![Page 1: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/1.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 1
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5)(001B00078N)
IMPROVE THE SAFETY OF KY 98 NEAR DURHAM SPRINGS CHURCH (12CCR)
IMPROVEMENTS TO KY 100: CURVE, BRIDGE, AND INTERSECTIONIMPROVEMENTS FROM NEAR THE STONY POINT ROAD INTERSECTION TO EASTOF THE ALONZO LONG HOLLOW ROAD INTERSECTION (12CCR)
REPLACE BRIDGE OVER BAYS FORK ON MITCHELL WEAVER ROAD (CR 1328) 2.1MI W OF KY 1332 (002C00063N)(SR=31.5)(16CCN)
RECONSTRUCT KY-100 (OLD GALLATIN ROAD) FROM 0.2 MILES SOUTH OF KY-2160 (MP 14.1) TO KY-980 (MP 14.41). (06CCN)
CONDUCT A SCOPING STUDY ON THE EASTERN SCOTTSVILLE BYPASS. (08CCN)(10CCR)(16CCN)
WIDENING OF KY 100 (FRANKLIN ROAD) TO 3 LANES WITH URBAN SECTIONFROM OLIVER STREET TO US 31E TO INCREASE CAPACITY/SAFETY. MP 11.800-12.700 (14CCN)
IMPROVE ACCESS ROAD ON EACH END OF INDUSTRIAL ACCESS ROAD INSCOTTSVILLE. (16CCN)
1.100
1.100
.020
.310
4.000
.900
ADAIR
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
KY-704
KY-98
KY-100
CR-1328
KY-100
KY-98
KY-100
-
$950,000
$3,680,000
$1,400,000
$2,280,000
$2,580,000
$500,000
$5,330,000
$300,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
R
U
D
R
U
C
R
U
C
P
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2021
2022
2017
2018
2018
2020
2021
2021
2021
2016
2016
2017
2016
2017
2018
2019
2020
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRX
BRX
BRX
BRX
SPP
SPP
SPP
BRZ
BRZ
BRZ
BRZ
SPP
SPP
SPP
SP
SPP
SP
SP
SP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$250,000
$150,000
$50,000
$500,000
$3,680,000
$500,000
$900,000
$400,000
$150,000
$75,000
$1,655,000
$370,000
$960,000
$1,250,000
$500,000
$480,000
$380,000
$670,000
$3,800,000
$300,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
03
03
03
03
03
03
03
1068.00
201.00
320.00
1088.00
8305.00
8400.00
8802.00
8901.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
08
03
03
03
03
03
03
03
1068.00
201.00
320.00
1088.00
8305.00
8400.00
8802.00
8901.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2012
2012
2016
2006
2016
2014
2016
2016
2012
2012
2016
2006
2016
2014
2016
11.905
3.64
3.1
.35
14.1
11.8
11.913
4.74
4.2
.39
14.441
12.7
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SCOPING STUDY(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / SAFETY(P)
![Page 2: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/2.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 2
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT 1.0 MILE EAST OF BRIDGE OVER BARREN RIVER LAKE TOCORRECT VERTICAL AND HORIZONTAL DEFICIENCIES.(16CCN)
RECONSTRUCT KY 151 FROM US 127 AT LAWRENCEBURG TO I-64 IN FRANKLINCOUNTY.
WIDENING AND IMPROVEMENTS ON US-62 FROM 0.103 MILE WEST OF THE NEWSCHOOL ENTRANCE/WESTWOOD ESTATES TO 0.095 MILE EAST OF US-127B(LAWRENCEBURG BYPASS). (02CCN)(04CCN)(08CCR)(12CCR)
PADUCAH-WICKLIFFE RD; 4-LANE US-60 FROM STAFFORD ROAD TO BETHELCHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10)(06CCR)(12CCR)(14CCR).
PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION.
PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION.
PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION.
REPLACE BRIDGE ON KY 358 OVER CLAYTON CREEK APPR. 0.5 MILE NORTH OFKY 473 (SR 26.5) 004B00044N
6.700
.900
3.700
.970
.970
.040
ALLEN
ANDERSON
ANDERSON
BALLARD
BALLARD
BALLARD
BALLARD
BALLARD
KY-98
KY-151
US-62
US-60
US-51
US-51
US-51
KY-358
$2,400,000
$32,000,000
$7,450,000
$16,670,000
$3,000,000
$6,500,000
$6,500,000
$500,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
P
D
R
U
C
R
C
R
U
D
D
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2020
2017
2017
2018
2020
2022
2016
2018
2017
2018
2019
2020
2021
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SP
SP
SPP
SPP
BRO
BRO
BRO
BRX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$400,000
$400,000
$300,000
$1,300,000
$250,000
$1,750,000
$5,000,000
$5,000,000
$20,000,000
$3,800,000
$3,650,000
$10,480,000
$6,190,000
$3,000,000
$6,500,000
$6,500,000
$500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
05
07
01
01
01
01
01
8902.00
806.00
8100.00
115.00
1140.01
1140.02
1140.03
1143.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
FRANKLIN
MCCRACKEN
03
05
07
01
01
01
01
01
8902.00
806.00
8100.00
115.00
1140.00
1140.02
1140.03
1143.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2002
1998
2004
2016
2016
2012
2016
2016
2002
1998
2004
2016
2016
2012
10.1
17.251
7.327
7.327
7.327
14.034
10.2
18.371
8.297
8.297
8.297
14.074
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 3: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/3.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 3
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
STUDY IMPROVEMENTS TO HALLOWAY LANDING ROAD (CR1232) (16CCN).
PRIORITY SECTION 3: RECONSTRUCT KY-90 EAST OF GLASGOW FROM BRIDGEOVER FALLEN TIMBER CREEK TO THE METCALFE COUNTY LINE.(2002BOPC)(08CCR)(10CCR)(12CCR)
CONNECT US-31E (MP 12.6) TO OLD CALVARY DRIVE (CS 1196) AT THE EXISTINGINTERSECTION OF US-31E AND TROJAN TRAIL.(12CCN)
MAJOR WIDENING FROM SANDERS STREET IN CAVE CITY TO US 68 (GLASGOWOUTER LOOP) IN GLASGOW. (14CCN)(16CCR).
MAJOR WIDENING OR 2+1 FROM STATE PARK ROAD TO NUNN PARKWAY.(14CCN)
MAJOR WIDENING FROM DONNELLY DRIVE TO US-31E (ROGER WELLS) INGLASGOW AND WIDEN DONNELLY DRIVE. (14CCN) (16CCN)
WIDEN KY-70 AT THE CAVE CITY INDUSTRIAL PARK. (16CCN)
CONSTRUCT AN ACCESS DRIVE AT THE CAVE CITY INDUSTRIAL PARK.(16CCN)
CONSTRUCT AN INDUSTRIAL ACCESS ROAD TO CONNECT TO KY 70 NEAR MP 5.9,INCLUDING A LEFT TURNING LANE ON KY 70. (16CCN)
3.590
.300
8.414
11.074
1.721
BALLARD
BARREN
BARREN
BARREN
BARREN
BARREN
BARREN
BARREN
BARREN
CR-1232
KY-90
US-31E
KY-90
US-31E
KY-1297
KY-70
-
-
$200,000
$12,070,000
$550,000
$39,200,000
$3,500,000
$15,110,000
$220,000
$415,000
$600,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
P
C
C
D
R
U
C
D
R
U
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2016
2016
2016
2017
2017
2019
2017
2017
2019
2021
2018
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SPP
SPP
STP
STP
STP
SPP
SPP
STP
STP
STP
SP
SP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$200,000
$12,070,000
$550,000
$2,200,000
$6,000,000
$3,500,000
$27,500,000
$3,500,000
$3,860,000
$4,100,000
$7,150,000
$220,000
$415,000
$600,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
03
03
03
03
03
03
03
03
8953.00
108.50
8705.00
8819.00
8820.00
8821.00
8906.00
8907.00
8953.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
03
03
03
03
03
03
03
03
8953.00
108.00
8705.00
8819.00
8820.00
8821.00
8906.00
8907.00
8953.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2000
2012
2014
2014
2016
2016
2016
2016
2016
2000
2012
2014
2014
2016
2016
2016
2016
0
17.758
.16
1.222
11.078
5.878
5.762
22.022
8.574
12.296
12.799
6.016
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
![Page 4: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/4.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 4
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT KY-111 IN THE VICINITY OF THE "S-CURVE" EAST OFOWINGSVILLE.(14CCR)
IMPROVE INTERSECTION OF KY 36 AND KENDALL SPRINGS ROAD TOACCOMODATE INDUSTRIAL TRUCK TRAFFIC. (14CCR)
RECONSTRUCTION FROM US-60 IN OWINGSVILLE NORTH TO PRICKLY ASHROAD. (SEE 9-193) (08CCN) (10CCN) (16CCN)
NEW CONSTRUCTION FROM KENDALL SPRINGS ROAD TO BATH COUNTY HIGHSCHOOL IN OWINGSVILLE. (08CCN)
RECONSTRUCT CURVE AT .8 MILE SOUTH OF KY-36. (08CCN)(12CCR)
INTERSECTION IMPROVEMENT AT KY 211 AND US 60 IN SALT LICK. (14CCN)
CORRECT HORIZONTAL AND WIDTH DEFICIENCIES ON KY 36 FROM "OLD KY 11"MP 1.004 TO KY 1325 (MP 6.97) TO IMPROVE SAFETY AND OPERATIONALEFFICIENCY OF ROADWAY. (14CCN)
.500
.100
1.900
.100
.200
5.966
BATH
BATH
BATH
BATH
BATH
BATH
BATH
KY-111
KY-36
KY-111
-
KY-965
US-60
KY-36
$8,140,000
$750,000
$8,100,000
$1,440,000
$800,000
$1,860,000
$6,400,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
R
U
C
P
D
U
C
R
U
C
P
D
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2016
2016
2017
2018
2016
2017
2016
2016
2017
2017
2018
2016
2017
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SP
SP
SP
SP
SP
SPP
SPP
STP
STP
STP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,580,000
$1,040,000
$5,520,000
$750,000
$1,600,000
$1,000,000
$5,500,000
$240,000
$1,200,000
$50,000
$750,000
$560,000
$300,000
$1,000,000
$400,000
$2,100,000
$2,700,000
$1,200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
193.00
394.00
8402.00
8403.00
8404.00
8813.00
8814.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
09
09
09
09
193.00
394.00
8402.00
8403.00
8404.00
8813.00
8814.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2014
2016
2008
2008
2014
2014
2006
2014
2016
2008
2008
2014
2014
1
12.65
0
7.147
16.3
1.004
1.5
12.75
1.909
7.247
16.5
6.97
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
![Page 5: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/5.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 5
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
CONSTRUCT NEW ROUTE FROM KY 441 TO US 25E IN MIDDLESBORO. (08CCR)
IMPROVE CONGESTION AND FREIGHT MOVEMENT BY CONSTRUCTING A TWOWAY LEFT TURN LANE. (LET W/ 11-8701)(12CCR)
RECONSTRUCT KY-66 FROM 500' S OF NCL PINEVILLE TO KY-221
REPLACE BRIDGE ON KY-2011 (MP 8.498) OVER RED BIRD CREEK; .55 MI SOUTHOF JCT KY 66; (SR=3.5) 007B00074N
PAGE SCHOOL TURN LANE. (LET W/ 11-189)(12CCN)
PROVIDE PASSING OPPORTUNITIES ON US 119 IN THE VICINITY OF MP 4.5 INBELL COUNTY. (12CCN)(14CCR)(16CCR)
CONSTRUCT LEFT AND RIGHT TURN LANES ONTO THE BELL COUNTYGARAGE/VETERANS PARK ENTRANCE FROM US 119. (14CCN)
.800
.800
.900
.100
.100
1.500
BELL
BELL
BELL
BELL
BELL
BELL
BELL
KY-441
US-119
KY-66
KY-2011
US-119
US-119
US-119
$7,910,000
$2,424,500
$11,030,000
$550,000
$980,000
$26,550,000
$1,275,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
R
U
C
C
C
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2017
2019
2016
2016
2016
2018
2016
2016
2017
2018
2019
2017
2018
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SPP
SP
SP
SP
BRX
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$400,000
$620,000
$490,000
$6,400,000
$2,424,500
$2,220,000
$830,000
$7,980,000
$550,000
$980,000
$1,450,000
$4,100,000
$21,000,000
$100,000
$25,000
$50,000
$1,100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
110.00
189.00
217.00
1079.00
8701.00
8702.00
8805.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
110.00
189.00
217.00
1079.00
8701.00
8702.00
8805.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2012
1996
2010
2012
2012
2014
2000
2012
1996
2010
2012
2012
2014
.37
.41
8.35
3.45
3.7
1.17
1.557
8.65
3.55
5.2
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW ROUTE(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
RELIABILITY / MINOR WIDENING(O)
SAFETY / SAFETY(P)
![Page 6: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/6.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 6
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT TO CORRECT SAFETY ISSUES AND IMPROVE STABILIZATION OFROADWAY ON KY 188 AND YELLOW CREEK ON THE SOUTHSIDE OF ROADWAY.(16CCN)
RECONSTRUCT KY 1534 AND YELLOW CREEK ALONG THE EASTSIDE OFROADWAY FROM MP 1.3 TO MP 3.5 TO IMPROVE SAFETY. (16CCN)
IMPROVE SAFETY ALONG KY 221 WHILE PROVIDING SAFER TURNING LANESFOR SCHOOL TRAFFIC. (16CCN)
IMPROVE CURB AND GUTTER ON KY 74 FROM 10TH STREET TO 30TH STREET.(16CCN)
RECONSTRUCT THE KY-536 (MT. ZION ROAD) INTERCHANGE. (14CCR)(16CCR)
ADD AUXILIARY LANES ON I-71/75 FROM KY 536 TO US 42 (NB & SB) AS PER THEINTERCHANGE JUSTIFICATION STUDY (IJS).(10CCR)(12CCR)
RECONSTRUCT THE KY-338 (RICHWOOD ROAD) INTERCHANGE. (FUNDING FORIMR SHOWN UNDER 6-14.01) (10CCR)(12CCR)(14CCR)(16CCR)
.100
1.500
.100
BELL
BELL
BELL
BELL
BOONE
BOONE
BOONE
KY-188
KY-1534
KY-221
KY-74
I-75
I-75
I-75
$3,300,000
$3,050,000
$1,100,000
$450,000
$44,060,000
$20,600,000
$53,730,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
R
U
C
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2020
2017
2018
2019
2020
2017
2018
2019
2020
2018
2019
2019
2020
2017
2019
2019
2018
2020
2019
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SP
SP
SP
SP
SP
SP
SP
SP
IM
IM
IM
IM
IM
IM
IM
IM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$250,000
$200,000
$350,000
$2,500,000
$250,000
$300,000
$250,000
$2,250,000
$200,000
$200,000
$75,000
$625,000
$50,000
$75,000
$75,000
$250,000
$14,700,000
$7,280,000
$22,080,000
$800,000
$19,800,000
$26,250,000
$12,480,000
$15,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
06
06
06
8901.00
8902.00
8903.00
8904.00
14.00
14.50
18.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
06
06
06
8901.00
8902.00
8903.00
8904.00
14.00
14.01
18.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2004
2008
2004
2016
2016
2016
2016
2004
2006
2004
0
1.3
15.19
177.659
178.039
175.217
2.55
3.5
16.753
178.345
180.106
175.622
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SAFETY(P)
RELIABILITY / SAFETY(P)
ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)
RELIABILITY / MINOR WIDENING(O)
ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)
![Page 7: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/7.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 7
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT THE KY-338 (RICHWOOD ROAD) INTERCHANGE. (ADDITIONAL C-FUNDS FOR 6-18.00)
RECONSTRUCT THE KY-338 (RICHWOOD ROAD) INTERCHANGE. (ADDITIONAL C-FUNDS FOR 6-18.00)
RECONSTRUCT KY-536 TO A 5-LANE URBAN SECTION FROM 1500' WEST OF US-42TO I-75 (MP 10.3 TO MP 13.24). (DOES NOT INCLUDE INTERCHANGERECONSTRUCTION) (00CCR) (10CCR)(12CCR)(14CCR)(16CCR)
RECONSTRUCT KY-536 TO A 5-LANE URBAN SECTION FROM 1500' WEST OF US-42TO I-75 (MP 10.4 TO MP 13.4). (ADDITIONAL FUNDING FOR C PHASE) (16CCR)
DRY RIDGE-FLORENCE ROAD; 5-LANE US-25 FROM RICHWOOD ROAD TOWINNING COLORS DRIVE WITH GRADE SEPARATION OF KY-338 AT US-25 & RROVERPASS FOR KY-338. (2004BOPC)(2006BOPC)(12CCR)(NO BUILD)(14CCN)
DRY RIDGE-FLORENCE ROAD; 5-LANE US-25 FROM WINNING COLORS DRIVE TOBEESOM DRIVE. (2006BOPC) (10CCR)(NO BUILD)(14CCN)
DRY RIDGE-FLORENCE ROAD; 5-LANE US-25 FROM BEESOM DRIVE TOARISTOCRAT DRIVE WITH GRADE SEPARATION OF KY 536 AT US 25. (2006BOPC)(10CCR)(NO BUILD)(14CCN)
DRY RIDGE-FLORENCE ROAD; 5-LANE US-25 FROM ARISTOCRAT DRIVE TO RRSPUR CROSSING. (2004BOPC)(2006BOPC) (10CCR)(NO BUILD)(14CCN)
MINOR WIDENING AND CONSTRUCT A SOUTHBOUND LEFT TURN LANE ON DRYRIDGE-FLORENCE ROAD AT MUBEA.
.100
2.940
3.000
.636
2.346
.379
1.370
.200
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
I-75
I-75
KY-536
KY-536
US-25
US-25
US-25
US-25
US-25
$15,000,000
$27,000,000
$12,930,000
$17,700,000
$12,530,000
$1,710,000
$1,770,000
$950,000
$2,600,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
D
R
U
C
D
D
D
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2017
2018
2016
2017
2017
2019
2016
2016
2016
2016
2017
2017
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
IM
IM
STP
STP
SP
SP
SP
SP
SP
SP
SP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$15,000,000
$27,000,000
$12,930,000
$17,700,000
$2,010,000
$3,640,000
$2,510,000
$4,370,000
$1,710,000
$1,770,000
$950,000
$100,000
$1,000,000
$500,000
$1,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
06
18.10
18.11
158.00
158.01
351.10
351.20
351.30
351.40
351.45
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
06
18.00
18.11
158.00
158.00
8200.10
8200.10
8200.70
8200.70
351.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2000
2006
2006
2006
2006
2006
2016
2004
2016
2000
2000
2004
2004
2004
2004
1996
175.217
175.217
10.3
10.4
4.859
5.085
7.431
7.81
175.622
175.622
13.24
13.4
5.085
7.431
7.81
9.18
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(O)
ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
![Page 8: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/8.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 8
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
DRY RIDGE-FLORENCE ROAD; 3-LANE US-25 FRONTAGE ROAD FROM 0.11 MILESOUTH OF KY 338 TO WINNING COLORS. (2006BOPC) (10CCR)(NO BUILD)(14CCN)
CONSTRUCT ADDITIONAL TURN LANES AT THE INTERSECTION OF KY 842 ANDUS 42.(12CCR) (16CCN)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
.226
.263
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
US-25
US-42
-
-
-
-
-
-
$10,000
$4,400,000
$44,000
$44,000
$44,000
$44,000
$44,000
$44,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2017
2017
2016
2017
2018
2019
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
CM
CM
CM
SNK
SNK
SNK
SNK
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$10,000
$1,750,000
$150,000
$2,500,000
$44,000
$44,000
$44,000
$44,000
$44,000
$44,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
351.50
367.00
400.11
400.12
400.13
400.14
400.15
400.16
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
06
06
06
06
06
06
06
06
8200.70
367.00
400.11
400.12
400.13
400.14
400.15
400.16
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2016
2012
2012
2012
2014
2014
2016
2004
2016
2012
2012
2012
2014
2014
2016
12.803 13.066
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
To:To:
To:To:
To:To:
To:To:
To:To:
To:To:
From:From:
From:From:
From:From:
From:From:
From:From:
From:From:
![Page 9: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/9.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 9
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
-
-
-
-
-
-
-
-
$44,000
$56,000
$56,000
$56,000
$56,000
$56,000
$56,000
$56,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2016
2017
2018
2019
2020
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$44,000
$56,000
$56,000
$56,000
$56,000
$56,000
$56,000
$56,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
400.17
401.11
401.12
401.13
401.14
401.15
401.16
401.17
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
06
06
06
06
06
06
06
06
400.17
401.11
401.12
401.13
401.14
401.15
401.16
401.17
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2012
2012
2012
2014
2014
2016
2016
2016
2012
2012
2012
2014
2014
2016
2016
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
To:To:
To:To:
To:To:
To:To:
To:To:
To:To:
To:To:
To:To:
From:From:
From:From:
From:From:
From:From:
From:From:
From:From:
From:From:
From:From:
![Page 10: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/10.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 10
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
CONSTRUCT A RAMP FROM THE MALL ROAD INTERCHANGE TO SOUTHBOUND I-75.(12CCR)
INTERSECTION IMPROVEMENT PROJECT AT US 42 AND RICE PIKE/HICKS PIKE.US 42 MP 8.4 TO 8.6. TOLL CREDITS. (2012BOP)(AR/W)
PROVIDE ADDITIONAL LEFT TURN LANE ONTO WORLDWIDE BLVD FROM KY 237.ADD ADDITIONAL THROUGH LANES ON KY 237 NORTH OF KY 2846 (TANNERS LN).PROVIDE LANE EXTENSION ON WORLDWIDE BLVD FROM KY 237. (2012BOP)(ADM.BY KYTC)
EXTENSION OF WENDELL FORD BLVD TO AERO PKWY, 0.48 MILES. (2012BOP)
RECONSTRUCTION OF THE INTERSECTION OF CAMP ERNST ROAD ANDLONGBRANCH ROAD. WIDENING OF 1,900 FEET OF LONGBRANCH ROAD.(2012BOP)
CORRECT GEOMETRIC DEFICIENCIES AND ADD LEFT TURN LANES ONFROGTOWN ROAD AT TRIPLE CROWN BLVD AND CEDARWOOD.(2012BOP)(ADM.BY KYTC)
STUDY ALL MAJOR HIGHWAY CORRIDOR OPTIONS TO RELIEVE TRAFFIC IN THEBRENT SPENCE BRIDGE CORRIDOR, (INCLUDES IN-DEPTH LOOK AT EASTERNBYPASS OF GREATER CINCINNATI), AS WELL AS POSSIBLE TRAFFICMANAGEMENT IMPROVEMENTS AT THE EXISTING BRENT SPENCE CROSSING.
TWO-LANE EXTENSION OF EXISTING VETERANS WAY BETWEEN KY 18 AND KY237. LPA PROJECT (LET BY COUNTY)(2012BOP)
.083
.200
.450
.753
.558
.450
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
I-75
US-42
KY-237
PV-1011
CR-1002
KY-3060
-
CR-1057L
$1,500,000
$4,100,000
$4,500,000
$2,366,717
$686,640
$1,640,000
$2,000,000
$1,640,000
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
R
U
C
C
R
U
C
D
R
U
C
P
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2017
2016
2016
2017
2016
2016
2016
2017
2016
2017
2017
2018
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
NH
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,500,000
$750,000
$600,000
$2,750,000
$1,000,000
$500,000
$3,000,000
$2,366,717
$50,000
$112,000
$524,640
$120,000
$200,000
$120,000
$1,200,000
$2,000,000
$1,640,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
409.00
412.00
415.00
417.00
422.00
423.00
431.00
700.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
KENTONCAMPBELL
06
06
06
06
06
06
06
06
409.00
966.00
966.02
966.02
966.02
966.02
431.00
966.01
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2002
2012
2012
2012
2012
2016
2012
2012
2002
2004
2004
2004
2004
2016
2002
180.3
8.4
10.9
.747
2.1
1.5
180.6
8.6
11.35
1.5
2.658
1.95
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / STRATGIC CORR STDY(O)
RELIABILITY / MATCHED FED FUNDS(O)
Milepoints:Milepoints:
To:To:
From:From:
![Page 11: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/11.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 11
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2016. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2017 (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2018 (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2019 (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
-
-
-
-
-
-
-
$14,500,000
$8,800,000
$8,900,000
$9,100,000
$9,100,000
$9,100,000
$9,100,000
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2018
2019
2020
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SNK
SNK
SNK
SNK
SNK
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$14,500,000
$8,800,000
$8,900,000
$9,100,000
$9,100,000
$9,100,000
$9,100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
966.04
966.05
966.06
966.07
966.08
966.09
966.10
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
06
06
06
06
06
06
06
966.04
966.05
966.06
966.07
966.08
966.09
966.10
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2008
2008
2014
2014
2016
2016
2006
2008
2008
2014
2014
2016
2016
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
To:To:
To:To:
To:To:
To:To:
To:To:
To:To:
To:To:
From:From:
From:From:
From:From:
From:From:
From:From:
From:From:
From:From:
![Page 12: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/12.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 12
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON KY 20 OVER WOOLPER CREEK SE OF STONE CREEK LANE(PR 1300)(SR 22.5) 008B00018N
REPLACE BRIDGE OVER NS (CNO&TP)RR ON RICHARDSON ROAD (KY 842) 0.14 MIE OF US 25 NEAR INDEPENDENCE (008B00092N)(SR=43)
I-275/KY-212 INTERCHANGE AND KY-20 RECONSTRUCTION NEAR GREATERCINCINNATI AIRPORT. (2004BOPC)(KYTC SHARE @ 46.6%)
RECONSTRUCT AND WIDEN KY 237 FROM VALLEY VIEW DRIVE TO ROGERSLANE. (14CCR)
RECONSTRUCT AND WIDEN KY 237 FROM VALLEY VIEW DRIVE TO ROGERSLANE.
CONSTRUCT A NEW LOOP ROAD AROUND THE CAMPUS OF GATEWAY COLLEGELOCATED OFF MOUNT ZION ROAD. (10CCN)
INCREASE SAFETY & OPERATIONS AT THE INTERSECTION OF KY 842(RICHARDSON RD.) AND US 25 (DIXIE HIGHWAY) FROM JUST W OF US 25 TOBOONE CO. LINE AND INCLUDES MULTI-MODES; (14CCN)
PHASE II - PEDESTRIAN SAFETY PROJECT TO RECONSTRUCT THE INTERSECTIONOF IDLEWILD ROAD AND INSTALL SIDEWALKS ALONG IDLEWILD ROAD ANDJEFFERSON STREET. (16CCN)
INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONECOUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)
.074
.100
3.119
.048
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
KY-20
KY-842
I-275
KY-237
KY-237
-
KY-842
KY-338
I-275
$3,250,000
$3,000,000
$25,310,000
$14,340,000
$9,000,000
$500,000
$2,000,000
$715,000
$375,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
U
C
C
C
D
R
C
R
U
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2020
2021
2021
2022
2016
2018
2019
2016
2016
2017
2018
2017
2017
2017
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRO
BRX
BRX
BRX
STP
STP
STP
STP
SB2
SP
SP
SP
STP
STP
STP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,250,000
$500,000
$2,000,000
$500,000
$25,310,000
$1,160,000
$13,180,000
$9,000,000
$500,000
$200,000
$300,000
$1,500,000
$90,000
$125,000
$500,000
$375,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
06
1079.00
1087.00
8000.20
8001.21
8001.22
8630.00
8851.00
8952.00
8953.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
06
1079.00
1087.00
8000.11
8001.00
8001.22
8630.00
8851.00
8952.00
8953.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2014
2004
2004
2016
2010
2014
2016
2016
2012
2014
2002
2000
2016
2010
2014
2016
2016
2.8
.094
4.842
2.251
2.251
0
2.86
.141
4.942
5.37
5.37
.34
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / SAFETY(P)
RELIABILITY / SAFETY(P)
RELIABILITY / SAFETY(P)
![Page 13: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/13.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 13
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
STRUCTURE OVER SCOTTS CREEK ON KY 3364, 0.7 MILE NORTH OF US 460 ATNORTH MIDDLETOWN (BRIDGE IMPROVEMENTS). (03KYDN)(2012BOP) (16CCN)
REPLACE BRIDGE ON CR-1308 (MP 3.588) OVER TOWNSEND CREEK; .9 MI E OF JCTKY 353; (STRUCTURALLY DEFICIENT, SR=33.2) 009C00043N
RECONSTRUCT US 460 FROM RUSSELL CAVE ROAD TO US 27 BYPASS IN PARIS;MP 1.394 TO MP 7.696.(12CCN)(14CCR)(16CCR)
RECONSTRUCT US 460 FROM RUSSELL CAVE ROAD TO US 27 BYPASS IN PARIS;MP 1.394 TO MP 7.696. (ADDITIONAL FUNDING FOR C PHASE) (16CCR)
EXTEND FIFTH STREET IN MILLERSBURG TO THE MILLERSBURGBYPASS.(12CCN) (16CCR)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2016.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2017.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2018.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
.100
.100
6.302
6.302
.070
BOURBON
BOURBON
BOURBON
BOURBON
BOURBON
BOYD
BOYD
BOYD
KY-3364
CR-1308
US-460
US-460
CS-2016
-
-
-
$18,723
$930,000
$25,500,000
$7,700,000
$1,450,000
$1,150,000
$1,600,000
$1,600,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
R
U
C
C
D
R
U
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2017
2016
2017
2017
2018
2016
2017
2017
2017
2016
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
KYD
BRZ
BRZ
BRZ
STP
STP
STP
STP
SPP
SPP
SPP
SPP
SAH
SAH
SAH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$18,723
$90,000
$75,000
$765,000
$3,000,000
$2,500,000
$20,000,000
$7,700,000
$150,000
$300,000
$100,000
$900,000
$1,150,000
$1,600,000
$1,600,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
09
09
09
365.10
1124.00
8705.00
8705.01
8707.00
208.02
208.03
208.04
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
GREENUP
GREENUP
GREENUP
07
07
07
07
07
09
09
09
365.00
1124.00
8705.00
8705.01
8707.00
208.02
208.03
208.04
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2010
2012
2016
2012
2014
2014
2014
2002
2010
2012
2016
2012
2014
2014
2014
5.389
3.538
1.394
1.394
0
5.489
3.638
7.696
7.696
.07
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REHAB(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 14: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/14.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 14
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2019.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2020.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2021.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2022.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
US 60 FROM I-64 AT INTERCHANGE 181 (MP 0.2) EXTENDING NORTHERLY TO THEKY 180 (MP 4.02) INTERSECTION AT CANNONSBURG, INCLUDINGSUPERELEVATION CORRECTION ALONG KY 180 AT THE US 60 INTERSECTION.(08CCN) (10CCR)(12CCR)
SAFETY UPGRADES AND CONSTRUCT TURN LANES ON US-23 AT 12TH STREET -CATLETTSBURG. (14CCN)
REPLACE U.S. 68 AND U.S. 150 BRIDGE OVER CHAPLIN RIVER, PERRYVILLE.011B00042N (2005HPP-KY134)(EARMARK DOES NOT COVER TOTAL PROJECT COSTOF $1,790,000).
OPERATION OF AUGUSTA FERRY FOR FY 2017. (12CCR)(14CCR)
OPERATION OF AUGUSTA FERRY FOR FY 2018. (12CCR)(14CCR)
2.020
.100
BOYD
BOYD
BOYD
BOYD
BOYD
BOYD
BOYLE
BRACKEN
BRACKEN
-
-
-
-
US-60
US-23
US-68
KY-8
KY-8
$1,600,000
$1,600,000
$1,600,000
$1,600,000
$30,290,000
$500,000
$364,940
$180,000
$180,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2022
2017
2016
2017
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SAH
SAH
SAH
SAH
SB2
SPP
HPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,600,000
$1,600,000
$1,600,000
$1,600,000
$30,290,000
$500,000
$364,940
$180,000
$180,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
07
06
06
208.05
208.06
208.07
208.08
8400.00
8801.00
242.01
355.19
355.20
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
GREENUP
GREENUP
GREENUP
09
09
09
09
09
09
07
06
06
208.05
208.06
208.07
208.08
8400.00
8801.00
242.01
355.19
355.20
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2016
2016
2008
2014
2010
2012
2012
2014
2014
2016
2016
2008
2014
2010
2012
2012
.2
14.458
6.4
13.1
13.1
4.02
14.558
6.418
13.2
13.2
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / CONGESTION MITIGTN(O)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 15: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/15.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 15
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
OPERATION OF AUGUSTA FERRY FOR FY 2019.(12CCR)(14CCR)
OPERATION OF AUGUSTA FERRY FOR FY 2020.(12CCR)(14CCR)
OPERATION OF AUGUSTA FERRY FOR FY 2021.
OPERATION OF AUGUSTA FERRY FOR FY 2022.
REPLACE BRIDGE ON KY-8 (MP 4.221) OVER SNAG CREEK; 1 MI W OF JCT KY 1109;(STRUCTURALLY DEFICIENT, SR=48.3) 012B00005N
SPOT IMPROVEMENTS FROM THE CITY OF BROOKSVILLE SOUTH TOPOWERSVILLE. (06CCN) (10CCR) (16CCR)
RECONSTRUCT KY-1159 FROM BROOKSVILLE TO KY-9/AA HIGHWAY. (06CCN)(10CCR)(12CCR) (16CCR)
IMPROVE SAFETY ALONG KY 2228 FROM KY 9 TO KY 8. (16CCN)
.100
3.579
2.650
BRACKEN
BRACKEN
BRACKEN
BRACKEN
BRACKEN
BRACKEN
BRACKEN
BRACKEN
KY-8
KY-8
KY-8
KY-8
KY-8
KY-10
KY-1159
KY-2228
$190,000
$190,000
$190,000
$190,000
$2,750,000
$37,040,000
$14,630,000
$675,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
R
C
D
R
U
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2022
2016
2017
2016
2016
2019
2020
2017
2017
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
BRO
BRO
SB2
SB2
SPP
SPP
SPP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$190,000
$190,000
$190,000
$190,000
$150,000
$2,600,000
$3,120,000
$5,790,000
$2,820,000
$25,310,000
$14,630,000
$75,000
$50,000
$50,000
$500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
355.21
355.22
355.23
355.24
1074.00
8309.00
8311.00
8901.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
355.21
355.22
355.23
355.24
1074.00
8309.00
8311.00
8901.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2016
2016
2010
2006
2006
2016
2014
2014
2016
2016
2010
2006
2006
2016
13.1
13.1
13.1
13.1
4.171
10.38
.85
13.2
13.2
13.2
13.2
4.271
13.959
3.5
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SAFETY(P)
![Page 16: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/16.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 16
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
ADD TURN LANES ON KY 9 AT KY 875 MT. ZION ROAD. (16CCN)
IMPROVEMENTS TO KY 19 FROM KY 165 TO KY 10 TO IMPROVE SIGHT DISTANCEAND CURVE ISSUES. (16CCN).
REPLACE BRIDGE ON KY 476 OVER CANEY CREEK BETWEEN HARDSHELLCANEY CREEK ROAD (CR 1117) AND NIX BRANCH ROAD (CR 1115)(SR 40.3)013B00014N
REPLACE BRIDGE ON MARIE ROBERTS ROAD (CR 1165) OVER TROUBLESOMECREEK 0.1 MILE SW OF KY 15(SR 27.1) 013C00011N
REPLACE BRIDGE OVER FROZEN CREEK ON KY 378 0.7 MI N OF KY 1812.(013B00050N)(SR=41)
REPLACE BRIDGE OVER SINKING CREEK ON DENTS BRIDGE ROAD (CR 1021) 1.4MI W OF KY 333 (014C00003N)(SR=26)
RECONSTRUCT KY 79 FROM KY 477 TO KY 428.(12CCN)(14CCR)
.040
.048
.028
.020
2.143
BRACKEN
BRACKEN
BREATHITT
BREATHITT
BREATHITT
BRECKINRIDGE
BRECKINRIDGE
KY-9
KY-19
KY-476
CR-1165
KY-378
CR-1021
KY-79
$4,000,000
$11,250,000
$840,000
$1,610,000
$1,350,000
$710,000
$19,380,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
C
C
D
R
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2020
2017
2018
2019
2020
2016
2018
2019
2021
2021
2022
2017
2019
2019
2020
2016
2017
2017
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SP
SP
SP
SP
BRO
BRZ
BRX
BRX
BRX
BRX
BRZ
BRZ
BRZ
BRZ
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$500,000
$250,000
$250,000
$3,000,000
$1,000,000
$750,000
$500,000
$9,000,000
$840,000
$1,610,000
$250,000
$50,000
$50,000
$1,000,000
$130,000
$30,000
$50,000
$500,000
$1,250,000
$3,710,000
$2,250,000
$12,170,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
10
10
10
04
04
8902.00
8903.00
1100.00
1105.00
1110.00
1090.00
8703.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
MEADE
06
06
10
10
10
04
04
8902.00
8903.00
1100.00
1105.00
1110.00
1090.00
8703.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2012
2012
2014
2014
2012
2016
2016
2012
2012
2014
2014
2012
4.255
.092
.672
1.42
16.032
4.295
.14
.7
1.44
16.912
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)0 1.263Milepoints: To:From:
![Page 17: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/17.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 17
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCTION STUDY ON KY 86 FROM MP 15.957 TO MP 26.137. (16CCN)
REPLACE LOW WATER STRUCTURE ON KY 261 AT MP 15.74. (16CCN)
REALIGN S-CURVE AND CULVERT WIDENING. (16CCN)
MINOR WIDENING OF KY 992 BETWEEN ROCK QUARRY AND US 60. (16CCN)
KY-61 BEGINS SOUTH OF KY-44 AND ENDS NORTH OF THE NEWLY CONSTRUCTEDCONESTOGA PARKWAY. (CSX RAILROAD)(CONSTRUCTION SEQUENCE 3)(10CCR)(12CCR)(LET W/ 117.20)
KY-61 BEGINS NORTH OF CONESTOGA PARKWAY AND ENDS AT EXISTING KY-61SOUTH OF BROOKS RUN CREEK. (CONSTRUCTION SEQUENCE 2)(10CCR)(12CCR)(LET W/ 117.10)
RECONSTRUCT KY-44 AT BOGARD/LLOYD LANE. (06CCN) (10CCR)(12CCR)(16CCR)
MT. WASHINGTON-TAYLORSVILLE RD; RECONSTRUCT KY 44 FROM MT.WASHINGTON BYPASS EAST 2.0 MILES (04CCN)(16CCR)
2.200
1.300
.500
2.300
BRECKINRIDGE
BRECKINRIDGE
BRECKINRIDGE
BRECKINRIDGE
BULLITT
BULLITT
BULLITT
BULLITT
KY-86
KY-261
KY-261
KY-992
KY-61
KY-61
KY-44
KY-44
$500,000
$550,000
$810,000
$580,000
$28,500,000
$19,700,000
$1,280,000
$6,660,000
Total
Total
Total
Total
Total
Total
Total
Total
P
D
R
U
C
D
R
U
C
C
C
C
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2017
2018
2019
2020
2017
2018
2019
2020
2018
2016
2016
2016
2016
2016
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
SP
SP
SP
SP
SP
SP
SP
SP
SPP
SPP
SPP
STP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$500,000
$100,000
$25,000
$25,000
$400,000
$100,000
$60,000
$50,000
$600,000
$580,000
$28,500,000
$19,700,000
$1,280,000
$890,000
$1,090,000
$4,680,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
05
05
05
05
8901.00
8902.00
8903.00
8904.00
117.10
117.20
150.20
347.50
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
04
04
04
04
05
05
05
05
8901.00
8902.00
8903.00
8904.00
117.00
117.00
150.00
347.50
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2000
2000
2004
1998
2016
2016
2016
2016
1996
1996
2000
1998
14.43
16.667
18.38
23.14
16.667
17.88
18.8
25.44
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SAFETY(P)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
![Page 18: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/18.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 18
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN CEDAR GROVE ROAD (KY 480) FROM CEDAR GROVE ELEMENTARYSCHOOL TO VALLEY VIEW DRIVE. (12CCR)(14CCR) (SEE 5-391.3 FORINTERCHANGE IMPROVEMENTS)
IMPROVEMENTS TO THE I-65/KY 480 INTERCHANGE INCLUDING RAMPIMPROVEMENTS AND TURNING LANES. (12CCR)(14CCR)(2014BOP)(16CCR)
ACCESS MANAGEMENT PROJECT TO RELOCATE LOVE'S ACCESS ROAD ON KY480 IN BULLITT COUNTY TO ADDRESS CONGESTION SAFETY PROBLEMS (2014BOPFROM 5-391.20).
CONSTRUCT NEW I-65 INTERCHANGE BETWEEN KY 480 AND KY 245.
REPLACE BRIDGE ON KY-61 (MP 7.609) OVER BARLEY CREEK; .10 MI NORTH OFJCT KY 251; (STRUCTURALLY DEFICIENT, SR=36.5) 015B00013N
WIDEN KY-245 FROM BERNHEIM FOREST TO THE COMMUNITY COLLEGE.(08CCN)(10CCR)(14CCR)(16CCR)
SOUND BARRIERS ON EAST SIDE OF I-65 BETWEEN MP 117.4 AND MP 117.8.(14CCN)(16CCR)
WIDEN TO 5 LANES BETWEEN MOUNT WASHINGTON AND SHEPHERDSVILLE.(14CCN)
CONSTRUCT A LEFT TURN LANE ON SOUTHBOUND KY 61 AT PLAZA PARK BLVD.AT MP 2.0 AND EXTEND EXISTING LEFT TURN LANE FOR NORTHBOUNDAPPROACH.(16CCN)
.830
.830
.100
1.990
.400
9.793
BULLITT
BULLITT
BULLITT
BULLITT
BULLITT
BULLITT
BULLITT
BULLITT
BULLITT
KY-480
KY-480
KY-480
I-65
KY-61
KY-245
I-65
KY-44
KY-61
$4,790,000
$7,900,000
$1,500,000
$28,500,000
$470,000
$10,510,000
$2,000,000
$3,000,000
$200,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
C
D
R
U
C
R
C
C
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2017
2018
2016
2016
2017
2017
2018
2016
2017
2016
2016
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
NH
NH
NH
NH
STP
NH
NH
NH
NH
BRO
BRO
STP
SP
SP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$4,790,000
$400,000
$1,800,000
$500,000
$5,200,000
$1,500,000
$2,500,000
$500,000
$500,000
$25,000,000
$20,000
$450,000
$10,510,000
$2,000,000
$3,000,000
$200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
391.20
391.30
534.00
538.00
1056.00
8509.00
8856.00
8857.00
8901.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
05
391.00
391.20
534.00
538.00
1056.00
8509.00
8856.00
8857.00
8901.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2014
2014
2016
2010
2008
2014
2014
2016
2006
2006
2014
2016
2010
2008
2014
2014
2016
2.01
1.1
7.559
4.425
117.4
13.072
2.84
1.11
7.659
6.415
117.8
22.865
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / NEW INTERCHANGE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SAFETY(P)
![Page 19: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/19.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 19
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
PROVIDE A RELIABLE CONNECTION AND IMPROVE SAFETY ALONG KY 44 FROMMP 9.2 TO MP 10.3, INCLUDING RAISING THE ROADWAY, WIDENING ANDREPLACING BRIDGE 015B00020N. (16CCN)
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2017.(12CCR)
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2018.(12CCR)
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2019.(12CCR)
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2020.(12CCR)
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2021.(12CCR)
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2022.(12CCR)
REPLACE BRIDGE ON KY-340 (MP 7.120) OVER BR OF E PRONG INDIAN CAMPCREEK; 1.0 MI NORTH OF JCT KY 79; (STRUCTURALLY DEFICIENT, SR=44.3)016B00041N
UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.
.100
BULLITT
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
KY-44
KY-269
KY-269
KY-269
KY-269
KY-269
KY-269
KY-340
WN-9007
$8,100,000
$157,200
$157,200
$157,200
$157,200
$157,200
$157,200
$260,000
$10,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2021
2022
2017
2018
2019
2020
2021
2022
2017
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SP
SPP
SPP
SPP
SPP
SPP
SPP
BRX
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$800,000
$1,710,000
$590,000
$5,000,000
$157,200
$157,200
$157,200
$157,200
$157,200
$157,200
$260,000
$10,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
03
03
03
03
03
03
03
03
8956.00
125.12
125.13
125.14
125.15
125.16
125.17
1072.00
2042.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
WARREN
05
03
03
03
03
03
03
03
03
8956.00
125.12
125.13
125.14
125.15
125.16
125.17
1072.00
2042.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2012
2012
2014
2014
2016
2016
2010
2016
2016
2012
2012
2014
2014
2016
2016
2010
2016
1.544
1.544
1.544
1.544
1.544
1.544
7.07
1.644
1.644
1.644
1.644
1.644
1.644
7.17
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)Milepoints: To:From:
![Page 20: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/20.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 20
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.
UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.
UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2017.(12CCR)
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2018.(12CCR)
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2019.(12CCR)
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2020.(12CCR)
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2021.(12CCR)
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2022.(12CCR)
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
WN-9007
WN-9007
WN-9007
KY-369
KY-369
KY-369
KY-369
KY-369
KY-369
$10,000,000
$10,000,000
$15,000,000
$157,200
$157,200
$157,200
$157,200
$157,200
$157,200
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2021
2022
2017
2018
2019
2020
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$10,000,000
$10,000,000
$15,000,000
$157,200
$157,200
$157,200
$157,200
$157,200
$157,200
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
03
03
2042.01
2042.02
2042.03
8504.07
8504.08
8504.09
8504.10
8504.11
8504.12
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
WARREN
WARREN
WARREN
OHIO
OHIO
OHIO
OHIO
OHIO
OHIO
03
03
03
03
03
03
03
03
03
2042.01
2042.02
2042.03
8504.07
8504.08
8504.09
8504.10
8504.11
8504.12
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2012
2012
2014
2014
2016
2016
2016
2016
2016
2012
2012
2014
2014
2016
2016
.526
.526
.526
.526
.526
.526
.626
.626
.626
.626
.626
.626
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
0
0
0
0
0
0
.067
.067
.067
.067
.067
.067
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
![Page 21: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/21.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 21
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RELOCATION OF US 641 FROM US 62 NEAR EDDYVILLE TO JUST SOUTH OF THELYON/CALDWELL COUNTY LINE.
RECONSTRUCT SUBSTANDARD CURVES AT ROCK SPRINGS HILL(10CCR)
NEW CONNECTOR FROM HOPKINSVILLE ROAD (KY-91) TO WILSON WAREHOUSEROAD (KY-293) NORTHEAST OF PRINCETON.(06CCR)(10CCR)(12CCR)(14CCR)(16CCR)
REPLACE KY 276 DRAINAGE STRUCTURE. (FLOOD REPAIR PROJECT)
MURRAY FIVE-POINTS INTERSECTION ROUNDABOUT. (12CCR)(16CCR)
MAJOR WIDENING FROM TENN. STATE LINE TO MURRAY PRIORITY SECTION 1;FROM CLARKS RIVER BRIDGE, NORTH 1.0 MILE TO EXISTING 4-LANE.(SEE 1-8852.00)(12CCR)
REPLACE BRIDGE ON CARLTON RD (CR 1411) OVER W FORK ROCKHOUSE CREEK0.1 MILE W OF COLLINS RD (CR 1505)(SR 28.1)018C00110N (AR/W)
4.250
.600
2.400
.100
.100
1.000
.040
CALDWELL
CALDWELL
CALDWELL
CALDWELL
CALLOWAY
CALLOWAY
CALLOWAY
US-641
KY-139
-
KY-276
KY-1327
US-641
CR-1411
$26,000,000
$4,220,000
$18,490,000
$525,000
$5,750,000
$8,120,000
$470,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
R
U
C
R
U
C
R
U
C
C
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2017
2018
2016
2017
2017
2019
2016
2017
2019
2017
2017
2018
2017
2017
2019
2017
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SP
SP
SP
SP
SPP
SPP
SPP
BRX
BRX
BRX
SP
SP
SP
SPP
BRZ
BRZ
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,500,000
$3,500,000
$1,000,000
$20,000,000
$500,000
$610,000
$470,000
$2,640,000
$2,960,000
$2,060,000
$13,470,000
$50,000
$25,000
$450,000
$2,000,000
$1,670,000
$2,080,000
$8,120,000
$100,000
$370,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
02
02
02
01
01
01
187.50
141.00
153.00
1095.00
121.00
314.10
1149.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
02
02
02
01
01
01
187.50
141.00
153.00
1095.00
121.00
314.00
1149.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2000
2002
2016
2006
2000
2012
2006
2000
2002
2016
2006
1996
2012
7.573
1.49
5.666
1.027
8.173
1.51
6.666
1.067
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RELOCATION(O)
SAFETY / SAFETY(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 22: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/22.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 22
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
CITY OF MURRAY BUSINESS LOOP FROM GLENDALE TO INDUSTRIAL ROAD. (SEE1-120 FOR D, R, & U FUNDING)(08CCN)(10CCR)(LET BY CITY)
CONSTRUCT A NEW IMPROVEMENT ALLOWING FOR AN OVERPASS FORPEDESTRIANS CROSSING 16TH STREET GOING TO THE OTHER SIDE OF CAMPUS.MURRAY STATE AND THE CITY ARE IN AGREEMENT WITH THE NEED OF THEIMPROVEMENT. (14CCN) (16CCR)
NEW CONSTRUCTION OF 4-LANE ON US-641 SOUTH OF MURRAY FROM END OFSECTION 1 TO TENNESSEE STATE LINE. (SEE 6-314.10 FOR PRIORITYSECTION)(14CCN)
IMPROVE N 16TH STREET FROM KY 1327 (5 POINTS) TO KY 121. (16CCN)
IMPROVE N 16TH STREET FROM KY 1327 (5 POINTS) TO KY 121. (16CCN)
STUDY AND REHABILITATE THE I-471 CORRIDOR, CAMPBELL COUNTY,KENTUCKY. (SEE ALSO 6-8104.00)(2005HPP-KY120)
EXTEND PROPOSED POND CREEK ROAD FROM US-27 TO AA HIGHWAY VIAPORTION OF KY 10/KY 1997 CORRIDOR (NEW KY-536)(04CCN)(12CCR)(14CCR)
.186
6.667
5.016
3.500
CALLOWAY
CALLOWAY
CALLOWAY
CALLOWAY
CALLOWAY
CAMPBELL
CAMPBELL
-
CS-1047
US-641
CS-1047
CS-1047
I-471
KY-536
$3,800,000
$8,500,000
$68,000,000
$6,900,000
$6,900,000
$1,439,840
$61,290,000
Total
Total
Total
Total
Total
Total
Total
C
U
C
D
R
U
C
D
R
U
C
D
R
U
C
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2018
2016
2018
2019
2021
2017
2018
2020
2022
2017
2018
2020
2022
2017
2021
2022
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SP
SP
SPP
SPP
SPP
SPP
STP
STP
STP
STP
STP
STP
STP
STP
HPP
STP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,800,000
$1,500,000
$7,000,000
$3,000,000
$7,500,000
$7,500,000
$50,000,000
$400,000
$2,000,000
$2,000,000
$2,500,000
$400,000
$2,000,000
$2,000,000
$2,500,000
$1,439,840
$10,940,000
$7,960,000
$42,390,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
01
01
06
06
8502.00
8851.00
8852.00
8952.00
8952.00
183.00
352.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
01
01
01
01
06
06
8502.00
8851.00
8852.00
8952.00
8952.00
183.00
352.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2008
2014
2014
2016
2016
2004
1996
2008
2014
2014
2016
2016
2004
1996
1.312
0
0
1.498
6.666
5.016
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW ROUTE(O)
SAFETY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
![Page 23: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/23.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 23
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
KY 9 EXTENSION, CAMPBELL COUNTY. (2006KYD). (KYD FUNDING MOVED FROM6-8101.02)
CONSTRUCT A SIDEWALK ON THE SOUTH SIDE OF KY 1120 (MEMORIALPARKWAY) FROM PAVILION PARKWAY TO WILSON ROAD OVER I-471 INNEWPORT. (2012BOP)
ROADWAY REHABILITATION ON CAROTHERS ROAD FROM MONMOUTH STREET(US 27) TO RIGHT TURN LANE INTO NEWPORT SHOPPING CENTER.
REPLACE BRIDGE ON KY-1996 (MP 0.259) OVER STEVENS BRANCH; .75 MI WESTOF JCT KY 10; (STRUCTURALLY DEFICIENT, SR=19.9) 019B00013N
REPLACE BRIDGE ON CS-1193 (MP 0.783) OVER TAYLOR CREEK; 1.0 MI N. JCT KY1120; (STRUCTURALLY DEFICIENT, SR=31.7) 019C00063N
REPLACE BRIDGE ON KY 10 OVER TWELVE MILE CREEK SE OF KY 1997 (SR 6.4)019B00006N
REPLACE BRIDGE ON KY 2921 OVER BR OF TWELVE MILE CREEK 0.2 MILE NW OFWASHINGTON TRACE ROAD (CR 1006)(SR 24.3) 019B00061N
REPLACE BRIDGE OVER TWELVEMILE CREEK ON KY 8 0.1 MI N OF NEISES ROAD(CR 1009). (019B00003N)(SR=46.1)
.150
.292
.173
.100
.100
.054
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
KY-9
KY-1120
KY-1892
KY-1996
CS-1193
KY-10
KY-2921
KY-8
$2,270,000
$552,000
$1,109,926
$300,000
$1,130,000
$1,910,000
$500,000
$3,960,000
Total
Total
Total
Total
Total
Total
Total
Total
R
C
U
C
D
C
C
C
R
U
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2017
2016
2017
2016
2017
2016
2016
2018
2016
2017
2019
2019
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
SNK
SNK
SNK
SNK
BRX
BRZ
BRX
BRX
BRX
BRX
BRX
BRX
BRX
BRX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$100,000
$2,170,000
$25,000
$527,000
$104,874
$1,005,052
$300,000
$1,130,000
$150,000
$130,000
$1,630,000
$500,000
$280,000
$200,000
$190,000
$3,290,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
407.00
425.00
427.00
1072.00
1076.00
1077.00
1078.00
1085.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
407.00
966.02
427.00
1072.00
1076.00
1077.00
1078.00
1085.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2010
2012
2014
2010
2010
2012
2012
2014
2010
2004
2014
2010
2010
2012
2012
2014
21.82
1.375
2.395
.209
.733
4.567
.4
18.017
21.97
1.667
2.568
.309
.833
4.607
.54
18.071
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 24: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/24.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 24
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON COVERT RUN PIKE (CR-1363) (0.048) OVER TRIBUTARY TOTAYLOR CREEK. (SR=11.9) 019C00069N
RECONSTRUCT KY 9 ALONG A NEW ROUTE FROM NORTH OF 10TH STREET TO5TH STREET. (2014BOP)
CONSTRUCT NEW I-471 SOUTHBOUND OFF-RAMP AT KY-8 (SEE ALSO 6-183.00).(02CCN)(06CCN)
TRANSPORTATION IMPROVEMENTS TO AA-I-275 CONNECTOR, CAMPBELLCOUNTY. (2005HPP-KY155)(SEE 6-8105.00 FOR "KYD" COMPONENT)(06CCR)(10CCR)
TRANSPORTATION IMPROVEMENTS TO AA-I-275 CONNECTOR, CAMPBELLCOUNTY. (2005HPP-KY166)(SEE 6-8105.00 FOR "KYD" COMPONENT)
CONSTRUCT NEW TECHNOLOGY TRIANGLE ACCESS ROAD, CAMPBELL COUNTY,KENTUCKY. (2005HPP-KY126)(2006BOPC).(10CCR)
REPAVING AND DRAINAGE IMPROVEMENTS ON LINCOLN ROAD BETWEENWARD AVENUE AND WOODLYN RIDGE (1/2 MILE) IN THE CITY OFBELLEVUE.(14CCN)
SPOT IMPROVEMENTS AND MINOR REPAIR WORK WITHIN THE CITY OFDAYTON. (14CCN)
SPOT IMPROVEMENTS AND MINOR REPAIR WORK WITHIN THE CITY OFHIGHLAND HEIGHTS. (14CCN)
SPOT IMPROVEMENTS AND MINOR REPAIR WORK WITHIN THE CITY OFNEWPORT. (16CCN)
.100
.459
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CR-1363
KY-9
I-471
I-275
I-275
-
CS-2079
-
-
-
$175,000
$4,000,000
$2,700,000
$940,402
$7,249,112
$1,439,839
$1,000,000
$500,000
$500,000
$1,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
R
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2016
2016
2017
2017
2016
2016
2017
2017
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
SPP
SP
HPP
HPP
HPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$4,000,000
$2,700,000
$940,402
$7,249,112
$1,439,839
$1,000,000
$500,000
$500,000
$1,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
06
06
1095.00
8101.25
8104.00
8105.01
8105.02
8105.03
8802.00
8804.00
8805.00
8904.00
-
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
06
06
1095.00
8101.20
8104.00
8105.01
8105.02
191.00
8802.00
8804.00
8805.00
8904.00
-
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2014
2002
2004
2004
2004
2014
2014
2014
2016
2016
2014
2002
2004
2004
2004
2014
2014
2014
2016
.045
4.722
0
.051
4.822
.459
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RESURFACING(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
SAFETY / SAFETY(P)
![Page 25: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/25.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 25
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
SPOT IMPROVEMENTS AND MINOR REPAIR WORK WITHIN THE CITY OFSOUTHGATE. (16CCN)
DESIGN A ROUNDABOUT AT KY 8 AND O'FALLON AVENUE IN DAYTON.(16CCN)
CORRECT GEOMETRIC DEFICIENCIES AT INTERSECTION OF US-51/US-62/FRONTST/ELM ST IN BARDWELL TO ADDRESS FLOW, SAFETY, AND ACCESSISSUES.(12CCR)
REPLACE BRIDGE OVER KENTUCKY RIVER ON US 42 INPRESTONSVILLE/CARROLLTON 0.13 MI E OF KY 55. (021B00043N)(SR=27.8)
KY-7 (CAROL MALONE BLVD.) WIDENING FROM LITTLE SANDY RIVER BRIDGETO ACADEMIC PARKWAY. (08CCR)(12CCR)(16CCR)
REPLACE BRIDGE ON US-60 (MP 26.172) OVER UPPER STINSON CREEK; 1.5 MI E OFE-JCT KY 1; (STRUCTURALLY DEFICIENT, SR=29.6) 022B00064N (AR/W)
REPLACE BRIDGE ON US-60 (MP 4.111) OVER TYGARTS CREEK; .75 MI E OF JCT KY1662; (STRUCTURALLY DEFICIENT, SR=47) 022B00037N
REPLACE BRIDGE ON KY 474 OVER SMITH CREEK IN CARTER AT INTERSECTIONOF KY 474 AND NUNN ROAD(CR 1507)(SR 40.1) 022B00123N
SAFETY IMPROVEMENTS AT THE EAST CARTER HIGH SCHOOL.(06CCN)(08CCR)(12CCR)
.100
.250
.980
.100
.100
.100
CAMPBELL
CAMPBELL
CARLISLE
CARROLL
CARTER
CARTER
CARTER
CARTER
CARTER
-
KY-8
US-51
US-42
KY-7
US-60
US-60
KY-474
KY-1
$500,000
$1,500,000
$250,000
$4,500,000
$3,640,000
$1,100,000
$990,000
$930,000
$3,520,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
D
R
U
C
C
C
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2016
2020
2021
2021
2019
2016
2016
2017
2016
2016
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
BRX
BRX
BRX
SPP
BRO
BRO
BRX
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$500,000
$1,500,000
$250,000
$2,080,000
$1,740,000
$680,000
$3,640,000
$1,100,000
$990,000
$930,000
$870,000
$570,000
$2,080,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
01
06
09
09
09
09
09
8907.00
8908.00
333.00
1084.00
144.00
1072.00
1075.00
1081.00
8311.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
01
06
09
09
09
09
09
8907.00
8908.00
333.00
1084.00
144.00
1072.00
1075.00
1081.00
8311.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2012
2014
1998
2010
2010
2012
2006
2016
2016
2012
2014
1998
2010
2010
2012
2006
7.8
5.697
10.318
26.072
4.061
5.062
10.08
7.9
5.947
10.865
26.172
4.161
5.102
10.18
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
![Page 26: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/26.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 26
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
SAFETY IMPROVEMENTS TO KY-773 FROM KY-7 TO KY-1. (06CCN)(08CCR)
SAFETY IMPROVEMENTS TO KY-773 AT KY-7: ADD LEFT-TURN LANE ANDIMPROVE SIGHT DISTANCE ON KY-7. (06CCN)(2006BOPC)(08CCR)(10CCR)(12CCR)
DESIGN BRIDGES IN CONJUNCTION WITH PROJECT 9-8312. (08CCN)
REPLACE BRIDGE ON CR-1169 (0.059) OVER SOUTH FORK CREEK. (SR=23)023C00029N
NEW ALIGNMENT FROM MP 16.8 TO MP 17.4 (12CCN)
CORRECT VERTICAL ALIGNMENT ON US 127 AND KY 1552 NEARINTERSECTION.(12CCN)
RECONSTRUCT BELL HILL FROM MP 10.4 TO MP 11.9.(12CCN)(16CCR)
RECONSTRUCT BRUSHY CREEK HILL FROM MP 1.8 TO MP 2.8.(12CCN)(16CCR)
3.400
.100
.060
.300
1.500
1.000
CARTER
CARTER
CARTER
CASEY
CASEY
CASEY
CASEY
CASEY
KY-773
KY-773
KY-773
CR-1169
KY-70
US-127
KY-70
KY-49
$230,000
$600,000
$7,170,000
$250,000
$1,760,000
$1,570,000
$4,980,000
$3,610,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
R
U
C
R
U
C
D
D
R
U
D
R
U
D
R
D
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2016
2017
2017
2017
2018
2021
2016
2018
2018
2016
2018
2018
2019
2021
2019
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SP
SPP
SPP
SPP
BRZ
SP
SP
SP
SP
SP
SP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$120,000
$110,000
$50,000
$50,000
$500,000
$560,000
$370,000
$6,240,000
$250,000
$780,000
$480,000
$500,000
$780,000
$530,000
$260,000
$1,560,000
$3,420,000
$1,250,000
$1,320,000
$1,040,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
08
08
08
08
08
8312.00
8312.10
8506.00
1067.00
8701.00
8702.00
8703.00
8704.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
08
08
08
08
08
8312.00
8312.00
8506.00
1067.00
8701.00
8702.00
8703.00
8704.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2006
2008
2016
2012
2012
2012
2012
2006
2006
2008
2016
2012
2012
2012
2012
.1
0
1
.051
16.8
18.746
10.4
1.8
3.505
.1
1.3
.067
17.4
19.046
11.9
2.8
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / DESIGN ENGINEERING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 27: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/27.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 27
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REALIGN KY 501 TO INTERSECT KY 70 EAST OF EXISTING LOCATION ANDCORRECT VERTICAL ALIGNMENT OF KY 70 NEAR EXISTINGINTERSECTION.(12CCN)
CONSTRUCT A NEW STORM DRAINING SYSTEM, CURB AND GUTTER FROMBELDON AVENUE EASTWARD AND CONSTRUCT A NEW LEFT TURN ONTOCOLLEGE STREET.(12CCN)
EXTEND KY-1682 FROM THE E.T. BREATHITT PARKWAY TO US-68/KY-80 EAST OFHOPKINSVILLE (HOPKINSVILLE NORTHEAST BYPASS). (16CCR)
WIDEN KY-911 FROM US-41A TO OAK GROVE.(12CCR)
RECONSTRUCT KY 1007 FROM US 68 TO SANDERSON ROAD INHOPKINSVILLE.(12CCR)(14CCR)(16CCR)
CONSTRUCT NEW CONNECTOR FROM US 41 NEAR THE INDUSTRIAL PARK TO KY115 SOUTH OF PEMBROKE. (16CCR)
RECONSTRUCT THE BREATHITT PARKWAY INTERCHANGE AT KY 1682 NORTHOF HOPKINSVILLE. (BREATHITT PARKWAY/FUTURE INTERSTATE SPURPROJECT) (16CCR)
.180
.368
4.000
1.800
1.724
2.500
CASEY
CASEY
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
KY-501
KY-70X
KY-1682
KY-911
KY-1007
US-41
EB-9004
$1,750,000
$3,530,000
$10,050,000
$8,800,000
$14,500,000
$14,000,000
$3,000,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
D
R
U
C
U
C
D
R
U
C
D
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2018
2018
2019
2016
2018
2018
2017
2020
2020
2016
2017
2018
2019
2020
2021
2022
2019
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SP
SP
SP
STP
STP
STP
STP
SB2
SB2
SPP
SPP
SPP
SPP
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$520,000
$80,000
$250,000
$900,000
$780,000
$1,660,000
$1,090,000
$2,940,000
$4,700,000
$2,410,000
$8,800,000
$3,250,000
$11,250,000
$1,000,000
$300,000
$700,000
$12,000,000
$1,000,000
$1,000,000
$1,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
02
02
02
02
02
8705.00
8706.00
136.00
180.00
227.00
381.00
898.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
08
08
02
02
02
02
02
8705.00
8706.00
136.00
180.00
227.00
381.00
898.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2012
2000
2006
2012
2016
2016
2012
2012
2000
2006
2012
2016
2016
11
2.407
0
.785
11.18
2.775
1.835
2.509
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 28: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/28.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 28
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
ADDRESS CONGESTION AND MOBILITY OF US 68 FROM KY 91 TO KY 1007 INHOPKINSVILLE.
REPLACE BRIDGE ON SUB STATION RD (CR 1116) OVER CSX RR 0.04 MILE E OF US41 (SR 34.4) 024C00034N
REPLACE BRIDGE OVER CSX RR ON WALNUT STREET (US 41A) IN HOPKINSVILLE475 FT NE OF EAST 21ST STREET (CS 1016) (024B00112N) (SR=30.3)
REPLACE BRIDGE OVER N FORK LITTLE RIVER ON MILBROOKE DRIVE (CS 1262)500 FT SW OF KAREN DRIVE (CS 1268) (SR 6) 024C00081N
WIDEN KY 107 TO THREE LANES FROM GREENWAY LANE TO KY380.(12CCN)(14CCR)
IMPROVE AND WIDEN KY 115 FROM ANDERSON ROAD (MP 6.87) TO JUST SOUTHOF PEMBROKE (MP 9.625)(16CCN)
IMPROVE AND WIDEN KY 115 FROM I-24 (MP 2.901) TO ANDERSON ROAD (MP6.87).(16CCN)
.900
.032
.038
.346
2.755
3.969
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
US-68
CR-1116
US-41A
CS-1262
KY-107
KY-115
KY-115
$9,950,000
$770,000
$3,410,000
$1,650,000
$4,720,000
$1,000,000
$1,300,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
R
U
C
D
R
U
C
D
R
U
C
R
U
C
D
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2021
2021
2022
2016
2016
2017
2019
2021
2021
2022
2017
2018
2018
2019
2016
2016
2017
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
BRZ
BRZ
BRZ
BRX
BRX
BRX
BRX
BRZ
BRZ
BRZ
BRZ
SPP
SPP
SPP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,200,000
$1,750,000
$1,500,000
$5,500,000
$150,000
$120,000
$500,000
$550,000
$120,000
$400,000
$2,340,000
$350,000
$150,000
$350,000
$800,000
$1,110,000
$1,360,000
$2,250,000
$1,000,000
$1,300,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
899.00
1085.00
1089.00
1094.00
8703.00
8953.00
8954.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
899.00
1085.00
1089.00
1094.00
8703.00
8953.00
8954.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2012
2014
2014
2012
2016
2016
2016
2012
2014
2014
2012
2016
2016
.019
15.386
.372
16.823
.059
15.418
.41
17.169
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / SAFETY(P)
SAFETY / SAFETY(P)
![Page 29: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/29.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 29
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT EB REST AREA
REPLACE BRIDGE ON KY-974 (MP 10.924) OVER DRY FORK; .05 MI E-CR 1124@ALLNSVL; (STRUCTURALLY DEFICIENT, SR=23.1) 025B00090N
WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION EIGHT FROM MILEPOST12.45 TO MILEPOST 14.32. (06CCN)(12CCR)(16CCR)
WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION SEVEN FROM MILEPOST10.09 TO MILEPOST 10.88. (06CCN)(12CCR)
WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION SIX FROM MILEPOST 9.30 TOMILEPOST 9.69. (06CCN)(12CCR)
WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION FIVE FROM MILEPOST 7.02TO MILEPOST 7.51. (06CCN)(12CCR)
WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION THREE FROM MILEPOST 3.06TO MILEPOST 4.28. (06CCN)(12CCR)
WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION TWO FROM MILEPOST 1.96TO MILEPOST 2.93. (06CCN)(12CCR)
WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION ONE FROM MILEPOST 0.96TO MILEPOST 1.96. (06CCN)(12CCR)
.100
1.870
.790
.400
.500
1.200
1.000
1.000
CLARK
CLARK
CLARK
CLARK
CLARK
CLARK
CLARK
CLARK
CLARK
I-64
KY-974
KY-89
KY-89
KY-89
KY-89
KY-89
KY-89
KY-89
$4,000,000
$570,000
$6,420,000
$440,000
$220,000
$220,000
$550,000
$400,000
$570,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
R
U
C
D
D
P
D
D
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2016
2016
2017
2016
2016
2018
2016
2016
2016
2016
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
IM
BRX
BRX
BRX
SPP
SPP
SPP
SP
SP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$4,000,000
$100,000
$90,000
$380,000
$1,260,000
$1,560,000
$3,600,000
$440,000
$220,000
$220,000
$550,000
$400,000
$570,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
07
6.00
1121.00
8302.00
8307.00
8308.00
8309.00
8310.00
8311.00
8312.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
07
07
6.00
1121.00
8302.00
8307.00
8308.00
8309.00
8310.00
8311.00
8312.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
1996
2010
2006
2006
2006
2006
2006
2006
2006
1996
2010
2006
2006
2006
2006
2006
2006
2006
98.041
10.874
12.45
10.09
9.3
7.02
3.06
1.96
.96
98.541
10.974
14.32
10.88
9.69
7.51
4.28
2.93
1.96
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / REST AREA REHAB(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
![Page 30: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/30.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 30
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
EXTEND THE WINCHESTER EAST BYPASS (KY 1958) FROM IRVINE ROAD (KY 89)TO KY 627 SOUTH OF WINCHESTER. (08CCN)(10CCR)
ERECT A FOUR-WAY TRAFFIC CONTROL SIGNAL AT THE INTERSECTION OF US-60 AND BREEZE HILL DRIVE. (08CCN)
RECONSTRUCT I-64/MOUNTAIN PARKWAY INTERCHANGE TO ADD NEW RAMPSTO AND FROM THE EAST.(12CCR)(14CCR)(16CCR)
EXTEND FULTON ROAD. (BY COUNTY)(10CCN)
RECONSTRUCT US 60 FOR SAFETY IMPROVEMENTS FROM I-64 IN CLARKCOUNTY (MP 14.210)) TO 500 FEET WEST OF SEWELL SHOP ROAD (MP17.032).(16CCN)
WEST BYPASS OF MANCHESTER (GRADE, DRAIN & INCIDENTAL SURFACING).(RU-04DEOB)(10CCR)
CORRECT STANDARDIZED ROADWAY GEOMETRICS AND ADDRESS SAFETYISSUES FROM SOUTH OF ENGINE BRANCH ROUTE TO US 421 (MP 7.2 TO MP 8.9).
REPLACE BRIDGE ON US 421 OVER ISLAND CREEK AT INTERSECTION OF US 421 &BOWLING BRANCH RD (CR 1346)(SR 27.8) 026B00001N
.030
2.575
3.600
CLARK
CLARK
CLARK
CLARK
CLARK
CLAY
CLAY
CLAY
KY-1958
US-60
I-64
-
US-60
US-421
KY-11
US-421
$37,510,000
$50,000
$14,220,000
$1,410,000
$55,000,000
$63,270,000
$3,100,000
$2,100,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
R
U
C
C
D
R
U
C
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2016
2018
2018
2019
2016
2017
2019
2021
2022
2020
2020
2022
2019
2021
2021
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SP
NH
NH
NH
SB2
SP
SP
SP
SP
SP
SP
SP
STP
STP
STP
BRO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$37,510,000
$50,000
$1,700,000
$900,000
$11,620,000
$1,410,000
$2,000,000
$6,000,000
$10,500,000
$36,500,000
$6,180,000
$2,930,000
$54,160,000
$500,000
$2,000,000
$600,000
$2,100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
11
11
11
8401.00
8410.00
8506.01
8639.00
8952.00
273.01
364.00
1088.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
11
11
11
8401.00
8410.00
8506.00
8639.00
8952.00
273.01
364.00
1088.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2008
2008
2012
2010
2016
1996
2016
2012
2008
2008
2008
2010
2016
1996
2016
2012
4.94
95.1
7.2
20.462
4.97
97.675
8.9
20.502
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW ROUTE(O)
SAFETY / SAFETY-HAZARD ELIM(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BYPASS(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 31: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/31.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 31
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON BEECH CREEK RD (CR 1004) OVER GOOSE CREEK ATINTERSECTION WITH CHANDLER BRANCH RD (CR 1003)(SR 30.8) C00001N
REPLACE BRIDGE ON MILL CREEK ROAD (CR 1154) OVER GOOSE CREEK AT JCTWITH KY 1524 (SR 47) 026C00025N
REPLACE BRIDGE OVER OTTER CREEK ON OTTER CREEK ROAD (CR 1160) ATJUNCTION WITH MAY FORK ROAD (CR 1158)(026C00031N)(SR=2)
RECONSTRUCT KY-2432 FROM SECOND STREET IN EAST MANCHESTER NORTHTO THE LEFT FORK OF COAL HOLLOW ROAD (MP 2.10)(00CCN)(06CCR)(08CCR)(10CCR)
WIDEN US-421/KY-80 TO THREE LANES FROM KY 80 SOUTH TO KY-149(LOCKARTS CREEK ROAD). (00CCN)(10CCR)(12CCR)
CONSTRUCT A NEW ENTRANCE TO THE GREEN PARK FROM US-421 TO END NEARCEMETERY. (10CCN)(12CCR)
REPLACE BRIDGE OVER CURRY BRANCH ROAD IN CLAY COUNTY.(12CCN)
RECONSTRUCT EXISTING S-CURVE FROM MP 32.9 TO MP 33.5 TO IMPROVEGEOMETRICS.(14CCN)
IMPROVE SAFETY AND SIGHT DISTANCE ALONG KY 638 (MP 6.7 TO MP 7.1) ANDITS INTERSECTION WITH KY 3476. (14CCN)
.016
1.230
2.060
.040
.600
.400
CLAY
CLAY
CLAY
CLAY
CLAY
CLAY
CLAY
CLAY
CLAY
CR-1004
CR-1154
CR-1160
KY-2432
US-421
US-421
CR-1263
KY-66
KY-638
$2,000,000
$750,000
$570,000
$16,540,000
$25,700,000
$3,150,000
$960,000
$300,000
$1,840,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
R
U
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2019
2020
2020
2022
2016
2016
2022
2016
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
SB2
SPP
SP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,000,000
$750,000
$150,000
$30,000
$50,000
$340,000
$16,540,000
$25,700,000
$3,150,000
$960,000
$300,000
$1,840,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
11
1091.00
1092.00
1099.00
8001.00
8003.00
8632.00
8711.00
8856.00
8861.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
11
1091.00
1092.00
1099.00
8001.00
8003.00
8632.00
8711.00
8856.00
8861.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2012
2014
2000
2000
2010
2012
2014
2014
2012
2012
2014
2000
2000
2010
2012
2014
2014
.144
0
2.01
.351
13.692
.281
32.9
6.7
.184
.035
2.026
1.58
16.915
.321
33.5
7.1
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MINOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
![Page 32: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/32.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 32
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
IMPROVE GEOMETRICS ALONG URBAN CREEK ROAD (CR 1286) AND, INCLUDINGINTERSECTIONS AT HAL ROGERS PARKWAY AND KY 687. (14CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM CLAY/LAUREL LINE TO MANCHESTER (JUST PAST EXIT 20 ATBRIDGE OVER KY 80/US 421), MP 10.593 TO MP 21.498 (SEGMENT 7). (16CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM MANCHESTER TO CLAY/LESLIE LINE; MP 21.498 TO MP 35.929(SEGMENT 8) (16CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM MANCHESTER TO CLAY/LESLIE LINE; MP 21.498 TO MP 35.929.(SEGMENT 8)(ADDITIONAL FUNDS FOR 11-8911.00 C PHASE) (16CCN)
RECONSTRUCT AND IMPROVE EXISTING ALIGNMENTS, WITH SHOULDERS, OFBARBOURVILLE - MANCHESTER ROAD (KY 11) FROM THE KNOX-CLAY COUNTYLINE (MP 0.0) TO US 421 IN CLAY COUNTY (MP 8.891). (16CCN)
REPLACE BRIDGE OVER CLEAR FORK CREEK ON KY 738 0.2 MI S OF US 127X.(027B00011N)(SR=31.5)
RELOCATION OF US 127 FROM APPROX 1.14 MI N OF INTERSECTION OF KY 3063 &OLD US 127, EXTENDING N TO KY 1730, LOCATED APPROX 0.36 MI E OF THEINTER. OF KY 1730 & MANNTOWN RD.(SEE 8-108 & 8-115 FORPE&ENV)(12CCR)(G&D)(SEE 8-8601.27 FOR SURFACING)(14CCR)
3.067
.010
21.300
CLAY
CLAY
CLAY
CLAY
CLAY
CLINTON
CLINTON
CR-1286
HR-9006
HR-9006
HR-9006
KY-11
KY-738
US-127
$6,100,000
$125,000,000
$131,000,000
$30,900,000
$3,000,000
$1,000,000
$28,960,000
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
D
R
U
C
C
D
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2016
2018
2019
2020
2016
2019
2020
2021
2021
2021
2019
2021
2021
2022
2016
2019
2019
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SP
SP
SP
SPP
SP
SP
SP
SP
SP
BRX
BRX
BRX
BRX
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$6,100,000
$1,000,000
$15,000,000
$11,000,000
$98,000,000
$1,000,000
$18,000,000
$13,000,000
$99,000,000
$30,900,000
$3,000,000
$250,000
$100,000
$10,000
$640,000
$2,300,000
$1,110,000
$550,000
$25,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
08
08
8864.00
8910.00
8911.00
8911.10
8957.00
1062.00
8601.26
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
RUSSELL
11
11
11
11
11
08
08
8864.00
8910.00
8911.00
8911.10
8957.00
1062.00
8601.26
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2016
2016
2016
2014
2012
2014
2016
2016
2016
2016
2014
2012
0
21.498
21.498
6.478
11.017
3.067
35.929
35.929
6.488
20.967
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RELOCATION(O)0 11.4Milepoints: To:From:
![Page 33: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/33.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 33
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RELOCATION OF US 127 FROM APPROX 0.18 MI E OF THE INTERSECTION OFAARON RIDGE RD AND OLD US 127, EXTENDING N TO APPROX 1.14 MI N OF THEINTERSECTION OF KY 3063 AND OLD US 127. (SEE 8-108 AND 8-115 FORPE&ENV)(12CCR)(G&D)(SEE 8-8601.31 FOR SURFACING)
RECONSTRUCTION OF US 127 FROM APPROX 0.18 MI E OF THE INTERSECTION OFAARON RIDGE RD AND OLD US 127, EXTENDING N TO APPROX 1.14 MI N OF THEINTERSECTION OF KY 3063 AND OLD US 127. (SEE 8-108 AND 8-115 FORPE&ENV)(12CCR)(SURFACING)(SEE 8-8601.30 FOR G&D)
RELOCATION OF US 127 FROM APPROX 1.14 MI N OF INTERSECTION OF KY 3063 &OLD US 127, EXTENDING N TO KY 1730, LOCATED APPROX 0.36 MI E OF THEINTER. OF KY 1730 & MANNTOWN RD.(SEE 8-108 & 8-115 FORPE&ENV)(ADDITIONAL C-FUNDS FOR 8-8601.26)
MARION TO FREDONIA; SURFACING AND INCIDENTAL GRADE ANDDRAIN.(12CCR)(14CCR)
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2017.(12CCR)
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2018.(12CCR)
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2019.(12CCR)
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2020.(12CCR)
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2021.
2.370
21.300
5.200
CLINTON
CLINTON
CLINTON
CRITTENDEN
CRITTENDEN
CRITTENDEN
CRITTENDEN
CRITTENDEN
CRITTENDEN
US-127
US-127
US-127
US-641
KY-91
KY-91
KY-91
KY-91
KY-91
$30,860,000
$4,000,000
$26,300,000
$13,000,000
$402,000
$402,000
$402,000
$402,000
$402,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2018
2018
2020
2020
2022
2016
2017
2018
2019
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SP
NH
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,600,000
$1,680,000
$580,000
$27,000,000
$4,000,000
$26,300,000
$13,000,000
$402,000
$402,000
$402,000
$402,000
$402,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
08
01
01
01
01
01
01
8601.30
8601.31
8601.32
187.23
326.14
326.15
326.16
326.17
326.18
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
RUSSELL
CALDWELL
08
08
08
01
01
01
01
01
01
8601.30
8601.31
8601.26
187.20
326.14
326.15
326.16
326.17
326.18
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2014
2016
2006
2012
2012
2014
2014
2016
2012
2014
2012
2000
2012
2012
2014
2014
2016
11.017
11.162
11.162
11.162
11.162
11.162
20.967
11.262
11.262
11.262
11.262
11.262
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RELOCATION(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
0 11.4Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 34: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/34.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 34
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2022.
REPLACE BRIDGE ON CR-1085 (0.048) OVER HUGHES BRANCH (SR=22.7) 028C00053N
SHOULDER TREATMENT ON KY 61 FROM JOE SCOTT RIDGE ROAD, SOUTH TOTHE TENNESSEE LINE.(2006BOPC)(10CCR)(12CCR)(14CCN)
REPLACE BRIDGE OVER CUMBERLAND RIVER ON KY 61 0.1 MI N OF COLDSPRINGS ROAD (CR 1204).(029B00012N)(SR=32)
REPLACE BRIDGE OVER CUMBERLAND RIVER ON KY 90 0.27 MI SE OF KY 61 ATTHE SCL OF BURKESVILLE. (029B00027N)(SR=35.4)
RECONSTRUCT KY-90 FROM NORRIS BRANCH WESTERLY TO KY-496 NEARMARROWBONE. (14CCN)
RECONSTRUCT INTERSECTION AT FAIRVIEW DRIVE (KY 3143) AND KY 298.(12CCR) (16CCR)
3.800
.140
.360
5.085
.100
CRITTENDEN
CRITTENDEN
CUMBERLAND
CUMBERLAND
CUMBERLAND
CUMBERLAND
DAVIESS
KY-91
CR-1085
KY-61
KY-61
KY-90
KY-90
KY-298
$402,000
$300,000
$930,000
$4,600,000
$6,100,000
$30,500,000
$5,100,000
Total
Total
Total
Total
Total
Total
Total
C
D
C
D
R
U
C
D
R
U
C
D
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2021
2017
2016
2017
2017
2019
2016
2017
2017
2018
2017
2019
2019
2021
2016
2016
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
BRZ
SPP
BRO
BRO
BRO
BRO
BRO
BRO
BRO
BRO
SP
SP
SP
SP
SB2
SB2
SB2
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$402,000
$300,000
$930,000
$500,000
$50,000
$50,000
$4,000,000
$500,000
$50,000
$50,000
$5,500,000
$3,500,000
$3,200,000
$1,800,000
$22,000,000
$600,000
$1,000,000
$3,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
08
08
08
08
02
326.19
1159.00
150.00
1060.00
1061.00
8852.00
229.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
01
99
08
08
08
02
326.19
1159.00
278.14
1060.00
1061.00
8852.00
229.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2006
2014
2014
2014
2012
2016
2016
2006
2014
2014
2014
2012
11.162
.044
0
9.945
14.127
5.347
7.7
11.262
.052
12.769
10.085
14.459
10.432
7.8
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / PAVEMENT REHAB-PRI(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
![Page 35: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/35.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 35
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT ON US 60 BETWEEN OAKFORD RD LOOP (CR 1370) TO ADDRESSFLOODING PROBLEM IN THE VICINITY OF THE KIMBERLY-CLARK PLANT(14CCR)
TRANSPORTATION IMPROVEMENTS TO US 60 OWENSBORO, DAVIESS COUNTY.(2005HPP-KY158)(2005HPP-KY167)(SEE 2-287.20 FOR "STP" COMPONENT)
REPLACE BRIDGE OVER BURNETT FORK ON FIELDS RD (CR 1014) 0.75 MI W OF KY142 030C00001N SR 39 (14CCR)
UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.
UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.
WIDENING KY-54 FROM THE US-60 BYPASS TOWARD WHITESVILLE FROMMILEPOST 4.51 TO MILEPOST 8.0. (06CCN)(10CCR)(12CCR)(14CCR)(16CCR)
ADDRESS SUBSTANDARD ROADWAY GEOMETRICS AND SAFETY CONCERNS ONKY 1456 FROM KY 54 TO HAYDEN ROAD. MP 2.778 TO 4.714 (SEE 2-8709.00)(14CCN)(16CCR)
GRAVES LANE BRIDGE REPLACEMENT-0.2 MI E JCT KY 405 (MM 1.005-1.009) OVERALLGOOD DITCH. (14CCN)(SR 47.5) 030C00016N
.592
2.200
.014
3.500
1.936
.004
DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
US-60
US-60
CR-1014
WN-9007
WN-9007
KY-54
KY-1456
CR-1053
$3,000,000
$2,000,000
$500,000
$10,000,000
$11,000,000
$64,480,000
$14,250,000
$915,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
R
U
C
C
C
R
U
C
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2016
2016
2016
2017
2018
2020
2017
2018
2019
2016
2016
2018
2016
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
HPP
BRZ
BRZ
BRZ
NH
NH
SPP
SPP
SPP
SPP
SPP
SB2
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$500,000
$500,000
$2,000,000
$2,000,000
$75,000
$75,000
$350,000
$10,000,000
$11,000,000
$13,000,000
$17,730,000
$33,750,000
$1,500,000
$1,500,000
$11,250,000
$75,000
$80,000
$760,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
02
237.00
287.52
1093.00
2092.00
2092.01
8300.00
8801.00
8813.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
OHIO
OHIO
02
02
02
02
02
02
02
02
237.00
287.52
1093.00
2092.00
2092.01
8300.00
8801.00
8813.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2004
2014
2016
2016
2006
2014
2014
2014
2004
2014
2016
2016
2006
2014
2014
5.69
1.326
4.505
2.778
1
6.282
1.34
8.003
4.714
1.014
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 36: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/36.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 36
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
EXTEND THE CURRENT 4 LANES TO THE ROUNDABOUT AT KY-56/KY-81. (14CCN)
WIDEN KY 3143 TO 3 LANES WITH CURB AND GUTTER FROM KY 3335 TO KY 54.(14CCN)
WIDEN KY 331 LANE AND SHOULDERS FROM INTERSECTION WITH SECONDSTREET (MP 0.436) TO HARBOR ROAD (MP 1.991). (16CCN)
RECONSTRUCT KY-70/KY-259 FROM 0.36 MILE NORTH GREEN RIVER BRIDGE ATBROWNSVILLE TO 0.42 MILE NORTH OF THE KY-70/KY-259INTERSECTION.(06CCR)(2004BOPC)(12CCR)(14CCR)
RECONSTRUCT KY-259 FROM 0.42 MILE NORTH OF THE KY-70 INTERSECTION TONORTH OF THE KYROCK ELEMENTARY SCHOOL (PRIORITY SECTION).(2004BOPC)
RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROADTO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(06CCR) (08CCR)(10CCR)(12CCR)(14CCR)(16CCR)
RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROADTO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(16CCR)
.556
1.129
.900
3.400
6.656
6.656
DAVIESS
DAVIESS
DAVIESS
EDMONSON
EDMONSON
ELLIOTT
ELLIOTT
KY-81
KY-3143
KY-331
KY-259
KY-259
KY-32
KY-32
$3,800,000
$12,855,000
$800,000
$8,490,000
$25,610,000
$38,620,000
$20,000,000
Total
Total
Total
Total
Total
Total
Total
U
C
D
R
U
C
D
R
U
C
R
U
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2017
2016
2017
2017
2018
2022
2017
2017
2018
2016
2016
2018
2017
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SP
SPP
SPP
SPP
SP
SP
SP
STP
STP
STP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$800,000
$3,000,000
$630,000
$2,475,000
$3,000,000
$6,750,000
$800,000
$1,540,000
$1,470,000
$5,480,000
$3,480,000
$1,690,000
$20,440,000
$7,720,000
$10,900,000
$20,000,000
$20,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
03
03
09
09
8851.00
8854.00
8952.00
7030.10
7030.50
192.01
192.02
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
03
03
09
09
8851.00
8854.00
8952.00
7030.00
7030.00
192.00
192.02
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2016
2004
2004
2006
2016
2014
2014
2016
1998
1998
2006
2016
11.13
1.829
11.676
12.096
2
2
11.686
2.958
12.096
16.204
8.656
8.656
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 37: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/37.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 37
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT KY-32 FROM KY-504 NEAR ELLIOTTVILLE TO 0.408 MI WEST OFSTEGALL COLD SPRING ROAD IN ELLIOTT COUNTY. (10CCR)(16CCN)
RECONSTRUCT KY-32 FROM KY-504 NEAR ELLIOTTVILLE TO 0.408 MI WEST OFSTEGALL COLD SPRING ROAD IN ELLIOTT COUNTY. (16CCN)
RECONSTRUCT KY 7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR)(16CCR)
RECONSTRUCT KY 7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR)(16CCN).
RECONSTRUCT KY 7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR) (16CCN).
KY-32 FROM 9.2 MILE MARKER TO 10.2 MILE MARKER WIDENING.(14CCN)(16CCR)
RECONSTRUCT KY-89 FROM 260' SOUTH OF RICE ST. IN IRVINE TO THE IRVINEBY-PASS.(10CCR)
NEW CIRCLE ROAD REHAB AND WIDENING FROM LEESTOWN ROAD TO NEARGEORGETOWN ROAD. (12CCR)(14CCR)
6.956
1.000
.900
3.400
ELLIOTT
ELLIOTT
ELLIOTT
ELLIOTT
ELLIOTT
ELLIOTT
ESTILL
FAYETTE
KY-32
KY-32
KY-7
KY-7
KY-7
KY-32
KY-89
KY-4
$55,000,000
$22,000,000
$41,380,000
$9,500,000
$9,500,000
$9,200,000
$6,200,000
$18,000,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
D
R
U
C
C
C
D
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2018
2020
2021
2018
2018
2019
2020
2021
2022
2017
2017
2017
2019
2016
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
SP
SP
SP
SP
STP
SP
SP
SP
SP
SP
STP
STP
STP
STP
SPP
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,000,000
$9,000,000
$6,000,000
$35,000,000
$22,000,000
$3,380,000
$12,000,000
$6,000,000
$20,000,000
$9,500,000
$9,500,000
$750,000
$850,000
$600,000
$7,000,000
$6,200,000
$18,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
10
07
192.03
192.04
228.00
228.10
228.20
8802.00
363.10
113.02
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
MORGAN
09
09
09
09
09
09
10
07
192.03
192.04
228.00
228.10
228.20
8802.00
363.00
113.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2012
2016
2016
2014
2000
2014
2016
2016
2012
2016
2016
2014
1996
2006
0
0
9.2
11.851
7.26
2
6.956
10.2
12.811
8.26
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
7.887 11.121Milepoints: To:From:
![Page 38: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/38.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 38
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT/WIDEN US-25 FROM SPURR ROAD SOUTH OF I-75 TO 1400 FEETSOUTH OF IRONWORKS ROAD. (06CCN)(08CCR)(10CCR)(12CCR)(16CCR)
RICHMOND ROAD MULTIUSE PATH IN LEXINGTON BETWEEN EAGLE CREEKDRIVE AND JACOBSON PARK. (LOCAL MATCH) (ALL WORK BY LFUCG)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
CLAYS MILL ROAD; WIDEN FROM HARRODSBURG ROAD TO NEW CIRCLE ROAD(SECTION 1) (LFUCG T.I.P.) (LOCAL MATCH) (ALL WORK BY LFUCG)(CONSTRUCTION SEQU. 2) (SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2017. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)
3.200
1.000
1.900
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
US-25
US-25
CS-4174
-
-
-
-
-
-
$34,970,000
$690,000
$13,415,000
$3,900,000
$4,600,000
$8,000,000
$8,200,000
$8,200,000
$8,200,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
R
U
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2017
2016
2016
2017
2017
2018
2019
2020
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SLX
SLX
SLX
SLX
SLX
SLX
SLX
SLX
SLX
SLX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$12,170,000
$3,520,000
$19,280,000
$690,000
$1,400,000
$280,000
$11,735,000
$3,900,000
$4,600,000
$8,000,000
$8,200,000
$8,200,000
$8,200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
07
122.10
220.00
224.10
227.10
227.11
227.13
227.14
227.15
227.16
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
07
07
122.10
996.04
224.00
227.10
227.11
227.13
227.14
227.15
227.16
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2000
2000
2012
2012
2014
2014
2016
2016
2006
1996
2000
2012
2012
2014
2014
2016
2016
18.264
8.4
0
21.415
9.55
2.01
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
![Page 39: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/39.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 39
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
SOUTH ELKHORN TRAIL IN LEXINGTON (PRIORITY SECTION 2); FROM JOSEPHBRYAN WAY THROUGH NS RAILROAD TUNNEL TO WAVELAND HISTORIC SITE(ALL WORK BY LFUCG). (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP).
SOUTH ELKHORN TRAIL(PRIORITY SECTION 3); FROM LOCHDALE TERRACE,EXTENDING NORTHERLY UNDER MAN O' WAR BOULEVARD TO SHILLITOPARK.(LOCAL MATCH)(DESIGN BY LFUCG)(ALL WORK BYLFUCG)(2004BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).
SIX-LANE NEWTOWN PIKE FROM KY-4 TO I-75. (16CCR)
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2017.(12CCR)
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2018.(12CCR)
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2019.(12CCR)
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2020.(12CCR)
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2021.(12CCR)
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2022.(12CCR)
.300
.300
1.837
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
-
-
KY-922
KY-169
KY-169
KY-169
KY-169
KY-169
KY-169
$400,000
$625,000
$28,150,000
$330,000
$330,000
$330,000
$330,000
$330,000
$330,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
R
U
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2017
2016
2019
2019
2017
2018
2019
2020
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLX
SLX
STP
STP
STP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$400,000
$625,000
$3,150,000
$5,000,000
$20,000,000
$330,000
$330,000
$330,000
$330,000
$330,000
$330,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
07
229.20
229.30
252.00
357.14
357.15
357.16
357.17
357.18
357.19
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
MADISON
MADISON
MADISON
MADISON
MADISON
MADISON
07
07
07
07
07
07
07
07
07
229.00
229.00
252.00
357.14
357.15
357.16
357.17
357.18
357.19
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2002
2004
2000
2012
2012
2014
2014
2016
2012
2000
2000
2000
2012
2012
2014
2014
2016
2012
1.47
0
0
0
0
0
0
3.22
.1
.1
.1
.1
.1
.1
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
12.411
12.411
12.411
12.411
12.411
12.411
12.449
12.449
12.449
12.449
12.449
12.449
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
![Page 40: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/40.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 40
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TOBOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION ATNEWTOWN PIKE.(2002BOPC)(2004BOPP)(10CCR)(12CCR)(14CCR)
WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TOBOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION ATNEWTOWN PIKE. (ADDITIONAL C-FUNDS FOR 7-366.00)
WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TOBOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION ATNEWTOWN PIKE. (ADDITIONAL C-FUNDS FOR 7-366.00)
STREAM RESTORATION ALONG CANE RUN AT THE KENTUCKY HORSE PARK FORGENERATION OF STREAM "CREDITS" DUE TO HIGHWAY PROJECT IMPACTS INTHE LOWER KENTUCKY RIVER WATERSHED. (2006BOPC)
REPLACE L&N RAILROAD BRIDGE OVERPASS (MP 8.378), IMPROVE DRAINAGEAND TYPICAL SECTION ON US 27 (NORTH BROADWAY)(12CCR)(14CCR)(16CCR)
CONSTRUCT AN ADDITIONAL LANE ON KY 922 (NEWTOWN PIKE) FROM PINTAILDR (MAIN ENTRANCE TO THE MARRIOTT GRIFFIN GATE) TO THE BEGINNING OFTHE SOUTHBOUND I-75 ENTRANCE RAMP.(12CCR)(14CCR)
IMPROVE ROADWAY TYPICAL SECTION AND PAVEMENT ON KY 2335 (WARE RD)FROM KY 57 (BRIAR HILL RD) TO NORTHERN ENTRANCE TO LEXINGTONBLUEGRASS ARMY DEPOT. (NOTE: DISTRICT IS ANTICIPATING EXPANSION OFLOCKHEED MARTIN FACILITY AT BLUEGRASS STATION)(12CCR)(16CCR)
CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS-4524) AND PINK PIGEON PKWY (CS-2540).
1.300
1.300
1.300
.126
.330
2.100
.100
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
KY-4
KY-4
KY-4
-
US-27
KY-922
KY-2335
CS-4524
$12,000,000
$12,000,000
$10,930,000
$2,000,000
$16,030,000
$2,800,000
$10,600,000
$456,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
R
U
C
R
U
C
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2016
2018
2019
2021
2016
2016
2017
2016
2017
2017
2018
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
SP
SPP
SPP
SPP
NH
NH
NH
SPP
SPP
SPP
SPP
SLX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$12,000,000
$12,000,000
$10,930,000
$2,000,000
$2,440,000
$1,550,000
$12,040,000
$1,500,000
$500,000
$800,000
$600,000
$4,000,000
$1,000,000
$5,000,000
$456,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
366.00
366.02
366.03
384.00
412.00
413.00
415.00
426.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
99
07
07
07
07
996.08
366.00
366.00
152.08
412.00
413.00
415.00
426.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2002
2016
2016
2006
2012
2012
2012
2014
1998
2002
2002
2006
2012
2012
2012
2014
8.731
8.731
8.731
8.324
2.72
0
14.722
10.015
10.015
10.015
8.45
3.05
2.1
14.822
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / ENVIRO MITIGATION(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
![Page 41: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/41.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 41
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS4524) AND ALUMNI DRIVE (CS 3016).
CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS-4524) AND RICHMOND ROAD (US-25).
INSTALL LIGHTING TO COMPLETE UPGRADE OF ALUMNI DR. BETWEENNICHOLASVILLE ROAD AND TATES CREEK ROAD. (16CCN)
NEWTOWN PIKE EXTENSION - PRIORITY 4: FROM EXISTING NEWTOWN PIKE &PATTERSON TO SOUTH LIMESTONE. (PHASE III - SCOTT STREETCONNECTOR)(14CCR)(16CCR)
REPLACE BRIDGE ON US 421 OVER FORK OF TOWN BRANCH AT INTERSECTIONOF US 421 AND BRACKTOWN RD (CS 4008)(SR 27.8) 034B00018N
REPLACE BRIDGE ON MALABU DRIVE (CS 3605) OVER BRANCH HICKMAN CREEKAT JCT WITH TATES CREEK ROAD (KY 1974)(SR 40) 034C00038N
REPLACE BRIDGE OVER BRANCH OF NORTH ELKHORN CREEK ON HUME ROAD(CR 1001) 0.7 MI NW OF US 60 (034C00001N)(SR=44.5)
SCOPING STUDY TO RECONSTRUCT/WIDEN US-60/WINCHESTER ROAD TO FOURLANES. (06CCN)(12CCR)
.100
.100
.040
.040
.900
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
CS-4524
CS-4524
-
-
US-421
CS-3605
CR-1001
US-60
$743,000
$590,000
$550,000
$22,879,700
$1,050,000
$700,000
$1,350,000
$280,000
Total
Total
Total
Total
Total
Total
Total
Total
R
C
R
C
C
R
U
C
R
U
C
R
U
C
D
R
U
C
P
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2016
2017
2016
2016
2018
2016
2016
2017
2016
2016
2018
2019
2021
2021
2022
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLX
SLX
SLX
SLX
SPP
SPP
SPP
SPP
BRO
BRO
BRO
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$18,000
$725,000
$40,000
$550,000
$550,000
$8,657,000
$3,467,500
$10,755,200
$125,000
$125,000
$800,000
$100,000
$100,000
$500,000
$300,000
$100,000
$200,000
$750,000
$280,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
427.00
428.00
429.10
593.30
1129.00
1132.00
1141.00
8340.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
07
427.00
428.00
429.10
593.02
1129.00
1132.00
1141.00
8340.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2016
2006
2012
2012
2014
2006
2014
2014
2016
2004
2012
2012
2014
2006
11.773
12.736
4.426
1.656
1.6
12.5
11.873
12.836
4.466
1.696
1.64
13.4
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SAFETY(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / SCOPING STUDY(O)
![Page 42: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/42.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 42
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
SCOPING STUDY TO RECONSTRUCT/WIDEN US-60/WINCHESTER ROAD FROMMAN-O-WAR BOULEVARD TO THE CLARK COUNTY LINE. (06CCN)(12CCR)
SCOPING STUDY TO RECONSTRUCT/WIDEN KY-4/NEW CIRCLE ROAD FROMNEWTOWN PIKE TO WINCHESTER ROAD. (06CCN)(12CCR)
COMPLETE CONSTRUCTION ON POLO CLUB BOULEVARD AT DEERHAVEN LANEAND TODDS ROAD. (08CCN)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)
SOUND BARRIERS ALONG OUTER LOOP OF NEW CIRCLE ROAD BETWEEN TATESCREEK ROAD AND NICHOLASVILLE ROAD. (14CCN)
SOUND BARRIERS ALONG INNER LOOP OF NEW CIRCLE ROAD BETWEEN TATESCREEK ROAD AND ALUMNI DRIVE. (14CCN) (16CCR)
SOUND BARRIERS ALONG INNER LOOP OF NEW CIRCLE ROAD BETWEEN TATESCREEK ROAD AND NICHOLASVILLE ROAD. (14CCN)
SOUND BARRIERS ALONG OUTER LOOP OF NEW CIRCLE ROAD BETWEEN TATESCREEK ROAD AND ALUMNI DRIVE. (14CCN)
SIDEWALK INSTALLATION ON BRYAN STATION ROAD FROM PREAKNESS DRIVETO HERMITAGE DRIVE. (14CCN)
EXTEND CITATION BLVD. (16CCN)
5.850
3.300
1.219
1.636
1.219
1.636
.380
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
US-60
KY-4
CS-2548
KY-4
KY-4
KY-4
KY-4
KY-57
-
$280,000
$340,000
$1,550,000
$4,600,000
$5,000,000
$5,000,000
$5,000,000
$250,000
$11,500,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
P
P
C
C
C
C
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2016
2017
2018
2019
2016
2017
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SLX
SPP
SPP
SP
SP
SPP
SPP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$280,000
$340,000
$1,550,000
$4,600,000
$5,000,000
$5,000,000
$5,000,000
$250,000
$1,000,000
$1,300,000
$1,100,000
$8,100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
07
8341.00
8342.00
8507.00
8801.00
8804.00
8805.00
8806.00
8812.00
8901.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
07
07
8341.00
8342.00
8507.00
8801.00
8804.00
8805.00
8806.00
8812.00
8901.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2006
2008
2014
2014
2014
2014
2014
2016
2006
2006
2008
2014
2014
2014
2014
2014
2016
13.4
9.4
17.778
16.142
17.778
16.142
.912
19.25
12.7
18.997
17.778
18.997
17.778
1.292
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SCOPING STUDY(O)
RELIABILITY / SCOPING STUDY(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
NEW ROUTES / NEW ROUTE(O)
![Page 43: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/43.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 43
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
EXTEND THE EXISTING 4-LANE ON LIBERTY ROAD FROM GRAFTONS MILL LANE(MP 1.145) TO NEW CIRCLE ROAD (MP 0.0) AND IMPROVE INTERSECTION WITHNEW CIRCLE ROAD. (16CCN)
WIDEN I-64/I-75 TO 8 LANES FROM BRYAN STATION OVERPASS (MP 112.012) TONORTHERN SPLIT (MP 117.665) TO ALLEVIATE CONGESTION (SECTION 1). (16CCN)
WIDEN I-75 TO 8 LANES FROM C&O RAILROAD BRIDGE (MP 107.417) TO BRYANSTATION OVERPASS (MP 112.012) TO ALLEVIATE CONGESTION (SECTION 2).(16CCN).
REPLACE BRIDGE ON KY 32 OVER MUD LICK CREEK 0.2 MILES W OFCRAINTOWN RD (CR 1302)(SR 48.9) 035B00038N
REPLACE BRIDGE OVER ALLISON CREEK ON KY 111 1.2 MI N OF KY 156.(035B00016N)(SR=32.1)(EBRP)
REPLACE BRIDGE OVER FLEMING CREEK ON MCINTIRE ROAD (CR 1240) AT THEJCT WITH PIKE BLUFF (CR 1305)(035C00065N)(SR=24)
RESTORATION OF RINGO'S MILL COVERED BRIDGE LOCATED ON KY 158 ATRAWLINGS ROAD APPROX 7.274 MILES EAST OF HILLSBORO (FY2010 AND FY2011NHCB PROJECT) (2010 BOPC).
.040
.020
.024
FAYETTE
FAYETTE
FAYETTE
FLEMING
FLEMING
FLEMING
FLEMING
KY-1927
I-75
I-75
KY-32
KY-111
CR-1240
KY-158
$19,500,000
$43,500,000
$1,000,000
$800,000
$1,550,000
$1,075,000
$508,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2020
2017
2017
2018
2019
2017
2016
2016
2017
2020
2021
2021
2022
2017
2019
2019
2020
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SP
SP
SP
IM
IM
IM
IM
IM
BRO
BRO
BRO
BRX
BRX
BRX
BRX
BRZ
BRZ
BRZ
BRZ
KYD
KYD
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,600,000
$3,900,000
$4,000,000
$10,000,000
$500,000
$1,500,000
$1,500,000
$40,000,000
$1,000,000
$150,000
$250,000
$400,000
$500,000
$100,000
$200,000
$750,000
$350,000
$75,000
$50,000
$600,000
$5,000
$503,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
09
09
09
09
8902.00
8909.00
8910.00
1084.00
1091.00
1092.00
3021.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
09
09
09
09
8902.00
8909.00
8910.00
1084.00
1091.00
1092.00
3021.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2012
2014
2014
2010
2016
2016
2016
2012
2014
2014
2010
7.76
11.84
2.04
7.8
11.86
2.064
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REHAB(P)
![Page 44: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/44.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 44
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
SURFACE INDUSTRIAL PARK ROAD ON KY-11. (06CCN)(10CCR)
RECONSTRUCT/IMPROVE KY-57 FROM THE FLEMING COUNTY COURTHOUSE TOSLEEPY RUN CREEK. (06CCN)(10CCR)
RESTORATION OF GRANGE CITY COVERED BRIDGE LOCATED ON KY-111BETWEEN FLEMINGSBURG AND GRANGE CITY. (14CCN) (16CCR)
UPGRADE, WIDEN, AND PROVIDE SPOT IMPROVEMENTS ON KY-165 TO IMPROVESAFETY FROM KY-32 TO US-68. (14CCN)
CORRECT GEOMETRIC AND WIDTH DEFICIENCIES BEGINNING AT SLEEPY RUNBRIDGE EXTENDING TO 0.5 MILES SOUTH OF LEWIS COUNTY LINE TO IMPROVEOPERATIONAL EFFICIENCY, SIGHT DISTANCE RESTRICTIONS AND OVERALLFLOW OF TRAFFIC. (14CCN)
CONSTRUCT LEFT TURN LANES ON KY 11 AT ROSS DRIVE, TAYLOR MILL ANDTHE INDUSTRIAL PARK ROAD. (16CCN)
IMPROVE ACCESS AND RESPONSE TIMES FOR THE FLEMINGSBURG FIREDEPARTMENT TO THE BYPASS AT MP 11.574. (16CCN)
SAFETY IMPROVEMENTS AND PAVEMENT REHAB EAST OF FLEMINGSBURGBYPASS TO KY 156. (16CCN)
.200
2.008
6.239
6.704
FLEMING
FLEMING
FLEMING
FLEMING
FLEMING
FLEMING
FLEMING
FLEMING
KY-11
KY-57
KY-111
KY-165
KY-57
KY-11
KY-11
KY-32
$520,000
$300,000
$1,200,000
$6,400,000
$2,000,000
$1,750,000
$80,000
$14,500,000
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
D
R
U
C
D
D
R
U
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2017
2017
2018
2019
2016
2017
2018
2019
2020
2018
2018
2019
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
TE
SPP
SPP
SPP
SPP
SP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$520,000
$300,000
$1,200,000
$900,000
$250,000
$250,000
$5,000,000
$2,000,000
$250,000
$400,000
$350,000
$750,000
$80,000
$750,000
$1,500,000
$1,500,000
$10,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
09
8300.00
8305.00
8804.00
8815.00
8817.00
8901.00
8902.00
8903.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
09
09
09
09
09
8300.00
8305.00
8804.00
8815.00
8817.00
8901.00
8902.00
8903.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2006
2014
2014
2014
2016
2016
2016
2006
2006
2014
2014
2014
2016
2016
2016
13.3
1.728
0
2.108
13.5
2.273
6.239
8.812
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ECONOMIC DEVELOPMENT / ECONOMIC DEVEL(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REHAB(P)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / DESIGN ENGINEERING(O)
RELIABILITY / SAFETY(P)
RELIABILITY / SAFETY(P)
SAFETY / SAFETY(P)
![Page 45: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/45.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 45
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
MOUNTAIN PARKWAY CORRIDOR: EXTEND THE FOUR LANE MOUNTAINPARKWAY FROM THE MAGOFFIN/FLOYD COUNTY LINE TO THE HEAD OF LEFTFORK OF ABBOTT CREEK. (SEE 12-1.01 FOR PE & ENV)(14CCR)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: EXTEND THE FOUR LANE MOUNTAINPARKWAY FROM THE HEAD OF LEFT FORK OF ABBOTT CREEK TO NEELEYBRANCH ROAD. (SEE 12-1.01 FOR PE & ENV)(14CCR)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: EXTEND THE FOUR LANE MOUNTAINPARKWAY FROM NEELEY BRANCH ROAD TO COUNTY ROAD 1386 ATPRESTONSBURG ELEMENTARY SCHOOL. (SEE 12-1.01 FOR PE &ENV)(14CCR)(16CCR)
MITIGATE SAFETY HAZARDS DUE TO SPEED, POOR ACCESS CONTROL BETWEENKY 80 AND INTERSECTION WITH KY 3384.(12CCR)
SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBOSCHOOL.(12CCR)(16CCR)
MINNIE-HAROLD CONNECTOR; FROM LITTLE MUD CREEK RD TO MOUTH OFTACKETT CREEK (ALT.3B SEC.2). KYTC SHALL CONSIDER DESIGN-BUILDOPPORTUNITY.(08CCN)(10CCR)(12CCR)(14CCR)
UPGRADE EXISTING FLOYD COUNTY WEIGH STATION.
REPLACE BRIDGE AND APPROACHES ON KY-466 OVER LEFT FORK BEAVERCREEK (B30). (SR=37.5): (036B00030N)
3.500
3.900
1.800
1.000
1.179
2.800
.100
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
KY-114
KY-114
KY-114
US-23
KY-979
KY-680
US-23
KY-466
$82,120,000
$54,700,000
$55,800,000
$2,700,000
$11,500,000
$25,220,000
$1,000,000
$1,090,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
D
R
U
C
R
U
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2021
2022
2019
2020
2020
2022
2018
2019
2019
2022
2016
2016
2018
2018
2016
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
SP
SP
SP
NH
SP
SP
SP
NH
SP
SP
SP
NH
NH
NH
SB2
SPP
NH
BRX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,900,000
$6,020,000
$1,200,000
$72,000,000
$3,200,000
$4,000,000
$4,500,000
$43,000,000
$1,800,000
$3,000,000
$4,000,000
$47,000,000
$400,000
$500,000
$1,800,000
$11,500,000
$25,220,000
$1,000,000
$1,090,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
12
1.20
1.30
1.40
191.00
195.00
301.20
345.00
1084.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
12
1.01
1.01
1.01
191.00
195.00
301.00
345.00
1084.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2014
2012
2012
1998
2016
2004
1996
1996
1996
2012
2012
1996
2016
2004
0
3.48
7.354
12.775
12.389
21.5
3.559
3.48
7.354
9.092
13.775
13.95
21.8
3.599
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / WEIGH STA REHAB(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 46: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/46.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 46
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON KY 1100 OVER LITTLE PAINT CREEK NEARFLOYD/JOHNSON COUNTY LINE (SR 47.1) 036B00002N
REPLACE BRIDGE OVER LEVISA FORK ON KY 2557 AT JCT US 23 IN JUSTELL.(036B00040N)(SR=19.9)
REPLACE BRIDGE OVER BRUSH CREEK ON KY 550 AT JCT WITH KY 850.(036B00015N)(SR=41.3)(EBRP)
CURVE REVISION TO INCLUDE IMPROVED SIGHT DISTANCE AND A LEFT TURNLANE ON KY-122 AT THE KY-680 INTERSECTION IN MCDOWELL. (02CCN)(12CCR)
IMPROVE ACCESS TO KY 80 AT GARRETT EASTBOUND AND ELIMINATENECESSITY FOR CROSSING WESTBOUND LANES TO MERGE INTO EASTBOUNDLANES. MP 1.527 TO MP 1.827 (12CCN)
BRIDGE OFF OF KY-1428 ACROSS LEVISA FORK TO SERVE BIG SANDYWASTEWATER TREATMENT PLANT. (14CCN)
MOUNTAIN PARKWAY EXPANSION FROM PRESTONSBURG TO WEST VIRGINIALINE. (16CCN)
WIDEN US 60 FROM JUST EAST OF THE EXISTING BRIDGE OVER SOUTH BENSONCREEK (B97) TO JUST WEST OF VICKY WAY, WEST OF FRANKFORT,KY.(04CCN)(10CCR)
.146
.040
.100
.300
1.400
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FRANKLIN
KY-1100
KY-2557
KY-550
KY-122
KY-80
KY-1428
-
US-60
$1,110,000
$5,050,000
$1,800,000
$3,950,000
$3,500,000
$2,840,000
$3,000,000
$12,390,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
D
R
U
C
D
R
U
C
C
R
C
C
P
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2019
2020
2020
2022
2019
2020
2020
2022
2016
2016
2017
2016
2017
2017
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRX
BRX
BRX
BRX
BRX
BRX
BRX
BRX
BRX
BRX
BRX
SPP
SPP
SPP
SPP
NH
SPP
SPP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$75,000
$135,000
$900,000
$750,000
$300,000
$500,000
$3,500,000
$300,000
$200,000
$300,000
$1,000,000
$3,950,000
$500,000
$3,000,000
$2,840,000
$3,000,000
$4,640,000
$2,340,000
$5,410,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
05
1111.00
1119.00
1121.00
8100.00
8703.00
8806.00
8901.00
97.50
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
05
1111.00
1119.00
1121.00
8100.00
8703.00
8806.00
8901.00
97.50
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2014
2014
2002
2012
2014
2016
1998
2012
2014
2014
2002
2012
2014
2016
1998
5.231
.152
2.03
18.5
1.527
2.78
5.271
.298
2.07
18.678
1.827
3.9
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
RELIABILITY / CONGESTION MITIGTN(O)
ECONOMIC DEVELOPMENT / ECONOMIC DEVEL(O)
RELIABILITY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
![Page 47: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/47.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 47
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
FRANKFORT-NEWCASTLE; RECONSTRUCT US-421 FROM TOP OF BALD KNOBHILL AT END OF RECONSTRUCTED SECTION TO HARVIELAND ROAD.(10CCR)
ENHANCEMENT OF US 60 (EAST MAIN STREET) FROM MARTIN LUTHER KINGBLVD TO SCHENKEL LANE IN FRANKFORT. (PEDESTRIAN BRIDGE UNDER ITEMNO. 5-8714) (08CCR)(12CCR)
DEMOLITION OF THE CLOSED ROADWAY SECTION OF THE BROADWAY BRIDGEIN FRANKFORT, KENTUCKY.
REPLACE BRIDGE ON US-421 (MP 13.09) OVER FLAT CREEK; 2.0 MI NORTH OF JCTKY 12; (STRUCTURALLY DEFICIENT, SR=46.8) 037B00023N
REPLACE BRIDGE ON US-421 (MP 14.059) OVER HUDSON CREEK; 2.8 MI NORTH OFJCT KY 12; (STRUCTURALLY DEFICIENT, SR=48.9) 037B00024N
REPLACE BRIDGE ON US-421 (MP 15.091) OVER LITTLE FLAT CREEK; 3.8 MINORTH OF JCT KY 12; (STRUCTURALLY DEFICIENT, SR=48.7) 037B00025N
REPLACE BRIDGE ON US 460 OVER SOUTH ELKHORN CREEK AT INTERSECTIONOF US 460 AND N SCRUGGS LN(CR 1010)(SR 41.3) 037B00006N (PART-WIDTHCONSTRUCTION ON EXISTING LOCATION)
REPLACE BRIDGE OVER BENSON CREEK ON CRAB ORCHARD ROAD (CR 1230) 200FT NW OF KY 151 NEAR I-64 EXIT 48 (037C00010N)(SR=23.9) (EBRP)(16CCR)
1.500
.810
.100
.100
.100
.025
FRANKLIN
FRANKLIN
FRANKLIN
FRANKLIN
FRANKLIN
FRANKLIN
FRANKLIN
FRANKLIN
US-421
US-60
-
US-421
US-421
US-421
US-460
CR-1230
$4,470,000
$1,720,000
$300,000
$640,000
$310,000
$560,000
$1,000,000
$1,255,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
C
C
C
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2018
2018
2016
2017
2016
2016
2016
2017
2017
2018
2016
2017
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SPP
SPP
BRO
BRO
BRO
BRO
BRO
BRO
BRZ
BRZ
BRZ
BRZ
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$680,000
$2,440,000
$1,350,000
$1,720,000
$300,000
$640,000
$310,000
$560,000
$100,000
$200,000
$700,000
$350,000
$10,000
$20,000
$875,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
374.00
600.00
805.00
1057.00
1058.00
1059.00
1065.00
1078.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
374.00
600.00
805.00
1057.00
1058.00
1059.00
1065.00
1078.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2004
2008
2016
2010
2010
2010
2012
2014
2004
2008
2016
2010
2010
2010
2012
2014
5.809
9.338
13.04
14.009
15.041
2.177
.04
7.309
10.148
13.14
14.109
15.141
2.217
.065
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
SAFETY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 48: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/48.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 48
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
PAVEMENT REHAB AND BRIDGE WIDENING ON I-64 FROM MP 47.70 TO MP 53.75.(2004BOPC)(DESIGN FUNDED UNDER 5-2035.40)(16CCN)
STUDY OF TRAFFIC FLOW THROUGH DOWNTOWN FRANKFORT. (12CCN)(14CCN)(16CCN)
CONSTRUCTION AND SIDEWALK IMPROVEMENTS TO THE INTERSECTION OFSECOND STREET AND BRIDGE STREET INCLUDING THE SIDEWALK ALONGSECOND STREET TO EWING STREET. (14CCN)(16CCN)
IMPROVE DRAINAGE ALONG SLICKWAY BRANCH BY EXPANDING WATER SHEDBASIN AT JIM BEAM DISTRIBUTION CENTER ON US 421S TO IMPROVE DRAINAGEISSUES ON COUNTRY LANE. (16CCN)
RECONSTRUCT AND IMPROVE I-69 AT THE KENTUCKY/TENNESSEE STATE LINETO US-51 INTERCHANGE AT FULTON. (I-69 CORRIDOR IMPROVEMENT)(2012BOP)
RECONSTRUCT ELEMENTS OF THE EXISTING PURCHASE PARKWAY BETWEENMP 1 AND MP 20 INCLUDING THE RECONSTRUCTION OF THE KY339INTERCHANGE IN WINGO, KY. (I-69 CORRIDOR IMPROVEMENT) (2012BOP)
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2017.(12CCR)
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2018.(12CCR)
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2019.(12CCR)
5.420
.098
1.660
19.000
FRANKLIN
FRANKLIN
FRANKLIN
FRANKLIN
FULTON
FULTON
FULTON
FULTON
FULTON
I-64
-
US-60
US-421S
JC-9003
JC-9003
KY-1354
KY-1354
KY-1354
$29,480,000
$43,000
$610,000
$2,100,000
$7,830,000
$15,750,000
$126,000
$126,000
$126,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
C
C
D
R
U
R
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2020
2017
2017
2018
2019
2021
2022
2019
2021
2017
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
IM
IM
IM
SPP
TE
SB2
NH
NH
NH
NH
NH
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$120,000
$110,000
$29,250,000
$43,000
$610,000
$2,100,000
$3,000,000
$3,830,000
$1,000,000
$750,000
$15,000,000
$126,000
$126,000
$126,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
01
01
01
01
01
2035.70
8711.00
8813.00
8902.00
25.00
26.00
320.14
320.15
320.16
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
HICKMANGRAVES
05
05
05
05
01
01
01
01
01
2035.00
8711.00
8813.00
8902.00
25.00
26.00
320.14
320.15
320.16
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2012
2008
2012
2012
2014
2004
2016
2016
2016
2012
2008
2012
2012
2014
47.7
8.019
0
1
0
0
0
53.75
8.117
1.66
3.434
.1
.1
.1
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PAVEMENT REHAB-INT(P)
RELIABILITY / FEASIBILITY STUDY(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
3.4348.352
8.35220
Milepoints:Milepoints:
To:To:
From:From:
![Page 49: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/49.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 49
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2020.(12CCR)
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2021.
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2022.
REPLACE BRIDGE ON HOLLAND LN (CR 1011) OVER BRANCH OF HARRIS FORKCREEK 0.26 MILE E OF KENTUCKY AVE (KY 307)(SR 31.9)038C00001N(12CCR)(AR/W)
SAFETY IMPROVEMENT AT INTERSECTION OF KY-1099 AND KY-125. (14CCN)
RECONSTRUCT US-42 ALONG THE OHIO RIVER TO CORRECT LANDSLIDEPROBLEMS BETWEEN MARKLAND DAM AND CRAIGS CREEK.(U-04DEOB)(10CCR)(14CCR)
REPLACE BRIDGE OVER LITTLE SUGAR CREEK ON LITTLE SUGAR CREEK ROAD(CR 1001) 1.1 MI S OF US 42 (039C00002N)(SR=46.7)(EBRP)
IMPROVE SAFETY, CONGESTION, AND PEDESTRIAN AND FREIGHT MOBILITY ONUS 42 IN WARSAW FROM DAVIS DRIVE TO 0.4 MILES EAST OF DORMAN DRIVE.MP 7.281-7.8. (16CCN)
.038
3.500
.008
FULTON
FULTON
FULTON
FULTON
FULTON
GALLATIN
GALLATIN
GALLATIN
KY-1354
KY-1354
KY-1354
CR-1011
KY-1099
US-42
CR-1001
US-42
$126,000
$126,000
$126,000
$470,000
$2,740,000
$17,310,000
$200,000
$9,750,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
U
C
R
U
C
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2022
2016
2017
2016
2017
2018
2016
2016
2017
2018
2018
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
BRZ
BRZ
SPP
SPP
SPP
SPP
BRZ
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$126,000
$126,000
$126,000
$100,000
$370,000
$500,000
$780,000
$1,460,000
$17,310,000
$200,000
$1,000,000
$1,000,000
$750,000
$7,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
01
01
06
06
06
320.17
320.18
320.19
1148.00
8853.00
202.00
1089.00
8909.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
01
01
01
01
06
06
06
320.17
320.18
320.19
1148.00
8853.00
202.00
1089.00
8909.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2016
2012
2014
1996
2014
2016
2014
2016
2016
2012
2014
1996
2014
2016
0
0
0
.247
2.25
3.325
1.13
.1
.1
.1
.287
2.288
4.636
1.138
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
RELIABILITY / LANDSLIDE REPAIR(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
![Page 50: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/50.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 50
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT I-71 FROM US 127 FROM MP 62.8 TO MP 64 TO IMPROVEGEOMETRICS. (16CCN).
RECONSTRUCT US 27 FROM WEST LANCASTER BYPASS TO KY 34. (2006BOPC)(16CCN)
DEVELOP DESIGN FOR A TRAFFIC CIRCLE ON US-27 INLANCASTER.(12CCR)(14CCR)(16CCR)
REPLACE BRIDGE ON KY-1972 (MP 0.663) OVER BR OF TURKEY CREEK; .50 MIEAST OF JCT KY 39; (STRUCTURALLY DEFICIENT, SR=11.5) 040B00023N
REPLACE BRIDGE ON KY-563 (MP 3.89) OVER SUGAR CREEK; E-@ JCT KY 39;(STRUCTURALLY DEFICIENT, SR=21.7) 040B00034N
REPLACE BRIDGE OVER GILBERTS CREEK ON KY 1972 1.4 MI E OF CRABORCHARD ROAD (CR 1226) AT SECL OF LANCASTER. (040B00024N)(SR=35.5)(EBRP)
5.100
.053
.100
.100
.010
GALLATIN
GARRARD
GARRARD
GARRARD
GARRARD
GARRARD
I-71
US-27
US-27
KY-1972
KY-563
KY-1972
$35,200,000
$57,500,000
$710,000
$485,000
$580,000
$1,225,000
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
R
U
C
R
U
C
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2020
2021
2017
2018
2019
2020
2016
2016
2017
2016
2016
2017
2016
2016
2017
2020
2021
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
IM
IM
IM
IM
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BRX
BRX
BRX
BRX
BRX
BRX
BRX
BRX
BRX
BRX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,200,000
$1,500,000
$500,000
$31,000,000
$500,000
$10,000,000
$9,000,000
$38,000,000
$10,000
$150,000
$550,000
$75,000
$60,000
$350,000
$80,000
$70,000
$430,000
$300,000
$100,000
$75,000
$750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
07
07
07
07
07
8910.00
196.30
285.00
1120.00
1122.00
1138.00
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
07
07
07
07
07
8910.00
196.01
285.00
1120.00
1122.00
1138.00
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2006
2010
2010
2014
2016
2004
2006
2010
2010
2014
5.199
3.009
.613
3.84
1.76
10.331
3.062
.713
3.915
1.77
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / DESIGN ENGINEERING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 51: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/51.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 51
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
CONSTRUCT AN INTERCHANGE ON I-75 AT SHERMAN. (06CCN)(08CCN)(10CCN)
ROADWAY IMPROVEMENTS TO KY-36 FROM US-25 AT WILLIAMSTOWN TOAPPROXIMATELY 1 MILE EAST OF HEEKIN CLARKS ROAD.(12CCR)(14CCR)
REPLACE BRIDGE ON SOUTH END OF BLANCHET ROAD 0.3 MILES NORTHEASTOF US 25. (SR=35.9) 041C00012N (12CCN)
REPLACE BRIDGE ON NORTH END OF BLANCHET ROAD 0.2 MILES SOUTHEASTOF THE JUNCTION WITH US 25. (SR=28.1) 041C00014N (12CCN)
REPLACE BRIDGE ON NORTH END OF DELANEY ROAD 0.1 MILE NORTH OF THEJUNCTION WITH US 25. (SR=21.5) 041C00016N (12CCN)
MURRAY-MAYFIELD RD; EXTEND MAYFIELD SOUTHERN BYPASS FROM KY 303SOUTH OF MAYFIELD, NORTHWEST TO JULIAN M. CARROLL PARKWAY(PURCHASE PARKWAY). (EXTENSION OF 1-181.30)(00CCR)(12CCR)(14CCR)
REPLACE BRIDGE ON RULE SHACK ROAD OVER IC RAILROAD 0.4 MILE E OF KY339(SR29.3)042C00146N
1.000
2.900
.050
.070
.050
2.800
GRANT
GRANT
GRANT
GRANT
GRANT
GRAVES
GRAVES
I-75
KY-36
CR-1138
CR-1138
CR-1142
KY-80
CR-1384
$49,070,000
$10,510,000
$2,380,000
$2,690,000
$2,720,000
$17,310,000
$1,600,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
R
U
C
R
U
C
R
U
C
R
U
C
C
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2017
2019
2016
2016
2017
2017
2017
2019
2017
2017
2020
2016
2016
2017
2018
2016
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
STP
STP
STP
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRO
BRO
BRO
SPP
BRZ
BRZ
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,690,000
$1,350,000
$1,900,000
$44,130,000
$400,000
$1,010,000
$9,100,000
$270,000
$480,000
$1,630,000
$340,000
$100,000
$2,250,000
$180,000
$290,000
$2,250,000
$17,310,000
$350,000
$1,250,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
01
01
112.10
411.00
8714.00
8715.00
8716.00
181.50
1147.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
01
01
112.00
411.00
8714.00
8715.00
8716.00
181.30
1147.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2012
2012
2012
2012
2000
2012
2006
2012
2012
2012
2012
1998
2012
161.5
13.7
.28
1.95
.02
.403
162.5
14.761
.33
2.02
.07
.443
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW INTERCHANGE(O)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 52: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/52.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 52
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE OVER PANTHER CREEK ON MCKENDREE CHURCH RD (CR1088) 0.3 MI E OF KY 301 042C00010N SR 28.3
DESIGN FOR LEITCHFIELD BYPASS PRIORITY SECTION. (06CCN)(10CCR)
WIDEN PORTIONS OF US-62 FROM LEITCHFIELD TO CLARKSON.(08CCN)(10CCR)(14CCN)(16CCR)
PROVIDE A CONNECTION FROM EAST WHITE OAK STREET TO WEST CARROLLGIBSON BOULEVARD AT THE NEW JUDICIAL CENTER. (16CCN).
EXTEND THE WILLIAM THOMASON BYWAY (KY 3155) FROM THE SOUTHERNINTERSECTION AT KY 259 WESTERLY TO KY 54. (16CCN)
COLUMBIA TO GREENSBURG PRIORITY SECTION 1B: KY-61 FROM KY-487 ATGRESHAM, NW TO 5000' SE OF US-68 IN GREENSBURG. TO CONSTRUCTINTERSECTION IMPROVEMENT AT KY61-KY487; (SEE ITEM #8-128.12)(2005HPP-KY125)(2005HPP-KY161).
US 68 IMPROVEMENTS FROM T DAVIS RD TO CLOVER LICK CREEK (MP 6.425 TO11.744) AS PER 3-203 SCOPING STUDY (SPOT IMPROVEMENTS #11,12 & 13). (DESIGNUNDER 4-397)(2014BOP)(16CCN)
.100
4.000
5.319
GRAVES
GRAYSON
GRAYSON
GRAYSON
GRAYSON
GREEN
GREEN
CR-1088
-
US-62
CS-1145
KY-3155
KY-61
US-68
$1,070,000
$18,470,000
$12,520,000
$300,000
$7,000,000
$1,790,000
$24,800,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
R
U
C
D
D
R
U
C
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2021
2021
2022
2016
2018
2018
2016
2016
2019
2021
2018
2020
2020
2021
2016
2016
2017
2017
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
BRZ
BRZ
BRZ
SP
SP
SP
STP
STP
STP
SP
SPP
SPP
SPP
SPP
HPP
HPP
HPP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$280,000
$120,000
$120,000
$550,000
$2,710,000
$14,590,000
$1,170,000
$2,400,000
$1,000,000
$9,120,000
$300,000
$2,000,000
$1,800,000
$200,000
$3,000,000
$200,000
$100,000
$1,490,000
$2,500,000
$2,300,000
$20,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
04
04
04
04
04
04
1157.00
308.01
8502.00
8953.00
8954.00
158.10
397.10
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
04
04
04
04
08
04
1157.00
308.01
8502.00
8953.00
8954.00
128.12
397.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2006
2008
2016
2016
2010
2016
2014
2006
2008
2016
2016
2010
2012
.3
23
3.9
6.425
.4
25.5
4.25
11.744
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MINOR WIDENING(O)
NEW ROUTES / NEW ROUTE(O)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 53: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/53.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 53
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
CONSTRUCT NEW CONNECTOR FROM VAUGHN CURVE ON US-68 BYPASS EASTOF GREENSBURG CROSSING KY-61 AND KY-417 AND CONNECTING WITH KY-3535NORTH OF GREENSBURG.(SEE ITEM #8-8711)(12CCN)(14CCR)(16CCR)
CORRECT GEOMETRIC DEFICIENCIES AND IMPROVE SAFETY CONCERN AT THEUS-68/KY-61 INTERSECTION. (10CCN)
CONSTRUCT A TRUCK CLIMBING LANE, SHOULDERS, AND TURN LANE AT KY-323.(12CCN)(PROJECT MOVED FROM DISTRICT 8 UNDER ITEM NO.8-8712)(14CCR)(16CCR)
SPOT IMPROVEMENTS & IMPROVE EXISTING ALIGNMENT ON KY 88 FROM 0.20MILES WEST OF AKIN NARROWS OF PITMAN RD (MP 8.996) TO KY 61 (MP 11.232).(14CCN)(16CCR)
ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ON KY 61 TO KY 1906. (16CCN)
MINOR SPOT IMPROVEMENTS ON GABE ROAD. (16CCN)
ADDRESS GEOMETRIC DEFICIENCIES ON KY 323 NEAR DIXIE CREEK ROAD FROMMP 7.3 TO MP 7.5 TO IMPROVE FLOW OF TRUCK TRAFFIC THROUGH A SHARPHORIZONTAL CURVE. (16CCN).
.045
.390
2.236
GREEN
GREEN
GREEN
GREEN
GREEN
GREEN
GREEN
-
US-68
KY-61
KY-88
KY-61
KY-323
KY-323
$25,500,000
$2,970,000
$15,100,000
$7,600,000
$6,650,000
$890,000
$965,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
R
U
C
R
U
C
D
R
U
C
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2018
2016
2016
2017
2019
2019
2020
2021
2017
2018
2019
2020
2018
2019
2020
2018
2018
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SB2
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SP
SP
SP
SP
SP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,500,000
$2,000,000
$20,000,000
$2,970,000
$2,310,000
$3,790,000
$9,000,000
$1,600,000
$900,000
$5,100,000
$450,000
$900,000
$1,000,000
$4,300,000
$325,000
$145,000
$420,000
$75,000
$325,000
$145,000
$420,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
04
04
04
398.00
8603.00
8712.00
8853.00
8905.00
8910.00
8955.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
08
04
08
04
04
04
04
8711.00
8603.00
8712.00
8853.00
8905.00
8910.00
8955.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2010
2012
2014
2016
2016
2016
2012
2010
2012
2014
2016
2016
2016
11.519
11.379
8.996
12.2
14.093
11.232
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW ROUTE(O)
SAFETY / SAFETY-HAZARD ELIM(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / SAFETY(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
SAFETY / SAFETY(P)
![Page 54: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/54.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 54
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT KY-2 FROM MP 13.2 TO US-23 (MP 17.2)(08CCN)(14CCR)(16CCR)
INSTALL TRAFFIC SIGNAL AT THE INTERSECTION OF US 23 AND KY 503(WURTLAND RIVERPORT). (2014BOP)
REPLACE BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF JCTUS 23; (STRUCTURALLY DEFICIENT, SR=47.9) 045B00039N (16CCR)
REPLACE BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF JCTUS 23; (STRUCTURALLY DEFICIENT, SR=47.9) 045B00039N (ADDITIONAL FUNDINGFOR C PHASE)(16CCR)
REPLACE BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF JCTUS 23;(STRUCTURALLY DEFICIENT SR=47.9) 045B00039N (ADDITIONAL FUNDINGFOR C PHASE)(16CCN)
"DEMOLISH" BRIDGE ON CS-1023 (MP 0.121) OVER TOWN BRANCH; 100' S. JCT KY2541; (STRUCTURALLY DEFICIENT, SR=16.5) 045C00051N
REPLACE BRIDGE OVER POND RUN ON WILLIAMS AVE (CS 4041) IN RACELAND250 FT NW OF POND RUN ROAD (CS 4001) (045C00119N) (SR=27.3)
CONSTRUCT A NEW CONNECTOR ROAD CONNECTING FLATWOODS AT KY-207AND KY-693 AND THE INDUSTRIAL PARKWAY CONNECTOR BETWEEN I-64 ANDUS-60. (08CCN)(16CCR)
4.000
.100
.100
.016
GREENUP
GREENUP
GREENUP
GREENUP
GREENUP
GREENUP
GREENUP
GREENUP
KY-2
US-23
KY-244
KY-244
KY-244
CS-1023
CS-4041
KY-207
$45,450,000
$143,704
$6,090,000
$4,740,000
$4,370,000
$1,085,000
$1,200,000
$41,150,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
U
C
C
C
R
U
C
D
R
U
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2020
2016
2017
2018
2018
2018
2016
2016
2017
2019
2021
2021
2017
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SAH
BRO
BRO
BRO
BRO
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
STP
STP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$6,070,000
$3,380,000
$36,000,000
$143,704
$1,090,000
$5,000,000
$4,740,000
$4,370,000
$60,000
$25,000
$1,000,000
$350,000
$500,000
$350,000
$8,400,000
$6,750,000
$26,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
09
132.00
395.00
1073.00
1073.01
1073.02
1078.00
1094.00
8509.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
09
09
09
09
09
132.00
208.02
1073.00
1073.00
1073.00
1078.00
1094.00
8509.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
1998
2014
2010
2014
2016
2010
2014
2008
1998
2014
2010
2010
2010
2010
2014
2008
13.2
7.387
0
0
0
.071
.05
17.2
7.767
.207
.207
.207
.171
.066
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PE & ENVIRONMENTAL(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW ROUTE(O)
![Page 55: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/55.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 55
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
IMPROVE CONNECTION BETWEEN US-60 AND CANNELTON BRIDGE APPROACHAT HAWESVILLE. (06CCR) (08CCR) (10CCR)(12CCR)
MINOR WIDENING OF OLD TWO WESTBOUND LANES OF US 60.(12CCR)(14CCR)
BRIDGE PAINTING OF THE BOB CUMMINGS LINCOLN TRAIL BRIDGE OVER THEOHIO RIVER BETWEEN CANNELTON, INDIANA AND HAWESVILLE, KENTUCKY.INDOT IS THE LEAD STATE ON THE PROJECT. (2014BOP)
BRIDGE PAINTING OF THE BOB CUMMINGS LINCOLN TRAIL BRIDGE OVER THEOHIO RIVER BETWEEN CANNELTON, INDIANA AND HAWESVILLE, KENTUCKY.INDOT IS THE LEAD STATE ON THE PROJECT. (ADDITIONAL FUNDING FOR CPHASE)
REPLACE BRIDGE ON KY 2124 OVER SOUTH FORK OF PANTHER CREEK SW OFINTERSECTION WITH HICKORY RIDGE RD (CR 1127)(SR 33.5)046B00031N
IMPROVE THE SAFETY AND INCREASE THE CAPACITY OF THE I-65/KY-222INTERCHANGE BASED ON EXISTING AND FUTURE NEEDS OF THE AREA.(2006BOPC)(08CCR)(10CCR)(14CCR)
SAFETY AND SPOT IMPROVEMENTS TO KY 251 AND KY 434 AS RECOMMENDEDBY THE 2012 PLANNING STUDY.
KY 251: FROM KY-434 TO KY-313. (BRAC)(10CCR)(12CCR)
6.267
.040
.751
3.600
1.700
HANCOCK
HANCOCK
HANCOCK
HANCOCK
HANCOCK
HARDIN
HARDIN
HARDIN
KY-69
US-60
KY-69
KY-69
KY-2124
I-65
KY-251
KY-251
$5,850,000
$5,410,000
$3,025,000
$2,975,000
$375,000
$35,100,000
$25,000,000
$8,890,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
C
C
U
C
C
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2017
2016
2018
2019
2016
2016
2022
2016
2016
2018
2016
2017
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SB2
SPP
BRO
BRO
BRO
BRX
BRX
NH
BR2
BR2
BR2
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,850,000
$5,410,000
$25,000
$3,000,000
$2,975,000
$75,000
$300,000
$35,100,000
$6,800,000
$4,500,000
$13,700,000
$1,630,000
$1,740,000
$1,130,000
$4,390,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
04
04
04
197.00
226.00
316.10
316.11
1082.00
20.01
153.01
153.05
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
99
02
02
04
04
04
197.00
226.00
1073.04
316.11
1082.00
20.00
153.00
153.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2012
2014
2016
2012
2006
2008
2008
2006
2012
2008
2016
2012
2002
2008
2008
1.933
2.593
85.313
2.722
6.326
8.2
2.633
86.064
6.326
8.019
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RELOCATION(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / BRIDGE PAINTING(P)
RELIABILITY / PREFINANCD CONVRSN(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / I-CHANGE RECONST(O)
RELIABILITY / PHASE I DESIGN(O)
RELIABILITY / PHASE I DESIGN(O)
![Page 56: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/56.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 56
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
EXTEND RING ROAD FROM THE WESTERN KENTUCKY PARKWAY TO I-65.(12CCR)(14CCR)
REPLACE BRIDGE OVER P&L AND CSX RAILROADS (MP 36.4 TO 36.8 IN WESTPOINT) (047B00007N).(16CCR)
I-65 SOUTHBOUND PORT OF ENTRY FOR A COMMERCIAL VEHICLE MONITORINGSTATION.(10CCR)
REPLACE BRIDGE ON US 62 OVER UNNAMED STREAM 0.65 MILE SW OF KY 1375 (SLONG GROVE RD)(SR 48.5) 047B00052N
REPLACE BRIDGE ON US 62 OVER ROLLING FORK AT THE HARDIN-NELSON COLINE. (SR=49.3) 047B00023N
SOUTH WILSON ROAD CONNECTOR. (50/50 SPLIT WITH CITY OF RADCLIFF)(16CCN)
ADD TURN LANE ON KY 313 AT COLE RIDGE AVENUE. (16CCN)
.400
.100
.400
.139
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
KY-3005
US-31W
I-65
US-62
US-62
US-31W
KY-313
$30,890,000
$9,460,000
$17,840,000
$680,000
$5,617,000
$875,000
$425,000
Total
Total
Total
Total
Total
Total
Total
U
C
R
U
C
D
R
U
C
R
U
C
D
R
U
C
D
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2018
2016
2016
2019
2016
2019
2019
2022
2016
2016
2017
2019
2021
2021
2022
2017
2017
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
STP
STP
STP
IM
IM
IM
IM
BRO
BRO
BRO
BRX
BRX
BRX
BRX
SPP
SB2
SB2
SB2
SB2
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,190,000
$29,700,000
$120,000
$110,000
$9,230,000
$1,000,000
$110,000
$1,040,000
$15,690,000
$80,000
$110,000
$490,000
$800,000
$30,000
$25,000
$4,762,000
$875,000
$75,000
$50,000
$50,000
$250,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
04
04
04
198.00
199.00
286.10
1077.00
1093.00
8906.00
8907.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
NELSON
04
04
04
04
04
04
04
198.00
199.00
286.00
1077.00
1093.00
8906.00
8907.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2012
2000
2012
2016
2016
2016
2012
2012
1996
2012
2016
2016
2016
36.4
81.95
8.894
28.157
36.8
82.05
8.934
28.193
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PE & ENVIRONMENTAL(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / WEIGH STA REHAB(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
0 .103Milepoints: To:From:
![Page 57: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/57.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 57
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
HARLAN-VIRGINIA STATE LINE; RESCOPE US-421 FROM BARN BRANCH TOVIRGINIA STATE LINE.(08CCR)(10CCR)(16CCR)
HARLAN-VIRGINIA STATE LINE; RESCOPE US-421 FROM BARN BRANCH TOVIRGINIA STATE LINE. (ADDITIONAL FUNDS FOR C PHASE. SEE 11-269.10) (16CCN)
HARLAN-VIRGINIA STATE LINE; RESCOPE US-421 FROM BARN BRANCH TOVIRGINIA STATE LINE. (ADDITIONAL FUNDS FOR C PHASE. SEE 11-269.1 AND 11-269.2)(16CCN)
REPLACE BRIDGE ON KY 72 OVER CATRON CREEK AT INTERSECTION OF KY 72AND SMITH LANE (CR 1226L)(SR 30) 048B00030N
REPLACE BRIDGE OVER WALLINS CREEK ON KY 219 3.0 MILE SOUTH OF SCL OFWALLINS CREEK. (048B00047N)(SR=43.8)
REPLACE BRIDGE ON US 119 OVER KY 160/MAIN ST IN HARLAN COUNTY, KY.(SR=32.3) 048B00126N
REPLACE BRIDGE ON SWEET BALL RD (CR-1328) (0.175) OVER AGES BRANCH.(SR=12.9) 048C00072N
PROVIDE A PASSING BAY ON US 119 FROM MP 1.2 TO MP 2.2 IN HARLANCOUNTY.(12CCN)(14CCR)(16CCR)
3.800
.040
.020
.118
1.000
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
US-421
US-421
US-421
KY-72
KY-219
US-119
CR-1328
US-119
$10,570,000
$10,000,000
$23,800,000
$1,300,000
$975,000
$8,600,000
$250,000
$4,000,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
C
C
C
D
R
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2019
2017
2020
2021
2021
2022
2019
2021
2021
2022
2021
2016
2016
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
STP
STP
BRX
BRX
BRX
BRX
BRX
BRO
BRO
BRO
BRO
BRZ
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$570,000
$10,000,000
$10,000,000
$23,800,000
$1,300,000
$250,000
$100,000
$75,000
$550,000
$800,000
$200,000
$100,000
$7,500,000
$250,000
$500,000
$500,000
$3,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
269.10
269.20
269.30
1087.00
1097.00
1101.00
1107.00
8703.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
269.00
269.20
269.30
1087.00
1097.00
1101.00
1107.00
8703.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2016
2016
2012
2014
2016
2016
2012
1996
2016
2016
2012
2014
2016
2016
2012
0
6.539
1.033
34.787
.171
1.2
3.832
6.579
1.053
34.905
.179
2.2
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MINOR WIDENING(O)
![Page 58: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/58.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 58
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
IMPROVE SAFETY ON DEAD MAN'S CURVE NEAR MP 10.1. (12CCN)
CONSTRUCT TURN LANES ONTO KY 840 FROM US 119. (14CCN) (16CCR)
CONSTRUCT A LEFT TURN LANE FROM S US 119 ONTO KY 3152. (14CCN) (16CCR)
CONSTRUCT A NEW TURN LANE ON US 119 BETWEEN KY 2007 AND KY 3467.(16CCN)
ADDRESS HORIZONTAL ALIGNMENT AND SAFETY ISSUES ON US 119 NEARHARLAN/BELL COUNTY LINE. (16CCN)
IMPROVE SAFETY ON KY-32 AT THE ENTRANCE TO HARRISON MEMORIALHOSPITAL IN CYNTHIANA.(12CCR)
REPLACE BRIDGE ON OLD LAIR RD (CR-1124) (0.071) OVER S. FORK LICKINGRIVER. (SR=14.2) 049C00035N (16CCR)
CONSTRUCT WEST US-27 CYNTHIANA BYPASS: SECTION THREE FROM US-27N TOUS-62 EAST. (06CCN)
.200
.200
.200
.200
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
HARRISON
HARRISON
HARRISON
KY-38
US-119
US-119
US-119
US-119
KY-32
CR-1124
US-27
$1,200,000
$1,500,000
$1,275,000
$1,325,000
$17,350,000
$2,290,000
$500,000
$7,300,000
Total
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
D
R
U
C
D
R
U
C
C
C
D
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2017
2018
2018
2017
2017
2018
2018
2016
2017
2017
2018
2019
2016
2017
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
NH
NH
NH
NH
NH
NH
NH
NH
SPP
SPP
SPP
SPP
NH
SPP
BRZ
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,200,000
$100,000
$25,000
$75,000
$1,300,000
$100,000
$25,000
$50,000
$1,100,000
$100,000
$50,000
$75,000
$1,100,000
$17,350,000
$2,290,000
$500,000
$7,300,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
06
06
06
8704.00
8807.00
8808.00
8905.00
8906.00
908.00
1093.00
8302.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
06
06
06
8704.00
8807.00
8808.00
8905.00
8906.00
908.00
1093.00
8302.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2014
2014
2016
2016
2010
2016
2006
2012
2014
2014
2016
2016
2010
2016
2006
10
10
9.8
10.074
.051
10.2
10.2
10
10.274
.091
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW ROUTE(O)
![Page 59: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/59.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 59
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT U2 62 FROM MP 11.9 TO MP 12.3.(12CCN)(14CCR)
RECONSTRUCT US 27 FROM MP 11.9 TO MP 12.4.(12CCN)(14CCR)
REPLACE UNION ROBINSON ROAD BRIDGE.(12CCN)
IMPROVE CONNECTIVITY AND SAFETY BY PROVIDING A ROUTE FOR TRUCKTRAFFIC WEST OF HORSE CAVE FROM KY 218 TO US 31W TO AVOID THERAILROAD CROSSING AND DOWNTOWN AREA. (16CCR)
PADUCAH-HENDERSON; RECONSTRUCT US-60 FROM THE CORYDON BYPASS(CORYDON-GENEVA ROAD) TO THE HENDERSON BYPASS (KY-425).(04CCR)
PADUCAH-HENDERSON; CONSTRUCT US-60 BYPASS OF CORYDON.(04CCR)(12CCR)
WIDEN AND IMPROVE US 60 FROM WEST OF HENDERSON COMMUNITY COLLEGE(MP 7.7) EXTENDING EAST TO KY 425 (MP 8.7). (BOP2012)
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2018. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
.400
.500
3.200
5.000
1.000
HARRISON
HARRISON
HARRISON
HART
HENDERSON
HENDERSON
HENDERSON
HENDERSON
US-62
US-27
CR-1062
KY-335
US-60
US-60
US-60
-
$2,920,000
$6,000,000
$1,150,000
$11,900,000
$38,320,000
$41,470,000
$5,500,000
$600,000
Total
Total
Total
Total
Total
Total
Total
Total
C
R
C
C
D
R
U
C
D
R
U
C
D
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2016
2017
2018
2019
2020
2016
2017
2017
2019
2016
2017
2017
2019
2016
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SP
SP
SP
SP
SP
SP
SP
SP
STP
SHN
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,920,000
$500,000
$5,500,000
$1,150,000
$1,000,000
$1,500,000
$1,000,000
$8,400,000
$1,500,000
$5,760,000
$4,880,000
$26,180,000
$2,500,000
$3,840,000
$1,960,000
$33,170,000
$5,500,000
$600,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
04
02
02
02
02
8707.00
8708.00
8710.00
441.00
79.02
79.10
79.30
700.13
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
04
02
02
02
02
8707.00
8708.00
8710.00
441.00
79.00
79.00
79.00
700.13
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2012
2012
2016
1998
1998
2012
2012
2012
2012
2012
2016
1996
1996
1996
2012
11.9
11.9
3.877
1.2
5.531
7.7
12.3
12.4
3.895
2.545
8.71
8.71
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
ECONOMIC DEVELOPMENT / ECONOMIC DEVEL(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MATCHED FED FUNDS(O)
![Page 60: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/60.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 60
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
US 41/KY 812 INTERSECTION UPGRADE: ADD RIGHT TURN AND LEFT TURN LANESINCLUDING SIGNAL PHASING. KYTC PROJECT WITH KYTC PROVIDING 20%MATCH.(TOLL CREDITS)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)
WATHEN BRIDGE REPLACEMENT: REPLACE EXISTING BRIDGE WITH 6FTPRECAST CONCRETE BOX CULVERT, PAVEMENT AND GUARDRAIL. LPAPROJECT. CITY TO PROVIDE MATCH.(FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)(051C00014)
KY 2183 / KY 1539 INTERSECTION AND UPGRADE: PROJECT WILL RECONSTRUCTTHE INTERSECTION AND MAKE IMPROVEMENTS TO THE SOUTHBOUNDAPPROACH. (2012BOP)
US 41/ WOLF HILLS ROAD INTERSECTION UPGRADE: PROJECT WILL ADDDEDICATED RIGHT TURN AND LEFT TURN LANES INCLUDING SIGNAL PHASINGTO BE MODIFIED OR ADDED TO EACH LEG OF THE INTERSECTION. (2012BOP)
.140
.100
.100
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENDERSON
-
-
-
-
US-41
CS-1453
KY-2183
US-41
$700,000
$700,000
$700,000
$600,000
$700,000
$225,000
$1,400,000
$650,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
R
U
C
R
U
C
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2022
2016
2016
2017
2016
2016
2017
2016
2016
2017
2016
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$700,000
$700,000
$700,000
$600,000
$50,000
$100,000
$550,000
$10,000
$15,000
$200,000
$400,000
$400,000
$600,000
$50,000
$100,000
$500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
02
700.14
700.15
700.16
700.17
711.00
713.00
714.00
715.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
02
700.14
700.15
700.16
700.17
700.07
700.07
700.08
700.08
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2016
2016
2006
2006
2012
2012
2014
2014
2016
2016
2006
2006
2008
2008
12.766
.72
1.693
18.488
12.906
.77
1.793
18.588
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
![Page 61: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/61.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 61
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078(SR 39)051B00015N.(12CCR)
REPLACE BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078(SR 39) 051B00015N (ADDITIONAL FUNDING FOR C PHASE)
REPLACE BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078(SR 39) 051B00015N (ADDITIONAL FUNDING FOR C PHASE)
PE/ENVIRONMENTAL AND INITIAL FINANCING PLAN FOR FUTURE I-69 BRIDGEOVER THE OHIO RIVER BETWEEN HENDERSON AND EVANSVILLE NEAR US 41BRIDGES. (16CCR)
DEVELOP ALIGNMENT FOR INTERSTATE 69 HENDERSON/EVANSVILLE OHIORIVER CROSSING (TO BE DEVELOPED IN CONCERT WITH 2-1088.00).(16CCR)
REPLACE BRIDGE ON KY 55 OVER DAUGHERTY CREEK 0.17 MILE N OF JONES RD(CR 1331)(SR 38.6) 052B00003N
MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 ANDPENDLETON AT KY-153. SEGMENT 1: PENDLETON ROAD (KY 153) TO LOST CREEK(1/2 MILE EAST OF SAFETY KLEEN ENTRANCE). MILE POINT 2.1 TO MILE POINT6.8. (06CCN)(08CCR)(10CCR)(12CCR)(14CCR)
MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 ANDPENDLETON AT KY-153. SEGMENT 2:LOST CREEK (1/2 MILE EAST OF SAFETYKLEEN ENTRANCE) TO MAIN STREET (US 421/KY 55). MILE POINT 6.8 TO MILEPOINT 9.8.(12CCN)(14CCR)
.208
.208
.208
1.028
7.600
3.000
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENRY
HENRY
HENRY
US-60
US-60
US-60
I-69
I-69
KY-55
KY-146
KY-146
$14,250,000
$6,000,000
$5,000,000
$2,820,000
$41,000,000
$380,000
$13,630,000
$11,060,000
Total
Total
Total
Total
Total
Total
Total
Total
U
C
C
C
P
D
R
U
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2018
2019
2016
2017
2018
2019
2016
2016
2017
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRO
BRO
BRO
BRO
NH
NH
NH
NH
BRO
BRO
BRO
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$250,000
$14,000,000
$6,000,000
$5,000,000
$2,820,000
$6,000,000
$20,000,000
$15,000,000
$90,000
$60,000
$230,000
$13,630,000
$11,060,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
05
05
05
1080.00
1080.01
1080.02
1088.00
1088.10
1066.00
8300.00
8300.10
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
05
05
05
1080.00
1080.00
1080.02
1088.00
1088.10
1066.00
8300.00
8300.10
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2016
2016
2014
2016
2012
2006
2012
2012
2012
2016
2014
2016
2012
2006
2012
19.236
19.236
19.236
6.105
2.169
6.8
19.444
19.444
19.444
6.145
6.8
9.8
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 62: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/62.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 62
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REHABILITATION-OVERLAY AND WIDENING EXISTING KY-55 FROM KY-22 TOCURVE AT MP 2.210 NORTH OF EMINENCE. INCLUDES REPLACING EXISTINGCURB AND GUTTER AND SIDEWALKS, AND RELOCATION OF IMPACT UTILITIES.(MP 1.408 TO 2.210)(14CCN)
IMPROVE DRAINAGE AND INSTALL SIDEWALK ALONG KY 241 INPLEASUREVILLE. (14CCN)
SCOPING/PLANNING STUDY FOR KY-389 IN HENRY COUNTY FROM KY-202(DRENNON ROAD) NORTH TO HENRY COUNTY/CARROLL COUNTY LINE. (14CCN)
REPLACE BRIDGE AND APPROACHES ON KY-1826 OVER TOWN CREEK (B79) INCLINTON. (SR=24.4): (053B00079N)
REPLACE BRIDGE OVER IC RR ON BALTIMORE RD (CR 1011) 0.3 MI NW OFHICKMAN/GRAVES CO LINE 053C00003N SR 24.5
REPLACE BRIDGE OVER HURRICANE BRANCH ON KY 1301, LOCATED 1.092 MI NWOF US 51 IN HICKMAN COUNTY, KY.(SR 21) (053B00083N) (2014BOP)
WIDEN US-41A TO 5 LANES FROM US-41 WEST TO KINGDOM HALL ROAD INMADISONVILLE. (2002BOPC)(04CCR)(SEE 2-137.02 FOR "HPP"COMPONENT)(08CCR)(10CCR)(12CCR)(16CCN)
US 41A PHASE II DESIGN AND RIGHT-OF-WAY. (2005HPP-KY135)(SEE 2-137.01 FOR"STP" COMPONENT)
.802
1.147
8.631
.100
.055
.057
3.600
3.600
HENRY
HENRY
HENRY
HICKMAN
HICKMAN
HICKMAN
HOPKINS
HOPKINS
KY-55
KY-241
KY-389
KY-1826
CR-1011
KY-1301
US-41A
US-41A
$5,260,000
$1,100,000
$500,000
$2,630,000
$2,610,000
$300,000
$27,000,000
$2,879,680
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
U
C
P
U
C
D
R
U
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2018
2016
2016
2017
2016
2016
2018
2019
2021
2021
2022
2017
2019
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BRX
BRX
BRZ
BRZ
BRZ
BRZ
BRX
SPP
HPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,450,000
$1,160,000
$2,650,000
$550,000
$75,000
$475,000
$500,000
$630,000
$2,000,000
$380,000
$150,000
$250,000
$1,830,000
$300,000
$27,000,000
$2,879,680
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
01
01
01
02
02
8820.00
8821.00
8822.00
1062.00
1156.00
1158.00
137.01
137.02
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
01
01
99
02
02
8820.00
8821.00
8822.00
1062.00
1156.00
1074.05
137.00
137.02
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2014
2008
2014
2014
2016
2004
2014
2014
2014
2008
2014
2008
2000
2004
1.408
0
13.16
4.888
.25
1.039
0
0
2.21
1.147
21.791
4.988
.305
1.096
3.426
3.426
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MINOR WIDENING(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / SCOPING STUDY(O)
SAFETY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
![Page 63: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/63.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 63
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN US-41A FROM INDUSTRIAL DRIVE TO YORKWOOD PLACE. (SECTION 1)(2012BOP)(16CCR)
WIDEN US-41A FROM YORKWOOD PLACE TO US 41 / KY 281. (SECTION 2)(2012BOP)(16CCR)
STUDY POSSIBILITIES FOR IMPROVING RAILROAD CROSSING ON KY-1034 AT US-41A, MP 11.336.(10CCR)
RECONSTRUCT KY-85 FROM KY-70 EAST TO AIRPORT ROAD AT ANTON.(08CCR)(10CCR)(16CCR)
CENTER STREET/ISLAND FORD CONNECTOR ROAD IN MADISONVILLE FROMCENTER STREET NORTH TO CSX RAILROAD. (14CCN)
REPLACE BRIDGE ON KY-260 (MP 2.14) OVER OTTER CREEK; .20 MI EAST OFPENNYRILE PARKWAY; (FUNCTIONALLY OBSOLETE, SR=31.9) 054B00022N (14CCR)
REPLACE BRIDGE ON KY 262 OVER GREASEY CREEK 0.67 MILE E OF BEANCEMETERY RD (CR 1396)(SR 40.3)054B00107N
REPLACE BRIDGE ON KY 293 AT THE CALDWELL/HOPKINS COUNTY LINE(SR37.7)054B00115N
REPLACE BRIDGE ON KY 1069 OVER OTTER CREEK AT INTERSECTION OF J DBUCHANAN RD (CR 1093)(SR 43.9)054B00157N
2.030
1.246
.300
1.700
.100
.040
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
US-41A
US-41A
KY-1034
KY-85
-
KY-260
KY-262
KY-293
KY-1069
$11,000,000
$11,000,000
$200,000
$9,690,000
$2,600,000
$1,140,000
$500,000
$1,750,000
$770,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
R
U
C
C
R
U
C
C
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2019
2016
2016
2016
2017
2016
2016
2017
2018
2016
2016
2016
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SP
SP
SP
SP
SPP
BRX
BRX
BRX
BRO
BRO
BRO
BRO
BRO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$11,000,000
$11,000,000
$200,000
$850,000
$840,000
$8,000,000
$2,600,000
$160,000
$300,000
$680,000
$500,000
$1,750,000
$150,000
$170,000
$450,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
02
02
137.10
137.20
161.00
176.00
804.10
1072.00
1079.00
1081.00
1084.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
CALDWELL
02
02
02
02
02
02
02
02
02
137.00
137.00
161.00
176.00
804.10
1072.00
1079.00
1081.00
1084.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2000
2004
2006
2014
2010
2012
2012
2012
2000
2000
2004
2006
2014
2010
2012
2012
2012
1.246
0
11.186
0
2.09
2.734
0
2.355
3.275
1.246
11.486
1.72
2.19
2.774
.044
2.395
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SCOPING STUDY(O)
ECONOMIC DEVELOPMENT / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
20.442 20.486Milepoints: To:From:
![Page 64: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/64.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 64
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN NORTH MAIN STREET FROM HOSPITAL DRIVE TO KY-281. (06CCN)(12CCR)
US-62; THREE LANES FROM BOARD OF EDUCATION TO CITY PARK IN DAWSONSPRINGS. (08CCN)(10CCR)(12CCR)(16CCN)
RECONSTRUCT KY 30 FROM US 421 TO THE OWSLEY COUNTY LINE. (14CCR)(SEE10-279.60 FOR PE & ENVIR)(16CCR)
REPLACE BRIDGE ON US 421 OVER PIGEON ROOST CREEK AT INTERSECTIONWITH WATER STREET E(CS 1006)(SR 43.9)(AR/W) 055B00157N
SNYDER FREEWAY; RECONSTRUCT 2 RAMPS AT I-265/I-64 INTERCHANGE EASTOF LOUISVILLE. (DESIGNED WITH 5-41.00)(2006BOPP)(12CCR)
SNYDER FREEWAY; RECONSTRUCT 2 RAMPS AT I-265/I-64 INTERCHANGE EASTOF LOUISVILLE. (DESIGNED WITH 5-41.00)(ADDITIONAL FUNDS FOR CPHASE)(12CCR)
COMPLETE I-265/I-64 INTERCHANGE IMPROVEMENTS.(ADDITIONAL FUNDS FOR CPHASE)
I-64 BRIDGE (SHERMAN MINTON) OVER OHIO RIVER @ LOUISVILLE (B279); JOINTPROJECT WITH INDIANA TO PERFORM IN-DEPTH INSPECTION. (056B00279N)
.600
.521
8.396
.040
.300
.300
.300
.300
HOPKINS
HOPKINS
JACKSON
JACKSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
US-41
US-62
KY-30
US-421
I-265
I-265
I-265
I-64
$11,330,000
$2,500,000
$65,000,000
$750,000
$31,590,000
$10,000,000
$19,600,000
$160,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
R
U
C
D
R
U
C
C
R
U
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2018
2017
2017
2018
2017
2018
2019
2020
2017
2017
2017
2019
2020
2021
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BRO
IM
IM
IM
IM
IM
IM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$840,000
$1,020,000
$1,280,000
$8,190,000
$500,000
$500,000
$1,500,000
$4,700,000
$8,300,000
$5,000,000
$47,000,000
$750,000
$4,210,000
$3,380,000
$24,000,000
$10,000,000
$19,600,000
$160,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
11
11
05
05
05
05
8305.00
8501.00
278.30
1090.00
21.00
21.01
21.02
63.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
11
11
05
05
05
05
8305.00
8501.00
278.30
1090.00
21.00
21.00
21.00
63.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2016
2014
2012
2016
2016
2016
2000
2006
2016
2014
2012
2016
2016
2016
2000
16.989
.829
9.913
13.919
25.3
25.3
25.3
0
17.548
1.35
18.309
13.959
25.6
25.6
25.6
.316
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)
ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
SAFETY / BRIDGE INSPECTION(P)
![Page 65: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/65.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 65
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
I-64 BRIDGE (SHERMAN MINTON) OVER THE OHIO RIVER @ LOUISVILLE (B279);JOINT PROJECT WITH INDIANA TO PAINT THIS BRIDGE. (056B00279N)
WIDEN FROM 2 TO 4 LANES FROM BEARGRASS CREEK TO ZORN AVENUE. (LOUT.I.P.) (KYTC MATCH) (SEE 5-91.07 FOR ADDITIONAL 'KYD' FUNDING FOR RPHASE.) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
CLEAN AND PAINT THE GEORGE ROGERS CLARK MEMORIAL BRIDGECARRYING US-31 OVER THE OHIO RIVER BETWEEN LOUISVILLE, KENTUCKYAND JEFFERSONTOWN, INDIANA (THIS STRUCTURE IS 100% OWNED ANDMAINTAINED BY KENTUCKY) (B118): (056B00118N)(12CCR)
MAJOR REVISION OF THE INTERSECTION LOCATED AT THE OUTER LOOP,FEGENBUSH LANE, AND BEULAH CHURCH ROAD. TURN LANE TO BE COMPLETEDBY TRANSPORTATION CABINET PER AGREEMENT.(04CCN)(08CCR)(10CCR)(12CCR)
CLEAN AND PAINT ALL STEEL BRIDGES AND STEEL BEARINGS ON THE GENESNYDER FREEWAY(10CCR)
WIDEN I-64 WESTBOUND RAMP TO I-264 WESTBOUND FROM ONE TO TWO LANESFOR ENTIRE LENGTH AND OTHER NEEDED IMPROVEMENTS TO ADDRESSWEAVE ISSUES AT MERGE ON I-264. (2006BOPP)(12CCR)
SIGNAL SYSTEM IMPROVEMENTS IN JEFFERSON COUNTY.
RECONSTRUCT SECOND CURVE ONLY ON I-65 SOUTHBOUND RAMP AT KY-1065(OUTER LOOP).(SEE 5-205.01 FOR BREAKOUT IMPROVEMENTS)
WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY-61 (LOU T.I.P.)(SECTION 2) (RU-04DEOB)(08CCR)(12CCR)(16CCR)
.300
1.500
1.100
.200
.500
.621
1.600
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
I-64
CS-1001B
US-31
KY-1065
I-265
I-64
-
I-65
KY-1450
$4,160,000
$11,500,000
$22,000,000
$5,570,000
$3,790,000
$21,460,000
$910,000
$1,820,000
$10,960,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
R
U
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2016
2018
2016
2016
2016
2016
2018
2016
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
IM
SLO
SPP
SPP
SP
NH
NH
NH
SP
IM
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$4,160,000
$11,500,000
$22,000,000
$5,570,000
$3,790,000
$9,430,000
$2,350,000
$9,680,000
$910,000
$1,820,000
$10,960,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
64.00
91.02
110.00
122.00
136.00
159.00
183.01
205.00
247.10
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
05
64.00
91.02
110.00
122.00
136.00
159.00
183.01
205.00
247.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2000
2000
2000
2000
2000
2006
2006
2000
2000
2000
2000
2000
2000
2000
2006
2006
1996
0
1.6
0
9.944
.232
0
1.873
.316
2.925
1.089
10.009
.779
.621
3.542
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE PAINTING(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BRIDGE PAINTING(P)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE PAINTING(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SIGNAL SYS IMPROVE(P)
SAFETY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
![Page 66: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/66.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 66
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R-04DEOB)(04CCR)(BOP2006P)(10CCR)(12CCR)
WIDEN SOUTHBOUND HURSTBOURNE LANE TO 3 LANES FROM LINN STATION RD(CS-1004H) TO EDEN AVE (CS-1660H). (06CCR)(03KYD)(2006BOPP)(SEE 5-344.02 FORKYD C PHASE)(14CCR)
ENGLISH STATION ROAD IN LOUISVILLE; WIDEN TO 3 LANES FROM AVOCAROAD TO WEST AIKEN ROAD.(FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).
RECONSTRUCT KY-22 AT SPRINGCREST DRIVE. (06CCN)(2004BOPC)(14CCR)(EMERGENCY CULVERT REPLACEMENT AWARDED UNDER 5-371.12)
INTERSECTION SAFETY IMPROVEMENTS ON KY-22 AT TEN BROECK WAYINCLUDING PROVIDING LEFT TURN LANES. (2004BOPC) (DESIGN SHOWN UNDER371.01).
RECONSTRUCT KY-22 AT GOOSE CREEK ROAD. (06CCN) (2004BOPC)(14CCR)
RECONSTRUCT KY-22 AT BARBOUR LANE. (06CCN) (2004BOPC)
RECONSTRUCT KY-22 AT AVENUE OF THE WOODS AND CHATSWORTH. (06CCN)(2004BOPC)
2.600
1.600
.850
.400
.400
.400
.500
.400
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
KY-1931
KY-1747
CR-1006C
KY-22
KY-22
KY-22
KY-22
KY-22
$8,630,000
$12,950,000
$4,060,000
$1,000,000
$2,640,000
$1,320,000
$880,000
$6,620,000
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
C
C
R
U
C
C
R
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2017
2018
2016
2016
2016
2016
2017
2016
2016
2017
2016
2016
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SLO
STP
SP
SP
SP
STP
SP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$8,630,000
$2,960,000
$3,140,000
$6,850,000
$4,060,000
$1,000,000
$640,000
$650,000
$1,350,000
$1,320,000
$310,000
$570,000
$1,290,000
$1,790,000
$3,540,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
323.01
344.01
353.00
371.10
371.11
371.13
371.14
371.15
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
323.01
344.00
965.08
371.12
371.00
371.00
371.00
371.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2000
2000
2014
2004
2004
2004
2004
2000
2000
1998
2004
1998
1998
1998
1998
.54
12.289
.457
1.432
3.2
2.537
1.919
1.03
3.148
13.632
1.232
1.789
3.48
2.937
2.419
1.43
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MINOR WIDENING(O)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
![Page 67: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/67.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 67
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
INTERSECTION IMPROVEMENT ON OLD KY-22 AT HERR LANE AND THEENTRANCE TO BALLARD HIGH SCHOOL. (06CCR)(2004BOPC)(12CCR)
EXTEND/RECONSTRUCT I-65 SB RAMP TO BROOK STREET (FUNDING SUBJECT TOFISCAL CONSTRAINT PENDING MPO TIP)
EXTEND COOPER CHAPEL ROAD FROM BEULAH CHURCH ROAD TO BARDSTOWNROAD (LOU T.I.P.) (ALL WORK BY LOUISVILLE METRO)(LOCALMATCH)(2004BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).
ALIGN INTERSECTION OF BROADWAY AND 18TH STREET BY MOVING THESOUTH LEG OF 18TH STREET TO THE EAST (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
WIDEN SOUTHSIDE DRIVE (KY-907) TO 5 LANES FROM NEW CUT ROAD TONATIONAL TURNPIKE. (2004BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).
REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS INLOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).
REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS INLOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).
REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS INLOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).
.200
.100
2.700
.100
.700
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
KY-22
I-65
-
US-150
KY-907
-
-
-
$3,200,000
$2,110,000
$3,750,000
$850,000
$7,000,000
$100,000
$100,000
$100,000
Total
Total
Total
Total
Total
Total
Total
Total
R
C
C
R
U
C
D
R
U
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2016
2016
2016
2017
2016
2017
2017
2018
2016
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,370,000
$1,830,000
$2,110,000
$3,750,000
$90,000
$760,000
$1,000,000
$1,000,000
$1,000,000
$4,000,000
$100,000
$100,000
$100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
371.16
378.10
404.01
413.00
437.01
439.03
439.04
439.05
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
OLDHAMBULLITT
OLDHAMBULLITT
OLDHAMBULLITT
05
05
05
05
05
05
05
05
371.00
378.00
404.00
413.00
437.00
439.02
439.03
439.03
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2004
2000
2004
2004
2004
2006
2014
2014
1998
1998
2000
2004
2004
2004
2006
2006
.438
0
.9
6.31
.87
.155
1.18
7.036
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
SAFETY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
To:To:
To:To:
To:To:
From:From:
From:From:
From:From:
![Page 68: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/68.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 68
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
INSTALLATION OF SIDEWALKS TO FIX GAPS IN PEDESTRIAN NETWORK ONVARIOUS STATE MAINTAINED ROADS IN THE LOUISVILLE URBANIZED AREA.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
INSTALLATION OF SIDEWALKS TO FIX GAPS IN PEDESTRIAN NETWORK ONVARIOUS STATE MAINTAINED ROADS IN THE LOUISVILLE URBANIZED AREA.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
SENECA PARK LOOP EXTENSIONS (EAST AND WEST). (LOCAL MATCH)(ALLWORK BY LOUISVILLE METRO)(2004BOPC) (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).
SENECA PARK LOOP EXTENSIONS (EAST AND WEST). (LOCAL MATCH)(ALLWORK BY LOUISVILLE METRO)(2004BOPC) (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).
MT. WASHINGTON ROAD (KY-2053) SECTION 1; FROM PRESTON TO MAPLE WAY.(KYTC MATCH)(2004BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)
MT. WASHINGTON ROAD (KY-2053) SECTION 2; FROM MAPLE WAY TO CEDARCREEK RD. (KYTC MATCH)(2004BOPC)(FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAYTRAFFIC (8TH, 7TH, SHELBY, CAMPBELL STREETS). PHASE 2
REDUCE CONGESTION AND IMPROVE SAFETY AT THE KY 3084 (OLD HENRYROAD) INTERCHANGE. (12CCR)
.300
2.460
.820
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
-
-
-
-
KY-2053
KY-2053
CS-1049F
I-265
$40,000
$40,000
$320,000
$650,000
$930,000
$290,000
$748,000
$5,790,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
D
R
U
D
C
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2016
2016
2017
2017
2016
2016
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
NH
IM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$40,000
$40,000
$320,000
$650,000
$320,000
$490,000
$120,000
$290,000
$748,000
$700,000
$5,090,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
440.01
440.02
442.00
442.02
443.10
443.20
470.10
474.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
OLDHAMBULLITT
OLDHAMBULLITT
05
05
05
05
05
05
05
05
440.01
440.02
965.09
442.00
443.00
443.00
965.12
474.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2004
2004
2004
2004
2004
2004
2014
2012
2004
2004
2000
2004
2004
2004
2004
2012
0
.343
.047
28.28
.343
2.804
.58
29.1
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
Milepoints:Milepoints:
Milepoints:Milepoints:
To:To:
To:To:
From:From:
From:From:
![Page 69: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/69.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 69
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
IMPROVE DIXIE HIGHWAY BETWEEN CRUMS LANE (KY 2049) AND ROCKFORDLANE (KY 2051)(12CCR)
IMPROVE DIXIE HIGHWAY BETWEEN ROCKFORD LANE (KY 2051) ANDGREENWOOD ROAD (KY 1931)
IMPROVE DIXIE HIGHWAY BETWEEN GREENWOOD ROAD (KY 1931) ANDSTONESTREET ROAD (CR 1003). (14CCN)
IMPROVE SAFETY ON DIXIE HIGHWAY BY PLACING BARRIER WALLS FOR 2MILES TO ELIMINATE CROSSOVER ACCIDENTS BETWEEN GREENWOOD ROAD(KY 1931) AND STONESTREET ROAD (CR 1003). (16CCN)
SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY 329.(16CCR)
CONSTRUCT A 2800' LONG, 10' WIDE MULTIUSE PATH THROUGH A.B. SAWYERPARK AND CONNECTING TO SURROUNDING NEIGHBORHOODS INCLUDES ANUNDERPASS, BRIDGE, AND SITE AMENITIES.
RE-CURB US 60A (EASTERN PARKWAY) FROM KY 1631 (CRITTENDEN DRIVE) TOUS 31E (BARDSTOWN ROAD).
GOOD SAMARITAN BICYCLE/PEDESTRIAN TRAIL CONNECTOR:CONSTRUCT AMULTI-USE BICYCLE & PEDESTRIAN TRAIL ALONG OLD TAYLORSVILLE ROAD &JEFFERSON ST IN DOWNTOWN JEFFERSONTOWN CONNECTING THEDOWNTOWN ST NETWORK TO THE GOOD SAMARITAN CENTER & BICYCLE/PEDTRAIL.
1.503
2.200
3.600
2.793
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
US-31W
US-31W
US-31W
US-31
I-71
-
US-60A
-
$4,330,000
$7,200,000
$4,800,000
$500,000
$49,000,000
$870,000
$4,400,000
$162,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
D
R
U
C
D
C
P
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2017
2016
2016
2018
2019
2020
2016
2016
2016
2016
2017
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SAF
NH
NH
NH
NH
SLO
SLO
SLO
SLO
SLO
SLO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$4,330,000
$7,200,000
$4,800,000
$500,000
$2,500,000
$1,000,000
$500,000
$45,000,000
$170,000
$700,000
$200,000
$400,000
$3,800,000
$162,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
478.00
478.20
478.30
478.40
483.00
484.00
485.00
486.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
OLDHAM
05
05
05
05
05
05
05
05
478.00
478.20
478.30
478.40
483.00
965.12
965.12
965.12
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2014
2014
2016
2014
2014
2014
2014
2012
2014
2014
2016
2014
2004
2004
2004
13.837
11.65
9.749
9.749
9.1
4.038
15.34
13.837
11.65
11.69
11.315
6.831
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / PAVEMENT REHAB-PRI(P)
SAFETY / BIKE/PED FACIL(O)
11.315 14.1Milepoints: To:From:
![Page 70: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/70.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 70
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
PRELIMINARY DESIGN & SCOPING STUDY TO DETERMINE LOCATION OF AMULTI-USE BICYCLE & PEDESTRIAN TRAIL PROJECT ALONG TAYLORSVILLEROAD FROM DOWNTOWN JEFFERSONTOWN TO 21ST CENTURY PARK.
DESIGN & CONSTRUCT SHARED USE PATH & LOUISVILLE LOOP TRAILHEADFACILITIES THRU JEFFERSON MEMORIAL FOREST FROM NORTH END OF SANDQUARRY TUNNEL AT GENE SNYDER FWY TO WEST TERMINUS OF EXISTING MSDTRAIL APPROX. 2.7 MI WHICH WILL INCLUDE BRIDGE OVER POND CR.
DESIGN & CONSTRUCT SHARED USE PATH & LOUISVILLE LOOP TRAILHEADFACILITIES THRU JEFFERSON MEMORIAL FOREST FROM BLEVINS GAP ROAD TONORTH END OF SAND QUARRY TUNNEL AT GENE SNYDER FWY(THE TUNNELWILL BE PART OF THIS SEGMENT) APPROX. 2.5 MILES.
DESIGN AND CONSTRUCT SHARED USE PATH AND LOUISVILLE LOOPTRAILHEAD FACILITIES THROUGH JEFFERSON MEMORIAL FOREST FROMPENDLETON RD AT MEDORA RD TO THE BEGINNING OF JEFFERSON MEMORIALFOREST PROPERTY ON BLEVINS GAP RD APPROX. 1.3 MILES.
MIDDLETOWN STREETSCAPE PHASE VI. ROADWAY AND STREETSCAPEIMPROVEMENTS ON OLD SHELBYVILLE RD FROM EVERGREEN RD TO US 60(SHELBYVILLE RD).
MISCELLANEOUS SIDEWALKS AND HANDICAP RAMPS: CONSTRUCT ANDREPLACE VARIOUS SIDEWALKS AND HANDICAP RAMPS THROUGHOUT THE CITYON A REOCCURRING ANNUAL BASIS.
OLMSTED PARKWAYS MULTI-USE PATH SYSTEM-SOUTHERN PKWY:CONSTRUCTION OF A 2.5 MILE SHARED USE PATH SYSTEM ALONG SOUTHERNPARKWAY BETWEEN SOUTH 3RD AND NEW CUT ROAD.
CONSTRUCTION OF A 0.5 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN WILSON AVENUE AND CYPRESS STREET.
CONSTRUCTION OF A 0.45 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN CYPRESS STREET AND DIXIE HWY.
2.500
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
-
-
-
-
CS-3596
-
KY-1020
KY-2054
KY-2054
$189,000
$333,600
$210,500
$144,240
$254,000
$37,800
$1,000,000
$1,000,000
$1,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
P
D
D
D
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2016
2016
2016
2016
2017
2016
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$189,000
$333,600
$210,500
$144,240
$254,000
$37,800
$1,000,000
$1,000,000
$1,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
487.00
489.00
490.00
491.00
492.00
493.00
495.00
496.00
497.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
05
965.12
965.12
965.12
965.12
965.12
965.12
965.12
965.12
965.12
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2014
2014
2014
2014
2014
2014
2014
2004
2004
2004
2004
2004
2004
2004
2004
2004
.494
7.837
.72
1.22
1.005
9.15
1.22
1.64
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SCOPING STUDY(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
![Page 71: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/71.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 71
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
CONSTRUCTION OF A 1.2 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN DIXIE HIGHWAY AND SHARP AVE.
RIVER ROAD BICYCLE AND PEDESTRIAN IMPROVEMENTS FROM DOWNTOWNLOUISVILLE TO THE CITY OF PROSPECT (US 42), 8.5 MILES. (SEE 5-3036.00)
CONSTRUCT SHARED USE PATH FROM NEIGHBORHOOD SIDEWALK TO REAR OFSCHOOL PROPERTY, AND PROVIDE OUTDOOR CLASSROOM AMENITIES ALONGSHARED USE PATH. PROJECT WILL INCLUDE WETLAND RESTORATION ONSCHOOL SITE.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
VARIOUS SAFETY PROJECTS IN THE LOUISVILLE URBANIZED AREA.
VARIOUS SAFETY PROJECTS IN THE LOUISVILLE URBANIZED AREA.
WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES FROM RUCKRIEGEL PARKWAY(CS-2056H) TO MAPLE ROAD (CS-1132H) AND FROM OLD TAYLORSVILLE ROAD(CS-1119H) TO RUCKRIEGEL PARKWAY (KY 1819). PROJECT TO INCLUDESTREETSCAPE ENHANCEMENTS.
CONSTRUCT A MULTI-USE BICYCLE AND PEDESTRIAN TRAIL ALONGWATTERSON TRAIL FROM MULBERRY ROW WAY TO MANSFIELD ESTATESDRIVE.
REPAIR DRAINAGE SYSTEM ON THE I-64 BRIDGE OVER N.S. RAILROAD AND THELEVEE AND REPAIR THE LEVEE.(056B00284N)(2014BOP)
"SHARED USE PATH" LOUISVILLE LOOP TRAILHEAD FACILITIES THROUGHJEFFERSON MEMORIAL FOREST FROM NORTH END OF SAND QUARRY TUNNELAT GENE SNYDER FWY TO WEST TERMINUS OF THE EXISTING MSD TRAILAPPROX 2.7 MI WHICH WILL INCLUDE A BRIDGE OVER POND CREEK. 2012BOP
.151
.831
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
KY-2054
CR-1001B
-
-
-
CR-1004H
CR-1004H
I-64
-
$1,000,000
$2,243,030
$82,500
$1,000,000
$1,000,000
$703,957
$656,640
$400,000
$333,600
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
D
C
C
C
U
C
C
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2016
2017
2016
2017
2016
2017
2017
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
IM
SLO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,000,000
$200,000
$2,043,030
$12,500
$70,000
$1,000,000
$1,000,000
$194,169
$509,788
$656,640
$400,000
$333,600
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
498.00
499.00
513.00
516.02
516.03
518.00
519.00
521.00
522.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
OLDHAMBULLITT
OLDHAMBULLITT
05
05
05
05
05
05
05
99
05
965.12
965.12
965.12
516.00
516.00
965.12
965.12
65.11
522.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2004
2014
2014
2014
2014
2014
2012
2004
2004
2004
2014
2014
2004
2004
2008
2012
1.64
0
3.179
1.857
1.387
2.717
6.761
3.33
2.688
1.891
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / MATCHED FED FUNDS(O)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / MINOR WIDENING(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / BRIDGE REHAB(P)
SAFETY / BIKE/PED FACIL(O)
Milepoints:Milepoints:
Milepoints:Milepoints:
To:To:
To:To:
From:From:
From:From:
![Page 72: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/72.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 72
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
IMPROVE THE SAFETY AND CONGESTION OF KY 1932 (CHENOWETH LANE) FROMUS 60 (SHELBYVILLE ROAD) TO US 42 (BROWNSBORO ROAD) APPROXIMATELY1.07 MILES (2014BOP).
WIDEN KY 1931 FROM 2 TO 3 LANES FROM US 31W (DIXIE HWY) TO DOSS HIGHSCHOOL. (2014BOP)
SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.
PROVIDE COLLECTOR-DISTRIBUTOR LANE ON SOUTHBOUND I-71 TOFACILITATE RAMP MOVEMENTS TO AND FROM I-265.
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-265FROM MP 16.6 TO MP 17.2 APPROX 3100 FT.
LOUISVILLE BRIDGES; KENTUCKY TRADITIONAL NH FUNDING FOR FY 2017PLEDGED TO SUPPORT THE FINANCING OF THE LSIORB (CANNOT BEMOVED)(14CCR)
RECONSTRUCT/WIDEN I-264 (WATTERSON EXPRESSWAY) FROM WESTPORTROAD (KY 1447) TO I-71, INCLUDING THE US-42 INTERCHANGE AS ASPUI.(PROJECT INCLUDES 5-594) (12CCR)(14CCR)
RECONSTRUCT/WIDEN I-264 (WATTERSON EXPRESSWAY) FROM WESTPORTROAD (KY 1447) TO I-71, INCLUDING THE US-42 INTERCHANGE AS ASPUI.(PROJECT INCLUDES 5-594) (ADDITIONAL FUNDING FOR C PHASE)
3.000
1.700
1.700
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
KY-1932
KY-1931
I-265
I-71
I-265
-
I-264
I-264
$5,016,400
$3,000,000
$46,500,000
$5,000,000
$2,100,000
$50,000,000
$32,900,000
$23,000,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
R
D
R
U
C
C
C
C
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2018
2018
2016
2018
2020
2021
2017
2018
2017
2016
2019
2019
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
SLO
NH
NH
NH
NH
IM
SP
NH
IM
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,250,000
$1,766,400
$2,000,000
$3,000,000
$2,500,000
$2,000,000
$2,000,000
$40,000,000
$5,000,000
$2,100,000
$50,000,000
$3,000,000
$5,020,000
$710,000
$24,170,000
$23,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
531.00
536.00
537.00
539.00
540.00
715.41
804.00
804.02
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
965.13
965.13
537.00
539.00
540.00
715.41
390.00
804.02
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2016
2016
2016
2008
2010
2016
2006
2006
2016
2016
2016
2008
2006
2016
5.523
3.148
23.409
16.6
20.9
20.9
6.59
4.887
34.727
17.2
22.6
22.6
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / I-CHANGE RECONST(O)
RELIABILITY / RECONSTRUCTION(O)
ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(O)
![Page 73: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/73.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 73
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2016 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2017 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
US 42 SAFETY IMPROVEMENTS FROM HARRODS CREEK BRIDGE TO RIVERROAD.(10CCR)
REPLACE BRIDGE ON CR-1038L OVER BEE LICK CREEK; (STRUCTURALLYDEFICIENT, SR=4) 056C00104N
1.000
.060
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
-
-
-
-
-
-
-
US-42
CR-1038L
$48,700,000
$5,800,000
$7,700,000
$23,000,000
$23,500,000
$23,500,000
$23,500,000
$12,000,000
$330,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2018
2019
2020
2021
2022
2016
2016
2018
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SP
SP
SP
BRZ
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$48,700,000
$5,800,000
$7,700,000
$23,000,000
$23,500,000
$23,500,000
$23,500,000
$5,000,000
$3,000,000
$4,000,000
$330,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
965.14
965.15
965.16
965.17
965.18
965.19
965.20
972.00
1061.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
99
05
965.14
965.15
965.16
965.17
965.18
965.19
965.20
134.00
1061.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2008
2008
2014
2014
2016
2016
1998
2010
2006
2008
2008
2014
2014
2016
2016
1996
2010
9.628
0
10.548
.06
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
SAFETY / SAFETY-HAZARD ELIM(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 74: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/74.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 74
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
OLMSTED PARKS HISTORIC BRIDGES: REHABILITATE 11 BRIDGES THROUGHOLMSTED PARK: (056C00032N, 056C00031N, 056C00026N, 056C00027N, 056C00028N,056C00030N, 056C00029N, 056C00034N, 056C00033N, 056C00139N, 056C00138N)
REPLACE BRIDGE ON EASTERN PARKWAY (US 60A) OVER SOUTH FORKBEARGRASS CREEK 0.2 MILE NE OF POPLAR LEVEL RD (KY 864)(SR 9.5)056B00139N
REPLACE BRIDGE ON E BROADWAY (US 150) OVER SOUTH FORK BEARGRASSCREEK AT INTERSECTION WITH BRENT STREET (CS 1312G)(SR 38) 056B00348N
REPLACE BRIDGE ON FAIRMOUNT RD (CR 1004N) OVER CEDAR CREEK 0.2 MILEW OF FARMERS WAY (PR 1021N)(SR 41) 056C00054N
REPLACE BRIDGE ON E KENTUCKY ST (CS 1017G) OVER SOUTH FORKBEARGRASS CREEK 0.01 MILE E OF SCHILLER AVE (CS 1138G)(SR 48.8) 056C00083N
REPLACE I-264 EB BRIDGE OVER NORTHWESTERN PARKWAY (KY-3064) (SR=48.0)
REPLACE BRIDGE OVER NORTHERN DITCH ON GRADE LANE (CR 1001G) 0.34 MI SOF KY 1747 (FERN VALLEY ROAD) (056C00064N)(SR=25.4)
.040
.040
.040
.020
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
-
US-60A
US-150
CR-1004N
CS-1017G
I-264
CR-1001G
$600,000
$1,400,000
$1,190,000
$650,000
$710,000
$2,000,000
$1,270,000
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
R
U
C
R
U
C
R
U
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2018
2016
2016
2017
2016
2016
2017
2017
2017
2019
2016
2017
2019
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
BRO
BRO
BRO
BRO
BRO
BRO
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRO
BRZ
BRZ
BRZ
BRZ
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$600,000
$100,000
$500,000
$800,000
$120,000
$220,000
$850,000
$100,000
$50,000
$500,000
$10,000
$100,000
$600,000
$2,000,000
$350,000
$20,000
$50,000
$850,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
1062.00
1064.00
1067.00
1068.00
1070.00
1073.00
1077.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
1062.00
1064.00
1067.00
1068.00
1070.00
1073.00
1077.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2010
2012
2012
2012
2012
2014
2014
2010
2012
2012
2012
2012
2014
2014
5.698
3.6
.737
1.293
.15
2.48
5.738
3.64
.777
1.333
.19
2.5
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REHAB(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 75: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/75.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 75
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE OVER GOOSE CREEK ON RIVER ROAD (CR 1001B) 0.2 MI N OFLIME KILN ROAD (CR 1002B) (056C00130N)(SR=26.5)
WIDEN BUECHEL BANK ROAD TO 3 LANES FROM GE APPLIANCE PARK TOBUECHEL BY-PASS (00CCN) (FUNDING MOVED FROM 5-8105 IN 2010 ENACTEDHIGHWAY PLAN FOR R, U, AND C PHASES.)(12CCR)
RECONSTRUCT BILLTOWN ROAD FROM NORTH OF COLONNADES PLACE TOSOUTH OF EASUM ROAD. (04CCN)(06CCN)(08CCR)(10CCR)(12CCR)
IMPROVE AND WIDEN MT WASHINGTON ROAD FROM PRESTON HIGHWAY TOPENN RUN CREEK BRIDGE. (10CCN)(SAME AS 5-8611.00)
IMPROVE AND WIDEN MT. WASHINGTON ROAD FROM PENN RUN CREEK BRIDGETO CEDAR CREEK ROAD. (10CCN)(SAME AS 5-8612.00)
INSTALL SOUND BARRIER ON BOTH SIDES OF KY-841 AT WATSONVILLE ROAD.(08CCN)(12CCR)
INTERCHANGE AT MANSLICK ROAD (KY-1931) AND I-264.(08CCN)(10CCR)(12CCR)(14CCR)(16CCR)
RAILROAD SAFETY CROSSING. IMPROVE LIGHTING, ERECT SIGNALS UPGRADEAND ROADWAY CROSSINGS BETWEEN CARDINAL AND HILL STREETS.(08CCN)(12CCR)
.070
.900
2.500
1.501
1.187
.300
.100
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
CR-1001B
CR-1007G
KY-1819
KY-2053
KY-2053
KY-841
I-264
-
$1,760,000
$5,080,000
$2,400,000
$9,650,000
$3,800,000
$2,170,000
$5,800,000
$200,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
U
C
C
R
U
D
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2021
2021
2022
2016
2017
2016
2016
2016
2016
2018
2018
2016
2019
2020
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
BRZ
BRZ
BRZ
SPP
SPP
SPP
SP
SP
SP
SP
SP
SPB
NH
NH
SAF
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$450,000
$50,000
$10,000
$1,250,000
$750,000
$4,330,000
$2,400,000
$3,260,000
$6,390,000
$1,000,000
$1,500,000
$1,300,000
$2,170,000
$4,000,000
$1,800,000
$200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
1079.00
8001.00
8203.00
8205.10
8205.20
8403.00
8405.00
8412.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
1079.00
8001.00
8203.00
8205.10
8205.20
8403.00
8405.00
8412.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2000
2004
2010
2010
2008
2008
2008
2014
2000
2004
2010
2010
2008
2008
2008
3.8
.114
6.9
0
1.501
3.55
8.08
3.87
1.004
8.1
1.501
2.688
3.85
8.18
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / ENVIRO MITIGATION(P)
RELIABILITY / NEW INTERCHANGE(O)
SAFETY / SAFETY-RR PROTECTN(P)
![Page 76: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/76.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 76
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN KY-1020, NATIONAL TURNPIKE, FROM FAIRDALE ROAD TO SOUTH PARKROAD. MP .615 TO MP 2.669. (08CCN)
WIDEN KY-2055 (MT. HOLLY ROAD) FROM NATIONAL TURNPIKE TO FAIRDALEROAD. (08CCN)(16CCR)
MAKE BEAUTIFICATION AND IMPROVEMENTS ON DIXIE HIGHWAY AT THEWATTERSON EXPRESSWAY EXCHANGE. (08CCN)(12CCR)
EXTEND THE EXISTING SOUND BARRIER WALL ON THE WEST SIDE OF THEWESTPORT ROAD INTERCHANGE. THE WALL SHALL EXTEND APPROXIMATELY2900' AND BE 16' HIGH. (10CCN)(10CCR)
IMPROVE AND WIDEN MT. WASHINGTON ROAD FROM PRESTON HIGHWAY TOPENN RUN CREEK BRIDGE. (10CCN)(12CCR)(SAME AS 5-8205.10)
IMPROVE AND WIDEN MT. WASHINGTON ROAD FROM PENN RUN CREEK BRIDGETO CEDAR CREEK ROAD. (10CCN)(12CCR)(SAME AS 5-8205.20)
UPGRADE A 1-MILE SECTION OF SIDEWALKS, CURBING AND BEAUTIFICATIONTO BARDSTOWN ROAD IN BUECHEL.(12CCN)
RESURFACE, STREETSCAPE, PEDESTRIAN BUMP-OUTS AND OTHER TRAFFICIMPROVEMENTS ON EAST MARKET STREET FROM BAXTER TO BROOK STREET,BETWEEN NUCLEUS UL URBAN RESEARCH PARK AND HOME OF THEINNOCENTS.(12CCN)
2.054
1.360
.400
1.501
1.187
1.192
.932
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
KY-1020
KY-2055
US-31W
KY-1447
KY-2053
KY-2053
KY-2251
US-31E
$1,350,000
$17,070,000
$102,000
$1,392,000
$22,330,000
$12,380,000
$300,000
$8,500,000
Total
Total
Total
Total
Total
Total
Total
Total
D
D
R
U
C
C
C
D
R
U
C
D
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2019
2020
2016
2016
2019
2020
2020
2022
2016
2017
2017
2019
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SP
SPP
SP
STP
SP
SP
SP
SP
SP
SP
SP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,350,000
$1,050,000
$1,050,000
$5,220,000
$9,750,000
$102,000
$1,392,000
$630,000
$3,500,000
$7,200,000
$11,000,000
$800,000
$2,020,000
$1,650,000
$7,910,000
$300,000
$8,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
8502.00
8503.00
8507.00
8601.00
8611.00
8612.00
8702.00
8703.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
8502.00
8503.00
8507.00
8601.00
8611.00
8612.00
8702.00
8703.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2008
2008
2008
2010
2010
2010
2012
2012
2008
2008
2008
2010
2010
2010
2012
2012
.615
0
14.5
0
1.501
0
16.635
2.669
1.36
14.9
1.501
2.688
1.192
17.567
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / ENVIRO MITIGATION(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
![Page 77: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/77.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 77
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
SOUND BARRIER ON I-264 FROM RAMP TO US 42 SOUTH TO EXISTINGBARRIERS.(12CCN)
SOUND BARRIER ON I-64 FROM WATTERSON RAMP TO EXISTING SOUNDBARRIER. (12CCN)
WIDEN RANGELAND ROAD TO 3 LANES FOR 1.23 MILES. (14CCN)
SAFETY IMPROVEMENTS TO PALATKA ROAD (KY-1142) MP 0.0 TO MP 1.73.(14CCN)
CONSTRUCT A SOUND WALL ON THE NORTH SIDE OF I-265 BETWEEN SMYRNAPARKWAY AND PENNSYLVANIA RUN ROAD. (14CCN)
NEW CONSTRUCTION - SOUNDWALL ALONG SOUTHWEST SIDE OF WATTERSONEXPRESSWAY FROM CRUMS LANE TO APPROXIMATELY 0.5 MILE WEST OF THEDIXIE HWY INTERCHANGE. (14CCN)
NEW CONSTRUCTION - CONSTRUCT SOUND WALL ALONG THE EAST SIDE OFGREENBELT HIGHWAY FROM APPROXIMATELY 0.5 MI SOUTH OF THEINTERSECTION WITH LOWER HUNTERS TRACE TO APPROXIMATELY 250 FEETSOUTH OF THE SAME INTERSECTION FOR NOISE ABATEMENT.(14CCN)
THREE LANE WIDENING ALONG KY-1931 FROM THE DOSS HIGH SCHOOLENTRANCE TO PALATKA ROAD, INCLUDING INTERSECTION IMPROVEMENTSWITH PALATKA ROAD AND TURN LANES. (14CCN)
ERECT SOUND WALL ON SOUTH SIDE OF GENE SNYDER FREEWAY FROM MP 18.0TO MP 18.5. (14CCN)
9.760
1.229
1.736
.730
1.040
.453
.599
.500
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
I-264
I-64
CR-1015G
KY-1142
I-265
I-264
KY-1934
KY-1931
I-265
$1,200,000
$1,200,000
$4,930,000
$220,000
$1,690,000
$2,850,000
$1,200,000
$11,090,000
$2,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
R
U
C
C
C
D
C
D
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2016
2017
2016
2016
2016
2017
2016
2016
2016
2016
2018
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
STP
STP
STP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,200,000
$1,200,000
$860,000
$990,000
$3,080,000
$220,000
$1,690,000
$250,000
$2,600,000
$240,000
$960,000
$3,130,000
$1,880,000
$6,080,000
$2,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
8716.00
8717.00
8801.00
8803.00
8806.00
8807.00
8808.00
8810.00
8854.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
05
8716.00
8717.00
8801.00
8803.00
8806.00
8807.00
8808.00
8810.00
8854.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2012
2014
2014
2014
2014
2014
2014
2014
2012
2012
2014
2014
2014
2014
2014
2014
2014
12.05
0
0
13.6
5.96
5.701
4.887
18
21.81
1.229
1.736
14.33
7
6.154
5.486
18.5
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / MINOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
![Page 78: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/78.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 78
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
ERECT SOUND WALL ON NORTH SIDE OF GENE SNYDER FREEWAY FROM MP 15.3TO MP 16.1. (14CCN)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71FROM MP 5.4 TO MP 6.3 FOR APPROX. 4700 FEET. (14CCN)(16CCR)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE SOUTH SIDE OF I-71FROM MP 7.5 TO MP 7.8. (14CCN)(16CCR)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71FROM MP 7.5 TO MP 8.7 FOR APPROX. 6400 FEET. (14CCN)
HILLTOP PATHWAY FROM TYLER PARK TO A STREET CROSSWALK ATEDGELAND AVENUE. (16CCN)
EXTEND THE LEFT TURN LANE ON HURSTBOURNE LANE AT INTERSECTIONWITH SIX MILE LANE. (16CCN)
CONSTRUCT A NEW PEDESTRIAN BRIDGE AND IMPROVE DRAINAGE AT THEENGINEERING SPEED SCHOOL AT THE UNIVERSITY OF LOUISVILLE APPLIEDSCIENCE AND RESEARCH PARK. (16CCN)
4-LANE BLUE LICK RD FROM GENE SNYDER TO BULLITT COUNTY LINE. (16CCN)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON I-64 WESTBOUNDBETWEEN MILEPOINTS 13.7 AND 14.2. (16CCN)
.800
.900
.300
1.200
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
I-265
I-71
I-71
I-71
-
KY-1747
-
KY-1450
I-64
$3,000,000
$2,961,000
$1,152,000
$4,608,000
$77,000
$200,000
$11,000,000
$62,000,000
$1,850,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
P
C
U
C
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2017
2018
2017
2017
2017
2017
2018
2019
2020
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SPP
SPP
SPP
SP
SPP
SPP
SPP
SPP
SP
SP
SP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,000,000
$2,961,000
$1,152,000
$4,608,000
$77,000
$200,000
$3,500,000
$7,500,000
$2,500,000
$12,000,000
$10,000,000
$37,500,000
$1,850,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
8855.00
8858.00
8859.00
8860.00
8904.00
8905.00
8906.00
8907.00
8951.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
05
8855.00
8858.00
8859.00
8860.00
8904.00
8905.00
8906.00
8907.00
8951.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2014
2014
2016
2016
2016
2016
2016
2014
2014
2014
2014
2016
2016
2016
2016
2016
15.3
5.4
7.5
7.5
0
13.7
16.1
6.3
7.8
8.7
1.88
14.2
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
NEW ROUTES / TRANSP ENHANCEMENT(P)
SAFETY / SAFETY(P)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
![Page 79: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/79.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 79
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN US 60 TO THREE LANES FROM EASTWOOD CUTOFF (MP 14.7) TOROCKCREST WAY (MP 15.1). (16CCN)
IMPROVE THE HURSTBOURNE PARKWAY (KY 1747) AT SHELBYVILLE ROAD (US60) INTERSECTION TO INCREASE CAPACITY, REDUCE DELAYS, AND IMPROVESAFETY. (16CCN)
DESIGN AND BUILD A NOISE BARRIER WALL ON THE NORTH SIDE OF I-265BETWEEN MP 15.3 AND MP 16.1 FOR APPROXIMATELY 4700 FEET. (16CCN)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE WESTBOUND SIDEOF I-64 FROM MP 10.3 TO MP 11.2 FOR APPROXIMATELY 4800 FEET. (16CCN)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-265FROM MP 16.6 TO MP 17.2 FOR APPROXIMATELY 3,100 FEET. (16CCN)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON I-71 NORTHBOUND FROMNEAR GLENVIEW AVENUE TO JUST NORTH OF THE LIME KILN OVERPASS FORAPPROXIMATELY 2,700 FEET. (16CCN)
EAST NICHOLASVILLE BYPASS SECTION IA FROM 50 FEET SOUTH OF KY 39 TO125 FEET NORTH OF KY 169.
EAST NICHOLASVILLE BYPASS SECTION IB FROM 125 FEET NORTH OF KY 169 TOEND OF PROJECT AT TIE-IN TO WEST BYPASS. THIS INCLUDES THEINTERCHANGE AT US 27 NORTH OF NICHOLASVILLE. (14CCR)
EAST NICHOLASVILLE BYPASS SECTION II; FROM KY-39, EXTENDINGSOUTHWESTERLY TO US-27 SOUTH OF NICHOLASVILLE. (SEE 7-8305.00 FOR DPHASE.)(2000BOP)(12CCR)(16CCR)
2.660
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JESSAMINE
JESSAMINE
JESSAMINE
US-60
KY-1747
I-265
I-64
I-265
I-71
-
-
-
$1,175,000
$4,338,000
$250,000
$250,000
$250,000
$1,730,000
$15,000,000
$38,000,000
$12,500,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
D
R
U
C
D
D
D
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2022
2017
2018
2019
2020
2022
2021
2022
2019
2016
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SPP
SPP
SPP
SPP
SP
SP
SP
SPP
SP
SP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$325,000
$400,000
$450,000
$138,000
$700,000
$1,000,000
$2,500,000
$250,000
$250,000
$250,000
$1,730,000
$15,000,000
$38,000,000
$12,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
07
07
07
8952.00
8953.00
8957.00
8960.00
8961.00
8963.00
87.20
87.30
87.50
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
07
07
07
8952.00
8953.00
8957.00
8960.00
8961.00
8963.00
87.10
87.10
87.02
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2016
2016
2014
2014
2000
2016
2016
2016
2016
2016
2016
2000
2000
1998
14.7
15.3
10.3
16.6
15.1
16.1
11.2
17.2
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MINOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
![Page 80: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/80.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 80
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
EAST NICHOLASVILLE BYPASS SECTION II; FROM KY-39, EXTENDINGSOUTHWESTERLY TO US-27 SOUTH OF NICHOLASVILLE. (SEE 7-8305.00 FOR DPHASE.)(200BOP)(12CCR)(16CCN)
EXTEND EAST BRANNON ROAD FROM END OF EXISTING ROAD FROM EAST OFLAUDERDALE DRIVE (CS 1501) TO TATES CREEK ROAD (KY 1974) (2-LANEIMPROVEMENT)(12CCR)(16CCN)
IMPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND ROADWAYHAZARDS ON KY 1980 (BRANNON RD) FROM US 68 (HARRODSBURG RD) TO US 27(NICHOLASVILLE RD)(12CCR)
RECONSTRUCT KY 169 JUST EAST OF KEENE TO ELIMINATE DROPOFFS.(12CCR)(14CCN)(16CCN)
ACCESS MANAGEMENT ON NICHOLASVILLE ROAD BETWEEN NICHOLASVILLEAND MAN-O-WAR BLVD. (14CCR)
RECONSTRUCT INTERSECTION OF KY 29 NORTH OF WILMORE.(16CCR)
REPLACE BRIDGE OVER HICKMAN CREEK AT BLACK BRIDGE ON KY 39 1.3 MI NOF KY 1268. (057B00002N)(SR=49.5)(EBRP)
3.205
.504
5.356
.700
.036
JESSAMINE
JESSAMINE
JESSAMINE
JESSAMINE
JESSAMINE
JESSAMINE
JESSAMINE
-
CS-1486A
KY-1980
KY-169
US-27
US-68
KY-39
$10,000,000
$22,380,000
$24,500,000
$4,400,000
$7,900,000
$6,230,000
$2,300,000
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
R
U
C
D
R
U
C
C
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2016
2017
2018
2019
2019
2021
2018
2019
2020
2021
2017
2017
2019
2021
2019
2020
2020
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
SPP
SPP
SPP
STP
STP
STP
SPP
SPP
SPP
SPP
SP
STP
STP
STP
BRX
BRX
BRX
BRX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$10,000,000
$3,000,000
$4,980,000
$14,400,000
$7,500,000
$5,000,000
$12,000,000
$400,000
$1,000,000
$1,000,000
$2,000,000
$7,900,000
$2,630,000
$600,000
$3,000,000
$350,000
$100,000
$200,000
$1,650,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
87.51
376.00
414.00
419.00
430.00
915.00
1136.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
FAYETTE
07
07
07
07
07
07
07
87.51
376.00
414.00
419.00
430.00
915.00
1136.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2012
2016
2014
2010
2014
2016
2016
2012
2016
2014
2010
2014
0
16.555
10.867
4.1
3.74
3.205
17.059
15.278
4.8
3.776
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
0 .945Milepoints: To:From:
![Page 81: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/81.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 81
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON CR-1238 (0.88) OVER NS SYSTEM. (SR=26.3) 057R00605N
CONSTRUCT A NEW 4 LANE CONNECTOR BETWEEN US-27 AND I-75.(08CCN)(12CCR)(16CCR)
REPLACE RAILROAD BRIDGE ON KY 169 (NORTH 3RD STREET) BETWEENMEADOWLARK LANE & ILHARDT AVENUE.(SR=28.9)057R00603(14CCN)(16CCR)
RECONSTRUCT KY 169 FROM US 68 TO 0.54 MILES NORTH OF CLEAR CREEK RD(MP 14.448 TO MP 19.00). (16CCN)
ADDRESS GEOMETRIC AND SAFETY ISSUES AND FUTURE CONGESTIONMITIGATION ON KY 40 FROM 0.10 MILE WEST OF TEAYS BR. ROAD TO 0.10 MILEEAST OF TEAYS BR. ROAD.(12CCR)
REPLACE BRIDGE ON KY 40 OVER BRANCH OF LITTLE PAINT CREEK 0.38 MILENE OF JOHNSON/MAGOFFIN COUNTY LINE (SR 12.5) 058B00012N
CORRECT ROCKFALL HAZARD @ MP 1.80 TO 3.05. (04CCR)(10CCR)(12CCR)
.046
.300
1.250
JESSAMINE
JESSAMINE
JESSAMINE
JESSAMINE
JOHNSON
JOHNSON
JOHNSON
CR-1238
US-27
KY-169
KY-169
KY-40
KY-40
KY-321
$675,000
$15,000,000
$2,000,000
$29,250,000
$1,506,000
$1,575,000
$12,600,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
D
R
U
D
C
D
R
U
C
D
R
U
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2022
2022
2017
2019
2020
2016
2018
2017
2018
2019
2020
2016
2017
2017
2016
2016
2017
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
BRZ
BRZ
STP
STP
STP
BRO
BRO
SP
SP
SP
SP
SPP
SPP
SPP
BRO
BRO
BRO
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$375,000
$150,000
$150,000
$2,000,000
$10,000,000
$3,000,000
$500,000
$1,500,000
$2,750,000
$4,000,000
$4,000,000
$18,500,000
$500,000
$496,000
$510,000
$400,000
$225,000
$950,000
$12,600,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
12
12
12
1144.00
8404.00
8851.00
8906.00
194.00
1114.00
5008.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
MADISON
07
07
07
07
12
12
12
1144.00
8404.00
8851.00
8906.00
194.00
1114.00
5008.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2008
2014
2016
2012
2012
1998
2016
2008
2014
2016
2012
2012
1998
.868
10.807
14.448
9.375
.372
1.8
.892
10.853
19
9.575
.412
3.05
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / ROCKFALL MITIGTN(P)
Milepoints: To:From:
![Page 82: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/82.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 82
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
IMPROVE SAFETY AND GEOMETRICS FROM KY 321 RAMP TO PAINTSVILLE, ATTHE BROADWAY INTERSECTION. (16CCN)
TRANSPORTATION IMPROVEMENTS TO BRENT SPENCE BRIDGE. (2005HPP-KY154): (059B00046N) (THESE FUNDS WILL BE USED BY KYTC FOR EXISTINGBRIDGE MAINTENANCE,REPAIR AND PAINTING.)
KY 143 HPP EARMARK "REPLACE BRENT SPENCE BRIDGE, KENTON COUNTY,KENTUCKY". (2005HPP-KY143)(SEE 6-17.04 FOR ADDITIONAL 2005HPP FUNDING)
BRENT SPENCE BRIDGE PROJECT (ADDITIONAL PROJECT FUNDS FORMAINTENANCE, REPAIR AND PAINTING)(10CCR)(14CCR)
BRENT SPENCE BRIDGE PROJECT (ADDITIONAL PROJECT FUNDS FORMAINTENANCE, REPAIR AND PAINTING).
RECONSTRUCT KY 1303 FROM KY 536 (MP 0.000) TO BEECHGROVE ELEMENTARY(MP 1.100) (PRIORITY SECTION 1). DESIGN PHASE UNDER PARENT NO. 6-162.01.(2012BOP)(16CCR)
RECONSTRUCT KY 536 FROM THE EAST END OF THE NS RAILROAD BRIDGE(B91)(MP 14.363 IN BOONE) TO KY 1303 (MP 1.061). (16CCN)
EXTEND THE SECOND EASTBOUND LANE OF THOMAS MORE PKWY FROMRENAISSANCE DR TO 0.1 SE OF CENTERVIEW BLVD. (2012BOP)
1.910
1.100
1.061
.510
JOHNSON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KY-1428
I-75
I-75
I-75
I-75
KY-1303
KY-536
CS-5555
$26,000,000
$16,800,000
$1,600,000
$6,520,000
$13,700,000
$14,000,000
$12,500,000
$568,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
C
C
C
R
U
C
R
U
C
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2020
2021
2017
2017
2018
2018
2019
2020
2022
2017
2019
2020
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
HPP
HPP
SB2
IM
STP
STP
STP
STP
STP
STP
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,500,000
$8,000,000
$1,500,000
$15,000,000
$16,800,000
$1,600,000
$6,520,000
$13,700,000
$3,000,000
$1,000,000
$10,000,000
$3,500,000
$1,000,000
$8,000,000
$40,000
$528,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
06
06
06
06
06
06
06
8903.00
17.04
17.05
17.09
17.10
162.10
162.20
416.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
BOONE
12
06
06
06
06
06
06
06
8903.00
17.04
17.05
17.09
17.10
162.01
162.01
966.02
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2004
2010
2010
2016
2012
2016
2012
2016
2004
2010
2010
2016
2000
2000
2004
.987
191.277
191.277
191.277
0
0
.29
2.897
191.777
191.777
191.777
1.1
1.061
.6
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REHAB(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REHAB(P)
RELIABILITY / BRIDGE REHAB(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MATCHED FED FUNDS(O)
14.363 14.746Milepoints: To:From:
![Page 83: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/83.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 83
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
PAVEMENT AND SIDEWALK RESTORATION ALONG 6TH STREET FROM SCOTTSTREET TO RUSSELL STREET (1,400 FEET). ALSO SIDEWALK IMPROVEMENTS ONSCOTT STREET FROM 4TH STREET TO 6TH STREET (900 FEET). (2012BOP)
PHASE I MULTI-USE PATH ALONG BROMLEY CRESCENT SPRINGS RD FROMANDERSON ROAD TO AMSTERDAM ROAD. (2012BOP)
PEDESTRIAN/BICYCLE TRAIL THROUGH THE CITIES OF LUDLOW, COVINGTON,NEWPORT & BELLEVUE ALONG THE OHIO RIVER. (2012BOP)
RESURFACE & STABILIZE DUDLEY ROAD FROM WINDING TRAILS TO THOMASMORE PARKWAY (PHASE 1). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).
RESURFACE & STABILIZE DUDLEY ROAD FROM THOMAS MORE PARKWAY TOCATHERINE DRIVE (PHASE 2). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).
LATONIA AVENUE ROADWAY RECONSTRUCTION FROM SOUTHERN AVENUE TONEAR WEST 36TH STREET (2014BOP)(MOA WITH THE CITY OF COVINGTON).
WEST 15TH STREET; REPLACE BRIDGE AND APPROACHES OVER CSX RR INCOVINGTON. (SR=19.1): (059C00029N)(12CCR)
EVALUATE BRIDGE ON KY-1120 (MP 0.621) OVER CSX RAILROAD; 11TH ST E OFRUSSELL ST; (STRUCTURALLY DEFICIENT, SR=19.5) 059B00083N
RECONSTRUCT HANDS PIKE (KY 1501) FROM KY 17 TO CRYSTAL LAKEDRIVE.(12CCR)(14CCR)(16CCR)
.170
.275
3.462
.079
.100
1.032
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
CS-2215
CR-1316
KY-8
CS-4128
CS-4128
CS-2604
CS-2097
KY-1120
KY-1501
$1,280,508
$4,280,000
$481,600
$1,044,000
$924,000
$588,000
$3,490,000
$1,550,000
$5,800,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
C
C
C
C
R
U
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2017
2016
2017
2017
2017
2016
2016
2018
2016
2016
2017
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
BRZ
BRZ
BRZ
BRO
BRO
BRO
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,280,508
$400,000
$800,000
$3,080,000
$481,600
$1,044,000
$924,000
$588,000
$830,000
$550,000
$2,110,000
$250,000
$550,000
$750,000
$5,800,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
06
418.00
419.00
421.00
428.10
428.20
429.00
1070.00
1075.00
8307.10
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
CAMPBELL
06
06
06
06
06
06
06
06
06
966.02
966.02
966.02
428.00
428.00
966.03
1070.00
1075.00
8307.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2012
2012
2014
2014
2014
2008
2010
2006
2004
2004
2004
2014
2014
2006
2008
2010
2006
0
0
4.2
2.19
1.46
.09
.144
.59
0
.17
.275
7.662
3.11
2.19
.36
.223
.65
1.032
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / RESURFACING(P)
RELIABILITY / RESURFACING(P)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
0 2.1Milepoints: To:From:
![Page 84: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/84.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 84
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCTION OF PIKE AND MAIN STREETS IN CITY OF COVINGTON.(14CCN)
RECONSTRUCT KY 16 BETWEEN 38TH STREET AND HOWARD LITZLER DRIVE.(14CCN)
SIDEWALK AND CURB CONSTRUCTION ON DIXIE HIGHWAY FROM NORTHARLINGTON NORTH TO COVINGTON SIDEWALK SYSTEM. (14CCN)(16CCR)
IMPROVE MONTCLAIR AVE., INCLUDING CURB REPLACEMENT, PAVEMENTMILLING, AND ASPHALT REPLACEMENT. (16CCN)
IMPROVE ASH ST., INCLUDING CURB REPLACEMENT, PAVEMENT MILLING, ANDASPHALT REPLACEMENT. (16CCN)
IMPROVE ADELA AVE., INCLUDING TREE REMOVAL, SIDEWALK REPLACEMENT,CURB REPLACEMENT, PAVEMENT MILLING, AND ASPHALT REPLACEMENT.(16CCN)
EXTEND HANDS PIKE (KY 1501) TO KY 177. (16CCN)
CONSTRUCT A SOUND BARRIER WALL ON I-275 FROM DIXIE HIGHWAYWESTBOUND. (16CCN)
EXTEND HOUSTON ROAD TO CINEMA PROPERTY. (16CCN)
IMPROVE EXISTING ALIGNMENT WITH BUTTERMILK PIKE, ORPHANAGE ROAD,AND US 25. (16CCN)
.200
.682
.415
.337
.251
.680
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
US-25
KY-16
US-25
CS-1500
CS-5046
CS-1560
KY-1501
I-275
-
US-25
$1,700,000
$12,980,000
$1,130,000
$168,000
$98,000
$280,000
$500,000
$100,000
$250,000
$250,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
D
D
D
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2017
2017
2018
2018
2017
2018
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SAF
SPP
SPP
SPP
SP
STP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,700,000
$12,980,000
$1,130,000
$168,000
$98,000
$280,000
$500,000
$100,000
$250,000
$250,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
06
06
8813.00
8814.00
8815.00
8911.00
8912.00
8913.00
8914.00
8915.00
8916.00
8951.00
-
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
06
06
8813.00
8814.00
8815.00
8911.00
8912.00
8913.00
8914.00
8915.00
8916.00
8951.00
-
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2014
2016
2016
2016
2016
2016
2016
2016
2014
2014
2014
2016
2016
2016
2016
2016
2016
2016
12.8
14.135
11.675
0
0
0
13
14.817
12.09
.337
.251
.68
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / RESURFACING(P)
RELIABILITY / RESURFACING(P)
RELIABILITY / RESURFACING(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / NEW ROUTE(O)
SAFETY / RECONSTRUCTION(O)
![Page 85: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/85.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 85
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON ERNEST BRIDGE DR (CR 1021) OVER CSX RAILROAD.(16CCN)
IMPROVEMENTS TO KY-550 IN HINDMAN; CONSTRUCT NEW BRIDGE OVERTROUBLESOME CREEK AT THE NEW ARTS AND CRAFTS COLLEGE @ KY 160.(16CCR)
REPLACE BRIDGE ON ROCKLICK BRANCH (CR 1008) OVER RIGHT FORK BEAVERCREEK AT JCT WITH SOUTH HIGHWAY 7 (KY 7)(SR 43.9) 060C00006N
REPLACE BRIDGE OVER RIGHT FORK TROUBLESOME CREEK ON FIELDWOODDRIVE (CS1016) IN HINDMAN (060C00060N)(SR=21.9)
NEW CONSTRUCTION OF ONE MILE STRETCH OF KY-1231 BEGINNING AT BRIDGEAFTER LEAVING KY-550. (04CCN)(06CCR)(08CCR)(10CCR)(12CCR)
SPOT IMPROVEMENTS ON KY-1393 FROM KY-582 TO KY-899. (06CCN) (10CCR)
RECONSTRUCT CURVE ON KY 899 IN KNOTT COUNTY BETWEEN MP 3.6 AND MP3.7. (14CCN)(16CCN)
PEDESTRIAN BRIDGE OVER KY 899 FROM THE ENTRANCE OF ALICE LLOYDCOLLEGE TO THE PARKING LOTS. (14CCN)
INTERSECTION LIGHTS AT KY-160 AND KY-899. (14CCN)
.022
.061
.012
1.000
2.800
.100
.016
KENTON
KNOTT
KNOTT
KNOTT
KNOTT
KNOTT
KNOTT
KNOTT
KNOTT
CR-1021
CS-1012
CR-1008
CS-1016
KY-1231
KY-1393
KY-899
KY-899
KY-899
$600,000
$2,160,000
$1,000,000
$950,000
$4,660,000
$6,000,000
$125,000
$475,000
$75,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
R
C
R
U
C
D
R
U
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2016
2017
2016
2016
2017
2019
2021
2021
2022
2016
2017
2018
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRX
BRO
BRO
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
SB2
SP
SAF
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$600,000
$530,000
$1,630,000
$75,000
$325,000
$600,000
$300,000
$150,000
$250,000
$250,000
$4,660,000
$6,000,000
$125,000
$475,000
$75,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
12
12
12
12
12
12
12
12
8954.00
283.40
1116.00
1124.00
8200.00
8301.00
8801.00
8802.00
8803.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
12
12
12
12
12
12
12
12
8954.00
283.00
1116.00
1124.00
8200.00
8301.00
8801.00
8802.00
8803.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2000
2012
2014
2004
2006
2016
2014
2014
2016
1998
2012
2014
2004
2006
2016
2014
2014
.027
0
0
.018
6.982
0
3.6
0
.65
.061
.04
.03
7.982
2.757
3.7
.016
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RESURFACING(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / SAFETY(P)
![Page 86: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/86.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 86
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE OVER BALLS FORK ON KY 3209. (16CCN)
CONSTRUCT AN ACCESS POINT OFF KY-7 AT APPROXIMATELY MP 13.2 TOCONNECT WITH JUSTIN EMERY LN (CR-1657), INCLUDING NEW BRIDGE FOR ASAFE CROSSING OVER RAILROAD TRACKS. (16CCN)
MAJOR WIDENING - ADDRESS SAFETY AND CAPACITY ON US 25E FROM CORBINBYPASS TO KNOX/LAUREL COUNTY LINE. IMPROVE SAFETY ALONG CORRIDORBY PROVIDING IMPROVED ACCESS MANAGEMENT.(12CCR)
REPLACE BRIDGE ON OLD HWY 25 (CR 1325) JUST WEST OF US 25E. (SR=20.7)061C00063N
REPLACE STINKING CREEK ROAD BROWNS BRANCH BRIDGE.(12CCN)
RAISE KY-459 ABOVE FLOOD PLAIN FROM MP 3 TO MP 5, INCLUDING RAISINGTHE BULL RUN CREEK BRIDGE (INCLUDES 11-8712).(12CCN)
IMPROVE KY 3041 FROM MP 1.5 TO MP 2.0 TO INCREASE SAFETY AND PROVIDEACCESS TO THUNDER GAP HORSE RACING TRACK. (16CCN)
WIDEN ALLISON BOULEVARD (CS-1107) TO IMPROVE SAFETY AND PROVIDEACCESS TO THUNDER GAP HORSE RACING TRACK. (16CCN)
1.976
.004
.044
1.000
.500
.318
KNOTT
KNOTT
KNOX
KNOX
KNOX
KNOX
KNOX
KNOX
KY-3209
-
US-25E
CR-1325
KY-223
KY-459
KY-3041
CS-1107
$1,000,000
$100,000
$12,400,000
$725,000
$900,000
$4,120,000
$1,000,000
$2,025,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
R
U
C
D
R
U
C
C
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2017
2017
2017
2018
2019
2021
2021
2022
2016
2016
2017
2017
2017
2017
2017
2017
2017
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
RRS
NH
NH
NH
BRZ
BRZ
BRZ
BRZ
BRX
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,000,000
$100,000
$3,480,000
$1,920,000
$7,000,000
$250,000
$50,000
$25,000
$400,000
$900,000
$4,120,000
$200,000
$200,000
$100,000
$500,000
$150,000
$150,000
$75,000
$1,650,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
11
11
11
11
11
11
8904.00
8908.00
188.00
1102.00
8705.00
8713.00
8955.00
8956.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
11
11
11
11
11
11
8904.00
8908.00
188.00
1102.00
8705.00
8713.00
8955.00
8956.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2012
2016
2012
2012
2016
2016
2016
2016
2012
2016
2012
2012
2016
2016
24.221
.191
15.26
3
1.5
0
26.197
.195
15.304
5
2
.318
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / MINOR WIDENING(O)
![Page 87: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/87.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 87
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT AND IMPROVE EXISTING ALIGNMENTS, WITH SHOULDERS, OFBARBOURVILLE - MANCHESTER ROAD (KY 11) FROM US 25E (MP 10.1) TO THEKNOX-CLAY COUNTY LINE (MP 22.7). (16CCN)
REPLACE BRIDGE OVER SOUTH FORK BRANCH ON KY 61 0.5 MILE NORTH OF KY1906 (062B00010N) (SR=49.8)
RECONSTRUCT-REHABILITATION AND IMPROVEMENTS TO KY 222.(08CCN)(14CCR)
REPLACE BRIDGE OVER SOUTH FORK BRANCH. (16CCN)
CONNECTOR IMPROVEMENTS HODGENVILLE TO I-65. (16CCN)
SPOT IMPROVEMENTS ON KY 84 FROM HODGENVILLE TO I-65. (16CCN)
SCOPING STUDY TO IMPROVE KY 210 FROM CAMPBELLSVILLE TOHODGENVILLE. (16CCN)
WIDEN I-75 TO 6-LANES FROM US-25E TO THE LITTLE LAUREL RIVER (MP 28.9 TOMP 33.2)(16CCR)
12.600
.008
9.033
4.300
KNOX
LARUE
LARUE
LARUE
LARUE
LARUE
LARUE
LAUREL
KY-11
KY-61
KY-222
KY-61
KY-222
KY-84
KY-210
I-75
$4,500,000
$680,000
$1,000,000
$675,000
$675,000
$500,000
$600,000
$40,900,000
Total
Total
Total
Total
Total
Total
Total
Total
D
D
R
U
C
D
D
R
U
C
D
R
U
C
D
D
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2017
2019
2019
2020
2017
2017
2018
2019
2020
2017
2018
2019
2020
2018
2017
2020
2021
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
BRX
BRX
BRX
BRX
SPP
BRZ
BRZ
BRZ
BRZ
SPP
SP
SP
SP
SP
SPP
IM
IM
IM
IM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$4,500,000
$130,000
$50,000
$100,000
$400,000
$1,000,000
$125,000
$50,000
$100,000
$400,000
$125,000
$50,000
$100,000
$400,000
$500,000
$600,000
$500,000
$200,000
$200,000
$40,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
04
04
04
04
04
04
11
8958.00
1087.00
8505.00
8908.00
8909.00
8911.00
8912.00
9.10
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
04
04
04
04
04
04
11
8958.00
1087.00
8505.00
8908.00
8909.00
8911.00
8912.00
9.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2014
2016
2016
2016
2016
2016
2000
2016
2014
2016
2016
2016
2016
2016
1996
10.1
1.504
0
28.9
22.694
1.512
9.033
33.2
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SPOT IMPROVEMENTS(O)
SAFETY / SPOT IMPROVEMENTS(O)
SAFETY / SCOPING STUDY(O)
RELIABILITY / MAJOR WIDENING(O)
![Page 88: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/88.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 88
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
US-25 CONGESTION RELIEF; WIDEN US-25 TO 5 LANES FROM KY-1006 TO KY-2069,CONSTRUCT A CONNECTOR FROM US-25 TO KY-229, IMPROVE KY-229 UP TO KY-192 AND CONSTRUCT A BACK ENTRANCE TO THE SCHOOL FROM KY-192 BYPASS.(06CCR)(10CCR)(12CCR)(14CCR)
ADDRESS SAFETY, CAPACITY, AND ACCESS MANAGEMENT ON KY 363 FROM KY1006 TO KY 192. (06CCR)(2006BOPC).(10CCR)(14CCR)
MAJOR WIDENING - ADDRESS SAFETY, CAPACITY, AND ACCESS MANAGEMENTON US 25E FROM KNOX/LAUREL COUNTY LINE TO KY 770(12CCR)(16CCR)
MAJOR WIDENING FROM KY 1006 TO US 25 IN LONDON. THE PROPOSEDWIDENING WILL INCREASE CAPACITY, IMPROVE FREIGHT MOVEMENT, SAFETYAND PROVIDE ACCESS MANAGEMENT. (12CCR)
REPLACE BRIDGE ON KY-578 (MP 5.154) OVER RACCOON CREEK; .10 MI W OF W-JCT KY 638; (STRUCTURALLY DEFICIENT, SR=24.9) 063B00069N
REPLACE BRIDGE ON DOG BRANCH SCHOOL RD (CR 1341) OVER SINKING CREEK0.56 MILE NW OF SINKING CREEK RD (FD 781)(SR 13.8) 063C00025N
REPLACE BRIDGE OVER CRAIG CREEK ON KY 312 1.8 MILE SE OF KY 192.(063B00053N)(SR=49.4)(14CCR)
REHAB BRIDGE ON I-75 AT MILEPOST 30.5 OVER LAUREL RIVER (SR 34.1) (B00043RAND B00043L)
.500
.500
2.024
1.565
.100
.020
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
US-25
KY-363
US-25E
KY-192
KY-578
CR-1341
KY-312
I-75
$25,310,000
$4,650,000
$14,730,000
$18,930,000
$1,530,000
$1,350,000
$1,350,000
$4,000,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
R
U
C
C
C
D
R
U
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2017
2016
2019
2020
2016
2017
2016
2017
2017
2019
2017
2017
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
NH
NH
NH
SPP
BRX
BRZ
BRZ
BRZ
BRZ
BRX
BRX
BRX
BRO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$25,310,000
$4,650,000
$3,000,000
$2,480,000
$9,250,000
$18,930,000
$1,530,000
$250,000
$50,000
$50,000
$1,000,000
$100,000
$50,000
$1,200,000
$4,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
147.00
147.10
185.00
187.00
1080.00
1094.00
1096.00
1105.01
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
147.00
147.00
185.00
187.00
1080.00
1094.00
1096.00
1105.01
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2006
2012
2012
2010
2012
2014
2016
2006
2006
2012
2012
2010
2012
2014
2016
9.028
9.187
0
18.505
5.269
1.071
1.737
30.5
9.53
9.654
2.024
20.07
5.309
1.111
1.757
30.6
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REHAB(P)
![Page 89: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/89.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 89
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
INCREASE CAPACITY OF THE ROBINSON CREEK BRIDGE ON US-25 AT MILEPOST3.28. (06CCN): (063B00024N)(10CCR)
CONSTRUCTION OF I-75 FRONTAGE ROAD FROM KY 3432 TO 5TH STREET (SEE 8-8514.10 AND 8-8514.00 FOR ADDITIONAL SECTIONS) (08CCN)
REPLACE BRIDGE LOCATED ON LILY ROAD (CR 1221) (MP 1.045) (AREA ADJACENTTO FARISTON INDUSTRIAL PARK WITH NEW ROADWAY ALIGNMENT). (14CCN)
PROVIDE FRONTAGE ROADS ON BOTH SIDES OF KY 80 JUST WEST OF I-75 EXIT 41(MP 9.9 TO MP 10.9) MAY INCLUDE RELOCATING EXISTING SIGNAL TO PROVIDEFOR ADEQUATE TURN LANE STORAGE AND IMPROVE CAPACITY.(14CCN)
PROVIDE LEFT AND RIGHT TURN LANES FOR KY 354 WHILE LOWERING THEEXISTING VERTICAL GRADE TO IMPROVE ALIGNMENT WITH KY 30. (14CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:EASTERN APPROACH TO THE ROCKCASTLE RIVER BRIDGE TO I-75 (SEGMENT 4)(16CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:EASTERN APPROACH TO THE ROCKCASTLE RIVER BRIDGE TO I-75 (SEGMENT 4).(ADDITIONAL FUNDING FOR C PHASE FOR 11-8907.00)(16CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:LONDON BYPASS, I-75 TO THE HAL ROGERS PARKWAY (SEGMENT 5). (16CCN)
.080
1.000
.087
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
US-25
KY-80
CR-1221
KY-80
KY-354
KY-80
KY-80
KY-80
$7,250,000
$3,130,000
$1,343,900
$2,000,000
$600,000
$160,400,000
$65,500,000
$143,500,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
C
C
C
D
R
U
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2018
2016
2017
2016
2016
2019
2020
2021
2021
2017
2019
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SB2
SPP
SPP
SPP
IM
SP
SP
SP
SP
IM
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,650,000
$170,000
$5,430,000
$3,130,000
$1,343,900
$2,000,000
$600,000
$1,000,000
$40,000,000
$20,400,000
$99,000,000
$65,500,000
$1,000,000
$25,000,000
$18,500,000
$99,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
8305.00
8514.20
8811.00
8851.00
8852.00
8907.00
8907.01
8908.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
8305.00
8514.00
8811.00
8851.00
8852.00
8907.00
8907.01
8908.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2008
2014
2014
2014
2016
2016
2016
2006
2008
2014
2014
2014
2016
2016
2016
3.299
1
9.9
1
3.326
1.08
10.9
1.087
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REHAB(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 90: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/90.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 90
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:LONDON BYPASS, I-75 TO THE HAL ROGERS PARKWAY (SEGMENT 5)(ADDITIONAL FUNDS FOR C PHASE FOR 11-8908.00)(16CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:APPROXIMATELY 4 MILES EAST OF KY 192 TO CLAY/LAUREL LINE, MP 7.877 TOMP 10.593 (SEGMENT 6). (16CCN)
IMPROVE SAFETY ON KY 490 FROM MP 0.0 TO MP 3.8 BY REPAIRING SHOULDERBREAKOFFS AND PAVEMENT SETTLING, AS WELL AS RESURFACING ROADWAY.(16CCN)
REPLACE BRIDGE (063C00044N) ON MT ZION CHURCH ROAD (CR 1414). (16CCN)
CONSTRUCT A NEW ROADWAY TO CONNECT BETWEEN KY 3215 TO KY 1185 ATYATESVILLE LAKE. (12CCR)(14CCR)
IMPROVE SIGHT DISTANCE ON KY 2565 AND ELIMINATE DEAD MAN'S CURVE.(12CCR)
RECONSTRUCT CR 1529 (INDUSTRIAL PARK ROAD) FROM APPROX. 1000' EAST OFCOMMERCE DRIVE/CHLOES LANE INTERSECTION TO APPROX. 400' WEST OF CR1529/KY2565/KY2563 INTERSECTION (SECTION 1). (SECTION 2 INTERSECTION SYP12-196.10)
RECONSTRUCT KY 2565 FROM APPROX. 550' NW OF CR 1529/KY2565/KY2563INTERSECTION TO APPROX. 1150' SE OF THE INTERSECTION (SECTION 2).(2014BOP)
REPLACE BRIDGE ON MATTIE RD (CR 1202) OVER RIGHT FORK OF LITTLE BLAIN0.38 MILE W OF ASH BRANCH RD (CR 1161)(SR 47) 064C00011N
.100
.150
.520
.318
LAUREL
LAUREL
LAUREL
LAUREL
LAWRENCE
LAWRENCE
LAWRENCE
LAWRENCE
LAWRENCE
KY-80
HR-9006
KY-490
CR-1414
KY-3215
KY-2565
CR-1529
KY-2565
CR-1202
$32,700,000
$31,200,000
$500,000
$300,000
$20,400,000
$1,265,000
$1,670,000
$600,000
$500,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
C
D
U
C
C
C
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2016
2019
2021
2021
2022
2022
2016
2019
2016
2016
2016
2016
2016
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
IM
SP
SP
SP
SP
SP
SPP
SPP
SPP
SPP
SPP
BRZ
BRZ
BRZ
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$32,700,000
$1,000,000
$2,200,000
$1,000,000
$27,000,000
$500,000
$300,000
$500,000
$19,900,000
$1,265,000
$1,670,000
$600,000
$75,000
$75,000
$350,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
12
12
12
12
12
8908.01
8909.00
8952.00
8953.00
3.00
193.00
196.00
196.10
1118.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
12
12
12
12
12
8908.01
8909.00
8952.00
8953.00
3.00
193.00
196.00
196.00
1118.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
1996
2012
2012
2012
2012
2016
2016
2016
2016
1996
2012
2012
2012
2012
7.877
0
3.2
.2
1.916
.844
10.593
3.8
3.35
.72
2.234
.884
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 91: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/91.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 91
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
SIGHT DISTANCE IMPROVEMENTS ON KY-581 FROM KY-645, EXTENDING SOUTH2000' TOWARDS PAINTSVILLE. (02CCNFD04)
REPLACE THE GEORGES CREEK BRIDGE.(12CCN)
SPOT IMPROVEMENTS ON SPANKEM BRANCH ROAD (CR 1044).(16CCN)
I-75 TO MOUNTAIN PARKWAY; RECONSTRUCT KY-11 FROM KY-30 AT LEVI INOWSLEY COUNTY TO 0.5 MILE SOUTH OF KY-587 IN LEE COUNTY.(06CCR)(10CCR)(14CCR)
CONSTRUCT SIDEWALKS, CURB AND GUTTER ON KY 52 FROM DOWNTOWNBEATTYVILLE TOWARD IRVINE. (14CCN)(AR/W)(16CCR)
CONSTRUCT HYDEN BYPASS FROM LESLIE COUNTY HIGH SCHOOL TO HYDENSPUR (KY-118).(00CCR) (04CCN)(10CCR)
REPLACE BRIDGE AND APPROACHES ON CR-1214 OVER BEECH FORK (C24).(SR=6.0)(PROJECT FUNDING CONTINGENT UPON BRIDGE POSTING COMPLIANCE):(066C00024N)(AR/W)
REPLACE BRIDGE AND APPROACHES ON US-421 OVER STINNET CREEK (B08) 0.028MILE SOUTH OF KY-406 NEAR STINNETT.(SR=26.0) (10CCR)
REPLACE BRIDGE ON KY 80 OVER CUTSHIN CREEK AT INTERSECTION WITHBUSY HOLLOW DR (CR 1063)(SR 30) 066B00002N
.400
4.200
.678
2.100
.100
.100
LAWRENCE
LAWRENCE
LAWRENCE
LEE
LEE
LESLIE
LESLIE
LESLIE
LESLIE
KY-581
KY-581
CR-1044
KY-11
KY-52
US-421
CR-1214
US-421
KY-80
$640,000
$840,000
$500,000
$22,620,000
$3,000,000
$4,230,000
$630,000
$3,220,000
$1,681,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
C
C
C
C
R
U
C
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2016
2016
2019
2017
2016
2016
2016
2016
2017
2019
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SPP
SPP
SPP
SP
STP
SP
SP
BRZ
BRO
BRO
BRO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$110,000
$60,000
$470,000
$40,000
$800,000
$500,000
$22,620,000
$3,000,000
$3,630,000
$600,000
$630,000
$180,000
$3,040,000
$1,681,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
10
10
11
11
11
11
8117.00
8701.00
8951.00
292.10
8852.00
12.00
1067.00
1078.00
1089.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
OWSLEY
12
12
12
10
10
11
11
11
11
8117.00
8701.00
8951.00
292.00
8852.00
12.00
1067.00
1078.00
1089.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2002
2012
2016
2004
2014
1996
2004
2008
2012
2002
2012
2016
1996
2014
1996
2004
2008
2012
4.815
9.45
0
11.78
.024
15.137
5.142
5.194
9.55
1.082
12.26
.064
15.177
5.182
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
14.343 17.444Milepoints: To:From:
![Page 92: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/92.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 92
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE OVER MUNCY CREEK ON US 421 0.5 MILE SOUTH OF TAYLORMORGAN ROAD (CR 1090).(066B00006N)(SR=31.5)
REPLACE BRIDGE OVER WOLF CREEK ON COON CREEK ROAD (CR 1528) AT JCTWITH KY 3427 (066C00039N) (SR=30.1) (EBRP)
REPLACE BRIDGE ON MILE BRANCH RD (CR 1219) (MP 0.022) OVER BEECH FORK.(SR=4.0) 066C00048N
REPLACE BRIDGE ON WILLIAMS BRANCH RD (CR-1207) (0.028) OVER MIDDLEFORK KENTUCKY RIVER. (SR=2) 066C00020N
CONSTRUCT A NEW APPROACH FROM KY-1482 ONTO THE HAL ROGERSPARKWAY AT MP 39. (08CCN)(10CCR)(2011BOPP)
CONSTRUCT A NEW APPROACH FROM KY-3424 ONTO THE HAL ROGERSPARKWAY AT MP 45.7. (08CCN)
CONSTRUCT A NEW APPROACH FROM KY-6272 ONTO THE HAL ROGERSPARKWAY AT MP 42.7. (08CCN)
.014
.012
.012
LESLIE
LESLIE
LESLIE
LESLIE
LESLIE
LESLIE
LESLIE
US-421
CR-1528
CR-1219
CR-1207
KY-1482
KY-3424
KY-6272
$1,225,000
$710,000
$1,225,000
$550,000
$3,340,000
$25,000
$638,300
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
R
U
C
R
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2019
2019
2020
2019
2021
2021
2022
2019
2021
2021
2022
2020
2022
2022
2016
2016
2017
2017
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRX
BRX
BRX
BRX
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
SB2
SB2
SB2
SPB
SPB
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$350,000
$100,000
$75,000
$700,000
$175,000
$60,000
$50,000
$425,000
$350,000
$150,000
$25,000
$700,000
$350,000
$100,000
$100,000
$920,000
$420,000
$2,000,000
$25,000
$638,300
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
1095.00
1100.00
1104.00
1106.00
8516.00
8517.00
8518.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
1095.00
1100.00
1104.00
1106.00
8516.00
8517.00
8518.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2016
2016
2008
2008
2008
2014
2014
2016
2016
2008
2008
2008
18.423
0
.016
.022
.09
2.521
0
18.437
.012
.028
.034
.19
3.121
.1
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
![Page 93: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/93.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 93
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN KY 118 TO PROVIDE LEFT AND RIGHT TURN LANES ONTO DENTONROAD.(12CCN)(14CCR)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM CLAY/LESLIE LINE TO HYDEN SPUR, MP 35.929 TO MP 44.188(SEGMENT 9). (16CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM HYDEN SPUR TO LESLIE/PERRY LINE (SEGMENT 10). (16CCN)
CONSTRUCT RIGHT TURN LANE ON US 421 AT INTERSECTION WITH KY 80.(16CCN)
RECONSTRUCT US-119 BY WIDENING TO 4-LANES, BEGINNING 0.15 MILES NORTHOF KY-15 AT END OF BRIDGE TO THE EXISTING 4-LANE AT BRASS DRIVE(SOUTH).(16CCN)
RECONSTRUCT US-119 BY WIDENING TO 4-LANES, BEGINNING 0.15 MILES NORTHOF KY-15 AT END OF BRIDGE TO THE KY 2034/COUGAR DRIVEINTERSECTION.(16CCN)
RECONSTRUCT US-119 BY WIDENING TO 4-LANES FROM KY 2034/COUGAR DRIVETO THE EXISTING 4-LANE AT BRASS DRIVE (SOUTH).(16CCN)
.200LESLIE
LESLIE
LESLIE
LESLIE
LETCHER
LETCHER
LETCHER
KY-118
HR-9006
HR-9006
US-421
US-119
US-119
US-119
$1,420,000
$116,400,000
$79,600,000
$850,000
$6,800,000
$10,700,000
$17,100,000
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
D
R
U
C
D
R
U
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2019
2020
2020
2021
2019
2020
2020
2022
2021
2022
2022
2017
2017
2017
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
NH
SP
SP
SP
NH
SP
SP
SP
SPP
SPP
SPP
NH
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,420,000
$1,000,000
$12,000,000
$9,000,000
$94,400,000
$1,000,000
$10,000,000
$7,000,000
$61,600,000
$500,000
$100,000
$250,000
$2,000,000
$2,400,000
$2,400,000
$10,700,000
$17,100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
12
12
12
8708.00
8912.00
8913.00
8951.00
199.10
199.11
199.15
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
12
12
12
8708.00
8912.00
8913.00
8951.00
199.10
199.11
199.15
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2016
2016
2016
2016
2016
2016
2012
2016
2016
2016
2016
2016
2016
2
35.929
2.2
44.188
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 94: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/94.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 94
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT US-119 BY WIDENING TO 4-LANES FROM EXISTING 4-LANE AT KY-1862 TO PAST JUST NORTH OF THE MAYKING MALL.(16CCN)
RECONSTRUCT US-119 BY WIDENING TO 4-LANES FROM NORTH OF MAYKINGMALL TO JUST SOUTH OF THE TRUCK PASSING LANES AND KY-3406.(16CCN)
RECONSTRUCT US-119 BY WIDENING TO 4-LANES FROM KY-3406 AND THEBEGINNING OF THE NORTHBOUND TRUCK PASSING LANES TO JUST NORTH OFKY-805. (16CCN)
RECONSTRUCT US-119 BY WIDENING TO 4-LANES FROM NORTH OF KY-805 TOTHE EXISTING 4-LANE.(16CCN)
RECONSTRUCT US-119 BY WIDENING TO 4-LANES ALONG A NEW ALIGNMENT(ORANGE) THROUGH THE GATEWAY INDUSTRIAL PARK TO US-23, INCLUDINGUS-23 FLYOVER RAMP.(16CCN)
RECONSTRUCT US-119 BY WIDENING TO 4-LANES ALONG A NEW ALIGNMENT(ORANGE) THROUGH THE GATEWAY INDUSTRIAL PARK TO US-23.(16CCN)
RECONSTRUCT US-119 BY WIDENING TO 4-LANES ALONG A NEW ALIGNMENT(ORANGE) THROUGH THE GATEWAY INDUSTRIAL PARK TO US-23. (ADDITIONALFUNDS FOR C PHASE FOR 12-199.51)(16CCN)
HARLAN-WHITESBURG; PINE MOUNTAIN; PARTRIDGE TO OVEN FORK;BEGINNING 1.3 MILES EAST OF THE HARLAN COUNTY LINE TO 1.71 MILES EASTOF KY-3404 NEAR JOE DAY BRANCH. (R/W FOR SECTIONS 1A & 1B) (F16)(2000BOPP)
3.480
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
US-119
US-119
US-119
US-119
US-119
US-119
US-119
US-119
$14,050,000
$1,800,000
$3,900,000
$2,500,000
$9,600,000
$18,000,000
$10,000,000
$3,150,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
D
R
U
D
R
U
D
R
U
C
C
R
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2019
2021
2020
2022
2022
2020
2022
2022
2020
2022
2022
2017
2018
2018
2020
2021
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
NH
NH
NH
NH
NH
NH
NH
NH
NH
NH
NH
NH
NH
NH
APD
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,350,000
$1,350,000
$1,350,000
$10,000,000
$600,000
$750,000
$450,000
$1,300,000
$1,150,000
$1,450,000
$1,000,000
$750,000
$750,000
$3,500,000
$3,600,000
$2,500,000
$18,000,000
$10,000,000
$3,150,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
12
199.31
199.32
199.33
199.34
199.50
199.51
199.52
311.30
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
12
199.31
199.32
199.33
199.34
199.50
199.51
199.52
311.10
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2016
2016
2016
2000
2016
2016
2016
2016
2016
2016
2016
1998
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RELOCATION(O)
![Page 95: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/95.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 95
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
HARLAN-WHITESBURG; PINE MOUNTAIN; PARTRIDGE TO OVEN FORK;BEGINNING 1.71 MILES EAST OF KY-3404 NEAR JOE DAY BRANCH TO THECOMMUNITY OF OVEN FORK. (R/W FOR SECTIONS 3 & 4) (F16) (2000BOP)(16CCR)
HARLAN-WHITESBURG; PINE MOUNTAIN; PARTRIDGE TO OVEN FORK;SURFACING ON US-119 FROM 1000 FT WEST JCT. KY 3404 TO 0.15 MI WEST OF KY806 AT OVEN FORK INCLUDING APPROACH TO EXISTING US 119. (SURFACINGFOR CONSTRUCTION SECTIONS 2, 3A, 3B, AND 4).
RECONSTRUCTION OF US-119 FROM 0.15 MILE WEST OF KY-806 TO KY-932.2012BOP
RECONSTRUCTION OF US-119 FROM 0.15 MILE WEST OF KY-806 TO KY-932.(16CCN)
REPLACE BRIDGE AND APPROACHES ON KY-343 OVER WRIGHT FORK (B79) 50FEET NE OF HAYMOND HILL ROAD. (SR=3.0): (067B00079N)
REPLACE BRIDGE ON CS-2026 OVER (MP 0.032) ELKHORN CREEK; AT EASTJENKINS; (STRUCTURALLY DEFICIENT, SR=13) 067C00058N
REPLACE BRIDGE ON CR-1841 (MP 0.015) OVER NORTH FORK KY RIVER; 1 MI NJCT KY 1862; (STRUCTURALLY DEFICIENT, SR=15.7) 067C00063N (AR/W)
REPLACE BRIDGE ON KY 2034C OVER N FORK KY RIVER 0.02 E OF US 119(SR 42.7)067B00121N
REPLACE BRIDGE ON STEEL BRIDGE RD (CR 1359Q4) OVER NORTH FORK OFKENTUCKY RIVER AT JCT WITH HIGHWAY 7 (KY 7)(SR 24) C00080N
2.860
1.550
1.600
.100
.100
.100
.040
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
US-119
US-119
US-119
US-119
KY-343
CS-2026
CR-1841
KY-2034C
CR-1359Q4
$3,300,000
$5,000,000
$36,800,000
$9,000,000
$670,000
$270,000
$450,000
$1,895,000
$875,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
R
C
R
U
C
C
C
C
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2018
2018
2019
2020
2021
2016
2016
2016
2016
2016
2018
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
APD
APD
APD
APD
APD
APD
BRX
BRZ
BRZ
BRX
BRX
BRX
BRZ
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,300,000
$5,000,000
$2,500,000
$300,000
$34,000,000
$9,000,000
$670,000
$270,000
$450,000
$420,000
$125,000
$1,350,000
$875,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
12
12
311.70
311.79
311.80
311.81
1094.00
1107.00
1108.00
1113.00
1117.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
12
12
311.10
311.77
311.77
311.81
1094.00
1107.00
1108.00
1113.00
1117.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2016
2014
2016
2008
2010
2010
2012
2012
1998
2004
2004
2016
2008
2010
2010
2012
2012
8.6
.622
0
0
.006
.002
10.2
.662
.1
.1
.046
.042
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RELOCATION(O)
RELIABILITY / SURFACE(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 96: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/96.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 96
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE OVER POOR FORK OF CUMBERLAND RIVER ON KY 3404 100 FTSOUTH OF US 119. (067B00114N)(SR=11.7)
REPLACE BRIDGE ON HAMPTON BRANCH (CR 1226) (MP 0.01) OVER COWANCREEK. (SR=7.0) 067C00021N
REPLACE BRIDGE ON CR-1225 (0.034) OVER COWAN CREEK. (SR=3.0) 067C00020N
IMPROVE THE EXISTING ROADWAY TO MEET CURRENT STANDARDS ANDIMPROVE CONGESTION INTO AND OUT OF JENKINS BETWEEN MP 8.741 AND MP9.247.(12CCN)
CONGESTION/SAFETY IMPROVEMENT AT THE JUNCTION OF MAIN STREET ANDEAST MAIN IN DOWNTOWN WHITESBURG. (14CCN)(16CCR)
UPGRADE KY-160 (ROXANA-VAN ROAD) WITH SHOULDER/BREAK REPAIRS,CULVERT EXTENSIONS, AND DRAINAGE UPGRADES. (16CCN)
CURVE CORRECTION AT MP 17.7 ALONG KY 160 NEAR INTERSECTION WITH KY588. (16CCN)
.012
.008
.506
.005
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
KY-3404
CR-1226
CR-1225
KY-805
KY-15X
KY-160
KY-160
$875,000
$750,000
$1,150,000
$6,060,000
$1,350,000
$3,300,000
$5,500,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
D
R
U
C
R
U
C
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2019
2019
2021
2017
2019
2019
2021
2020
2022
2022
2016
2016
2016
2017
2019
2019
2020
2019
2020
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRX
BRX
BRX
BRX
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$275,000
$75,000
$75,000
$450,000
$200,000
$150,000
$100,000
$300,000
$600,000
$250,000
$300,000
$6,060,000
$150,000
$200,000
$1,000,000
$50,000
$100,000
$3,150,000
$300,000
$100,000
$100,000
$5,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
1120.00
1125.00
1126.00
8702.00
8804.00
8909.00
8910.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
1120.00
1125.00
1126.00
8702.00
8804.00
8909.00
8910.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2016
2012
2014
2016
2016
2014
2016
2016
2012
2014
2016
2016
.782
.006
.03
8.741
1.8
.794
.014
.038
9.247
1.805
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / CONGESTION MITIGTN(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 97: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/97.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 97
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RESURFACE KY-160 (ROXANA-VAN ROAD) FROM MP 15.376 TO MP 21.843.(16CCN)
RECONSTRUCT KY-59 FROM KY-9 (AA) IN VANCEBURG TO JUNCTION OF KY-344MP 18.1 TO MP 23.19.(16CCN)
RECONSTRUCT THE INTERSECTION OF KY 10 AND KY 1306.(16CCR)
REPLACE BRIDGE ON KY 8 OVER KINNICONNICK CREEK 0.094 MILE W OFDUDLEY AVE (CR-1031A) (SR 26.5) 068B00003N (14CCR)
REPLACE BRIDGE OVER LAUREL FORK ON KY 1068 30 FT S OF DEEP HOLEBRANCH ROAD (CR 1125).(068B00057N)(SR=60.1)(16CCR)
CONSTRUCT A NEW BRIDGE CROSSING THE NORTH FORK OF THE LICKINGRIVER AT THE LEWIS-FLEMING COUNTY LINE. (08CCN): (068B00027N)
RECONSTRUCT KY-8 FROM KY-8C IN GARRISON TO SCAFFOLD LICKROAD.(14CCN)(16CCR)
RECONSTRUCT KY-8 FROM KY-8C IN GARRISON TO SCAFFOLD LICK ROAD.(ADDITIONAL FUNDS FOR C PHASE. SEE 9-8806.00)(16CCN)
6.467
5.090
.160
.074
.020
4.387
LETCHER
LEWIS
LEWIS
LEWIS
LEWIS
LEWIS
LEWIS
LEWIS
KY-160
KY-59
KY-10
KY-8
KY-1068
KY-57
KY-8
KY-8
$1,200,000
$54,000,000
$550,000
$3,250,000
$1,550,000
$5,200,000
$31,500,000
$10,000,000
Total
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
U
C
C
D
R
U
C
C
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2017
2019
2019
2020
2016
2016
2016
2017
2018
2018
2019
2016
2017
2019
2019
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
STP
STP
STP
STP
SPP
SPP
BRO
BRX
BRX
BRX
BRX
SPP
STP
STP
STP
STP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,200,000
$6,000,000
$5,000,000
$3,000,000
$40,000,000
$50,000
$500,000
$3,250,000
$500,000
$75,000
$75,000
$900,000
$5,200,000
$3,000,000
$5,000,000
$3,500,000
$20,000,000
$10,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
09
09
09
09
09
09
09
8911.00
231.00
232.00
1082.00
1090.00
8507.00
8806.00
8806.10
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
ROWAN
FLEMING
GREENUP
12
09
09
09
09
09
09
09
8911.00
231.00
232.00
1082.00
1090.00
8507.00
8806.00
8806.10
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2014
2012
2014
2008
2014
2016
2016
2016
2014
2012
2014
2008
2014
2016
15.376
18.1
12
22.563
1.74
0
24.016
21.843
23.19
12.16
22.637
1.76
.031
28.95
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PAVEMENT REHAB-PRI(P)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / PREFINANCD CONVRSN(O)
8.952
0
9.012
1.233
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 98: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/98.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 98
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT KY-57 FROM KY-9 TO FLEMING/LEWIS COUNTY LINE.(14CCN)(16CCR)
RECONSTRUCT KY-57 FROM KY-9 TO FLEMING/LEWIS COUNTY LINE.(ADDITIONAL FUNDS FOR C PHASE. SEE 9-8807.00)(16CCN)
RECONSTRUCT INTERSECTION AT KY-9 AND KY-2523. (14CCN)
RECONSTRUCT FROM KY 59 FROM KY 9 IN VANCEBURG TO JUNCTION OF KY 344.(16CCN)
PAVEMENT REHABILITATION ON THE AA HIGHWAY (KY 9) FROM THEINTERSECTION OF KY 59 (MP 11.205) TO 0.481 MILES NORTH OF CR 1303 (MP 15.800)IN LEWIS COUNTY. A TOTAL OF 4.595 MILES. (16CCN)
WIDEN US-27 FROM KY-590 TO BELL STREET IN STANFORD (MP 18.2 TO MP 18.9).(INCLUDES NEW GOSHEN CUT-OFF ROAD)(2005HPP-KY115)
RELOCATE A SHORT SECTION OF GOSHEN ROAD FROM ITS EXISTINGINTERSECTION WITH US 27 TO A NEW LOCATION OPPOSITE THE EXISTING WAL-MART SIGNAL.
REPLACE BRIDGE ON KY 1247 OVER ST. ASAPH CREEK 0.044 S OF KY 78(SR 45.4)069B00055N
4.557
.080
4.595
.700
.040
LEWIS
LEWIS
LEWIS
LEWIS
LEWIS
LINCOLN
LINCOLN
LINCOLN
KY-57
KY-57
KY-9
KY-59
KY-9
US-27
CR-1071
KY-1247
$30,700,000
$10,000,000
$1,325,000
$20,000,000
$1,280,000
$9,000,000
$850,000
$1,280,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
R
U
C
C
C
R
U
C
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2021
2022
2016
2016
2017
2021
2019
2019
2019
2021
2016
2016
2016
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
STP
STP
SPP
SPP
SPP
STP
NH
NH
NH
NH
SP
BRX
BRX
BRX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,100,000
$5,200,000
$3,400,000
$20,000,000
$10,000,000
$200,000
$125,000
$1,000,000
$20,000,000
$1,280,000
$1,400,000
$1,100,000
$6,500,000
$850,000
$120,000
$350,000
$810,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
08
08
08
8807.00
8807.01
8808.00
8904.10
8917.00
196.00
395.00
1055.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
09
09
08
08
08
8807.00
8807.01
8808.00
8904.10
8917.00
196.00
395.00
1055.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2014
2016
2016
2014
2012
2012
2014
2016
2014
2016
2016
2014
2012
2012
0
12.709
11.205
18.2
17.67
4.557
12.789
15.8
18.9
17.71
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PAVEMENT REHAB-PRI(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 99: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/99.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 99
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON CR-1043 (0.643) OVER LOGAN CREEK. (SR=20.2) 069C00008N
PADUCAH-HENDERSON; RELOCATION OF US-60 FROM APPROX. 0.8 MILE EAST OFTENN. RIVER BRIDGE TO 0.5 MILE EAST OF RUDD-SPEES ROAD(00CCR)(12CCR)(14CCR)
REPLACE BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70(SR 32.7) 070B00017N.
REPLACE BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70(SR 32.7) 070B00017N (ADDITIONAL FUNDING FOR C PHASE)
REPLACE BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70(SR 32.7) 070B00017N (ADDITIONAL FUNDING FOR C PHASE)
REPLACE BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70(SR 32.7) 070B00017N (ADDITIONAL FUNDING FOR C PHASE)
REPLACE BRIDGE ON KY 866 OVER FORK OF GUM CREEK 0.02 MILE N OF KY1664(SR 44.5)070B00050N
RUSSELLVILLE SOUTHERN BYPASS. (12CCR)
REPLACE BRIDGE ON KY-664 (MP 3.298) OVER PLEASANT RUN CREEK; 2.3 MI N.W.OF JCT KY 663; (STRUCTURALLY DEFICIENT, SR=29.8) 071B00040N
3.300
.344
.344
.040
4.000
.100
LINCOLN
LIVINGSTON
LIVINGSTON
LIVINGSTON
LIVINGSTON
LIVINGSTON
LIVINGSTON
LOGAN
LOGAN
CR-1043
US-60
US-60
US-60
US-60
US-60
KY-866
-
KY-664
$250,000
$22,360,000
$15,870,000
$15,000,000
$15,000,000
$5,650,000
$750,000
$19,300,000
$460,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
R
U
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2016
2016
2016
2018
2019
2020
2021
2016
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
SP
BRO
BRO
BRO
BRO
BRO
BRO
BRX
SPP
BRX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$250,000
$22,360,000
$500,000
$370,000
$15,000,000
$15,000,000
$15,000,000
$5,650,000
$750,000
$19,300,000
$460,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
01
01
01
01
01
01
03
03
1066.00
330.00
1142.00
1142.01
1142.02
1142.03
1145.00
311.10
1073.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
08
01
01
01
01
01
01
03
03
1066.00
330.00
1142.00
1142.00
1142.02
1142.03
1145.00
311.01
1073.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
1998
2012
2016
2016
2016
2012
2002
2010
2016
1998
2012
2012
2016
2016
2012
1998
2010
.635
12.524
12.524
12.524
12.524
.022
3.248
.651
12.868
12.868
12.868
12.868
.062
3.348
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RELOCATION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 100: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/100.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 100
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
IMPROVE SAFETY BY IMPROVING SIGHT LINES CROSSING RAILROAD BETWEENSTOCKYARDS AND INDUSTRIAL PARK. (16CCN)
RELOCATION OF US 641 FROM JUST SOUTH OF THE LYON/CALDWELL COUNTYLINE TO FREDONIA, 4.5 MILES.
UPGRADE KY 93/RIVERPORT ROAD INTERSECTION.
RECONSTRUCT INTERSECTION AT JUNCTION OF KY-93 AND KY-3305. (16CCN)
CONSTRUCT 4-LANE BEREA BYPASS SECTION 2; FROM 150' EAST OF US-25, SE TOKY-21. (2004BOPC)(08CCR)(12CCR)
RELOCATE AND/OR REALIGN KY-52 FROM WALLACE MILL ROAD TOINTERSTATE 75 AT THE DUNCANNON ROAD INTERCHANGE.(02CCR)(12CCN)(14CCR) (DESIGN/BUILD)(16CCR)
COMPREHENSIVE TRAFFIC STUDY FOR INTERSECTION OF MAIN STREET ANDBEREA COLLEGE CAMPUS, BEREA. (2005HPP-KY112)(MOA WITH BEREA). (16CCR)
WIDEN US-25 FROM US-421 NORTH TO KY-876. STATE TO PROVIDE DESIGN ANDPLANS, AND FUNDS FOR THIS PROJECT ARE REQUESTED TO BE PAID TO THEMADISON COUNTY FISCAL COURT, WHICH SHALL COORDINATE THE PROJECT.(2005HPP-KY110)(06CCR)
4.500
.200
3.600
6.000
3.500
LOGAN
LYON
LYON
LYON
MADISON
MADISON
MADISON
MADISON
KY-2349
US-641
KY-93
KY-93
-
KY-52
KY-595
US-25
$1,250,000
$28,000,000
$1,910,000
$1,450,000
$22,420,000
$49,710,000
$500,000
$719,921
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
U
C
C
C
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2019
2020
2016
2017
2017
2018
2016
2017
2017
2016
2017
2019
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
STP
SPP
SPP
SPP
HPP
HPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$150,000
$100,000
$150,000
$850,000
$2,500,000
$4,000,000
$1,500,000
$20,000,000
$350,000
$1,560,000
$1,450,000
$22,420,000
$15,840,000
$33,870,000
$500,000
$719,921
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
01
01
01
07
07
07
07
8908.00
187.60
801.00
8901.00
192.20
235.00
236.00
251.01
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
CALDWELL
03
01
01
01
07
07
07
07
8908.00
187.60
801.00
8901.00
192.00
235.00
236.00
251.01
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2014
2016
2004
2002
2004
2004
2016
2016
2014
2016
2000
2002
2004
2004
14.3
1.17
2.565
11.903
14.5
4.19
2.665
15.442
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / RELOCATION(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SCOPING STUDY(O)
RELIABILITY / MAJOR WIDENING(O)
Milepoints: To:From:
![Page 101: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/101.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 101
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
PRIORITY SECTION III: WIDEN US 25 FROM US 421 TO 1500' SOUTH OFDUNCANNON LANE. (SEE 7-251.40 FOR R/W)(2006BOPC)
PRIORITY SECTION II & III: WIDEN US-25 FROM US 421 TO PUMPKIN RUN.(SEE 7-251.10 FOR SEC III UTIL & CONST) (2006BOPC)(08CCR)(10CCR)(12CCR)(14CCR)
REPLACE BRIDGE ON KY 3376 OVER HAYS FORK 0.048 SOUTH OF US 421 (SR 23.1)076B00086N.
REPLACE BRIDGE ON BATTLEFIELD MEMORIAL HWY (US 421) OVER COWBELLCREEK AT JCT WITH HIGHWAY 21 E (KY 21)(SR 45.5) 076B00021
REPLACE BRIDGE ON OLD HAYS FORK LN (CR 1158) OVER BRANCH OF HAYSFORK 0.2 MILE SE OF BATTLEFIELD MEMORIAL HWY (US 421)(SR 16.9) 076C00023N
REPLACE BRIDGE OVER TERRILL BRANCH ROAD ON KY 3376 IN BEREA 200 FT NOF PEACHTREE DRIVE (CS 2072).(076B00085N)(SR=46.5)
REPLACE BRIDGE ON CR-1017 (3.405) OVER MUDDY CREEK. (SR=27.5) 076C00004N
.700
2.980
.040
.040
.020
MADISON
MADISON
MADISON
MADISON
MADISON
MADISON
MADISON
US-25
US-25
KY-3376
US-421
CR-1158
KY-3376
CR-1017
$6,600,000
$10,880,000
$760,000
$805,000
$480,000
$1,450,000
$475,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
U
C
C
R
U
C
R
U
C
D
R
U
C
D
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2017
2018
2016
2016
2016
2017
2016
2016
2017
2019
2021
2021
2022
2020
2022
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
NH
NH
BRX
BRO
BRO
BRO
BRZ
BRZ
BRZ
BRX
BRX
BRX
BRX
BRZ
BRZ
BRZ
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$570,000
$2,290,000
$3,740,000
$3,970,000
$6,910,000
$760,000
$90,000
$90,000
$625,000
$40,000
$40,000
$400,000
$300,000
$75,000
$325,000
$750,000
$275,000
$100,000
$100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
251.10
251.40
1126.00
1130.00
1131.00
1137.00
1142.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
251.50
251.50
1126.00
1130.00
1131.00
1137.00
1142.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2006
2012
2012
2012
2014
2016
2004
2004
2012
2012
2012
2014
2016
11.903
11.903
4.586
2.443
.252
.279
3.397
12.744
14.883
4.626
2.483
.292
.299
3.413
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 102: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/102.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 102
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON CR-1044 (0.007) OVER BR OF MUDDY CREEK. (SR=29.5)076C00066N
RECONSTRUCT AND WIDEN THE KY-627 BRIDGE OVER I-75 TO FIVE LANES TOIMPROVE TRAFFIC CONGESTION AND IMPROVE SAFETY. (INCLUDES 7-8400)(B40)(08CCN)(10CCR)(14CCR)(16CCR)
IMPROVE ROADWAY, SIDEWALKS, AND BIKE PATHS ON US-25 BETWEEN ELLIPSESTREET TO GLADES ROAD AND THEN CONTINUES ON TO THE BEREA BYPASS.(08CCN)(10CCR)(12CCR)(LET BY KYTC)
REHABILITATION FROM CLAY'S FERRY BRIDGE TO BARNES MILL ROAD. (14CCN)
PROPOSED ROADWAY IMPROVEMENTS FROM DUNCANNON RD TO THEMADISON CO AIRPORT TO INCLUDE CALEAST RD (KY 2881 MP.783-MP 2.780),JOHN BALLARD RD (KY 2877 MP0-MP.806 & CR 1236 MP0-MP.429) FROM MENELAUSTO AIRPORT RD, & A NEW BRIDGE OVER SILVER CR.(14CCN)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM APPROXIMATELY 0.4 MILES EAST OF KY 3050 OVERPASS (MP 71.0)TO 1.1 MI W OF BRIDGE OVER LICKING RIVER (MP 73.4). (2012BOP)(ADDITIONALFUNDING FOR C PHASE)(16CCN)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCN)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCN)
.100
1.212
10.381
3.232
2.400
4.600
4.600
4.600
MADISON
MADISON
MADISON
MADISON
MADISON
MAGOFFIN
MAGOFFIN
MAGOFFIN
MAGOFFIN
CR-1044
KY-627
US-25
I-75
KY-2881
KY-9009
KY-9009
KY-9009
KY-9009
$500,000
$18,720,000
$6,220,000
$1,500,000
$13,200,000
$12,861,470
$40,850,000
$25,000,000
$22,870,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
D
D
R
U
C
C
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2022
2022
2017
2016
2016
2019
2020
2021
2022
2016
2017
2020
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
BRZ
BRZ
NH
SPP
IM
SPP
SPP
SP
SP
NH
NH
NH
STP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$300,000
$100,000
$100,000
$18,720,000
$6,220,000
$1,500,000
$1,000,000
$500,000
$2,700,000
$9,000,000
$12,861,470
$850,000
$40,000,000
$25,000,000
$22,870,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
10
10
10
10
1143.00
8403.00
8505.00
8820.00
8853.00
126.13
126.40
126.41
126.42
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
10
10
10
10
1143.00
8403.00
8505.00
8820.00
8853.00
126.12
126.03
126.40
126.40
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2008
2008
2014
2014
2016
1998
2016
2016
2016
2008
2008
2014
2014
2012
1996
1998
1998
.003
.073
4.644
87.16
.783
71
65
65
65
.011
.193
5.856
97.541
2.78
73.4
69.6
69.6
69.6
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / PAVEMENT REHAB-INT(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
![Page 103: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/103.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 103
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.4 MI E OF THE KY-134 JOHNSON CREEK BR TO 0.3 MI W OF KY3047 - SECTION 5. (14CCR)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.4 MI E OF THE KY-134 JOHNSON CREEK BR TO 0.3 MI W OF KY3047 - SECTION 5.(ADDITIONAL FUNDING FOR C PHASE)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.4 MI E OF THE KY-134 JOHNSON CREEK BR TO 0.3 MI W OF KY3047 - SECTION 5.(ADDITIONAL FUNDING FOR C PHASE)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: MOUNTAIN PARKWAY WIDENING ANDSAFETY IMPROVEMENTS FROM MP 73.4, 1.1 MI W OF LICKING RIVER BRIDGE, TOMP 75.3 BURNING FORK BRIDGE. (08CCR)(10CCR)(12CCR)(14CCR)(ADDITIONALFUNDING FOR 10-140.00)(16CCN)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAYEXTENSION (KY 114/US 460) THROUGH THE CONGESTED AREA AT SALYERSVILLEFROM BURNING FORK BRIDGE TO KY 114. (14CCR)(R & U PHASES UNDER 10-166.01)(2014TIGER $24M)
MOUNTAIN PARKWAY CORRIDOR: EXTEND THE FOUR LANE MOUNTAINPARKWAY FROM US 460 TO THE MAGOFFIN/FLOYD COUNTY LINE. (SEE 12-1.01FOR PE & ENV)(14CCR)(16CCR)
REPLACE BRIDGE ON KY 2019 OVER LICK CREEK 0.055 MILE S OF KY 3334 (SR31.9) 077B00062N
REPLACE BRIDGE ON KY 2019 OVER RACCOON CREEK 0.039 S OF KY 1081(SR33.2)(AR/W)077B00063N
2.400
2.400
2.400
1.900
2.400
5.000
.040
.040
MAGOFFIN
MAGOFFIN
MAGOFFIN
MAGOFFIN
MAGOFFIN
MAGOFFIN
MAGOFFIN
MAGOFFIN
KY-9009
KY-9009
KY-9009
KY-9009
US-460
KY-114
KY-2019
KY-2019
$15,630,000
$15,000,000
$7,700,000
$10,000,000
$24,000,000
$112,070,000
$780,000
$680,000
Total
Total
Total
Total
Total
Total
Total
Total
U
C
C
C
C
C
D
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2018
2019
2016
2016
2017
2018
2019
2021
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
NH
KYD
NH
NH
NH
SP
BRO
BRO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$630,000
$15,000,000
$15,000,000
$7,700,000
$10,000,000
$24,000,000
$3,000,000
$8,570,000
$2,500,000
$98,000,000
$780,000
$680,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
10
10
10
10
126.50
126.51
126.52
140.10
166.00
169.00
1098.00
1099.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
MORGAN
MORGAN
MORGAN
10
10
10
10
10
12
10
10
126.01
126.50
126.50
140.00
166.00
1.01
1098.00
1099.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
1998
2016
2016
2016
2012
2014
2012
2012
1998
1998
1998
2006
2012
1996
2012
2012
63.123
63.123
63.123
73.4
12.486
0
2.898
5.497
65
65
65
75.331
14.566
5.026
2.938
5.537
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
62.588
62.588
62.588
63.123
63.123
63.123
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 104: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/104.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 104
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT KY-30 AT THE BREATHITT/MAGOFFIN COUNTY LINE BEGINNINGAT MILEPOST 37 IN BREATHITT COUNTY TO MILEPOST 0.75 IN MAGOFFINCOUNTY. (06CCN)(10CCR)
BRIDGE NEAR NEW MAGOFFIN COUNTY HIGH SCHOOL NEAR OLD BURNINGFORK ROAD. (14CCN)(16CCR)
RECONSTRUCT US 460 IN MAGOFFIN COUNTY AT IVY POINT HILL FROM MP 10.0TO 10.7. (16CCN)
REPLACE BRIDGE ON KY 49 OVER HAMILTON BRANCH 0.33 MILE E OF COWHERDLN (CR-1301) (SR 25) 078B00031N.
ROADWAY IMPROVEMENTS TO KY 49 FROM JUST SOUTH OF KY 84 EXTENDINGNORTH THROUGH LORETTO TO KY 52 (MP 18.63 TO MP 27.54). (2012BOP)
CONNECTOR FROM HENDRICKSON DRIVE TO CORPORATE DRIVE (12CCN)
KY 49 FROM RIVERSIDE BRIDGE (B76) TO KY 337 IN BRADFORDSVILLE (12CCN)
1.270
.700
.040
8.910
2.513
MAGOFFIN
MAGOFFIN
MAGOFFIN
MARION
MARION
MARION
MARION
KY-30
-
US-460
KY-49
KY-49
-
KY-49
$10,890,000
$256,370
$8,550,000
$570,000
$40,350,000
$8,200,000
$17,110,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
D
R
U
C
U
C
D
R
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2017
2018
2019
2020
2021
2016
2017
2016
2018
2018
2020
2016
2017
2017
2019
2016
2017
2017
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
BRO
STP
STP
STP
STP
BRO
BRO
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$310,000
$180,000
$10,400,000
$256,370
$850,000
$1,500,000
$200,000
$6,000,000
$90,000
$480,000
$3,000,000
$2,500,000
$3,000,000
$31,850,000
$700,000
$2,000,000
$500,000
$5,000,000
$1,770,000
$2,210,000
$1,130,000
$12,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
04
04
04
04
8308.00
8801.00
8901.00
1076.00
8707.01
8714.00
8715.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
BREATHITT 10
10
10
04
04
04
04
8308.00
8801.00
8901.00
1076.00
8707.00
8714.00
8715.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2014
2016
2012
2012
2012
2012
2006
2014
2016
2012
2012
2012
2012
0
10
20.553
18.63
7.987
.75
10.7
20.593
27.54
10.5
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
37 37.522Milepoints: To:From:
![Page 105: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/105.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 105
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
SPOT IMPROVEMENTS ON KY-49 (MP 20.900 TO MP 21.830) AS PER THE KY-49PLANNING STUDY. (14CCN)
SPOT IMPROVEMENTS ON KY-49 (MP 23.350 TO 24.980) AS PER THE KY-49PLANNING STUDY. (14CCN)
IMPROVE CURVE/TURNING LANE AT WEST MARION ELEMENTARY. (14CCN)
NEW CONSTRUCTION - EXTEND MARTIN LUTHER KING AVENUE FROMDOWNTOWN LEBANON BYPASS (VETERANS MEMORIAL HIGHWAY). ESTIMATEDDISTANCE IS 1.5 MILES. (14CCN)
SAFETY IMPROVEMENTS TO KY-243 BETWEEN HWY 68 AND GRAVEL SWITCH(MP 1.751 TO MP 2.558). (14CCN)
IMPROVE INTERSECTION OF US 68 AND KY 2154.(16CCN)
REPLACE BRIDGE ON KY 84 OVER HARDINS CREEK. (16CCN)
.930
1.630
.100
.807
MARION
MARION
MARION
MARION
MARION
MARION
MARION
KY-49
KY-49
KY-49
-
KY-243
US-68
KY-84
$3,900,000
$5,900,000
$450,000
$14,450,000
$900,000
$2,750,000
$797,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
U
C
C
D
R
U
C
D
R
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2017
2018
2017
2017
2018
2016
2016
2017
2017
2019
2019
2020
2017
2019
2019
2020
2017
2019
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$800,000
$700,000
$2,400,000
$1,700,000
$900,000
$3,300,000
$450,000
$850,000
$3,000,000
$500,000
$10,100,000
$150,000
$750,000
$350,000
$550,000
$750,000
$1,100,000
$135,000
$30,000
$50,000
$582,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
04
04
04
8802.00
8803.00
8804.00
8805.00
8810.00
8913.00
8914.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
04
04
04
04
04
04
04
8802.00
8803.00
8804.00
8805.00
8810.00
8913.00
8914.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2014
2014
2014
2016
2016
2014
2014
2014
2014
2014
2016
2016
20.9
23.35
25.65
1.751
21.83
24.98
25.75
2.558
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
SAFETY / SAFETY(P)
NEW ROUTES / NEW ROUTE(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 106: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/106.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 106
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
IMPROVE SAFETY ISSUES AND SIGHT DISTANCE SOUTH OF BRADFORDSVILLEFROM MP 16.90 TO MP 17.6. (16CCN)
HEARTLAND PARKWAY: LEBANON BYPASS TO MARION/WASHINGTON LINE.(16CCN)
HEARTLAND PARKWAY: MARION/TAYLOR LINE TO LEBANON BYPASS.(16CCN)
ADDRESS GEOMETRIC DEFICIENCIES AND SAFETY ALONG KY 49 SOUTH OFBRADFORDSVILLE FROM MP 6.9 TO MP 7.6. (16CCN)
WIDEN KY-348 TO 4 LANES BETWEEN PURCHASE PARKWAY AND US-641.(00CCN)(06CCR)(INCLUDES DESIGN FOR 1-8101.00)(RU-04DEOB)(12CCR)(16CCR)
INEZ TO WARFIELD (SECTION 2-1): FROM LITTLE BLACKLOG TO BOOTH FORK.[STA. 190+00 TO STA. 298+00 (ENGLISH)] (2002BOP)(12CCR)(AR/W)(16CCR)
INEZ TO WARFIELD (SECTION 2-1): FROM LITTLE BLACKLOG TO BOOTH FORK[STA. 190+00 TO STA. 298+00] (ADDITIONAL FUNDING FOR C PHASE)(16CCR)
INEZ TO WARFIELD (SECTION 2-2): FROM BOOTH FORK TO KY-2031 [STA. 298+00TO STA. 382+00 (ENGLISH)] (2002BOP)(16CCR)
1.750
2.000
2.000
1.600
MARION
MARION
MARION
MARION
MARSHALL
MARTIN
MARTIN
MARTIN
KY-49
KY-55
US-68
KY-49
KY-348
KY-40
KY-40
KY-40
$500,000
$5,500,000
$13,400,000
$500,000
$4,680,000
$18,000,000
$24,560,000
$48,140,000
Total
Total
Total
Total
Total
Total
Total
Total
D
D
R
U
C
D
R
U
C
D
C
U
C
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2017
2018
2018
2019
2017
2018
2018
2019
2022
2016
2018
2019
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
NH
NH
NH
NH
NH
NH
NH
NH
SP
SB2
SPP
SPP
SPP
SPP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$500,000
$300,000
$350,000
$350,000
$4,500,000
$600,000
$900,000
$900,000
$11,000,000
$500,000
$4,680,000
$2,000,000
$16,000,000
$5,000,000
$19,560,000
$48,140,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
01
12
12
12
8915.00
8916.00
8917.00
8952.00
8002.00
154.11
154.12
154.16
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
04
04
04
04
01
12
12
12
8915.00
8916.00
8917.00
8952.00
8002.00
154.10
154.12
154.10
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2000
2002
2016
2002
2016
2016
2016
2016
2000
1998
2016
1998
16.9
6.9
7.62
17.6
7.6
8.783
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RELOCATION(O)
![Page 107: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/107.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 107
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
INEZ TO WARFIELD (SECTION 2-2): FROM BOOTH FORK TO KY-2031 [STA. 298+00TO STA. 382+00 (ENGLISH)](16CCR)
INEZ TO WARFIELD (SECTION 2-3): FROM KY-2031 TO KY-292 [STA. 382+00 TO STA.427+00 (ENGLISH)] (2002BOP)(16CCR)
INEZ TO WARFIELD; BRIDGE OVER TUG FORK (SECTION III) (R & U IDENTIFIEDIN SECTION II-ITEM NO. 154.10)(16CCR)
IMPROVE ALIGNMENT AND GEOMETRICS OF THE CURVE LOCATED JUSTBEFORE THE JUNCTION OF KY 2031 AND KY 40 TO .1 MILES BEFORE GORDONHOLLOW ROAD, AND IMPROVE THE CULVERT/SAFETY DESIGN TO INCREASEMOTORIST AND PEDESTRIAN SAFETY. (12CCR)
REPLACE BRIDGE AND APPROACHES ON PR-1015 OVER ROCKCASTLE CREEK(C26) 275 FEET WEST JCT. KY-3 JUST SOUTH OF CROOKED RUN ROAD. (SR=2.0):(080C00026N)
REPLACE BRIDGE ON KY 40 OVER BUCK CREEK AT THE KY 2031 INTERSECTION(SR 49.8) 080B00002N.(AR/W)
NEW FULLY CONTROLLED ACCESS ROUTE FROM US 68 NEAR WASHINGTONEAST TO KY 11 INCLUDING A NEW I-CHNG AT KY 11. (PRIORITYSECTION)(2004BOPC)(06CCR)
NEW FULLY CONTROLLED ACCESS ROUTE FROM KY 11 NORTHEAST TO KY 9 (AAHWY) INCLUDING NEW I-CHNG AT KY 9. (2004BOPC)(06CCR)
.900
.100
.200
.070
2.700
2.900
MARTIN
MARTIN
MARTIN
MARTIN
MARTIN
MARTIN
MASON
MASON
KY-40
KY-40
KY-40
KY-40
CR-1324
KY-40
US-68
US-68
$18,000,000
$18,000,000
$17,080,000
$1,150,000
$60,000
$675,000
$36,630,000
$37,930,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2022
2017
2016
2016
2017
2016
2018
2018
2020
2016
2017
2017
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
SPP
BRZ
BRO
BRO
SP
SP
SP
SP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$18,000,000
$18,000,000
$17,080,000
$1,150,000
$60,000
$175,000
$500,000
$780,000
$1,580,000
$1,820,000
$32,450,000
$780,000
$1,580,000
$1,820,000
$33,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
09
09
154.17
154.21
154.30
192.00
1092.00
1112.00
147.20
147.60
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
09
09
154.17
154.10
154.10
192.00
1092.00
1112.00
147.11
147.11
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2010
2002
1998
2012
2008
2012
2004
2004
2010
1998
1998
2012
2008
2012
1998
1998
18.2
0
19.63
18.4
.028
19.7
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RELOCATION(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
![Page 108: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/108.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 108
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPAIR BRIDGE ON US 68 OVER LAWRENCE CREEK 0.13 MI SW OF KY 3056.(081B00067N)(16CCR)
ADDITION OF AN INTERCHANGE ON HEATHER FRENCH HENRY SOUTHERN LOOP(US 62 AND US 68). (14CCN)(16CCR)
RECONSTRUCT US 62 GOING TO SARDIS BETWEEN KY 324 AND SARDIS (BETWEENTWIN BRIDGES). (14CCN)
CONSTRUCT RIGHT TURN LANE (SB) INTO CLARKSON SHERMAN ROAD(LANDFILL, 4.740) TO PROVIDE SAFETY FOR MOTORISTS TRAVELING ALONG THEAA HIGHWAY. (MP 4.6 TO MP 4.9)(14CCN)
INSTALL DECORATIVE LIGHTING ON SIMON KENTON BRIDGE OVER OHIO RIVERIN MAYESVILLE.(16CCN)
REPLACE BRIDGE ON KY 3056 OVER SOUTH FORK LAWRENCE CREEK. (16CCN)
WIDEN KY 9/AA HIGHWAY TO 4 LANES FROM KY 435 TO KY 2370 IN BRACKEN CO.(16CCN)
.400
.150
2.828
.300
MASON
MASON
MASON
MASON
MASON
MASON
MASON
US-68
US-68
US-62
KY-9
US-62
KY-3056
KY-9
$2,550,000
$10,000,000
$300,000
$300,000
$300,000
$2,000,000
$57,000,000
Total
Total
Total
Total
Total
Total
Total
D
C
D
R
U
C
P
C
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2018
2019
2019
2020
2017
2017
2018
2017
2018
2019
2020
2017
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRO
BRO
STP
STP
STP
STP
SP
SPP
STP
BRO
BRO
BRO
BRO
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$550,000
$2,000,000
$750,000
$750,000
$500,000
$8,000,000
$300,000
$300,000
$300,000
$400,000
$175,000
$175,000
$1,250,000
$4,000,000
$3,000,000
$5,000,000
$45,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
1095.00
8809.00
8810.00
8816.00
8905.00
8906.00
8907.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
09
09
09
09
1095.00
8809.00
8810.00
8816.00
8905.00
8906.00
8907.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2014
2014
2014
2016
2016
2016
2016
2014
2014
2014
2016
2016
2016
16.8
11.75
.7
4.6
17.2
11.9
3.528
4.9
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REHAB(P)
NEW ROUTES / NEW INTERCHANGE(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
SAFETY / LIGHTING(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
![Page 109: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/109.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 109
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN THE AA HIGHWAY TO 4 LANES FROM KY 1449 TO KY 11. (16CCN)
IMPROVE SAFETY BY ADDING LEFT AND RIGHT TURN LANES FOR EXIT ALONGKY 11. (16CCN)
REPLACE THE BRIDGE ON DAVIS LANE. (16CCN)
REPLACE THE BRIDGE ON KENNEDY CREEK ROAD. (16CCN)
REPAIR BRIDGE (081C00018N) ON DIXIE PIKE. (16CCN)
I-24 BRIDGE OVER THE OHIO RIVER @ PADUCAH (B100); JOINT PROJECT WITHILLINOIS TO MITIGATE SCOUR (073B00100N)
PADUCAH-WICKLIFFE; 4-LANE US-60 FROM BETHEL CHURCH ROAD TO KY-1154(MARTIN MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).(10CCR)(12CCR)
1.000
1.600
MASON
MASON
MASON
MASON
MASON
MCCRACKEN
MCCRACKEN
KY-9
KY-11
CR-1124
CR-1019
CR-1122
I-24
US-60
$31,600,000
$5,450,000
$1,750,000
$1,100,000
$60,000
$260,000
$5,860,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
C
C
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2020
2017
2018
2019
2020
2017
2018
2019
2020
2017
2018
2019
2020
2017
2016
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SP
SP
SP
SP
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
IM
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,500,000
$1,600,000
$3,500,000
$24,000,000
$550,000
$500,000
$400,000
$4,000,000
$500,000
$100,000
$150,000
$1,000,000
$300,000
$150,000
$100,000
$550,000
$60,000
$260,000
$3,150,000
$2,710,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
01
01
8908.00
8909.00
8910.00
8911.00
8916.00
2.00
115.10
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
09
09
01
01
8908.00
8909.00
8910.00
8911.00
8916.00
2.00
115.10
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2016
2000
1998
2016
2016
2016
2016
2016
2000
1998
0
.4
1.067
1.968
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REHAB(P)
SAFETY / BRIDGE REHAB(P)
RELIABILITY / MAJOR WIDENING(O)
![Page 110: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/110.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 110
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
MAJOR WIDENING OF US 62 FROM KY 998 TO PADUCAH INFORMATION AGEPARK. (12CCR)
UPGRADE KY 1286 (FRIENDSHIP ROAD) FROM MP 3.6 TO MP 6.4 IN PADUCAH.(PRELIMINARY ENGINEERING) (12CCR)(14CCR)(16CCN)
CONSTRUCT A DOUBLE-CROSSOVER DIAMOND INTERCHANGE ON US 60 AT THEI-24 INTERCHANGE NEAR KENTUCKY OAKS MALL.
PADUCAH OUTER LOOP (PRIORITY SECTION 1); FROM KY-1322 (LOVELACEVILLEROAD) TO US-62 (BLANDVILLE ROAD). (GRADE & DRAIN AND INC. SURFACE)(2002BOPC)(16CCR)
PADUCAH OUTER LOOP (PRIORITY SECTION 2); FROM US-45 (PADUCAH-MAYFIELD ROAD) TO KY-1322 (LOVELACEVILLE ROAD). (GRADE & DRAIN ANDINC. SURFACE) (2002BOPC)
PADUCAH OUTER LOOP (PRIORITY SECTION 3); FROM US-62 (BLANDVILLE ROAD)TO US-60 (PADUCAH-WICKLIFFE ROAD). (GRADE & DRAIN AND INC. SURFACE)(2002BOPC)
REPLACE BRIDGE AND APPROACHES ON US-62 OVER SUGG CREEK (B24) 0.2 MILENORTH OF WOBLE ROAD. (SR=29.5): (073B00024N)
RELOCATION AND MINOR WIDENING OF US-60 FROM CLARKS RIVER TO US-62JCT.(10CCR)(14CCR)(LET W/ 1-1115.20)(16CCR)
.957
2.800
1.500
2.000
2.500
.100
1.000
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
US-62
KY-1286
US-60
-
-
-
US-62
US-60
$10,100,000
$27,460,000
$4,320,000
$5,010,000
$7,420,000
$9,210,000
$750,000
$17,440,000
Total
Total
Total
Total
Total
Total
Total
Total
U
C
R
U
C
R
U
C
R
U
R
U
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2018
2019
2020
2016
2016
2017
2019
2020
2016
2016
2016
2016
2016
2016
2016
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
NH
NH
NH
SPP
SPP
SP
SP
SP
SP
BRO
NH
NH
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,500,000
$7,600,000
$4,870,000
$4,870,000
$17,720,000
$210,000
$320,000
$3,790,000
$2,520,000
$2,490,000
$5,040,000
$2,380,000
$5,040,000
$4,170,000
$750,000
$3,500,000
$3,120,000
$10,820,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
01
01
01
01
01
152.00
153.00
154.00
310.10
310.30
310.50
1055.00
1115.10
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
01
01
01
01
01
01
01
152.00
153.00
154.00
310.01
310.01
310.01
1055.00
1115.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2016
2014
2002
2002
2002
2008
2000
2012
2016
2014
1996
1996
1996
2008
1996
7.851
3.623
10.484
.852
18.65
8.808
6.423
10.891
.92
19.673
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
SAFETY / BRIDGE REPLACEMENT(P)
RELIABILITY / RELOCATION(O)
![Page 111: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/111.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 111
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RELOCATION OF US-62 FROM US-60 DEPARTURE TO KY-1887 (PARKROAD).(10CCR)(12CCR)(LET W/ 1-1115.10)(16CCR)
REPLACE BRIDGE OVER BOTTOM DITCH ON KY 1954 0.7 MILE NORTH OF KY 348(073B00096N) (SR=8.3).
REPLACE BRIDGE OVER BRANCH OF BOTTOM DITCH ON KY 994 0.8 MI NW OF KY348 (073B00015N)(SR=35.3)(EBRP)
I-24; CONSTRUCT NEW INTERCHANGE AT KY-994 (OLD MAYFIELD ROAD) SE OFPADUCAH. (00CCN)(14CCN)
NEW ACCESS ROAD FROM KY-305 NEAR KY-998, EXTENDING WEST TO THE OHIORIVER MEGAPARK. (2-LANE INITIAL, 4-LANE ULTIMATE)(12CCN)(14CCR)
RECONSTRUCT KY-92 FROM 1450 FT WEST OF KY 592 TO 350 FT EAST OF THEWHITLEY/MCCREARY COUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)
BRIDGE OVER ROCK CREEK ON OLD FIDELITY-BELL FARM ROAD (CR 1239) 0.25MI W OF ROCK CREEK ROAD (CR 1236) (074C00008N)(SR=22)
1.500
.022
.038
.100
4.566
.040
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCREARY
MCCREARY
US-62
KY-1954
KY-994
I-24
KY-305
KY-92
CR-1239
$16,390,000
$1,080,000
$1,300,000
$42,550,000
$23,680,000
$33,300,000
$920,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
D
R
U
C
R
U
C
R
U
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2018
2019
2020
2017
2019
2019
2020
2020
2021
2021
2022
2016
2017
2019
2017
2017
2019
2016
2019
2020
2020
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
STP
BRX
BRX
BRX
BRX
BRX
BRX
BRX
BRX
SP
SP
SP
SPP
SPP
SPP
SPP
BRZ
BRZ
BRZ
BRZ
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$520,000
$4,500,000
$2,710,000
$8,660,000
$260,000
$140,000
$120,000
$560,000
$240,000
$320,000
$310,000
$430,000
$7,170,000
$3,790,000
$31,590,000
$4,200,000
$3,250,000
$16,230,000
$33,300,000
$280,000
$50,000
$20,000
$570,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
01
01
08
08
1115.20
1152.00
1154.00
8003.00
8702.00
261.30
1065.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
WHITLEY
01
01
01
01
01
11
08
1115.00
1152.00
1154.00
8003.00
8702.00
184.20
1065.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2014
2014
2000
2012
2014
2014
1996
2014
2014
2000
2012
2014
2014
12.881
.768
2.27
8.56
20.335
.25
14.358
.79
2.308
8.66
24.835
.29
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RELOCATION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW INTERCHANGE(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
0 .066Milepoints: To:From:
![Page 112: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/112.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 112
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE OVERFLOW STRUCTURE ON US-431 AT THE MUHLENBERG-MCLEAN COLINE (SR 39) B00056N.
REPLACE BRIDGE OVER BRANCH OF POND DRAIN CREEK ON KY 2385 0.9 MI SWOF KY 81 (075B00066N)(SR=43.6)
SPOT IMPROVEMENTS AT THE INTERSECTION OF US-431 AND KY-250.(08CCN)(12CCR)
RECONSTRUCT AND WIDEN FROM MCLEAN/MUHLENBURG COUNTY LINE) TOLIVERMORE. (08CCN)(10CCR)(16CCR)
CORRECT LINE OF SIGHT WITH INTERSECTION OF KY 56 & KY 1233. (14CCN)
REPLACE BRIDGE OVER UNNAMED STREAM ON KY 823 0.5 MILE WEST OF KY2734.(082B00008N) (SR=45.2)
RECONSTRUCT KY 79 FROM KY 428 TO KY 144.(12CCN)(14CCR)
.142
.080
.100
5.500
.120
.010
3.148
MCLEAN
MCLEAN
MCLEAN
MCLEAN
MCLEAN
MEADE
MEADE
US-431
KY-2385
US-431
US-431
KY-56
KY-823
KY-79
$2,700,000
$1,560,000
$880,000
$6,800,000
$450,000
$950,000
$17,470,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
D
R
U
C
R
U
C
R
U
C
R
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2019
2021
2021
2022
2016
2016
2017
2016
2016
2018
2016
2016
2017
2019
2021
2021
2022
2016
2017
2017
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRO
BRO
BRO
BRX
BRX
BRX
BRX
SPP
SPP
SB2
SB2
SB2
SPP
SPP
SPP
SPP
BRX
BRX
BRX
BRX
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$200,000
$100,000
$2,400,000
$440,000
$60,000
$120,000
$940,000
$200,000
$180,000
$500,000
$1,430,000
$1,210,000
$4,160,000
$50,000
$50,000
$350,000
$150,000
$50,000
$80,000
$670,000
$1,040,000
$3,250,000
$1,770,000
$11,410,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
04
04
1078.00
1090.00
8400.00
8401.00
8852.00
1088.00
8702.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
MUHLENBERG 02
02
02
02
02
04
04
1078.00
1090.00
8400.00
8401.00
8852.00
1088.00
8702.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2014
2008
2008
2014
2014
2012
2012
2014
2008
2008
2014
2014
2012
0
3.5
9.8
0
6.1
.54
1.263
.071
3.58
9.9
5.5
6.22
.55
4.411
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SPOT IMPROVEMENTS(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
28.273 28.344Milepoints: To:From:
![Page 113: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/113.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 113
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT KY 79 FROM KY 144 TO KY 1051.(12CCN)(14CCR)
CONSTRUCT A SIDEWALK FROM 700 BLOCK OF HIGH STREET (KY 448) TO THEBYPASS IN BRANDENBURG ALONG THE NORTHWEST SIDE OF THE ROAD. (16CCN)
CONSTRUCT A ROUNDABOUT AT NORTHERN END OF MAIN STREET (CS 1004) INBRANDENBURG. (16CCN)
SPOT IMPROVEMENTS KY 36:(SECT A) FROM .20 MI N OF JCT W/ STONEQUARRYRD (MP 2.08) TO 0.16 MI S OF THE JCT W/ STONEQUARRY RD (MP 2.44). (SECT G)FROM .05 MI N OF THE JCT W/ SUITER BRCH RD (MP 3.90) TO .10 MI S OF THE JCTW/ SUITER BRCH RD (MP 4.05).(16CCR)
SPOT IMPROVEMENTS ON KY 36: (PRIORITY SECTION B-F) FROM 0.18 MILESSOUTH OF JUNCTION WITH STONEQUARRY RD (MP 2.463) TO 0.6 MILES NORTHOF JUNCTION WITH SUITER BRANCH RD (MP 3.90). (SEE 8001.10 FOR SECTION A &G)
IMPROVE SAFETY AND SUBSTANDARD GEOMETRICS FOR US 460 FROM MP 6.2 TOMP 8.5. RECONSTRUCTION FROM END OF ROTHWELL HILL RECONSTRUCTIONTO BRIDGE OVER BEAVER CREEK. (14CCN)(16CCR)
WIDEN EXISTING ROADWAY AND IMPROVE VERTICAL AND HORIZONTALCURVES. NEW CONSTRUCTION. COMPLETES US 460 UPGRADES IN MENIFEECOUNTY FROM MP 14.35 TO 19.39 AND IN MORGAN COUNTY FROM MP 0 TO MP0.8. (14CCN)(16CCR)
IMPROVE SAFETY ON US 68 AT KY 127 INTERSECTION IN HARRODSBURG.(12CCR)(14CCR)(16CCR)
3.826
.360
1.440
2.300
5.839
.300
MEADE
MEADE
MEADE
MENIFEE
MENIFEE
MENIFEE
MENIFEE
MERCER
KY-79
KY-448
CS-1004
KY-36
KY-36
US-460
US-460
US-68
$15,560,000
$76,000
$110,000
$2,800,000
$2,700,000
$14,500,000
$6,500,000
$3,500,000
Total
Total
Total
Total
Total
Total
Total
Total
U
C
C
C
C
D
R
U
C
R
U
C
D
R
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2018
2018
2018
2016
2017
2017
2018
2019
2020
2022
2019
2020
2016
2017
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SP
SP
SPP
SP
SP
SP
SP
SPP
SPP
SP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,030,000
$13,530,000
$76,000
$110,000
$2,800,000
$200,000
$250,000
$250,000
$2,000,000
$3,000,000
$1,500,000
$10,000,000
$3,000,000
$3,500,000
$500,000
$1,000,000
$1,000,000
$1,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
10
10
10
10
07
8705.00
8918.00
8919.00
8001.10
8001.20
8802.00
8805.00
416.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
MORGAN
04
04
04
10
10
10
10
07
8705.00
8918.00
8919.00
8001.00
8001.00
8802.00
8805.00
416.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2016
2016
2000
2000
2014
2014
2012
2012
2016
2016
2000
2000
2014
2014
2012
4.411
2.08
2.463
6.2
14.347
7.3
8.237
2.44
3.9
8.5
19.386
7.6
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SAFETY(P)
0 .8Milepoints: To:From:
![Page 114: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/114.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 114
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
IMPROVE SYSTEM MOBILITY ALONG MOBERLY ROAD FROM KY 390 TO KY 1989IN NORTHWEST HARRODSBURG. (12CCR)
REPLACE BRIDGE AND APPROACHES ON KY-152 OVER HERRINGTON LAKE ATTHE MERCER/GARRARD COUNTY LINE (B05). (SR=3.0); (084B00005N)
REPLACE BRIDGE AND APPROACHES ON KY-152 OVER HERRINGTON LAKE ATTHE MERCER/GARRARD COUNTY LINE (B05). (SR=3.0)(084B00005N)
REPLACE BRIDGE AND APPROACHES ON KY-152 OVER HERRINGTON LAKE ATTHE MERCER/GARRARD COUNTY LINE (B05). (SR=3.0)(084B00005N)(ADDITIONALFUNDING FOR C PHASE)
REPLACE BRIDGE ON US 68 OVER SHAKER CREEK 0.019 W OF CHATHAM RD(CR-1113)(SR 36.2) 084B00001N
SCOPING STUDY ON US-68 FROM HARRODSBURG TO WILMORE.(12CCN)
SAFETY IMPROVEMENTS ON US 127 IN SALVISA. (14CCN)
SUMMER SHADE BYPASS. (06CCR)(2006BOPC)(08CCR)(12CCR)(14CCR)
CONSTRUCT TWO-WAY LEFT TURN LANE AND INSTALL RAISED PAVEMENTMARKER ON US-68 FROM BRIDGE OVER ROGERS CREEK TO MAJESTIC DRIVE(CS-1024). (2004BOPC) (10CCR)
.341
.100
.400
13.837
2.434
.263
MERCER
MERCER
MERCER
MERCER
MERCER
MERCER
MERCER
METCALFE
METCALFE
CS-1237
KY-152
KY-152
KY-152
US-68
US-68
US-127
KY-90
US-68
$990,000
$8,000,000
$7,280,000
$5,000,000
$710,000
$500,000
$200,000
$19,390,000
$1,600,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
U
C
C
C
C
C
P
D
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2016
2017
2018
2016
2016
2016
2017
2018
2020
2016
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
BRO
BRO
BRO
BRO
SPP
SP
STP
STP
STP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$210,000
$780,000
$8,000,000
$7,280,000
$5,000,000
$710,000
$500,000
$200,000
$2,440,000
$1,760,000
$15,190,000
$190,000
$370,000
$1,040,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
03
03
417.00
1116.00
1116.01
1116.02
1128.00
8708.00
8858.00
112.10
900.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
GARRARD
GARRARD
JESSAMINE
07
07
07
07
07
07
07
08
99
417.00
1116.00
1116.00
1116.02
1128.00
8708.00
8858.00
136.00
354.07
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2008
2014
2016
2012
2012
2014
2006
2004
2012
2008
2008
2016
2012
2012
2014
2000
2004
0
18.818
18.818
18.818
12.5
8.391
14.469
0
7
.341
18.894
18.894
18.894
12.9
20.058
16.903
3.283
7.263
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / PREFINANCD CONVRSN(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / SCOPING STUDY(O)
SAFETY / SAFETY(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
SAFETY / SAFETY(P)
0
0
0
.076
.076
2.17
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 115: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/115.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 115
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE OVER OIL WELL BRANCH ON KY 496 0.5 MILE SE OF KY533.(085B00025N) (SR=48.2)(EBRP)
REPLACE BRIDGE AND APPROACHES OVER ROGERS CREEK AT MP 7.307. (DESIGNHANDLED UNDER 3-8506.00)(STRUCTURALLY OBSOLETE, SR=79.8) 085B00010N(2014BOP)
REPLACE BRIDGE AND APPROACHES OVER BLACK ROCK CREEK AT MP 8.474(DESIGN HANDLED UNDER 3-8506.00)(STRUCTURALLY OBSOLETE,SR=73.0)085B00009N (2014BOP)
SPOT IMPROVEMENTS ON US-68 FROM THE CUMBERLAND PARKWAY TO THEGREEN/METCALFE COUNTY LINE.(12CCN)(16CCN)
RECONSTRUCT KY 163 AS A NEW ROUTE ON THE WEST SIDE OF EDMONTONFROM KY 163 AT GARY BELL RD (MP 10.0) S OF EDMONTON, CROSSING US 68(STOCKTON ST) 2000 FT WEST OF THE COURTHOUSE SQ, TO US 68 (GREENSBURGST) AT I-CHNG WITH NUNN PKWY (MP 9.8). (14CCN)(16CCR)
IMPROVE HIGHWAY SAFETY AND SYSTEMS MOBILITY IN THE KY 163 CORRIDORBETWEEN KY 90 (MP 2.907) AND THE PROPOSED WEST EDMONTON BYPASS (MP9.777). (16CCN)
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2017. (12CCR)
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2018. (12CCR)
.020
.616
.176
2.191
1.443
6.870
METCALFE
METCALFE
METCALFE
METCALFE
METCALFE
METCALFE
MONROE
MONROE
KY-496
KY-163
KY-163
US-68
KY-163
KY-163
KY-214
KY-214
$660,000
$3,133,000
$1,008,987
$9,750,000
$18,135,000
$2,500,000
$444,000
$444,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
C
R
U
C
D
R
U
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2020
2021
2016
2016
2018
2019
2021
2016
2017
2018
2019
2021
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRX
BRX
BRX
BRX
SPP
SPP
STP
STP
STP
SPP
SPP
SPP
SPP
SP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$250,000
$75,000
$100,000
$235,000
$3,133,000
$1,008,987
$1,550,000
$1,200,000
$7,000,000
$1,000,000
$3,000,000
$2,190,000
$11,945,000
$2,500,000
$444,000
$444,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
03
1087.00
8506.20
8506.30
8706.00
8859.00
8955.00
128.08
128.09
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
03
03
03
03
03
03
03
1087.00
8506.00
8506.00
8706.00
8859.00
8955.00
128.08
128.09
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2014
2016
2014
2016
2012
2012
2014
2008
2008
2016
2014
2016
2012
2012
11.201
6.999
8.386
17.835
9.777
2.907
1.737
1.737
11.221
7.615
8.562
20.026
11.22
9.777
1.837
1.837
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SAFETY(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
![Page 116: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/116.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 116
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2019.(12CCR)
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2020.(12CCR)
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2021.(12CCR)
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2022.(12CCR)
REPLACE BRIDGE ON NEW SALEM RD (CR 1354) OVER PETER CREEK 0.2 MILE EOF BETHLEHAM CHURCH RD (CR 1335)(SR 20.4) 086C00015N
CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "GRADE &DRAIN ONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BESUPPLEMENTAL TO THE AUTHORIZED AMOUNT ALREADY EXPENDED ON THISPROJECT). (08CCR)(10CCR)
CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACINGONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BESUPPLEMENTAL TO THE AUTHORIZED AMOUNT ALREADY EXPENDED ON THISPROJECT). (08CCR)(10CCR)
RECONSTRUCT INTERSECTION OF KY 63 AND POPLAR LOG CHURCH ROAD.(16CCN)
MONTGOMERY COUNTY I-64 WEST BOUND REST AREA IMPROVEMENTS.
.040
MONROE
MONROE
MONROE
MONROE
MONROE
MONROE
MONROE
MONROE
MONTGOMERY
KY-214
KY-214
KY-214
KY-214
CR-1354
-
-
KY-63
I-64
$444,000
$444,000
$444,000
$444,000
$280,000
$6,930,000
$7,310,000
$1,600,000
$250,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2022
2017
2017
2018
2017
2018
2018
2019
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
BRZ
STP
STP
SPP
SPP
SPP
SPP
IM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$444,000
$444,000
$444,000
$444,000
$280,000
$6,930,000
$7,310,000
$200,000
$300,000
$400,000
$700,000
$250,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
03
07
128.10
128.11
128.12
128.13
1084.00
7020.01
7020.17
8954.00
6.01
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
03
03
03
03
03
03
03
07
128.10
128.11
128.12
128.13
1084.00
7020.00
7020.01
8954.00
6.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2016
2016
2012
2002
2002
2016
1996
2014
2014
2016
2016
2012
1998
2002
2016
1996
1.737
1.737
1.737
1.737
1.954
10.5
107.652
1.837
1.837
1.837
1.837
1.994
10.6
107.702
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / I-CHANGE RECONST(O)
RELIABILITY / REST AREA REHAB(P)
![Page 117: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/117.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 117
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN KY 1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL INDUSTRIAL PARK,MONTGOMERY COUNTY (SEE 7-8501.00 FOR "SPB" FUNDS)(2005HPP-KY129)
RECONSTRUCT US 460 AT LUCKY STOP HILL. (12CCR)
UPGRADE HINKSTON PIKE IN MT. STERLING FROM NEW MIDLAND TRAIL TOTHE NEW INDUSTRIAL PARK ENTRANCE (INCLUDES EXTENSION OF INDUSTRIALACCESS ROAD TO HINKSTON PIKE). (12CCR)
WIDEN KY-1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL INDUSTRIAL PARK.(2005HPP-KY129) TO BE DONE IN CONJUNCTION WITH 7-240.00. (08CCN)(12CCR)
WIDEN EXISTING PAVEMENT AND IMPROVE VERTICAL AND HORIZONTALCURVES FROM EXISTING MOUNT STERLING BYPASS (KY 686) TO 500' W OFBENTBROOK SUBDIVISION. ADD FULL WIDTH SHOULDERS & A CENTER TURNINGLANE IN CONGESTION AREAS FROM MP 2.2 TO 4.311.(14CCN)(16CCR)
WIDEN EXISTING PAVEMENT AND IMPROVE VERTICAL AND HORIZONTALCURVES FROM BOTTOM OF HILL TO US 460 IN JEFFERSONVILLE. ADD FULL-WIDTH SHOULDERS TO IMPROVE SAFETY. (14CCN)
WIDEN EXISTING BYPASS FROM 2 LANES TO 4 LANES FROM US 460 TO US 60.IMPROVE CAPACITY AND SAFETY IMPROVEMENTS ALONG KY-713INTERSECTION. ADD TURNING LANES WHERE APPROPRIATE. INCLUDE MULTI-USE TRAILWAY ALONG ROUTE. (14CCN)
WIDEN TO SIX LANES FROM MP 107.5 TO MP 113.7. (14CCN)
RECONSTRUCT US 60 FOR SAFETY IMPROVEMENTS FROM 500 FEET WEST OFSEWELL SHOP ROAD (MP 17.032) IN CLARK COUNTY TO 500 FEET WEST OFBENTBROOK (MP 2.007) IN MONTGOMERY COUNTY.(16CCN)
1.768
1.480
1.032
1.768
2.111
1.656
6.200
2.141
MONTGOMERY
MONTGOMERY
MONTGOMERY
MONTGOMERY
MONTGOMERY
MONTGOMERY
MONTGOMERY
MONTGOMERY
MONTGOMERY
KY-1991
US-460
KY-1991
KY-1991
US-60
KY-213
KY-686
I-64
US-60
$559,899
$12,980,000
$4,010,000
$1,600,000
$11,800,000
$1,000,000
$200,000
$1,500,000
$1,500,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
D
R
U
C
D
D
D
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2017
2016
2016
2016
2017
2018
2019
2016
2016
2016
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
HPP
STP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
IM
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$559,899
$12,980,000
$4,010,000
$1,600,000
$800,000
$1,500,000
$1,500,000
$8,000,000
$1,000,000
$200,000
$1,500,000
$1,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
07
240.01
250.10
411.00
8501.00
8810.00
8817.00
8818.00
8819.00
8953.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
CLARK
07
07
07
07
07
07
07
07
07
240.01
250.10
411.00
8501.00
8810.00
8817.00
8818.00
8819.00
8953.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2010
2010
2012
2008
2014
2014
2014
2014
2016
2010
2010
2012
2008
2014
2014
2014
2014
2016
0
18.125
1.768
0
2.007
0
107.5
0
1.768
19.6
2.8
1.768
4.311
1.656
113.7
2.007
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)17.032 17.166Milepoints: To:From:
![Page 118: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/118.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 118
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM CR 1226 PARKWAY ROAD TUNNEL (MP 59.3) TO 0.4 MI EAST OF THEKY-134 JOHNSON CREEK BRIDGE - SECTION 6.(12CCR)(14CCR)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM CR 1226 PARKWAY ROAD TUNNEL (MP 59.3) TO 0.4 MI EAST OF THEKY-134 JOHNSON CREEK BRIDGE - SECTION6.(12CCR)(14CCR)(16CCR)(ADDITIONAL FUNDING FOR C PHASE)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM CR 1226 PARKWAY ROAD TUNNEL (MP 59.3) TO 0.4 MI EAST OF THEKY-134 JOHNSON CREEK BRIDGE - SECTION6.(12CCR)(14CCR)(16CCR)(ADDITIONAL FUNDING FOR C PHASE)
IMPROVE SAFETY AND REDUCE ACCIDENTS ON KY-7 BY ELIMINATING ROCKOVERHANG AND ADDING SHOULDERS 1000 FEET SOUTH OF KY 1161 TO 1000 FEETNORTH OF KY 1161. (12CCR)(16CCR)
RECONSTRUCT/WIDENING OF MAIN ST (KY 7) IN WEST LIBERTY BEGINNING ATRIVERSIDE DR. (CS 1058) AND EXTENDING NORTH TO 0.159 MILES NORTH OFINTERSECTION WITH CEDAR RD (CS 1053). (2014BOP)(D,R,U COMPLETED UNDER10-293)(CONSTRUCTION SEQ 2)(16CCR)
REPLACE BRIDGE OVER WHITE OAK CREEK ON US 460 0.5 MILE NW OF KY 1000.(088B00021N)(SR=35)
RECONSTRUCT AND STRAIGHTEN CURVE IN US-460 FROM MILEPOST 0.8 TOMILEPOST 2.1. (06CCN)(12CCR)(16CCR)
RECONSTRUCT KY-7 FROM MILE POST 2.7 TO MILE POST 5.6 (JUNCTION 519 TOSOUTH SIDE OF WRIGLEY HILL). (08CCN)(12CCR)
3.300
3.300
3.300
.400
.366
.050
.500
2.950
MORGAN
MORGAN
MORGAN
MORGAN
MORGAN
MORGAN
MORGAN
MORGAN
KY-9009
KY-9009
KY-9009
KY-7
KY-7
US-460
US-460
KY-7
$8,900,000
$12,100,000
$15,000,000
$4,270,000
$3,800,000
$1,750,000
$4,370,000
$13,110,000
Total
Total
Total
Total
Total
Total
Total
Total
U
C
C
C
C
R
C
D
R
U
C
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2018
2019
2020
2016
2016
2017
2020
2021
2021
2022
2016
2016
2016
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
SB2
SPP
SPP
BRX
BRX
BRX
BRX
STP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$900,000
$8,000,000
$12,100,000
$15,000,000
$4,270,000
$1,050,000
$2,750,000
$300,000
$150,000
$50,000
$1,250,000
$4,370,000
$2,320,000
$1,560,000
$9,230,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
10
10
10
10
126.60
126.61
126.62
160.00
293.10
1111.00
8302.00
8402.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
10
10
10
10
10
10
10
126.01
126.60
126.60
160.00
293.00
1111.00
8302.00
8402.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2016
2016
2012
2012
2014
2006
2008
1998
2000
2000
2012
2012
2014
2006
2008
59.3
59.3
59.3
3.45
.134
25.74
1.6
2.667
62.588
62.588
62.588
3.85
.5
25.79
2.1
5.592
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 119: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/119.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 119
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
IMPROVEMENTS TO CORNER OF KY 2498 & US 460 EXTENDING ONE MILE TO THEARH HOSPITAL AT THE TOP OF THE HILL. (14CCN)(16CCN)
REPLACE BRIDGE ON KY 191 OVER CANEY CREEK .5 MILES WEST OF KY 1162.(16CCN)
IMPROVE RAILROAD CROSSING AT MP 15.674 BETWEEN CENTRAL CITY ANDDRAKESBORO. (04CCR)
WIDEN US-62 FROM WAL-MART TO US-431.(08CCN)(10CCR)(12CCR)(14CCR)(INCLUDES 2-8301)
WIDEN KY-181 BY FOUR FEET ON EACH SIDE FROM INTERSECTION 601 TOWENDELL FORD CENTER. (14CCN)
STRAIGHTEN DEAN ROAD INTERSECTION OF 189 BYPASS TO KY 181 NORTH NEARTHE INTERSECTION WITH THE WKY PARKWAY, WENDELL FORD NATIONALGUARD CENTER, AND JOB CORP. (14CCN)
LOWER THE ROAD AT THE INTERSECTION OF MERLE TRAVIS HIGHWAY (KY 246)AND KY 176 SO THAT THE INTERSECTION IS ON THE SAME LEVEL AS 176 ANDMERLE TRAVIS HIGHWAY. (14CCN)(16CCR)
1.000
.040
.300
1.500
2.467
MORGAN
MORGAN
MUHLENBERG
MUHLENBERG
MUHLENBERG
MUHLENBERG
MUHLENBERG
KY-2498
KY-191
US-431
US-62
KY-181
KY-2533
KY-246
$7,403,000
$1,200,000
$4,120,000
$9,740,000
$5,060,000
$6,600,000
$1,560,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
D
R
U
C
D
R
U
C
C
R
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2020
2017
2018
2019
2020
2016
2017
2017
2019
2016
2016
2017
2018
2016
2017
2018
2019
2017
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SP
SP
SP
SP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,200,000
$335,000
$5,868,000
$250,000
$100,000
$100,000
$750,000
$630,000
$450,000
$330,000
$2,710,000
$9,740,000
$530,000
$1,820,000
$2,710,000
$780,000
$500,000
$820,000
$4,500,000
$280,000
$120,000
$180,000
$980,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
02
02
02
02
02
8804.00
8902.00
160.00
8506.00
8802.00
8803.00
8804.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
10
02
02
02
02
02
8804.00
8902.00
160.00
8506.00
8802.00
8803.00
8804.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2004
2008
2014
2014
2014
2016
2016
2004
2008
2014
2014
2014
7.2
7.813
15.524
16.471
12.767
0
0
7.719
7.853
15.824
17.93
15.234
2.023
.04
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 120: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/120.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 120
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
BARDSTOWN-LOUISVILLE; WIDENING AND ACCESS MANAGEMENTIMPROVEMENTS ON US-31E BETWEEN NAZARETH DRIVE AND KY-509. (2004BOPC)
REPLACE BRIDGES ON US 62 (HINKLE CREEK) AND KY 48 IN BLOOMFIELD090B00096N (SR 28.2) 090B00095N (SR 49.7)(12CCR)
REPLACE BRIDGE OVER FROMAN CREEK ON KY 509 0.9 MI W OF US 31E(090B00068N)(SR=38.7)
REPLACE BRIDGE OVER DAVIS RUN ON HIGDON LOOP (CR 1215) 0.1 MI S OF US31E NEAR SCL OF NEW HAVEN (090C00030N)(SR=27) (EBRP)
WIDEN KY-245 FROM FLAGET HOSPITAL (MP 7.722) THROUGH COUNTY LINE(MP12.261 NELSON/MP0.000 BULLITT) TO HAPPY HOLLOW RD (MP 4.425).
WIDEN US-150 FROM KY-49 TO NEAR KY-245/WAL-MART WIDENING. (06CCN)
3.700
.100
.018
.020
8.964
1.300
NELSON
NELSON
NELSON
NELSON
NELSON
NELSON
US-31E
US-62
KY-509
CR-1215
KY-245
US-150
$37,880,000
$2,090,000
$1,130,000
$428,000
$67,200,000
$16,880,000
Total
Total
Total
Total
Total
Total
R
U
C
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2016
2016
2017
2020
2021
2021
2022
2019
2021
2021
2022
2017
2019
2019
2021
2016
2017
2017
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
BRO
BRO
BRO
BRX
BRX
BRX
BRX
BRZ
BRZ
BRZ
BRZ
SP
SP
SP
SP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$9,930,000
$2,440,000
$25,510,000
$170,000
$520,000
$1,400,000
$150,000
$100,000
$80,000
$800,000
$100,000
$30,000
$50,000
$248,000
$4,500,000
$10,000,000
$6,700,000
$46,000,000
$570,000
$2,440,000
$710,000
$13,160,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
04
04
287.10
1078.00
1089.00
1092.00
8307.20
8308.10
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
BULLITT
04
04
04
04
04
04
287.30
1078.00
1089.00
1092.00
8307.00
8308.00
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2004
2012
2014
2014
2006
2006
2004
2012
2014
2014
2006
2006
16.835
27.278
3.61
.12
7.722
.44
20.536
27.318
3.628
.14
12.261
1.697
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
RELIABILITY / RELOCATION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
0 4.425Milepoints: To:From:
![Page 121: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/121.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 121
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN US-150 FROM NEAR KY-245 THROUGH THE BLUEGRASS PARKWAYINTERCHANGE TO JUST PAST LESLIE BALLARDROAD.(06CCN)(2006BOPC)(12CCR)(14CCR)(16CCR)
NEW ROUTE BETWEEN US 62 AND KY 245 WEST OF BARDSTOWN. (16CCR)
WIDEN TEMPLIN AVENUE BETWEEN CHAMBERS BLVD AND BEN IRVIN RD/KY2737. (14CCN)(16CCR)
PARIS-MAYSVILLE ROAD; RECONSTRUCT FROM MILLERSBURG TO KY-1455 ATCARLISLE (SECTION 3). (08CCR)(12CCR)(14CCR)(16CCR)
RECONSTRUCT KY 36-KY 32 NEAR THE NICHOLAS COUNTY SCHOOLS PROPERTY.MP 3.10 TO MP 3.283. (12CCR)(16CCR)
RECONSTRUCT KY 36/KY 928 INTERSECTION. (14CCN)(16CCR)
SAFETY IMPROVEMENTS ALONG KY 32 FROM LAKE ROAD (MP 9.5) TOSCRUBGRASS CREEK (MP 12.5) TO CORRECT HORIZONTAL, VERTICAL,PAVEMENT WITH DEFICIENCIES. (14CCN)
REPLACE BRIDGE ON ABNER'S MILL ROAD (CR 1010) 2.4 MILES NORTH OF KY 32.(16CCN)
.600
.642
4.400
.183
.230
3.000
NELSON
NELSON
NELSON
NICHOLAS
NICHOLAS
NICHOLAS
NICHOLAS
NICHOLAS
US-150
-
KY-1430
US-68
KY-36
KY-36
KY-32
CR-1010
$28,570,000
$500,000
$200,000
$16,870,000
$6,600,000
$1,750,000
$5,600,000
$100,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
D
D
C
R
U
C
R
U
C
P
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2020
2017
2016
2017
2016
2016
2017
2016
2016
2016
2016
2017
2017
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
NH
STP
STP
STP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BRX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,630,000
$940,000
$25,000,000
$500,000
$200,000
$16,870,000
$1,250,000
$850,000
$4,500,000
$200,000
$150,000
$1,400,000
$100,000
$2,000,000
$2,000,000
$1,500,000
$100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
07
09
09
09
09
8309.10
8809.00
8851.00
310.30
205.00
8811.00
8812.00
8951.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
04
04
04
07
09
09
09
09
8309.00
8809.00
8851.00
310.01
205.00
8811.00
8812.00
8951.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2014
2014
2000
2012
2014
2014
2016
2006
2014
2014
1996
2012
2014
2014
2016
1.697
.971
3.1
8
9.5
2.4
2.285
1.613
3.283
8.23
12.5
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 122: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/122.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 122
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT INTERSECTION AT KY 54 AND KY 2671. (12CCR)
REPLACE BRIDGE ON CR-1194 (MP 0.079) OVER THREELICK CREEK; .15 MI W JCTCR 5172; (STRUCTURALLY DEFICIENT, SR=2) 092C00128N (AR/W)
REPLACE BRIDGE ON US 62 OVER BRANCH OF THREE LICK FORK 0.23 MILE E OFGREEN MEADOWS DR (CS 6068)(SR 47.2)092B00032
REPLACE BRIDGE OVER THREELICK FORK ON US 62 0.4 MILE E OF GREENMEADOWS DRIVE (CS 6068) IN BEAVER DAM. (092B00033N)(SR=48)
ADDRESS LEFT TURN LANE ISSUES ON US-231 AT SOUTHERN ELEMENTARYSCHOOL, MP 5.15 TO 5.25.(12CCN)
WIDEN/RECONSTRUCT KY 69 FROM CENTERTOWN TO HARTFORD.(14CCN)(16CCR)
CONSTRUCT A CONNECTOR ROAD INTO BLUEGRASS CROSSINGS INDUSTRIALPARK TO IMPROVE ACCESS AND ELIMINATE SAFETY ISSUES. (14CCN)
.100
.100
.040
.074
.100
5.761
OHIO
OHIO
OHIO
OHIO
OHIO
OHIO
OHIO
KY-54
CR-1194
US-62
US-62
US-231
KY-69
-
$1,500,000
$490,000
$970,000
$1,910,000
$1,800,000
$25,690,000
$4,000,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
U
C
R
U
C
D
R
U
C
R
U
C
D
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2016
2017
2016
2016
2017
2020
2021
2021
2022
2016
2016
2017
2016
2018
2020
2021
2016
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
BRZ
BRZ
BRO
BRO
BRO
BRX
BRX
BRX
BRX
SPP
SPP
SPP
STP
STP
STP
STP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$200,000
$300,000
$1,000,000
$150,000
$340,000
$230,000
$90,000
$650,000
$440,000
$60,000
$120,000
$1,290,000
$400,000
$500,000
$900,000
$1,690,000
$2,500,000
$5,000,000
$16,500,000
$700,000
$300,000
$3,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
231.00
1077.00
1083.00
1091.00
8705.00
8810.00
8811.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
231.00
1077.00
1083.00
1091.00
8705.00
8810.00
8811.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2010
2012
2014
2012
2014
2014
2012
2010
2012
2014
2012
2014
2014
3.939
.029
11.892
12
5.15
7.556
4.039
.129
11.932
12.074
5.25
13.317
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY-HAZARD ELIM(P)
NEW ROUTES / NEW ROUTE(O)
![Page 123: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/123.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 123
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE, IMPROVE ALIGNMENTS AND APPROACHES, AND ADDRESS SAFETYISSUES WITH BRIDGES ON KY 136 FROM MP 0.00 TO 22.618 IN MCLEAN COUNTYAND MP 0.00 TO 9.6 IN OHIO COUNTY. (14CCN)
UPGRADE KY 54 TO A 3 LANE AND PROVIDE NEW CURB AND GUTTER ANDADDRESS TWO DANGEROUS CURVES AT FORDSVILLE ON EAST SIDE OFROADWAY. (16CCN)
IMPROVE SAFETY ON KY 54 BY UPGRADING MP 7.0 TO MP 8.0 TO THREE LANESINCLUDING CURB AND GUTTER AND ADDRESSING TWO SHARP TURNS. (16CCN)
KY-393 RECONSTRUCT FROM 140FEET SOUTH OF RAILROAD CROSSING (CSX)EXTENDING NORTHWEST TOWARDS KY 146 ENDING AT STATION 12+00 (DESIGNUNDER 5-230.00). (CONSTRUCTION SEQ.#2)
RECONSTRUCT KY-22 FROM KY-329 TO ABBOTT LANE.(2004BOPC)(08CCR)(10CCR)(12CCR)
RECONSTRUCT KY-22 TO 5-LANES FROM ABBOTT LANE TO PROPOSED KY-393INTERSECTION AND CONTINUING WITH 3-LANES TO EXISTING KY-393.(2004BOPC)
CONSTRUCT NEW ROUTE FROM OLD HENRY INTERCHANGE AT I-265 TOCRESTWOOD BYPASS. (98CCR)(2004BOPP)(10CCN)(14CCR)
32.218
1.000
.959
2.100
2.200
5.000
OHIO
OHIO
OHIO
OLDHAM
OLDHAM
OLDHAM
OLDHAM
KY-136
KY-54
KY-54
KY-393
KY-22
KY-22
-
$9,500,000
$10,750,000
$10,750,000
$11,520,000
$17,440,000
$18,240,000
$16,000,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
D
R
U
C
D
R
U
C
C
R
U
C
D
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2017
2018
2019
2020
2017
2019
2020
2021
2016
2017
2017
2019
2016
2017
2017
2019
2016
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
STP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,000,000
$1,600,000
$6,900,000
$750,000
$1,000,000
$2,000,000
$7,000,000
$750,000
$1,000,000
$2,000,000
$7,000,000
$11,520,000
$2,560,000
$2,540,000
$12,340,000
$910,000
$3,840,000
$2,540,000
$10,950,000
$500,000
$500,000
$15,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
05
05
05
05
8812.00
8901.00
8951.00
234.00
304.10
304.20
367.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
MCLEAN
SHELBYJEFFERSON
02
02
02
05
05
05
05
8812.00
8901.00
8951.00
230.00
304.01
304.01
367.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2016
2000
2004
2004
1996
2014
2016
2016
1996
1996
1996
1996
0
7
5.13
3.25
5.32
9.6
8
5.868
5.32
7.5
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SAFETY(P)
RELIABILITY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / NEW ROUTE(O)
0 22.618Milepoints:
Milepoints:Milepoints:
To:
To:To:
From:
From:From:
![Page 124: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/124.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 124
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
EXTENSION OF OLD HENRY ROAD EAST TO ASH AVENUE (KY362). (12CCR)
INTER-URBAN GREENWAY: CONSTRUCT A NON-MOTORIZED CORRIDOR FROMLAGRANGE TO JEFFERSON COUNTY LINE. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP). (14CCR)
CONSTRUCT AN UNINTERRUPTED RAIL UNDERPASS WEST OF LAGRANGE.(LOCAL MATCH)(ALL WORK BY OLDHAM COUNTY) (FUNDING SUBJECT TOFISCAL CONSTRAINT PENDING MPO TIP). (14CCR)
CONSTRUCT SIDEWALKS ON KY 1793 FROM RIDGEVIEW DRIVE TO SETTLERSPOINT TRAIL, AND A SIDEWALK CONNECTION FROM TIMOTHY WAY TO PEGGYBAKER PARK.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
RECONSTRUCT US-42 FROM THE JEFFERSON/OLDHAM COUNTY LINE TORIDGEMOOR DRIVE. (2004BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).
INTERSECTION IMPROVEMENT AT KY 22 AND KY 329 IN CRESTWOOD. (ALLWORK BY KYTC)(2006BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP)
CONSTRUCTION OF A PARK AND RIDE FACILITY INCLUDING A PARKING LOT,SHELTER, PLAYGROUND, BIKE LOCKERS, WALKWAYS, AND A 1000' ACCESSROAD LOCATED ON APPLE PATCH WAY OFF OF KY-329 NEAR I-71 EXIT 14 INCRESTWOOD.(2010BOPC)(ADDITIONAL FUNDING)(14CCN)
WIDEN I-71 FROM FOUR TO SIX LANES FROM KY 329 (MP 14.1) TO KY 393 (MP 18.0).(16CCN)
2.200
.750
.286
.900
.200
.041
3.900
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
-
-
CR-1002
KY-1793
US-42
KY-22
CS-7000
I-71
$15,000,000
$2,610,000
$10,140,000
$80,000
$3,510,000
$870,000
$308,000
$41,100,000
Total
Total
Total
Total
Total
Total
Total
Total
C
D
R
C
R
U
C
C
C
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2017
2016
2016
2018
2016
2016
2016
2016
2019
2020
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SB2
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$15,000,000
$180,000
$350,000
$2,080,000
$3,190,000
$1,350,000
$5,600,000
$80,000
$3,510,000
$870,000
$308,000
$3,500,000
$1,900,000
$1,700,000
$34,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
367.20
410.01
434.00
440.10
441.01
449.00
468.10
483.10
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
JEFFERSON 05
05
05
05
05
05
05
05
367.00
410.00
434.00
440.01
441.00
965.12
468.10
483.10
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2010
2004
2004
2004
2004
2004
2014
2016
1996
2002
2004
2004
2004
2004
2014
2016
0
1.542
0
3.15
0
14.1
.747
1.828
.942
3.35
.041
18
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW ROUTE(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / MAJOR WIDENING(O)
Milepoints: To:From:
![Page 125: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/125.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 125
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN I-71 FROM FOUR TO SIX LANES FROM KY 393 (MP 18.0) TO KY 53 (MP 22.4),INCLUDING A NEW INTERCHANGE AT MP 20.6. (16CCN)
OLD FLOYDSBURG ROAD SAFETY IMPROVEMENTS: REPLACE NARROW ONE-LANE CULVERT CROSSING; CLEAR TREES AND VEGETATION OUT OF RIGHT-OF-WAY; ADD SHOULDER TO THE ROAD, AND ADD SIGNAGE FOR SAFETY.
CONSTRUCT VARIOUS SIDEWALKS IN OLDHAM COUNTY.
CONSTRUCT VARIOUS SIDEWALKS IN OLDHAM COUNTY.
IMPROVE DRAINAGE ON KY-362 (ASH AVENUE) IN PEWEE VALLEY.(14CCN)(16CCR)
DESIGN FOR IMPROVING KY-53 FROM ZHALE SMITH ROAD TO KY-22 (TOTAL 3.2MILES). (14CCN)
RECONSTRUCT KY-22 AT KY-227 AT END OF NEW CONSTRUCTION TO 0.4 MILEEAST OF KY 845 SOUTH. (06CCR)(08CCN)(12CCR)(14CCR)
REPLACE BRIDGE OVER CEDAR CREEK ON SAWDRIDGE CREEK W ROAD (CR1214) 0.2 MI N OF US 127 (094C00011N)(SR=20.3)
4.400
.571
2.617
4.700
.040
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OWEN
OWEN
I-71
CR-1209
-
-
KY-362
KY-53
KY-22
CR-1214
$7,800,000
$752,000
$100,000
$100,000
$500,000
$2,000,000
$26,490,000
$850,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
R
C
C
C
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2022
2016
2017
2016
2017
2016
2020
2017
2017
2019
2017
2019
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
SLO
SLO
SLO
SLO
SPP
STP
SPP
SPP
SPP
BRZ
BRZ
BRZ
BRZ
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,500,000
$2,300,000
$230,000
$522,000
$100,000
$100,000
$500,000
$2,000,000
$1,840,000
$1,250,000
$23,400,000
$150,000
$100,000
$100,000
$500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
06
06
483.20
494.00
517.02
517.03
8851.00
8852.00
198.00
1088.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
06
06
483.20
965.12
517.00
517.00
8851.00
8852.00
198.00
1088.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2014
2014
2014
2014
2014
2006
2014
2016
2004
2014
2014
2014
2014
2006
2014
18
1.43
.975
3.068
11.315
.22
22.4
1.44
1.546
5.685
16.057
.26
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SAFETY-HAZARD ELIM(P)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / DRAINAGE IMPROVE(P)
RELIABILITY / DESIGN ENGINEERING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 126: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/126.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 126
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
WIDEN KY 22 FROM INTERSECTION WITH KY 845 TO THE OWEN/GRANT COUNTYLINE.(12CCN)(14CCR)(16CCR)
KY 30 (PRIORITY SECTION); FROM NORTH OF JCT. KY 847 AT TRAVELLERS RESTAT END OF NEW CONSTRUCTION TO KY 11 AT LEVI.(08CCN)(10CCR)(12CCR)(14CCR)
RECONSTRUCT KY 30 FROM KY 847 TO THE JACKSON COUNTY LINE.(14CCR)(SEE10-279.60 FOR PE & ENVIR) (AR/W)(16CCR)
RECONSTRUCT KY 30 FROM KY 847 TO THE JACKSON COUNTY LINE.(14CCR)(SEE10-279.60 FOR PE & ENVIR) (AR/W)(16CCR)
REPLACE BRIDGE ON KY-3185 (MP 1.535) OVER LICK CREEK; 1.6 MI NE - JCT KY17; (STRUCTURALLY DEFICIENT, SR=13.7) 096B00038N
REPLACE BRIDGE ON KY-159 (MP 3.639) OVER KINCAID CREEK; .2 MI. SOUTH OFJCT.KY 609; (STRUCTURALLY DEFICIENT, SR=42.4) 096B00004N
REPLACE BRIDGE ON KY 330 OVER SHORT CREEK 0.35 MILE N OF J H GODMANRD (CR 1238).(SR 2) 096B00012N (16CCR)
REPLACE BRIDGE ON HALE RD (CR 1020) 0.395MI N OF FLOUR CREEK RD.(SR=22.0) 096C00102N
2.500
6.200
3.378
.100
.100
.040
.006
OWEN
OWSLEY
OWSLEY
OWSLEY
PENDLETON
PENDLETON
PENDLETON
PENDLETON
KY-22
KY-30
KY-30
KY-30
KY-3185
KY-159
KY-330
CR-1020
$35,000,000
$28,080,000
$22,750,000
$16,510,000
$400,000
$2,525,000
$2,600,000
$290,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
D
R
U
C
C
C
R
U
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2016
2016
2017
2017
2018
2019
2016
2016
2016
2018
2016
2017
2018
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
STP
STP
STP
STP
STP
BRX
BRX
BRX
BRX
BRX
BRZ
BRZ
BRZ
BRZ
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,000,000
$1,000,000
$31,000,000
$28,080,000
$2,250,000
$2,000,000
$2,500,000
$16,000,000
$16,510,000
$400,000
$100,000
$75,000
$2,350,000
$2,600,000
$30,000
$50,000
$10,000
$200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
10
10
10
06
06
06
06
8702.00
279.51
279.61
279.62
1071.00
1073.00
1081.00
1092.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
10
10
10
06
06
06
06
8702.00
279.50
279.60
279.62
1071.00
1073.00
1081.00
1092.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
1996
2014
2016
2010
2010
2012
2016
2012
1996
2014
2016
2010
2010
2012
2016
16.057
0
1.485
3.589
8.638
.395
18.56
5.132
1.585
3.689
8.678
.401
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 127: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/127.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 127
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON EAST FAIRVIEW RD (CR-1207) (1.618) OVER S. FORK GRASSYCREEK. (SR=28) 096C00072N
RECONSTRUCT US-27 FROM BUTLER IN PENDLETON COUNTY TO SOUTH OF KY-154 IN CAMPBELL COUNTY (MP 17.9 PENDLETON COUNTY TO MP 1.9 CAMPBELLCOUNTY).(12CCN)(14CCR)
IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY 15 BYPASS
IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY 15BYPASS.(ADDITIONAL FUNDING FOR C PHASE)
IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY 15 BYPASS.(ADDITIONAL FUNDING FOR C PHASE)
RECONSTRUCTION OF KY 15 FROM BONNYMAN TO NEAR KY 28. (14CCN)
RECONSTRUCTION OF THREE (3) AT-GRADE RAILROAD CROSSING ON KY15 INPERRY COUNTY LOCATED BETWEEN MP 2.1 TO MP 3.7. (2012BOP)
REPLACE BRIDGE ON BULAN HINER RD (KY 1146) OVER TRACE FORK AT JCTWITH KENTUCKY HIGHWAY 476 (KY 476)(SR 25.5) 097B00103N
REPLACE BRIDGE ON BIG WILLARD RD (KY 2021) OVER WILLARD CREEK ATINTERSECTION WITH BEECH NUT LN (CR 1213)(SR 44.6) 097B00027N
3.340
1.243
1.243
1.243
3.300
1.600
.033
.040
PENDLETON
PENDLETON
PERRY
PERRY
PERRY
PERRY
PERRY
PERRY
PERRY
CR-1207
US-27
KY-15
KY-15
KY-15
KY-15
KY-15
KY-1146
KY-2021
$650,000
$67,790,000
$25,000,000
$15,000,000
$12,000,000
$66,600,000
$1,000,000
$600,000
$550,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
R
U
C
C
C
C
D
R
U
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2022
2022
2016
2016
2018
2017
2018
2019
2020
2020
2020
2020
2016
2017
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
BRZ
BRZ
SPP
SPP
SPP
NH
NH
NH
SP
SP
SP
SP
RRP
BRX
BRX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$250,000
$200,000
$200,000
$20,000,000
$4,500,000
$43,290,000
$25,000,000
$15,000,000
$12,000,000
$1,510,000
$3,040,000
$2,050,000
$60,000,000
$1,000,000
$600,000
$550,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
10
10
10
10
10
10
10
1094.00
8706.00
158.00
158.01
158.02
269.20
294.00
1102.00
1103.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
CAMPBELL
06
06
10
10
10
10
99
10
10
1094.00
8706.00
158.00
158.00
158.00
269.01
352.10
1102.00
1103.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2012
2012
2016
2016
1996
2008
2012
2012
2016
2012
2012
2012
2012
1996
2008
2012
2012
1.612
17.9
13.269
13.269
13.269
16.847
2.1
2.679
1.075
1.624
19.34
14.512
14.512
14.512
20.135
3.7
2.712
1.115
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / SAFETY-RR PROTECTN(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
0 1.9Milepoints: To:From:
![Page 128: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/128.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 128
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON BLACK HAWK RD (CR 1107) OVER CARR FORK AT JCTWITH RAPTOR LN (CR 1179)(SR 4.3) 097C00006N
REPLACE BRIDGE OVER CLOVER FORK ON ROAD TO LEATHERWOOD SCHOOL50 FT N OF KY 699 (097C00052N) (SR= 14.6)
REPLACE BRIDGE OVER NORTH FORK KENTUCKY RIVER ON KENMONT ROAD(CR 1114) 380 FT SE OF KY 7 (097C00005N)(SR=48.6)
REPLACE BRIDGE OVER STRAIGHT FORK ON LITTLE LEATHERWOOD CREEKROAD (CR 1140) AT JCT WITH KY 3348 (097C00013N)(SR=38)
MINOR WIDENING & RESURFACING OF KY 451 FROM MP 11.3 TO MP 11.65. (14CCN)
NEW INTERCHANGE OFF OF A NEW EXIT 57 HAL ROGERS PARKWAY. (16CCN)
IMPROVE SAFETY AND SUBSTANDARD GEOMETRICS FROM BAKER STREET TOKY 15 IN COMBS. (16CCN)
.010
.047
.009
.350
.504
PERRY
PERRY
PERRY
PERRY
PERRY
PERRY
PERRY
CR-1107
PR-1056
CR-1114
CR-1140
KY-451
HR-9006
KY-80
$940,000
$850,000
$2,000,000
$875,000
$360,000
$15,779,000
$2,105,000
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
D
R
U
C
D
R
U
C
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2019
2019
2020
2019
2021
2021
2022
2019
2020
2020
2022
2016
2017
2018
2019
2020
2017
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
SPP
STP
STP
STP
STP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$940,000
$250,000
$50,000
$50,000
$500,000
$300,000
$100,000
$100,000
$1,500,000
$250,000
$50,000
$75,000
$500,000
$360,000
$1,340,000
$530,000
$159,000
$13,750,000
$515,000
$318,000
$212,000
$1,060,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
10
10
10
1107.00
1112.00
1113.00
1114.00
8851.00
8903.00
8904.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
10
10
10
10
10
10
1107.00
1112.00
1113.00
1114.00
8851.00
8903.00
8904.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2014
2014
2014
2014
2016
2016
2012
2014
2014
2014
2014
2016
2016
.062
.005
.07
0
11.3
57
7.406
.102
.011
.117
.009
11.65
7.91
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / NEW INTERCHANGE(O)
RELIABILITY / SAFETY(P)
![Page 129: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/129.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 129
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REMOVE CONCRETE BARRIER ON KY-80 AND JUSTICE DRIVE IN HAZARD.(16CCN)
SAFETY IMPROVEMENTS ON KY 80 FROM LESLIE COUNTY LINE TO KY 451.(16CCN)
IMPROVE SAFETY AND DRAINAGE ALONG KY 478 NORTH OF AJAX HOLLOW TOJAKES BRANCH FIRE DEPARTMENT. (16CCN)
REPAIR SLIDE AREA TO CORRECT A CONTINUOUS MAINTENANCE ISSUE FROMMP 2.9 TO MP 3.1. (16CCN)
RECONSTRUCT FROM LOCUST STREET TO KY 15X IN HAZARD. (16CCN)
REPLACE BRIDGE ON KY-1166 OVER RT. FK. MACES CREEK. SR=26.8 (16CCN)
4.378
.200
1.579
.040
PERRY
PERRY
PERRY
PERRY
PERRY
PERRY
KY-80
KY-80
KY-80
KY-476
KY-451
KY-1166
$500,000
$6,036,000
$2,168,000
$1,166,000
$10,700,000
$1,653,000
Total
Total
Total
Total
Total
Total
C
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2017
2018
2019
2020
2017
2018
2019
2020
2017
2018
2019
2020
2017
2018
2019
2020
2017
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SAF
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
BRO
BRO
BRO
BRO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$500,000
$670,000
$309,000
$257,000
$4,800,000
$258,000
$265,000
$265,000
$1,380,000
$530,000
$53,000
$53,000
$530,000
$1,550,000
$1,590,000
$1,060,000
$6,500,000
$335,000
$155,000
$103,000
$1,060,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
10
10
8905.00
8906.00
8907.00
8908.00
8909.00
8910.00
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
10
10
10
10
10
8905.00
8906.00
8907.00
8908.00
8909.00
8910.00
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
0
2.9
1.891
.624
4.378
3.1
3.47
.664
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY-HAZARD ELIM(P)
RELIABILITY / SAFETY(P)
RELIABILITY / SAFETY(P)
RELIABILITY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 130: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/130.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 130
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT CURVE EAST OF HURT CEMETERY TO WEST OF HURT BR RD.(16CCN)
REPLACE BRIDGE ON KY 1168 OVER MACES CREEK. (16CCN)
NEW INTERCHANGE OFF OF HAL ROGERS PARKWAY AT MP 52.85. (16CCN)
REPLACE BRIDGE OVER LEATHERWOOD CREEK. SR=35(16CCN)
RESURFACE KY 699 FOR 2 MILES TO IMPROVE SAFETY AT OWEN'S BRANCHROAD. (16CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM LESLIE/PERRY LINE TO HAZARD, INCLUDING INTERCHANGE INHAZARD; MP 51.03 TO MP 59.09. (16CCN)
IMPROVE KY 194 FROM US 119 RAMP NEAR SMITH FARMS BOTTOM (CR 1458) TONEAR DESKINS BRANCH CULVERT
.050
2.000
8.060
2.049
PERRY
PERRY
PERRY
PERRY
PERRY
PERRY
PIKE
KY-1088
KY-1168
HR-9006
CR-1150
KY-699
HR-9006
KY-194
$2,460,000
$1,653,000
$12,500,000
$1,022,000
$260,000
$22,000,000
$16,000,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
C
D
R
U
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2020
2017
2018
2019
2020
2017
2018
2019
2020
2017
2018
2019
2020
2017
2019
2021
2021
2017
2017
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
BRO
BRO
BRO
BRO
SP
SP
SP
SP
BRO
BRO
BRO
BRO
SPP
SP
SP
SP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$795,000
$212,000
$53,000
$1,400,000
$335,000
$155,000
$103,000
$1,060,000
$1,000,000
$250,000
$250,000
$11,000,000
$258,000
$103,000
$78,000
$583,000
$260,000
$1,000,000
$12,000,000
$9,000,000
$2,000,000
$1,500,000
$12,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
10
10
12
8912.00
8913.00
8914.00
8915.00
8916.00
8917.00
198.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
10
10
10
10
10
12
8912.00
8913.00
8914.00
8915.00
8916.00
8917.00
198.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2016
2016
2014
2016
2016
2016
2016
2016
2016
2014
0
51.03
17.951
.05
59.09
21
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / NEW INTERCHANGE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RESURFACING(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 131: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/131.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 131
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
PIKEVILLE TO VA STATE LINE; US 460/KY 80; MAINLINE BRIDGES OVER KY 195 @MARROWBONE CREEK. (SECTION 5B) (2014BOP)
PIKEVILLE TO VA. STATE LINE; US460/KY80 FROM KY-195 TO EAST OF PONDCREEK - SECTION 6A-2 BRIDGE AT POND CREEK.(14CCR)
PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM DUNLEARY HOLLOW TO KY-80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY.(14CCN)(16CCR)
PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM DUNLEARY HOLLOW TO KY-80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY. (ADDITIONAL FUNDING FORC PHASE 12-263.67)(14CCN)(16CCN)
PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM KY-195 TO DUNLEARYHOLLOW. (SURFACING FOR SECTIONS 6A & 6B) (2000BOP)(14CCN)
PIKEVILLE TO VA. STATE LINE; US 460/KY 80 AT BEAVER CREEK NEAR BEAVERBOTTOM (SECTION 7A-2), RAMP 2, GRADE, DRAIN ANDSURFACING.(14CCR)(16CCR)
PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM KY-80 AT BEAVER CREEK TOVIRGINIA STATE LINE (SURFACING FOR SECTIONS 7A, 7B, 8 & 9V)(2000BOP)(14CCR)(16CCR)
CONSTRUCT BRIDGE AT POTTER FLATS NEAR ELKHORN CITY.(10CCR)(16CCR)
CURVE REVISION AND PASSING LANES ON KY-194 NEAR DESKINS BRANCH(08CCR)(12CCR)
KY-199 SPOT IMPROVEMENT (PRIORITY 2); IMPROVE INTERSECTION WITH KY-1056 AND RELOCATE PORTIONS OF KY-199 ALONG OLD NORFOLK SOUTHERNRAILROAD BED @ MCANDREWS. (2002BOPC) (08CCR)(10CCR)
.800
1.700
.400
.400
3.400
.600
4.500
.700
1.400
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
US-460
US-460
US-460
US-460
US-460
US-460
US-460
-
KY-194
KY-199
$15,000,000
$20,000,000
$43,000,000
$17,000,000
$17,550,000
$18,500,000
$17,000,000
$2,990,000
$8,300,000
$4,500,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2019
2019
2017
2018
2016
2016
2017
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
APD
APD
APD
NH
APD
APD
APD
SPP
SPP
SPP
SPP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$15,000,000
$20,000,000
$43,000,000
$17,000,000
$17,550,000
$18,500,000
$17,000,000
$120,000
$60,000
$2,810,000
$8,300,000
$4,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
12
12
12
263.55
263.63
263.67
263.68
263.69
263.74
263.89
276.00
281.00
298.30
-
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
12
12
12
263.50
263.61
263.60
263.67
263.60
263.72
263.80
276.00
281.00
298.00
-
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2006
2006
2016
2000
2002
2000
2000
1998
2002
2000
2000
2000
2006
2000
2000
2000
2000
1998
1996
21.3
7.9
22
9.3
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RELOCATION(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / SURFACE(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / SURFACE(O)
RELIABILITY / NEW ROUTE(O)
SAFETY / SAFETY(P)
![Page 132: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/132.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 132
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
KY-199 SPOT IMPROVEMENT; RELOCATE PORTIONS OF KY-199 ALONG OLDNORFOLK SOUTHERN RAILROAD BED @ STONE. (2002BOPC)(08CCR)
REPLACE BRIDGE ON KY-610 (MP 8.146) OVER LONG FORK; .1 MI S OF JCT KY-1469; (STRUCTURALLY DEFICIENT, SR=32) (AR/W)098B00069N
REPLACE BRIDGE ON KY-1469 (MP 5.243) OVER MARSHALL'S BRANCH; .72 MI E.JCT KY-3414; (STRUCTURALLY DEFICIENT, SR=7.5) 098B00242N
REPLACE BRIDGE ON FISHTRAP RD (KY 1441) OVER RACCOON CREEK ATINTERSECTION WITH COON CREEK (CR 1371)(SR 37.9) 098B00093N
REPLACE BRIDGE OVER LEVISA FORK ON SOUTH RIVER ROAD CONNECTOR (CR1181-70) AT JCT WITH US 460 NEAR VIRGINIA STATE LN (098C00088N)(SR=49)
REPLACE BRIDGE OVER BLACKBERRY CREEK ON BIG BLUE SPRINGS ROAD (CR1801) AT JCT WITH KY 1056 (098C00028N)(SR=15.2)
IMPROVEMENTS TO CASSIDY BLVD. AND THOMPSON RD TO ADDRESS SAFETYCONCERNS AND CONGESTION ISSUES.(12CCN)(14CCR)(16CCR)
CONSTRUCT NEW CONNECTION FROM THOMPSON ROAD TO US 23 ATSTONECOAL.(12CCN)(14CCR)(16CCR)
1.000
.100
.100
.040
.038
.265
.055
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
KY-199
KY-610
KY-1469
KY-1441
CR-1181
CR-1801
CS-1215
CS-1215
$5,300,000
$1,100,000
$500,000
$1,175,000
$1,800,000
$1,100,000
$9,933,000
$6,790,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
U
C
D
R
U
C
D
R
U
C
R
U
C
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2016
2018
2017
2019
2019
2021
2019
2021
2021
2022
2016
2016
2017
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
BRO
BRX
BRX
BRX
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
BRZ
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,300,000
$1,100,000
$500,000
$225,000
$950,000
$400,000
$100,000
$100,000
$1,200,000
$300,000
$150,000
$150,000
$500,000
$1,233,000
$2,200,000
$6,500,000
$1,500,000
$5,290,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
12
298.40
1104.00
1105.00
1115.00
1122.00
1123.00
8704.00
8705.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
12
298.00
1104.00
1105.00
1115.00
1122.00
1123.00
8704.00
8705.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2002
2010
2010
2012
2014
2014
2012
2012
1996
2010
2010
2012
2014
2014
2012
2012
9.5
8.096
5.193
10.279
.04
.005
1.37
10.5
8.196
5.293
10.319
.078
.027
1.425
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
![Page 133: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/133.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 133
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
EXTEND THE INDUSTRIAL PARK ACCESS ROAD ON CR-1268.(14CCN)(16CCN)
TRAFFIC SIGNAL AT THE ENTRANCE TO FOOD CITY AND US 119, SOUTHWILLIAMSON. (14CCN)
IMPROVE CONNECTIVITY BETWEEN KY 881 AND US 119. (16CCN)
IMPROVE CONNECTIVITY BETWEEN KY 292 AND US 119/US 52 MINGO. (16CCN)
REPLACE VIRGIE BRIDGE OVER SHELBY CREEK ON KY 610.(16CCN)
SPOT IMPROVEMENTS ON KY 194/KY 632 (META TO PHELPS) FROM MP 18.68 TOMP 20.98. (16CCN)
SPOT IMPROVEMENTS ON KY 194/KY 632 (META TO PHELPS) FROM MP 22.00 TOMP 27.00. (16CCN)
.100
2.300
5.000
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
-
US-119
KY-881
-
KY-610
KY-194
KY-194
$1,270,000
$75,000
$26,280,000
$3,450,000
$2,710,000
$19,639,000
$90,520,000
Total
Total
Total
Total
Total
Total
Total
C
C
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2016
2018
2019
2020
2021
2018
2019
2020
2021
2017
2018
2018
2019
2018
2019
2020
2021
2018
2019
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,270,000
$75,000
$1,750,000
$1,530,000
$1,500,000
$21,500,000
$450,000
$50,000
$100,000
$2,850,000
$400,000
$110,000
$600,000
$1,600,000
$2,000,000
$2,000,000
$1,500,000
$14,139,000
$5,700,000
$3,500,000
$2,600,000
$78,720,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
8805.00
8807.00
8905.00
8906.00
8912.00
8913.10
8913.20
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
8805.00
8807.00
8905.00
8906.00
8912.00
8913.10
8913.20
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2014
2016
2016
2016
2016
2016
2016
2014
2016
2016
2016
2016
2016
23.85
18.68
22
23.95
20.98
27
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / SIGNAL SYS IMPROVE(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
![Page 134: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/134.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 134
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
SPOT IMPROVEMENTS ON KY 194/KY 632 (META TO PHELPS) FROM MP 0.21 TO MP4.00. (16CCN)
SPOT IMPROVEMENTS ON KY 194/KY 632 (META TO PHELPS) FROM MP 4.20 TO MP10.50. (16CCN)
SPOT IMPROVEMENTS ON KY 194/KY 632 (META TO PHELPS) FROM MP 10.50 TOMP 14.00. (16CCN)
IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 213 FROM KY 11 TO BOTTOM OF MOUNTAIN. (12CCR)(16CCR)
SOMERSET TO LONDON. (2006KYD)(10CCR)
HAL ROGERS PARKWAY NORTHEAST BYPASS AROUND SOMERSET. (2006KYD)
HORIZONTAL AND VERTICAL REALIGNMENT OF KY-196 AT WHITE OAK CREEKFROM 1.0 MILE E OF WARNER ROAD TO 0.3 MILE W OF SIEVERSROAD.(10CCR)(14CCR)
MEDIAN SAFETY IMPROVEMENTS WITH LEFT-TURN LANES ON US-27 FROM 0.05MILE NORTH OF LOST LODGE ROAD TO BOAT DOCK ROAD. (2006BOPC)(10CCR)
3.790
6.300
3.500
3.671
25.000
10.000
.500
.900
PIKE
PIKE
PIKE
POWELL
PULASKI
PULASKI
PULASKI
PULASKI
KY-632
KY-632
KY-632
KY-213
I-66
I-66
KY-196
US-27
$53,300,000
$2,300,000
$3,000,000
$17,280,000
$3,219,838
$1,470,000
$1,660,000
$510,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
D
R
U
C
C
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2022
2020
2021
2019
2021
2022
2016
2016
2016
2016
2017
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SP
SP
SPP
SPP
SPP
KYD
KYD
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,200,000
$3,300,000
$2,500,000
$44,300,000
$2,300,000
$3,000,000
$6,060,000
$1,090,000
$10,130,000
$3,219,838
$1,470,000
$70,000
$180,000
$1,410,000
$510,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
10
08
08
08
08
8913.30
8913.40
8913.50
163.00
59.11
59.21
121.00
147.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
LAUREL
12
12
12
10
08
08
08
99
8913.30
8913.40
8913.50
163.00
59.11
59.21
121.00
376.01
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2012
2004
2004
2006
2006
2016
2016
2016
2012
2004
2004
2006
2006
.21
4.2
10.5
7.595
7.7
10.38
4
10.5
14
11.271
8.2
11.374
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
SAFETY / SAFETY(P)
RELIABILITY / PE & ENVIRONMENTAL(O)
RELIABILITY / NEW ROUTE(O)
SAFETY / SAFETY(P)
SAFETY / SAFETY-HAZARD ELIM(P)
Milepoints: To:From:
![Page 135: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/135.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 135
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDSINCLUDING ACCESS: SOMERSET NORTHERN BYPASS, LOUIE B. NUNN(CUMBERLAND) PARKWAY TO HAL ROGERS PARKWAY (KY 80) (SEGMENT1).(16CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:HAL ROGERS PARKWAY TO THE WESTERN APPROACHES OF THE ROCKCASTLERIVER BRIDGE (SEGMENT 2). (16CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:HAL ROGERS PARKWAY TO THE WESTERN APPROACHES OF THE ROCKCASTLERIVER BRIDGE (SEGMENT 2). (ADDITIONAL FUNDS FOR C PHASE. SEE 8-8902.00)(16CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDSROCKCASTLE RIVER BRIDGE AND APPROACHES. (SEGMENT 3)(16CCN)
IMPROVE CURVE ON KY 616 AND IMPROVE ROADWAY FROM THE NEWROBERTSON COUNTY SCHOOL TO MT OLIVET. (12CCN)(14CCR)
IMPROVE SAFETY BY RECONSTRUCTING THE CURVE ON KY 165 FROM MP 7.0 TOMP 7.2.(12CCN)(14CCN)(16CCR)
IMPROVE SAFETY BEGINNING AT ORCHARD AVENUE TO THE INTERSECTION ATKY 616. (12CCN)(14CCN)(16CCR)
.203
.200
1.268
PULASKI
PULASKI
PULASKI
PULASKI
ROBERTSON
ROBERTSON
ROBERTSON
-
KY-80
KY-80
KY-80
KY-616
KY-165
US-62
$100,000,000
$180,300,000
$64,000,000
$50,800,000
$3,280,000
$1,750,000
$14,670,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
C
D
R
U
C
R
U
C
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2020
2018
2019
2020
2021
2021
2018
2019
2020
2021
2016
2016
2017
2016
2016
2017
2017
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$10,000,000
$10,000,000
$15,000,000
$65,000,000
$24,400,000
$30,000,000
$26,900,000
$99,000,000
$64,000,000
$5,100,000
$5,000,000
$4,900,000
$35,800,000
$250,000
$210,000
$2,820,000
$200,000
$50,000
$1,500,000
$1,250,000
$3,220,000
$10,200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
08
08
06
06
06
8901.00
8902.00
8902.01
8903.00
8711.00
8712.00
8713.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
08
08
08
08
06
06
06
8901.00
8902.00
8902.01
8903.00
8711.00
8712.00
8713.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2012
2012
2012
2016
2016
2016
2016
2012
2012
2012
6.3
7
10.834
6.503
7.2
12.102
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
![Page 136: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/136.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 136
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
SHOULDER IMPROVEMENTS ALONG KY 1504. (14CCN)
I-75 IN ROCKCASTLE COUNTY, KENTUCKY (MILEPOINT 64.5 TO MILEPOINT 69.0),4.5 MILES. (04KYD-KY070)
MAKE I-75 THREE LANES IN EACH DIRECTION FROM MP 64.5 TO MP 69.0.(12CCN)(DESIGN/BUILD)(16CCN)
MAKE I-75 THREE LANES IN EACH DIRECTION FROM MP 55.7 TO 60.1.(12CCN)(DESIGN/BUILD)(16CCN)
MAKE I-75 THREE LANES IN EACH DIRECTION FROM MP 60.1 TO MP64.5.(12CCN)(DESIGN/BUILD)(16CCN)
MAKE I-75 THREE LANES IN EACH DIRECTION FROM MP 60.1 TO MP64.5.(ADDITIONAL FUNDS FOR C PHASE. SEE 8-8718.10 AND 8-8718.12)(12CCN)(DESIGN/BUILD)(16CCN)
MAKE I-75 THREE LANES IN EACH DIRECTION FROM MP 60.1 TO MP64.5.(ADDITIONAL FUNDS FOR C PHASE. SEE 8-8718.10 AND 8-8718.11)(12CCN)(DESIGN/BUILD)(16CCN)
FOUR LANE US 461 FROM US 150 TO THE EXISTING FOUR LANEAPPROACH.(16CCN)
UPGRADE EXISTING ROWAN COUNTY WEIGH STATION.
6.857
4.500
4.500
4.400
4.400
4.400
ROBERTSON
ROCKCASTLE
ROCKCASTLE
ROCKCASTLE
ROCKCASTLE
ROCKCASTLE
ROCKCASTLE
ROCKCASTLE
ROWAN
KY-1504
I-75
I-75
I-75
I-75
I-75
I-75
US-461
I-64
$6,490,000
$855,000
$35,500,000
$47,500,000
$16,790,000
$15,000,000
$12,500,000
$1,200,000
$1,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
C
D
R
U
C
U
C
C
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2016
2016
2016
2016
2016
2016
2018
2016
2018
2019
2020
2022
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
KYD
IM
IM
IM
IM
IM
IM
IM
IM
IM
IM
SP
IM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$6,490,000
$855,000
$500,000
$35,000,000
$1,500,000
$750,000
$250,000
$45,000,000
$1,790,000
$15,000,000
$15,000,000
$12,500,000
$1,200,000
$1,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
08
08
08
08
08
08
08
09
8810.00
6.02
8718.00
8718.02
8718.10
8718.11
8718.12
8952.00
61.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
08
08
08
08
08
08
08
09
8810.00
6.02
8718.00
8718.02
8718.10
8718.11
8718.12
8952.00
61.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2004
2016
2016
2016
2016
2016
2016
2016
2014
2004
2016
2016
2016
2016
2016
2016
2016
0
64.5
64.5
55.7
60.1
60.1
60.1
147.5
6.857
69
69
60.1
64.5
64.5
64.5
148
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RECONSTRUCTION(O)
ECONOMIC DEVELOPMENT / WEIGH STA REHAB(P)
![Page 137: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/137.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 137
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH. (12CCR)
CONSTRUCT TURN LANES INTO LAKESIDE CHRISTIAN ACADEMY TO IMPROVESAFETY.(12CCR)
NEW ROUTE FROM US-60/KY-32 EAST OF MOREHEAD TO I-64 INCLUDING A NEWINTERCHANGE. (98CCN)(08CCR)(14CCR)
REPLACE BRIDGE OVER BULL FORK ON HORSEMAN CEMETERY ROAD (CR 1140)AT JCT WITH BULLFORK ROAD (CR 1222) (103C00108N)(SR=32.5)(EBRP)
WIDEN KY-519 FROM THE INTERSECTION OF KY-801 AND EXTENDING 2.0 MILESNORTH. (98CCN) (08CCR)(12CCR)
RECONSTRUCT US-60 FROM WEST OF GLENWOOD HOLLOW ROAD TO EAST OFKY-3296. THE PROJECT SHALL INCLUDE 12' LANES, WIDE PAVED SHOULDERS,UNOBSTRUCTED CLEAR ZONES, FLATTER VERTICAL GRADES, AND GENTLYHORIZONTAL CURVES. (08CCN)(12CCR)(14CCR)
RECONSTRUCT KY 377 FROM KY 32 (MP 0.0) TO JUST NORTH OF KY 799 (MP 8.2+-)TO IMPROVE SAFETY, CAPACITY, EFFICIENCY AND HIGHWAY SYSTEMSCONNECTIVITY. (08CCN)(10CCR)(16CCR)
2.000
.300
3.200
.010
2.000
1.500
8.200
ROWAN
ROWAN
ROWAN
ROWAN
ROWAN
ROWAN
ROWAN
KY-32
US-60
-
CR-1140
KY-519
US-60
KY-377
$26,924,000
$250,000
$14,000,000
$850,000
$13,520,000
$7,030,000
$59,910,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
D
R
U
D
R
U
C
C
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2016
2016
2018
2018
2019
2020
2020
2021
2016
2016
2016
2017
2017
2017
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SP
SP
BRZ
BRZ
BRZ
BRZ
SB2
SPP
SPP
SPP
SB2
SB2
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,000,000
$3,888,000
$18,036,000
$250,000
$3,000,000
$8,000,000
$3,000,000
$350,000
$50,000
$50,000
$400,000
$13,520,000
$830,000
$700,000
$5,500,000
$5,210,000
$13,100,000
$41,600,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
204.00
227.00
301.10
1093.00
7030.00
8401.00
8406.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
CARTER
09
09
09
09
09
09
09
204.00
227.00
301.00
1093.00
7030.00
8401.00
8406.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2012
2000
2014
1998
2008
2008
2012
2012
1996
2014
1998
2008
2008
2.235
5.25
.01
2.464
16
0
4.157
5.55
.02
4.464
17.112
8.2
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MINOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
0 .4Milepoints: To:From:
![Page 138: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/138.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 138
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE THE WEST BRIDGE ON US 60 AT SUNNYBROOK.(16CCN)
PROVIDE WEST TURN LANES ON US 60 AT SUNNYBROOK. (16CCN)
REPLACE BRIDGE ON LITTLE PERRY ROAD OVER TRIPLETT CREEK.(16CCN)
WIDEN KY 801 FROM NEAR MMRC REGIONAL PARK TO KY 158 IN FLEMING CO.(16CCN)
US-127 FROM NORTH BANK OF THE CUMBERLAND RIVER TO THE JAMESTOWNBYPASS. (00CCR) (08CCR)(10CCR)(12CCR)(G&D)(14CCR)
CONSTRUCT A NEW INTERCHANGE AT THE CUMBERLAND PARKWAYINTERSECTION WITH KY-910 AT WINDSOR. (08CCN)(10CCR)
3.444
ROWAN
ROWAN
ROWAN
ROWAN
RUSSELL
RUSSELL
US-60
US-60
CR-1025
KY-801
US-127
LN-9008
$1,475,000
$3,450,000
$1,575,000
$17,075,000
$43,200,000
$9,340,000
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
D
R
U
C
P
D
R
U
C
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2017
2018
2017
2018
2019
2020
2017
2018
2019
2020
2017
2017
2018
2019
2020
2016
2016
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRO
BRO
BRO
BRO
SPP
SPP
SPP
SPP
BRZ
BRZ
BRZ
BRZ
STP
STP
STP
STP
STP
SB2
SB2
SB2
SB2
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$600,000
$50,000
$75,000
$750,000
$300,000
$250,000
$400,000
$2,500,000
$400,000
$175,000
$100,000
$900,000
$75,000
$1,500,000
$2,000,000
$1,000,000
$12,500,000
$43,200,000
$1,840,000
$760,000
$6,740,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
08
08
8912.00
8913.00
8914.00
8915.00
108.00
8502.00
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
09
08
08
8912.00
8913.00
8914.00
8915.00
108.00
8502.00
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2000
2008
2016
2016
2016
2016
2000
2008
8.129
70.5
11.573
70.9
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
ECONOMIC DEVELOPMENT / NEW INTERCHANGE(O)
![Page 139: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/139.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 139
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RELOCATE US 127 FR APPROX .36 MI E OF INTERSECTION KY 1730 & MANNTOWNRD EXTEND N TO N BANK OF CUMBERLAND RIVER INCLUDING NEW BRIDGEOVER LAKE CUMBERLAND FR CLINTON CO TO RUSSELL CO(SEE 8-108&8-115 FORPE&ENV)(12CCR)(SEE 8-8601.22-SURFACING)(14CCR)
RECONSTRUCT US 127 FR APPROX .36 MI E OF INTERSECTION KY 1730 &MANNTOWN RD EXTEND N TO N BANK OF CUMBERLAND RIVER INCLUDE NEWBRIDGE OVER LAKE CUMBERLAND FR CLINTON CO TO RUSSELL CO(SEE 8-108&8-115 FOR PE&ENV) (ADDITIONAL C-FUNDS FOR 8-8601.21)(16CCR)
GEORGETOWN NORTHWEST BYPASS; FROM KY-32, EAST TO I-75.(04CCR)(2004BOPC)(SEE 7-102.01 FOR "HPP" COMPONENT)(10CCR)(12CCR)(16CCR)
REPLACE BRIDGE ON KY 1689 OVER LECOMPTES RUN 0.46 MILE W OF KY 227(SR9.4) 105B00038N
REPLACE BRIDGE OVER NS (CNO&TP)RR ON FIELDS ROAD (CR 1022) ATSCOTT/HARRISON CO LINE (105R00607N)(SR=28.8) (EBRP)
WIDEN/IMPROVE SHOULDERS ON KY-620. (06CCN) (08CCR)
RECONSTRUCT KY-227 FROM MP 2.98 TO MP 3.34 TO IMPROVE HORIZONTALCURVE. (16CCN)
2.520
2.520
4.700
.040
.020
1.370
RUSSELL
RUSSELL
SCOTT
SCOTT
SCOTT
SCOTT
SCOTT
US-127
US-127
-
KY-1689
CR-1022
KY-620
KY-227
$15,690,000
$15,000,000
$18,250,000
$720,000
$1,900,000
$2,500,000
$2,025,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
U
C
R
U
C
D
R
U
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2017
2018
2019
2017
2018
2016
2016
2018
2018
2019
2019
2020
2016
2017
2018
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
NH
STP
STP
BRX
BRX
BRX
BRZ
BRZ
BRZ
BRZ
SPB
STP
STP
STP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,900,000
$2,100,000
$810,000
$10,880,000
$15,000,000
$3,540,000
$14,710,000
$60,000
$60,000
$600,000
$300,000
$100,000
$250,000
$1,250,000
$2,500,000
$225,000
$225,000
$325,000
$1,250,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
07
07
07
07
07
8601.21
8601.22
102.50
1127.00
1139.00
8306.00
8907.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
08
08
07
07
07
07
07
8601.21
8601.21
102.01
1127.00
1139.00
8306.00
8907.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2016
2004
2012
2014
2006
2016
2012
2012
1996
2012
2014
2006
2016
1.801
1.19
11.26
1.841
1.21
12.63
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RELOCATION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / BYPASS(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 140: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/140.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 140
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON KY-53 (MP 11.366) OVER FOX RUN CREEK; 3.0 MI NORTH OFJCT US-60W; (STRUCTURALLY DEFICIENT, SR=2) 106B00031N
REPLACE BRIDGE ON KY-55 OVER BULL SKIN CREEK 0.18 MILE N OF HERITAGELN (PR-1212)(SR 35.9) 106B00020N.
REPLACE BRIDGE ON SCRABBLE RD (CR 1036) OVER BACKBONE CREEK 0.47MILE E OF CEDARMORE RD (KY 1922)(SR 44.2) 106C00055N
WIDEN KY-53 TO FOUR LANES FROM I-64 TO US-60.(08CCN)(10CCN)(12CCR)(14CCR)(16CCR)
CONSTRUCT A THIRD LANE ON US-60 FROM THE MASONIC HOME TO ROCKETLANE. (12CCN)(14CCR)
WIDEN KY 55X FROM TWO TO FIVE LANES FROM US 60 (MP 0.0) NORTH TO KY 43(MP 1.354).(16CCN)
NEW NORTH-SOUTH ROUTE BETWEEN US 60 AND BENSON PIKE WEST OF ANDPARALLEL TO ROCKET LANE (KY 1871).(16CCN)
IMPROVEMENTS TO KY 100: RECONSTRUCT KY 100 FROM KY 622 TO EAST OFSULPHUR FORK CREEK. (12CCR)
RECONSTRUCTION AND WIDENING KY-100 FROM I-65 TO KY-622. (06CCN)(10CCR).(12CCR)(14CCR)
.100
.040
1.900
1.378
2.875
2.806
SHELBY
SHELBY
SHELBY
SHELBY
SHELBY
SHELBY
SHELBY
SIMPSON
SIMPSON
KY-53
KY-55
CR-1036
KY-53
US-60
KY-55X
-
KY-100
KY-100
$1,360,000
$2,580,000
$450,000
$11,290,000
$2,170,000
$13,101,000
$770,000
$15,260,000
$8,670,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
D
R
U
C
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2019
2017
2020
2021
2021
2022
2022
2016
2016
2018
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRO
BRO
BRZ
STP
SPP
SP
SP
SP
SP
SP
SPP
SPP
SPP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,360,000
$2,580,000
$450,000
$11,290,000
$2,170,000
$1,420,000
$175,000
$786,000
$10,720,000
$770,000
$2,100,000
$2,750,000
$10,410,000
$8,670,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
03
03
1060.00
1063.00
1069.00
8511.00
8713.00
8958.00
8959.00
319.00
8306.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
ALLEN
05
05
05
08
05
05
05
03
03
1060.00
1063.00
1069.00
8511.00
8713.00
8958.00
8959.00
319.00
8306.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2010
2012
2012
2008
2012
2016
2016
2012
2006
2010
2012
2012
2012
2016
2016
2012
2006
11.316
3.839
.462
6.064
11.5
0
16.34
13.534
11.416
3.879
.502
8.006
12.878
1.354
19.115
16.34
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
0 .1Milepoints: To:From:
![Page 141: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/141.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 141
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
GARVIN LANE EXTENSION TO HENDERSON INDUSTRIAL PARK. (14CCN)(16CCR)
MAJOR WIDENING TO 3-LANES WITH URBAN SECTION FROM KY-73 TO NORTHFRANKLIN STREET. (14CCN)
MAJOR WIDENING TO 5-LANES WITH URBAN SECTION FROM KY-1008 TO KY-621.(14CCN)(16CCR)
PLANNING STUDY FOR NEW ROUTE BETWEEN KY 100 WEST OF FRANKLIN OR US31W SOUTH OF FRANKLIN AND THE KENTUCKY/TENN LINE NEAR WITT ROAD INSIMPSON CO. (16CCN)
CONSTRUCT NEW ACCESS ROAD TO BROADY INDUSTRIAL PARK.(16CCN)
REPLACE BRIDGE OVER BUCK CREEK ON KY 1169 75 FT EAST OF YODER TIPTONROAD (CR 1142). (108B00022N)(SR=45.6)(EBRP)
REPLACE BRIDGE OVER SIMPSON CREEK ON KY 2885 (WEST RIVER ROAD) ATJCT WITH NETHERTON LANE (CR 1082) 3-TON WEIGHT LIMIT (SR=2)(108B00041N)
CONSTRUCT A 2+1 ROAD ON KY 55/155 (TAYLORSVILLE ROAD) IN SPENCERCOUNTY AND KY 155 (TAYLORSVILLE LAKE ROAD) IN JEFFERSON COUNTY BYADDING A CONTINUOUS THIRD LANE THAT SERVES AS AN ALTERNATINGPASSING LANE.(16CCN)
.645
2.322
SIMPSON
SIMPSON
SIMPSON
SIMPSON
SIMPSON
SPENCER
SPENCER
SPENCER
-
KY-1008
US-31W
KY-100
-
KY-1169
KY-2885
KY-155
$300,000
$6,800,000
$15,000,000
$300,000
$300,000
$1,060,000
$650,000
$4,750,000
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
D
R
U
C
P
C
D
R
U
C
R
U
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2017
2018
2016
2017
2017
2019
2017
2018
2020
2021
2021
2022
2016
2016
2017
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BRX
BRX
BRX
BRX
BRX
BRX
BRX
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$300,000
$1,700,000
$2,600,000
$2,500,000
$1,000,000
$2,000,000
$3,000,000
$9,000,000
$300,000
$300,000
$350,000
$10,000
$20,000
$680,000
$100,000
$50,000
$500,000
$4,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
05
05
05
8810.00
8855.00
8856.00
8903.00
8956.00
1076.00
1080.00
8954.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
03
03
03
03
05
05
05
8810.00
8855.00
8856.00
8903.00
8956.00
1076.00
1080.00
8954.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2014
2016
2016
2014
2014
2016
2014
2014
2014
2016
2016
2014
2014
2016
3.688
8.477
8.53
2.629
4.333
10.799
8.552
2.635
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / SCOPING STUDY DD (O)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
![Page 142: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/142.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 142
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY 44 NEARDUTCHMAN CREEK ROAD. (16CCN)
HEARTLAND PARKWAY; CAMPBELLSVILLE BYPASS FROM KY-55 SOUTH TO KY-70. (2010BOP)(14CCR)(16CCR)
HEARTLAND PARKWAY; CAMPBELLSVILLE BYPASS FROM KY-70 TO US-68 EASTOF CAMPBELLSVILLE. (2010BOP)(16CCR)
CONSTRUCT 2 LANES WITH PASSING LANE TO CONTINUE ROUTE FROMADAIR/TAYLOR COUNTY LINE TO CAMPBELLSVILLE BYPASS. MP 0.00 TO MP8.003. (16CCN)
PLANNING STUDY FOR KY 210. (16CCN)
RECONSTRUCT KY-181 (ELKTON ROAD) FROM US-79 (MP 0.000) TO NORTH OFINTERSECTION WITH US-41 (MP 0.214) TO INCLUDE A NEW INTERSECTION WITHKY-294. (MP 0.000-0.400) (14CCN)
RESURFACE POND RIVER RD FROM NORTH MAIN ST TO THE 68/80 BYPASS INELKTON. (16CCN)
REPLACE BRIDGE ON KY-1585 (MP 4.87) OVER SINKING FORK; .3 MI. NORTH OFHWY. 272 JCT.; (STRUCTURALLY DEFICIENT, SR=19.7) 111B00054N (AR/W)
.400
.100
SPENCER
TAYLOR
TAYLOR
TAYLOR
TAYLOR
TODD
TODD
TRIGG
KY-44
KY-555
KY-555
KY-55
KY-210
KY-181
CS-1028
KY-1585
$1,560,000
$22,970,000
$16,190,000
$11,500,000
$250,000
$3,520,000
$65,000
$1,100,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
R
U
C
R
U
C
D
R
U
C
P
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2021
2022
2017
2017
2019
2019
2019
2020
2018
2019
2020
2021
2019
2016
2017
2018
2018
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
NH
NH
NH
STP
STP
STP
NH
NH
NH
NH
SP
SPP
SPP
SPP
SPP
BRX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$230,000
$170,000
$160,000
$1,000,000
$6,780,000
$1,000,000
$15,190,000
$4,920,000
$500,000
$10,770,000
$500,000
$1,000,000
$1,000,000
$9,000,000
$250,000
$250,000
$670,000
$2,600,000
$65,000
$1,100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
04
04
04
04
03
03
01
8955.00
142.20
142.30
8920.00
8951.00
8811.00
8909.00
1133.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
04
04
04
04
03
03
01
8955.00
142.10
142.10
8920.00
8951.00
8811.00
8909.00
1133.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2010
2010
2016
2016
2014
2016
2010
2016
2006
2006
2016
2016
2014
2016
2010
0
0
4.82
8.003
.4
4.92
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SCOPING STUDY DD (O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PAVEMENT REHAB-PRI(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
![Page 143: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/143.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 143
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
REPLACE BRIDGE ON CR-1380 (0.014) OVER DYERS CREEK (SR=17.8) 111C00027N
REALIGN KY 124 APPROACH TO KY 139 TO IMPROVE INTERSECTION ANGLE ANDSIGHT DISTANCE. (16CCN)
NEW MILTON-MADISON BRIDGE APPROACHES TO REALIGN US 421 AT BOTTOMOF HILL AT NEW BRIDGE LOCATION.
ADDRESS SAFETY ISSUES AND ACCESS AT THE INTERSECTION OF US-421/KY-1226AT MP 11.5. (12CCR)
REPLACE BRIDGE OVER LITTLE KENTUCKY RIVER ON KY 2871 150 FT NW OF KY1335. (112B00029N) (SR=46.2)(14CCR)(16CCR)
CONSTRUCT TURN LANES INTO TRIMBLE COUNTY HIGH SCHOOL. (12CCN)
PADUCAH-HENDERSON; RECONSTRUCT US-60 FROM WAVERLY BYPASS TOCORYDON BYPASS. (PRIORITY SECTION)(08CCR)(12CCR)(14CCR)
.600
.040
.040
.100
3.637
TRIGG
TRIGG
TRIMBLE
TRIMBLE
TRIMBLE
TRIMBLE
UNION
CR-1380
KY-139
US-421
US-421
KY-2871
US-421
US-60
$200,000
$1,100,000
$870,000
$1,410,000
$1,334,000
$2,200,000
$9,670,000
Total
Total
Total
Total
Total
Total
Total
D
D
R
U
C
C
R
U
C
R
U
C
R
U
C
D
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2018
2019
2019
2019
2017
2016
2016
2017
2016
2016
2018
2016
2016
2017
2016
2017
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
SPP
SPP
SPP
SPP
BRO
STP
STP
STP
BRX
BRX
BRX
SPP
SPP
SPP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$200,000
$200,000
$150,000
$150,000
$600,000
$870,000
$320,000
$260,000
$830,000
$10,000
$24,000
$1,300,000
$100,000
$1,000,000
$1,100,000
$1,740,000
$5,680,000
$2,250,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
05
05
05
05
02
1160.00
8951.00
135.81
905.00
1075.00
8712.00
79.20
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
HENDERSON
01
01
05
05
05
05
02
1160.00
8951.00
135.80
905.00
1075.00
8712.00
79.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2004
2010
2014
2012
1998
2016
2016
2000
2010
2014
2012
1996
.011
18.776
11.278
.228
7.6
23.86
.017
19.198
11.678
.268
7.7
26.069
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)0 1.428Milepoints: To:From:
![Page 144: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/144.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 144
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
PADUCAH-HENDERSON; MORGANFIELD BYPASS TO WAVERLY(08CCR)(12CCR)(14CCR)
PADUCAH-HENDERSON; WAVERLY BYPASS. (12CCR)(14CCR)
CONSTRUCT NEW US-60 BYPASS AT SULLIVAN. (04CCN)
ADDRESS SAFETY, CONDITION AND SERVICE CONCERN FROM KY 109 TO WESTOF KY 360 TO ESTABLISH TRUCK NETWORK CONNECTION TO SHAWNEETOWNBRIDGE.(14CCR) (SAME AS ITEM NO. 2-310.20 IN 2014 SYP)
REPLACE BRIDGE ON KY-359 (MP 0.971) OVER LOST CREEK; .95 MI N.E. OF JCT US-60; (FUNCTIONALLY OBSOLETE, SR=34.5) 113B00006N (LET W/ 2-1074)
REPLACE BRIDGE ON KY-359 (MP 1.193) OVER SINKING CREEK; 1.1 MI N.E. OF JCTUS-60; (FUNCTIONALLY OBSOLETE, SR=12.6) 113B00007N (LET W/ 2-1073)
RECONSTRUCT US 60 TO ALLEVIATE FLOODING ISSUES BETWEEN MP 23.8 ANDMP 25.2. (16CCN)
CONSTRUCTION OF NEW I-65 INTERCHANGE IN WARREN COUNTY.(SURFACINGONLY, SEE 16.03 FOR G&D) (SEE 3-16.00 FOR STP COMPONENT)
CONSTRUCTION OF NEW I-65 INTERCHANGE IN WARREN COUNTY. (SURFACINGONLY, SEE 16.03 FOR G&D) (SEE 3-16.00 FOR STP COMPONENT) (ADDITIONAL C-FUNDS FOR 3-16.04)
3.900
2.600
.300
4.460
.100
.100
UNION
UNION
UNION
UNION
UNION
UNION
UNION
WARREN
WARREN
US-60
US-60
US-60
KY-56
KY-359
KY-359
US-60
I-65
I-65
$33,310,000
$23,760,000
$970,000
$14,500,000
$570,000
$570,000
$2,700,000
$13,380,000
$6,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
U
C
D
C
C
C
D
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2016
2017
2019
2016
2017
2016
2016
2018
2019
2019
2020
2016
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SP
SP
SP
SP
BRO
BRO
SPP
SPP
SPP
SPP
IM
IM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,680,000
$2,610,000
$27,020,000
$1,730,000
$1,480,000
$20,550,000
$970,000
$14,500,000
$570,000
$570,000
$300,000
$150,000
$250,000
$2,000,000
$13,380,000
$6,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
03
03
122.01
123.01
139.00
310.21
1073.00
1074.00
8955.00
16.04
16.05
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
03
03
122.01
123.01
139.00
310.01
1073.00
1074.00
8955.00
16.04
16.05
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
1996
1996
2000
2000
2010
2010
2016
2004
2016
1996
1996
2000
2000
2010
2010
2016
2004
2016
17.6
1.398
2.723
.921
1.143
23.8
21.5
1.6
7.182
1.021
1.243
25.2
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BYPASS(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW INTERCHANGE(O)
RELIABILITY / PREFINANCD CONVRSN(O)
![Page 145: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/145.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 145
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT KY-185 FROM NORTH OF THE JUNCTION WITH KY-263 NEARRICHARDSVILLE (MP 6.29) TO THE BUTLER COUNTY LINE (MP 11.913).(02CCR)(04CCR)(06CCR)(10CCR)(14CCR)
WIDEN TO 5 LANES FROM 1.0 MILE SOUTH OF KY 242 (MP 4.1) TO DILLARD ROAD(MP 6.7).(12CCR)
CONSTRUCT A PEDESTRIAN UNDERPASS UNDER US 31W CONNECTINGBUCHANON PARK TRAIL TO CHANEY'S DAIRY BARN.(16CCN)
RECONSTRUCT THE EXISTING NATCHER PARKWAY/US 231 INTERCHANGE ONWEST SIDE OF BOWLING GREEN. (12CCR)
REPLACE BRIDGE ON KY-234 OVER DRAKES CREEK 0.097 E OF SHAKER MILL RD(CR-1131) (SR 42.8) 114B00012N.
WIDEN AND EXPAND US 231 FROM PASCOE BLVD. TO NORTH OF CAVE MILLROAD. (12CCN)
CONSTRUCT A NEW INTERCHANGE ON THE NATCHER PARKWAY AT ELRODROAD IN BOWLING GREEN (MP 3.4 TO MP 4.0).(12CCN)
THREE SPRINGS ROAD EXTENSION FROM FLEALAND TO THE NATCHERPARKWAY INCLUDING BRIDGE OVER PARKWAY. (14CCN)
5.600
2.600
.200
.060
.346
.600
1.320
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
KY-185
US-31W
US-31W
WN-9007
KY-234
US-231
WN-9007
KY-884
$29,350,000
$9,610,000
$450,000
$13,810,000
$5,850,000
$5,500,000
$10,050,000
$15,730,000
Total
Total
Total
Total
Total
Total
Total
Total
U
C
C
D
C
D
R
U
C
C
R
U
C
D
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2018
2017
2017
2017
2017
2019
2019
2021
2018
2016
2017
2018
2019
2021
2021
2022
2016
2016
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
NH
NH
NH
NH
BRO
SPP
SPP
SPP
NH
NH
NH
NH
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,540,000
$26,810,000
$9,610,000
$50,000
$400,000
$1,250,000
$1,740,000
$1,690,000
$9,130,000
$5,850,000
$840,000
$2,080,000
$2,580,000
$800,000
$2,000,000
$950,000
$6,300,000
$4,000,000
$2,800,000
$8,930,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
03
110.00
199.00
199.99
202.00
1077.00
8702.00
8707.00
8818.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
03
03
03
03
03
03
03
110.00
199.00
199.99
202.00
1077.00
8702.00
8707.00
8818.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2012
2016
2012
2012
2012
2012
2014
2000
2012
2016
2012
2012
2012
2012
2014
6.29
4.1
9.4
9.746
9.654
3.4
7.302
11.913
6.7
9.6
9.806
10
4
8.622
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / NEW INTERCHANGE(O)
NEW ROUTES / NEW ROUTE(O)
![Page 146: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/146.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 146
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT KY-884 FROM LONG ROAD TO THE NATCHER PARKWAY (MP 5.516TO MP 7.438). (14CCN) (BRIDGE OVER NATCHER PKWY UNDER 3-8818).
MINOR WIDENING (2 + 1 CONCEPT) FROM WARREN/SIMPSON COUNTY LINE TOBUCHANON PARK.(14CCN)
MAJOR WIDENING/RECONSTRUCTION OF CEMETERY ROAD (KY-234) FROMFOUNTAIN TRACE TO ROGER PORTER ROAD (MP 7.878 TO MP9.625).(14CCN)(16CCR)
MAJOR WIDENING/RECONSTRUCTION FROM CAMPBELL LANE (US 231) TOUNIVERSITY BOULEVARD (US 231X). MP 10.561 TO MP 11.688 (14CCN)(16CCR)
EXTEND SHIVE LANE TO LOVERS LANE (KY 880) IN BOWLING GREEN.(14CCN)(16CCR)
MAJOR WIDENING WITH URBAN SECTION FROM CEMETERY ROAD TO US 68 INBOWLING GREEN, INCLUDING IMPROVING SAFETY AT THE INTERSECTION OFUS 31W BYPASS AND KY 234. (16CCN)
1.922
4.258
1.747
1.238
.400
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
KY-884
US-31W
KY-234
US-31W
CS-1540
US-31W
$12,150,000
$17,300,000
$10,750,000
$8,800,000
$3,820,000
$14,100,000
Total
Total
Total
Total
Total
Total
R
U
C
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2018
2019
2020
2017
2018
2019
2020
2017
2019
2020
2020
2017
2018
2018
2018
2017
2019
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,000,000
$2,000,000
$9,150,000
$1,800,000
$2,000,000
$13,500,000
$750,000
$2,000,000
$2,500,000
$5,500,000
$800,000
$1,750,000
$2,000,000
$4,250,000
$139,000
$324,000
$434,000
$2,923,000
$800,000
$2,500,000
$3,000,000
$7,800,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
8852.00
8853.00
8854.00
8857.00
8858.00
8904.00
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
03
03
03
03
03
8852.00
8853.00
8854.00
8857.00
8858.00
8904.00
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2014
2014
2014
2016
2014
2014
2014
2014
2014
2016
5.516
0
7.878
10.561
7.438
4.258
9.625
11.688
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
![Page 147: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/147.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 147
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
ACCOMMODATE INCREASED TRAFFIC FROM THE RESIDENTIAL ANDINDUSTRIAL DEVELOPMENT NORTH OF BOWLING GREEN ALONG THE SECTIONOF US 31W FROM US 68 (MP 21.148) TO MIZPAH. (16CCN)
IMPROVE CAPACITY AND SAFETY ON SCOTTSVILLE ROAD BY WIDENING TO SIXLANES FROM KY 884 (3 SPRINGS RD) TO WILKINSON TRACE/ASHLEY CIRCLE.(16CCN)
REPLACE BRIDGE ON KY 528 (MP 1.437) OVER ROAD RUN BRANCH.(SD,SR=46.6)(115B00043N)
REPLACE BRIDGE ON TEXAS-MACKVILLE ROAD (CR 1140) OVER PRATHERCREEK. (16CCN)
REPLACE BRIDGE ON TEXAS-MACKVILLE ROAD (CR 1140) AT MP 0.349 OVERLONG LICK CREEK. (16CCN)
ADDRESS SAFETY, MOBILITY, AND GEOMETRIC ISSUES ALONG US 150 INWASHINGTON COUNTY FROM 400 FEET WEST OF OLD FREDERICKTOWN-BARDSTOWN ROAD (KY 1872) TO 0.7 MILES EAST OF GRUNDY HOME ROAD (CR1337). (16CCN)
RECONSTRUCT KY-90 FROM OLD MILL SPRINGS ROAD TO BRIDGE AT MP 19.5.(12CCR)(16CCR)
1.800
WARREN
WARREN
WASHINGTON
WASHINGTON
WASHINGTON
WASHINGTON
WAYNE
US-31W
US-231
KY-528
CR-1140
CR-1140
US-150
KY-90
$4,900,000
$61,500,000
$630,200
$175,000
$175,000
$12,520,000
$8,440,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
D
R
U
C
C
C
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2017
2017
2018
2017
2019
2019
2021
2020
2021
2021
2022
2018
2017
2019
2020
2021
2022
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SP
SP
SPP
SPP
SPP
SPP
BRX
BRX
BRX
BRX
BRX
BRX
SPP
SPP
SP
SP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$800,000
$900,000
$400,000
$2,800,000
$2,000,000
$9,500,000
$19,900,000
$30,100,000
$150,000
$50,000
$50,000
$380,200
$175,000
$175,000
$700,000
$900,000
$1,100,000
$9,820,000
$8,440,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
04
04
04
04
08
8905.00
8951.00
1094.00
8956.00
8957.00
8958.00
109.10
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
03
04
04
04
04
08
8905.00
8951.00
1094.00
8956.00
8957.00
8958.00
109.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2016
2016
2016
2016
2004
2016
2016
2016
2016
2016
2016
2000
1.433
17.691
1.441
19.5
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
![Page 148: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/148.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 148
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RAISE GRADE TO PREVENT FLOODING FROM 0.5 MI EAST OF VALLEY VIEWDRIVE TO 0.7 MI W OF KY 1258. (12CCR)(14CCR)
REPLACE BRIDGE ON CR-1136 (MP 0.225) OVER LITTLE SOUTH FORK RIVER; 0.25MI SE OF JCT CR-5137; (STRUCTURALLY DEFICIENT, SR=16.6) 116C00007N
PLANNING STUDY FOR KY 92 EAST IN WAYNE AND RUSSELL COUNTIES. (16CCN)
RECONSTRUCT US-41A BETWEEN PROVIDENCE AND DIXON(04CCN)(08CCR)(10CCR)(12CCR)
RECONSTRUCT BETWEEN KY 120 AND RR BRIDGE AT SLAUGHTERS TOALLEVIATE FLOODING. (12CCR)
RECONSTRUCT KY-92 FROM 500 FT WEST OF THE WHITLEY/MCCREARY COUNTYLINE TO 1200 FT EAST OF OLD JELLICO CREEK ROAD. (SECTION 1)(14CCR)
MAJOR WIDENING, ADDRESSES CONGESTION, FREIGHT MOVEMENT, ANDACCESS ALONG 25W FROM KY 727 TO KY 3041. (12CCR)(16CCR)
REHAB BRIDGE ON I-75 AT MILEPOINT 27.9 OVER LYNN CAMP CREEK (SR 34.1)(B00063R AND B00063L)
2.061
.100
9.000
.281
4.172
2.225
WAYNE
WAYNE
WAYNE
WEBSTER
WEBSTER
WHITLEY
WHITLEY
WHITLEY
KY-92
CR-1136
KY-92
US-41A
KY-138
KY-92
US-25W
I-75
$12,830,000
$740,000
$250,000
$46,150,000
$1,550,000
$23,800,000
$14,170,000
$4,000,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
U
C
P
D
R
U
C
R
U
C
U
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2016
2016
2017
2019
2016
2016
2016
2018
2016
2016
2017
2016
2017
2017
2017
2020
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
BRZ
BRZ
BRZ
SP
SPP
SP
SP
SP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BRO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,660,000
$2,170,000
$9,000,000
$90,000
$80,000
$570,000
$250,000
$1,700,000
$5,370,000
$4,430,000
$34,650,000
$100,000
$250,000
$1,200,000
$1,800,000
$22,000,000
$2,630,000
$2,540,000
$9,000,000
$4,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
08
02
02
11
11
11
394.00
1050.00
8951.00
143.00
228.00
184.10
186.00
1105.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
MCCREARY
08
08
08
02
02
11
11
11
394.00
1050.00
8951.00
143.00
228.00
184.00
186.00
1105.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2010
2016
2000
2012
2014
2012
2016
2012
2010
2016
2000
2012
2010
2012
2016
10.62
.175
1.324
10.449
0
28.2
27.85
13.1
.275
10.01
10.73
4.172
30.425
27.95
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / SCOPING STUDY DD (O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / BRIDGE REHAB(P)
24.74 24.835Milepoints: To:From:
![Page 149: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/149.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 149
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
CONSTRUCT A NEW ENTRANCE TO THE UNIVERSITY OF THE CUMBERLANDSFROM SOUTH 2ND ST UP THE HILL TO TIE INTO HUTTON WAY. (16CCN)
WIDEN I-75 TO EIGHT LANES FROM MP 20.2 TO MP 27.943 IN WHITLEY COUNTYAND MP 27.943 TO MP 28.85 (US 25E) IN LAUREL COUNTY. (16CCN)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.45 MI W OF KY 205 (MP 56.8) TO CR 1226 PARKWAY ROAD TUNNEL(MP 59.30). (2012BOP)(14CCR)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.45 MI W OF KY 205 (MP 56.8) TO CR 1226 PARKWAY ROAD TUNNEL(MP 59.30). (ADDITIONAL C-FUNDS FOR 10-126.70)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.45 MI W OF KY 205 (MP 56.8) TO CR 1226 PARKWAY ROAD TUNNEL(MP 59.30). (ADDITIONAL C-FUNDS FOR 10-126.70)(16CCN)
RECONSTRUCT TO CURRENT STANDARDS THE CURVE FROM THE KY 15OVERPASS TO 2700 EAST OF KY 15 OVERPASS. (12CCR)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MTN PKY TO 4 LANES FROM 0.6MI W OF KY 191 OVERPASS TO 0.45 MI W OF KY 205 INTERCHANGE. (SEE 10-126.03FOR PE & ENVIR FUNDS)(2012BOP)(14CCR)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MTN PKY TO 4 LANES FROM 0.6MI W OF KY 191 OVERPASS TO 0.45 MI W OF KY 205 INTERCHANGE. (SEE 10-126.03FOR PE & ENVIR FUNDS)(2012BOP)(14CCN)(ADDITIONAL FUNDS FOR 10-168.00)(16CCR)
2.500
2.500
.600
11.000
11.000
WHITLEY
WHITLEY
WOLFE
WOLFE
WOLFE
WOLFE
WOLFE
WOLFE
-
I-75
KY-9009
KY-9009
KY-9009
KY-9000
KY-9009
KY-9009
$1,950,000
$2,000,000
$21,070,000
$8,000,000
$8,000,000
$3,410,000
$18,250,000
$10,200,000
Total
Total
Total
Total
Total
Total
Total
Total
D
U
C
D
U
C
C
C
C
R
U
C
D
R
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2017
2017
2022
2016
2018
2018
2018
2017
2017
2018
2019
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
NH
NH
NH
NH
NH
SB2
NH
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$300,000
$50,000
$1,600,000
$2,000,000
$2,400,000
$18,670,000
$8,000,000
$8,000,000
$3,410,000
$6,000,000
$2,250,000
$10,000,000
$5,200,000
$5,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
10
10
10
10
10
10
8954.00
8960.00
126.70
126.71
126.72
162.00
168.00
168.10
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
LAUREL
MORGAN
MORGAN
11
11
10
10
10
10
10
10
8954.00
8960.00
126.03
126.71
126.72
162.00
168.00
168.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
1996
2016
2016
2012
1996
2014
2016
2016
1996
2016
2016
2012
1996
1996
20.2
56.8
56.8
56.8
38
45.8
45.8
27.943
57.72
57.72
59.3
38.6
56.8
56.8
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
27.943
57.72
57.72
28.85
59.3
59.3
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 150: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/150.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 150
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
RECONSTRUCT KY-205 FROM THE WOLFE/BREATHITT CO. LINE TO THEMOUNTAIN PARKWAY (PHASE 1). (02CCN)(06CCR)(08CCR)(10CCR)(12CCR)(16CCR)
HILL AND CURVE CORRECTION ON KY-191 BETWEEN HAZEL GREEN AND KY-205.(02CCN)(08CCR)(10CCR)
RECONSTRUCTION OF KY-715 & KY-2016 INTERSECTION MP 2.548 - MP 2.748.(14CCN)
REPLACE BRIDGE OVER GRIER CREEK ON GRIER CREEK ROAD (CR 1217) 0.8 MIW OF SCOTTS FERRY ROAD (CR 1215) (120C00017N)(SR=31.5)
REPLACE THE WEISENBURG MILL ROAD BRIDGE AT THE WOODFORD/SCOTTCOUNTY LINE. (10CCN)
STUDY IMPROVEMENTS TO TRAFFIC FLOW ISSUES IN DOWNTOWN VERSAILLES.(16CCN)
RECONSTRUCT KY 33 FROM 100 FEET NORTH OF KY 1267 TO 100 FEET NORTH OFKY 169. (MP 3.04 TO MP 10.65) (16CCN)
ACCESS MANAGEMENT IMPROVEMENTS ON US 60 FROM LEXINGTON ROAD ATWOODFORD FEED TO MARSAILLES DRIVE (MP 9.38 TO MP 9.70).(16CCN)
6.390
4.000
.200
.030
.023
WOLFE
WOLFE
WOLFE
WOODFORD
WOODFORD
WOODFORD
WOODFORD
WOODFORD
KY-205
KY-191
KY-715
CR-1217
CR-1015
-
KY-33
US-60
$16,500,000
$2,470,000
$280,000
$1,225,000
$1,380,000
$100,000
$40,200,000
$4,100,000
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
C
D
R
U
C
C
D
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2017
2017
2019
2020
2020
2022
2016
2017
2018
2019
2020
2021
2016
2016
2018
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SB2
SP
SP
SP
SPP
BRZ
BRZ
BRZ
BRZ
SB2
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$16,500,000
$250,000
$670,000
$1,550,000
$280,000
$325,000
$50,000
$100,000
$750,000
$1,380,000
$100,000
$3,000,000
$8,300,000
$6,400,000
$22,500,000
$400,000
$950,000
$750,000
$2,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
07
07
07
07
07
8101.00
8102.00
8803.00
1140.00
8642.00
8903.00
8904.00
8905.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
SCOTT
10
10
10
07
07
07
07
07
8101.00
8102.00
8803.00
1140.00
8642.00
8903.00
8904.00
8905.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2002
2002
2014
2014
2010
2016
2016
2016
2002
2002
2014
2014
2010
2016
2016
2016
0
10.256
2.548
1.15
2.499
3.04
9.38
6.394
14.298
2.748
1.18
2.522
10.65
9.7
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / SCOPING STUDY DD (O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
.536 .559Milepoints: To:From:
![Page 151: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM](https://reader034.vdocuments.us/reader034/viewer/2022051907/5ff9e2a7a3450d77d3606e3a/html5/thumbnails/151.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 151
FY - FY - THRU2016 2022
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
18 MAY 2016
EXTEND FALLING SPRINGS BLVD FROM TYRONE PIKE (US-62) TO CLIFTON ROAD(KY-1964). (16CCN)
WOODFORD -
$15,150,000Total
D
R
U
C
PHASE
2019
2020
2021
2022
YEAR
SP
SP
SP
SP
FUNDING
$900,000
$2,750,000
$4,250,000
$7,250,000
AMOUNT 07 8908.00-
Purpose and Need: 07 8908.00-
Parent No.:2016
2016Milepoints: To:From:
RELIABILITY / NEW ROUTE(O)