overview of space internet development plan november 14, 2014
TRANSCRIPT
![Page 1: Overview of Space Internet Development Plan November 14, 2014](https://reader035.vdocuments.us/reader035/viewer/2022062715/56649d765503460f94a57d96/html5/thumbnails/1.jpg)
Overview of Space In-ternet Development
PlanNovember 14, 2014
![Page 2: Overview of Space Internet Development Plan November 14, 2014](https://reader035.vdocuments.us/reader035/viewer/2022062715/56649d765503460f94a57d96/html5/thumbnails/2.jpg)
2
Korea Lunar Exploration Plan
Step 1Test Lunar orbiter(KPLO) will be manufactured by Korea
KPLO: Korean Pathfinder Lunar Orbiter
Launch vehicle will be used foreign onesLaunch date: end of 2017
Step 2Lunar orbiter, Lander and Rover will be manufactured by KoreaLaunch vehicle will be manufactured by Korea alsoLaunch date: end of 2020
ResponsibilityKARI is responsible for overall Korea lunar projectETRI is responsible for DTN development and validation
![Page 3: Overview of Space Internet Development Plan November 14, 2014](https://reader035.vdocuments.us/reader035/viewer/2022062715/56649d765503460f94a57d96/html5/thumbnails/3.jpg)
3
DTN Mission
DTN is a test missionDTN communications are separated with KPLO mission communica-tions
DTN validationDTN technologies will be validated through KPLO for next Lunar mis-sion
Test configurationKPLO will be a DTN nodeLander and Rover are located in the ground for the tests
Lander: ground communication modelRover: ground test model
![Page 4: Overview of Space Internet Development Plan November 14, 2014](https://reader035.vdocuments.us/reader035/viewer/2022062715/56649d765503460f94a57d96/html5/thumbnails/4.jpg)
4
Test Configuration
DSN
Lander model
Source
KPLO
Destination
MCC
DTN node
DTN node
Earth
Internet
RCC
Rover model
DTN node
Moon
DTN test configuration through KPLO
![Page 5: Overview of Space Internet Development Plan November 14, 2014](https://reader035.vdocuments.us/reader035/viewer/2022062715/56649d765503460f94a57d96/html5/thumbnails/5.jpg)
5
Data Flow
RCC → Rover
Link Protocols
L1 BP over terrestrial network
L2/L5 BP/LTP over SLE
L3/L4 BP over TM/TC
L6 BP over terrestrial network
L7 BP over Proximity-1
![Page 6: Overview of Space Internet Development Plan November 14, 2014](https://reader035.vdocuments.us/reader035/viewer/2022062715/56649d765503460f94a57d96/html5/thumbnails/6.jpg)
6
Data Flow
Rover → RCC
Link Protocols
L1 BP over Proximity-1
L2.1(TM)L2.2(image)
BP over terrestrial network
L3/L6 BP over SLE
L4/L5 BP over TM/TC
L7 BP over terrestrial network
![Page 7: Overview of Space Internet Development Plan November 14, 2014](https://reader035.vdocuments.us/reader035/viewer/2022062715/56649d765503460f94a57d96/html5/thumbnails/7.jpg)
7
Design of proximity space links
What ETRI is doingPossible definition of new operating frequency bandsProfiling of proximity-1 features which should be necessarily imple-mented for Korean space internet w.r.t. SWaPDefinition of optimized Proximity-1 protocol parameters under the consideration of lunar communication environmentsEnhancement of existing proximity-1 to support broadband service
High order modulations (GMSK, etc)New FEC schemes (LDPC with longer block size, turbo code, etc), etc
Possible consideration of interoperability with proximity-1 links in in-ternational space projects
![Page 8: Overview of Space Internet Development Plan November 14, 2014](https://reader035.vdocuments.us/reader035/viewer/2022062715/56649d765503460f94a57d96/html5/thumbnails/8.jpg)
8