Page 1: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 1/18

1 © Nokia Siemens Networks

PA Inspection GuidelinesFor

Single Site Acceptance

Page 2: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 2/18

 © Nokia Siemens NetworksFor internal use only!

Page 1PA Certificate

Page 1 will be filled byDCC team, just leaveit

Page 3: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 3/18

 © Nokia Siemens NetworksFor internal use only!

Page 2Site Info & Google Earth Picture

Page 2 Contains dateof drive test, Site ID &Google picture

Page 4: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 4/18

 © Nokia Siemens NetworksFor internal use only!

Page 2.aSite Info & Google Earth Picture

Date of drive test mustbe filled & can bechecked on logfilecreated date.

Sites in this Polygonplease refer to thelatest SDB. When thesite’s not on air yet just

leave it blank.

Page 5: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 5/18

 © Nokia Siemens NetworksFor internal use only!

Page 2.bSite Info & Google Earth Picture

Put proporsional viewof google earth picturehere.

This picture mustshown the PA site & its

surrounding neighbor(at least the firs tier)

Page 6: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 6/18

 © Nokia Siemens NetworksFor internal use only!

Page 3Coverage Prediction and RxLevel Comparison

Page 3 Containssingle site coverageprediction & Overlaycomparison Picture

Page 7: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 7/18 © Nokia Siemens NetworksFor internal use only!

Page 3.aCoverage Prediction and RxLevel Comparison

Put proportional view ofCoverage Prediction

When generatingprediction, the ranges

& colors must set to PAdefault ranges

Page 8: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 8/18

 © Nokia Siemens NetworksFor internal use only!

Page 3.bCoverage Prediction and RxLevel ComparisonThis is overlay betweencoverage prediction &RxLevel idle measresult.

All ranges must be as same as itused on covplot , so it comparable.

All ranges must be shown onlegend even when no data on it.

Also show Site ID & Site Name

Please be concerned on comparison :

Drive test result must as closed aspossible to the prediction

Check also the logfile in tems, makesure the partner not cheating

Use Tems Route Analysis to checkbinning validity

Page 9: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 9/18

 © Nokia Siemens NetworksFor internal use only!

Page 4Idle RxLevel & RxQuality Plot

Page 4 Contains IdleRxLevel andRxQuality Plot

Page 10: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 10/18

 © Nokia Siemens NetworksFor internal use only!

Page 4.aIdle RxLevel & RxQuality Plot

Put proportional viewof RxLevel Idle measresult

The plot must be assame as it shown on

overlay

All ranges must be shown onlegend even when no data on it.

Also show Site ID & Site Name

Page 11: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 11/18

 © Nokia Siemens NetworksFor internal use only!

Page 4.bIdle RxLevel & RxQuality Plot

Put proportional view ofRxQuality Plot

These are default ranges &colors for RxQuality Plot

All ranges must be shown onlegend even when no data on it.

Also show Site ID & Site Name

Page 12: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 12/18

 © Nokia Siemens NetworksFor internal use only!

Page 5Idle CI Plot & SQI Plot

Page 5 Contains IdleCI Plot & SQI Plot

Page 13: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 13/18

 © Nokia Siemens NetworksFor internal use only!

Put proportional view of IdleCI Plot

Colors For PA site, Sect1 CIis Red, Sec2 CI is Yellow &Sect3 CI is Green

Make sure there’s no swap

sectorMake sure that all sectorsserve on its beam correctly.

Fix CI Colors only for PA site.

Also show Site ID & Site Name

Page 5.aIdle CI Plot & SQI Plot

Site picture must belabeled with CI foreach sector

Page 14: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 14/18

 © Nokia Siemens NetworksFor internal use only!

Put proportional view of SQIPlot

Colors For PA site, Sect1 CIis Red, Sec2 CI is Yellow &Sect3 CI is Green

Make sure there’s no swap

sectorMake sure that all sectorsserve on its beam correctly.

Page 5.bIdle CI Plot & SQI Plot

These are default ranges &colors for SQI Plot

All ranges must be shown onlegend even when no data on it.

Also show Site ID & Site Name

Page 15: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 15/18

 © Nokia Siemens NetworksFor internal use only!

Page 6Drive test KPI & CI Samples Table

Page 5 Contains IdleCI Plot & SQI Plot

Page 16: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 16/18

 © Nokia Siemens NetworksFor internal use only!

Make sure all KPI arereached

Cross check each value onReached Column from filesthat attach on this PA

Check also the FTP test,make sure it’s a moving test

around the site using 1 MB fileand all sectors are covered (

use tems to check) .

FTP test are applicationthroughput, not RLCthroughput

Page 6.aDrive test KPI & CI Samples Table

For SQI ;

For samples contain only Full Rate(EFR/AMRFR), KPI to reach is “

>=28,80% “ 

For samples contain only Half Rate(HR/AMRHR), KPI to reach is “ >=20,80% 

For Mix samples, KPI to reach is “>=20,90%

Page 17: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 17/18

 © Nokia Siemens NetworksFor internal use only!

 All CI’s shown on plot

(page 5) must be listedin this table.

Make sure that PAsite has CI more than

200 samples eachsector.

Page 6.bDrive test KPI & CI Samples Table

Page 18: PA Inspection Guidelines

8/4/2019 PA Inspection Guidelines

http://slidepdf.com/reader/full/pa-inspection-guidelines 18/18

 © Nokia Siemens NetworksFor internal use only!

Page 7 onwardDefect

Page 7 onward mayContains defect for

 justification