over creating value 50 years beyondthe build of dedicated ... · royal atlantis the palm, dubai,...

42
50 years of dedicated service to the Middle-East Creating Value beyond the Build Over Philippe DESSOY General Manager Business Development

Upload: others

Post on 12-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

50 years of dedicated service to the Middle-East

Creating Value

beyond the Build

Over

Philippe DESSOYGeneral Manager Business Development

Page 2: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 2

Excel in creatingsustainable solutions

for better world

Our commitmentto excellence

As BESIX Group we develop

multiple services to create value for our clients, whilst incorporating

the evolving expectations of the end

users and building on strongpartnership with all stakeholders

1 Leveraging on our customer centricity

2

Promotion a great place to work

3

Developing a « one-stop-shop » solution

4

Being a leader in open innovation

5

Synergizing our ways of working6

Promoting openness towardsnew ventures & activities for business

Page 3: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 3

+4,500 white collars

+10,000 blue collars

N°1in Belgium

25 countries

80 Nationalities

N°61TOP 250International

Contractors

65%activities abroad

+95 yearsinternational activity

+55 yearsexperience

in the Middle East

PrivatelyOwned50% MIC with casting vote

50% OC

Page 4: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 4

GROUP REVENUESBESIX Group Figures 2014-2018 (in mio EUR)

REVENUES 2018Breakdown by region

56.6%

17.2%

7.6%

4.4%

13.0%

Building

Infrastructure

Marine Works

Environment

Other

46.4%

15.4%

30.5%

7.7%

Belgium

NL – FR – LUX

Middle East

Rest of the World

2.0012.160

2.359 2.337 2.542

2014 2015 2016 2017 2018

From which+ EUR

1,2 billion in

Belgium

REVENUES 2018Breakdown by activity

Building works

Civil works

Marine works

Foundations

Environmental works

Other (mainly cables)

Quarries/Concrete

Page 5: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

A strategy of diversification

Monday, July 15, 2019 5

Our geographical spread reinforce our service offerings and mitigate risk

Australia

Bahrein

Belgium

Cameroon

Canada

Denmark

Egypt

Equatorial Guinea

France

Ivory Coast

Italy

Luxemburg

Montenegro

Morocco

Oman

Poland

Portugal

Qatar

Saudi Arabia

Spain

Sri Lanka

Switzerland

The Netherlands

United Arab Emirates

United Kingdom

Page 6: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

A strategy of diversification

6

Our large activity scope reinforces our service offerings and mitigates risk

1 2 3

Page 7: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Domain of Expertise

Monday, July 15, 2019 7

Contracting Activities

Building Project

•High-rise buildings, Airports, Hotels, Hospitals

•Offices, Commercial Centers, Housing schemes

Leisure Projects

•Sport Facilities

•Theme Parks

Infrastructure Projects

•Roads and motorways, railways, tunnels, subways

•Bridges, dams, high speed train lines

Water & Environment

•Water Treatment plants & networks, incineration plants, Compost installations

•Water intakes

Industrial Projects

•Power plants, refineries, petrochemical plants

•Pharmaceutical Facilities, cement factories

Marine Works

•Jetties, Harbors, Waterway improvements

•Coastal protection, Quay walls, Breakwaters, LNG terminals

Page 8: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Expertise along the whole value chain

8

05Maintain & Operate

02Design

01Project Development

04Finance

03Build

CONCESSIONS & ASSETSREAL ESTATE CONTRACTING

Page 9: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Ground-breaking recordsWe take pride in pioneering

IntegrationFirst tram system in the Gulf

region

InnovationFirst to pump concrete

Timing60,000-capacity stadium

Partnership First PPP project in the

region: wastewater system

delivered in

26 monthsinstead of 40 months

4,000,000passengers per year

400,000 citizens

up to

585m

Page 10: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Engineering

10

Enabling flawless execution on-site through a state-of-the art design

Fully integratedin BESIX Group

Activities

Dedicated Engineering offices

in Dubai & Brussels, working closely

together

Strong focus on

Constructability & Value

engineering(best quality-price

balance)

Close integration between Design,

Methods & Planning Department and Construction Site

Domainsof expertise

Page 11: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Safety: always on our mind

11

SAFETY AWARENESS is a Key performance indicator

• The Toolbox meeting

• Life Saving Rules

• Safety Time Out

• High Standard Procedures

Our 10Life Saving

Rules

Page 12: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Constructing the World’s Highest Tower

12

Duration: 59 months (01/02/2005 - 30/12/2009)

on average one floor per 5/6 days

Height 828 meter165 floors

Dismantling last crane & spire

lifting: technical ‘tour de force’

All tubes and joints flexible

because of sway

Coordination of 4000 workers on site and about 30 subcontractors

Vertical transportation: tower cranes -

construction lift - jump lifts

Windtunnel tests (exposed to winds of

200 km per hour/hurricane speed)RN1

Page 13: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

∆ιαφάνεια 12

RN1 to put - more than 1 billionRadulovic, Nadja; 6/6/2019

Page 14: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

MaastorenRotterdam

164m2009

New OrleansRotterdam

158m2010

Four SeasonsBahrein

202m2015

AspireDoha

318m2006

Address HotelDubai

306m2008

Adnoc HQAbu Dhabi

342m2016

SofazBakou

140m2014

TornadoDoha

200m2008

EXPERIENCE in High Rise Buildings

12

5

Page 15: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 Excel in creating sustainable solutions for a better world 14

Royal AtlantisThe Palm, Dubai, United Arab Emriates

Page 16: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 Excel in creating sustainable solutions for a better world 15

Cleveland ClinicAbu Dhabi - United Arab Emirates

Page 17: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 Excel in creating sustainable solutions for a better world 16

Ferrari ExperienceAbu Dhabi - United Arab Emirates

Page 18: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 17

2015 - 2018

Design & Build – 453.5 million euro

Six Construct is responsible for the development of

the theme park proper, the retail areas,

restaurants, offices, behind-the-scenes

installations and external works.

Total square meters of project

- land plot: 315,549 m²

- construction surface: 96,528 m²

Farah Experiences LLC

AECOM

Warner Bros Theme ParkAbu Dhabi

Page 19: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 Excel in creating sustainable solutions for a better world 18

Al Wakrah Stadium – World Cup 2022Doha, Qatar

Page 20: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Friday, March 30, 2018 19

Roskilde Fjord LinkRoskilde - Denmark

Page 21: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Friday, March 30, 2018 20

Al Shindagha CrossingDubai - UAE

Page 22: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 Excel in creating sustainable solutions for a better world 21

Sheikh Zayed BridgeAbu Dhabi - United Arab Emirates

Page 23: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 Excel in creating sustainable solutions for a better world 22

Luštica Bay Marine VillageLuštica - Montenegro

Page 24: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Excel in creating sustainable solutions for a better world 23

Container Terminal Gdansk - Poland

Capacity doubled in a record 12 months

Design & Build

Page 25: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Excel in creating sustainable solutions for a better world

24

Tanger Med IIMorocco (2014)

Design & Build

In JV with Somagec

New berthing structures (Terminal 4) of

the extension of the Tangiers

Mediterranean Harbour.

Huge capacity9 mio containers, 7 mio passengers, 700,000 vehicles for export Annual capacity of over 8 million containers

Page 26: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 Excel in creating sustainable solutions for a better world 25

Jetty for WAFA Coastal PlantWest of Tripoli, LYBIA

Page 27: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Excel in creating sustainable solutions for a better world 26

Port of DuqmDuqm - Oman

Page 28: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

27

Port of Duqm Duqm - Oman

Page 29: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Excel in creating sustainable solutions for a better world 28

Ain Sokhna Product Hub Gulf of Suez - Egypt

3 km F-shaped jetty

2 km long jetty 'ready to berth a ship' in only 5.5 months

Page 30: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Friday, March 30, 2018 29

Ain Sokhna Product Hub Gulf of Suez - Egypt

Ain Sokhna Product Hub Gulf of Suez - Egypt

Page 31: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Bahrain LNG Import TerminalMuharraq Island, Bahrain

2015 - 2018

Six Construct

Bahrain LNG Import Terminal scope of works

includes the Design and Construction of an

LNG Jetty constructed on drilled and grouted

pin piles with a maximum length of 55m,

located 5 km offshore (with seabed level at -

18m) as well as a 600m long rubble mound

offshore breakwater with concrete armor

units, type Accropodes II.

Termco

Design and Build

Page 32: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 Excel in creating sustainable solutions for a better world 31

Dubai Water CanalDubai - United Arab Emirates

Page 33: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Excel in creating sustainable solutions for a better world 32

Al Safooh TramlineDubai - UAE

Page 34: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Jebel Ali Wastewater Treatment PlantDubai– United Arab Emriates

Monday, July 15, 2019 33

Page 35: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 Excel in creating sustainable solutions for a better world 34

Page 36: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 Excel in creating sustainable solutions for a better world 35

Grand Egyptian MuseumCairo - Egypt

New iconic building to house the state Egyptian artefacts.

+160,000 m²

Page 37: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Monday, July 15, 2019 Excel in creating sustainable solutions for a better world 36

Grand Egyptian MuseumCairo - Egypt

Page 38: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Projects in Iraq

37

Monday, July 15, 2019

Page 39: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

BAIJI HOUSING SCHEME

Monday, July 15, 2019 38

Iraq

1980 - 1983

18,815,000 euro

CONSTR. OF 330 HOUSES, A BACHELOR

BLDG.,A FAMILY BLDG.,A CLUB, A

KINDERGARTEN AND A PRIMARY SCHOOL.

Total floor area : 40,000 m²

Iraqi State Organization

Page 40: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Al Qaim FERTILIZER COMPLEX

Monday, July 15, 2019 39

Iraq - Alkaim

1976 – 1982

145,880,000 euro

FERTILIZER COMPLEX WITH A PRODUCTION

CAPACITY OF 1,100,000 T/Y

Iraqi State Organization for Minerals

Page 41: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

AKASHAT PHOSPHATE MINE COMPLEX

Monday, July 15, 2019 40

Iraq - Akashat

1976 - 1979

32,436,000 euro

Annual Production capacity: 3,400,000 T

CIVIL WORKS FOR A PHOSPHATE MINE,

INCL.CRUSHER HOUSES, TUNNELS, LOADING

TOWER, LABORATORIES, BUILDINGS,

RAILWAYS, AIRFIELD, ROADS, SEWAGE

TREATMENT PLANT

Iraqi State Organization for Minerals

Page 42: Over Creating Value 50 years beyondthe Build of dedicated ... · Royal Atlantis The Palm, Dubai, United Arab Emriates. Monday, July 15, 2019 Excel in creating sustainable solutions

Contact Us

[email protected]

+32 470 90 44 17

Gemeenschappenlaan 100 Avenue des Communautés

1200 Brussels

www.besix.com

41