p. paolucci - i.n.f.n. di napoli 1 10-05-2006 / joint rpc-trigger meeting easy crate...

9
P. Paolucci - I.N.F.N. di Napoli 1 10-05-2006 / Joi nt RPC-Trigger m eeting EASY Crate board/ crate channel/ crate (max power) power/ crate # crate/r ack power/ rack # A3486 LV 3 36 (11 watt/ch) < 900* 1 < 900 1ch/ rack HV 4-5 24-30 (10 watt/ch) < 600** 3 < 1800 2ch/ rack A3486 AC/DC has 2 channels of 2 KW each * 3 boards with safety factor 2 ** 6 boards with safety factor 2

Upload: marshall-francis

Post on 17-Jan-2018

224 views

Category:

Documents


0 download

DESCRIPTION

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10  100% A3018 (T sens) 30/34  88% EASY crates 5/7  71% branch controllers 6 boards land to ALICE + 2 to the DT group

TRANSCRIPT

Page 1: P. Paolucci - I.N.F.N. di Napoli 1 10-05-2006 / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#

P. Paolucci - I.N.F.N. di Napoli1

10-05-2006 / Joint RPC-Trigger meeting

EASY Crate

board/crate channel/crate (max power)

power/crate # crate/rack power/rack # A3486

LV 3 36 (11 watt/ch) < 900* 1 < 900 1ch/rack

HV 4-5 24-30 (10 watt/ch) < 600** 3 < 1800 2ch/rack

A3486 AC/DC has 2 channels of 2 KW each

* 3 boards with safety factor 2** 6 boards with safety factor 2

Page 2: P. Paolucci - I.N.F.N. di Napoli 1 10-05-2006 / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#

P. Paolucci - I.N.F.N. di Napoli2

10-05-2006 / Joint RPC-Trigger meeting

EASY crate connection schema

Connector Cost Cable cost

48V power APP - 75A red/black + pin (14-8 awg) (2.1-8.2 mm2)

2.46 + 1.5 1 KW 2.5 (black) + 2.5 (red) + 3.0 (2 pins) = 8.0

48V service APP - 30A red/black + pin (16-12 awg) (1.5-4 mm2)

0.52 + 0.27

0.1 KW 0.52(black) + 0.52(red) + 0.54 (2 pins) = 1.58

EASY bus 50 pins flat cable 8.39 Flat 50 wires

Earth Fork 7mm 0.10

Page 3: P. Paolucci - I.N.F.N. di Napoli 1 10-05-2006 / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#

P. Paolucci - I.N.F.N. di Napoli3

10-05-2006 / Joint RPC-Trigger meeting

HV & LV status

DELIVERED AT BLG 90440/60 67% of the A3009 (LV) 6/40 15% A3512N (HV)10/10 100% A3018 (T sens)30/34 88% EASY crates5/7 71% branch controllers

6 boards land to ALICE + 2 to the DT group

Page 4: P. Paolucci - I.N.F.N. di Napoli 1 10-05-2006 / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#

P. Paolucci - I.N.F.N. di Napoli4

10-05-2006 / Joint RPC-Trigger meeting

BLG 904 test setup

Hardware and Software Test3 LV EASY Crate running 15 boards 180 channels 1 HV EASY Crate running 2 boards 12 channels

20 LV boards tested = 240 channels 2 broken (< 1%)2 HV boards tested = 12 channels OK

Board Temperature went up to 60 °C due to a bad air circulation. Now fixed and temperature around 40 °C

DCS is always running (see Giovanni Talk)LabVIEW (D. Lomidze) test program is under installation

for more than 900 hours

Page 5: P. Paolucci - I.N.F.N. di Napoli 1 10-05-2006 / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#

10-05-2006 / Joint RPC-Trigger meeting

P. Paolucci - I.N.F.N. di Napoli 5

HV

24 ch – HV - Barrel

HV HV HV

HV-LV schema for MTCC

MAJISTEHV service

Balcony Barack Detector

W+2

W+1

RPCLV

380 3-phase

triggerLV

RPCLV

triggerLV

LV

BCHV

SY1527

BCLV

BCLV

PP

servicecontrol

PP

MAORpc-dt

servicecontrol

HV multicond. 10 ch.

48 V - service

MAOrpc-dt

380 3-phase

HV

24 ch – HV - Endcap

HV HV HV

BCLV

Control cable

Page 6: P. Paolucci - I.N.F.N. di Napoli 1 10-05-2006 / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#

P. Paolucci - I.N.F.N. di Napoli6

10-05-2006 / Joint RPC-Trigger meeting

MTCC status

LV hardware is ready for Barrel and Endcap HV hardware ready for May the 22th

LV LB hardware now at blg 904

LV EASY crates installation on the balconies started on May the 9th.

Crate insertion in the rack is difficultNo space around the racks

Balcony barrack 3-phase installation is underway

Page 7: P. Paolucci - I.N.F.N. di Napoli 1 10-05-2006 / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#

P. Paolucci - I.N.F.N. di Napoli7

10-05-2006 / Joint RPC-Trigger meeting

MTCC status

HV multicond. cables 3 barrel cables are ready and have been tested by myself at CPE 2 endcap cables are in construction at CPE They will be sent at CERN on May 12th to be installed on May 22th

Local EASY cables will be ready for May 22th

Service and Control long cables ready on May 22th

Page 8: P. Paolucci - I.N.F.N. di Napoli 1 10-05-2006 / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#

P. Paolucci - I.N.F.N. di Napoli8

10-05-2006 / Joint RPC-Trigger meeting

MTCC status

Page 9: P. Paolucci - I.N.F.N. di Napoli 1 10-05-2006 / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#

P. Paolucci - I.N.F.N. di Napoli9

10-05-2006 / Joint RPC-Trigger meeting

To be done

LV hardware is ready for Barrel and Endcap HV hardware ready for May the 22th

LV EASY crates installation on the balconies started on May the 9th.

Crate insertion in the rack is difficultNo space around the racks

Balcony barrack 3-phase installation is underway DCS is almost ready (Condition DB fixing)