outline 1.brief overview of multibox model (john) 2.results of independent testing (katherine)...

14
Outline 1. Brief overview of multibox model (John) 2. Results of independent testing (Katherine) 3. Next steps for development (?) (John) 4. Overview of planned uncertainty testing (Tom)

Upload: jordan-donovan

Post on 27-Mar-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

Outline

1. Brief overview of multibox model (John)

2. Results of independent testing (Katherine)

3. Next steps for development (?) (John)

4. Overview of planned uncertainty testing (Tom)

Page 2: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

Multibox PCB Model

CFWG Meeting

September 15, 2005

Page 3: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

• Multibox ?– 50 Model Boxes

– 2 Vertical Layers

– 100 cm of sediments

• Physics Forced by:– Tides at Golden Gate

– ‘Delta Outflow’

– Local Tributaries

– Wind, Rain

Page 4: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

PCBs in shallow sediments Version 2.0b

Page 5: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

PCBs in channel sediments Version 2.0b

Page 6: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned
Page 7: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned
Page 8: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

Independent Testing of SFEI’s Multi-box Model for PCB Fate and

Transport

Prepared by Tetra Tech, Inc.

Lafayette, CA

September 15, 2005

Page 9: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

Next Steps for Model Development

Page 10: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

Recommendations from independent testing:

• Documentation is outdated– Provide documentation sufficient to proceed with testing without

creating an extra report.• Include updating equations from draft report• Eventually document everything in a draft technical report

• Review and modify historic input data– Data are available, easy to update inputs

• Add variability to forecast data– Investigate applicability of alternative methods for generation of

forecast inputs

• Investigate sea level rise– Interesting question, out of the scope of this project

Page 11: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

• Investigate impact of elevated SSC in Lower South Bay on PCB transport– Contribution to PCB mass transport is likely small,

though an investigation is warranted– Prefer to leave sediment model development to

Schoellhamer et al.

• Evaluate spin-up period. Investigate alternative initialization.– Significant consequences for PCB transport– Artifact of sediment model calibration– Lack data to change PCB initial conditions

• Include additional congeners– Yes

Recommendations from independent testing:

Page 12: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

• Can Model / Data comparison be improved?– How good does hindcast need to be?– Probabilistic comparison may be useful– Loading function may be cause of overestimate

• Calibration (of loading curve?) Loading Curve

Recommendations from independent testing:

Page 13: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

Estimated Timeline

Create documentation 3-4 days

Review/modify input data 2-3 days

Elevated SSC in LSB 2-3 days

Adjust spin-up period 4-5 days **

Additional congeners 2 days

Improve hindcast (calibration) 5+ days **

Total: 18-22 days

10-12 daysRed indicates steps ‘critical’ to continue with testing

Page 14: Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned

Uncertainty Testing