outer back strips pre-installation
DESCRIPTION
Outer Back strips pre-installation . 16 radial Back strips that we would like to reassemble early July on the stand off. Back strips are reassembled on the stand offs identified in red on the ID face. Justification. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Outer Back strips pre-installation](https://reader035.vdocuments.us/reader035/viewer/2022062315/5681662a550346895dd98c91/html5/thumbnails/1.jpg)
Outer Back strips pre-installation
![Page 2: Outer Back strips pre-installation](https://reader035.vdocuments.us/reader035/viewer/2022062315/5681662a550346895dd98c91/html5/thumbnails/2.jpg)
16 radial Back strips that we would like to reassemble early July on the stand off
![Page 3: Outer Back strips pre-installation](https://reader035.vdocuments.us/reader035/viewer/2022062315/5681662a550346895dd98c91/html5/thumbnails/3.jpg)
Back strips are reassembled on the stand offs identified in red on the ID face
![Page 4: Outer Back strips pre-installation](https://reader035.vdocuments.us/reader035/viewer/2022062315/5681662a550346895dd98c91/html5/thumbnails/4.jpg)
Justification
• The windows for IDEP installation is rather short, 1rst week of August, for both sides installation. An earlier installation of the back strips will release the schedule constrains.
• Earlier installation of the back strips will also allow the team to control that no stand offs have been moved or removed, and act consequently.