To view the slide show the press the left mouse button or the arrows keys on your keyboard to proceed through the slides. Welcome to Bid List Connection Slide Show presentation to explain how a bond might get processed in the bidding process. - PowerPoint PPT PresentationTRANSCRIPT
1
North Coast Surety North Coast Surety
Welcome to Bid List Connection Slide Show presentation to explain how a bond might get processed in the bidding process.
This explanation is in English. The technical version entails the use of wrappers, verification and integration protocols, and a host of other
elements that are beyond the author of this presentation. One of the goals of this effort is to explain in layman terms what the various programmers
along the communication path need to envision as a collective goal.
To view the slide show the press the left mouse button or the arrows keys on your keyboard to proceed through the slides.
2
North Coast Surety North Coast Surety
This is Part III is a series, and viewers should be acquainted with parts I & II to understand what XML is, and an overview of the flow of data.
Owner
Contractor
Surety Agent
Surety Company
Data Processing
3
North Coast Surety North Coast Surety
Contractor
Project Name.XML from www.caltrans.com
Step One-The Download File
Contractor saves the downloaded file in the directory they have selected to hold downloads.
4
North Coast Surety North Coast Surety
Start:aecXML
<Project Description> Highway 1 Tunnel<Project Description/>
<Project IFB> 04-12345<Project IFB/>
<Bid Date> 082501 <Bid Date/>
<Owner> Caltrans<Owner/>
<Architect> Caltrans <Architect/>
<Engineers Estimate> 10000000<Engineers Estimate/>
<Time for Completion> 365 <Time for Completion/>
<Liquidated Damages> 1000 <Liquidated Damages/>
<Bid Bond Form Number> 04-12345BB <Bid Bond Form Number/>
<Project URL>www.caltrans.gov/projects/04-12345<Project URL/>
<Bid Bond Return>www.caltrans.gov/projects/04-12345/bidbond<Bid Bond Return/>
End:aecXML
Step One-The Download File
The downloaded file contains an industry standard XML script that contains the basic
project information.
5
North Coast Surety North Coast Surety
Start:aecXML
<Project Description> Highway 1 Tunnel<Project Description/>
<Project IFB> 04-12345<Project IFB/>
<Bid Date> 082501 <Bid Date/>
<Owner> Caltrans<Owner/>
<Architect> Caltrans <Architect/>
<Engineers Estimate> 10000000<Engineers Estimate/>
<Time for Completion> 365 <Time for Completion/>
<Liquidated Damages> 1000 <Liquidated Damages/>
<Bid Bond Form Number> 04-12345BB <Bid Bond Form Number/>
<Project URL>www.caltrans.gov/projects/04-12345<Project URL/>
<Bid Bond Return>www.caltrans.gov/projects/04-12345/bidbond<Bid Bond Return/>
End:aecXML
Step One-The Download File
The downloaded file contains an address that links future viewers to the project specific
location on the owners website
6
North Coast Surety North Coast Surety
Start:aecXML
<Project Description> Highway 1 Tunnel<Project Description/>
<Project IFB> 04-12345<Project IFB/>
<Bid Date> 082501 <Bid Date/>
<Owner> Caltrans<Owner/>
<Architect> Caltrans <Architect/>
<Engineers Estimate> 10000000<Engineers Estimate/>
<Time for Completion> 365 <Time for Completion/>
<Liquidated Damages> 1000 <Liquidated Damages/>
<Bid Bond Form Number> 04-12345BB <Bid Bond Form Number/>
<Project URL>www.caltrans.gov/projects/04-12345<Project URL/>
<Bid Bond Return>www.caltrans.gov/projects/04-12345/bidbond<Bid Bond Return/>
End:aecXML
Step One-The Download File
The downloaded file contains an address that provides the project specific internet address that the owner has established to ultimately receive
the electronic bid bond.
7
North Coast Surety North Coast Surety
Start:aecXML
<Project Description> Highway 1 Tunnel<Project Description/>
<Project IFB> 04-12345<Project IFB/>
<Bid Date> 082501 <Bid Date/>
<Owner> Caltrans<Owner/>
<Architect> Caltrans <Architect/>
<Engineers Estimate> 10000000<Engineers Estimate/>
<Time for Completion> 365 <Time for Completion/>
<Liquidated Damages> 1000 <Liquidated Damages/>
<Bid Bond Form Number> 04-12345BB <Bid Bond Form Number/>
<Project URL>www.caltrans.gov/projects/04-12345<Project URL/>
<Bid Bond Return>www.caltrans.gov/projects/04-12345/bidbond<Bid Bond Return/>
End:aecXML
Step Two-The Import of Download File
Contractor imports the data into Bid List Connection, or any other application that can process the data.
8
North Coast Surety North Coast Surety
Step Three
Once contractor has imported the data from the download file they complete the remaining fields in the project information panel
9
North Coast Surety North Coast Surety
Step Four- Electronic Bid Request
Contractor sends electronic bid request to surety agent, with digital signature. It is the beginning of an electronic bid document.
10
North Coast Surety North Coast Surety
Start:aecXML
<Project Description> Highway 1 Tunnel<Project Description/>
<Project IFB> 04-12345<Project IFB/>
<Bid Date> 082501 <Bid Date/>
<Owner> Caltrans<Owner/>
<Architect> Caltrans <Architect/>
<Engineers Estimate> 10000000<Engineers Estimate/>
<Time for Completion> 365 <Time for Completion/>
<Liquidated Damages> 1000 <Liquidated Damages/>
<Bid Bond Form Number> 04-12345BB <Bid Bond Form Number/>
<Project URL>www.caltrans.gov/projects/04-12345<Project URL/>
<Bid Bond Return>www.caltrans.gov/projects/04-12345/bidbond<Bid Bond Return/>
<Construction Company>Under the Hill Construction<Construction Company/>
<Estimator>Bob Jones<Estimator/>
<Bidding Office>San Francisco<Bidding Office/>
<Bond Signer>Larry Williams<Bond Signer/>
< Principle Electronic Signature>DFG456787FDGREE344dfRR< Principle Electronic Signature/>
< Principle Verification Certificate >XRTV34RDR78FD34DS< Principle Verification Certificate/>
End:aecXML
Step Four- Electronic Bid Request
The data now includes both the original information from the owners download file and the data added by the contractor.
Contractors D
ataO
wners D
ata
11
North Coast Surety North Coast Surety
Owner
Contractor
Surety Agent
Surety Company
Start:aecXML
<Project Description> Highway 1 Tunnel<Project Description/>
<Project IFB> 04-12345<Project IFB/>
<Bid Date> 082501 <Bid Date/>
<Owner> Caltrans<Owner/>
<Architect> Caltrans <Architect/>
<Engineers Estimate> 10000000<Engineers Estimate/>
<Time for Completion> 365 <Time for Completion/>
<Liquidated Damages> 1000 <Liquidated Damages/>
<Bid Bond Form Number> 04-12345BB <Bid Bond Form Number/>
<Project URL>www.caltrans.gov/projects/04-12345<Project URL/>
<Bid Bond Return>www.caltrans.gov/projects/04-12345/bidbond<Bid Bond Return/>
<Construction Company>Under the Hill Construction<Construction Company/>
<Estimator>Bob Jones<Estimator/>
<Bidding Office>San Francisco<Bidding Office/>
<Bond Signer>Larry Williams<Bond Signer/>
< Principle Electronic Signature>DFG456787FDGREE344dfRR< Principle Electronic Signature/>
< Principle Verification Certificate >XRTV34RDR78FD34DS< Principle Verification Certificate/>
End:aecXML
Step Four- Electronic Bid Request
Because the bid bond request is from the contractors computer a digital signature can be added, with certification.
12
North Coast Surety North Coast Surety
Start:aecXML
<Project Description> Highway 1 Tunnel<Project Description/>
<Project IFB> 04-12345<Project IFB/>
<Bid Date> 082501 <Bid Date/>
<Owner> Caltrans<Owner/>
<Architect> Caltrans <Architect/>
<Engineers Estimate> 10000000<Engineers Estimate/>
<Time for Completion> 365 <Time for Completion/>
<Liquidated Damages> 1000 <Liquidated Damages/>
<Bid Bond Form Number> 04-12345BB <Bid Bond Form Number/>
<Project URL>www.caltrans.gov/projects/04-12345<Project URL/>
<Bid Bond Return>www.caltrans.gov/projects/04-12345/bidbond<Bid Bond Return/>
<Construction Company>Under the Hill Construction<Construction Company/>
<Estimator>Bob Jones<Estimator/>
<Bidding Office>San Francisco<Bidding Office/>
<Bond Signer>Larry Williams<Bond Signer/>
<Principle Electronic Signature>DFG456787FDGREE344dfRR< Principle Electronic Signature/>
< Principle Verification Certificate >XRTVT345GR78FD34DS< Principle Verification Certificate/>
<Surety Agency>North Coast Surety Insurance Services, Inc.<Surety Agency/>
<Agency Code>NCS1239<Agency Code/>
<Authorizing Agent>K. Dixon Wright<Authorizing Agent/>
<Approval Status>Approved under existing Program<Approval Status/>
<Principle ID>U12345<Principle ID/>
<Principle Backlog>10000000<Principle Backlog/>
<Agent Electronic Signature>DFG456787FDGREE344dfRR< Agent Electronic Signature/>
< Agent Verification Certificate >XRTVT345GR78FD34DS< Agent Verification Certificate/>
End:aecXML
Step Five-The Agent Processes Request
The surety agent processes the bid request, adds its digital signature, with certification. The resulting XML file contains the project data, with both the contractors and the agents signature.
Agents D
ataO
wners and C
ontractors data
13
North Coast Surety North Coast Surety
Step Five-The Agent Processes Request
The data is received by the surety company. The agent is authorized to issue the bid bond. The record of the bonds issuance is maintained by the surety.
Owner
Contractor
Surety Agent
Surety Company
14
North Coast Surety North Coast Surety
Owner
Contractor
Surety Agent
Surety Company
From Surety Agent to Caltrans: www.caltrans.gov/projects/04-12345/bidbondStart:aecXML<Project Description> Highway 1 Tunnel<Project Description/><Project IFB> 04-12345<Project IFB/> <Bid Date> 082501 <Bid Date/> <Bid Bond Form Number> 04-12345BB <Bid Bond Form Number/><Construction Company>Under the Hill Construction<Construction Company/><Bond Signer>Larry Williams<Bond Signer/><Principle Electronic Signature>DFG456787FDGREE344dfRR< Principle Electronic Signature/>< Principle Verification Certificate >XRTVT345GR78FD34DS< Principle Verification Certificate/><Surety Electronic Signature>DFG456787FDGREE344dfRR< Surety Electronic Signature/>< Surety Verification Certificate >XRTVT345GR78FD34DS< Surety Verification Certificate/>< Surety NAIC Code >1239499< Surety NAIC Code /> End:aecXML
Step Six-The Agent Transmits Bid Bond
Agent transmits just the information necessary for the bid bond, including the contractor and agents signatures. It also identifies the verification address for the surety.
15
North Coast Surety North Coast Surety
Step Seven-The Owner Verifies the Bond
The file received by the owner contains all the information necessary for the owner to verify directly with the surety company, or a third party verification facility, the authenticity of the bond.
Owner
Contractor
Surety Agent
Surety Company
16
North Coast Surety North Coast Surety
Start:aecXML<<Project Description>> Highway 1 Tunnel<<Project Description>><<Project IFB>> 04-12345<<Project IFB>> <<Bid Date>> 082501 <<Bid Date>> <<Bid Bond Form Number>> 04-12345BB <<Bid Bond Form Number>><<Construction Company>>Under the Hill Construction<<Construction Company>><<Principle Electronic Sig>>DFG456787FDGREE344dfRR<< Principle Electronic Sig>><< Principle Verif Certificate >>XRTVT345GR78FD34DS<< Principle Verif Certificate>><<Agent Electronic Sig>>DFG456787FDGREE344dfRR<< Agent Electronic Sig>><< Agent Verif Certificate >>XRTVT345GR78FD34DS<< Agent Verif Certificate>><< Surety NAIC Code >>345GR7<< Surety NAIC Code >><< Surety Confirmation Code >>38fr45GR7<< Surety Confirmation Code >><Surety Electronic Signature>DFG456787FDGREE344dfRR< Surety Electronic Signature/>< Surety Verification Certificate >XRTVT345GR78FD34DS< Surety Verification Certificate/> End:aecXML
Step Eight-The Surety Verification
The surety matches the received request for verification against the bonds it maintains records on. A match results in an affirmative verification, with the surety company digital signature.
17
North Coast Surety North Coast Surety
Step Eight-The Surety Verification
The owner now possesses all the information and authentication necessary to conclude the bond process.Owner
Contractor
Surety Agent
Surety Company
EndEnd