page 1 administrator training overview-d2 greyhawk 2 version: april 2009
TRANSCRIPT
Page 1
Administrator Training Overview-D2
Greyhawk 2
Version: April 2009
Page 2
Overview
Introduction Components Technology Barco Wall Control Manager
Page 3
OV-7xx
Page 4
OV-5xx
Page 5
Wall naming convention
OVf-SRR OV= overview S = screen size
– 5 = 50 inch– 7 = 70 inch– 8 = 80 inch– 10 = 100 inch
RR = resolution – 08 = XGA = 1024x768 = 786 000 ~ 8– 13 = SXGA = 1280x1024 = 1 310 720 ~13– 15 = SXGA+ = 1400x1050 = 1 470 000 ~15
f = front accessible
Examples : OV-508 OV-715 OV-1013
Page 6
Screens
Rear projection screen requirements Viewable from all angles High contrast Focused Minimal reflection
Cleaning of screens : Avoid to touch screens !!!! See user manual for cleaning instructions.
Page 7
Screens
Screens can be mounted in different ways. Expand/shrink due to temperature and moisture Canned
– Minimal gap between screens– Visible gap– Only 50” and front access 70 “
Canned – seamless– No gap– Screens push against each other– Only 50”
Stitched– Small needle like wires hold the screens together– No gaps– Only from 70” onwards
Page 8
Components : Projection Unit
Page 9
Projector Alignment
Correct geometry on the screen by tilting the projector in its frame
Service personnel only !
Page 10
Components : Illumination unit
Page 11
Components : Dual Lamp system
•120W/132W lamp•two lamps in each projector•Switch automatically upon failure•Lamp lift mechanism
Page 12
Components : Intelligent Lamps
Mounting handle and locking mechanism
120W/132W lamp
Lamp ID chipAir inlet for burner cooling
power
Page 13
Lamp cut-off voltage – lamp retry
When lamps get older they can Simply stop working and refuse to start again Explode…… : no danger !
Graph not representative, for illustration purposes only !
Page 14
Maintenance actions
- Defective lamp :- Retry lamp first (reset error + reselect lamp)- When fails again (same day)- Replace lamp- Lamp warm-up – wait 2 min.- Optimize the new lamp! (only possible in service mode).
Air Filter Replacement- Dependent on Contract and/or Need- Don’t shake the dirty filter- Dispose used filters – DO NOT CLEAN
Page 15
Components : Typical delays & button functions
Cooling / warming : 2 min Color stabilizing : 5 min Overtemp before shutdown : 5 min
On/Res button: Up
– 1-3 sec: switch on from standby– 4-8 sec: toggle between IP address and error status– > 10 sec: reset lamp error
Down – 1-3 sec: switch to standby– 4-8 sec: not used (yet)– >10 sec: self diagnostic of IU
Page 16
Technology
What’s inside the projector units ?
Page 17
Technology : DLP chip
DLP-chip technology– One chip containing more than 1m mirrors– Each mirror representing one pixel– Pixel value is created through reflection time modulation– See movie...
Page 18
Light-path
Page 19
Technology : PU - Color sensor
Allows the BCM software (see further) to Have equal brightness on every projector Have equal color on every projector.
Page 20
Barco Wall Control manager (BCM)
Controlling all your walls from an easy to use software
Page 21
Network Interfacing: Wall Control Network
Page 22
BCM for administrators – simple view
Features Overview of cubes Shows health Multiple walls Can generate reports
Page 23
BCM for administrators – lamp view
Page 24
BCM for administrators – input view
Page 25
BCM: Brightness Lock
3 basic modes: Uncalibrated
– Brightness locking not active so dimmer wheel stays in last known position.
– Color correction not active so native colors are shown.
Brightness locked– The brightness is dynamically controlled with the dimmer
wheel by using only the brightness information of the color sensor. The colors are static.
Sense 6 (License required, see BLM)– Next to Brightness, color is also dynamically controlled. This
is done with the DMD chip.
Page 26
BCM for administrators
Problems or alarms Severity :
– Green– Yellow– Orange– Red
Recommended solution
Page 27
BCM: License
Following options will require licenses:– Hot standby– Sense6– High power (120 -> 132 W)– Scaling
Checking for the required licenses:– Via BCM, Help menu
Page 28
Questions ?