oxford final sign-off check list
TRANSCRIPT
-
8/3/2019 Oxford Final Sign-Off Check List
1/4
B6 Oxford final sign-off check list
Barrel Check that all bolts and other mechanical fixings are glued in
place with loctite (a removable rad-
hard adhesive)
Not done
Verify that no loose objects are
inside the barrel/service cages.
Done
Service cages Check that all boxes are properly
secured and all screws are tight
inside the earthing ring. Check thatno loose DCS sensor cables are
hanging out of their slots.
Done
Harnesses Disconnect fibres, fit each MT12connector with protective cap and
carefully coil fibres in boxes,
taking care that nothing is sticking
out of the lid.
Done
Shorting cards are mounted on
TPPs with all connectors properly
attached.
Done
Check visually that all harnesses
are properly insulated from the
barrel structure (have kapton at theclamping at the barrel ends).
Not done (no problems found during testing)
-
8/3/2019 Oxford Final Sign-Off Check List
2/4
DCS Check all temperature sensors for
swaps. If a swap is found the
sensors should be swapped in the
JST connector on the service cages.
No swaps on B6
Secure all screws on the cooling
temperature sensor clips with
Loctite. Make sure that the wires to
these sensors cannot touch any
modules. Glue down if necessary.
Not done
Publish calibrations for all sensors
on barrel on the web.
Not yet done
FSI Before shipping check that no FSI
ribbon has been damaged on the
spools during the assembly.
One fibre ribbon damaged at RAL
Cooling Close of all cooling loops at theend with Metrulok blanking pieces.Should we leave capillaries on?
Done. Capillaries left in place
Modules All modules have been electrically
tested (incl. HV). Test results arepublicly accessible.
Done
Check that no module connector is
exceeding the envelope of the
particular barrel.
Not done. No template available
Shipping Barrel
-
8/3/2019 Oxford Final Sign-Off Check List
3/4
Closing transport
boxes.
Install the ShockLogChange both batteries and only install at
the last moment. It has a 10-day life.
Once ShockLog is in place, avoid
knocks and bangs around the barrel (e.g.floor).
Done
Install roof panels first.Someone holds a gloved hand below each
corner piece when screw is inserted and
tightened in the upper part.
Done
Make sure that all ground straps are
properly connected.
Removed bottom straps to enable insertion into outer box
Secure brass inserts in corner
pieces with tape so that they cannot
fall into the container.
Secured with glue
Carry out final visual inspection
before service cage ends are closed.
Done
Mark one end of inner box with a
sign indicating Z (gearbox) end.
Not done. Gearbox end is coming out last out of outer container.
Wrap inner box Done
After installing inner box in outer,
check that inner box rails are fixed
into outer box saddles. (Screwsshould be M6 or bigger).
Done
Take care with installation of the
outer box panels. These were a
difficult fit on B3 and one mustavoid shocks to the barrel.
Nitrogen system, if used. Needs
specification
Not used
-
8/3/2019 Oxford Final Sign-Off Check List
4/4
General Make sure that any written
documentation about the barrel is
passed on to CERN.
Working on it.