14/6/2000 End Cap Muon Tr igger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics group • Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC Status, Issues, Development plan Hi-pT Board Task of Hi-pT Board/ASIC System, Structure of the ASIC Status,Development plan Hi-pT Board configuration

Upload: stuart

Post on 13-Jan-2016

43 views

Category:

Documents


2 download

DESCRIPTION

Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics group. Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC Status, Issues, Development plan Hi-pT Board Task of Hi-pT Board/ASIC - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

1

Muon Track Trigger Processing on Slave and Hi-pT Boards

C.Fukunaga/Tokyo Metropolitan University TGC electronics group

• Outline– Slave Board

• Task of Board and its ASIC (Board ~ ASIC)• System, and Structure of the ASIC• Status, Issues, Development plan

– Hi-pT Board• Task of Hi-pT Board/ASIC• System, Structure of the ASIC• Status,Development plan• Hi-pT Board configuration

Page 2: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

2

Slave Board (SB) /ASIC

•An on detector board, installed several boards in a PS pack

•Inputs are Bunch crossing identified hit patterns from TRIPLET and two DOUBLETS (pivot(outer most one) and middle)

•Low pT muon candidates (> 6 GeV/c) will be identified

•DAQ(Pipeline, derandomizer) system for TGC coordinates are embedded

•Encoded hit information is sent to Hi-pT Board

•Board functionality is more-or-less the same as one of ASIC

Slave Board ASIC TTL/LVDS

Page 3: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

3

Low-pT track Identification

•Low-pT CM formation

•among triplet three(two) planes r and

•between two doublets (pivot and middle) rr and

Page 4: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

4

Slave Board (SB) System

Page 5: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

5

Variety of SB tasks-classified with input detector-

  I nput Output

Sort Hit Pattern (encoded)

Wire Doublet WD (6+32+6)*2 r (5 bit)

X (2+32+2)*2 r (3 bit)

Strip Doublet SD (0+32+0)*2 (5 bit)

X (0+32+0)*2 (3 bit)

Wire Triplet WT (0+32+0) X 3 hit (1 bit), r (5 bit)

Strip Triplet ST (0+32+0) X 2 hit (1 bit), (4 bit)

Red: adjacent hit pattern

Page 6: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

6

SB ASIC Structure (Doublet)

Main Blocks

MIDDLE,PIVOT-IN

1. Phase Adjust

2. Mask

3. Local Coincidence

MATRIX

Coincidence of Middle and Pivot planes

DECLUSTER

continuous  hits to  single coordinate

Page 7: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

7

Local  Coincidence

• Doublet two planes are staggered• Resolution of a simple coincidence te

chnique will be the same width as CELL width (wire, strip)

• New logic with relaxed AND– Single hit (a track passed edge)– Double hits (a track passed center)– Effective resolution will be finer

Page 8: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

8

(Coincidence) Matrixincluding local coincidence

Page 9: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

9

Primary Encode,Declustering & Encodecommon for all sorts of SBs

• After Matrix operation– Primary Encode to select tra

ck with minimum r and/or

– Declustering• A successive cluster for a tr

ack is shrunk to one hit– Encode 3 bit for r, and 4

or 5 bit for r and

Page 10: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

10

Triplet SB

Wire (2-out-of-3) Strip (1-out-of-2=OR)

Determination of coordinate

(Center plane of triplet has no strip readout)

Determination of r coordinate

Page 11: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

11

SB ASIC Status

• Very prototype SB ASIC has been designed for training– ASIC for Wire Doublets part only

• no DAQ staff• INPUS(PIVOT,MIDDLE w/o Phase adjust)• MATRIX with full size(88 x 72))• DECLUSTER,32-5 ENCODER

– Simulation has been done • All blocks installed work fine (except decluster logic)• A bug found in decluster logic if several hits are occurred in boundary of Matrix-A,

and –B. (Double counting) ( will be fixed in the next version)• Max delay estimations are given below for this chip (unit,ns)• The maximum latency allowed for the slave board is 1+3 clock (25+75ns)

– Fabrication has been done for training even if we had known bug.

Max Delay

MATRIX 3.60

ENCODER 1.70

Total 5.92 (ns)

Page 12: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

12

SB ASICIssues, Development Plan

• Issues– Radiation Tolerance

• Dose 25 Gy (10 yrs)• Neutron 3.9x10^12 (8.1x10^11 for >1MeV) (10 yrs)• We choose normal process for fabrication, but pay lots of

attention for functionality– Magnetic Field

• 100 ~ 1000 Gauss, need confirmation for working• Under investigating

– Future plan• Summarized in the last slide

Soft Tolerant Hard

Page 13: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

13

Hi-pT board/ASIC• Inputs are encoded data of SB for tri

ple and doublet• All SB processed data are once pass

ed in a Hi-pT system• Hi-pT ASICs on a Hi-pT board are (VM

E 9U module) installed in a Hi-pT crate which is put on a outer rim of the pivot doublet

• Basic relation of board and ASIC

• But number of ASICs/board are different for different trigger purposes

LVDS/TTL Hi-pT ASIC

Opt./E Conv.

Hi-pT track Identification

• pT > 20 GeV/c

Page 14: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

14

Structure and block diagrams(Wire and Strip)

• For both wire and strip, a common ASIC will serve

• Main Blocks– TRIPLET-IN/DOUBLET-IN

1. Phase Adjust2. Decode

– MATRIX– 2-out-of-6 SELECT– H/L SELECT

(If no Hi-pT, then Low-Pt data are filled in output buffer)

– G-OUT(Serializer/G-link converter)

Page 15: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

15

Matrix for wire&strip

Wire Input

192 x 232 CM

Wire Input

192 x 232 CM

Strip Input

192 x 192 CM

Strip Input

192 x 192 CM

Page 16: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

16

Logical Diagram of Hi-pT Matrix

Page 17: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

17

Main modifications since the last TDR

• OR logic for strip signal(for track signals shared with two(three) chambers)

• DAQ part is removed (SB readout only)

• 2-out-of-6 SELECT 6 tracks are found, but only two highest pT tracks are sent to Sector Logic

• Width of Diagonal lines of CM widen (|15| to |20|)• Identical output format for both strip & wire (9 bits)

OR is needed

direction

Page 18: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

18

Status,Future Plan for Hi-Pt ASIC

• Complete design, and simulation have been done– Confirmed all blocks work fine– Maximum delay of the ASIC estimated as 2 clock (4 assigned)

• Fabrication with 0.6um Rohm Full custom has been done– Hardware inspection is now being done in Tokyo and KEK

• If we find no problem, then we proceed to produce prototype-0 chip in this year (0.35um 3.3V)

• Number of ASICs is not so large, we can make all with University VLSI Design Education Center (VDEC).

Page 19: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

19

Hi-pT Board configuration and

production

Page 20: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

20

One of Hi-pT boards

Page 21: Outline Slave Board Task of Board and its ASIC (Board ~ ASIC) System, and Structure of the ASIC

14/6/2000 End Cap Muon Trigger Review at CERN

21

Summary

• SB ASIC/Board– Concentrate to complete design– Four sorts of functions into one ASIC– + DAQ system ingredient– We are contacting several companies

• Mask pattern made with VDEC and send to a fabrication company (Rohm,inc,Kyoto,Japan) (to save money)

• Complete order to a companybut difficult to find a company since number of fabrications (~5000) too small for them

– Full Design&simulation must be finalized till Oct,’00

• Hi-pT ASIC/Board– Nearly ready to produce the prototype 0 chip– Will be ready till Oct,’00