Page | 6 The solar arrays are laid out in a north-south direction and are to be connected to a single axis tracking system which rotates the arrays from east to west each day to ensure optimal exposure to the sun. The tracking system is designed and constructed in accordance with Australian Standards and will have a maximum height of 4.66 metres. Inverters, Switch Yard & Compound A number of inverters (converting energy generation from Direct Current (DC) to Alternating Current (DC) energy) and transformers are to be installed throughout the solar array. The inverters will be housed either in standard shipping containers, in small buildings, or in an outdoor “skid” configuration. For example, a skid mounted inverter / transformer typically measures 6.50 metres (W) x 2.50 metres (D) x 3.50 metres (H) as shown in the photo below. A small switch station (sub-station) being a fenced compound is proposed to be constructed within the solar farm footprint area. The location of the switch station will be determined to optimise the connection point at the SA Power Networks (SAPN) Woods Point - Jervois 33kV electricity transmission line. The small switch yard is where the voltage will be increased to 33 kV thereby allowing for connection of the solar farm to the national electricity grid. 1.5- 4.66m

Upload: others

Post on 10-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 6

The solar arrays are laid out in a north-south direction and are to be connected to a single axis tracking system which rotates the arrays from east to west each day to ensure optimal exposure to the sun. The tracking system is designed and constructed in accordance with Australian Standards and will have a maximum height of 4.66 metres.

Inverters, Switch Yard & Compound

A number of inverters (converting energy generation from Direct Current (DC) to Alternating Current (DC) energy) and transformers are to be installed throughout the solar array. The inverters will be housed either in standard shipping containers, in small buildings, or in an outdoor “skid” configuration. For example, a skid mounted inverter / transformer typically measures 6.50 metres (W) x 2.50 metres (D) x 3.50 metres (H) as shown in the photo below.

A small switch station (sub-station) being a fenced compound is proposed to be constructed within the solar farm footprint area. The location of the switch station will be determined to optimise the connection point at the SA Power Networks (SAPN) Woods Point - Jervois 33kV electricity transmission line. The small switch yard is where the voltage will be increased to 33 kV thereby allowing for connection of the solar farm to the national electricity grid.

1.5- 4.66m

Page 2: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 7

Grid Connection & Battery Energy Storage (BES)

The solar farm will connect directly to the national electricity grid via an overhead transmission line running from the solar farm’s proposed Sub-Station to the existing SAPN Woods Point - Jervois 33kV electricity distribution line. The solar farm also has the option of installing a Battery Energy Storage System, comprising a modular sheds (containers) and a fenced compound is to be located adjacent to the electricity grid connection point to the SAPN Woods Point - Jervois 33kV electricity transmission line. An example of the battery storage system is shown below.

The SAPN Woods Point - Jervois 33kV electricity transmission line is located immediately adjoining the Subject Land on its north-eastern boundary as shown in the photograph below.

The existing Woods Point - Jervois 33kV electricity transmission line adjacent the subject land.

The proposed layout of the Solar Farm is shown in the plan below.

Page 3: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 8

Page 4: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 9

3. Locality of the Subject Land

The Subject Land is located in the Primary Production Zone of the Development Plan (Murray Bridge Council) – refer to Zone Map MuBr/11. The following aerial plan shows the form of development existing in the immediate vicinity of the Subject Land.

The pattern and form of development existing in the immediate vicinity of the subject land (as shown on the aerial plan above) is described as follows – Immediately surrounding the proposed solar farm site (north, south & west) is established

primary production landuses, primarily cropping and livestock grazing. To the north-east of the subject land between Jervois Road and the Murray Bridge –

Wellington Road the landuse comprises small ‘rural living’ style allotments in a ribbon style rural living development.

On the north-eastern side of the Murray Bridge – Wellington Road the primary landuse is irrigation and dairy farming / livestock grazing – located in the River Murray Flood Zone.

Approximately 5.4 kilometres to the south of the subject land is the Jervois Township and 6.1 kilometres to the south-east is the Tailem Bend Township.

In summary the area in the vicinity of the Subject Land is characterised by a mixed of primary production landuses comprising cropping, livestock grazing, irrigation and dairy farming, and rural living landuses. The current condition of the subject land is shown in the photos below.

Page 5: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 10

The looking easterly across the subject land towards the Jervois Road.

The looking across the subject land.

The looking across the subject land from Jervois Road.

Page 6: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 11

4. Planning Considerations

The following is an assessment of the proposed solar farm development against the relevant key Objectives and Principles of Development Control of the Development Plan for the Murray Bridge Council area (Consolidated – 21 February 2019). The policies for the Council area are expressed generally in relation to all development throughout the Council area, then in more detail for the various zones. All sections and all relevant provisions within each section of the Development Plan must be considered in relation to a Development Application. In the event of any inconsistency between the Council-wide provisions and the Zone provisions, then the more detailed zone provisions would generally prevail.

4.1 Primary Production Zone The most directly applicable provisions of the Development Plan in the Primary Production Zone related to the proposed solar farm development are as follows –

Objectives 1 The long term continuation of primary production. 2 Economically productive, efficient and environmentally sustainable primary

production. 3 Allotments of a size and configuration that promote the efficient use of land

for primary production. 4 Protection of primary production from encroachment by incompatible land

uses and protection of scenic qualities of rural landscapes. 5 Accommodation of wind farms and ancillary development. 6 Development that contributes to the desired character of the zone. Desired Character The zone will incorporate environmentally sustainable rural activities and maintain a rural character. Development will be undertaken in a manner that minimises adverse impacts on water resources, biodiversity or the visual and scenic quality of the environment, and does not result in air and land pollution, weed infestation, vermin proliferation or the uneconomic provision of infrastructure. Wind farms and ancillary development such as substations, maintenance sheds, access roads and connecting power-lines (including to the National Electricity Grid) are envisaged within the zone and constitute a component of the zone's desired character. These facilities will need to be located in areas where they can take advantage of the natural resource upon which they rely and, as a consequence, components (particularly turbines) may need to be: ▪ located in visually prominent locations such as ridgelines ▪ visible from scenic routes and valuable scenic and environmental areas ▪ located closer to roads than envisaged by generic setback policy. This, coupled with the large scale of these facilities (in terms of both height and spread of components), renders it difficult to mitigate the visual impacts of wind farms to the degree expected of other types of development. Subject to implementation of management techniques set out by general / council wide policy regarding renewable energy facilities, these visual impacts are to be accepted in pursuit of benefits derived from increased generation of renewable energy. Principles of Development Control Land Use 1 The following forms of development are envisaged in the zone: ▪ wind farm and ancillary development ▪ wind monitoring mast and ancillary development. 2 Development listed as non-complying is generally inappropriate.

Page 7: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 12

3 Wind farms and ancillary development should be located in areas which provide opportunity for harvesting of wind and efficient generation of electricity and may therefore be sited:

(a) in visually prominent locations (b) closer to roads than envisaged by generic setback policy. Form and Character 11 Development should not be undertaken unless it is consistent with the desired

character for the zone. 12 Development should not occur within 500 metres of a National Park,

Conservation Park, Wilderness Protection Area or significant stands of native vegetation if it will increase the potential for, or result in, the spread of pest plants.

13 Development should provide an access way of at least 3 metres wide that provides access for emergency vehicles to the rear of the allotment.

14 Buildings should primarily be limited to farm buildings (including storage and implement sheds, pump sheds and the like), a detached dwelling associated with primary production on the allotment and residential outbuldings that are: (a) grouped together on the allotment and set back from allotment

boundaries to minimise the visual impact of buildings on the landscape as viewed from public roads

(b) screened from public roads and adjacent land by existing vegetation or landscaped buffers.

17 Any building or modification to the land form should not be located closer than 50 metres to a watercourse identified on a current series 1:50 000 SA Government topographic map.

19 Development that involves either of the following: (a) the construction of a new building on vacant land (b) an increase of the floor area of an existing building by more than 50 per

cent and does not include buildings associated with intensive animal keeping,

should incorporate the following measures to limit the rate of stormwater discharged from the site: (i) installation of a rainwater tank with a capacity of 5000 litres for every

100 square metres of roof area, which is plumbed to at least a water closet or a water heater

(ii) incorporate overflow from rainwater tanks directed to on-site stormwater detention structures / techniques which have a combined storage volume exceeding the 1-in-100 year average return interval flood event 3 hour duration runoff volume.

Central Policy Area 3

Objectives 1 A policy area accommodating mixed farming including horticulture and some

intensive animal keeping. 3 Development that contributes to the desired character of the policy area. Desired Character

The most sensitive of all the Primary Production Zone policy areas, this area contains a diverse range of general farming, intensive animal keeping, mushroom farming, composting and freeway activities. Protection of the existing agricultural uses within the area is important if the environmental quality and agricultural viability of the area is to be maintained. Sensitive land uses will be sited and designed to minimise adverse impacts on existing and future activities consistent with the objectives and desired character for the policy area. Separation distances between land uses will be guided by relevant environment protection guidelines and policies prepared under the Environment Protection Act 1993.

Principles of Development Control Land Use 1 The following forms of development are envisaged in the policy area:

▪ allied food industry (value adding) ▪ energy generation facility

Page 8: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 13

▪ farming including mixed broadacre farming ▪ horticulture ▪ intensive animal keeping.

3 Energy generation facilities may be developed where: (a) located on land of less productive potential for primary production (b) of low potential for adverse impact on other uses in the locality.

4 Supporting buildings (including storage and implement sheds, pump sheds and the like) and service infrastructure should be provided to the level required to adequately service the land use.

Form and Character 5 Development should not be undertaken unless it is consistent with the desired

character for the policy area.

4.2 Council Wide Provisions

The most directly applicable Council Wide provisions of the Council’s Development Plan related to the proposed solar farm development are as follows –

Design and Appearance Objectives 1 Development of a high design standard and appearance that responds to and

reinforces positive aspects of the local environment and built form. Principles of Development Control 3 Buildings should be designed to reduce their visual bulk and provide visual

interest through design elements such as: (a) articulation (b) colour and detailing (c) small vertical and horizontal components (d) design and placing of windows (e) variations to facades.

6 Transportable buildings and buildings which are elevated on stumps, posts, piers, columns or the like, should have their suspended footings enclosed around the perimeter of the building with brickwork or timber, and the use of verandas, pergolas and other suitable architectural detailing to give the appearance of a permanent structure.

Building Setbacks from Road Boundaries 19 The setback of buildings from public roads should:

(a) be similar to, or compatible with, setbacks of buildings on adjoining land and other buildings in the locality

(b) contribute positively to the streetscape character of the locality (c) not result in or contribute to a detrimental impact upon the function,

appearance or character of the locality. 20 Buildings in rural areas should be sited a minimum distance of:

(a) 100 metres from the South Eastern Freeway (b) 50 metres from primary arterial road other than the South Eastern

Freeway (c) 50 metres from a secondary arterial road.

Hazards Objectives 1 Maintenance of the natural environment and systems by limiting development

in areas susceptible to natural hazard risk. 2 Development located away from areas that are vulnerable to and cannot be

adequately and effectively protected from the risk of natural hazards. 4 Development located and designed to minimise the risks to safety and

property from flooding. 5 Development located to minimise the threat and impact of bushfires on life

and property.

Page 9: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 14

6 Expansion of existing non-rural uses directed away from areas of high bushfire risk.

Principles of Development Control 1 Development should be excluded from areas that are vulnerable to, and

cannot be adequately and effectively protected from, the risk of hazards. Flooding 4 Development should not occur on land where the risk of flooding is likely to be

harmful to safety or damage property. 7 Development, including earthworks associated with development, should not

do any of the following: (a) impede the flow of floodwaters through the land or other surrounding

land (b) increase the potential hazard risk to public safety of persons during a

flood event (c) aggravate the potential for erosion or siltation or lead to the destruction

of vegetation during a flood (d) cause any adverse effect on the floodway function (e) increase the risk of flooding of other land (f) obstruct a watercourse.

Bushfire 8 The following bushfire protection principles of development control apply to

development of land identified as General, Medium and High bushfire risk areas as shown on the Bushfire Protection Area BPA Maps - Bushfire Risk.

9 Development in a Bushfire Protection Area should be in accordance with those provisions of the Minister’s Code: Undertaking development in Bushfire Protection Areas that are designated as mandatory for Development Plan Consent purposes.

10 Buildings and structures should be located away from areas that pose an unacceptable bushfire risk as a result of one or more of the following:

(a) vegetation cover comprising trees and/or shrubs (b) poor access (c) rugged terrain (d) inability to provide an adequate building protection zone (e) inability to provide an adequate supply of water for fire fighting purposes.

Interface Between Land Uses Objectives 1 Development located and designed to minimise adverse impact and conflict

between land uses. 2 Protect community health and amenity from adverse impacts of development. 3 Protect desired land uses from the encroachment of incompatible development. Principles of Development Control 1 Development should not detrimentally affect the amenity of the locality or

cause unreasonable interference through any of the following: (a) the emission of effluent, odour, smoke, fumes, dust or other airborne

pollutants (b) noise (c) vibration (d) electrical interference (e) light spill (f) glare (g) hours of operation (h) traffic impacts.

2 Development should be sited and designed to minimise negative impacts on existing and potential future land uses desired in the locality.

5 Sensitive uses likely to conflict with the continuation of lawfully existing developments and land uses desired for the zone should be designed to minimise negative impacts.

Page 10: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 15

Rural Interface 13 The potential for adverse impacts resulting from rural development should be

minimised by: (a) not locating horticulture or intensive animal keeping on land adjacent to

townships (b) maintaining an adequate separation between horticulture or intensive

animal keeping and townships, other sensitive uses and, where desirable, other forms of primary production.

14 Traffic movement, spray drift, dust, noise, odour and the use of frost fans and gas guns associated with primary production should not lead to unreasonable impact on adjacent land uses.

15 Existing primary production and mineral extraction should not be prejudiced by the inappropriate encroachment of sensitive uses such as urban development.

16 Development that is adjacent to land used for primary production (within either the zone or adjacent zones) should include appropriate setbacks and vegetative plantings designed to minimise the potential impacts of chemical spray drift and other impacts associated with primary production.

Natural Resources Objectives 1 Retention, protection and restoration of the natural resources and

environment. 6 Development sited and designed to:

(a) protect natural ecological systems (b) achieve the sustainable use of water (c) protect water quality, including receiving waters (d) reduce runoff and peak flows and prevent the risk of downstream

flooding (e) minimise demand on reticulated water supplies (f) maximise the harvest and use of stormwater (g) protect stormwater from pollution sources.

Principles of Development Control 1 Development should be undertaken with minimum impact on the natural

environment, including air and water quality, land, soil, biodiversity, and scenically attractive areas.

Biodiversity and Native Vegetation 31 Development should retain existing areas of native vegetation and where

possible contribute to revegetation using locally indigenous plant species. 32 Development should be designed and sited to minimise the loss and

disturbance of native flora and fauna, including riparian, riverine animals and plants, and their breeding grounds and habitats. .

Soil Conservation 41 Development should not have an adverse impact on the natural, physical,

chemical or biological quality and characteristics of soil resources. 42 Development should be designed and sited to prevent erosion. Orderly and Sustainable Development Objectives 2 Development occurring in an orderly sequence and in a compact form to

enable the efficient provision of public services and facilities. 3 Development that does not jeopardise the continuance of adjoining

authorised land uses. Principles of Development Control 1 Development should not prejudice the development of a zone for its intended

purpose.

Page 11: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 16

2 Land outside of townships and settlements should primarily be used for primary production and conservation purposes.

3 The economic base of the region should be expanded in a sustainable manner.

Renewable Energy Facilities Objectives 1 Development of renewable energy facilities that benefit the environment, the

community and the state. 2 The development of renewable energy facilities, such as wind farms and

ancillary development, in areas that provide opportunity to harvest natural resources for the efficient generation of electricity.

3 Location, siting, design and operation of renewable energy facilities to avoid or minimise adverse impacts on the natural environment and other land uses.

Principles of Development Control 1 Renewable energy facilities, including wind farms and ancillary development,

should be: (a) located in areas that maximize efficient generation and supply of

electricity; and (b) designed and sited so as not to impact on the safety of water or air

transport and the operation of ports, airfields and designated landing strips.

Siting and Visibility Objectives 1 Protection of scenically attractive areas, particularly natural, rural and coastal

landscapes. Principles of Development Control 1 Development should be sited and designed to minimise its visual impact on: (a) the natural, rural or heritage character of the area (b) areas of high visual or scenic value, particularly rural and coastal areas (c) views from the coast, near-shore waters, public reserves, tourist routes

and walking trails. 5 Buildings and structures should be designed to minimise their visual impact in

the landscape, in particular: (a) the profile of buildings should be low, and the rooflines should

complement the natural form of the land (b) the mass of buildings should be minimised by variations in wall and roof

lines and by floor plans which complement the contours of the land (c) large eaves, verandas and pergolas should be incorporated into designs

so as to create shadowed areas that reduce the bulky appearance of buildings.

Transportation and Access Objectives 2 Development that: (a) provides safe and efficient movement for all motorised and non-motorised

transport modes (b) ensures access for vehicles including emergency services, public

infrastructure maintenance and commercial vehicles (c) provides off street parking (d) is appropriately located so that it supports and makes best use of existing

transport facilities and networks.

Page 12: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 17

Principles of Development Control Access 22 Development should have direct access from an all weather public road. 23 Development should be provided with safe and convenient access which: (a) avoids unreasonable interference with the flow of traffic on adjoining

roads (b) accommodates the type and volume of traffic likely to be generated by

the development or land use and minimises induced traffic through over-provision

(c) is sited and designed to minimise any adverse impacts on the occupants of and visitors to neighbouring properties.

4.3 Planning Assessment The Desired Character statement for the Primary Production Zone is generally supportive of the renewable energy development in the Zone (particularly windfarms and ancillary development) and a solar farm (renewable energy facility) is considered to be a form of development compatible with windfarm development and is considered to be low profile form of renewable energy development. The location of the solar farm immediately adjoining the existing SA Power Networks (SAPN) Woods Point - Jervois 33kV electricity transmission line on Jervois Road as the grid connection point will minimise the amount of infrastructure (ie: overhead transmission lines) that is required to enable connection of the solar farm to the National Grid. With the subject land being 19.75 hectares in area, the development of a sola farm on the property will not result in a significant loss of primary production capacity or output. The proposed solar farm array will be setback 50 metres from Jervois Road as required by PDC #20 in the Design & Appearance General Provisions with Jervois Road being classified as a secondary arterial road. The subject land is located on Jervois Road, being a sealed secondary arterial road under the care control and management of the Murray Bridge Council and will provide all-weather access to the solar farm. Once constructed the proposed solar farm will not generate any significant traffic volumes that would cause unreasonable interference with the flow of traffic on this road or adjacent local road network. During the construction phase of the solar farm there is expected to be 18 two-way (in / out) traffic movements from the site on a daily basis. Again, this volume of traffic is not expected to have any adverse impacts on the local road network. The operation of the proposed solar farm is passive and will not have an adverse impact or create a conflict with the existing landuses in this locality particularly the rural living properties to the east of the site. It is proposed that visual screening plantings will be undertaken along the western and southern boundaries of the solar farm site to minimise the visual intrusion of the solar farm from the adjoining rural living properties and dwellings. The location, siting, design and operation of proposed solar farm (being a renewable energy facility) has been undertaken to – avoid and/or minimise adverse impacts on the natural environment – no native

vegetation is impacted, and the development will not give rise to soil erosion on the site.

avoid and/or minimise adverse impacts on the visual amenity in this locality or cause any nuisance, including glare, to adjoining properties.

Page 13: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 18

ensure the facility does no pose or create a bushfire hazard. provide for the continuation of existing landuses in the vicinity including primary

production landuses. maximise efficient generation and supply of electricity from the solar farm to the

existing SAPN Woods Point - Jervois 33kV electricity transmission line on Jervois Road where it is proposed to connect to the national electricity grid.

The location and topography of the subject land (and solar farm) provides an ideal opportunity to harvest the natural sunlight for the production of a renewable electricity supply. The proposed solar farm is considered to be a passive renewable energy facility that will not have any detrimental impacts on the adjoining properties and the continuation of the landuses currently on them or allowed to be undertaken in the future.

5. Conclusion

It is submitted that the proposed solar farm development incorporating a solar panel array, inverters / transformers and electricity (switch yard) sub-station on the subject land is consistent with the respective Desired Character Statements, Objectives and Principles of Development Control in the Council-wide provisions, Primary Production Zone and Central Area Policy Area sections of the Development Plan (Murray Bridge Council – consolidated on 21 February 2019). When assessed against the provisions of the Development Plan, the proposed solar farm development demonstrates sufficient merit and warrant the granting of Development Plan Consent.

F.N. (Frank) Brennan PSM MPIA Principal Consultant FRANK BRENNAN CONSULTING SERVICES

Page 14: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Page | 19

Appendix 1 – Certificate of Title

Page 15: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Certificate of TitleTitle Reference CT 5963/860

Status CURRENT

Easement NO

Owner Number 14100766

Address for Notices RSD 3113 JERVOIS ROAD WOODS POINT 5259

Area 19.72HA (CALCULATED)

Estate TypeFEE SIMPLE

Registered ProprietorGARRIE ALLAN NEGUS

OF 1813 JERVOIS ROAD MURRAY BRIDGE SA 52531 / 2 SHARE

PATRICIA HELEN NEGUSOF 1813 JERVOIS ROAD MURRAY BRIDGE SA 52531 / 2 SHARE

Description of LandSECTION 939HUNDRED OF BRINKLEYIN THE AREA NAMED WOODS POINT

Last Sale DetailsDealing Reference TRANSFER (T) 11209386

Dealing Date 30/06/2009

Sale Price $50,000

Sale Type TRANSFER FOR FULL MONETARY CONSIDERATION

ConstraintsEncumbrances

Dealing Type Dealing Number Beneficiary

MORTGAGE 12201601 WESTPAC BANKINGCORPORATION

Stoppers

NIL

Valuation Numbers

Valuation Number Status Property Location Address

4171404403 CURRENT Lot 939 JERVOIS ROAD, WOODSPOINT, SA 5253

Product Title Details

Date/Time 28/01/2020 09:48AM

Customer Reference Tetris Energy - WP

Order ID 20200128001778

Land Services SA Page 1 of 2Copyright Privacy Terms of Use: Copyright / Privacy / Terms of Use

Page 16: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

NotationsDealings Affecting Title

NIL

Notations on Plan

NIL

Registrar-General's Notes

NIL

Administrative Interests

NIL

Product Title Details

Date/Time 28/01/2020 09:48AM

Customer Reference Tetris Energy - WP

Order ID 20200128001778

Land Services SA Page 2 of 2Copyright Privacy Terms of Use: Copyright / Privacy / Terms of Use

Page 17: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

25

Appendix Two – Site Layout Plan

Page 18: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Solar PV Array and access track envelop

Indicative Inverter Location

Indicative substation/switchboard/transformer

SVC Location

33 kV cable/overhead and connection pole

Central Inverter

Substation1)

Native Vegetation Landscaping

Map Legend

N

Woods Point Solar Farm – Indicative Site Layout

See detailed insert

Scale: A4

Page 19: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

50m

10m

10m

10m

10m setback from Northern and Southern boundaries

50m setback from Jervois Road boundary

10m setback from Western boundary

Page 20: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

P

Access point

SAPN Connection PoleAccess track

Indicative solar pv array

Storage shed

50m setback

Vegetation buffer (see detailed plan)

Portable Toiilet

Solar PV Array and access track envelop

Indicative Inverter Location

Indicative substation/switchboard/transformer

SVC Location

33 kV cable/overhead and connection pole

Central Inverter

Substation1)

Native Vegetation Landscaping

Map Legend

N

Woods Point Solar Farm – Indicative Site Layout

Page 21: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

26

Appendix Three – Site Elevation Plans

Page 22: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

0 1.5 3 m

Pro

po

sa

l

On

ly

Do not scale from this drawing. Site verify all dimensions prior to construction.Report all discrepancies to the drawing originator immediately. This drawing is tobe read in conjunction with all relevant documents and drawings.

[email protected]

0423 778 125

Client:

Title:

Drawn: Checked:

Scale: Date:

Drawing No: Rev:

Tetris Energy Pty Ltd

Tracker Side Elevation

DETRA FB

1:30@A3 13/12/17

FB1001-B-01 --

3000

4640

1640

6

0

°

6

0

°

6

0

°

6

0

°

Page 23: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

DN

O

TYPICAL FRONT VIEW

TYPICAL PLAN VIEW

TYPICAL SIDE VIEW

Notes:

N

PROPOSED BATTERIES CONTAINER LOCATION

Pro

po

sa

l

On

ly

M 1:200@A3

PLAN VIEW

M 1:100@A3

PLAN VIEW

M 1:50@A3

PLAN VIEW

M 1:50@A3

2695

6058

2438

1000

1000

600

600

2938

BATTERY INVERTER

2x BATTERY CONTAINER

2 MW SYSTEM SIZE

Do not scale from this drawing. Site verify all dimensions prior to construction.Report all discrepancies to the drawing originator immediately. This drawing is tobe read in conjunction with all relevant documents and drawings.

[email protected]

0423 778 125

Client:

Location:

Title:

Drawn: Checked:

Scale: Date:

Drawing No: Rev:

Tetris Energy Pty Ltd

Woods Point

Batteries Container Side Elevation

DETRA FB

As Shown@A3 13/12/17

FB1001-C-01 --

Finished Ground Level

Foundation

450

1650

300

Page 24: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

27

Appendix Four – Landscaping Plan

Page 25: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Woods Point Solar FarmLandscaping Plan

16 March 2020Ref: DA Number TBC

Page 26: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Landscaping Plan – Woods Point Solar Farm

Solar PV Array and access track envelop

Indicative Inverter Location

Indicative substation/switchboard/transformer

SVC Location

33 kV cable/overhead and connection pole

Central Inverter

Substation1)

Native Vegetation Landscaping

Map Legend

100m

Page 27: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Fig.1. Current view along Jervois road. The vegetation buffer will be setback 50m from the fence and comply with SAPN clearance requirements.

Fig.2. Representative vegetation opposite proposed site which includes (Mallee Woodlands) and mixed shrubs which will form part of the new vegetation buffer in the landscaping plan. A further list of species is on page 3.

Landscaping Plan – Existing site and Vegetation

Page 28: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Landscaping Plan – Operation and management overview

PlantingThe planting will occur within the first 6 months of the solar farm construction being completed. The target planting date will be Autumn and Winter to align with the early rains – this is will be April to July 2021 based on a notice to proceed in Mid 2020.

SelectionThe species will be combination of the list of page 7 and planted in a similar spacing to figure 4 and page 6. This is to ensure diversity and coverage at different heights. Soil testing has been undertaken to help inform the most suitable plant species.

Design The design of the vegetation buffer is outlined on page 5 and 6. This will be further refined once the final species have been selected. The plants will be located within the 3m buffer and around 1.5m apart. A further buffer will be included on the project side as a fire break and to minimize shading of the plants on the Solar PV array.

Maintenance The plant selection has been based on suitability with the local climate. Once established, they should be self-sufficient. During the first year the plants will be hand watered as part of the project's operation and maintenance program. The performance of the buffer will be monitored and updated as required. The water will be carted in by either the landowner or the solar farm maintenance crew.

Page 29: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Landscaping Plan – Sectional Diagram

Vegetation Buffer

Fire break and access track

Solar PV array

7m 3m

2-3m

Fig.3. Inset showing location of vegetation buffer along Jervois Road and the northern and southern side of the array. The width of the vegetation buffer will be 3m. Access track corridor and fire break also shown.

Fig.4. Sectional diagram of proposed plant heights – with an average height will be around 2-3m. The vegetation buffer will include Mallee Woodlands and coastal trees and a mixture of different native shrubs indigenous to the Southern Murray Mallee region. The planting within the row will be a mixture of trees, tall shrubs and medium-low shrubs – selected from the list on the page 3.

Project boundary

Page 30: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Planting notes• Planting corridor will be 3 metre wide. Target will be to have two rows of medium to large

shrubs/trees. Alternating across the corridor to allow sufficient space to grow and room for the smaller shrubs.

• Spacing between plants will be around 1.5 metres. Some of the smaller shrubs will be closer. • Plant species selection will be done in conjunction with Trees for Life and based on the recommended

species on page 7. The final selection cannot be made until we know the exact timing of the planting and availability of stock in local nurseries.

• The vegetation screen will be planted as either tube stock or seedlings. • The vegetation screen will be monitored regularly during the first 3 years to ensure the plants properly

establish. Any sections of the vegetation screen that fail to established will be reviewed and replaced.

Medium to large shrubs

Landscaping Plan – Planting guide

30m

3m

Objective To create a native vegetation screen along the Northern, Jervois Road and southern boundaries of the solar farm layout area.

Page 31: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

Landscaping Plan – Species Register

Source: Trees For Life – Southern Murray Mallee Zone.

Page 32: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

28

Appendix Five – DAPR Search results

Page 33: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

ABORIGINAL HERITAGE SITES

Aboriginal Affairs and Reconciliation| Date: Fri Feb 14 2020 15:06:45 GMT+1030 (ACDT)Level 16, 30 Wakefield Street | GPO Box 2343 Adelaide SA 5001Tel (+61) 08 8226 8900 | Fax (+61) 08 8226 8999 | www.dpc.sa.gov.au | ABN 83 524 915 929

Frank BolandTetris Energy Pty LtdLevel 3, 10 Bond StSydney 2000 New South Wales

Dear Frank

Thank you for the search request dated 07 Feb 2020. The search was based on the title details - Title Type: CT, Volume: 5963, Folio: 860. The address for this parcel is: JERVOIS RD WOODS POINT SA 5253. Your reference is 1115.

I advise that the central archive, which includes the Register of Aboriginal Sites and Objects (the Register), administered by Aboriginal Affairs and Reconciliation (AAR), has no entries for Aboriginal sites at this location.

The applicant is advised that sites or objects may exist in the proposed development area, even though the Register does not identify them. All Aboriginal sites and objects are protected under the Aboriginal Heritage Act 1988 (the Act), whether they are listed in the central archive or not. Land within 200 metres of a watercourse (for example the River Murray and its overflow areas) in particular, may contain Aboriginal sites and objects.

Pursuant to the Act, it is an offence to damage, disturb or interfere with any Aboriginal site, object or remains (registered or not) without the authority of the Premier. If the planned activity is likely to damage, disturb or interfere with a site, object or remains, authorisation of the activity must be first obtained from the Premier under Section 23 of the Act. Section 20 of the Act requires that any Aboriginal sites, objects or remains, discovered on the land, need to be reported to the Premier. Penalties apply for failure to comply with the Act. It should be noted that this Aboriginal heritage advice has not addressed any relevant obligations pursuant to the Native Title Act 1993.

Please be aware in this area there are Aboriginal groups/organisations/traditional owners that may have an interest. These may include:

Ngarrindjeri Heritage CommitteeChairperson: Lawrie Rankine SnrAddress: Telephone: Email: [email protected] Officer: Luke TrevorrowTelephone: 0419408152Email: [email protected]

Original Southern South Australian Tribes Indigenous CorporationChairperson: Mark KoolmatrieAddress: 13 Gillian Close Noarlunga Downs SA 5168Telephone: 0459371515Email: [email protected] Officer: Telephone: Email:

If you require further information, please contact the Aboriginal Heritage Team on telephone (08) 8226 8900 or send to our generic email address [email protected] sincerely,

Page 34: Page | 6...Page | 7 Grid Connection & Battery Energy Storage (BES) The solar farm will connect directly to the national electricity grid via an overhead transmission line running from

ABORIGINAL HERITAGE SITES

Aboriginal Affairs and Reconciliation| Date: Fri Feb 14 2020 15:06:45 GMT+1030 (ACDT)Level 16, 30 Wakefield Street | GPO Box 2343 Adelaide SA 5001Tel (+61) 08 8226 8900 | Fax (+61) 08 8226 8999 | www.dpc.sa.gov.au | ABN 83 524 915 929

Perry LangebergSENIOR INFORMATION OFFICER (HERITAGE)ABORIGINAL AFFAIRS & RECONCILIATION

14 February 2020