Overview of Science Support SystemsReview of SSS Software Readiness for SRO, June 5, 2009
Bryan ButlerEVLA Computing Division Head
Remaining Milestone Schedule
A - WIDAR0 testing supportB - full OSRO support (256 MHz); begin support of RSRO capability (2 GHz)C - begin support of full-bandwidth RSRO capability (8 GHz)D - begin support of narrow-band RSRO capability (recirculation)E - begin support of mixed-bandwidth RSRO capability (different widths/channels per
subband)F - full OSRO support (2 GHz); begin support of correlator resource reallocation RSRO
capability (trade subbands for channels)G - begin support of RSRO capability (special capabilities)H - full OSRO support (8 GHz)
Crude Software Block Diagram
What you are reviewing here
RequirementsWe have a detailed requirements document (available onthe web as a computing memo) covering all SSSsubsystems:• PST• OPT• OST• AATRequirements have priority and timescale. Theserequirements are for the final EVLA software system.
Requirements - SROWe also have high level requirements (or “deliverables”)from operations and the construction project for SROobserving. An example:• “PST updated for OSRO”We believe that these, combined with the granular overallrequirements and our own domain knowledge, aresufficient. However, to be sure that we are not lettingsomething slip through the cracks, we are in the processof gathering more granular requirements for SROobserving (as modifications to the spreadsheet for the fullconstruction project requirements).
DATAFLOW
High Level Block Diagram
ObservationPreparationTool (OPT)
Ast
rono
mer
or
Staf
f
Project EVLA ObservingHeuristics
Program Block(Set of Scheduling Blocks for one Program)
Proposal SubmissionTool (PST)
To Observation Scheduling Tool
High Level Design (1)
Portal
Proposal HandlingTool (PHT)
Proposal
Aut
hent
icat
edA
stro
nom
er o
r St
aff
High Level Design (2)
ObservationSchedulingTool (OST)
Executor
Next SBExecutionState
EquipmentState
Metadata to DCAF
Operator
Environment
From OPT
Results from TelCal
Sequence of ConfigurationsAntenna Delays
Archive
Archive
Operator
Heuristics
Metadata to DCAF
To AMCS& CMCS
From AMCS& CMCS
High Level Design (3)
HardwareM&C
AMCS
CMCS
RF EVLAAntennas
FOTSReceiver
Station,BaselineBoards Lag Frames
CBEState Counts
RawVis
Equipment State,Data AddressingInfo, Messages,Alerts, etc.
From Executor
FF
To Archive& TelCal
To DCAFTo DCAF
High Level Design (4)
SDM
Data Capture AndFormat (DCAF)
From CMCS
TelCal
SDM
From AMCS& CMCS
To ExecutorAnd Archive
To Archive
Quick LookPipeline
(QLP)
Astronomer orOperator
ObservationMonitoring
Tool (OMT)
M&CArchive
Portal
AuthenticatedAstronomer or
OperatorM&CArchive
To Archive (?)
TelCalResults
From DCAF
DataPost-Processing
(DPP)
ImageCubes
VO Astronomer
Default ImagePipeline (DIP)
Cubes (?)
From CMCS
High Level Design (5)
ArchiveArchive Access Tool
(AAT)
Astronomer
Portal
AuthenticatedAstronomerReprocessed
ProprietaryProducts
Existing ProprietaryProducts
OpenProducts
OpenProducts
Trigger