Page 1: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALSAUSTRALIAN COPPER CONFERENCE

March 2010WWW.OZMINERALS.COM

Page 2: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 2

DISCLAIMER

This presentation has been prepared by OZ Minerals Limited (“OZ Minerals”) and consists of written materials/slides for a presentation concerning OZ Minerals. By reviewing/attending this presentation, you agree to be bound by the following conditions.

No representation or warranty, express or implied, is made as to the fairness, accuracy, or completeness of the information, contained in the presentation or of the views, opinions and conclusions contained in this material. To the maximum extent permitted by law, OZ Minerals and its related bodies corporate and affiliates, and its respective directors, officers, employees, agents and advisers disclaim any liability (including, without limitation any liability arising from fault or negligence) for any loss or damage arising from any use of this material or its contents, including any error or omission there from, or otherwise arising in connection with it.

Some statements in this presentation relate to the future and are forward looking statements. Such statements may include, but are not limited to, statements with regard to intention, capacity, future production and grades, projections for sales growth, estimated revenues and reserves, targets for cost savings, the construction cost of new projects, projected capital expenditures, the timing of new projects, future cash flow and debt levels, the outlook for minerals and metals prices, the outlook for economic recovery and trends in the trading environment and may be (but are not necessarily) identified by the use of phrases such as “will”, “expect”, “anticipate”, “believe” and “envisage”. By their nature, forward-looking statements involve risk and uncertainty because they relate to events and depend on circumstances that will occur in the future and may be outside OZ Mineral’s control. Actual results and developments may differ materially from those expressed or implied in such statements because of a number of factors, including levels of demand and market prices, the ability to produce and transport products profitably, the impact of foreign currency exchange rates on market prices and operating costs, operational problems, political uncertainty and economic conditions in relevant areas of the world, the actions of competitors, activities by governmental authorities such as changes in taxation or regulation.

Given these risks and uncertainties, undue reliance should not be placed on forward-looking statements and intentions which speak only as at the date of the presentation. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, OZ Minerals does not undertake any obligation to publicly release any updates or revisions to any forward looking statements contained in this presentation, whether as a result of any change in OZ Minerals expectations in relation to them, or any change in events, conditions or circumstances on which any such statement is based.

Certain statistical and other information included in this presentation is sourced from publicly available third party sources and has not been independently verified.

Page 3: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 3

OUTLINE

1. OZ Minerals – the strategy

2. Why copper?

3. Prominent Hill - the advantages

Page 4: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 4

Prominent Hill copper-gold

operation

Operation

Headquarters

AUSTRALIA

Cambodia

Exploration

Australia68%

UK12%

Europe2%

Other4%

N America9%

Asia5%

Institutions: 60%. Retail: 40%

• Code: OZL, S&P ASX 100• Market capitalisation: A$3.6 billion• 3,121m issued shares• Average turnover 25 million shares/day• Prominent Hill open-pit copper-gold operation

• Underground feasibility study underway• Significant exploration potential

• Advanced gold exploration project in Cambodia• Global regional exploration • A$1,076.3m cash at 31 December 2009.

105,600 shareholders

OZ MINERALS: SNAPSHOT

Page 5: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 5

STRATEGY

ZERO HARM

FOUNDATION BUILT ON GOVERNANCE

SUPERIOR TOTALSHAREHOLDER RETURNS

FOCUS ON COPPER

MAXIMISE POTENTIAL OF ASSETS

BUILD A PROJECT PIPELINE

INVEST IN EXPLORATION

DISCIPLINED CAPITAL

MANAGEMENT

Page 6: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 6OZ MINERALS • NOVEMBER 2009 • PAGE 6

WHY COPPER?

Page 7: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 7

COPPER – OUT SHINES ON MOST CRITERIA

Source: MEG, OZ Minerals

Demand Mine Supply Opportunities - US$200 M EBITDA

Commodity DemandFundamentals

Substitution China SelfSufficiency

2009Cutbacks

AnnualProduction, t or oz (spot)

No. operatingprojects at orabove required production rate

No. identifiedprojects at or above required production rate

Copper Good Low 19% 10% 50,000 83 49

Zinc Good Low 90% 24% 400,000 3 1

Nickel Good Medium 28% 25% 28,000 19 20

Gold Fair Low 84% 430,000 43 17

Uranium Good No 50% 3,000 5 8

HG Iron Ore Good No 44% 16% 5,000,000 30 18

Potash Good No 26% 27% 1,000,000 >20

The OZ Minerals commodity ‘Traffic Light’ table

Page 8: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 8

COPPER DEMAND – ON OUR DOORSTEP

Source: Macquarie Source: Macquarie

-2,000

-1,500

-1,000

-500

0

500

1,000

1,500

2,000

2009e 2010f 2011f 2012f 2013f 2014f 2015f

'000

tonn

es

-2,000

-1,500

-1,000

-500

0

500

1,000

1,500

2,000

USA Europe Japan China Other Asia Other World

Year-on-year Copper Demand Growth by Region Copper consumption per capita since 1950

Page 9: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 9

SUPPLY CHALLENGES: NEW PROJECTS

Source: Teck

Annual AnnualProject Kt Cu Ore Mt CuEQ Project Kt Cu Ore Mt CuEQ%Oyu Tolgoi 555 3,495 1.11 Bougainville 150 1,064 0.49La Granja 500 2,770 0.54 Kingking 134 555 0.65Panantza/San Carlos 340 678 065 Cerro Casale 130 887 0.48

Reko Diq 340 4,116 062 Freida River 110 840 0.64Tampakan 300 2,180 0.68 Casino 100 914 0.44Las Bambas 285 1,132 0.88 Ambler 100 29 6.11Michiquillay 250 728 0.78 Canariaco 100 518 0.42Pachon 215 1,380 0.68 Minas Congas 70 618 0.54Resolution 200 1,341 1.71 Mirador 63 347 0.67Aynak 200 240 2.30 Haquira 50 630 0.58Galore Creek 200 1,143 0.60 Marcapunta 114 2.06Cerro Colarado (Panama) 200 1,886 0.76 Altar 947 0.46

Pebble 0.6 CuEq 200 4,250 0.89 Los Azules 843 0.53

Petaquilla 190 986 0.57 Kerr-Sulphurets

1,293 0.54

El Galeno 190 884 0.53 Tantahuatay 386 0.93

Agua Rica 165 1,179 0.78 Mesaba 1,100 0.58Rio Blanco 160 1,707 0.64 Birch Lake 555 1.15Vizcachitas 150 1,133 0.42 Nokomis 734 1.22Junin 150 1,360 0.89

Total 5.8 Mt

Page 10: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 10

Majority of new projects in riskier domains

Future Copper Production - Jurisdiction Balance

0%

10%

20%

30%

40%

50%

60%

70%

80%

LOW MEDIUM HIGH

Control Risk - Risk Assignment

% o

f Pro

duct

ion

Current Production

New Projects

SUPPLY CHALLENGES: CHANGING JURISDICTIONS

Source, Control Risk, CRU, Teck

Page 11: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 11

SUPPLY CHALLENGES: GRADES ARE DECLINING

New projects - grade v tonnes

0.00%0.20%0.40%0.60%0.80%1.00%1.20%1.40%1.60%1.80%2.00%2.20%2.40%2.60%2.80%3.00%

0 1,000 2,000 3,000 4,000 5,000 6,000

Cumulative annual production ktpa copper equivalent

Copp

er E

quiv

alen

t %

1/3 projected annual production @ <0.6% copper equivalent

Source: Teck

Page 12: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 12

MORE OPPORTUNITIES IN COPPER

Source: OZ Minerals

The probabilities of achieving a material business for OZ Minerals are much higher in copper as there are significantly more operations producing >50ktpa compared to other commodities.

THE BASE METALS BALANCE: GRADE-TONNAGE-EBITDA RELATIONSHIPS

Size of circles is proportional to EBITDA:

US$200 M

US$1 B

Page 13: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 13

COPPER OPPORTUNITIES – SUITABLE SCALE FOR OZ MINERALS− 50-150ktpa copper mines are often too small for the major companies but have significant technical, financial and marketing

challenges for smaller companies. − 50-150ktpa represents a “Window of Opportunity” for a company of OZ Minerals’ size and capability. Not a lot of other

companies compete in this space.− Porphyry and IOCG deposits dominate this window and are hence the main exploration and acquisition targets.

Source: OZ Minerals

GLOBAL COPPER DEPOSITS – EBITDA VS PRODUCTION

Major Companies

OZ MineralsWindow of

Opportunity

Page 14: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 14

$0.00

$0.01

$0.02

$0.03

$0.04

$0.05

$0.06

$0.07

$0.08

Cu-Au Project #1 -PFS Level

Cu Project #2 - BFSLevel

Cu-Au Project #3 -PFS Level

Cu-Au Project #4 -BFS Level

US$

per

Res

ourc

e lb

Purchase Price Premium per lb

Study NPV per lb @ Cu US$2-2.20

Long-term Price Forecast –US$2.20/LB ($2010), 2.65/LB ($2016)

Dec2009

2010 2010 2010

STRONG OUTLOOK SUPPORTED

Source: OZ Minerals Source: Macquarie

0

50

100

150

200

250

300

350

400

450

500

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000

Cumulative Average Copper Production (kt/a)

B

r

e

a

ke

v

e

n

C

opp

e

r

P

ri

ce

(

c

/

l

b

) 15%IRR

Incentive prices for new copper supply

Copper transactions - last 6 monthsLong Term Price Premium

Page 15: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 15OZ MINERALS • NOVEMBER 2009 • PAGE 15

THE PROMINENT HILL ADVANTAGE

Page 16: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 16

PROMINENT HILL – SUCCESSFUL RAMP-UP NOW IN FULL PRODUCTIONLocation: South Australia, Australia.

Ownership: 100%.

Status: Ramp-up completed.

Copper-gold resources:

189.7Mt @ 1.32% Cu, 0.5g/t Au (2.5Mt Cu, 2.9 Moz Au)

Strip ratio: 5-6:1 (waste to ore, tonnes basis)

Plant: 8.8Mtpa crush, grind, flotation.

Production 2009:

96,310t contained copper, 75,535oz gold.

Production 2010-2012

100,000t to 110,000t contained copper,80,000oz to 90,000oz gold

C1 costs 2010E: US$0.85 – US$0.95/lb

Workforce: 600 (including contractors)

Reserves: 75.7Mt @ 1.19% Cu, 0.59g/t Au (0.9Mt Cu, 1.4Moz Au)

Gold only resources:

78.8Mt @ 0.06% Cu, 1.4g/t Au (0.05Mt Cu, 3.4Moz Au)

Mine: 45Mtpa open pit, mining contractor Thiess

Product: High grade (+50% Cu), high quality, copper concentrate.

Estimated mine life:

8 years remaining for Stage 1 open pit. Potential underground capable of supporting mine life and throughput expansion.

Page 17: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 17

PROMINENT HILL UNDERGROUND FEASIBILITY STUDY – UPDATE Q2 2010

Selected Infill Drilling where sites allow – otherwise, more drilling west

and east, along strike

? ?

? ?

In progress Q1 2010

Proposed for 2010

2200 mplanned

2700m4000m

4000m4000m

4000m

4000m4000m

2700m

ExtensionDiamond Drilling

ExtensionDiamond Drilling

Proposed for 2010

?

Extension and InfillDiamond Drilling –

28,000m drilled to date

Completed in 2009

Western copper deposit Main underground deposit

Page 18: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 18

PROMINENT HILL SITE

TAILINGS DAM

PIT

ROM PAD

PROCESSING PLANT

VILLAGE

WESTERN COPPER ZONE

AREA

NORTHERN WASTE DUMP

SOUTHERN WASTE DUMP

Page 19: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 19

PROMINENT HILL CONCENTRATES: COMPETITIVE ADVANTAGES

Highest grade copper concentrate traded on the open market

– Cu levels globally declining– Lower freight/handling costs

per unit/metal– Less slag per unit of metal

Low impurities (As, Bi, Hg, Zn/Pb) – Helps smelters’ blending– Arsenic levels globally rising– Contained U&F manageable

Short transit time– Two weeks to major custom

smelters in Asia– Planning certainty for

customersSource: OZ Minerals

Trad ed C oncent rat es f rom mines in C ont inent s ind icat ed

0 10 20 30 40 50 60

Australia

Australia

South America

Australia

South America

Australia

South America

Australia

South America

Asia

Asia

Asia

Asia

Prominent Hill

Page 20: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 20

CUSTOM SMELTERS ON OUR DOORSTEP

China, 6

Japan, 4.5

Sth Korea, 1.5

India, 2.1

Philippines, 0.5

Year 2008: Major custom smelters, Asia. Actual concentrates demand [Millions tonnes pa]

Year 2014: Major custom smelters, Asia. Forecast concentrates demand [Millions tonnes pa]

Total smelter production in Asia approx 9.6mt contained Cu

Total smelter production in Asia approx 6.6mt contained Cu

Source: CRU 2009

China, 12

Japan, 4.8

Sth Korea, 1.6

India, 3.2

Philippines, 0.65

Page 21: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 21

PROMINENT HILL HIGH REGIONAL PROSPECTIVITY

− Large 100% owned, under-explored tenement holding, highly prospective for IOCG deposits

− Now drilling targets

− Several broad zones of IOCG-style alteration systems intersected with low-grade mineralisation.

− Heads of Agreement with IMX Resources* extends available exploration area to 7,000km2.

− 51% stake with potential to increase.

− Secures most of Mt Woods Inlier. Total IMX area of 3208 Sq Km

* Subject to joint venture agreement

Page 22: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 22

INDUCED POLARISATION (IP) - TEST PROGRAM

Purple Lines - inline and offset dipole-dipole test lines over the Western Copper Zone.

Blue Lines - inline dipole-dipole and pole-dipole test lines over selected exploration prospects.

Western Copper Zone

Caliban

Triton

Proteus

Larissa

Neptune

Prominent Hill

Nichol Well

Page 23: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 23

INDUCED POLARISATION (IP) -CALIBAN PROSPECT

6.3

4.5

8.0

2.8

1.0

-400mRL

0mRL

-200RL

50mRL

6711000mE 6711400mE 6711800mE

6711000mNDD07CAL006 DD08CAL007 DD08CAL008

6711400mN 6711400mN

Induced Polarisation – Inverted chargeability cross-section

Lower grade copper intersections.(up to 0.5%)

Both zones appear as defined

chargeable highs in IP survey

above.

Page 24: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 24

EARLY DRILL RESULTS - SOME ENCOURAGEMENT

Triton Prospect

DD09TR1006 182.8 m @ 0.25% Cu from 261m

including 75 m @ 0.39% Cu from 261m

including 15 m @ 0.53% Cu from 428m

Nichol Well Prospect

DD09NWL001 115.6 m @ 0.16% Cu from 149.4m

including 71 m @ 0.16% Cu from 149.4m

including 19.3m @ 0.21% Cu from 231.7m

Page 25: OZ MINERALS AUSTRALIAN COPPER CONFERENCE · 3/25/2010  · OZ MINERALS • PAGE 8 COPPER DEMAND – ON OUR DOORSTEP Source: Macquarie Source: Macquarie -2,000-1,500-1,000-500 0 500

OZ MINERALS • PAGE 25

THE PROMINENT HILL ADVANTAGE

• Good jurisdiction• Quality asset• Preferred commodity – growing market• High quality product• Favourable logistics• Significant exploration potential