Environmental Monitoring Report Bi-annual Report Loan 2540-PAK July–December 2014
Pakistan: National Highway Development Sector
Investment Program–Tranche 2
Construction Supervision Package 2 (CSP–2)
Sukkur–Shikarpur–Jacobabad Road Project, ICB–5
(N–65)
Prepared by Oriental Consultants Company Limited for the National Highway Authority and the
Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Page 2 of 56
CONTENTS
1. INTRODUCTION………...............................................................................................5
1.1 Construction activities of the project………......................................................7
1.2 Project Organization and Environmental Management Team..........................7
1.3 Relationship with the Contractor, owner and lender.........................................8
2. ENVIRONMENTAL MONITORING............................................................................10
2.1 Environmental Monitoring Summary...............................................................10
2.2 Noise………....................................................................................................10
2.3 Ground Water………......................................................................................13
2.4 Ambient Air Quality………..............................................................................14
2.5 Flora and Fauna………..................................................................................16
2.6 Camp Sites………..........................................................................................16
2.7 Borrow Areas ………......................................................................................18
2.8 Safety Provisions……….................................................................................18
3. ENVIRONMENTAL MANAGEMENT………..............................................................19
3.1 Field Visits………............................................................................................19
3.2 Environment Management and Monitoring Plan (EMMP) ……….................. 20
3.3 Environment Management Plans……….........................................................21
3.4 EMP Compliance Checklist………..................................................................21
3.5 Environmental Training………....................................................................... 21
3.6 Environment Action Plan….………................................................................ 22
3.7 Environmental Notifications………................................................................ 22
3.8 Environmental Inspections/Audits……………………………………………….22
4. Road Safety / Traffic Management………........................................................ 22
4.1 Safety Provisions………………………………………………………………….22
4.2 Safety at road construction……………………………………………….……...23
Page 3 of 56
4.3 Safety Management…………………………….……………………………….…23
4.4 Traffic Management…………………………………………………………….….24
5. CONCLUSIONS AND RECOMMENDATIONS………………………………………….25
Tables
Table 1: Noise Monitoring Results of ZKB operating plants …………………………….12
Table 2: Noise Monitoring Results at various locations along the road alignment …...12
Table 3: Drinking water results of the residential camp 2 & along the road alignment .14
Table 5: Stack emission results of generator of asphalt plant 2 ………………………………15
Table 6: Stack emission results of asphalt plant 2………………………………………...15
Table 7: Ambient air, concentration of gases /particulate matters (PM10) Tests ……..15
Table 8: Soil testing. …………………………………………………………………………16
Figures
Figure.1: Project Map………………………………….………………………………………06
Figure 2: Locations of sampling stations………….…………………………………………11
Figure. 3: Organization Setup for EMMP Implementation………………………………….08
Annexes
I. Summary of Construction activities of the project……….………………………….….29
II. Rehabilitation/Restoration Plans for both Campsites……………………………….….31
III. EMMP Compliance Checklist…………………………………………………………......41
IV. Environmental Monitoring Results………………………………………………………..43
V. Photographs……………………………………………………………………………….. 51
Page 4 of 56
ABBREVIATIONS
ADB Asian Development Bank
dB Decibel
EALS Environment Afforestation Land Acquisition & Social
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EMMP Environmental Management Monitoring Plan
ES Environment Specialist
SE Safety Engineer
NEQS National Environmental Quality Standard
OC Oriental Consultants Co. Ltd.
REA Rapid Environmental Assessment
W.H.O World Health Organization
PSQCA Pakistan Standards and Quality Control Authority (Drinking Water Quality Standard)
IAR Improvement Action Report
Page 5 of 56
1. INTRODUCTION
1. This section is part of National Highway N-65 which connects the province of Sindh with the
province of Balochistan. N-65 starts from Sukkur and terminates at Quetta passing through the
cities of Shikarpur, Jacobabad, Dera Allah Yar Khan and Sibbi. This is a very important link
between the provinces of Sindh and Balochistan. Different sections of N-65 are under
construction. With the improvement of this section, from Sukkur to Jacobabad, trade activities
will be enhanced and the public will be facilitated through considerable amount of savings
against Vehicle Operating Cost. This section passes through flat terrain and through the
agriculture fields. Existing road is 6.0m wide and the same, presently, is being upgraded to four
(4) lane dual carriageway with each side 7.3 m wide along with construction of four (4) lane
bypass for the city of Shikarpur. Detailed Design has been prepared by M/s Loya Associates,
Karachi, whereas the Construction Supervision Consultants are M/s Oriental Consultants
Company (Japan) in association with M/s National Engineering Services Pakistan (Pvt) Limited
(NESPAK), M/s Asif Ali & Associates (AAA), M/s International Consultants (IC) and M/s National
Engineering Corporation (NEC).
2. The prime objective of project is to facilitate movement of people and goods transport in
project area and between Sindh and Balochistan Provinces by providing better access and
enhance the efficacy of the existing road network.
3. Project had got the category-A on the basis of screening questions listed in Rapid
Environmental Assessment (REA) checklist. As category-A projects required EIA study to be
executed to propagate the environmental profile of the project vicinity, EIA had been conducted
by NESPAK. Site visits carried out for collecting primary and secondary data to identify and
establish the Corridor of impact and mitigations required to minimize the adverse impacts.
4. This road/highway passes through Sukkur, Shikarpur and Jacobabad Districts. The terrain is
quite flat and leveled. All the three districts have mostly agriculture fields on both sides of the
road. The project area is one of the hottest regions in the country with extremely severe climate,
especially in summer, June and July are the hottest months and December and January are the
coldest months. Project area is irrigated by canals emerging from Guddu Barrage system. Rice
and wheat are the major crops in all three districts. Water table is higher in the project area and
varies from 3 to 20 m at certain locations. Industrial activity in the project area is scarce. The
sources of pollution are the emissions from vehicular movement & Asphalt plant stack
emissions. Large amount of suspended particular matter is generated when the vehicles move
on unpaved shoulders and poorly maintained existing road.
Page 6 of 56
5. Various probable impacts on the existing resources were studied under the parameters of
change of land use, dismantling of structures, relocation of existing utilities, soil erosion, water
bodies, air pollution, noise, flora and fauna etc. Mitigations measures to eliminate/ minimize
those negative impacts had been proposed to bring them to acceptable level through
implementation of Environmental Management and Monitoring Plans (EMMP).
Page 7 of 56
1.1. Construction activities of the project.
6. Physical progress achieved till 30 June, 2014 is detailed in Annex-1.
1.2. Project Organization and Environmental Management Team.
7. Overall responsibility for Environmental Management and Monitoring rests with the Environment
Afforestation Land acquisition Social (EALS) of the National Highway Authority, the implementation
agency (IA) which is headed by a Project Director (PD). Contractor is responsible for
implementation whereas the Supervision Consultant (OC) is responsible for monitoring the
implementation. Environmental Protection Agency (EPA) Sindh acts as the overall regulatory body.
8. Environmental monitoring is responsibility of the Oriental Consultants Co. Ltd. Oriental
Consultants has hired services of Environment Specialist (ES) since July, 2012 & Safety Engineer
has been deployed since December, 2012. Contractor is responsible to make sure project activities
are in compliance with the EMMP and fall under NEQS. Contractor has appointed their
environmental specialist since September, 2012. Contractor’s designated environmental
representative is responsible to implement EMMP, prepare environmental compliance reports and
submit to ES of the consultant. ES reviews environmental monitoring reports, ensures that day-to-
day construction activities are carried out in an environmentally sound and sustainable manner. ES
conducts site visit regularly to ensure that EMMP recommendations are implemented in its true
essence. ES reviews environmental safeguard issues of the project and submit monthly
environmental progress report to NHA. ES gives notification to contractor in case of any
environmental non-conformity and recommends mitigating measures to overcome non-
conformities.
9. The organogram for Environmental Management and Monitoring is given on the next page.
Page 8 of 56
Fig 3: Organogram for implementation of Environmental Management and Monitoring Plan.
1.3 Relationship with the Contractor and the Engineer
10. A good working relationship had been established among the contractor, client and the
consultant during the execution of work at the project. Contractor representatives had been made
aware of the Environmental Management and Monitoring activities. Environmental non-
conformities had been notified to contractor and mitigating measures recommended accordingly.
Camp site management instructions & environment management plans had been passed on to the
contractor to get the realistic results of implementation. Weekly EMP compliance checklist had
been devised by ES and shared with contractor to submit their response to environmental
provisions. Monthly progress report had been submitted to the client (NHA) as part of the Monthly
Progress Report (MPR).
11. The relationship of the contractor with the local communities /lenders and passing by travelers
had been excellent. Up until the completion of the project more than 300 local dwellers have been
Supervisors /
Inspectors
Community
Based
Organizations
Non
Governmental Organizations
Assistant Director (One of each section)
Deputy
Director
(Environment)
Assistant
Director (Env)
Environmental
Specialist Monitoring
Consultant
General Manager (NHA/ADB)
Project Director
(NHA)
Supervision
Consultant (RE)
Deputy Project
Director
Director
(Environment,
Social & Land Resettlement)
Assistant Director
(Social &
Land/Resettlement
Deputy Director
(Social &
Land/Resettlement
Page 9 of 56
hired by the contractor .These includes drivers, watchman, and skilled and unskilled labor. The
local people had not only availed the chance of employment but also a chance of growth in
technical skills. It is expected that after the completion of this 68.358 Km project the local
communities will get chances not only to promote their business, but to improve health conditions
due to controlled environmental hazards, save travel times and improve their quality of life in
general. It is expected that after completion of this project more than 200,000 local people will be
directly or indirectly benefitted socio-economically.
12. During execution of work, operation of batching plant, asphalt plant or any other construction
activity on road side the contractor (M/S LIMAK–JV–ZKB) has taken care to minimize the impact of
its activities and degraded environment on the local communities, passing by vehicles’ likely to be
affected by the major activities of construction such as widening, earth work, asphalt laying,
aggregate laying or prolonged road closures and diversion of traffic etc. The services of Pak
Rangers had been acquired during road closures and for general safety purposes at road site and
camp site. For traffic management traffic meetings had been held with local traffic police. Different
Traffic Management Plans have been devised by the collaboration of Environmental Specialists of
the consultant and the contractor.
13. Complaints / Grievance Register had been placed and maintained at camp (Km 42+100). It
had been placed for registering any complaints from the local community / passing-by motorist or
any complaint from the local Government agencies regarding environmental pollution etc. Even
contractor’s employees could register their complaints or reservations in this register. All the written
or even verbal complaints had been dealt with by the contractor’s staff on urgent basis by adopting
necessary improvement actions to resolve the matters. Major complaints registered were regarding
dust emission and traffic blockage and some regarding the availability of the basic welfare facilities
for the camp workers.
Page 10 of 56
2. ENVIRONMENTAL MONITORING
2.1. Environmental Monitoring Summary
14. Comprehensive Environmental monitoring has been carried out during the second week of
December, 2014. Comprehensive environmental monitoring parameters included vehicle emission
testing, noise levels recordings of operating machinery, campsite drinking water facility sampling,
ambient air quality monitoring, generators stack emissions testing and soil testing under the
supervision of contractor’s ES. PERAC Laboratory, Karachi conducted the testing & analysis of
environmental parameters.
2.2. Noise
15. Noise monitoring has been carried out at ten different locations. Results of the noise
monitoring during the last 6 months i.e. from June 2014 to December 2014 revealed that the
average noise level of project was recorded between 74-80dB, which is meeting NEQS. Noise
Monitoring Results of operating plants depicts range (67-79 dB) within NEQS. Therefore noise has
been rated as non-significant environmental impact for N-65 project until EMMP properly followed
by contractor. Noise level of heavy machinery, excavators, rollers, pavers, air blowers and
generators had been checked for noise levels on regular basis by the environmental Engineer of
ZKB and its record had been maintained in the Monthly Environmental and Monitoring Report.
Machinery found with exceeding noise levels than NEQS standard limits are repaired and
maintained and are fixed with air mufflers/ sound attenuators for protection of local settlements.
Contractor workforce had been instructed to use personal protective equipment (PPE’s) like ear
plugs and ear muffs at noise generating sites to abolish the slight effects from noise especially the
dozer operators exposed to noise continuously for more than 08 hour above 85d.B. Grievance had
been recorded from the work force and from the local settlements along with the project alignment
in respect of noise nuisance/Air emission after a survey conducted by the Environmental Engineer
of LIMAK–JV-ZKB in June,2014. So far no major complaint had been recorded regarding noise
pollution. However minor verbal complaint reports were resolved at site.
Camp sites had been established away from the residential areas/Urban vicinities. Contractor had
been strictly instructed to keep their rollers, excavators, pavers, air blowers, vehicles, generators
and other machinery in good condition & contractor had shown compliance in this context. To save
the local settlements from the noise, the heavy machineries had operated only between 08 AM to
05 PM. Noise level measurement of LIMAK–JV-ZKB operating machineries had also been
checked from time to time and necessary mitigating measures were adopted to reduce noise level.
Page 11 of 56
Page 12 of 56
Table 1: Noise Monitoring Results of Operating Plants
Sr. No Location Noise level (dB)
1. ASPHALT PLANT 2, KM (42 +100) 78.90
2. BATCHING PLANT 2, KM(42 +100 ) 75.8
3. GENERATOR, PLANT 2 ,KM (42 +100 ) 78.8
4. COMPRESSION TESTING MACHINE LAB (42+100). 66.5
Table 2: Noise and Emission Monitoring Results of Vehicles.
Sr. No Vehicle/Machinery
Smoke Ringlemann Scale –By Analyzer
Carbon Monoxide Vol.%- By Analyzer
NOISE dB (A)
By Analyzer
1 QAC- DUMPER 02 <0.1 87.9
2 JGA-9588 PICKUP SINGLE CABIN
02 <0.1 78.6
3 TKL-666 01 <0.1 72.9
4 TKD-444 TRALLER TWIN TURBO
02 <0.1 78.0
5 BD-1455 PRADO 01 <0.1 75.3
6 CN-1635 DOUBLE CABIN 02 <0.1 72.7
7 TKC-512 SHIFTER TRAILER
02 <0.1 73.6
8 EXCAVATOR EX-200 01 <0.1 81.0
9 QA-775 WATER TANKER 03 <0.1 76.4
10 ARF-2013 SURF ZERO 0.2 67.0
11 ISD-4240 PICKUP DOUBLE CABIN
01 <0.1 74.3
12 WAF-146 DOUBLE CABIN 01 <0.1 68.2
13 PAVER MACHINE SUPER 1800
01 <0.1 78.0
14 TUM DOM MACHINE 01 <0.1 69.0
15 TKN -273 TANKER 01 <0.1 78.5
16. From the above data as well as from the Ambient Noise level taken along the road
alignment/urban areas, conformed to NEQS. Noise level of Generator at the Asphalt plant-2,
revealed that it was within NEQS limits (78.9 dB). During the comprehensive monitoring in
December, 2014, 15 vehicles were measured for ambient noise level measurement at random.
These included some previously tested machinery , paver machine ,tandem, compressors machine
tractor trolley, trailers heavy trucks, double cabin jeeps , water bowsers & road operating
machineries were found conforming to NEQS standards except few which were sent to workshop
for repair and maintenance. Noise parameters of operating machinery had been measured during
Page 13 of 56
the months of June, July, August, September, October, November and December 2014, were
conforming to NEQS (Ref: Monthly Environmental Management and Monitoring Reports). Noise
levels of operating machineries as checked during comprehensive monitoring in December, 2014
were also found within NEQS limits.
2.3. Ground Water
17. Drinking water requirements of camp 2 had been met with ground water source located at a
distance of 300 meters away from camp 2. Drinking water parameter E.Coli had been analyzed
during the comprehensive Environmental Monitoring of drinking water as per EMMP guide lines. It
had been revealed from the test/ analysis of drinking water of camp site 2 that the Fecal Coli of the
drinking water for camp-2 is Nil and therefore found suitable for drinking and conformed to WHO
guidelines and Pakistan Standards and Quality Control Authority (PSQCA) Drinking Water Quality
Standards.
Potable water had been provided to workers in water coolers to workshop workers and
supervisors, dining halls and at asphalt plants and other areas of the camp 2.
18. To eradicate ground water contamination including protection of land from oil / fuel, concrete
platforms had been constructed at the oil storage areas of at campsite 2 as per EMMP to avoid oil
spillage and leaching in to soil.
19. In order to treat the sewage waste water from campsite toilets, soakage pits had been
constructed and maintained as per approved design. Shallow soakage pits design had been
approved as project lies in high water table vicinity. Asphalt plant effluent treatment had been
operating and maintained to mitigate the harmful effects of the waste water. Trap tanks had been
designed and maintained for vehicle service station effluent treatment. This treatment helped to
reduce oil & grease percolation into the ground water strata and maintain its quality.
20. Awareness training sessions for careful handling of oil grease and tackling of emergency
spillage had been arranged regularly especially for the work force involved in handling oil.
Furthermore fire stations had also been provided near the oil refueling points at Asphalt plant and
near motor workshop. A partition brick wall has been constructed between the operating
generators and the fuel storage tanks of camp 2, to avoid fire emergencies. Fire point 1 near the
fuel refilling point, Fire point 2 of Asphalt plant and Fire point 3 of the motor work shop had been
maintained and upgraded by increasing number of fire extinguishers and there were more than 15
all-purpose fire extinguishers of 6.0 kg each installed at each point.
21. Waste oil Generated from the work shop had been collected regularly and sent to oil collection
Page 14 of 56
point located near the work shop at camp 2 and ultimately sold out to oil dealers on monthly basis.
Concrete platforms had been built at the oil collection points .Underground oil collectors had also
been provided to these platforms for collection of oil during any spill emergency.
22. Asphalt plant 2 had been installed with water scrubber to control emissions .Waste
water/effluents from the water scrubber got treated in settling tanks and the solid sludge generated
is collected on a concrete platform in 20 plus drums and ultimately collected by TMA twice a week
or as per asphalt plant operation schedule. Waste water from the scrubber had been analyzed on
quarterly basis or upon requirement basis and necessary improvement / corrective action taken in
the light of analysis report, whereas the exceeding parameters had been controlled within NEQS
limits after implementation of maintenance program.
Table 3. Drinking Water Results Of Residential Camp2 and along road alignment N-65.
Sr. No. DESCRIPTION F.E. Coli Count/ml
1 000+500(right side ) ice factory, D/W1 NIL
2 42 +100 (camp -2 ), D/W2 NIL
3 53+300, urban area, Sultan Kot l/s community hand pump , D/W3
NIL
4 Urban area 56+300 R/S, community hand pump, D/W4 NIL
5 Urban area (68 +100), D/W5 NIL
2.4. Ambient Air Quality
23. Ambient air monitoring had been executed as per EMP test frequency. The parameters
measured include PM10, SO2, NO2, CO, CO2, & O2 levels which were compared to NEQS.
Generally PM10 particulate matters parameter had been found exceeding NEQS at the
construction sites due to very fine aggregate loss and heavy traffic volume for which water had
regularly been sprinkled to mitigate particulate material generation. However the concentration of
SO2 and NO2 values fell within NEQS standards.
24. Visible dust and smoke emissions were major aspects air pollution which had been eradicated
as stipulated in EMP. Visual checks of ZKB vehicles had been performed during site visits of N-65
and timely maintenance of vehicles had been done as a preventive measure. ZKB vehicular
emissions along with noise measurement had been carried out regularly to plan a preventive
maintenance program. Water scrubber equipped with the asphalt plant 2 had been operating to
mitigate air pollution. Tests of stack emissions were performed as per EMP requirements. Stack
emission analysis of water scrubber of Asphalt plant 2 had been carried out and results attached.
Stack emission test results of generator of Asphalt plant 2 is appended in table (4). Exceeding dust
Page 15 of 56
emission had been observed at the asphalt plant 2 dust collection system which had been rectified.
Table 4: Stack Emission Results of Generator of Asphalt Plant 2.
TEST METHOD PARAMETERS GENERATOR
DIESEL 350KV
NEQS LIMIT
BY ANALYSER SMOKE ,RINGLEMANN SCALE 2 40% OR 2
D-3685 PARTICULATE MATTER ,mg/Nm3 205 300-500
D-4599 HYDROGEN SULPHIDE, mg/Nm3 NIL 10
BY ANALYSER OXIDES OF SULFER (SO2),mg/Nm3 NIL 10
BY ANALYSER Oxides OF NITROGEN (NOX),mg/Nm3 580 600
BY ANALYSER CARBON MON0 OXIDE(CO),mg/Nm3 250 800
BY ANALYSER CARBON DI-OXIDE ,VOL % 3.82 --
Table 5: Stack Emission Results of Asphalt Plant 2
Test method Parameters Asphalt
Plant NEQS
BY ANALYSER Smoke Ringleman Scale 2 40% or 2
D-3685 Particulate Matter ,mg/Nm3 230 300-500
D-4599 Hydrogen Sulphide ,mg/Nm3 Nil 10
BY ANALYSER Oxides of Sulfur (So2 ),mg/Nm3 814 1700
BY ANALYSER Oxides Of Nitrogen (NOX)mg/Nm3 300 400
BY ANALYSER Carbon Monoxide ,(CO),mg/Nm3 700 800
BY ANALYSER Carbon Di –Oxide, Vol % 5.7 -
Table 6: Ambient Air, Concentration of gases/ particulate maters (PM10
) at various locations along the road alignment at N-65.
Location/Sample #
( km)
PM10, µg/Nm3
analyzer
SO2 µg/Nm3
ISO 4221
NO2 µg/Nm3
ISO 6768
CO, ppm
Temp oC
analyzer
CO2, ppm analyzer
O2, Vol.% analyzer
Humidity
% HR analyz
er
20 +700, Culvert , A-1
180 60 42 NIL -- 108 20.8 25.2
21+700, Culvert, A-2
159 50 36 NIL - 110 20.8 30.2
45+000,Culvert, A-3
170 54 40 NIL -- 140 20.8 29.6
51+100(urban area) A-4
170 64 44 NIL 220 20.9 30.3
55+400 (urban area),A-5
200 66 45 NIL - 170 20.7 30.9
57+ 000(Aggregate), A-6
198 60 43 NIL - 180 20.8 31.0
68+358 (EOP ) , A-7
180 62 46 NIL - 171 20.8 31.9
Page 16 of 56
25. During last six months visible dust particulate matters PM10 at various locations of N-65 were
observed at these location. From km 13 +200 to km 15+000, km 35+000 to km 40+000, km
45+000 to km 46+500, km 55+100 to km 57+100, km 60+800 to km 61+500, km 64+700 to km
65+00, km 67+000 to km 68. The dust re-suspension occurred at some places due to various
construction activities like aggregate laying, asphalt laying etc. Although regular sprinkling of water
had been carried out but the climatic conditions and higher temperatures up to 50 C during the
summer season and dust storms in the project area caused early drying up of land and re-
suspension of particulate matters. Generally gaseous concentrations of NO2, SO2, and O2 at the
road alignment at various locations fall within NEQS limits. Stack emission results of the generator
camp 2 and Asphalt Plant itself conformed to NEQS standards.
Table 7: Soil Testing
Location Description Sample #
WORKSHOP2 ,KM 42+200 GREASE &OIL,WT % 1.048
ASPHALT PLANT2 ,KM42+200 (200)
GREASE &OIL ,WT % 0.476
Generally the oil and grease content of the workshop and asphalt plant is not very significant. 2.5. Flora and Fauna
26. During the reported period no flora and fauna was disturbed due to construction activities of
Contractor and sub-contractors. No mortality of wild animal is reported. No wildlife sanctuary or
protected area lies with in jurisdiction of RoW. Plantation (Shrub Species, Cono carpus
) in the
median carried out on section-I and some parts of Section-II.
2.6. Camp sites
27. Environmental Management of campsite had been undertaken according to the guide lines of
EMMP. After completion of the project and partial handing over to NHA, both campsites will stay
functional for the defects liability period. The rehabilitation / restoration plan of both campsites had
been submitted by the contractor as per discussions with the ADB mission. (Attached as Annex V).
Copy of EMP is made available with incharges of campsite 2. EMP copy has also been provided
to the foremen constructions/site incharges. EMP compliance check list had been maintained by
contractor’s ES to monitor the Environmental compliance of N-65 project and forwarded to the
Page 17 of 56
consultant after up gradation on monthly basis.
28. Environmental Audits and Inspections/joint inspections of road sides and campsites had been
carried out by the contractor and consultant and necessary mitigating actions had been opted in
the light of non-conformities pointed out. During last six months more than (20) Improvement
Action Reports (IARs) have been initiated, out of which more than 99% IARs have been rectified.
29. Work force of M/S LIMAK-JV-ZKB residing at camp2 had been trained on emergency training
and groups of trained workers are available at campsite to tackle any type of emergency including
outbreak of fire, medical emergency, accidental cases etc. Trainings in respect of fire emergency
had been given to maximum employees including use of fire extinguishers, fire emergencies, fire
drills, emergency exists points, emergency / evacuations plan including emergency reporting
procedures, rescue and medical tasks and first aid procedures. Emergency and contingency plan
had been devised and implemented. Fire point # 1, #2 and #3 located near the generator, Asphalt
plant and the workshop had been maintained and upgraded by increasing the quantity of Fire
extinguishers of 6.0 kg from ten to fifteen at each fire point. Similarly the number of sand and water
buckets have been increased from ten to fifteen at the aforementioned fire points as per EMMP. No
smoking signage and other safety signs had been installed at appropriate locations across the
camp.
30. Trainings in respect of precautions to be taken during electric and gas welding and electric
shock emergency rehabilitation had also been given to the workshop welders / helpers. Since start
of project more than 395 employees of ZKB have availed trainings on Environment Health and
Safety.
Safety patrol had been performed on monthly basis participated by Team Leader of O.C, E.S. of
Consultant, S.E. of contractor, Engineers of Consultant and Contractor along with site workers.
Lectures on road safety had been delivered by both E.S. and S.E. of the contractor and the
consultant respectively.
31. Test requirements as detailed in EMP plan had been arranged through authorized laboratory
as per test frequency. These tests includes drinking water quality test at campsites as well as road
site ,also air emission tests and soil quality test were performed and their record is maintained on
the Monthly Environmental Management and Monitoring Report.
32. Public complaint register had been placed at camp 2 to register any grievance regarding
environment etc. from the local settlements, passing by travelers, company employees and
vendors etc. Survey in this respect has also been conducted. Up until completion of the project 40
written and 55 verbal complaints have been registered from various people travelling on N-65
regarding dust emissions and traffic jam at different sections of N-65 which had been dealt with in a
Page 18 of 56
satisfactory manner. Complaints from ZKB employees had also been registered and necessary
action as deem fit had been taken. Local administration had been liaised with in all accidental case
or land issue.
2.7. Borrow Areas
33. All borrow areas are inactive now as the project is almost completed. Borrow areas located at
KM 22+000 (Rafique Khan Borrow) and at 40+700 (Kora khan Borrow), from where A3 material
(sand) had been excavated. These borrow areas are mostly of canal formation. Excavation of sand
from these canals had helped in desalination of canals. The status of borrow areas is up dated in
the monthly monitoring report that verified the compliance of EMP as far as borrows areas’
restoration is concerned. Mostly our borrow areas were located in barren areas, thus no damage
occurred to agricultural land so far the extraction of sand is concerned.
2.8. Safety Provision
34. Necessary safety provisions e.g. safety helmet, safety shoes, gloves, glasses, ear plugs, ear
muffs, dust masks, half masks etc. had been made available to the workforce of ZKB during
construction activities. Work force had worn reflective jackets during working hours. Contractor’s
Accident Prevention Officer had been responsible for the safety of its workers and general public.
Traffic Management Plans had been devised in consultation with the consultant to ensure the
safety of the workers and general public. Safety signs, safety tapes (reflective types) caution
signs/cones had been installed for this purpose as well. Flag men had been deployed at diversions
to control traffic. Contractor’s safety representative ensured daily safety patrolling and endorsed
non -conformities on Daily Safety Patrol and implemented safety plans accordingly.
Page 19 of 56
3. ENVIRONMENTAL MANAGEMENT
35. During the reporting period i.e. from June to December 2014 the following parameters had
been observed strictly for environmental management.
3.1. Field Visits
36. Field visits had been carried out by Environment Specialist during road construction stage of
the project on frequent basis and pros and cons had been identified and discussed with contractor
to overcome the environmental compliance gap. Environmental attributes had been disclosed
before contractor and corrective and preventive actions had been thoroughly discussed. These
field visits related to inspection of EMMP sensitization, road side safety, excavations of borrow pits
& its restoration, campsite management, Asphalt plant effluent treatment facility, Soak pits
construction supporting septic tanks, Weekly EMMP compliance checklist verification,
environmental monitoring and reporting. EALS representative DD (Environment) visited the N-65
during the reporting period and verified the environmental compliance. ADB mission along with
Environmental team had visited N-65 at different occasion during the course the project. ADB
missions visited the project N-65 on multiple occasions. E.g. 17-Feb-2012 to 18-Feb-2012, 17-
May-2012, 12-July-2012, 11-Oct-2012, 01-Feb-2013 to 02-Feb-2013, 10-Apr-2013 to 11-Apr-2013,
04-May-2013 to 07-May-2013, 05-Oct-2013 to 06-Oct-2013, 19-Dec-2013 to 21-Dec-2013 and 27-
Mar-2014 to 28-Mar-2014 and November 2014. Ms. Safia Shafiq (ADB Environmental Consultant)
along with her team had detailed inspection of the compliance of Environmental parameters
against the EMP guidelines. Director Environment Cell NHA (Ms. Fasiah Malik) and Assistant
Director Environment Cell NHA (Mr. Riaz Shah) had also accompanied ADB teams on multiple
occasions. Environment Cell NHA had visited the project on regular basis as well for internal audits
of the environmental compliance. Environment Cell NHA had been reporting to ADB of the
activities and progress of the project regularly. ADB team had been quite satisfied during every visit
with the steps taken towards the EMMP Compliance Accomplishments during the construction
project. Visits of both camp sites and whole project had been carried out along with the ADB team,
client, contractor and consultant. Comprehensive Environmental monitoring had been appreciated
by the ADB mission as the monitoring had been carried out every six month as per ADB guidelines
and reports submitted to client and ADB for their records.
Page 20 of 56
3.2. Environmental Management and Monitoring Plan (EMMP)
37. Environment Management and Monitoring Plan had been prepared by supervisory
consultant (NESPAK). Environment Management and Monitoring Plan (EMMP) is aimed at
mitigating the possible adverse impact of a development project and for ensuring to maintain the
existing environment quality. The Environment Management and Monitoring Plan address all
aspects of planning, construction and operation of project, which are relevant to environment.
Main objective of the EMMP is to identify the project specific activities that would have to be
considered for investigation of the significant adverse impacts and the mitigation measures
required.
38. The Framework of Environment Management and Monitoring Plan (EMMP) includes
identifying and evaluating environmental risk, organizing and managing environmental
responsibilities, evaluating the quality of the environment and determining how it is affected by
the organizational mission and conducting a self-evaluation of the effectiveness of the EMMP in
achieving desired levels of environmental performance.
39. Scope of EMMP encompasses the following areas of concern:
• Civil work for the proposed project
• Operational activities
• Discharges: Effluent and Emissions
• Personal Protective Equipment and Road side safety/workforce safety
• Solid Waste Management and Waste Water Management
• Biological Hazards
• Emergency Response Plans
• Conservation of Flora and Fauna
• Oil Spill/leakages
• Noise Control
• Campsites management
Page 21 of 56
• Air Quality
• Environmental Monitoring, Management and Audit
3.3. Environmental Management Plans
40. Environment Management Plans had been acted upon which include Borrow Pit
Management Plans, Spills Management Plans, Waste Management Plans and Traffic
Management Plans which had been implemented by the contractor. Contractor had been
advised to streamline their road construction activities according to the guidelines of these
plans.
3.4. EMMP Compliance Checklist
41. Simple checklist had been developed to monitor weekly environmental compliance of road
construction project (N-65). The checklist had generally been based on the recommended
mitigations measures given in the EMMP for environmental safeguard at different stages of the
project. Contractor reported its environmental compliance as per checklist in the form of YES
and NO during the reporting month to Environment Specialist (OC). Environment Specialist
verified contractor’s compliance according to the ground realities after site visit. In case, if any
impact happened, corrective action taken had been provided in the remarks column. Latest
EMMP compliance checklist is attached as ANNEX III.
3.5. Environmental Training Sessions
42. Environment training sessions are based on creating awareness among workforce regarding
EMMP and safety regulations during construction activities. Training executed at working sites
of workforce i.e. Store room, Workshop, Asphalt plant etc. Training proliferates the environment
prospects like oil & spillage control, solid waste management, recording of
grievance/complaints, general cleanliness, safety gear etc. Training sessions had been
executed with intervals as per site requirements. Safety provisions communicated among
workforce. They had been instructed to use PPE’s like Safety shoes, gloves, goggles, safety
helmets, dust masks as per nature of their jobs. Environmental training sessions with intervals
had given fruitful results in getting true essence of EMMP compliance.
Page 22 of 56
3.6. Environment Action Plan
43. Environmental Action Plan had been devised after combined visit of NHA executives and
ADB mission. It has been generated on the basis of major environmental issues. Environment
action plan has triggered the environmental compliance activities & helped to meet the
environmental non-conformities within stipulated time period. Environment action plan covered
all the significant & non-significant environmental issues of campsites and road side
construction activities on N-65. All the non-conformities had been rectified as per deadlines.
3.7. Environmental Notification
44. Field visits had been carried out on frequent basis by Environment Specialist. Environmental
non-conformities have been communicated to contractor’s environment representative.
Contractor had been given environmental non-compliance notifications regarding their non-
conformities.
3.8. Environmental Inspections /Audits
45. From June to December 2014, following inspection /audit visits to N-65 were held by NHA /
ADB.
Internal audit carried out by consultant, client and contractor during the month of July, 2014.
Combined visit of NHA/ADB mission and meeting held during the month of November 2014.
Assistant Director Environment NHA visited the project to monitor the implementation of the
Environmental Action Plans.
During all above visits the efforts have been appreciated for the implementation of
Environmental & safety compliance. Non conformities pointed out during these visits have been
rectified as well.
4. Road Safety / Traffic Management
4.1. Safety Provisions
46. The safety of road users and workers is a concern on roads and highways worldwide. Many
accidents happened when traffic has to pass through road construction or maintenance works
every year. There had been close communication between the Contractor and the Client as this
Page 23 of 56
has been one of the main factors for better Safety Management. It has been intended to
reinforce the understanding of the Consultant as well as the Contractor and the Client involved
with construction so that the performance in the Safety Management could be assessed and
suitable measures could be undertaken accordingly. Overall responsibility of implementing
safety provisions during road construction lies with Contractor as per contract.
4.2. Safety at Road Construction
47. Road works operations are being carefully planned and administered to avoid accidents.
Contractor has been advised to submit the site specific Traffic Management Plan. It is being
considered as very important step towards better Safety and Traffic Management across the
project. Effective management is helping to limit the risk of accidental road accidents as follows:
• Traffic control workers have been properly trained. They have been taught where to
stand, how to slow or stop traffic, and how to coordinate public and construction traffic
movements.
• Traffic controllers and general road workers have been provided with suitable
conspicuous clothing to ensure that they can be seen by motorists
• Signs are being kept clean and well maintained so that they could be effective.
• A number of safety measures are being taken to protect both workers and motorists
alike. These include flagging operations; use of concrete median barriers; bright orange
cones and barrels to separate traffic from work space and reduced work zone speed
limits with dedicated police enforcement.
4.3. Safety Management
• Safety Patrol is conducted every month under the supervision of Team Leader where
safety lapses and non-conformities are identified and measures recommended.
• Multimedia briefings have been arranged for the workers and site staff to make them
aware of safe working practices.
• Purpose of safety patrols and briefings have been to involve the workers in decision
making regarding health and safety. This is being proved to be very helpful.
• First aid boxes have been provided for site vehicles and at camp sites for workers to
deal with minor injuries.
Page 24 of 56
• Fire extinguishers have been installed at camp sites.
• PPE’s (Personal Protective Equipment) e.g. Safety Helmet, Safety Shoes, Gloves,
Goggles, Ear Muffs, Face Mask, Safety Vests are provided for the site workers.
• Safety Tool Box Talks (TBTs) Safety Awareness Seminars are conducted for the site on
regular basis.
• Daily site visits are conducted by consultant and contractor representatives to ensure the
health and safety of workers.
• ADB Pakistan Mission visited the N-65 project on 27th
• Contractor is hiring local labor. Hiring of child labor (below 14) and forced labor is
prohibited and no observation in this context.
of February, 2014 to review the
performance of the project. Safety on the project has been found to be satisfactory.
4.4. Traffic Management
• The safe and efficient flow of traffic through work zones is a major concern for health
and safety of employees / public, businesses, and commercial motor carriers. Proper
road maintenance contributes to reliable transport at reduced cost, as there is a direct
link between road condition and vehicle operating costs (VOC). Contractor has been
advised to monitor the effects of the Traffic Management Plan and develop safe systems
of work to prevent any escalation in traffic issues.
• Safety / Traffic Management is the responsibility of the Contractor for project of N-65.
The contractor is required to ensure that all the applicable road safety standards are
complied with during the execution of works, as per Health and Safety (6.7) clause of the
Particular Conditions of Contract.
• As per Traffic Management Works (SP-8) of Special Provisions of the Contract, traffic
must at no cost be hindered or stopped due to construction operations of this Section of
National Highway (N-65).
• It must therefore be mandatory upon the Contractor to plan and get approval from the
Engineer and the local traffic police of a traffic management plan to ensure smooth and
unhindered flow of traffic at all times during the period of construction.
• Contractor’s Accident Prevention Officer is responsible for maintaining safety and
protection against accidents, as per 6.7 (Health and Safety) of General Conditions of
Contract. Accident investigation reports are being prepared in this regard. Contractor
has been advised to carry out risk assessments of high risk activities and permit to work
Page 25 of 56
system should be implemented for activities like hot work, high voltage, excavation, work
at height and complex machinery.
• Road side incident / accidents are being reported by the contractor’s safety worker and
reports submitted to the Engineer’s office immediately as per contract requirement.
• To achieve above objective, it is made sure that all necessary detours, traffic control
devices, traffic signals, flagmen, safety signs, barricades, lighting and other
management tools required for this purpose are provided and maintained by the
Contractor to ensure health and safety of the employees and general public.
• Traffic Management Plans (TMP) are developed and implemented after consultation with
Safety Engineer of consultant as per requirement of EMP.
• The safe and efficient flow of traffic through work zones is a major concern
• Site areas are being cordoned off with reflective / warning tape prior to the start of
construction activity and reflective paint / tape is used to warn the night traffic of
dangers.
• Traffic police and local authorities are coordinated with to implement the traffic
management plan where necessary.
• It is being brought into practice that contractor’s site supervisors ensure that no
construction activities starts without proper safety and traffic management. It is being
assured that the workers wear safety vests and proper PPE during construction activities
and area has been well cordoned off. Site supervisors and workers have been provided
with sufficient PPE for the continuous period of the construction on the project N-65.
• Drums marked with warnings have been installed at appropriate sites.
• Safety Patrol and regular site visits with contractor’s safety specialist have improved the
safety and traffic management across the project.
5. CONCLUSIONS AND RECOMMENDATIONS
Trench at campsite 2 had created environmental issues. Contractor has started the
process to level its surface and stagnant water being drained. As sewage discharged
directly into trench, ground water strata is becoming contaminated. Soak pit has been
constructed to treat sewage waste as water will be receded. Rehabilitation plan has
been submitted by the contractor as well to mitigate the issues of trench.
No surface water contamination is reported due to oil spillages or asphalt laying during
the reporting period.
Page 26 of 56
No flora and fauna is disturbed by the construction activity. No mortality of wild animal is
reported.
Comprehensive environment monitoring executed during reporting period which included
analysis of ambient air, ground water, waste water, stack emissions testing, noise,
vehicle emission testing etc. The parameters have been controlled within NEQS limits
with continual efforts.
No complaints from workforce & communities along with project alignment regarding
road construction activities.
No damage to the agricultural land due to borrow pits or top soil erosion is reported.
Bypass agriculture land owners had been fully compensated by NHA’s resettlement
department. Borrow area used for aquaculture practices after getting desired material.
Road site safety considered to be serious concern along the roads. Contractor is
advised to take road safety a priority, place safety signs (Safety cautions, Safety cones,
Safety tapes, Safety posters etc.). Site specific Traffic Management Plans are being
devised and implemented with the consultation of contractor and consultant.
Contractor has provided PPE’s to workforce and train / motivate them about their use. A
safety culture has been developed among the workforce by regular training sessions.
Regular sprinkling of water had been done at the construction sites, twice a day to avoid
re-suspension of visible dust particulate matters.
Medical facilities had been provided to all work force of M/S LIMAK-JV-ZKB. First aid
boxes provided at camp sites, workshops, asphalt/batching plant and at sites .First aid
boxes were also available in the vehicles of site incharges/site foremen. For major
emergency treatment was given to the workers at the near- by hospitals.
The contractor has employed local labor as much as possible. Contractor has been
made aware about ADB policy that hiring of child labor is strictly prohibited. No child
labor observed.
No complaints regarding transmission of communicable diseases were reported.
Overall no major conflict with the community was observed. Cordial liaison is maintained
with local community.
Health risk assessment of workforce had been planned. Contractor had been advised to
hire services of Doctor for medical checkup of its workforce.
Housekeeping had improved at camp 2 to keep the environment clean and workforce
healthy.
All the excavated areas on the whole project were cordoned off for the safety of the
general public. Whenever an area was observed not being properly cordoned off, the
Page 27 of 56
contractor was issued with a site note for unsafe practices and advised to cordon off the
area immediately.
All the heavy machinery operated with warning sound and beacon while operating to
warn the oncoming traffic. This was implemented across the project.
During the project time total 40 written and 55 verbal complaints were received from the
general public/travelling through N-65, concerning dust and few about traffic congestions
due closure of roads at certain under construction areas, which were entertained by the
contractor. Cordial relationship is maintained with local settlement and no major conflict
was observed regarding environment/or land .All disputed matters were resolved
through arbitration.
For safety of employees the services of Rangers had been hired by the company and
they are on call for any accidental occurrence or matter of traffic blockage or any other
dispute aroused with the local people. A group of Rangers were also deployed at the
Residential camps for security of man and machines.
Non conformities noted by the EH&S Engineer of the contractor, during the Daily
patrolling of N-65 site were endorsed on” Safety format” and necessary mitigating
actions were taken in consultation with the consultant. Joint visits of site were carried out
with the consultant and client as well.
Improvements in environment/safety had been achieved through internal/external audits
observations/non conformities arranged from time to time.
Creating continual proactive and continual change in the EHS (Environment, Health and
Safety) culture was the main focus for the in-time and on-budget completion of the
project. To induce a change in culture, a behavioral change was required and was
achieved by regular monitoring and training provided by the joint efforts of consultant
and contractor.
Overall health and safety conditions across the project site had improved considerably.
There had been zero injury hours for the site workers. Good safety measures adopted
due to continued safety patrols. Issues dealt with and conditions improved across the
project. The culture of the enforcement of safety measures just in time of executives’
visits had been abolished altogether. Implementation of the planned recommendations
and proposals helped the contractor, consultant and the client to move forward towards
achieving the common goal of health and safety management by working together.
Overall ADB’s monitoring had been pivotal in achieving the EMMP compliance goals set
up by ADB for the preservation of the environment during the course of this construction
project.
ADB and client has appraised the role of consultant guiding the contractor in execution
of better environmental practices and safety measures. Project N-65 had been
appraised by the Chairman NHA and ADB for maintaining a safe working environment
for the workers and general public.
Page 28 of 56
ANNEXES
Page 29 of 56
ANNEX 1
SUMMARY OF CONSTRUCTION ACTIVITIES AND
PHYSICAL WORK PROGRESS
SUKKUR - SHIKARPUR - JACCOBABAD PROJECT(N-65)
Physical & Financial Progress
Up to 30th December 2014
Sr.# Description Work Done Value %age
PHYSICAL PROGRESS
Certified Work Done Up to 30th June 2014
1 Work Done
Highway & Structure 8,513,933,085 99.549
%
Grand Total 8,513,933,085 99.549
%
Page 30 of 56
Summary of Construction Activities and Project Progress.
During the previous six months i-e from June to December 2014, following activities have been under progress at ICB5, N-65.
1. Aggregate Base Course laying
2. Prime Coat laying
3. Asphaltic base course laying
4. Excavation of Unsuitable Material
5. Drainage work
6. Bridges construction
7. Stone masonry toe wall
8. Installation of Kerb stones
9. Lane Marking (TP Paint)
10. Cat eyes / studs installation
11. Approach road construction
12. Ancillary works
Page 31 of 56
Restoration / Rehabilitation Plan
For both Camps of N-65
Sukkur~Shikarpur~Jacobabad
Annex-II
Page 32 of 56
List of Abbreviations
ADB Asian Development Bank
BMP Best Management Practices
BBS Behavior Based Safety
CAPA Corrective and Preventive actions
CBOs Community Based Organizations
CO Carbon monoxide
dB deci Bell
DCO District Coordination Officer
DCP Dry Chemical Powder
DPO District Police Officer
DTR Daily Time Register
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EPA Environmental Protection Agency
HSE Health, Safety and Environment
Leq Loudness equivalent
ND Not detectable
NEQS National Environmental Quality Standards
NGVS No guideline values
NHA National Highway Authority
NO2 Nitrogen dioxide
PAPs Project affected persons
ROW Right Of Way
SC Supervision Consultants
SO2 Sulfur dioxide
SSEMP Site Specific Environmental Management Plan
TCF Temporary Construction Facility
TDS Total Dissolved Solids
PM Particulate Matter
PPE Personal Protective Equipment
RD Running distance
RA Risk Assessment
WHO World Health Organization
Page 33 of 56
1. Project Brief
This section is part of National Highway N-65 which connects the province of Sindh with the
province of Balochistan. N-65 starts from Sukkur and terminates at Quetta passing through the
cities of Shikarpur, Jacobabad, Dera Allah Yar Khan and Sibbi. This is a very important link
between the provinces of Sindh and Balochistan. Different sections of N-65 are under
construction. With the improvement of this section, from Sukkur to Jacobabad, trade activities
will be enhanced and the public will be facilitated through considerable amount of savings
against Vehicle Operating Cost. This section passes through flat terrain and through the
agriculture fields. Existing road is 6.0m wide and the same, presently, is being upgraded to four
(4) lane dual carriageway with each side 7.3 m wide along with construction of four (4) lane
bypass for the city of Shikarpur. Detailed Design has been prepared by M/s Loya Associates,
Karachi, whereas the Construction Supervision Consultants are M/s Oriental Consultants
Company (Japan) in association with M/s National Engineering Services Pakistan (Pvt) Limited
(NESPAK), M/s Asif Ali & Associates (AAA), M/s International Consultants (IC) and M/s
National Engineering Corporation (NEC).
2. HSE Management & Monitoring During Restoration of both Camps at N-
65
There are two camp sites for the construction activities of the project. Camp 1 is situated at RD
9+100 and Camp 2 is located at RD 41+200. Both camps are equipped with Asphalt plants,
batching plants, Labs, Workshops, contractor offices and workers’ residences. This Document
provides the Mechanism for the mitigation of HSE related issues of the N-65 Project during the
restoration of these camps.
The Rehabilitation process should form an integral part of site and construction activities. The
Rehabilitation Specialist should therefore be appointed, and on-site at the project construction
inception. The Rehabilitation Specialist would form an integral part of the project team,
attending regular project site meetings and formulating rehabilitation activities.
Risk Assessment of HSE Impacts & Mitigation measures during Restoration Phase is attached as
Annexure.
Page 34 of 56
Location of camp is also attached on next page for general understanding of the temporary
construction facilities.
Page 35 of 56
3.1 Restoration of Campsites at N-65
Campsites rehabilitation shall ensure that all disturbed areas caused by construction and
maintenance activities are restored, leaving a stable environment that is conducive to the
establishment of landscapes characteristic to the area.
The restoration work of temporary construction facilities of site, camps and asphalt plants
including other facilities such as workshops, equipment washing yards, crushing plants, batching
plants and construction material storage areas will be started after the “Defects Liability Period”.
Camps’ restoration will be decided by the Contractor who is also the Landlord.
Following measures would be ensured during restoration of TCFs and will be implemented by
the Contractor to mitigate the temporary and moderate negative HSE impacts:
Demolished and dismantled material will not be stored in sensitive areas i.e. within 500
meters distance from the existing settlements. The material will be stored and located a
new project.
Pollution and spillage will be minimized by utilizing environment friendly practices
during the restoration of campsite.
Demolition and dismantling will be closely supervised monitored by contractor’s safety
representative to avoid any mishap.
Thorough inspection of vehicles and equipment will be carried out prior to start of the
restoration process.
Experienced operators and drivers will be deputed having authorized valid license of
Govt. of Pakistan to conduct the restoration process.
Inspected and verified tools will be used during such process. It will be ensured that the
damaged or homemade tools are not used during restoration of temporary construction
facilities.
If the controls do not eliminate the hazard, appropriate PPE will be provided to workers.
Materials will be properly secured before transportation and will be stored in the yard.
The material storage areas will be away from sensitive areas and shall be sheltered or
sited within hoardings.
All the heavy vehicles entering into the construction site will use the service road. Any
damage caused due to overloading or heavy vehicles shall be borne by the Contractor.
Page 36 of 56
The sites for temporary construction facilities shall be reinstated by the Contractor after
defects Liability Period of the Project.
3.2 TOPSOIL MANAGEMENT
Below are the basic principles and approaches that should be applied to rehabilitation efforts at
the site in order to increase the success and effectiveness of rehabilitation and re-vegetation
activities at the site.
Effective topsoil management is a critical element of rehabilitation, particularly in arid and semi-
arid areas where soil properties are a fundamental determinant of vegetation composition and
abundance.
Topsoil is the top-most layer (0-25cm) of the soil in undisturbed areas. This soil layer is
important as it contains nutrients, organic matter, seeds, micro-organisms fungi and soil
fauna. All these elements are necessary for soil processes such as nutrient cycling and the
growth of new plants. The biologically active upper layer of the soil is fundamental in the
maintenance of the entire ecosystem.
Topsoil will be retained on site in order to be used for site rehabilitation. The correct
handling of the topsoil will be a key element to rehabilitation success. Firstly the correct
depth of topsoil will be excavated. If the excavation is too deep, the topsoil will be mixed
with sterile deeper soil, leading to reduction in nutrient levels and a decline in plant
performance on the soil.
Wherever possible, stripped topsoil will be placed directly onto an area being
rehabilitated. This will avoid stockpiling and double handling of the soil. Topsoil placed
directly onto rehabilitation areas contains viable seed, nutrients and microbes that allow it
to re-vegetate more rapidly than topsoil that has been in stockpile for long periods.
If direct transfer is not possible, the topsoil will be stored separately from other soil heaps
until construction in an area is complete. The soil will not be stored for a long time and
will be used as soon as possible. The longer the topsoil is stored, the more seeds,
microorganisms and soil biota are killed.
Ideally stored topsoil will be used within a month and will not be stored for longer than
three months. In addition, topsoil stores will not be too deep, a maximum depth of 1m is
Page 37 of 56
recommended to avoid compaction and the development of anaerobic conditions within
the soil.
If topsoil had to be stored on a slope then sediment fencing will be used downslope of the
stockpile in order to intercept any sediment and runoff.
Page 38 of 56
HSE Regulations: Risk Assessment
S.# IDENTIFIED HAZARD
CAUSES
(Possible threat that
potentially release a hazard)
CONSEQUENC
ES
(Harm which
could possibly
occur)
RISK
EVALUATION
EXISTING
SAFEGUARDS and
CONTROLS
(For each hazard to
reduce its
probability, severity
or both)
RECOMMENDED ADDITIONAL
(Controls & Corrective measures to eliminate the
hazard or to reduce it to ALARP)
RESIDU
AL
RISKS
(H/M/L)
With
the
control
in place
ACTIO
N BY
PRO
B
SEV RIS
K
1 Slip/trips and
falling personnel
Improper handling
Manually handling
materials Personnel
injury
Property
damage
C 2 M HSE-PPE
PTW
Emergency
Flow Chart
Manual
Handling
Training
Examine size/ weight of object before lifting
and observe correct techniques and posture
(one person can lift maximum 25 kg only).
Do mechanical lifting when possible;
Avoid sharp edges;
Proper housekeeping in the work area;
Unnecessary materials/ tools shall be kept in
the correct storage/store.
Provide barricades around the work area to
prevent entrance of personnel not involved in
activities
Provide warning signs.
Ensure appropriate PPE shall be used. Mechanical handling device shall be used
wherever possible to replace manual
handling.
L CWE
2 Moving parts
Sharp edges
Cold Cutting with
space restrictions
and nearby live
lines;
Personnel
injury
Eye injury
Hand injury Soil
contaminatio
n
C 2 M HSE-PPE
PTW
Cold Work PTW conditions to be strictly
observed;
Ensure barricades and warning signs in place;
Ensure line is secured and properly
supported;
Ensure proper body position for cutting;
Ensure proper cold cutter is utilized;
Contain product seepage ( if any);
Ensure pipe segment is timely removed from
L CWE
RISK ASSESSMENT
Work Location: CAMP, Asphalt Plants(RD 9+100) and (RD 41+200) RA Ref No.: CWE/N65/2014/01 Date: 01-December-2015
Activity – Proposed TCFs’ Rehabilitation / Restoration Plan: Demolishing
and disposal of existing Camps, Dismantling of Asphalt Plant,
Shifting of material
Expected duration to complete
the activity: 75 days
No. of person involved: 30
(approx.)
RA Team Members,
Designation & Signature
Team Leader:
HSE Rep.:
Engineer: Supervisor:
RA Member:
RA Member: RA Member: RA Member: RA Member:
Hazardous Area Classification: N/A
Tools & equipment to be used.
Tag No. for Oil & Gas System
Equipment.
Tools & Equipments to be used
: Hand Tools - Cutting Machine – Generator.-.Air Compressor set - Grinders – Crane -
Trailer - pick up – Trail tractor, Tractor
Annexure-I: Risk Assessment for Restoration of TCFs
Page 39 of 56
HSE Regulations: Risk Assessment
the area;
Ensure to remove sharp edges asap;
Contaminated Soil to be disposed of along
with approved procedures.
3 Fire& Explosion
Splatter/ sparks
Moving parts
Grinding where
cold cutting not
feasible (e.g. limited
clearance) in
presence of space
restrictions and
nearby live lines.
Welding activities
for new line.
Personnel
injury/
Property
damage
Eye injury
Hand
injury
Pollution
C 3 M HSE-PPE
PTW
Fire
Protection
Naked flame PTW conditions to be strictly
observed;
Hot work Habitat Checklist must be signed
and attached to the permit.
Preference to be given to cold-cutting;
Ensure barricades and warning signs in place;
Ensure line is secured and properly
supported;
Ensure proper body position for cutting;
Ensure proper grinder is utilized;
Ensure to remove sharp edges ASAP
All hot works to be contained within the
confines of a fire blanket habitat;
Ensure ventilation of the habitat
Fire watcher to be on stand-by with charged
fire hose;
Fire extinguishers to be at work location Hot work activities close to existing live process
shall be protected with fire retardant habitat /
blanket Supervisor to be present during the works Areas to be clear of flammable / combustible
materials Ensure correct earthling of compressors and
generators Cables shall be tied up properly and neatly to avoid
damage or personal injury (tripping hazard) Ensure double eye protection for welders, grinders
and assistants Scaffolding to be erected by trained scaffolders
and tagged by CWE scaffold inspector Full body harness to be used when working at
height. Tool tie off to be practiced at height Power and lifting equipment to be certified by
CWE
L CWE
4 Falling object
Crane failure
Improper handling
Overloading
Collision with any
existing service/
equipment or
workers
Swinging of the
load and hitting
personnel
Lifting/Over-head
live wires. Crane
operations
Handling of
demolished /
dismantled material
Personnel
injury
Property
damage
C 3 M HSE – PPE
PTW
CWE Lifting Over-head Live Wires to be
implemented and attached.
Crane and lifting gear shall have valid 3rd
Party inspection certificate.
Lifting gear shall be inspected before use
Assign competent and certified riggers;
Crane outriggers to be on firm footing and
fully extended;
No personnel shall work or stand under
suspended load and not be close to the
suspended load free of swinging;
Use minimum 2 ropes to control the load;
Wind speed above 25 knots all the lifting
L CWE
Page 40 of 56
HSE Regulations: Risk Assessment
activities to be stopped ( caution to be applied
while working over 20 knots wind)
Loads to be properly secured on the trailer
during transportation and storing in the yard;
5 Uncontrolled traffic
movement
Vehicles accident
Vehicles/ machinery
movement Injury to
personnel
Property
damage
C 3 M PTW
Flagmen /
banks man
Comply with PTW procedure
Workers must be kept clear off moving
vehicles;
Assignment of banks man wearing reflective
vest for signaling, directions to equipment
operator;
Flagmen must be detailed to control the flow
of vehicles
L CWE
PROCEED THE WORK: NOT TO PROCEED:
Signature of Assessment Team Leader Endorsement by:
--------------------------------------------------------- -----------------------------
----
Job Title: Operation Rep / Site Rep Job Title:
PM
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
41
ORIENTAL CONSULTANTS (OC) AND NATIONAL HIGHWAY AUTHORITY (NHA)
NATIONAL HIGHWAY DEVELOPMENT SECTOR INVESTMENT PROGRAM, CONSTRUCTION
SUPERVISION PACKAGE-2 ADB LOAN NO. 2540-PAK
MONTHLY ENVIRONMENTAL PROGRESS CHECKLIST(December-2014 )
N-65 SUKKUR-SHIKARPUR-JACOBABAD ROAD
A:- Camp Site
Status
Yes /
No
Remarks
1 If copy of the Site specific EMP is provided at
the camp site? YES
Copy has been kept there since start of
project.
2 If contractor provides PPEs to workforce? YES PPEs provided to workforce as per nature of
their jobs.
3 If PPEs are used by workforce? YES Workforce encouraged to use PPEs during
training sessions & site visits.
4 If potable water is available to labor? YES Potable water available for workforce both at
working sites & campsites.
5 If First Aid Kit is provided at campsite? YES Fully equipped First Aid Kits available at
Campsites and Project sites.
6 If campsite trench has been abolished? NO Contractor is in a process of abolishing the
trench as agreed during ADB visit.
7
If contractor maintains Environmental
Monitoring Record and submits monthly
monitoring reports?
YES Proper Environmental record are submitted
and maintained.
8 If contractor maintain Grievances Log and
registers the complaints from community? YES
Log Register is available, No Complaint
Registered, only verbal complaints.
9 If camp area have adequate natural drainage? YES Needs to be improved and maintained
10 If arrangement for proper storage and disposal
for solid waste is planned? YES
Agreement with TMA, Solid waste is
collected by TMA on weekly basis.
11 If Soak Pits have been constructed for
treatment of effluents? YES
Design was approved by the OC ES.
Construction has been completed and soak pit
is working properly.
12 If contractor provides training to workers to
effectively implement project specific EMP? YES Training provided at regular intervals.
13 If contractor prohibits child labor or forced
labor? YES Child labor strictly prohibited at N-65.
14 If contractor encourages hiring of local labor? YES Local labor hired to raise their livelihood.
Annex-III
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
42
15 If contractor properly disposes off debris
materials on approved barren land? YES
Agreement with TMA & collection and
disposal of solid waste in process by TMA
Shikarpur.
16 If there is any complaint regarding
transmission of Communicable diseases. NO
No complaint registered by any worker
infected with any serious disease.
B:- Topsoil Erosion due to Borrow Pits
17 If borrow areas identified have suitable
material and approved by design team? YES
Borrow areas materials have been approved
by Material Engineers.
18 If there is any damage to the agriculture land
due to borrow pits on agriculture land? NO It is a barren area.
19 If top 15 cm are stripped and stockpiled for
redressing? YES
20 If top 0.5 m is stripped of when deep ditching
is carried out? YES
21
If ditch is filled with construction debris and
leveled with stockpiled topsoil layer to
maintain the landscape?
NO Left open on the discretion of the land owner.
22 If borrow area is leased? Whether the land
owner is compensated as per lease agreement? YES
Verbal agreements / written agreements were
settled for some areas however the land
owners are being compensated.
C:- Impact on Vegetation
23 If project activities involve removal of
vegetation cover? NO
Sufficient ROW is available along with road
alignment.
24 If any trees cutting is required on the ROW or
shoulders of the road? NO No tree cutting during reporting period.
D:- Surface and Ground water contamination / Drainage
25
If any surface water or ground water
contamination reported due to oil spillages,
solid waste dumping or asphalt laying?
NO
Biological contamination of ground water due
to stagnant water in trenches reported during
water testing, which will be filled.
E:- Impact on adjacent communities
26
If project activities are displayed at proper
locations and not affecting adjacent
communities?
YES No harmful effect on the adjacent
communities.
27 If any complaint registered in the Grievance
Log NO
Complaint register placed at campsites for
record, but no complaint registered.
F:- Dust generation
28 If there is dust generation during the visual
checks? YES
Visual Dust generated from KM 9+000 TO
KM 10+000 and at KM 33+125 T0 KM
35+550.
29 If proper water sprinkling is done on regular
basis? YES Water bowsers are well maintained.
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
43
30 If there is impact of dust generation on human
settlements? NO Dust is being mitigated by water sprinkling.
G:- Safety impacts due to road constructions
31 If safety signs are properly displayed? YES Safety signs displayed at appropriate
locations.
32 If construction machinery is parked at
designated areas? YES Areas are designated at camp site.
33 If any complaints registered regarding traffic
issues? YES
Only verbal complaints, However mitigating
measures were taken on site.
H:- Noise and Vibration
34 If any complaints due to noise and vibration? NO
35 If vibratory rollers used during road
construction? NO
36 If construction activities are carried out in
daylight to reduce the impact of noise? YES From 8:00 AM to 05:00 PM
I:- Transportation of construction materials
37
If the construction material transported with
appropriate coverage like tarpal or polythene
sheet etc.?
YES
J:- Asphalt plants
38 If asphalt material is taken from existing
approved plants? YES
39 If Asphalt plant wet scrubber working
appropriately to mitigate air pollution? YES
Wet scrubber is operative when hot mix is
being prepared.
40 If any complaint registered about the asphalt
plants? NO
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
44
Annex-IV
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
45
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
46
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
47
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
48
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
49
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
50
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
51
PICTURES
Phot o 1. Asphalt Plant 2, Wat er Scrubber in
operat ion
Phot o 2. Wat er Scrubber of Asphalt Plant
during operat ion. Ef f luent Treat ment in
progress as wel l
Phot o 3. Bat ching Plant of Camp 2.
Phot o 4. Wast e Oil Drums placed on concret e
plat form t o mit igat e t he spil lage of discarded
oil
Annex-V
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
52
Phot o 5. Fire St at ion 1 at Camp 2 near
Workshop
Phot o 6. Fire St at ion 2 at Camp 2 near
Asphalt Plant
Phot o 7. Sampling for Biannual
Environment al Monit oring in progress.
Phot o 8. Sampling Biannual Environment al
Monit oring in progress.
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
53
Phot o 9. Wast e Col lect ion Area maint ained
at Camp 2
Phot o 10. Asphalt plant workers in proper
safet y gear at Asphalt Plan Camp 2.
Phot o 11. Sampling at Asphalt Plant Camp 2
for Biannual Environment al Monit oring in
progress.
Phot o 12. Sampling at Camp 2 for Biannual
Environment al Monit oring in progress.
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
54
Phot o 13. First Aid t raining session wit h t he
help of mult imedia present at ion in progress
Phot o 14. On sit e Tool box Talk by t he
consult ant ’ s Safet y Engineer
Phot o 15. Safet y Engineer of Consult ant
giving lect ure t o sit e engineers regarding
safe working pract ices at Camp 2.
Phot o 16. ADB mission visit of Campsit e 2
wit h Safet y Engineer
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
55
Phot o 17. Road view af t er lane marking and
median plant at ion at KM 6+300.
Phot o 18. Road view af t er lane marking and
median plant at ion. Cono carpus plant ed in
t he median.
Phot o 19. Shrub species Cono carpis
plant ed in t he median
Phot o 20. View of Shikarpur bypass wit h
super elevat ion.
Please consider the ENVIRONMENT before printing this document.
Think Green!!!
Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)
56