PA Inspection GuidelinesFor
Single Site Acceptance
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 2/18
© Nokia Siemens NetworksFor internal use only!
Page 1PA Certificate
Page 1 will be filled byDCC team, just leaveit
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 3/18
© Nokia Siemens NetworksFor internal use only!
Page 2Site Info & Google Earth Picture
Page 2 Contains dateof drive test, Site ID &Google picture
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 4/18
© Nokia Siemens NetworksFor internal use only!
Page 2.aSite Info & Google Earth Picture
Date of drive test mustbe filled & can bechecked on logfilecreated date.
Sites in this Polygonplease refer to thelatest SDB. When thesite’s not on air yet just
leave it blank.
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 5/18
© Nokia Siemens NetworksFor internal use only!
Page 2.bSite Info & Google Earth Picture
Put proporsional viewof google earth picturehere.
This picture mustshown the PA site & its
surrounding neighbor(at least the firs tier)
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 6/18
© Nokia Siemens NetworksFor internal use only!
Page 3Coverage Prediction and RxLevel Comparison
Page 3 Containssingle site coverageprediction & Overlaycomparison Picture
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 7/18 © Nokia Siemens NetworksFor internal use only!
Page 3.aCoverage Prediction and RxLevel Comparison
Put proportional view ofCoverage Prediction
When generatingprediction, the ranges
& colors must set to PAdefault ranges
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 8/18
© Nokia Siemens NetworksFor internal use only!
Page 3.bCoverage Prediction and RxLevel ComparisonThis is overlay betweencoverage prediction &RxLevel idle measresult.
All ranges must be as same as itused on covplot , so it comparable.
All ranges must be shown onlegend even when no data on it.
Also show Site ID & Site Name
Please be concerned on comparison :
Drive test result must as closed aspossible to the prediction
Check also the logfile in tems, makesure the partner not cheating
Use Tems Route Analysis to checkbinning validity
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 9/18
© Nokia Siemens NetworksFor internal use only!
Page 4Idle RxLevel & RxQuality Plot
Page 4 Contains IdleRxLevel andRxQuality Plot
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 10/18
© Nokia Siemens NetworksFor internal use only!
Page 4.aIdle RxLevel & RxQuality Plot
Put proportional viewof RxLevel Idle measresult
The plot must be assame as it shown on
overlay
All ranges must be shown onlegend even when no data on it.
Also show Site ID & Site Name
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 11/18
© Nokia Siemens NetworksFor internal use only!
Page 4.bIdle RxLevel & RxQuality Plot
Put proportional view ofRxQuality Plot
These are default ranges &colors for RxQuality Plot
All ranges must be shown onlegend even when no data on it.
Also show Site ID & Site Name
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 12/18
© Nokia Siemens NetworksFor internal use only!
Page 5Idle CI Plot & SQI Plot
Page 5 Contains IdleCI Plot & SQI Plot
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 13/18
© Nokia Siemens NetworksFor internal use only!
Put proportional view of IdleCI Plot
Colors For PA site, Sect1 CIis Red, Sec2 CI is Yellow &Sect3 CI is Green
Make sure there’s no swap
sectorMake sure that all sectorsserve on its beam correctly.
Fix CI Colors only for PA site.
Also show Site ID & Site Name
Page 5.aIdle CI Plot & SQI Plot
Site picture must belabeled with CI foreach sector
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 14/18
© Nokia Siemens NetworksFor internal use only!
Put proportional view of SQIPlot
Colors For PA site, Sect1 CIis Red, Sec2 CI is Yellow &Sect3 CI is Green
Make sure there’s no swap
sectorMake sure that all sectorsserve on its beam correctly.
Page 5.bIdle CI Plot & SQI Plot
These are default ranges &colors for SQI Plot
All ranges must be shown onlegend even when no data on it.
Also show Site ID & Site Name
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 15/18
© Nokia Siemens NetworksFor internal use only!
Page 6Drive test KPI & CI Samples Table
Page 5 Contains IdleCI Plot & SQI Plot
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 16/18
© Nokia Siemens NetworksFor internal use only!
Make sure all KPI arereached
Cross check each value onReached Column from filesthat attach on this PA
Check also the FTP test,make sure it’s a moving test
around the site using 1 MB fileand all sectors are covered (
use tems to check) .
FTP test are applicationthroughput, not RLCthroughput
Page 6.aDrive test KPI & CI Samples Table
For SQI ;
For samples contain only Full Rate(EFR/AMRFR), KPI to reach is “
>=28,80% “
For samples contain only Half Rate(HR/AMRHR), KPI to reach is “ >=20,80%
For Mix samples, KPI to reach is “>=20,90%
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 17/18
© Nokia Siemens NetworksFor internal use only!
All CI’s shown on plot
(page 5) must be listedin this table.
Make sure that PAsite has CI more than
200 samples eachsector.
Page 6.bDrive test KPI & CI Samples Table
8/4/2019 PA Inspection Guidelines
http://slidepdf.com/reader/full/pa-inspection-guidelines 18/18
© Nokia Siemens NetworksFor internal use only!
Page 7 onwardDefect
Page 7 onward mayContains defect for
justification