page index - saltire energy index tubing specification sheets 2-3/8” od, 4.60 lbs/ft, l-80 tubing...
TRANSCRIPT
Page Index
TUBING SPECIFICATION SHEETS
2-3/8” OD, 4.60 LBS/FT, L-80 TUBING w/ HYDRIL 511 CONNECTIONS2-3/8” OD, 4.60 LBS/FT, P-110 TUBING w/ HYDRIL 511 CONNECTIONS2-7/8” OD, 6.40 LBS/FT, L-80 TUBING w/ HYDRIL 511 CONNECTIONS2-7/8” OD, 6.40 LBS/FT, P-110 TUBING w/ HYDRIL 511 CONNECTIONS2-7/8” OD, 7.90 LBS/FT, P-110 TUBING w/ HYDRIL 533 CONNECTIONS3-1/2” OD, 9.20 LBS/FT, L-80 TUBING w/ HYDRIL 511 CONNECTIONS3-1/2” OD, 9.20 LBS/FT, P-110 TUBING w/ HYDRIL 511 CONNECTIONS3-1/2” OD, 15.80 LBS/FT, L-80 TUBING w/ HYDRIL 533 CONNECTIONS4” OD, 9.20 LBS/FT, L-80 TUBING w/ HYDRIL 511 CONNECTIONS4” OD, 11.60 LBS/FT, P110 TUBING w/ HYDRIL 511 CONNECTIONS4-1/2” OD, 15.50 LBS/FT, L-80 TUBING w/ HYDRIL 533 CONNECTIONS5” OD, 18.00 LBS/FT, L-80 TUBING w/ HYDRIL 511 CONNECTIONS5” OD, 18.00 LBS/FT, Q-125 TUBING w/ HYDRIL 521 CONNECTIONS
Page 12345678910111213
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
2-3/8” OD, 4.60 LBS/FT, L-80 TUBING w/ HYDRIL 511 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 2-3/8” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 4.60 GRADE L-80 NOMINAL WALL THICKNESS 0.190” NOMINAL INSIDE DIAMETER 1.995” DRIFT SIZE 1.901” TYPE OF UPSET N/A PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 104,000 PIPE YIELD TORQUE (FT-LBS) 5,100 PIPE API COLLAPSE (PSI) 11,780 PIPE INTERNAL YIELD (PSI) 11,200 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 511 BOX OD 2.406” PIN ID (BORED) 1.930” INTERNAL YIELD (PSI) 99.6% COLLAPSE (PSI) 100% JOINT STRENGTH (MIN PARTING LOAD) 74,000 MAKE-UP LOSS 2.27” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 550 MAKE-UP TORQUE (TARGET) (FT-LBS) 600 YIELD TORQUE (FT-LBS) 1,900
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 1
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
2-3/8” OD, 4.60 LBS/FT, P-110 TUBING w/ HYDRIL 511 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 2-3/8” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 4.60 GRADE P-110 NOMINAL WALL THICKNESS 0.190” NOMINAL INSIDE DIAMETER 1.995” DRIFT SIZE 1.901” TYPE OF UPSET N/A PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 143,000 PIPE YIELD TORQUE (FT-LBS) 7,000 PIPE API COLLAPSE (PSI) 16,130 PIPE INTERNAL YIELD (PSI) 15,400 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 511 BOX OD 2.406” PIN ID (BORED) 1.930” INTERNAL YIELD (PSI) 99.6% COLLAPSE (PSI) 100% JOINT STRENGTH (MIN PARTING LOAD) 98,000 MAKE-UP LOSS 2.27” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 550 MAKE-UP TORQUE (TARGET) (FT-LBS) 600 YIELD TORQUE (FT-LBS) 2,700
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 2
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
2-7/8” OD, 6.40 LBS/FT, L-80 TUBING w/ HYDRIL 511 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 2-7/8” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 6.40 GRADE L-80 NOMINAL WALL THICKNESS 0.217” NOMINAL INSIDE DIAMETER 2.441” DRIFT SIZE 2.347” TYPE OF UPSET N/A PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 145,000 PIPE YIELD TORQUE (FT-LBS) 8,600 PIPE API COLLAPSE (PSI) 11,170 PIPE INTERNAL YIELD (PSI) 10,570 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 511 BOX OD 2.875” PIN ID (BORED) 2.377” INTERNAL YIELD (PSI) 99.4% COLLAPSE (PSI) 100% JOINT STRENGTH (MIN PARTING LOAD) 95,000 MAKE-UP LOSS 2.27” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 700 MAKE-UP TORQUE (TARGET) (FT-LBS) 800 YIELD TORQUE (FT-LBS) 2,800
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 3
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
2-7/8” OD, 6.40 LBS/FT, P-110 TUBING w/ HYDRIL 511 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 2-7/8” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 6.40 GRADE P-110 NOMINAL WALL THICKNESS 0.217” NOMINAL INSIDE DIAMETER 2.441” DRIFT SIZE 2.347” TYPE OF UPSET N/A PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 199,000 PIPE YIELD TORQUE (FT-LBS) 11,900 PIPE API COLLAPSE (PSI) 14,550 PIPE INTERNAL YIELD (PSI) 14,530 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 511 BOX OD 2.875” PIN ID (BORED) 2.377” INTERNAL YIELD (PSI) 99.4% COLLAPSE (PSI) 100% JOINT STRENGTH (MIN PARTING LOAD) 125,000 MAKE-UP LOSS 2.27” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 700 MAKE-UP TORQUE (TARGET) (FT-LBS) 800 YIELD TORQUE (FT-LBS) 3,900
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 4
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
2-7/8” OD, 8.70 LBS/FT, P-110 TUBING w/ HYDRIL 533 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 2-7/8” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 8.70 GRADE P-110 NOMINAL WALL THICKNESS 0.308” NOMINAL INSIDE DIAMETER 2.259” DRIFT SIZE 2.165” TYPE OF UPSET EU PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 273,000 PIPE YIELD TORQUE (FT-LBS) 15,272 PIPE API COLLAPSE (PSI) 21,040 PIPE INTERNAL YIELD (PSI) 20,620 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 533 BOX OD (TURNED) 3.328” PIN ID (BORED) 2.259” INTERNAL YIELD (PSI) 100% COLLAPSE (PSI) 100% TENSILE EFFICIENCY 100% MAKE-UP LOSS 3.64” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 2,500 MAKE-UP TORQUE (TARGET) (FT-LBS) 3,000 YIELD TORQUE (FT-LBS) 9,100
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 5
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
3-1/2” OD, 9.20 LBS/FT, L-80 TUBING w/ HYDRIL 511 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 3-1/2” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 9.20 GRADE L-80 NOMINAL WALL THICKNESS 0.254” NOMINAL INSIDE DIAMETER 2.992” DRIFT SIZE 2.867” TYPE OF UPSET N/A PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 207,000 PIPE YIELD TORQUE (FT-LBS) 15,100 PIPE API COLLAPSE (PSI) 10,540 PIPE INTERNAL YIELD (PSI) 10,160 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 511 BOX OD 3.500” PIN ID (BORED) 2.897” INTERNAL YIELD (PSI) 100% COLLAPSE (PSI) 100% JOINT STRENGTH (MIN PARTING LOAD) 150,000 MAKE-UP LOSS 2.74” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 1,200 MAKE-UP TORQUE (TARGET) (FT-LBS) 1,400 YIELD TORQUE (FT-LBS) 5,600
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 6
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
3-1/2” OD, 9.20 LBS/FT, P-110 TUBING w/ HYDRIL 511 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 3-1/2” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 9.20 GRADE P-110 NOMINAL WALL THICKNESS 0.254” NOMINAL INSIDE DIAMETER 2.992” DRIFT SIZE 2.867” TYPE OF UPSET N/A PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 285,000 PIPE YIELD TORQUE (FT-LBS) 21,000 PIPE API COLLAPSE (PSI) 13,530 PIPE INTERNAL YIELD (PSI) 13,970 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 511 BOX OD 3.500” PIN ID (BORED) 2.897” INTERNAL YIELD (PSI) 100% COLLAPSE (PSI) 100% JOINT STRENGTH (MIN PARTING LOAD) 197,000 MAKE-UP LOSS 2.74” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 1,200 MAKE-UP TORQUE (TARGET) (FT-LBS) 1,400 YIELD TORQUE (FT-LBS) 7,600
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 7
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
3-1/2” OD, 15.80 LBS/FT, L-80 TUBING w/ HYDRIL 533 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 3-1/2” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 15.80 GRADE L-80 NOMINAL WALL THICKNESS 0.476” NOMINAL INSIDE DIAMETER 2.548” DRIFT SIZE 2.423” TYPE OF UPSET EU PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 362,000 PIPE YIELD TORQUE (FT-LBS) 23,000 PIPE API COLLAPSE (PSI) 18,800 PIPE INTERNAL YIELD (PSI) 19,040 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 533 BOX OD (TURNED) 4.160” PIN ID (BORED) 2.498” INTERNAL YIELD (PSI) 100% COLLAPSE (PSI) 100% TENSILE EFFICIENCY 100% MAKE-UP LOSS 4.49” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 7,800 MAKE-UP TORQUE (TARGET) (FT-LBS) 9,000 YIELD TORQUE (FT-LBS) 14,700
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 8
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
4” OD, 9.50 LBS/FT, L-80 TUBING w/ HYDRIL 511 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 4” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 9.50 GRADE L-80 NOMINAL WALL THICKNESS 0.226” NOMINAL INSIDE DIAMETER 3.548” DRIFT SIZE 3.423” TYPE OF UPSET N/A PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 214,000 PIPE YIELD TORQUE (FT-LBS) 18,400 PIPE API COLLAPSE (PSI) 6,590 PIPE INTERNAL YIELD (PSI) 7,910 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 511 BOX OD 4.000” PIN ID (BORED) 3.454” INTERNAL YIELD (PSI) 100% COLLAPSE (PSI) 100% JOINT STRENGTH (MIN PARTING LOAD) 157,000 MAKE-UP LOSS 2.74” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 1,300 MAKE-UP TORQUE (TARGET) (FT-LBS) 1,500 YIELD TORQUE (FT-LBS) 7,500
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 9
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
4” OD, 11.60 LBS/FT, P-110 TUBING w/ HYDRIL 511 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 4” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 11.60 GRADE P-110 NOMINAL WALL THICKNESS 0.286” NOMINAL INSIDE DIAMETER 3.428” DRIFT SIZE 3.303” TYPE OF UPSET N/A PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 367,000 PIPE YIELD TORQUE (FT-LBS) 31,000 PIPE API COLLAPSE (PSI) 13,160 PIPE INTERNAL YIELD (PSI) 13,760 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 511 BOX OD 4.000” PIN ID (BORED) 3.334” INTERNAL YIELD (PSI) 93.6% COLLAPSE (PSI) 100% JOINT STRENGTH (MIN PARTING LOAD) 254,000 MAKE-UP LOSS 2.74” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 1,700 MAKE-UP TORQUE (TARGET) (FT-LBS) 2,000 YIELD TORQUE (FT-LBS) 10,300
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 10
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
4-1/2” OD, 15.50 LBS/FT, L-80 TUBING w/ HYDRIL 533 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 4-1/2” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 15.50 GRADE L-80 NOMINAL WALL THICKNESS 0.337” NOMINAL INSIDE DIAMETER 3.826” DRIFT SIZE 3.701” TYPE OF UPSET EU PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 353,000 PIPE YIELD TORQUE (FT-LBS) 33,000 PIPE API COLLAPSE (PSI) 11,080 PIPE INTERNAL YIELD (PSI) 10,480 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 533 BOX OD (TURNED) 4.992” PIN ID (BORED) 3.776” INTERNAL YIELD (PSI) 100% COLLAPSE (PSI) 100% TENSILE EFFICIENCY 100% MAKE-UP LOSS 4.09” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 5,800 MAKE-UP TORQUE (TARGET) (FT-LBS) 6,700 YIELD TORQUE (FT-LBS) 21,000
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 11
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
5” OD, 18.00 LBS/FT, L-80 TUBING w/ HYDRIL 511 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 5” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 18.00 GRADE L-80 NOMINAL WALL THICKNESS 0.362” NOMINAL INSIDE DIAMETER 4.276” DRIFT SIZE 4.151” TYPE OF UPSET N/A PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 422,000 PIPE YIELD TORQUE (FT-LBS) 44,000 PIPE API COLLAPSE (PSI) 10,500 PIPE INTERNAL YIELD (PSI) 10,140 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 511 BOX OD 5.000” PIN ID (BORED) 4.185” INTERNAL YIELD (PSI) 100% COLLAPSE (PSI) 100% JOINT STRENGTH (MIN PARTING LOAD) 315,000 MAKE-UP LOSS 3.62” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 3,500 MAKE-UP TORQUE (TARGET) (FT-LBS) 4,000 YIELD TORQUE (FT-LBS) 18,300
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 12
Saltire Energy LtdBadentoy RoadBadentoy ParkPortlethenAberdeenAB12 4YA
VAT No. 671 1126 64EU No. EU/0908/147/08Registered No. 165384Registered O�ce: 23 Rubislaw Terrace, Aberdeen AB10 1XE
Telephone: (01224) 872228Fax: ((01224) 897541
E mail: [email protected]
TUBING SPECIFICATION SHEET
5” OD, 18.00 LBS/FT, Q-125 TUBING w/ HYDRIL 521 CONNECTIONS
PIPE SPECIFICATION NEW NOMINAL PIPE OD 5” NOMINAL WEIGHT (PIPE TUBE) (LBS/FT) 18.00 GRADE Q-125 NOMINAL WALL THICKNESS 0.362” NOMINAL INSIDE DIAMETER 4.276” DRIFT SIZE 4.151” TYPE OF UPSET PIPE CAPACITIES NEW PIPE BODY YIELD STRENGTH (LBS) 659,000 PIPE YIELD TORQUE (FT-LBS) 69,000 PIPE API COLLAPSE (PSI) 14,830 PIPE INTERNAL YIELD (PSI) 15,840 CONNECTION SPECIFICATION NEW CONNECTION HYDRIL 521 BOX OD (TURNED) 5.359” PIN ID (BORED) 4.226” INTERNAL YIELD (PSI) 15,840 COLLAPSE (PSI) 14,820 JOINT STRENGTH (MIN PARTING LOAD) 525,000 MAKE-UP LOSS 3.62” MAKE-UP TORQUE (MINIMUM) (FT-LBS) 6,100 MAKE-UP TORQUE (TARGET) (FT-LBS) 7,300 YIELD TORQUE (FT-LBS) 18,300
The information on this specification sheet is provided for illustration purposes only and is taken from information available from the manufacturer and other public sources. Saltire Energy Limited accepts no responsibility or liability for the accuracy of the information provided or for any error, omission or misstatement. The user is fully expected to review the information for accuracy.
Page 13