overview and introduction
DESCRIPTION
Overview and Introduction. March 22-23, 2006 Regional SIG Meetings Houston, Texas. Regional SIG Meeting Roles. All Maximize value delivered from POSC to industry and from industry to POSC POSC and SIG Members Maximize value delivered from POSC to members and from members to POSC - PowerPoint PPT PresentationTRANSCRIPT
© Copyright 2006 POSC
Overview and Introduction
March 22-23, 2006Regional SIG Meetings
Houston, Texas
© Copyright 2006 POSC
Regional SIG Meeting Roles• All
– Maximize value delivered from POSC to industry and from industry to POSC
• POSC and SIG Members– Maximize value delivered from POSC to members and from
members to POSC• Translation:
– Learn what’s cooking and get involved• As a patron, a server, a chef, a supplier, a manager, …
– Contribute items you need/want for “tomorrow’s” menu.• As a champion, subject expert, connoisseur, cook, or guest
© Copyright 2006 POSC
Overall Standards ProcessStage Description
0 Opportunity Discovery, Evaluation (ongoing), <decide>
1 Planning, Review, <decide>
2 Requirements, Review, <decide>
3 First Specification Iteration, Review, <decide>
4 Iteration Cycles of Revision and Review, <decide>
5 Final Reviews, <decide>, Release
6 Promotion, Support [<decide> May go to 0 for upgrade]
7 Periodic Effectiveness (Value Delivery) Review [<decide> May go to 0 for upgrade or retirement]
© Copyright 2006 POSC
Success Factors• Collaboration – steer [just] clear of competitiveness • Value – neither theory nor art are sufficient reasons,
must enhance real business advantages• Change Agency – standardization requires change
– Innovation– Resources– Marketing– Planning– Execution
© Copyright 2006 POSC
Modes of Collaboration• Late
– Clean-up diversity ride replacement cycles• Early
– Make a good start ride adoption cycles• Top-Down
– Sold from the top visible, funded efforts• Bottom-Up
– Incremental knitting almost invisible, evolutionary at best
© Copyright 2006 POSC
May 9-11 Events• Public Seminar and Vendor Exhibition (May 11, Thursday)
– Current reports from actual experiences and plans from oil companies, service companies, and software companies.
• SIG Working Meetings – Technical Teams
• We address implementation feedback and continuing detailed specification issues
– Use Case and Requirements Team• We address possible future areas of focus: drilling reports, completions,
environmental, well services, well stimulation, service rig reporting.
– Implementation Support Team• People supporting WITSML-enabled environments share lessons learned
and current issues and challenges.
© Copyright 2006 POSC
May 11: WITSML Public Seminar
• Meeting Host: Schlumberger • Exhibitors (from Nov. 2005)
– Baker Hughes, Halliburton/Landmark, INT, Knowledge Systems, Paradigm, POSC, SDC Geologix, Sense Intellifield, Smith Bits, Wellstorm Development
© Copyright 2006 POSC
May 12: Integrated Production Operations SIG Meeting
• Follow-up to March 23 SIG Meeting– More on PRODML Optimization progress– Review of feedback from reviews of Fluid Properties
data transfer specifications– Update from the Norway IIP project– …
© Copyright 2006 POSC
Meeting Plan• Jan 11. India. Preliminary Geophysics and WITSML
Deployment meetings• Mar. 22-23. Houston. SIG Meetings• Apr.- June Geophysical SIG APAC (Mumbai)• May 9-12. Houston. WITSML and IntOps Events [SLB host]• June 13-14, 20-21. Norway and UK. Regional SIG Meetings• Sep. 19-20. Houston. SIG Meetings• Oct. 17-20. Europe. WITSML and IntOps Events [BP host]• Nov. 8. Houston. Annual Member Meeting• Nov. 28-Dec. 1. Europe. Regional SIGs (2 locations)
© Copyright 2006 POSC
Standards Activity in 2005 and 2006
Drilling
Production
Geology
Data Mgt
Regulatory
Technology
Consulting
Drilling
Production
Geology
Data Mgt
Regulatory
Technology
Consulting
Geophysics
© Copyright 2006 POSC
Standards Activity in 2005 and 2006
Stds Dev
Stds Evo
SIG Fac
Outside
Other
Consulting
Stds Dev
Stds Evo
SIG Fac
Outside
Consulting
© Copyright 2006 POSC
Drilling Portfolio
Standard Type History Stable Active Next Comments
WITSML Drilling & Family
Data Xch
Start 2001,
Xfer 2003
V1.2 V1.3.1 TBD Stage 6, ’06 13%
- WITSML Completion
Data Xch
B 2004 N/A N/A Q2 Stage 4 5V1.3.1 supplement
Norway Daily Drilling Project
Data Xch
Start pending
N/A N/A TBD OUTSIDE,Stage 1, ’06 2%
Drilling (WITSML) SIG Facilitation, ’06 10%
© Copyright 2006 POSC
WITSML Drilling: Vision• Now
– Mainly geosteering support– Mainly straight-through source to operator– Usage
• Statoil and Hydro 100%, • 2+ Majors High-end Wells, • 1+ Major Significant use by early ‘07
• +2 or 3 Years– Broader range of business processes– Sufficient maturity for aggregation/QC by service companies– Greater usage by operators
• Quantification– Considering profiling WITSML Drilling benefits in terms of project costs
and savings for typical drilling projects
© Copyright 2006 POSC
Board
Economics
ReservoirEngineering
ExplGeology
Petrophysics PetroleumEngineering
Drilling
Engineering
ProductionGeology
Production
Engineering
Facilities
Engineering
ProductionOperationsGeophysics
DrillingOperations
Completion &Workover
E&P Subject Areas: WITSML Coverage
Can we use this image to portray the growth in WITSML coverage?
© Copyright 2006 POSC
General Board
Economics
ReservoirEngineering
ExplGeology
Petrophysics PetroleumEngineering
Drilling
Engineering
ProductionGeology
Production
Engineering
Facilities
Engineering
ProductionOperationsGeophysics
DrillingOperations
Completion &Workover
E&P Subject Areas: WITSML Coverage
Enhancements for Production beginning with Volume and Activity Reporting, continuing with PRODML towards Optimization.
Network Model Volume Report Activity Report
Log,WellLog
WellPath
Well Wellbore Trajectory
CRS, ProjectionsUnits of Measure
© Copyright 2006 POSC
General Board
Economics
ReservoirEngineering
ExplGeology
Petrophysics PetroleumEngineering
Drilling
Engineering
ProductionGeology
Production
Engineering
Facilities
Engineering
ProductionOperationsGeophysics
DrillingOperations
Completion &Workover
E&P Subject Areas: WITSML Coverage
At a future time, we could consider the viability of data exchange Standards for facility data, reservoir data, economics data, etc. filling out the E&P space.
© Copyright 2006 POSC
epiXMLBoard
Economics
ReservoirEngineering
ExplGeology
Petrophysics PetroleumEngineering
Drilling
Engineering
ProductionGeology
Production
Engineering
Facilities
Engineering
ProductionOperationsGeophysics
DrillingOperations
Completion &Workover
What’s in a Name? epiXML Family
Regardless of the naming pattern, this is one integrated Standards Family with a great deal of reuse and consistency.
This anticipates a successful integration of PRODML results.
WITSML
PRODML?ML
?ML
?ML
?ML
© Copyright 2006 POSC
Production PortfolioStandard Type History Stable Active Next Comments
WITSML Production, including Reporting
Data Xch
Prior 1999,Start 2005
N/A N/A Q2 Reporting, Stage 4 5,Deployment In Norway,’06 14%
WITSML Production Optimization
Data Xch
Start 2005,Xfr Q3
N/A N/A N/A OUTSIDE: “PRODML”,Stage 3, ’06 7%Pilots Apr – Aug.
WITSML Production DTS
Data Xch
Start 2004 N/A 1.3.1 TBD Stage 6, Deploymentsby BP and Shell
WITSML Production Lab (Fluid Analysis)
Data Xch
Xfr 2004,Start 2005
N/A N/A Q2 Stage 3, ’06 2%
Norway IIP Project Mixed Start 2004 N/A N/A N/A OUTSIDE, ’06 2%Stage 3; Statoil, Hydro.
Production (Integrated Operations) SIG Facilitation, ’06 8%
© Copyright 2006 POSC
Production Portfolio: Vision• Now
– Daily Reporting to Partners: • Ready for Public Review, Deployment starting in Norway
– PRODML Work Group due to complete end of August• Three basic optimization use cases: specifications and pilot testing
– Distributed Temperature Survey Standard published• Field deployments by BP and Shell (Lios, SLB, Weatherford)
• +2 or 3 Years– Co-existence with / adaptation for OPC Foundation UA– Integration of Optimization and Reporting– Beginning of Automation of Administration, Scheduling, etc.– Integration with Equipment and Facility reference standards
• Quantitative / Qualitative Value – Baseline in ’07.
© Copyright 2006 POSC
Geology PortfolioStandard Type History Stable Active Next Comments
WITSML Geology wellLog
Data Xch
Start 2004,Rel 2005
N/A 1.3.1 TBD Stage 6, ’06 2.5%,DIGGS use
WITSML Geology Depth Registration
Data Xch
Start 2004 N/A N/A Q2 Stage 5, ’06 2%supplement to V1.3.1
PWLS Ref Start 2001 2.0 2.0 Q1 Stage 6, ’06 5.5%Shell, XOM, Petris
RP66 (DLIS) Data Xch
Xfr 1996 1 & 2 1 & 2 N/A Stage 6, ’06 0.5%
WellLogML Data Xch
Start 2000 1 2 draft N/A Stage 6 & 7, transition to WITSML
LogGraphicsML Data Xch
Start 2000 1 N/A N/A Stage 6 & 7
LAS (CWLS) to WITSML Utility
O.S. Utility
Start 2005 N/A N/A Q1 Stage 3,Ready for First Review
Geology (PWLS) SIG Facilitation, ’06 4.5%
© Copyright 2006 POSC
Data Management PortfolioStandard Type History Stable Active Next Comments
WITSML Well Path Profile Start 2004 N/A 1.3.1 TBD Stage 4, ’06 1.0%, Review by “Tech Team”
WellHeaderML Data Xch
Start 2000 2.0 N/A N/A Stage 6, ’06 1.0%UK Usage, PPDM Profile
WellChemicalML Data Xch
Start 2002 1.0 N/A N/A Stage 6UK Usage
WellPathML Data Xch
Start 2001 1.0 N/A N/A Stage 6 & 7, WITSML, PPDM Profile
Well Identity Service
Ref Service
Start 2004 N/A N/A TBD Stage 3, ’06 1.8%RFP in Q2
Epicentre Data Model
Start 1991 3.0 N/A TBD Stage 6, ’06 0.5%Ref. SLB and LGC
Geoshare Data Model
Start 1992 13.0 14.0 N/A Stage 6
© Copyright 2006 POSC
Data Management PortfolioStandard Type History Stable Active Next Comments
Reference Entities
Ref Start 1991 Varied Varied TBD Stage 6, ’06 2.7%
CRS/Geodetics Ref Start 1993 Varied Varied TBD For WITSML, Phase 2-Stage 4, ’06 0.8%
Lithology Ref Start 2005 N/A 1.3.1 Q1 Phase 2-Stage 3, ’06 0.8%
E&P Catalogue Ref Start 2003 0.5 0.5 TBD Stage 6, ’06 1.8%
E&P Bus Pro Ref Model
Ref Start 2004 1.0 1.0 TBD Stage 6, ’06 0.1%
Data Management (DSS) SIG Facilitation, ’06 1.8%Liaison 0.2%, Outside 1.0%, Help 0.5%
© Copyright 2006 POSC
Regulatory Portfolio
Standard Type History Stable Active Next Comments
WITSML Regulatory Permitting
Data Xch
Start 2004 N/A N/A Q3 California, Stage 5,4-6 states, Stage 2,’06 3%
© Copyright 2006 POSC
Geophysical Portfolio
Standard Type History Stable Active Next Comments
GeophysicalML Data Xch
Start 2000 N/A N/A N/A As reference only
WITSML Geophysical
Data Xch
N/A N/A N/A N/A APAC Stage 1 & 2,’06 2%
Geophysical SIG Facilitation, ’06 2%
© Copyright 2006 POSC
Alan Doniger, POSC Chief Technology OfficerEmail: [email protected]
Phone: +1 713 267-5124Fax: +1 713 784-9219
http://www.posc.org
http://www.witsml.org
http://www.prodml.org