![Page 1: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/1.jpg)
Filename
Pad ICD Changesfor
Modified GH2 Vent Ice Suppression Shroud CR S063347/IRN KO-2125
To ERB
Gary Hopkins
April 26, 2006
![Page 2: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/2.jpg)
Page 16/26/2010
Filename
Agenda
• Background
• ET GH2 Vent Umbilical Overview
• Development Testing
• Modified Shroud Configuration
• Installation Photos
• Requalification Testing
• Conclusions
• Recommendation
• Backup
– ICD Changes
![Page 3: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/3.jpg)
Page 26/26/2010
Filename
Background
• During the STS-114 tanking tests, launch attempt and launch, the ET GH2 Vent Ice Suppression Shroud formed Ice and Liquid Nitrogen.
– Investigation Problem Report (IPR) 114V-0361 and IFA STS-114-I-014 were generated
Ice
![Page 4: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/4.jpg)
Page 36/26/2010
Filename
System Overview
External Tank
Vent Arm
Ground Umbilical
Carrier Plate
(GUCP) & Shroud
Pivot Arm
• ET GH2 Vent Umbilical System
– Provides GH2 venting from hydrogen tank
– T-0 quick disconnect operation
ET GH2 Vent Umbilical
Ground Umbilical
Carrier Plate
(GUCP) & Shroud
![Page 5: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/5.jpg)
Page 46/26/2010
Filename
Old Shroud Configuration
• Flow path of commodities (GN2 & GHe) in GH2 vent shroud
Insulation
GH2
GHe
GHe, 750 PSI
Heated GN2, 3000 PSI, 160oF
.046
.020.034
.030
![Page 6: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/6.jpg)
Page 56/26/2010
Filename
Development Testing
• The shroud was modified and went through a series of LN2 development tests at the NASA Cryogenic Lab & Launch Equipment Test Facility (LETF).
– Development tests determined the following
• Best seal material & configuration for the GHe and both GN2 annulus
• Size the purge vent holes in the phenolic rings
• Size of purge vent hole in rear conical portion
![Page 7: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/7.jpg)
Page 66/26/2010
Filename
Modified Configuration
GUCP
LH2 7” QD
Forward Flex Hose
Shroud
Rear Half
Shroud
Front Half
QD/Shroud
Alignment Pin (4)
New Front
Phenolic
Shroud Conical
Section (2)
GHe
Heated GN2
RTV
1/8 x 45o
Chamfer
.030 Teflon
Tape
1/8 x 45o
Chamfer
New 1” Hole
New Rear
Phenolic
LN2 Liquid Level
Front Seal
Detail
Rear Seal
Detail
L-T-80 Type
![Page 8: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/8.jpg)
Page 76/26/2010
Filename
Modified Configuration Details• Easy to install, No new installation tools required
• Front Seal is partially visible for inspection prior to applying tape
• Front and rear tape visible for inspection.
Rear Seal
Front Seal
.010
Teflon
Tape
L-T-80
Tape
½” Gore-
Tex Seal
L-T-80
Tape
InsulationInsulation
• Q.D. wrapped with 4 wraps of ¼” Aerogel Blanket (Aspon AR3103)
![Page 9: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/9.jpg)
Page 86/26/2010
Filename
New Shroud Configuration
• Flow path of commodities (GN2 & GHe) in hydrogen vent shroud
Insulation
GH2
GHe
GHe, 750 PSI
Heated GN2, 3000 PSI, 160oF
.046
.020.034
.030
![Page 10: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/10.jpg)
Page 96/26/2010
Filename
Installation Photos
![Page 11: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/11.jpg)
Page 106/26/2010
Filename
Requalification Test
• Test Conditions
– Two Qualification Tests with final shroud configuration
– 48 Hours minimum between test starts
– Chill QD with LH2 for 5 Hrs
– Misters on test article for 3 to 4-hours
– No shroud re-mate between tests.
• Test Results
– Test verified no to minimal GN2 entered the GHe annulus
• Mass Spec & positive delta P
– Test Verified no ice or frost can form on shroud
• Temperature measurements on OD of shroud
• Open Issue
– There was excessive ice on GUCP legs during LETF testing with misters.
• Cause is most likely the test conditions, misters for 4-hours.
• Analysis in-work by Lockheed Martin, ECD 5/3/2006.
![Page 12: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/12.jpg)
Page 116/26/2010
Filename
Conclusions
• The new seals greatly improved the existing design which has supported many launches.
• New seals good for cryogenic conditions
– Gore-Tex is good from –450oF to 600oF per vendor data.
– Seals have have been tested @ LN2 temperatures @ 2-3X the nominal flow rate.
• Material used for modifications are good for launch pad environment.
– Environmental exposure will not affect L-T-80 tape or Gore-Tex materials
• Operational impacts will be limited to installing the new insulation and seals.
– The new seals and other improvements are controlled, therefore no special test equipment is required.
– Visual inspection of seals and tape is adequate.
![Page 13: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/13.jpg)
Page 126/26/2010
Filename
Recommendations
• Recommend approval of IRN.
– Pending analysis results on GUCP ice during LETF testing.
![Page 14: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/14.jpg)
Page 136/26/2010
Filename
Back-up Slides
![Page 15: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/15.jpg)
Page 146/26/2010
Filename
Modified Configuration
• Modified phenolic rings
– Smaller ID, 1/8 x 45o Chamber, GHe holes plugged, Front GN2 holes plugged
– (2) 1/8” holes in upper rear GN2 phenolic
– (18) 1/8” holes & (4) 3/16” holes in lower rear phenolic
• 0.020” GHe Orifice (Standard Launch Configuration)
• L-T-80 Tape installed on the Rear Cone (Standard Launch Configuration)
• L-T-80 Tape installed on outer telescoping section
• .030 Teflon Tape installed on telescoping sections
• RTV applied between phenolic and inner annulus metal
• Shroud forward seal configuration
– ½” Gore-Tex Tape applied to GUCP/Q.D. O.D. interface
• Shroud sandwiches Gore-Tex between forward phenolic and GUCP
– L-T-80 tape applied to shroud/GUCP interface
• Shroud rear seal configuration
– .010 Teflon Tape applied to O.D. of flange of forward 8” flex hose.
– L-T-80 Tape applied over rear phenolic/flex hose flange interface
• 1” hole added to bottom of shroud’s rear cone section
• QD wrapped with Aerogel Blanket insulation secured with Mylar Wrap and Mylar tape.
– Covered with L-T-80 Tape to protect insulation from GN2 purge.
![Page 16: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/16.jpg)
Page 156/26/2010
Filename
LETF Test Data
Measure Number
Measure Location Description LH2 Test #3 @ LETF
LH2 Test #3 @ LETF w/misters
LH2 Test #4 @ LETF
LH2 Test #4 @ LETF w/misters
8 OD Shroud Rear 12:00 81 68 90 68
9 ID Shroud Rear 12:00 48 46 53 43
12 OD of QD Rear 12:00 -407 -409 -404 -406
14 OD of QD Rear 6:00 -406 -407 -404 -405
17 ID Shroud Rear 6:00 58 61 61 53
18 OD Shroud Rear 6:00 62 74 71 63
21 OD Flex Hose In Conical 6:00 -28 -28 -27 -25
25 QD Flange Surface 12:00 -364 -360 -362
26 QD Flange Surface 6:00 -385 -382 -383
37 OD Flex Hose 6:00 65 60 67 61
38 Conical Portion Vent Gas 37 39 35 29
39 OD Shroud Front 6:00 82 96 92 82
41 OD Conical Portion 6:00 68 69 70 65
Description Ambient Temperature (oF)
Humidity (%) Wind (mph)
LH2 Test #3 @ LEFT 64 59 0
LH2 Test #3 @ LEFT w/misters 64 60 1
LH2 Test #4 @ LEFT 71 59 5
LH2 Test #4 @ LEFT w/misters 68 58 2
![Page 17: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/17.jpg)
Page 166/26/2010
Filename
IRN Revision C, Figure 3.3-2.9
FIGURE 3.3-2.9 ET-1 GH2 VENT QD ICE SUPRESSION
![Page 18: Pad ICD Changes for Modified GH2 Vent Ice Suppression ... · 4/26/2006 · Page 10 6/26/2010 Filename Requalification Test • Test Conditions –Two Qualification Tests with final](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9dc8ce8cb54220a8457a99/html5/thumbnails/18.jpg)
Page 176/26/2010
Filename
IRN Revision C, Figure 3.3-2.9 Detail J