paghahanda ng planosa isang gawain
DESCRIPTION
planoTRANSCRIPT
E P P
5
Modified In-School Off-School Approach Modules (MISOSA)
Distance Education for Elementary Schools
SELF-INSTRUCTIONAL MATERIALS
PAGHAHANDA NG PLANO SA ISANG GAWAIN
Department of Education
BUREAU OF ELEMENTARY EDUCATION 2nd Floor Bonifacio Building DepEd Complex, Meralco Avenue Pasig City
Revised 2010 by the Learning Resource Management and Development System (LRMDS),
DepEd - Division of Negros Occidental under the Strengthening the Implementation of Basic Education
in Selected Provinces in the Visayas (STRIVE).
This edition has been revised with permission for online distribution through the Learning Resource Management Development System (LRMDS) Portal (http://lrmds.deped.gov.ph/) under Project STRIVE for BESRA, a project supported by AusAID.
Section 9 of Presidential Decree No. 49 provides: “No copyright shall subsist in any work of the Government of the Republic of the Philippines. However, prior approval of the government agency or office wherein the work is created shall be necessary for exploitation of such work for profit.” This material was originally produced by the Bureau of Elementary Education of the Department of Education, Republic of the Philippines.
1
PAGHAHANDA NG PLANO SA ISANG GAWAIN
ALAMIN MO
Bago pa lamang umpisahan ang isang proyekto o gawain ay kailangan mo muna itong pagplanuhang mabuti. Napapadali ng plano ang anumang gawain. Ang plano ay karaniwang ginagamit ng mga arkitekto at inhinyero (engineer). Sila rin ang maingat na sumuri ng isang plano upang mapanatiling matatag at matibay ang gagawing proyekto.
2
PAGBALIK-ARALAN MO
• Muling isaisip ang mga pamantayan sa maingat na paggawa
• PAG-ARALAN MO •
Ang isang proyekto ay napapadali kung maihahandang mabuti ang disenyo at plano. Kaya bago simulan ang paghahanda sa iyong napiling proyekto ay pag-aralan muna ang sumusunod upang makatulong sa pagbuo ng isang maayos at mahusay na plano. Mga hakbang na dapat tandaan sa paggawa ng plano.
1. Pagpili ng Gawain ayon sa pangangailangan
Pumili ng proyekto o Gawain na may kapakinabangan, madalas gamitin at
naaayon sa pangangailangan sa pang-araw na buhay.
2. Pagpili ng mga materyales na may kakayahan
Maging maingat sa pagpili ng mga materyales na gagamitin upang maging
matibay ang gagawing proyekto.
3. Pagpili ng gamit na madaling hanapin at bilhin
Pumili ng kagamitan na madaling Makita o mabili upang hindi mahirapan sa
panahon ng pagbuon ng plano sa napiling proyekto.
3
Narito ang mga bahagin upang mabuo ang isang plano ng proyekto.
I. Pamgalan ng proyekto.
II. Layunin ng proyekto.
III. Talaan ng mga materyales.
a. Bilang
b. Yunit
c. Sukat at katangian ng materyales
d. Halaga ng bawat piraso
e. Kabuuang halaga
f. Pangkalahatang halaga
IV. Mga Kasangkapan
V. Disenyo o krokis ng proyekto
VI. Mga hakbang
Halimbawa ng isang plano ng proyekto
PLANO NG PROYEKTONG “EXTENSION CORD”
I. Pangalan ng Proyekto: “EXTENSION CORD”
II. Layunin ng proyekto:
Makagawa ng panibagong saksakan upang makaabot sa iba’t ibang bahagin ng tahanan.
III. Talaan ng mga Materyales
Bilang Yunit Sukat at Katangian ng Materyales Halaga ng
Bawat
Piraso
Kabuuang
Halaga
1 Piraso Saksakan (Outlet) P25.00 P25.00
5 Metro Kawad pang Elektrisidad “Duplex” # 16
Standard
P12.00 P60.00
1 Piraso Plug (Male) P8.00 P8.00
PANGKALAHATANG HALAGA P93.00
4
IV. Mga Kasangkapan:
1. Plais
2. Wire stripper
3. Disturnilyador
V. Disenyo o Krokis ng proyekto:
VI. Mga Hakbang:
1. Ihanda ang lahat ng mga materyales at kasangkapan sa paggawa.
2. Bago umpisahan ang Gawain kailangan munang isipin ang mga pamantayan sa
maingat na paggawa.
3. Gamitin ang disturnilyador at buksan ang “outlet”. Paluwagin ang dalawang
turnilyo na nasa loob.
4. Balatan ang dulo ng kable ng 2 sentimetro (2 cm.) at paikutin pakanan
“clockwise” upang lumapad pagkatapus ay higpitan ang turnilyo. Parehong
hakbang ang gawin, kunin ang takip at isara ang “outlet”.
5
5. Sa paglagay naman ng plug, paluwagin ang dalawang turnilyo, balatan ang dulo
ng kable ng 2 sentimetro (2 cm.) pagkatapos ay ilapat itp sa turnilyo at paikutin
pakanan o “clockwise” at higpitan ang turnilyo. Parehong hakbang ang sundin
sa kabilang turnilyo.
6. Tiyaking huwag magdikit ang dalawang dulo upang maiwasan ang anumang
kapahamakan.
7. Para sa karagdagang pa-iingat magpagabay sa nakatatanda bago isaksak ang
natapos na proyekto.
SUBUKIN MO
• Sa iyong sagutang kuwaderno pumili ng isang proyekto at gawan ito ng plano
• Mga proyektong mapagpipilian
6
TANDAAN MO
• Napapadali g anumang gawain kung ito ay napaghahandaan at may mahusay an
plano.
• Ang isang mahusay na plano ay nagdudulot ng magandang resulta sa anumang
gawain.
ISAPUSO MO
• Ano ang kahalagahan ng plano sa isang proyekto?
• Bakit kailangang maging maingat sa pagpili ng gagawing proyekto?
7
Binabati kita at matagumpay mong natapos ang dodyul na ito! Maari mo na ngayong simulan ang susunod na modyul.
GAWIN MO
Umisip ng isang proyekto na maaring gawan ng plano. Sundin ng
wasto ang mga hakbang sa paggawa nito at itala sa iyong kuwadernong
sagutan.
PAGTATAYA
• Kopyahin at sagutan ang mga tanong sa iyong sagutang kuwaderno. Lagyan ng tsek (√) Kung Oo at ekis (x) kung Hindi. Tanong Oo Hindi 1. Nakasunod ba ako ng tama sa mga hakbang sa paggawa ng plano?
2. Naging maingat ba ako sa paggawa ng plano? 3. Natapos ko ban g may kagalakan ang plano? • Basahin ang mga tanong at isulat ang sagot sa iyong sagutang kuwaderno.
1. Anu-ano ang mga bahagi ng isang plano? 2. Ano-ano ang mga dapat sundin sa paggawa ng plano? 3. Bakit mahalagang gumawa ng plano bago simulan ang isang gawain?