packaging and presenting requirements · 2013. 11. 19. · • cbap® obtained may ’07 ......

16
Packaging and Presenting Requirements Setting the Stage for Success

Upload: others

Post on 06-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Packaging and Presenting Requirements

    Setting the Stage for Success

  • • 25+ year of business analysis

    • Industries include :– Financial– Academic– Government– Retail

    • CBAP® obtained May ’07

    • Requirements Evangelist

    Billie Johnson, CBAP®, CSM

    Billie in Norway

  • Agenda

    • Introduction to Requirements Management and Communication

    • Requirements Depiction• Packaging the Requirements• Reaching and Maintaining Consensus• Questions

  • Requirements Management and Communication Knowledge Area

    Manage Solution Scope

    & Requirements

    Manage Requirements

    Traceability

    Maintain Requirements

    for Reuse

    Prepare Requirements

    Package

    Communicate Requirements

  • Understanding the Vision

    “Vision without execution is a daydream

    Execution without vision is a nightmare”

    Japanese Proverb

  • Why Vision?We have a Funded Project

  • Alignment to Vision

    “Humans are not ideally set up to understand logic; they are ideally set up to understand stories.” -- Roger C. Schank, author, cognitive scientist

  • Requirement Depiction

  • Setting Scope

  • Use Case DiagramActivity DiagramClass ModelState Diagram

    User Goal Use Case

    Interface Control 

    Document

    Business Rules

    Business Model

    Concept of Operations

    GUI Specifications

    Quality Attributes

    Summary  Use Case

    Technical Design Documents

    Test Plan and Cases

    Legend:•All shapes represent documentation modules•Directional Flow indicates module traceability•Solution and User Requirements represented in blue

    Glossary

  • 830™ Requirements Specification

    TediousError‐proneTime‐consumingBoring to readDifficult to grasp the “big picture”

    “The system shall…”

    “If possible, the system will…”

    “If we have time (money, people), 

    we’ll try to…”

  • Configure for Packaging

  • Packaging Requirements

    • Extract views as needed from requirements repository

    • Avoid maintaining multiple copies• Package with audience needs in mind

  • Reaching and Maintaining Consensus

    • Keep the content focused• Build team of reviewers with impact to the

    specific content• After consensus, baseline requirements

    content• Follow requirements management plan for

    the changes that will occur

  • Questions

  • How to Claim Your PDU

    • Go to aspe-sdlc.com/pdu/ for instructions on submitting your PDU.

    • You can submit your PDU by mail or electronically.

    • The Activity code for today’s presentation is WS102913 and ASPE’s REP number is 2161.

    • The seminars are Category A for one PDU