Overview of Khazzan Project Rashid Al Maawali Dec 2015

Upload: lebao

Post on 17-Mar-2018

223 views

Category:

Documents


5 download

TRANSCRIPT

Overview of

Khazzan Project Rashid Al Maawali Dec 2015

At the start

• December 2013;

• February 2014;

• Partnership with Oman Oil Company

Exploration and Production;

• 300 wells over 15 years;

• One billion cubic feet of gas per day;

• BP supplies around third of Oman Gas

• Construction work has commenced

• First Gas by late 2017.

Wells

• 300 wells over 15 years.

• 10 operating rigs by end 2015

• 2 testing units

• 1 frac unit.

Centre Processing Facility

CPF work underway

Gathering Wells & Export System

5

Gathering Wells & Export Systems

Key Infrastructure Works

132kV OHL, Switchyard and

SER

Phase 4 (EPCM) Office

Installation of modules

block A

RWTP RO Packaged WTP Units

installed

KOB - Warehouse Backfill

Key infrastructure Works (2)

Process Systems Works

Gas Export (TOCO) Pipe

OffloadingCondensate pipeline Stock yard

no. 1 Pipe cold bend to 31.6

degrees

Produced water pipe Welding

work at KP0+350 towards

KP0+750

Gas Gathering 1520 Header

Stringing

Khazzan Logistics

Logistics activities (1).

Khazzan

• Duqm port strategic Location.

• Around 500 JMPs/day.

• Over 10,000 MT ( over 25,000

M3) of heavy lift.

• 9 million Km to be driven on

cargo during 2016.

Logistics activities (2).