, and the position at least of the defendant had been made clear by their solicitorsby stipulating in their letter of 17 June 1999, and repeating in their letter accompanying theengrossed formal agreement on 13 July 1999, that nothing would be binding on their clientuntil they had signed the agreement. The fact that their letter of 14 July was not marked"subject to contract", in the absence of clear agreement to the contrary, could not expungethe qualification. Their statement that they were "prepared to" let the plaintiffs' solicitors havethe executed document as soon as possible, and to return it duly stamped within 5 days afterso doing, does not, in my view, amount to an agreement that matters are no longer subject tocontract, or to their requirement that the tenancy agreement be signed by their client to bebinding, nor can it give rise to an implication to that effect. It is true that by 14 July 1999 theparties were of one mind in that the terms of the tenancy had been settled between them. Butthis does not remove the requirement of execution and exchange of the formal agreement forthose terms to become binding on them, unless it is clear that they agree otherwise. There isno such agreement here.

15. Mr Chow has further sought to equate the events on 14 July with a conveyancingtransaction by undertakings. I again have no difficulty in distinguishing that situation. Forconveyancing transactions to be by undertaking there must be an agreement to do so, itcannot be assumed, nor implied. There is no such agreement here. Secondly, the wording ofthe defendant's solicitors' letter falls far short of an undertaking that the document will besigned by their client, being at most an undertaking as to when a copy of the executedagreement will be given to the plaintiff, which was stated to be "as soon as possible". If theagreement is not executed, it would not be possible at all and no agreement exists. Neitherdo I find the presenting of the plaintiff's cheque for charges and rates to assist the plaintiff.

Page 8: Pakwell Pe

This is equally consistent with the defendant's solicitors protecting their client's interests inensuring that money due under the agreement is paid before the agreement is executed bythem.

16. Having found that no contract came into existence between the parties, it is unnecessaryfor me to deal with the matter of the requirement of the Conveyancing and PropertyOrdinance, although there is no doubt in my mind that, had there been a concluded contract,the correspondence between the solicitors and the documents sent therewith would havesatisfied those requirements.

Proprietary Estoppel

17. This second limb of the plaintiff's case relies on the course of negotiations between theparties, and what the plaintiff claims were assurances given to them that the tenancy wouldbe granted to them, as a result of which they incurred expense, entered into contracts therebymaking themselves liable under them, and otherwise acted to their detriment.

18. It is clear that, from the signing by the defendant of the amended letter of 15 April 1999, itwas their firm intention to grant a tenancy of the premises to the plaintiff. As Mr Wang Chunconceded, once the plaintiff had shown sincerity by paying a deposit of the equivalent of onemonth's rent, they negotiated with no other parties except the plaintiff. Those negotiationsinvolved the renovation of the retained part of the premises, which was going to be part of theagreement, and as to which the defendant clearly had to be satisfied that their requirementswere met, and the other terms to be included in the final agreement. Mr Wong described suchother terms as minor. While they were secondary to the rent payable and the term of thelease, and to the renovations planned, I do not consider that they can be dismissed asunimportant in a commercial environment. It is also clear that these negotiations were with MrWong, and later Mr Nei, rather than with a particular company. There is no evidence that MrWang Chun took any steps to investigate Guangjian, to find out who were the directors andshareholders, and from where the funds were to come to finance the project. It was Mr Wonghe dealt with, and satisfied himself that he was able to carry out the project. For this reasonthere was no objection when the name of the proposed tenant was changed, not once, buttwice, as the defendant was still negotiating with the same person, and did not seemconcerned with his other partners in the project. It is for this reason I find that the defendant'switnesses' evidence, as to the doubts they harboured about his ability and sincerity incarrying the matter to fruition, unconvincing. The decision not to continue with the intendedtenancy was, in my view, a commercial decision taken when a change in managementbrought a review of the profitability of the defendant's properties. The only question now iswhether it was unconscionable for them to do so.

19. Given that the defendant was negotiating with no other party between April 1999 and the

Page 9: Pakwell Pe

final decision not to proceed with this tenancy, it is apparent that both sides were conductingthemselves on the basis that the plaintiff would become the tenant of the premises, andassumed that their negotiations would lead to a final agreement, subject to the right I havedealt with above of either party to withdraw. It is inevitable in those circumstances that thedealings between them should be coloured by that assumption and expectation, andencouragement should be given to proceed to that end. To that extent, I have no doubt thatMr Wong took Mr Wang Chun's encouragement as an assurance that the tenancy would begranted. At the same time, on such assumption, it was essential for other preliminary steps tobe taken to expedite matters once the tenancy came into being. These included appointingthe plaintiff's architect as authorised person for the works, asking the plaintiff to erecthoardings and turn off the air conditioning water supply, and pressing the plaintiff for thepreparation of plans, which were essential to the tenancy, as they had to be approved beforethe defendant could agree to the plaintiff carrying out the renovation as part of that tenancyagreement.

20. The plaintiff relies further on a meeting which took place on 13 July 1999, shortly after MrLau took over his role of reviewing the properties, and was clearly for the purpose ofintroducing Mr Wong, Mr Nei and others in his team to Mr Lau. There is some dispute aboutwhat happened at that meeting and what, if any, assurances were given that the tenancywould go ahead. What is not disputed is that there was mention by Mr Lau of the possibility ofthe defendant themselves developing a shopping arcade in their retained portion of theproperty. Whether or not this started alarm bells ringing for the plaintiff is not clear, but it waswith remarkable alacrity that they informed the defendant's solicitors that afternoon that theremaining terms of the tenancy agreement were approved by them, and signed theagreement the next day, despite having had it since 9 July. Mr Lau denied that the meetingwas about the terms of the agreement, or that he had been briefed by Mr Wang Chun aboutthe negotiations so far, but was just for the purpose of understanding the plaintiff's plans forthe premises if a tenancy was granted. I have to say I find it unlikely that he had not beenbrought up to date on negotiations which had reached such an advanced stage, although Ican accept that he wanted to be introduced to the plaintiff's representatives and ask abouttheir plans. Neither is it in dispute that he said words at that meeting to the effect that theywould honour legal commitments to the plaintiff "in accordance with the spirit of the contract"and would work by the book. It is probable that there was no direct suggestion at that meetingthat there was any change in the attitude of the defendant to the still intended tenancy, and, inso far as that could be taken as an assurance that it would be granted, I am satisfied thatsuch an assurance was given. Indeed, throughout the negotiations, bearing in mind thatbetween Mr Wang Chun, Mr Wong and Mr Nei, there was clearly an firm understanding thatthey progress to execution of the tenancy agreement, I have no doubt that anycommunication between them would be positive and helpful to that end. To that extent,

Page 10: Pakwell Pe

assurances from either side in a spirit of commercial cooperation would be inevitable. Butgiven my finding above, and the concession of Mr Chow that there was no contract before 13July 1999 as a result of the "subject to contract" provision, such assurances andencouragement do not commit the defendant in any way unless they caused the plaintiff toact to their detriment.

21. What then does the plaintiff say they did to their detriment, and was it in reliance on thoseassurances? In chronological order they say the first was on 19 June 1999 when theyappointed Hang Foong M & E Consulting Co Ltd and committed themselves to pay aconsultant fee of 7% of the contract sum. On 21 June they appointed Mr Lung Tze Ming andMr David Wong as consultant and manager respectively, and on 26 June appointedChristopher Leung & Associates Ltd as architects at a fee of 5% of the total contract sum. On5 July they applied for and were granted banking facilities, to cover the initial cost at least ofthe project and the security deposit guarantee, and the same day sent a contractor to erectthe hoardings round the escalators. On 10 July they entered into a contract with Hope SengConstruction Ltd for the works at a total cost of $23,535,440, including about $3.7 million forthe renovation of the defendant's portion, and on 13 July approved a quotation for installationof water inlets and drains on the part of the 1st floor. On 14 July they obtained the bankguarantee and on 19 July paid $11,200.00 to the Building Authority in connection with thesubmission of plans for approval of the building works.

22. I am told that the only sums paid out by the plaintiff in addition to the last were$200,000.00 to the architects, who had been providing plans throughout the negotiations fromFebruary 1999, and about $27,000.00 to the bank as charges and interest to the date thedefendant finally withdrew. There is no evidence that anything was paid to Mr Lung and MrDavid Wong, nor that serious attempts have been made to recover any of the sumscontracted for as above.

23. I have to bear in mind that these were commercial negotiations being carried out by twocompanies, and, in the case of the plaintiff, it was inevitable that they would have to incurexpense, initially to prepare their submissions to the defendant with plans to persuade thelatter to continue to negotiate with them with a view to those plans being implemented. Asthose negotiations progressed and came near to a concluded deal, it was also both sensibleand inevitable that they should make preparations so that they could move quickly intocarrying out the work as soon as they were given possession, the sooner to realise the profitthey expected to see from the investment, which here has been estimated by Mr Wong as inexcess of $50 million over the period of the tenancy. Indeed, it would not make commercialsense for them to wait until the agreement was signed to start such preparatory work, therebyseriously delaying the project. In any such dealings with a view to a commercially largeagreement, there will always be expenses to be incurred by way of architects fees, staff

Page 11: Pakwell Pe

costs, and bank charges, and it can only be in the limited number of cases where something

over and above that is incurred, to the knowledge of, and with the concurrence of, the other

party, to the extent that it would be inequitable not to allow the party incurring the expense to

complete the contract under which he will receive recompense for that expenditure. If I may

borrow the words of Lord Templeman in Attorney General & anor v. Humphreys Estate

(Queens Gardens) Ltd[1987] HKLR 427, I have no doubt that the plaintiff acted in the

confident and not unreasonable hope that the agreement would come into effect, and as time

passed, and more and more actions were undertaken in conformity with the proposals, their

hopes were strengthened, and it became more unlikely that the defendant would have a

change of heart and withdraw. But as in that case, as I have found above, there was never

any indication either expressly or by implication that the defendant had surrendered their right

to change their mind.

24. What was done here was no more than what one would expect of a commercial

organisation properly managing its affairs in the belief that negotiations would prove fruitful,

and it was done for their benefit in the sense that they hoped to make a profit out of it, and to

accelerate the work towards that profit. All that was done solely for the defendant was the

hoarding, and turning off the cold water supply to the air conditioning, for which there is no

evidence of any payment being made. I would need very much more than this to show a

detriment such as to make it inequitable or unconscionable for the defendant to withdraw from

the proposed tenancy. The plaintiff must fail on this head as well.

25. For these reasons the plaintiff's claim will be dismissed and there will be judgment for the

defendant and an order that the registration in the Land Registry of the letter of 15 April 1999

and the writ herein be vacated forthwith, being the only claim the defendant now seeks to

make. There will also be an order nisi that the plaintiff pays the defendant's costs of these

proceedings to be taxed.