Outline. Pore Pressure and Fracture G radient Drilling Fluid Casing Design Cement Design Drilling Bit Economic Analysis. Area of Interest. Area of Interest. Area of Interest. Area of Interest. OGIP Surface Map. Porosity Surface Map. Porosity 3D View. Net Pay 3D View. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Outline
Page 2: Outline

OutlinePore Pressure and Fracture GradientDrilling FluidCasing DesignCement DesignDrilling BitEconomic Analysis

Page 3: Outline

Area of Interest

Page 4: Outline

Area of Interest

Page 5: Outline

Area of Interest

Page 6: Outline

Area of Interest

Page 7: Outline

OGIP Surface Map

Page 8: Outline

Porosity Surface Map

Page 9: Outline

Porosity 3D View

Page 10: Outline

Net Pay 3D View

Page 11: Outline

Vertical Well Placement

Page 12: Outline

Horizontal Well Placement

Page 13: Outline

Future Production Estimate

Page 14: Outline

Fracturing Well #1

Page 15: Outline

Pore Pressure and Fracture Gradient

Equation used Pff = 0.33 x [(σOB / d) + 2 x (σpore / d)]

Pore Pressure Gradient

Approximately 0.42 psi/ft

Fracture Gradient

Approximately 0.73 psi/ft

Page 16: Outline

Casing DesignAPI GRADE Yield Strength Min Ultimate Strength Min Elongation J-55 40K (min) – 80K (max) [psi] 60K psi 29.5%[Table 7.1 from text]

Based off of the calculated yield strength: around 42,000 psi No need for larger ultimate strength Water Table between 500 – 2000 foot (From NE)

Conductor Casing: 50 feet Surface Casing: 2200 feet Intermediate Casing: 6000 feet Production Casing: 12000 feet

50

2200

6000

12000

Page 17: Outline

Casing Design cont’d Casing Diameter Casing Pressure

Conductor 23.125 in 20 in 35 psi

Surface 19.2 in 14 in 1100 psi Intermediate 13.5 in 11.25 in

2460 psi Production 9.4 in 8.4 in 4850 psi

• SF = 1.7

Page 18: Outline

Casing Design cont’d Casing Collapse Res.

Conductor 480 psi Surface 1875 psi Intermediate 5500 psi Production 10200 psi

MW = Pressure x (0.052 x TVD)

Page 19: Outline

Drilling Fluid Casing Mud Weight

Conductor 13.4 ppg Surface 8.76 ppg Intermediate 7.58 ppg Production 6.16 ppg

MW = Pressure x (0.052 x TVD)

Page 20: Outline

Cement DesignType: Class C High early strength properties which allows cement to be used at high water levels.Regularly used for shallow well cementing operations through salt beds.

Density of the cement = 11.53 ppg

Page 21: Outline

Cement Design cont’dAc = ( dout

2 – din

2) / 1029.4 (bbl/ft)Volume = Ac (bbl/ft) * Depth (ft) Casing Cement Volume Conductor 6.5 bbl 36.498 ft3

Surface 368.9 bbl 2071.37 ft3

Intermediate 324.58 bbl 1822.52 ft3

Production 207.49 bbl 1165.07 ft3

Total cement Volume 907.47 bbl 5095.44 ft3

Page 22: Outline

Drilling BitDrilling through shale and sandstone We will use Poly diamond crystal bit (because

they are faster and tend not to break as often as other bits)

Use multi pad drilling (Will use 75% less land)

Page 23: Outline

DrillingHow many days to reach depth?It will take about 14 and half days to drill to the

pay zone with an average rate of penetration of 34.3 ft/hr

Page 24: Outline

How much will it cost per day?rule-of-thumb for trip-time estimations is 1

hr/1,000 ft of a well.C= [(R=$1125)( (t=12 hrs) +(td=350hrs)+Cb

$25,000]/(F=12,000ft) = $36.02/ft$29,652.35How much will it cost total to drill?$432,331.27