pakistan: national highway development sector tranche 2 … · 2015. 1. 29. · 1. introduction 1....

57
Environmental Monitoring Report Bi-annual Report Loan 2540-PAK JulyDecember 2014 Pakistan: National Highway Development Sector Investment ProgramTranche 2 Construction Supervision Package 2 (CSP2) SukkurShikarpurJacobabad Road Project, ICB5 (N65) Prepared by Oriental Consultants Company Limited for the National Highway Authority and the Asian Development Bank.

Upload: others

Post on 19-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Environmental Monitoring Report Bi-annual Report Loan 2540-PAK July–December 2014

Pakistan: National Highway Development Sector

Investment Program–Tranche 2

Construction Supervision Package 2 (CSP–2)

Sukkur–Shikarpur–Jacobabad Road Project, ICB–5

(N–65)

Prepared by Oriental Consultants Company Limited for the National Highway Authority and the

Asian Development Bank.

Page 2: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 2 of 56

CONTENTS

1. INTRODUCTION………...............................................................................................5

1.1 Construction activities of the project………......................................................7

1.2 Project Organization and Environmental Management Team..........................7

1.3 Relationship with the Contractor, owner and lender.........................................8

2. ENVIRONMENTAL MONITORING............................................................................10

2.1 Environmental Monitoring Summary...............................................................10

2.2 Noise………....................................................................................................10

2.3 Ground Water………......................................................................................13

2.4 Ambient Air Quality………..............................................................................14

2.5 Flora and Fauna………..................................................................................16

2.6 Camp Sites………..........................................................................................16

2.7 Borrow Areas ………......................................................................................18

2.8 Safety Provisions……….................................................................................18

3. ENVIRONMENTAL MANAGEMENT………..............................................................19

3.1 Field Visits………............................................................................................19

3.2 Environment Management and Monitoring Plan (EMMP) ……….................. 20

3.3 Environment Management Plans……….........................................................21

3.4 EMP Compliance Checklist………..................................................................21

3.5 Environmental Training………....................................................................... 21

3.6 Environment Action Plan….………................................................................ 22

3.7 Environmental Notifications………................................................................ 22

3.8 Environmental Inspections/Audits……………………………………………….22

4. Road Safety / Traffic Management………........................................................ 22

4.1 Safety Provisions………………………………………………………………….22

4.2 Safety at road construction……………………………………………….……...23

Page 4: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 3 of 56

4.3 Safety Management…………………………….……………………………….…23

4.4 Traffic Management…………………………………………………………….….24

5. CONCLUSIONS AND RECOMMENDATIONS………………………………………….25

Tables

Table 1: Noise Monitoring Results of ZKB operating plants …………………………….12

Table 2: Noise Monitoring Results at various locations along the road alignment …...12

Table 3: Drinking water results of the residential camp 2 & along the road alignment .14

Table 5: Stack emission results of generator of asphalt plant 2 ………………………………15

Table 6: Stack emission results of asphalt plant 2………………………………………...15

Table 7: Ambient air, concentration of gases /particulate matters (PM10) Tests ……..15

Table 8: Soil testing. …………………………………………………………………………16

Figures

Figure.1: Project Map………………………………….………………………………………06

Figure 2: Locations of sampling stations………….…………………………………………11

Figure. 3: Organization Setup for EMMP Implementation………………………………….08

Annexes

I. Summary of Construction activities of the project……….………………………….….29

II. Rehabilitation/Restoration Plans for both Campsites……………………………….….31

III. EMMP Compliance Checklist…………………………………………………………......41

IV. Environmental Monitoring Results………………………………………………………..43

V. Photographs……………………………………………………………………………….. 51

Page 5: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 4 of 56

ABBREVIATIONS

ADB Asian Development Bank

dB Decibel

EALS Environment Afforestation Land Acquisition & Social

EIA Environmental Impact Assessment

EMP Environmental Management Plan

EMMP Environmental Management Monitoring Plan

ES Environment Specialist

SE Safety Engineer

NEQS National Environmental Quality Standard

OC Oriental Consultants Co. Ltd.

REA Rapid Environmental Assessment

W.H.O World Health Organization

PSQCA Pakistan Standards and Quality Control Authority (Drinking Water Quality Standard)

IAR Improvement Action Report

Page 6: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 5 of 56

1. INTRODUCTION

1. This section is part of National Highway N-65 which connects the province of Sindh with the

province of Balochistan. N-65 starts from Sukkur and terminates at Quetta passing through the

cities of Shikarpur, Jacobabad, Dera Allah Yar Khan and Sibbi. This is a very important link

between the provinces of Sindh and Balochistan. Different sections of N-65 are under

construction. With the improvement of this section, from Sukkur to Jacobabad, trade activities

will be enhanced and the public will be facilitated through considerable amount of savings

against Vehicle Operating Cost. This section passes through flat terrain and through the

agriculture fields. Existing road is 6.0m wide and the same, presently, is being upgraded to four

(4) lane dual carriageway with each side 7.3 m wide along with construction of four (4) lane

bypass for the city of Shikarpur. Detailed Design has been prepared by M/s Loya Associates,

Karachi, whereas the Construction Supervision Consultants are M/s Oriental Consultants

Company (Japan) in association with M/s National Engineering Services Pakistan (Pvt) Limited

(NESPAK), M/s Asif Ali & Associates (AAA), M/s International Consultants (IC) and M/s National

Engineering Corporation (NEC).

2. The prime objective of project is to facilitate movement of people and goods transport in

project area and between Sindh and Balochistan Provinces by providing better access and

enhance the efficacy of the existing road network.

3. Project had got the category-A on the basis of screening questions listed in Rapid

Environmental Assessment (REA) checklist. As category-A projects required EIA study to be

executed to propagate the environmental profile of the project vicinity, EIA had been conducted

by NESPAK. Site visits carried out for collecting primary and secondary data to identify and

establish the Corridor of impact and mitigations required to minimize the adverse impacts.

4. This road/highway passes through Sukkur, Shikarpur and Jacobabad Districts. The terrain is

quite flat and leveled. All the three districts have mostly agriculture fields on both sides of the

road. The project area is one of the hottest regions in the country with extremely severe climate,

especially in summer, June and July are the hottest months and December and January are the

coldest months. Project area is irrigated by canals emerging from Guddu Barrage system. Rice

and wheat are the major crops in all three districts. Water table is higher in the project area and

varies from 3 to 20 m at certain locations. Industrial activity in the project area is scarce. The

sources of pollution are the emissions from vehicular movement & Asphalt plant stack

emissions. Large amount of suspended particular matter is generated when the vehicles move

on unpaved shoulders and poorly maintained existing road.

Page 7: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 6 of 56

5. Various probable impacts on the existing resources were studied under the parameters of

change of land use, dismantling of structures, relocation of existing utilities, soil erosion, water

bodies, air pollution, noise, flora and fauna etc. Mitigations measures to eliminate/ minimize

those negative impacts had been proposed to bring them to acceptable level through

implementation of Environmental Management and Monitoring Plans (EMMP).

Page 8: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 7 of 56

1.1. Construction activities of the project.

6. Physical progress achieved till 30 June, 2014 is detailed in Annex-1.

1.2. Project Organization and Environmental Management Team.

7. Overall responsibility for Environmental Management and Monitoring rests with the Environment

Afforestation Land acquisition Social (EALS) of the National Highway Authority, the implementation

agency (IA) which is headed by a Project Director (PD). Contractor is responsible for

implementation whereas the Supervision Consultant (OC) is responsible for monitoring the

implementation. Environmental Protection Agency (EPA) Sindh acts as the overall regulatory body.

8. Environmental monitoring is responsibility of the Oriental Consultants Co. Ltd. Oriental

Consultants has hired services of Environment Specialist (ES) since July, 2012 & Safety Engineer

has been deployed since December, 2012. Contractor is responsible to make sure project activities

are in compliance with the EMMP and fall under NEQS. Contractor has appointed their

environmental specialist since September, 2012. Contractor’s designated environmental

representative is responsible to implement EMMP, prepare environmental compliance reports and

submit to ES of the consultant. ES reviews environmental monitoring reports, ensures that day-to-

day construction activities are carried out in an environmentally sound and sustainable manner. ES

conducts site visit regularly to ensure that EMMP recommendations are implemented in its true

essence. ES reviews environmental safeguard issues of the project and submit monthly

environmental progress report to NHA. ES gives notification to contractor in case of any

environmental non-conformity and recommends mitigating measures to overcome non-

conformities.

9. The organogram for Environmental Management and Monitoring is given on the next page.

Page 9: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 8 of 56

Fig 3: Organogram for implementation of Environmental Management and Monitoring Plan.

1.3 Relationship with the Contractor and the Engineer

10. A good working relationship had been established among the contractor, client and the

consultant during the execution of work at the project. Contractor representatives had been made

aware of the Environmental Management and Monitoring activities. Environmental non-

conformities had been notified to contractor and mitigating measures recommended accordingly.

Camp site management instructions & environment management plans had been passed on to the

contractor to get the realistic results of implementation. Weekly EMP compliance checklist had

been devised by ES and shared with contractor to submit their response to environmental

provisions. Monthly progress report had been submitted to the client (NHA) as part of the Monthly

Progress Report (MPR).

11. The relationship of the contractor with the local communities /lenders and passing by travelers

had been excellent. Up until the completion of the project more than 300 local dwellers have been

Supervisors /

Inspectors

Community

Based

Organizations

Non

Governmental Organizations

Assistant Director (One of each section)

Deputy

Director

(Environment)

Assistant

Director (Env)

Environmental

Specialist Monitoring

Consultant

General Manager (NHA/ADB)

Project Director

(NHA)

Supervision

Consultant (RE)

Deputy Project

Director

Director

(Environment,

Social & Land Resettlement)

Assistant Director

(Social &

Land/Resettlement

Deputy Director

(Social &

Land/Resettlement

Page 10: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 9 of 56

hired by the contractor .These includes drivers, watchman, and skilled and unskilled labor. The

local people had not only availed the chance of employment but also a chance of growth in

technical skills. It is expected that after the completion of this 68.358 Km project the local

communities will get chances not only to promote their business, but to improve health conditions

due to controlled environmental hazards, save travel times and improve their quality of life in

general. It is expected that after completion of this project more than 200,000 local people will be

directly or indirectly benefitted socio-economically.

12. During execution of work, operation of batching plant, asphalt plant or any other construction

activity on road side the contractor (M/S LIMAK–JV–ZKB) has taken care to minimize the impact of

its activities and degraded environment on the local communities, passing by vehicles’ likely to be

affected by the major activities of construction such as widening, earth work, asphalt laying,

aggregate laying or prolonged road closures and diversion of traffic etc. The services of Pak

Rangers had been acquired during road closures and for general safety purposes at road site and

camp site. For traffic management traffic meetings had been held with local traffic police. Different

Traffic Management Plans have been devised by the collaboration of Environmental Specialists of

the consultant and the contractor.

13. Complaints / Grievance Register had been placed and maintained at camp (Km 42+100). It

had been placed for registering any complaints from the local community / passing-by motorist or

any complaint from the local Government agencies regarding environmental pollution etc. Even

contractor’s employees could register their complaints or reservations in this register. All the written

or even verbal complaints had been dealt with by the contractor’s staff on urgent basis by adopting

necessary improvement actions to resolve the matters. Major complaints registered were regarding

dust emission and traffic blockage and some regarding the availability of the basic welfare facilities

for the camp workers.

Page 11: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 10 of 56

2. ENVIRONMENTAL MONITORING

2.1. Environmental Monitoring Summary

14. Comprehensive Environmental monitoring has been carried out during the second week of

December, 2014. Comprehensive environmental monitoring parameters included vehicle emission

testing, noise levels recordings of operating machinery, campsite drinking water facility sampling,

ambient air quality monitoring, generators stack emissions testing and soil testing under the

supervision of contractor’s ES. PERAC Laboratory, Karachi conducted the testing & analysis of

environmental parameters.

2.2. Noise

15. Noise monitoring has been carried out at ten different locations. Results of the noise

monitoring during the last 6 months i.e. from June 2014 to December 2014 revealed that the

average noise level of project was recorded between 74-80dB, which is meeting NEQS. Noise

Monitoring Results of operating plants depicts range (67-79 dB) within NEQS. Therefore noise has

been rated as non-significant environmental impact for N-65 project until EMMP properly followed

by contractor. Noise level of heavy machinery, excavators, rollers, pavers, air blowers and

generators had been checked for noise levels on regular basis by the environmental Engineer of

ZKB and its record had been maintained in the Monthly Environmental and Monitoring Report.

Machinery found with exceeding noise levels than NEQS standard limits are repaired and

maintained and are fixed with air mufflers/ sound attenuators for protection of local settlements.

Contractor workforce had been instructed to use personal protective equipment (PPE’s) like ear

plugs and ear muffs at noise generating sites to abolish the slight effects from noise especially the

dozer operators exposed to noise continuously for more than 08 hour above 85d.B. Grievance had

been recorded from the work force and from the local settlements along with the project alignment

in respect of noise nuisance/Air emission after a survey conducted by the Environmental Engineer

of LIMAK–JV-ZKB in June,2014. So far no major complaint had been recorded regarding noise

pollution. However minor verbal complaint reports were resolved at site.

Camp sites had been established away from the residential areas/Urban vicinities. Contractor had

been strictly instructed to keep their rollers, excavators, pavers, air blowers, vehicles, generators

and other machinery in good condition & contractor had shown compliance in this context. To save

the local settlements from the noise, the heavy machineries had operated only between 08 AM to

05 PM. Noise level measurement of LIMAK–JV-ZKB operating machineries had also been

checked from time to time and necessary mitigating measures were adopted to reduce noise level.

Page 12: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 11 of 56

Page 13: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 12 of 56

Table 1: Noise Monitoring Results of Operating Plants

Sr. No Location Noise level (dB)

1. ASPHALT PLANT 2, KM (42 +100) 78.90

2. BATCHING PLANT 2, KM(42 +100 ) 75.8

3. GENERATOR, PLANT 2 ,KM (42 +100 ) 78.8

4. COMPRESSION TESTING MACHINE LAB (42+100). 66.5

Table 2: Noise and Emission Monitoring Results of Vehicles.

Sr. No Vehicle/Machinery

Smoke Ringlemann Scale –By Analyzer

Carbon Monoxide Vol.%- By Analyzer

NOISE dB (A)

By Analyzer

1 QAC- DUMPER 02 <0.1 87.9

2 JGA-9588 PICKUP SINGLE CABIN

02 <0.1 78.6

3 TKL-666 01 <0.1 72.9

4 TKD-444 TRALLER TWIN TURBO

02 <0.1 78.0

5 BD-1455 PRADO 01 <0.1 75.3

6 CN-1635 DOUBLE CABIN 02 <0.1 72.7

7 TKC-512 SHIFTER TRAILER

02 <0.1 73.6

8 EXCAVATOR EX-200 01 <0.1 81.0

9 QA-775 WATER TANKER 03 <0.1 76.4

10 ARF-2013 SURF ZERO 0.2 67.0

11 ISD-4240 PICKUP DOUBLE CABIN

01 <0.1 74.3

12 WAF-146 DOUBLE CABIN 01 <0.1 68.2

13 PAVER MACHINE SUPER 1800

01 <0.1 78.0

14 TUM DOM MACHINE 01 <0.1 69.0

15 TKN -273 TANKER 01 <0.1 78.5

16. From the above data as well as from the Ambient Noise level taken along the road

alignment/urban areas, conformed to NEQS. Noise level of Generator at the Asphalt plant-2,

revealed that it was within NEQS limits (78.9 dB). During the comprehensive monitoring in

December, 2014, 15 vehicles were measured for ambient noise level measurement at random.

These included some previously tested machinery , paver machine ,tandem, compressors machine

tractor trolley, trailers heavy trucks, double cabin jeeps , water bowsers & road operating

machineries were found conforming to NEQS standards except few which were sent to workshop

for repair and maintenance. Noise parameters of operating machinery had been measured during

Page 14: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 13 of 56

the months of June, July, August, September, October, November and December 2014, were

conforming to NEQS (Ref: Monthly Environmental Management and Monitoring Reports). Noise

levels of operating machineries as checked during comprehensive monitoring in December, 2014

were also found within NEQS limits.

2.3. Ground Water

17. Drinking water requirements of camp 2 had been met with ground water source located at a

distance of 300 meters away from camp 2. Drinking water parameter E.Coli had been analyzed

during the comprehensive Environmental Monitoring of drinking water as per EMMP guide lines. It

had been revealed from the test/ analysis of drinking water of camp site 2 that the Fecal Coli of the

drinking water for camp-2 is Nil and therefore found suitable for drinking and conformed to WHO

guidelines and Pakistan Standards and Quality Control Authority (PSQCA) Drinking Water Quality

Standards.

Potable water had been provided to workers in water coolers to workshop workers and

supervisors, dining halls and at asphalt plants and other areas of the camp 2.

18. To eradicate ground water contamination including protection of land from oil / fuel, concrete

platforms had been constructed at the oil storage areas of at campsite 2 as per EMMP to avoid oil

spillage and leaching in to soil.

19. In order to treat the sewage waste water from campsite toilets, soakage pits had been

constructed and maintained as per approved design. Shallow soakage pits design had been

approved as project lies in high water table vicinity. Asphalt plant effluent treatment had been

operating and maintained to mitigate the harmful effects of the waste water. Trap tanks had been

designed and maintained for vehicle service station effluent treatment. This treatment helped to

reduce oil & grease percolation into the ground water strata and maintain its quality.

20. Awareness training sessions for careful handling of oil grease and tackling of emergency

spillage had been arranged regularly especially for the work force involved in handling oil.

Furthermore fire stations had also been provided near the oil refueling points at Asphalt plant and

near motor workshop. A partition brick wall has been constructed between the operating

generators and the fuel storage tanks of camp 2, to avoid fire emergencies. Fire point 1 near the

fuel refilling point, Fire point 2 of Asphalt plant and Fire point 3 of the motor work shop had been

maintained and upgraded by increasing number of fire extinguishers and there were more than 15

all-purpose fire extinguishers of 6.0 kg each installed at each point.

21. Waste oil Generated from the work shop had been collected regularly and sent to oil collection

Page 15: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 14 of 56

point located near the work shop at camp 2 and ultimately sold out to oil dealers on monthly basis.

Concrete platforms had been built at the oil collection points .Underground oil collectors had also

been provided to these platforms for collection of oil during any spill emergency.

22. Asphalt plant 2 had been installed with water scrubber to control emissions .Waste

water/effluents from the water scrubber got treated in settling tanks and the solid sludge generated

is collected on a concrete platform in 20 plus drums and ultimately collected by TMA twice a week

or as per asphalt plant operation schedule. Waste water from the scrubber had been analyzed on

quarterly basis or upon requirement basis and necessary improvement / corrective action taken in

the light of analysis report, whereas the exceeding parameters had been controlled within NEQS

limits after implementation of maintenance program.

Table 3. Drinking Water Results Of Residential Camp2 and along road alignment N-65.

Sr. No. DESCRIPTION F.E. Coli Count/ml

1 000+500(right side ) ice factory, D/W1 NIL

2 42 +100 (camp -2 ), D/W2 NIL

3 53+300, urban area, Sultan Kot l/s community hand pump , D/W3

NIL

4 Urban area 56+300 R/S, community hand pump, D/W4 NIL

5 Urban area (68 +100), D/W5 NIL

2.4. Ambient Air Quality

23. Ambient air monitoring had been executed as per EMP test frequency. The parameters

measured include PM10, SO2, NO2, CO, CO2, & O2 levels which were compared to NEQS.

Generally PM10 particulate matters parameter had been found exceeding NEQS at the

construction sites due to very fine aggregate loss and heavy traffic volume for which water had

regularly been sprinkled to mitigate particulate material generation. However the concentration of

SO2 and NO2 values fell within NEQS standards.

24. Visible dust and smoke emissions were major aspects air pollution which had been eradicated

as stipulated in EMP. Visual checks of ZKB vehicles had been performed during site visits of N-65

and timely maintenance of vehicles had been done as a preventive measure. ZKB vehicular

emissions along with noise measurement had been carried out regularly to plan a preventive

maintenance program. Water scrubber equipped with the asphalt plant 2 had been operating to

mitigate air pollution. Tests of stack emissions were performed as per EMP requirements. Stack

emission analysis of water scrubber of Asphalt plant 2 had been carried out and results attached.

Stack emission test results of generator of Asphalt plant 2 is appended in table (4). Exceeding dust

Page 16: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 15 of 56

emission had been observed at the asphalt plant 2 dust collection system which had been rectified.

Table 4: Stack Emission Results of Generator of Asphalt Plant 2.

TEST METHOD PARAMETERS GENERATOR

DIESEL 350KV

NEQS LIMIT

BY ANALYSER SMOKE ,RINGLEMANN SCALE 2 40% OR 2

D-3685 PARTICULATE MATTER ,mg/Nm3 205 300-500

D-4599 HYDROGEN SULPHIDE, mg/Nm3 NIL 10

BY ANALYSER OXIDES OF SULFER (SO2),mg/Nm3 NIL 10

BY ANALYSER Oxides OF NITROGEN (NOX),mg/Nm3 580 600

BY ANALYSER CARBON MON0 OXIDE(CO),mg/Nm3 250 800

BY ANALYSER CARBON DI-OXIDE ,VOL % 3.82 --

Table 5: Stack Emission Results of Asphalt Plant 2

Test method Parameters Asphalt

Plant NEQS

BY ANALYSER Smoke Ringleman Scale 2 40% or 2

D-3685 Particulate Matter ,mg/Nm3 230 300-500

D-4599 Hydrogen Sulphide ,mg/Nm3 Nil 10

BY ANALYSER Oxides of Sulfur (So2 ),mg/Nm3 814 1700

BY ANALYSER Oxides Of Nitrogen (NOX)mg/Nm3 300 400

BY ANALYSER Carbon Monoxide ,(CO),mg/Nm3 700 800

BY ANALYSER Carbon Di –Oxide, Vol % 5.7 -

Table 6: Ambient Air, Concentration of gases/ particulate maters (PM10

) at various locations along the road alignment at N-65.

Location/Sample #

( km)

PM10, µg/Nm3

analyzer

SO2 µg/Nm3

ISO 4221

NO2 µg/Nm3

ISO 6768

CO, ppm

Temp oC

analyzer

CO2, ppm analyzer

O2, Vol.% analyzer

Humidity

% HR analyz

er

20 +700, Culvert , A-1

180 60 42 NIL -- 108 20.8 25.2

21+700, Culvert, A-2

159 50 36 NIL - 110 20.8 30.2

45+000,Culvert, A-3

170 54 40 NIL -- 140 20.8 29.6

51+100(urban area) A-4

170 64 44 NIL 220 20.9 30.3

55+400 (urban area),A-5

200 66 45 NIL - 170 20.7 30.9

57+ 000(Aggregate), A-6

198 60 43 NIL - 180 20.8 31.0

68+358 (EOP ) , A-7

180 62 46 NIL - 171 20.8 31.9

Page 17: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 16 of 56

25. During last six months visible dust particulate matters PM10 at various locations of N-65 were

observed at these location. From km 13 +200 to km 15+000, km 35+000 to km 40+000, km

45+000 to km 46+500, km 55+100 to km 57+100, km 60+800 to km 61+500, km 64+700 to km

65+00, km 67+000 to km 68. The dust re-suspension occurred at some places due to various

construction activities like aggregate laying, asphalt laying etc. Although regular sprinkling of water

had been carried out but the climatic conditions and higher temperatures up to 50 C during the

summer season and dust storms in the project area caused early drying up of land and re-

suspension of particulate matters. Generally gaseous concentrations of NO2, SO2, and O2 at the

road alignment at various locations fall within NEQS limits. Stack emission results of the generator

camp 2 and Asphalt Plant itself conformed to NEQS standards.

Table 7: Soil Testing

Location Description Sample #

WORKSHOP2 ,KM 42+200 GREASE &OIL,WT % 1.048

ASPHALT PLANT2 ,KM42+200 (200)

GREASE &OIL ,WT % 0.476

Generally the oil and grease content of the workshop and asphalt plant is not very significant. 2.5. Flora and Fauna

26. During the reported period no flora and fauna was disturbed due to construction activities of

Contractor and sub-contractors. No mortality of wild animal is reported. No wildlife sanctuary or

protected area lies with in jurisdiction of RoW. Plantation (Shrub Species, Cono carpus

) in the

median carried out on section-I and some parts of Section-II.

2.6. Camp sites

27. Environmental Management of campsite had been undertaken according to the guide lines of

EMMP. After completion of the project and partial handing over to NHA, both campsites will stay

functional for the defects liability period. The rehabilitation / restoration plan of both campsites had

been submitted by the contractor as per discussions with the ADB mission. (Attached as Annex V).

Copy of EMP is made available with incharges of campsite 2. EMP copy has also been provided

to the foremen constructions/site incharges. EMP compliance check list had been maintained by

contractor’s ES to monitor the Environmental compliance of N-65 project and forwarded to the

Page 18: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 17 of 56

consultant after up gradation on monthly basis.

28. Environmental Audits and Inspections/joint inspections of road sides and campsites had been

carried out by the contractor and consultant and necessary mitigating actions had been opted in

the light of non-conformities pointed out. During last six months more than (20) Improvement

Action Reports (IARs) have been initiated, out of which more than 99% IARs have been rectified.

29. Work force of M/S LIMAK-JV-ZKB residing at camp2 had been trained on emergency training

and groups of trained workers are available at campsite to tackle any type of emergency including

outbreak of fire, medical emergency, accidental cases etc. Trainings in respect of fire emergency

had been given to maximum employees including use of fire extinguishers, fire emergencies, fire

drills, emergency exists points, emergency / evacuations plan including emergency reporting

procedures, rescue and medical tasks and first aid procedures. Emergency and contingency plan

had been devised and implemented. Fire point # 1, #2 and #3 located near the generator, Asphalt

plant and the workshop had been maintained and upgraded by increasing the quantity of Fire

extinguishers of 6.0 kg from ten to fifteen at each fire point. Similarly the number of sand and water

buckets have been increased from ten to fifteen at the aforementioned fire points as per EMMP. No

smoking signage and other safety signs had been installed at appropriate locations across the

camp.

30. Trainings in respect of precautions to be taken during electric and gas welding and electric

shock emergency rehabilitation had also been given to the workshop welders / helpers. Since start

of project more than 395 employees of ZKB have availed trainings on Environment Health and

Safety.

Safety patrol had been performed on monthly basis participated by Team Leader of O.C, E.S. of

Consultant, S.E. of contractor, Engineers of Consultant and Contractor along with site workers.

Lectures on road safety had been delivered by both E.S. and S.E. of the contractor and the

consultant respectively.

31. Test requirements as detailed in EMP plan had been arranged through authorized laboratory

as per test frequency. These tests includes drinking water quality test at campsites as well as road

site ,also air emission tests and soil quality test were performed and their record is maintained on

the Monthly Environmental Management and Monitoring Report.

32. Public complaint register had been placed at camp 2 to register any grievance regarding

environment etc. from the local settlements, passing by travelers, company employees and

vendors etc. Survey in this respect has also been conducted. Up until completion of the project 40

written and 55 verbal complaints have been registered from various people travelling on N-65

regarding dust emissions and traffic jam at different sections of N-65 which had been dealt with in a

Page 19: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 18 of 56

satisfactory manner. Complaints from ZKB employees had also been registered and necessary

action as deem fit had been taken. Local administration had been liaised with in all accidental case

or land issue.

2.7. Borrow Areas

33. All borrow areas are inactive now as the project is almost completed. Borrow areas located at

KM 22+000 (Rafique Khan Borrow) and at 40+700 (Kora khan Borrow), from where A3 material

(sand) had been excavated. These borrow areas are mostly of canal formation. Excavation of sand

from these canals had helped in desalination of canals. The status of borrow areas is up dated in

the monthly monitoring report that verified the compliance of EMP as far as borrows areas’

restoration is concerned. Mostly our borrow areas were located in barren areas, thus no damage

occurred to agricultural land so far the extraction of sand is concerned.

2.8. Safety Provision

34. Necessary safety provisions e.g. safety helmet, safety shoes, gloves, glasses, ear plugs, ear

muffs, dust masks, half masks etc. had been made available to the workforce of ZKB during

construction activities. Work force had worn reflective jackets during working hours. Contractor’s

Accident Prevention Officer had been responsible for the safety of its workers and general public.

Traffic Management Plans had been devised in consultation with the consultant to ensure the

safety of the workers and general public. Safety signs, safety tapes (reflective types) caution

signs/cones had been installed for this purpose as well. Flag men had been deployed at diversions

to control traffic. Contractor’s safety representative ensured daily safety patrolling and endorsed

non -conformities on Daily Safety Patrol and implemented safety plans accordingly.

Page 20: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 19 of 56

3. ENVIRONMENTAL MANAGEMENT

35. During the reporting period i.e. from June to December 2014 the following parameters had

been observed strictly for environmental management.

3.1. Field Visits

36. Field visits had been carried out by Environment Specialist during road construction stage of

the project on frequent basis and pros and cons had been identified and discussed with contractor

to overcome the environmental compliance gap. Environmental attributes had been disclosed

before contractor and corrective and preventive actions had been thoroughly discussed. These

field visits related to inspection of EMMP sensitization, road side safety, excavations of borrow pits

& its restoration, campsite management, Asphalt plant effluent treatment facility, Soak pits

construction supporting septic tanks, Weekly EMMP compliance checklist verification,

environmental monitoring and reporting. EALS representative DD (Environment) visited the N-65

during the reporting period and verified the environmental compliance. ADB mission along with

Environmental team had visited N-65 at different occasion during the course the project. ADB

missions visited the project N-65 on multiple occasions. E.g. 17-Feb-2012 to 18-Feb-2012, 17-

May-2012, 12-July-2012, 11-Oct-2012, 01-Feb-2013 to 02-Feb-2013, 10-Apr-2013 to 11-Apr-2013,

04-May-2013 to 07-May-2013, 05-Oct-2013 to 06-Oct-2013, 19-Dec-2013 to 21-Dec-2013 and 27-

Mar-2014 to 28-Mar-2014 and November 2014. Ms. Safia Shafiq (ADB Environmental Consultant)

along with her team had detailed inspection of the compliance of Environmental parameters

against the EMP guidelines. Director Environment Cell NHA (Ms. Fasiah Malik) and Assistant

Director Environment Cell NHA (Mr. Riaz Shah) had also accompanied ADB teams on multiple

occasions. Environment Cell NHA had visited the project on regular basis as well for internal audits

of the environmental compliance. Environment Cell NHA had been reporting to ADB of the

activities and progress of the project regularly. ADB team had been quite satisfied during every visit

with the steps taken towards the EMMP Compliance Accomplishments during the construction

project. Visits of both camp sites and whole project had been carried out along with the ADB team,

client, contractor and consultant. Comprehensive Environmental monitoring had been appreciated

by the ADB mission as the monitoring had been carried out every six month as per ADB guidelines

and reports submitted to client and ADB for their records.

Page 21: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 20 of 56

3.2. Environmental Management and Monitoring Plan (EMMP)

37. Environment Management and Monitoring Plan had been prepared by supervisory

consultant (NESPAK). Environment Management and Monitoring Plan (EMMP) is aimed at

mitigating the possible adverse impact of a development project and for ensuring to maintain the

existing environment quality. The Environment Management and Monitoring Plan address all

aspects of planning, construction and operation of project, which are relevant to environment.

Main objective of the EMMP is to identify the project specific activities that would have to be

considered for investigation of the significant adverse impacts and the mitigation measures

required.

38. The Framework of Environment Management and Monitoring Plan (EMMP) includes

identifying and evaluating environmental risk, organizing and managing environmental

responsibilities, evaluating the quality of the environment and determining how it is affected by

the organizational mission and conducting a self-evaluation of the effectiveness of the EMMP in

achieving desired levels of environmental performance.

39. Scope of EMMP encompasses the following areas of concern:

• Civil work for the proposed project

• Operational activities

• Discharges: Effluent and Emissions

• Personal Protective Equipment and Road side safety/workforce safety

• Solid Waste Management and Waste Water Management

• Biological Hazards

• Emergency Response Plans

• Conservation of Flora and Fauna

• Oil Spill/leakages

• Noise Control

• Campsites management

Page 22: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 21 of 56

• Air Quality

• Environmental Monitoring, Management and Audit

3.3. Environmental Management Plans

40. Environment Management Plans had been acted upon which include Borrow Pit

Management Plans, Spills Management Plans, Waste Management Plans and Traffic

Management Plans which had been implemented by the contractor. Contractor had been

advised to streamline their road construction activities according to the guidelines of these

plans.

3.4. EMMP Compliance Checklist

41. Simple checklist had been developed to monitor weekly environmental compliance of road

construction project (N-65). The checklist had generally been based on the recommended

mitigations measures given in the EMMP for environmental safeguard at different stages of the

project. Contractor reported its environmental compliance as per checklist in the form of YES

and NO during the reporting month to Environment Specialist (OC). Environment Specialist

verified contractor’s compliance according to the ground realities after site visit. In case, if any

impact happened, corrective action taken had been provided in the remarks column. Latest

EMMP compliance checklist is attached as ANNEX III.

3.5. Environmental Training Sessions

42. Environment training sessions are based on creating awareness among workforce regarding

EMMP and safety regulations during construction activities. Training executed at working sites

of workforce i.e. Store room, Workshop, Asphalt plant etc. Training proliferates the environment

prospects like oil & spillage control, solid waste management, recording of

grievance/complaints, general cleanliness, safety gear etc. Training sessions had been

executed with intervals as per site requirements. Safety provisions communicated among

workforce. They had been instructed to use PPE’s like Safety shoes, gloves, goggles, safety

helmets, dust masks as per nature of their jobs. Environmental training sessions with intervals

had given fruitful results in getting true essence of EMMP compliance.

Page 23: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 22 of 56

3.6. Environment Action Plan

43. Environmental Action Plan had been devised after combined visit of NHA executives and

ADB mission. It has been generated on the basis of major environmental issues. Environment

action plan has triggered the environmental compliance activities & helped to meet the

environmental non-conformities within stipulated time period. Environment action plan covered

all the significant & non-significant environmental issues of campsites and road side

construction activities on N-65. All the non-conformities had been rectified as per deadlines.

3.7. Environmental Notification

44. Field visits had been carried out on frequent basis by Environment Specialist. Environmental

non-conformities have been communicated to contractor’s environment representative.

Contractor had been given environmental non-compliance notifications regarding their non-

conformities.

3.8. Environmental Inspections /Audits

45. From June to December 2014, following inspection /audit visits to N-65 were held by NHA /

ADB.

Internal audit carried out by consultant, client and contractor during the month of July, 2014.

Combined visit of NHA/ADB mission and meeting held during the month of November 2014.

Assistant Director Environment NHA visited the project to monitor the implementation of the

Environmental Action Plans.

During all above visits the efforts have been appreciated for the implementation of

Environmental & safety compliance. Non conformities pointed out during these visits have been

rectified as well.

4. Road Safety / Traffic Management

4.1. Safety Provisions

46. The safety of road users and workers is a concern on roads and highways worldwide. Many

accidents happened when traffic has to pass through road construction or maintenance works

every year. There had been close communication between the Contractor and the Client as this

Page 24: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 23 of 56

has been one of the main factors for better Safety Management. It has been intended to

reinforce the understanding of the Consultant as well as the Contractor and the Client involved

with construction so that the performance in the Safety Management could be assessed and

suitable measures could be undertaken accordingly. Overall responsibility of implementing

safety provisions during road construction lies with Contractor as per contract.

4.2. Safety at Road Construction

47. Road works operations are being carefully planned and administered to avoid accidents.

Contractor has been advised to submit the site specific Traffic Management Plan. It is being

considered as very important step towards better Safety and Traffic Management across the

project. Effective management is helping to limit the risk of accidental road accidents as follows:

• Traffic control workers have been properly trained. They have been taught where to

stand, how to slow or stop traffic, and how to coordinate public and construction traffic

movements.

• Traffic controllers and general road workers have been provided with suitable

conspicuous clothing to ensure that they can be seen by motorists

• Signs are being kept clean and well maintained so that they could be effective.

• A number of safety measures are being taken to protect both workers and motorists

alike. These include flagging operations; use of concrete median barriers; bright orange

cones and barrels to separate traffic from work space and reduced work zone speed

limits with dedicated police enforcement.

4.3. Safety Management

• Safety Patrol is conducted every month under the supervision of Team Leader where

safety lapses and non-conformities are identified and measures recommended.

• Multimedia briefings have been arranged for the workers and site staff to make them

aware of safe working practices.

• Purpose of safety patrols and briefings have been to involve the workers in decision

making regarding health and safety. This is being proved to be very helpful.

• First aid boxes have been provided for site vehicles and at camp sites for workers to

deal with minor injuries.

Page 25: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 24 of 56

• Fire extinguishers have been installed at camp sites.

• PPE’s (Personal Protective Equipment) e.g. Safety Helmet, Safety Shoes, Gloves,

Goggles, Ear Muffs, Face Mask, Safety Vests are provided for the site workers.

• Safety Tool Box Talks (TBTs) Safety Awareness Seminars are conducted for the site on

regular basis.

• Daily site visits are conducted by consultant and contractor representatives to ensure the

health and safety of workers.

• ADB Pakistan Mission visited the N-65 project on 27th

• Contractor is hiring local labor. Hiring of child labor (below 14) and forced labor is

prohibited and no observation in this context.

of February, 2014 to review the

performance of the project. Safety on the project has been found to be satisfactory.

4.4. Traffic Management

• The safe and efficient flow of traffic through work zones is a major concern for health

and safety of employees / public, businesses, and commercial motor carriers. Proper

road maintenance contributes to reliable transport at reduced cost, as there is a direct

link between road condition and vehicle operating costs (VOC). Contractor has been

advised to monitor the effects of the Traffic Management Plan and develop safe systems

of work to prevent any escalation in traffic issues.

• Safety / Traffic Management is the responsibility of the Contractor for project of N-65.

The contractor is required to ensure that all the applicable road safety standards are

complied with during the execution of works, as per Health and Safety (6.7) clause of the

Particular Conditions of Contract.

• As per Traffic Management Works (SP-8) of Special Provisions of the Contract, traffic

must at no cost be hindered or stopped due to construction operations of this Section of

National Highway (N-65).

• It must therefore be mandatory upon the Contractor to plan and get approval from the

Engineer and the local traffic police of a traffic management plan to ensure smooth and

unhindered flow of traffic at all times during the period of construction.

• Contractor’s Accident Prevention Officer is responsible for maintaining safety and

protection against accidents, as per 6.7 (Health and Safety) of General Conditions of

Contract. Accident investigation reports are being prepared in this regard. Contractor

has been advised to carry out risk assessments of high risk activities and permit to work

Page 26: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 25 of 56

system should be implemented for activities like hot work, high voltage, excavation, work

at height and complex machinery.

• Road side incident / accidents are being reported by the contractor’s safety worker and

reports submitted to the Engineer’s office immediately as per contract requirement.

• To achieve above objective, it is made sure that all necessary detours, traffic control

devices, traffic signals, flagmen, safety signs, barricades, lighting and other

management tools required for this purpose are provided and maintained by the

Contractor to ensure health and safety of the employees and general public.

• Traffic Management Plans (TMP) are developed and implemented after consultation with

Safety Engineer of consultant as per requirement of EMP.

• The safe and efficient flow of traffic through work zones is a major concern

• Site areas are being cordoned off with reflective / warning tape prior to the start of

construction activity and reflective paint / tape is used to warn the night traffic of

dangers.

• Traffic police and local authorities are coordinated with to implement the traffic

management plan where necessary.

• It is being brought into practice that contractor’s site supervisors ensure that no

construction activities starts without proper safety and traffic management. It is being

assured that the workers wear safety vests and proper PPE during construction activities

and area has been well cordoned off. Site supervisors and workers have been provided

with sufficient PPE for the continuous period of the construction on the project N-65.

• Drums marked with warnings have been installed at appropriate sites.

• Safety Patrol and regular site visits with contractor’s safety specialist have improved the

safety and traffic management across the project.

5. CONCLUSIONS AND RECOMMENDATIONS

Trench at campsite 2 had created environmental issues. Contractor has started the

process to level its surface and stagnant water being drained. As sewage discharged

directly into trench, ground water strata is becoming contaminated. Soak pit has been

constructed to treat sewage waste as water will be receded. Rehabilitation plan has

been submitted by the contractor as well to mitigate the issues of trench.

No surface water contamination is reported due to oil spillages or asphalt laying during

the reporting period.

Page 27: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 26 of 56

No flora and fauna is disturbed by the construction activity. No mortality of wild animal is

reported.

Comprehensive environment monitoring executed during reporting period which included

analysis of ambient air, ground water, waste water, stack emissions testing, noise,

vehicle emission testing etc. The parameters have been controlled within NEQS limits

with continual efforts.

No complaints from workforce & communities along with project alignment regarding

road construction activities.

No damage to the agricultural land due to borrow pits or top soil erosion is reported.

Bypass agriculture land owners had been fully compensated by NHA’s resettlement

department. Borrow area used for aquaculture practices after getting desired material.

Road site safety considered to be serious concern along the roads. Contractor is

advised to take road safety a priority, place safety signs (Safety cautions, Safety cones,

Safety tapes, Safety posters etc.). Site specific Traffic Management Plans are being

devised and implemented with the consultation of contractor and consultant.

Contractor has provided PPE’s to workforce and train / motivate them about their use. A

safety culture has been developed among the workforce by regular training sessions.

Regular sprinkling of water had been done at the construction sites, twice a day to avoid

re-suspension of visible dust particulate matters.

Medical facilities had been provided to all work force of M/S LIMAK-JV-ZKB. First aid

boxes provided at camp sites, workshops, asphalt/batching plant and at sites .First aid

boxes were also available in the vehicles of site incharges/site foremen. For major

emergency treatment was given to the workers at the near- by hospitals.

The contractor has employed local labor as much as possible. Contractor has been

made aware about ADB policy that hiring of child labor is strictly prohibited. No child

labor observed.

No complaints regarding transmission of communicable diseases were reported.

Overall no major conflict with the community was observed. Cordial liaison is maintained

with local community.

Health risk assessment of workforce had been planned. Contractor had been advised to

hire services of Doctor for medical checkup of its workforce.

Housekeeping had improved at camp 2 to keep the environment clean and workforce

healthy.

All the excavated areas on the whole project were cordoned off for the safety of the

general public. Whenever an area was observed not being properly cordoned off, the

Page 28: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 27 of 56

contractor was issued with a site note for unsafe practices and advised to cordon off the

area immediately.

All the heavy machinery operated with warning sound and beacon while operating to

warn the oncoming traffic. This was implemented across the project.

During the project time total 40 written and 55 verbal complaints were received from the

general public/travelling through N-65, concerning dust and few about traffic congestions

due closure of roads at certain under construction areas, which were entertained by the

contractor. Cordial relationship is maintained with local settlement and no major conflict

was observed regarding environment/or land .All disputed matters were resolved

through arbitration.

For safety of employees the services of Rangers had been hired by the company and

they are on call for any accidental occurrence or matter of traffic blockage or any other

dispute aroused with the local people. A group of Rangers were also deployed at the

Residential camps for security of man and machines.

Non conformities noted by the EH&S Engineer of the contractor, during the Daily

patrolling of N-65 site were endorsed on” Safety format” and necessary mitigating

actions were taken in consultation with the consultant. Joint visits of site were carried out

with the consultant and client as well.

Improvements in environment/safety had been achieved through internal/external audits

observations/non conformities arranged from time to time.

Creating continual proactive and continual change in the EHS (Environment, Health and

Safety) culture was the main focus for the in-time and on-budget completion of the

project. To induce a change in culture, a behavioral change was required and was

achieved by regular monitoring and training provided by the joint efforts of consultant

and contractor.

Overall health and safety conditions across the project site had improved considerably.

There had been zero injury hours for the site workers. Good safety measures adopted

due to continued safety patrols. Issues dealt with and conditions improved across the

project. The culture of the enforcement of safety measures just in time of executives’

visits had been abolished altogether. Implementation of the planned recommendations

and proposals helped the contractor, consultant and the client to move forward towards

achieving the common goal of health and safety management by working together.

Overall ADB’s monitoring had been pivotal in achieving the EMMP compliance goals set

up by ADB for the preservation of the environment during the course of this construction

project.

ADB and client has appraised the role of consultant guiding the contractor in execution

of better environmental practices and safety measures. Project N-65 had been

appraised by the Chairman NHA and ADB for maintaining a safe working environment

for the workers and general public.

Page 29: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 28 of 56

ANNEXES

Page 30: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 29 of 56

ANNEX 1

SUMMARY OF CONSTRUCTION ACTIVITIES AND

PHYSICAL WORK PROGRESS

SUKKUR - SHIKARPUR - JACCOBABAD PROJECT(N-65)

Physical & Financial Progress

Up to 30th December 2014

Sr.# Description Work Done Value %age

PHYSICAL PROGRESS

Certified Work Done Up to 30th June 2014

1 Work Done

Highway & Structure 8,513,933,085 99.549

%

Grand Total 8,513,933,085 99.549

%

Page 31: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 30 of 56

Summary of Construction Activities and Project Progress.

During the previous six months i-e from June to December 2014, following activities have been under progress at ICB5, N-65.

1. Aggregate Base Course laying

2. Prime Coat laying

3. Asphaltic base course laying

4. Excavation of Unsuitable Material

5. Drainage work

6. Bridges construction

7. Stone masonry toe wall

8. Installation of Kerb stones

9. Lane Marking (TP Paint)

10. Cat eyes / studs installation

11. Approach road construction

12. Ancillary works

Page 32: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 31 of 56

Restoration / Rehabilitation Plan

For both Camps of N-65

Sukkur~Shikarpur~Jacobabad

Annex-II

Page 33: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 32 of 56

List of Abbreviations

ADB Asian Development Bank

BMP Best Management Practices

BBS Behavior Based Safety

CAPA Corrective and Preventive actions

CBOs Community Based Organizations

CO Carbon monoxide

dB deci Bell

DCO District Coordination Officer

DCP Dry Chemical Powder

DPO District Police Officer

DTR Daily Time Register

EIA Environmental Impact Assessment

EMP Environmental Management Plan

EPA Environmental Protection Agency

HSE Health, Safety and Environment

Leq Loudness equivalent

ND Not detectable

NEQS National Environmental Quality Standards

NGVS No guideline values

NHA National Highway Authority

NO2 Nitrogen dioxide

PAPs Project affected persons

ROW Right Of Way

SC Supervision Consultants

SO2 Sulfur dioxide

SSEMP Site Specific Environmental Management Plan

TCF Temporary Construction Facility

TDS Total Dissolved Solids

PM Particulate Matter

PPE Personal Protective Equipment

RD Running distance

RA Risk Assessment

WHO World Health Organization

Page 34: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 33 of 56

1. Project Brief

This section is part of National Highway N-65 which connects the province of Sindh with the

province of Balochistan. N-65 starts from Sukkur and terminates at Quetta passing through the

cities of Shikarpur, Jacobabad, Dera Allah Yar Khan and Sibbi. This is a very important link

between the provinces of Sindh and Balochistan. Different sections of N-65 are under

construction. With the improvement of this section, from Sukkur to Jacobabad, trade activities

will be enhanced and the public will be facilitated through considerable amount of savings

against Vehicle Operating Cost. This section passes through flat terrain and through the

agriculture fields. Existing road is 6.0m wide and the same, presently, is being upgraded to four

(4) lane dual carriageway with each side 7.3 m wide along with construction of four (4) lane

bypass for the city of Shikarpur. Detailed Design has been prepared by M/s Loya Associates,

Karachi, whereas the Construction Supervision Consultants are M/s Oriental Consultants

Company (Japan) in association with M/s National Engineering Services Pakistan (Pvt) Limited

(NESPAK), M/s Asif Ali & Associates (AAA), M/s International Consultants (IC) and M/s

National Engineering Corporation (NEC).

2. HSE Management & Monitoring During Restoration of both Camps at N-

65

There are two camp sites for the construction activities of the project. Camp 1 is situated at RD

9+100 and Camp 2 is located at RD 41+200. Both camps are equipped with Asphalt plants,

batching plants, Labs, Workshops, contractor offices and workers’ residences. This Document

provides the Mechanism for the mitigation of HSE related issues of the N-65 Project during the

restoration of these camps.

The Rehabilitation process should form an integral part of site and construction activities. The

Rehabilitation Specialist should therefore be appointed, and on-site at the project construction

inception. The Rehabilitation Specialist would form an integral part of the project team,

attending regular project site meetings and formulating rehabilitation activities.

Risk Assessment of HSE Impacts & Mitigation measures during Restoration Phase is attached as

Annexure.

Page 35: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 34 of 56

Location of camp is also attached on next page for general understanding of the temporary

construction facilities.

Page 36: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 35 of 56

3.1 Restoration of Campsites at N-65

Campsites rehabilitation shall ensure that all disturbed areas caused by construction and

maintenance activities are restored, leaving a stable environment that is conducive to the

establishment of landscapes characteristic to the area.

The restoration work of temporary construction facilities of site, camps and asphalt plants

including other facilities such as workshops, equipment washing yards, crushing plants, batching

plants and construction material storage areas will be started after the “Defects Liability Period”.

Camps’ restoration will be decided by the Contractor who is also the Landlord.

Following measures would be ensured during restoration of TCFs and will be implemented by

the Contractor to mitigate the temporary and moderate negative HSE impacts:

Demolished and dismantled material will not be stored in sensitive areas i.e. within 500

meters distance from the existing settlements. The material will be stored and located a

new project.

Pollution and spillage will be minimized by utilizing environment friendly practices

during the restoration of campsite.

Demolition and dismantling will be closely supervised monitored by contractor’s safety

representative to avoid any mishap.

Thorough inspection of vehicles and equipment will be carried out prior to start of the

restoration process.

Experienced operators and drivers will be deputed having authorized valid license of

Govt. of Pakistan to conduct the restoration process.

Inspected and verified tools will be used during such process. It will be ensured that the

damaged or homemade tools are not used during restoration of temporary construction

facilities.

If the controls do not eliminate the hazard, appropriate PPE will be provided to workers.

Materials will be properly secured before transportation and will be stored in the yard.

The material storage areas will be away from sensitive areas and shall be sheltered or

sited within hoardings.

All the heavy vehicles entering into the construction site will use the service road. Any

damage caused due to overloading or heavy vehicles shall be borne by the Contractor.

Page 37: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 36 of 56

The sites for temporary construction facilities shall be reinstated by the Contractor after

defects Liability Period of the Project.

3.2 TOPSOIL MANAGEMENT

Below are the basic principles and approaches that should be applied to rehabilitation efforts at

the site in order to increase the success and effectiveness of rehabilitation and re-vegetation

activities at the site.

Effective topsoil management is a critical element of rehabilitation, particularly in arid and semi-

arid areas where soil properties are a fundamental determinant of vegetation composition and

abundance.

Topsoil is the top-most layer (0-25cm) of the soil in undisturbed areas. This soil layer is

important as it contains nutrients, organic matter, seeds, micro-organisms fungi and soil

fauna. All these elements are necessary for soil processes such as nutrient cycling and the

growth of new plants. The biologically active upper layer of the soil is fundamental in the

maintenance of the entire ecosystem.

Topsoil will be retained on site in order to be used for site rehabilitation. The correct

handling of the topsoil will be a key element to rehabilitation success. Firstly the correct

depth of topsoil will be excavated. If the excavation is too deep, the topsoil will be mixed

with sterile deeper soil, leading to reduction in nutrient levels and a decline in plant

performance on the soil.

Wherever possible, stripped topsoil will be placed directly onto an area being

rehabilitated. This will avoid stockpiling and double handling of the soil. Topsoil placed

directly onto rehabilitation areas contains viable seed, nutrients and microbes that allow it

to re-vegetate more rapidly than topsoil that has been in stockpile for long periods.

If direct transfer is not possible, the topsoil will be stored separately from other soil heaps

until construction in an area is complete. The soil will not be stored for a long time and

will be used as soon as possible. The longer the topsoil is stored, the more seeds,

microorganisms and soil biota are killed.

Ideally stored topsoil will be used within a month and will not be stored for longer than

three months. In addition, topsoil stores will not be too deep, a maximum depth of 1m is

Page 38: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 37 of 56

recommended to avoid compaction and the development of anaerobic conditions within

the soil.

If topsoil had to be stored on a slope then sediment fencing will be used downslope of the

stockpile in order to intercept any sediment and runoff.

Page 39: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 38 of 56

HSE Regulations: Risk Assessment

S.# IDENTIFIED HAZARD

CAUSES

(Possible threat that

potentially release a hazard)

CONSEQUENC

ES

(Harm which

could possibly

occur)

RISK

EVALUATION

EXISTING

SAFEGUARDS and

CONTROLS

(For each hazard to

reduce its

probability, severity

or both)

RECOMMENDED ADDITIONAL

(Controls & Corrective measures to eliminate the

hazard or to reduce it to ALARP)

RESIDU

AL

RISKS

(H/M/L)

With

the

control

in place

ACTIO

N BY

PRO

B

SEV RIS

K

1 Slip/trips and

falling personnel

Improper handling

Manually handling

materials Personnel

injury

Property

damage

C 2 M HSE-PPE

PTW

Emergency

Flow Chart

Manual

Handling

Training

Examine size/ weight of object before lifting

and observe correct techniques and posture

(one person can lift maximum 25 kg only).

Do mechanical lifting when possible;

Avoid sharp edges;

Proper housekeeping in the work area;

Unnecessary materials/ tools shall be kept in

the correct storage/store.

Provide barricades around the work area to

prevent entrance of personnel not involved in

activities

Provide warning signs.

Ensure appropriate PPE shall be used. Mechanical handling device shall be used

wherever possible to replace manual

handling.

L CWE

2 Moving parts

Sharp edges

Cold Cutting with

space restrictions

and nearby live

lines;

Personnel

injury

Eye injury

Hand injury Soil

contaminatio

n

C 2 M HSE-PPE

PTW

Cold Work PTW conditions to be strictly

observed;

Ensure barricades and warning signs in place;

Ensure line is secured and properly

supported;

Ensure proper body position for cutting;

Ensure proper cold cutter is utilized;

Contain product seepage ( if any);

Ensure pipe segment is timely removed from

L CWE

RISK ASSESSMENT

Work Location: CAMP, Asphalt Plants(RD 9+100) and (RD 41+200) RA Ref No.: CWE/N65/2014/01 Date: 01-December-2015

Activity – Proposed TCFs’ Rehabilitation / Restoration Plan: Demolishing

and disposal of existing Camps, Dismantling of Asphalt Plant,

Shifting of material

Expected duration to complete

the activity: 75 days

No. of person involved: 30

(approx.)

RA Team Members,

Designation & Signature

Team Leader:

HSE Rep.:

Engineer: Supervisor:

RA Member:

RA Member: RA Member: RA Member: RA Member:

Hazardous Area Classification: N/A

Tools & equipment to be used.

Tag No. for Oil & Gas System

Equipment.

Tools & Equipments to be used

: Hand Tools - Cutting Machine – Generator.-.Air Compressor set - Grinders – Crane -

Trailer - pick up – Trail tractor, Tractor

Annexure-I: Risk Assessment for Restoration of TCFs

Page 40: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 39 of 56

HSE Regulations: Risk Assessment

the area;

Ensure to remove sharp edges asap;

Contaminated Soil to be disposed of along

with approved procedures.

3 Fire& Explosion

Splatter/ sparks

Moving parts

Grinding where

cold cutting not

feasible (e.g. limited

clearance) in

presence of space

restrictions and

nearby live lines.

Welding activities

for new line.

Personnel

injury/

Property

damage

Eye injury

Hand

injury

Pollution

C 3 M HSE-PPE

PTW

Fire

Protection

Naked flame PTW conditions to be strictly

observed;

Hot work Habitat Checklist must be signed

and attached to the permit.

Preference to be given to cold-cutting;

Ensure barricades and warning signs in place;

Ensure line is secured and properly

supported;

Ensure proper body position for cutting;

Ensure proper grinder is utilized;

Ensure to remove sharp edges ASAP

All hot works to be contained within the

confines of a fire blanket habitat;

Ensure ventilation of the habitat

Fire watcher to be on stand-by with charged

fire hose;

Fire extinguishers to be at work location Hot work activities close to existing live process

shall be protected with fire retardant habitat /

blanket Supervisor to be present during the works Areas to be clear of flammable / combustible

materials Ensure correct earthling of compressors and

generators Cables shall be tied up properly and neatly to avoid

damage or personal injury (tripping hazard) Ensure double eye protection for welders, grinders

and assistants Scaffolding to be erected by trained scaffolders

and tagged by CWE scaffold inspector Full body harness to be used when working at

height. Tool tie off to be practiced at height Power and lifting equipment to be certified by

CWE

L CWE

4 Falling object

Crane failure

Improper handling

Overloading

Collision with any

existing service/

equipment or

workers

Swinging of the

load and hitting

personnel

Lifting/Over-head

live wires. Crane

operations

Handling of

demolished /

dismantled material

Personnel

injury

Property

damage

C 3 M HSE – PPE

PTW

CWE Lifting Over-head Live Wires to be

implemented and attached.

Crane and lifting gear shall have valid 3rd

Party inspection certificate.

Lifting gear shall be inspected before use

Assign competent and certified riggers;

Crane outriggers to be on firm footing and

fully extended;

No personnel shall work or stand under

suspended load and not be close to the

suspended load free of swinging;

Use minimum 2 ropes to control the load;

Wind speed above 25 knots all the lifting

L CWE

Page 41: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Page 40 of 56

HSE Regulations: Risk Assessment

activities to be stopped ( caution to be applied

while working over 20 knots wind)

Loads to be properly secured on the trailer

during transportation and storing in the yard;

5 Uncontrolled traffic

movement

Vehicles accident

Vehicles/ machinery

movement Injury to

personnel

Property

damage

C 3 M PTW

Flagmen /

banks man

Comply with PTW procedure

Workers must be kept clear off moving

vehicles;

Assignment of banks man wearing reflective

vest for signaling, directions to equipment

operator;

Flagmen must be detailed to control the flow

of vehicles

L CWE

PROCEED THE WORK: NOT TO PROCEED:

Signature of Assessment Team Leader Endorsement by:

--------------------------------------------------------- -----------------------------

----

Job Title: Operation Rep / Site Rep Job Title:

PM

Page 42: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

41

ORIENTAL CONSULTANTS (OC) AND NATIONAL HIGHWAY AUTHORITY (NHA)

NATIONAL HIGHWAY DEVELOPMENT SECTOR INVESTMENT PROGRAM, CONSTRUCTION

SUPERVISION PACKAGE-2 ADB LOAN NO. 2540-PAK

MONTHLY ENVIRONMENTAL PROGRESS CHECKLIST(December-2014 )

N-65 SUKKUR-SHIKARPUR-JACOBABAD ROAD

A:- Camp Site

Status

Yes /

No

Remarks

1 If copy of the Site specific EMP is provided at

the camp site? YES

Copy has been kept there since start of

project.

2 If contractor provides PPEs to workforce? YES PPEs provided to workforce as per nature of

their jobs.

3 If PPEs are used by workforce? YES Workforce encouraged to use PPEs during

training sessions & site visits.

4 If potable water is available to labor? YES Potable water available for workforce both at

working sites & campsites.

5 If First Aid Kit is provided at campsite? YES Fully equipped First Aid Kits available at

Campsites and Project sites.

6 If campsite trench has been abolished? NO Contractor is in a process of abolishing the

trench as agreed during ADB visit.

7

If contractor maintains Environmental

Monitoring Record and submits monthly

monitoring reports?

YES Proper Environmental record are submitted

and maintained.

8 If contractor maintain Grievances Log and

registers the complaints from community? YES

Log Register is available, No Complaint

Registered, only verbal complaints.

9 If camp area have adequate natural drainage? YES Needs to be improved and maintained

10 If arrangement for proper storage and disposal

for solid waste is planned? YES

Agreement with TMA, Solid waste is

collected by TMA on weekly basis.

11 If Soak Pits have been constructed for

treatment of effluents? YES

Design was approved by the OC ES.

Construction has been completed and soak pit

is working properly.

12 If contractor provides training to workers to

effectively implement project specific EMP? YES Training provided at regular intervals.

13 If contractor prohibits child labor or forced

labor? YES Child labor strictly prohibited at N-65.

14 If contractor encourages hiring of local labor? YES Local labor hired to raise their livelihood.

Annex-III

Page 43: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

42

15 If contractor properly disposes off debris

materials on approved barren land? YES

Agreement with TMA & collection and

disposal of solid waste in process by TMA

Shikarpur.

16 If there is any complaint regarding

transmission of Communicable diseases. NO

No complaint registered by any worker

infected with any serious disease.

B:- Topsoil Erosion due to Borrow Pits

17 If borrow areas identified have suitable

material and approved by design team? YES

Borrow areas materials have been approved

by Material Engineers.

18 If there is any damage to the agriculture land

due to borrow pits on agriculture land? NO It is a barren area.

19 If top 15 cm are stripped and stockpiled for

redressing? YES

20 If top 0.5 m is stripped of when deep ditching

is carried out? YES

21

If ditch is filled with construction debris and

leveled with stockpiled topsoil layer to

maintain the landscape?

NO Left open on the discretion of the land owner.

22 If borrow area is leased? Whether the land

owner is compensated as per lease agreement? YES

Verbal agreements / written agreements were

settled for some areas however the land

owners are being compensated.

C:- Impact on Vegetation

23 If project activities involve removal of

vegetation cover? NO

Sufficient ROW is available along with road

alignment.

24 If any trees cutting is required on the ROW or

shoulders of the road? NO No tree cutting during reporting period.

D:- Surface and Ground water contamination / Drainage

25

If any surface water or ground water

contamination reported due to oil spillages,

solid waste dumping or asphalt laying?

NO

Biological contamination of ground water due

to stagnant water in trenches reported during

water testing, which will be filled.

E:- Impact on adjacent communities

26

If project activities are displayed at proper

locations and not affecting adjacent

communities?

YES No harmful effect on the adjacent

communities.

27 If any complaint registered in the Grievance

Log NO

Complaint register placed at campsites for

record, but no complaint registered.

F:- Dust generation

28 If there is dust generation during the visual

checks? YES

Visual Dust generated from KM 9+000 TO

KM 10+000 and at KM 33+125 T0 KM

35+550.

29 If proper water sprinkling is done on regular

basis? YES Water bowsers are well maintained.

Page 44: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

43

30 If there is impact of dust generation on human

settlements? NO Dust is being mitigated by water sprinkling.

G:- Safety impacts due to road constructions

31 If safety signs are properly displayed? YES Safety signs displayed at appropriate

locations.

32 If construction machinery is parked at

designated areas? YES Areas are designated at camp site.

33 If any complaints registered regarding traffic

issues? YES

Only verbal complaints, However mitigating

measures were taken on site.

H:- Noise and Vibration

34 If any complaints due to noise and vibration? NO

35 If vibratory rollers used during road

construction? NO

36 If construction activities are carried out in

daylight to reduce the impact of noise? YES From 8:00 AM to 05:00 PM

I:- Transportation of construction materials

37

If the construction material transported with

appropriate coverage like tarpal or polythene

sheet etc.?

YES

J:- Asphalt plants

38 If asphalt material is taken from existing

approved plants? YES

39 If Asphalt plant wet scrubber working

appropriately to mitigate air pollution? YES

Wet scrubber is operative when hot mix is

being prepared.

40 If any complaint registered about the asphalt

plants? NO

Page 45: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

44

Annex-IV

Page 46: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

45

Page 47: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

46

Page 48: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

47

Page 49: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

48

Page 50: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

49

Page 51: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

50

Page 52: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

51

PICTURES

Phot o 1. Asphalt Plant 2, Wat er Scrubber in

operat ion

Phot o 2. Wat er Scrubber of Asphalt Plant

during operat ion. Ef f luent Treat ment in

progress as wel l

Phot o 3. Bat ching Plant of Camp 2.

Phot o 4. Wast e Oil Drums placed on concret e

plat form t o mit igat e t he spil lage of discarded

oil

Annex-V

Page 53: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

52

Phot o 5. Fire St at ion 1 at Camp 2 near

Workshop

Phot o 6. Fire St at ion 2 at Camp 2 near

Asphalt Plant

Phot o 7. Sampling for Biannual

Environment al Monit oring in progress.

Phot o 8. Sampling Biannual Environment al

Monit oring in progress.

Page 54: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

53

Phot o 9. Wast e Col lect ion Area maint ained

at Camp 2

Phot o 10. Asphalt plant workers in proper

safet y gear at Asphalt Plan Camp 2.

Phot o 11. Sampling at Asphalt Plant Camp 2

for Biannual Environment al Monit oring in

progress.

Phot o 12. Sampling at Camp 2 for Biannual

Environment al Monit oring in progress.

Page 55: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

54

Phot o 13. First Aid t raining session wit h t he

help of mult imedia present at ion in progress

Phot o 14. On sit e Tool box Talk by t he

consult ant ’ s Safet y Engineer

Phot o 15. Safet y Engineer of Consult ant

giving lect ure t o sit e engineers regarding

safe working pract ices at Camp 2.

Phot o 16. ADB mission visit of Campsit e 2

wit h Safet y Engineer

Page 56: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

55

Phot o 17. Road view af t er lane marking and

median plant at ion at KM 6+300.

Phot o 18. Road view af t er lane marking and

median plant at ion. Cono carpus plant ed in

t he median.

Phot o 19. Shrub species Cono carpis

plant ed in t he median

Phot o 20. View of Shikarpur bypass wit h

super elevat ion.

Please consider the ENVIRONMENT before printing this document.

Think Green!!!

Page 57: Pakistan: National Highway Development Sector Tranche 2 … · 2015. 1. 29. · 1. INTRODUCTION 1. This section is part of National Highway N-65 which connects the province of Sindh

Sukkur-Jacobabad (N-65) Biannual Environmental Report (June-December, 2014)

56