packetabis over tdm_bts_commissioning steps

8
 Click on Change

Upload: gaurav-pandey

Post on 02-Nov-2015

6 views

Category:

Documents


0 download

DESCRIPTION

COMISSIONING OF FLEXI MULTI RADIO BTS TO IMPLEMENT PacketAbis Over TDM

TRANSCRIPT

Click on Change

BTS IP details need to fill from Datafill

M-Plane SCTP/IUA settings need to verify from Datafill.

PPP configuration need to check from datafill

Select All for Bundle ID=1