overview of nibw site history and current status
DESCRIPTION
Overview of NIBW Site History and Current Status. NIBW Site Visit June 21, 1999. Overview of NIBW Site History. Overview of Work. Comprehensive site characterization Summary of Site conditions in RI/FS Implementation of ROD-required Remedy Capture and containment not achieved - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/1.jpg)
Overview of NIBW Site History Overview of NIBW Site History and Current Statusand Current Status
NIBW Site Visit
June 21, 1999
![Page 2: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/2.jpg)
Overview of NIBW Site HistoryOverview of NIBW Site History
![Page 3: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/3.jpg)
Overview of WorkOverview of Work
Comprehensive site characterizationSummary of Site conditions in RI/FSImplementation of ROD-required Remedy
– Capture and containment not achieved
Implementation of Enhanced Remedy– Capture and containment projected
Preparation of FSA– Documentation of effectiveness of Enhanced Remedy
![Page 4: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/4.jpg)
Components of ROD-Required Components of ROD-Required RemedyRemedy
MAU & LAU extraction at wells COS31, COS71, COS72, and COS75
Monitoring of UAU mass fluxSoil vapor extraction at Areas 7, 8,
and 12
![Page 5: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/5.jpg)
Voluntary Components of the Voluntary Components of the Enhanced RemedyEnhanced RemedyCOS6 tie-in to the CGTF (MAU/LAU)Replacement LAU extraction at well
COS75ALAU extraction at well PCX-1MRTF for treatment of groundwater from
PCX-1, and PVWC#15 and #14UAU extraction at Area 7MAU extraction at Areas 7 and 12
![Page 6: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/6.jpg)
Hydrogeology OverviewHydrogeology Overview
![Page 7: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/7.jpg)
![Page 8: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/8.jpg)
SCHEMATIC OF SOUTHWEST MARGIN
HYDROGEOLOGY
![Page 9: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/9.jpg)
UAU
TCE CONCENTRATION
CONTOURS
APRIL 1998
![Page 10: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/10.jpg)
UPPER MAU
TCE CONCENTRATION
CONTOURS
APRIL 1998
![Page 11: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/11.jpg)
LOWER MAU
TCE CONCENTRATION
CONTOURS
APRIL 1998
![Page 12: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/12.jpg)
LAU
TCE CONCENTRATION
CONTOURS
1990
![Page 13: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/13.jpg)
LAU
TCE CONCENTRATION
CONTOURS
1992
![Page 14: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/14.jpg)
LAU
TCE CONCENTRATION
CONTOURS
1994
![Page 15: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/15.jpg)
LAU
TCE CONCENTRATION
CONTOURS
1996
![Page 16: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/16.jpg)
LAU
TCE CONCENTRATION
CONTOURS
APRIL 1998
![Page 17: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/17.jpg)
Area 12 Remedial ActionsArea 12 Remedial Actions
![Page 18: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/18.jpg)
AREA 12
SVE
PROGRAM
![Page 19: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/19.jpg)
ROOSEVELT ROAD
L
MCDOWELL ROAD
HA
YD
EN
RO
AD
GR
AN
ITE
RE
EF
RO
AD
GRANITE
REEF WELL
EXTRACTION
WELL MEX-1MA
TREATMENT
SYSTEM
MAU GROUNDWATER EXTRACTION
AND TREATMENT
![Page 20: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/20.jpg)
PROJECTED
HYDRAULIC
CAPTURE
1,000 gpm
![Page 21: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/21.jpg)
PROJECTED
HYDRAULIC
CAPTURE
1,850 gpm
![Page 22: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/22.jpg)
Performance/Effectiveness Performance/Effectiveness Evaluation for MAU Evaluation for MAU GroundwaterGroundwater
![Page 23: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/23.jpg)
UPPER MAU
WATER LEVEL
CONTOURS
APRIL 1998
![Page 24: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/24.jpg)
YEAR
980
1,010
1,040
1,070
1,100
1,130
1,160
WA
TE
R L
EV
EL
ALT
ITU
DE
(F
EE
T M
SL)
0
200
400
600
800
1,000
1,200
TC
E C
ON
CE
NT
RA
TIO
N (
mic
rogr
ams
per
liter
)
FIG U R E . W ATER LEVEL H YD R O G R APH AN D TC E C O N C EN TR ATIO N FO R M O N ITO R W ELL (A -1-4)1bba1 [M -5M A]
S :/P R O JE C T S/365 /365 .01/JM U R R AY /G R A P H S /M -5M A .G R F /06/18 /99JLM
1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998
W L
TCE
![Page 25: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/25.jpg)
YEAR
920
950
980
1,010
1 ,040
1 ,070
1 ,100
WA
TE
R L
EV
EL
ALT
ITU
DE
(F
EE
T M
SL)
0
50
100
150
200
250
300
TC
E C
ON
CE
NT
RA
TIO
N (
mic
rogr
ams
per
liter
)
FIG U R E . W ATER LEVEL H YD R O G R APH AN D TC E C O N C EN TR ATIO N FO R M O N ITO R W ELL (A -1-4)2ccb2 [PG -6M A]
S :/P R O JE C T S/365 /365 .01/JM U R R AY /G R A P H S /P G -6M A .G R F/06 /18 /99JLM
1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998
W L
TC E
![Page 26: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/26.jpg)
Performance/Effectiveness Performance/Effectiveness Evaluation for LAU Evaluation for LAU GroundwaterGroundwater
![Page 27: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/27.jpg)
EXTRACTION WELL COS75A
INSTALLATION
![Page 28: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/28.jpg)
ESTIMATED WATER LEVEL ALTITUDE IN VICINITY OF COS75A, APRIL 1995,
PRIOR TO IMPLEMENTATION OF EXTRACTION
![Page 29: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/29.jpg)
ESTIMATED WATER LEVEL ALTITUDE IN VICINITY OF COS75A, APRIL
1997, AFTER IMPLEMENTATION OF EXTRACTION
![Page 30: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/30.jpg)
TCE CONCENTRATIONS AT MONITOR WELL PA-5LA
YEAR
0
50
100
150
200
250
300T
CE
CO
NC
EN
TR
AT
ION
(m
icro
gram
s pe
r lit
er)
FIG U R E . TC E C O NC EN TR ATIO N FO R M O N ITO R W ELL (A -2-4)23ddd4 [PA-5LA ]
PA 5LATC E.G R F/02 /09 /99E AL
1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998
![Page 31: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/31.jpg)
EXTRACTION WELL PCX-1
INSTALLATION
![Page 32: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/32.jpg)
ESTIMATED WATER LEVEL ALTITUDE IN VICINITY OF PCX-1, APRIL 1997,
PRIOR TO IMPLEMENTATION OF EXTRACTION
![Page 33: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/33.jpg)
ESTIMATED WATER LEVEL ALTITUDE IN VICINITY OF PCX-1, APRIL 1998,
AFTER IMPLEMENTATION OF EXTRACTION
![Page 34: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/34.jpg)
1996 1997 1998 1999
0.0000
0.0040
0.0080
HY
DR
AU
LIC
GR
AD
IEN
T (
UN
ITLE
SS
)
FIGURE . HYDRAULIC GRADIENT BETWEEN MONITOR W ELLS PA-6LA AND PG-2LA
366.0901\PA-PG 2.G R F\05-06-99
![Page 35: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/35.jpg)
1996 1997 1998 1999
-0 .0080
-0 .0040
0.0000
0.0040
0.0080H
YD
RA
ULI
C G
RA
DIE
NT
(U
NIT
LES
S)
FIGURE . HYDRAULIC GRADIENT BETW EEN MONITOR W ELLS PG-2LA AND PG-41MA/LA
366.0901\PG 2-P G 41.G R F\05-06-99
![Page 36: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/36.jpg)
FSA Groundwater Flow and FSA Groundwater Flow and Contaminant Transport ModelContaminant Transport Model
![Page 37: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/37.jpg)
PurposePurpose
Predictive tool for evaluating a range of remedial actions with respect to:– Capture and containment of the zones of
contamination (flow model) – Relative clean-up time (transport model)
![Page 38: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/38.jpg)
TasksTasks
Compare ROD Required and Enhanced Remedial Alternatives
Simulate range of potential additional Remedial Actions
Simulate combinations of Remedial Actions comprising potential Remedial Alternatives
![Page 39: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/39.jpg)
FSA
MODEL
DOMAIN
AND
BOUNDARIES
(66 sq. mi.)
GENERAL HEAD
BOUNDARY
GENERAL HEAD
BOUNDARY
NO
FL
OW
BO
UN
DA
RY
N
O F
LO
W
BO
UN
DA
RY
![Page 40: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/40.jpg)
Total Mass Removed, Year 2008
0
20000
40000
60000
80000
100000
120000
140000
ROD ENH
Alternative
Pou
nds
of M
ass
Rem
oved
SWMARG-NEW
NEW LAU-3
NEW LAU-2
NEW LAU-1
MILLER/McD
7EXNEW-2
7EXNEW-1
7EX-4MA
7EX-3MA
7EX -1&2
Granite Reef
12M-EX1
PVWC-14
PVWC-15
PCX-1
COS-75A
COS-75
COS-72
COS-71
COS-31
COS-6
![Page 41: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/41.jpg)
Total Mass Removed, Year 2028
0
20000
40000
60000
80000
100000
120000
140000
ROD ENH
Alternative
Pou
nds
of M
ass
Rem
oved
SWMARG-NEW
NEW LAU-3
NEW LAU-2
NEW LAU-1
MILLER/McD
7EXNEW-2
7EXNEW-1
7EX-4MA
7EX-3MA
7EX -1&2
Granite Reef
12M-EX1
PVWC-14
PVWC-15
PCX-1
COS-75A
COS-75
COS-72
COS-71
COS-31
COS-6
EnhancedROD
![Page 42: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/42.jpg)
Estimated TCE Wellhead ConcentrationsCOS 71
0
50
100
150
200
250
300
1990 2000 2010 2020 2030 2040 2050
Year
TC
E C
once
ntra
tion
(ug
/l)
Required Remedy
Enhanced Remedy
![Page 43: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/43.jpg)
Estimated TCE Wellhead ConcentrationsPVWC 15
0
20
40
60
80
100
120
140
1990 2000 2010 2020 2030 2040 2050
Year
TC
E C
once
ntra
tion
(ug
/l)
Required Remedy
Enhanced Remedy
![Page 44: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/44.jpg)
![Page 45: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/45.jpg)
![Page 46: Overview of NIBW Site History and Current Status](https://reader036.vdocuments.us/reader036/viewer/2022062410/568158e9550346895dc629d1/html5/thumbnails/46.jpg)