Determining the Significant Aspects
EPA Regions 9 & 10and
The Federal Network for Sustainability
![Page 2: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/2.jpg)
2
Objectives
After this discussion, you should :• Describe the importance of significant
environmental aspects for your EMS.• Describe factors to consider in evaluating
the significance of environmental aspects and impacts.
![Page 3: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/3.jpg)
3
Overview
• Definition• EMS Requirements• Risk Assessment• Decision Matrices
![Page 4: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/4.jpg)
4
Definition• A significant environmental aspect is an
environmental aspect that has or can have a significant environmental impact.
• Significance could be tied to:– Environmental concerns– Natural resource concerns– Regulatory or legal exposure– Business or mission concerns– Concerns of interested parties
![Page 5: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/5.jpg)
5
EMS Requirements
• ISO 14001 uses “significant” aspects and impacts as the basis for developing objectives and preparing programs.
• The facility determines which aspects and impacts are “significant.”
• The EMS must address all significant aspects.
![Page 6: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/6.jpg)
6
Considerations for Determining Significance
• Legal and other requirement• Toxicity• Consequence / Magnitude • Risk / Likelihood• Sustainable• Others
![Page 7: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/7.jpg)
7
Several Methods for Determining Significance
• Risk Assessment• Decision Matrices• Significance Set by Management
![Page 8: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/8.jpg)
8
Risk Assessment
• Risk assessment is a tool used by managers to provide information for decision making.
• Risk assessment may be formal or informal, but it is always there.
![Page 9: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/9.jpg)
9
Risk Management
• Risk management addresses unacceptable risk.
• Residual risk is the unidentified risk plus any acceptable, identified risk remaining after risk management.
![Page 10: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/10.jpg)
10
Characterizing Risk
• Exposure - How big of a problem is it?– Global, regional, local?
• Severity - How bad will it get?• Probability - How likely is it to occur?
– Daily, weekly, monthly, annually, in emergencies, only when a certain event happens, when a new project starts?
![Page 11: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/11.jpg)
11
Risk Assessment
• Estimate exposure, severity, and probability for each aspect
• Prepare relative rank for each aspect• Compare ranking to determine significance
![Page 12: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/12.jpg)
12
Not real data. Scale of 1 to 5 used with 1 being low and 5 high. Numbers were multiplied to give totals. No weighting factors used.
Risk Assessment Example
Aspect Exposure Severity Probability Total
Vehicle exhaust 4 2 3 24
Hazardous waste 1 4 2 8
Food waste 3 1 2 6
![Page 13: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/13.jpg)
13
Decision Matrices
• A decision matrix is a tool used to quantify a risk assessment
• Identify key criteria• Determine relative ranking• Evaluate significance
![Page 14: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/14.jpg)
14
Key Criteria for Significance
• Environmental impact• Health & safety• Regulatory or Executive Order requirement• Cost• Mission impact• Environmental policy commitments• Community impact
![Page 15: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/15.jpg)
15
Decision Matrix Example
National data. Scale of 1 to 5 used with 1 being low and 5 high. Numbers were added to give totals. No weighting factors used.
Aspect Env.Imp H&S Cost of Change
Mission Comm. Total
Vehicle exhaust
3 2 -1 1 3 8
Hazardous waste
4 3 -2 2 2 9
Food waste
1 1 -1 1 1 3
![Page 16: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/16.jpg)
16
Significance May Be Defined by Management
• Environmental Goals• Management Priorities
![Page 17: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/17.jpg)
17
Determining Significance
• Risk Assessment and Decision Matrices are only suggestions
• Refer to your agency’s risk management procedures
• Establish a procedure and stick with it• Make a list of significant aspects and the
impacts associated with them
![Page 18: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/18.jpg)
18
Where Do Significant Aspects Fit in Your EMS?
• EMS manages your significant aspects, impacts• Objectives and targets for your significant aspects shall
be considered• Employees need to be aware of significant
environmental aspects of their jobs• Organizations shall consider processes for external
communication of significant aspects and document decision
• Organization shall have procedures to monitor operations & activities that can have signif. impact(s)
![Page 19: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/19.jpg)
19
Summary
• Significant aspects are defined based on facility-specific criteria
• A formal procedure is used to evaluate significance
• Preparing a list of significant aspects is a big part of an EMS
![Page 20: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/20.jpg)
20
Exercise 4: Determining significant Aspects
Potential factors– severity– probability/frequency– risk (environmental/
health/financial)– toxicity
– external concerns– ability to control/
influence/investigate– duration– regulatory concern
Use reproducible methodology; e.g., rank using a formula containing factors the organization considers important
![Page 21: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/21.jpg)
21
Examples of Factor RatingsSeverity
• 5 Catastrophic• 4 High• 3 Moderate• 2 Low• 1 Slight• 0 Positive Impact
Regulatory Importance
• 5 Current violation• 4 Non-compliance, past
3 yrs• 3 Non-compliance, past
5 yrs• 2 In compliance• 1 Below regulatory cut-off• 0 Unregulated
![Page 22: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/22.jpg)
22
Examples of Factor Ratings
Probability
• 5 Certainty• 4 Likely• 3 So/So• 2 Unlikely• 1 Very unlikely
Potential for Increased Control
• 5 High, with cost savings• 4 High at low cost• 3 Moderate • 2 Low• 1 Low and very costly
![Page 23: p 19 Significant Aspects](https://reader034.vdocuments.us/reader034/viewer/2022051521/577ccf1f1a28ab9e788eec74/html5/thumbnails/23.jpg)
23
Example of Rating Scheme
Significance =
(Severity + RI + Prob) Control