OWLS 2013: ATLANTA SPOTLIGHT

Download OWLS 2013: ATLANTA SPOTLIGHT

Post on 20-May-2015

264 views

Category:

Environment

2 download

Embed Size (px)

TRANSCRIPT

<ul><li> 1. One Water Leadership Summit SPOTLIGHT: Atlanta Moderator: John Batten, Executive Vice President, ARCADIS Panelists: Jo Ann J. Macrina, PE, Commissioner, Dept of Watershed Management, City of Atlanta Margaret E. Tanner, PE, Deputy Commissioner, Dept of Watershed Management, City of Atlanta Catherine Owens, PE, Senior Civil Engineer, Atlanta BeltLine, Inc. Denise Quarles, Director, Mayors Office of Sustainability, City of Atlanta Stacy Funderburke, Real Estate Associate, The Conservation Fund From Federal Enforcement to Federal Partnerships </li></ul> <p> 2. Department of Watershed ManagementDepartment of Watershed Management City of Atlanta Watershed Management Serves population of 1.2 million (450,000 night) Adequate water supply and treatment capacity 2 water treatment plants, 112 MGD (2 plants) Adequate wastewater treatment plant capacity 4 wastewater treatment plants, 184 MGD 6 CSO facilities Regional provider; 6 wholesale govt. customers 2,750 mi of water mains 1,900+ mi of sewer (50-100 yrs old) 15% combined, 85% separated 1,475 positions Annual budget $595M 3. Department of Watershed ManagementDepartment of Watershed Management Watershed Management Pre 2000 Long-term system under-investment Failed water utility privatization Consent Orders Flawed stormwater utility fee imposed $7 million refunded 2 Wastewater Consent Decrees 100+ overflows/yr at CSO facilities 1,000 sewer spills in year 2000 Poor image Insensitive Inactive Incompetent Irresponsible 4. Department of Watershed Management CSO Consent Decree Success Consent Decree issued Sept 1998, full compliance by Nov 2008 Reduced CSOs from 100/yr to 4/yr Total cost: $711M West Area CSO Tunnel Boring Machine 5. Department of Watershed Management SSO Consent Decree Consent Decree issued Dec 1999, full compliance by July 2014 (*extension) Phased Approach to Capital Improvement Program Phase I - Sewer System Evaluation Survey (1600 miles) Phase II - Sewer Rehabilitation Phase III - Sewer Capacity Relief Total -- $1.4 Billion Capital Program Preventive Maintenance Program 6. Department of Watershed Management Post 2000 Highest W&amp;S Rates in US 7. Department of Watershed Management Compliance at a Price 71% decrease in number of spills to waters of the state Success! 8. Department of Watershed ManagementDepartment of Watershed Management Mayor Kasim Reed Commitment to Community Provide effective solutions for real issues Community involvement Take action and follow through Commitment to Sustainable Initiatives Focus on green solutions Focus on decreased carbon footprint Focus on reduced energy consumption Commitment to Environmental Protection Comply with all regulations Manage infrastructure responsibly Build partnerships with state and federal agencies 9. Department of Watershed Management Achieving the Goals through New Initiatives Financial flexibility with CD extension 13 year extension; longest in U.S. (1999-2027) Approx $450MM work remaining Ability to balance all needs Integrated Water Resources Data analysis Utilize technology Sustainability &amp; Green Infrastructure 10. Department of Watershed Management Promoting Sustainability Goal of green infrastructure - mimic the natural hydrologic function preserving conservation areas reducing impervious surfaces installing aesthetically-pleasing structural measures such as green roofs, vegetated swales, permeable pavement, infiltration planters, cisterns, and rain gardens. An alternative approach to managing stormwater runoff Decreasing energy consumption Waste to energy program Enhancing aesthetics and public access/use 11. Department of Watershed Management Southeast Atlanta Green Infrastructure Initiative Background: Homes built in historic stream channels; low lying areas where stormwater naturally drain Stream channels were piped; floodplains still exist due to pipe overflows from capacity limitations Combined sewer area out of conveyance capacity Limited capacity often exceeded by high rainfall events Stormwater runoff exacerbated by higher amounts of impervious cover running across hard surfaces at greater velocities Over time, systems cannot accommodate developments Partial improvements made, leaving other problems Typical solutions can be disruptive, cost prohibitive 12. Department of Watershed ManagementDepartment of Watershed Management Computer Simulation of Existing Conditions 25 year 4 hour Critical Storm Drainage Area Total Area (acres) Impervious % Mechanicsville / Peoplestown 900 65% Summerhill 505 58% Grant Park 380 42% Englewood Manor 715 42% Assessment of Issues 13. Department of Watershed Management Phased Approach &amp; Community Input Action Plan Immediate Response Completed w/in 30 days Short Term Projects Completed w/in 6 months Intermediate Projects - NTP: Nov.1, 2013 Long Term Projects - In Design Follow-up Meetings with Community Communicate phased approach Inform them of alternatives &amp; schedule 14. Department of Watershed Management Short-Term Projects March 2013 completed 15. Department of Watershed Management Media Lot Vault Permeable Pavers Intermediate Projects Media Lot Vault 16. Department of Watershed Management Intermediate Projects Permeable Pavers ~6 miles of permeable pavers: Mechanicsville Peoplestown Summerhill AfterBefore 17. Department of Watershed Management Long-Term Projects Three additional storage vaults Detention Ponds Cistern at Braves Stadium Connally Storage 1 &amp; 2 Columbia Apts 18. Department of Watershed Management Urban Waters Federal Partnership Through our partnership, we will revitalize urban waters and the communities that surround them, transforming overlooked assets into treasured centerpieces and drivers of urban revival. www.EPA.gov 19. Department of Watershed Management Proctor Creek Watershed DWM Activities Streamwalks WQ data Spill response program FOG education Future BMPs Future Green Infrastructure projects 20. Department of Watershed Management Atlanta Green Infrastructure Projects Green Roof City Hall Rainwater Harvesting Southface Rain Garden Adair Park Pervious Paving English Park Bioswale Fernbank Museum Stormwater Planters Juniper Street (Proposed) Pervious Concrete Felder Street Stormwater Bump-out Whitehall Terrace 21. Atlanta BeltLine Key Project Elements: 22 miles of modern streetcar transit 33 miles of multi-use trails 1,300 acres of parks 5,600 units of affordable housing 1,100 acres of brownfield remediation Public Art Historic Preservation Economic Development 22. Historic Fourth Ward Park and Skatepark 17 acres Opened June 2011 2-acre lake that doubles as stormwater capacity relief Outdoor amphitheater Modern playground with splashpad Open, passive lawns Elegant walkways 23. Atlanta BeltLine Investments $362 million: Total funds invested to date $157 million: Atlanta BeltLine Tax Allocation District (TAD) $121 million: City of Atlanta bond funds (Watershed, Parks, Public Works) $22 million: Federal (transit and trail) $21 million: Federal (streets and streetscapes within the TAD) $41 million: Private philanthropic Awards and Accomplishments Livable Centers Initiative Grant ($4 million) (2012) Atlanta Regional Commission (ARC) Grant ($1.47 million) (2012) Atlanta Regional Commission (ARC) Development of Excellence Award for Historic Fourth Ward Park (2012) Atlanta Business Chronicles Land Deal of the Year for the Eastside Trail (2012) Environmental Communications Award Grand Prize (2013) Atlanta Urban Design Commission Adaptive Reuse Award for the Eastside Trail (2013) Great Places in Georgia Public Spaces Award for D. H. Stanton Park (2011) Atlanta Urban Design Commission Award for Historic Fourth Ward Park (2011) and D. H. Stanton Park (2012) GAASLA Merit Award For D. H. Stanton Park (2011) and Historic Fourth Ward Park (2012) ULI Project of the Year (2013) 24. Eastside Trail 2.25 miles Opened October 2012 First trail segment built in old railroad corridor Connects five intown neighborhoods, three major parks, and bike paths Corridor preserved for transit Over 600 large trees planted 25. Environmental remediation: 73 acres of brownfields remediated Environmental Justice Policy adopted by Board of Directors (August 2012) Master Planning All ten subarea master plans adopted by Atlanta City Council (April 2012) 26. Power to Change is Atlantas citywide sustainability initiative Full Circle Commitment 360 success that can be measured 365 days a year 5 Stakeholder groups around 10 Impact Areas with 30+ Measures of success and 100+ Initiatives.. Green infrastructure is 1 initiative but it affects multiple impact areas 27. Atlanta ACTS Citywide.Green Infrastructure for the Urban Community Academia Nonprofit Atlantan Spelman College Water Efficient Landscaping 59.52% reduction in the use of potable water for landscaping. 39,950 gallons savings of potable water annually; avoiding $1,469 a year in water costs. Residential Potable Water System First installed under rainwater ordinance. 49,400 gallon/50 inches rainfall potential Southface Energy Institute Green Roof Entire buildings water savings are an 84% overall reduction in potable water consumption compared to a baseline commercial building of the same size, saving 112,781 gallons/year. 28. Atlanta ACTS Citywide.Green Infrastructure for the Urban Community Business Business Home Depot Rainwater Holding Tank 500,000 gallon tank Landscape irrigation retro- fits saving water too Epsten Group Green roof system 91% of sites stormwater captured, treated and infiltrated on site LEED Platinum facility Government Fire Station #16 Rain Garden Sized to capture the first 1.2 of runoff from stations downspouts 29. Expanding Atlantas Greenspace Land Acquisition 30. Facilitating Green Infrastructure Best Practices Philadelphia Peer Exchange City of Atlanta Green Infrastructure Task Force Conservation Leadership Network 31. Engaging Communities in Green Infrastructure 32. Seeing Multiple Benefits of a Green Infrastructure Approach Community Leaders Trip - Milwaukee </p>