~~-110016 Government of India
Northern Regional Power Committee 18-A, S. Jeet Singh Marg, Katwaria Sarai,
New Delhi-110016
<ir.r-011-26513265' 26868681 ~Fax :26865206
~l)ere- mail: [email protected]
~ebsite: www.nrpc.gov.in
~- 13, lo • . 2016
Subject: Proposed outage programme of Transmission Assets for consideration in 128th OCC Meeting-Reg.
\3cq1~'1 cf;qf."l4l iiTa \3cq1~'1 ~ ~ q{{~u1 cf;qf."l4l CfiT SIH11fcld ~ Cfl14'~~ En m~ m~ \3cql~'1 cf;qf."l41. iiTa Slfdlfcla q({~o1 ~ (ft&l~Cfl-1 ~ 2(A&B) ,3A,38(1-7) CfiT
~ Cfl14'~~ ;:J.&f.fct.~. cfiT ~~fil~c(http://www.nrpc.gov.in) lf{ ~~ ~ 1 \3Ui ~
Cfl14'~~ 14 ~, 2016 oFT 10.30 ~if cflR4l CflTrfiJf"fi~l En~ Sl'tll&1'1 fi~f"Cil( \3qf1fl\Rl cfiT
128cft ~if~ iiTa ~-Fctll"J<f ~ mwr ~ ' ~ ;:J.fit.m.~.En. cfiT ~mit \3q4l~l if
~~I
Outage programme of Generating Units proposed by Generating Companies (Annexure-!) and outage programme of Transmission Elements proposed by Generating and Transmission Companies (Annexure-11 (A&B) and Annexure3A,3B(1-7) has been up-loaded on NRPC's web-site (http://www.nrpc.gov.in). This proposed outage programme is for consideration/approval of the OCC in its 128th meeting to be held on 14th October 2016 (from 10.30 hrs.) through video conferencing wherein resources of NRLDC would be utilised.
(m C1~a1lctCfl't) (Ajay Talegaonkar)
3fal&10T ~(SI'il 1&1'1)
~ fi4l\l16fl ~. ~""' 1&1'1 fi~.-~4 ;:J11-~
Annexure – 1
PROPOSED OUTAGE OF GENERATION STATIONS FOR THE MONTH OF NOVEMBER, 2016 THDC India Limited S.No. Station Unit
No. Capacity Date of
Start Date of
Completion No. of Days Remarks
1 Koteshwar HEP 4 100 08.11.2016 23.12.2016 45 Annual Maintenance
* Remarks: For Unit # 3 maintenance schedule has already been approved in last OCC meeting from 22.09.2016 to 10.11.2016
RRVUNL S.No. Station Unit
No. Capacity Date of
Start Date of
Completion No. of Days Remarks
1 SSTPS, Suratgarh 5 250 01.11.2016 15.12.2016 45 Annual Capital
Overhaul
NTPC – NCR S.No. Station Unit
No. Capacity Date of
Start Date of
Completion No. of Days Remarks
1 Badarpur 5 - 14.11.2016 08.12.2016 - Annual Capital
Overhaul
Indraprastha Power Generation Co. Ltd. & PPCL S.No. Station Unit
No. Capacity Date of
Start Date of
Completion No. of Days Remarks
1 PPS-III Bawana PPCL STG1 - 01.11.2016 30.11.2016 30 Overhauling of Steam Turbine &
Inspection of Generator
Remarks: GT#2 of Module-1 will be available in open cycle operation during proposed period. Module-II (i.e. GT#3, GT#4 & STG#2) will be available in combined cycle. NHPC S.No. Station Unit No. Capacity Date of Start Date of
Completion No. of Days Remarks
1. Bairasuil 1 60 10-11-2016 29-11-2016 20 Annual Maintenance
2. Salal 1 115 01-10-2016 09-11-2016 40 Annual Maintenance
3. Salal 5 115 12-11-2016 21-12-2016 40 Annual Maintenance
4. Salal 6 115 01-10-2016 28-01-2017 120 Capital Maintenance
5. Tanakpur 2 31.4 15-11-2016 14-12-2016 30 Annual Maintenance
6. Uri 1 120 08-11-2016 22-11-2016 15 Annual Maintenance
7. Uri 2 120 25-11-2016 09-12-2016 15 Annual Maintenance
8. Chamera-II 1 100 14-11-2016 28-11-2016 15 Annual Maintenance
9. Dhauliganga 4 70 15-11-2016 06-12-2016 22 Annual Maintenance
10. Sewa-II 1 40 16-11-2016 03-12-2016 18 Annual Maintenance
11. Uri-II 1 60 01-11-2016 20-11-2016 20 Annual Maintenance
12. Uri-II 2 60 24-11-2016 13.12.2016 20 Annual Maintenance
13. Parbati-III 3 130 01-11-2016 15.12.2016 45 Capital Maintenance
Above shutdowns are subject to availability of water.
DATE TIME DATE TIME
1 PGCIL 800 AGRA BNC PGCIL I INTER Cont
For Integration of Pole-3 with
Pole-1 and neutral busbar
installation work at both end.
19/11/16 8:00 23/11/16 18:00 Agra
2 PGCIL 800 AGRA BNC PGCIL II INTER Cont
For Integration work of Pole-4
with Pole-1 and extension of
HV side Busbar at both end.
25/11/16 8:00 30/11/16 18:00 Agra
3 PGCIL 500 BALIA BHIWADI PGCIL I INTRA DAILYHVDC line and Terminal eqpt
AMP/ prewinter maint works.21/11/16 8:00 24/11/16 18:00
4 PGCIL 500 BALIA BHIWADI PGCIL II INTRA DAILYHVDC line and Terminal eqpt
AMP/ prewinter maint works.25/11/16 8:00 30/11/16 18:00
5 PGCIL 500 BALIA BHIWADI PGCIL I INTRA DAILYHVDC line and Terminal eqpt
AMP/ prewinter maint works.29/11/16 8:00 30/11/16 18:00
6 PGCIL 500 RIHAND DADRI PGCIL I INTRA CONTHVDC line and Terminal eqpt
AMP/ prewinter maint works.03/11/16 8:00 09/11/16 18:00 Rh/Dadri
7 PGCIL 500 RIHAND DADRI PGCIL II INTRA CONTHVDC line and Terminal eqpt
AMP/ prewinter maint works.10/11/16 8:00 15/11/16 18:00 Rh/Dadri
8 PGCIL 765 BHIWANI PHAGI PGCIL I INTRA DAILY Pre winter maintenance work 30/11/16 8:00 30/11/16 18:00 SIKAR/ Bassi
9 PGCIL 765 BHIWANI PHAGI PGCIL II INTRA DAILY
RTV Coating on HV-Bushing
of L/ Reactor one unit each
day/ swaping with Spare unit
02/11/16 8:00 05/01/16 18:00 Bhiwani
10 PGCIL 765 BHIWANI MOGA PGCIL I INTRA DAILYInstallation of Polymer
insulator in jack Bus-I.25/11/16 8:00 25/11/16 18:00 Bhiwani, 25-26 Moga
11 PGCIL 765 KANPUR JHATIKRA PGCIL S/C INTRA DAILYJumper tightening/ Prewinter
maintenance work.18/11/16 11:00 21/11/16 18:00 VK Singh KNP
12 PGCIL 765 GWALIOR PHAGI PGCIL I INTRA DAILY Pre winter maintenance work 23/11/16 8:00 23/11/16 18:00 Bassi
13 PGCIL 765 GWALIOR PHAGI PGCIL II INTRA DAILY Pre winter maintenance work 24/11/16 8:00 24/11/16 18:00 Bassi
14 PGCIL 765 AGRA FATEHPUR PGCIL INTRA DAILY
Stringing of 400KV Agra(UP)
Agra(S) D/C lines under
Lalitpur-Agra Transmission
project.
01/11/16 8:00 02/11/16 18:00
PROPOSED OUTAGE OF NLDC TRANSMISSION LINES FOR THE MONTH OF NOVEMBER, 2016ANNEXURE 2(A)
VOLT
LEVEL
(KV)
FROMS.N.CKT ID
TOREMARKSNAME OF
REQUESTING AGENCY
LINE DETAILS PROPOSED DATE AND TIME
TO S/S OWNERFROM S/SREASON
DAILY/ CONTINUOUS
INTER/
INTRA
REGION
AL
15 PGCIL 800 AGRA BNC PGCIL I INTRA DAILY
S/D of 132KV Earth Electrode
line at Agra HVDC for stringing
of 400KV Agra(UP) - Agra(S)
D/C lines under Lalitpur-Agra
transmission project. Other
pole will run in metallic return
mode
01/11/16 8:00 02/11/16 18:00
16 PGCIL 800 AGRA BNC PGCIL I INTRA DAILY
S/D of 132KV Earth Electrode
line at Agra HVDC for stringing
of 400KV Agra(UP) - Agra(S)
D/C lines under Lalitpur-Agra
transmission project. Other
pole will run in metallic return
mode
07/11/16 8:00 08/11/16 18:00
17 PGCIL 765 AGRA GWALIOR PGCIL I INTRA DAILY For Insulator Cleaning 05/11/16 8:00 07/11/16 18:00
18 PGCIL 765 AGRA GWALIOR PGCIL II INTRA DAILY For Insulator Cleaning 08/11/16 8:00 10/11/16 18:00
19 PGCIL 765 BALIA LUCK PGCIL INTRA DAILY For Insulator Cleaning 28.11.2016 9:30 1.12.2016 17:30
19SLDC
RAJASTHAN765 ANTA PHAGI RAJASTHAN II INTRA DAILY
Replacement of defective
NGR of line reactor bank of
765KV Anta Phagi II
03/11/16 8:00 03/11/16 20:00
20SLDC
RAJASTHAN220 KOTA BADOD RAJASTHAN - INTRA Cont
For Replacement of
deteriorated twin zebra bus
conductor or 220KV Bus B
which is crossing over line
conductor of 220KV Badod
and RAPP (A) feeder at 220KV
GSS Sakatpura Kota
10/11/16 7:00 11/11/16 18:00
21 SLDC UP 765 ANPARA UNNAO UP - INTRA DAILY For Insulator Cleaning 22/11/16 8:00 25/11/16 18:00
From Date From Time To Date To
TimeRequest Detail
1 NTPC [ DELHI ] Anta(NTPC)-Swaimadhopur(RVPNL)(220 kV) Powergrid Continuous Annual Bay Maintenance 11/3/2016 9:00 11/5/2016
Sno Request By Element Name Owner Name Mode Reasons
18:00
3 NTPC [ DELHI ] Anta(NTPC)-Bhilwara(RVPNL) 1(220 kV) Powergrid Continuous Annual Bay Maintenance 11/28/2016 9:00 11/30/2016
18:00
2 NTPC [ DELHI ] Anta(NTPC)-Lalsot(RVPNL) 2(220 kV) Powergrid Continuous Annual Bay Maintenance 11/21/2016 9:00 11/23/2016
18:00
5 NTPC [ DELHI ] Faridabad(NTPC)-Palla(HVPNL) 2(220 kV) Powergrid Daily Annual Bay Maintenance 11/11/2016 9:00 11/12/2016
18:00
4 NTPC [ DELHI ] Faridabad(NTPC)-Palla(HVPNL) 1(220 kV) Powergrid Daily Annual Bay Maintenance 11/9/2016 9:00 11/10/2016
18:00
18:00
7 NTPC [ DELHI ] Faridabad(NTPC)-Samaypur(BBMB) 2(220 kV) Powergrid Daily Annual Bay Maintenance 11/17/2016 9:00 11/18/2016
18:00
6 NTPC [ DELHI ] Faridabad(NTPC)-Samaypur(BBMB) 1(220 kV) Powergrid Daily Annual Bay Maintenance 11/15/2016 9:00 11/16/2016
17:00
18:008 NTPC [ DELHI ] Rihand HVDC(PG)-Rihand(NTPC) 1(400 kV) NTPC Continuous
Replacement of 20 years old CTs and
maintenance of bay equipments and
testing 11/8/2016 8:00 11/9/2016
18:00
10 NTPC [ DELHI ] Auraiya(NTPC)-Kanpur(PG) 2(400 kV) Powergrid Daily
Maintenance of bay equipments and
testing 11/15/2016 8:00 11/15/2016
9 NTPC [ DELHI ] Allahabad(PG)-Rihand(NTPC) 2(400 kV) Powergrid Daily
Maintenance of bay equipments and
testing 11/11/2016 8:00 11/12/2016
18:00
12 NTPC [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 2(220 kV) Powergrid Continuous
Complete replacement of Protection
Relay panel and Maintenance of bay
equipments and testing 11/3/2016 8:00 11/11/2016
18:00
11 NTPC [ DELHI ] Agra(PG)-Auraiya(NTPC) 2(400 kV) Powergrid Daily
Maintenance of bay equipments and
testing 11/18/2016 8:00 11/18/2016
18:00
18:00
13 NTPC [ DELHI ] Basti(UP)-Tanda(NTPC)(400 kV)
Uttar
Pradesh Daily
Maintenance of bay equipments and
testing 11/18/2016 8:00 11/19/2016
14
PROPOSED OUTAGE OF TRANSMISSION LINES FOR THE MONTH OF NOVEMBER, 2016 ANNEXURE 2B
11/16/20169:0011/16/2016
For tightening of jumpers, vibration
dampers, spacers and lopping
chopping of line & other maintenance
work of line.DailyUttrakhandKashipur-Rishikesh(400 kV)
SLDC_UTTARAKHAND [
UTTARAKHAND ]
17:0015
SLDC_UTTARAKHAND [
UTTARAKHAND ] Kashipur(UTT)-Moradabad(UP)(220 kV) Uttrakhand Daily
For tightening of jumpers, vibration
dampers, spacers and lopping
chopping of line & other maintenance
work of line. 11/17/2016 9:00 11/17/2016
POWERGRID [ DELHI ] Agra-Bassi 1(400 kV) Powergrid Daily For Insulator Cleaning work 11/17/2016 8:00 11/20/2016
18:00
17 POWERGRID [ DELHI ] Agra-Jaipur South-2(400 kV) Powergrid Daily For insulator Cleaning work 11/14/2016 8:00 11/16/2016
16 POWERGRID [ DELHI ] Agra-Jaipur South-1(400 kV) Powergrid Daily For Insulator Cleaning work 11/11/2016 8:00 11/13/2016
21 POWERGRID [ DELHI ] Ballabgarh-Kanpur 1(400 kV) Powergrid Daily For Insulator Cleaning work 11/27/2016 8:00 11/28/2016
18:00POWERGRID [ DELHI ] Agra(PG)-Auraiya(NTPC) 2(400 kV) Powergrid Daily
For polymer insulator replacement
and cleaning 11/26/2016 8:00 11/30/2016
18:00
19 POWERGRID [ DELHI ] Agra(PG)-Auraiya(NTPC) 1(400 kV)
18:0022 POWERGRID [ DELHI ] Fatehpur-Kanpur 2(400 kV) Powergrid Daily For AMP work 11/22/2016 9:30 11/22/2016
18:00
18:00
20
Powergrid Daily
For Polymer insulator replacement
and cleaning 11/21/2016 8:00 11/25/2016
18:00
18
17:30
24 POWERGRID [ DELHI ] Hisar-Moga(400 kV) Powergrid Daily
For AMP Works. (400KV Hisar-Moga-
1) 11/17/2016 9:00 11/17/2016
23 POWERGRID [ DELHI ] Jalandhar - Kurukshetra(400 kV) Powergrid Daily
To facilitate construction activities of
400 KV Kurukshetra-Malerkotla-II line
Equipment erection (i.e. CVT/LA/BPI)
along with TPP Tower and Beam
(Falling besides the induction area of
Jalandhar Line in AIS). 11/1/2016 9:30 11/3/2016
17:30
17:30
26 POWERGRID [ DELHI ] Kishenpur-Moga 2(400 kV) Powergrid Daily For AMP Works. 11/9/2016 9:00 11/9/2016
17:30
25 POWERGRID [ DELHI ] Kishenpur-Moga 1(400 kV) Powergrid Daily For AMP Works. 11/4/2016 9:00 11/4/2016
18:00
29 POWERGRID [ DELHI ] Lucknow(UP)-Singrauli(NTPC)(400 kV) Powergrid Daily For insulator cleaning work 11/12/2016 8:00 11/13/2016
18:00
28 POWERGRID [ DELHI ] Allahabad(PG)-Singrauli(NTPC) 2(400 kV) Powergrid Daily For insulator cleaning work 11/10/2016 8:00 11/11/2016
27 POWERGRID [ DELHI ] Allahabad(PG)-Singrauli(NTPC) 1(400 kV) Powergrid Daily For insulator cleaning work 11/8/2016 8:00 11/9/2016
18:00
18:00
30 POWERGRID [ DELHI ] Allahabad(PG)-Rihand(NTPC) 1(400 kV) Powergrid Daily For insulator cleaning work 11/15/2016 8:00 11/16/2016
18:00
31 POWERGRID [ DELHI ] Allahabad(PG)-Rihand(NTPC) 2(400 kV) Powergrid Daily For insulator cleaning work 11/15/2016 8:00 11/16/2016
30 POWERGRID [ DELHI ] Allahabad(PG)-Rihand(NTPC) 1(400 kV) Powergrid Daily For insulator cleaning work 11/15/2016 8:00 11/16/2016
18:00
33 POWERGRID [ DELHI ] Allahabad-Fatehpur 2(400 kV) Powergrid Daily For insulator cleaning work 11/17/2016 8:00 11/18/2016
18:00
32 POWERGRID [ DELHI ] Allahabad-Fatehpur 1(400 kV) Powergrid Daily For insulator cleaning work 11/17/2016 8:00 11/18/2016
18:00
18:00
34 POWERGRID [ DELHI ] Fatehpur-Singrauli(400kV) Powergrid Daily For insulator cleaning work 11/21/2016 8:00 11/22/2016
35 POWERGRID [ DELHI ] Fatehpur-Mainpuri 1(400 kV) Powergrid Daily For insulator cleaning work 11/5/2016 8:00 11/7/2016
18:00
37 POWERGRID [ DELHI ] Lucknow-Rosa(400 kV) Powergrid Daily Insulator cleaning 11/21/2016 9:30 11/21/2016
18:00
36 POWERGRID [ DELHI ] Fatehpur-Mainpuri 2(400 kV) Powergrid Daily For insulator cleaning work 11/8/2016 8:00 11/10/2016
17:30
39 POWERGRID [ DELHI ] Agra(PG)-Auraiya(NTPC) 2(400 kV) Powergrid Continuous
For 02 Nos. bushing replacement
work on DGA violation 11/8/2016 9:00 11/8/2016
17:30
38 POWERGRID [ DELHI ] 400KV LUCKNOW-SHAHJHNPR-II(400 kV) Powergrid Daily Insulator cleaning 11/22/2016 9:30 11/22/2016
18:00
41 POWERGRID [ DELHI ] Allahabad-Fatehpur 1(400 kV) Powergrid Daily For AMP work 11/10/2016 9:30 11/10/2016
18:00
40 POWERGRID [ DELHI ] Agra-Jaipur South-1(400 kV) Powergrid Continuous
For 02 Nos.Bushing replacement
work on DGA violation 11/9/2016 9:00 11/9/2016
18:00
43 POWERGRID [ DELHI ] Fatehpur-Kanpur-1(400 kV) Powergrid Daily For AMP work 11/15/2016 9:30 11/15/2016
18:00
42 POWERGRID [ DELHI ] Allahabad-Fatehpur 2(400 kV) Powergrid Daily For AMP work 11/8/2016 9:30 11/8/2016
17:30
45 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 2(220 kV) Powergrid Daily Insulator replacement work 11/7/2016 9:30 11/12/2016
18:00
44 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 1(220 kV) Powergrid Daily Insulator replacement work 11/1/2016 9:30 11/6/2016
17:30
17:30
47 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 4(220 kV) Powergrid Daily Insulator replacement work 11/19/2016 9:30 11/24/2016
17:30
46 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 3(220 kV) Powergrid Daily Insulator replacement work 11/13/2016 9:30 11/18/2016
18:0048 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 1(400 kV) Powergrid Continuous
Erection works of Dead end Tower
and Beam for new FSC. 11/16/2001 8:00 11/16/2001
49 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 1(400 kV) Powergrid Continuous
Erection works of Dead end Tower
and Beam for new FSC. 11/16/2008 8:00 11/16/2008
19:00
51 POWERGRID [ DELHI ] Agra-Sikar 2(400 kV) Powergrid Continuous
Jumper tightening/ Prewinter AMP
works. 11/16/2013 8:00 11/16/2014
18:00
50 POWERGRID [ DELHI ] Agra-Sikar 1(400 kV) Powergrid Continuous
Jumper tightening/ Prewinter AMP
works. 11/16/2011 8:00 11/16/2012
18:00
53 POWERGRID [ DELHI ] Neemrana-Sikar 2(400 kV) Powergrid Continuous
Jumper tightening/ Prewinter AMP
works. 11/16/2010 8:00 11/16/2010
18:00
52 POWERGRID [ DELHI ] Neemrana-Sikar 1(400 kV) Powergrid Continuous
Jumper tightening/ Prewinter AMP
works. 11/16/2009 8:00 11/16/2009
18:00
55 POWERGRID [ DELHI ] Ballabgarh-Mainpuri 1(400 kV) Powergrid Continuous
Diversion due to DFCC Rail project.It
involves erection of 01 No tower. 11/16/2014 8:00 11/16/2023
18:00
54 POWERGRID [ DELHI ] Bhiwadi-Gurgaon(400 kV) Powergrid Continuous
Diversion due to DFCC Rail project.It
involves erection of 01 No tower. 11/16/2007 8:00 11/16/2011
18:00
57 POWERGRID [ DELHI ] Koteshwar Pool(PG)-Koteshwar(THDC) 1(400 kV) Powergrid Continuous
Replacement of Isolator contacts at
Koteshwar-GIS. With Bus-I S/D 11/16/2005 8:00 11/16/2007
18:00
56 POWERGRID [ DELHI ] Ballabgarh-Mainpuri 2(400 kV) Powergrid Continuous
Diversion due to DFCC Rail project.
Erection/dismantalling of 2 towers. 11/16/2014 8:00 11/16/2023
18:00
59 POWERGRID [ DELHI ] Koteshwar Pool(PG)-Tehri(THDC) 1(220 kV) Powergrid Continuous
Replacement of Isolator contacts at
Koteshwar-GIS. With Bus-I S/D 11/16/2012 8:00 11/16/2014
18:00
58 POWERGRID [ DELHI ] Koteshwar Pool(PG)-Koteshwar(THDC) 2(400 kV) Powergrid Continuous
Replacement of Isolator contacts at
Koteshwar-GIS. With Bus-I S/D 11/16/2008 8:00 11/16/2010
18:00
61 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 1(400 kV) Powergrid Continuous
Replacement of Isolator contacts at
Koteshwar-GIS. With Bus-I S/D 11/16/2019 8:00 11/16/2021
18:00
60 POWERGRID [ DELHI ] Koteshwar Pool (PG)-Tehri(THDC) 2(220 kV) Powergrid Continuous
Replacement of Isolator contacts at
Koteshwar-GIS. With Bus-I S/D 11/16/2015 8:00 11/16/2017
18:00
63 POWERGRID [ DELHI ] Agra-Jaipur South-1(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2009 8:00 11/16/2009
18:00
62 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 2(220 kV) Powergrid Continuous
Replacement of Isolator contacts at
Koteshwar-GIS. With Bus-I S/D 11/16/2022 8:00 11/16/2024
18:00
18:00
64 POWERGRID [ DELHI ] Agra-Jaipur South-2(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2010 8:00 11/16/2010
65 POWERGRID [ DELHI ] Agra-Bassi 1(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2011 8:00 11/16/2013
18:00
67 POWERGRID [ DELHI ] Bassi-Jaipur 2(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2016 8:00 11/16/2016
18:00
66 POWERGRID [ DELHI ] Bassi-Jaipur 1(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2015 8:00 11/16/2015
18:00
69 POWERGRID [ DELHI ] Kota(PG)-Merta(RVPNL) 1(400 kV) Powergrid Continuous
Replacement of bottom Expandable
below of Line Reactor. 11/16/2023 8:00 11/16/2026
18:00
68 POWERGRID [ DELHI ] Bassi(PG)-Heerapura(RVPNL) 2(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2017 8:00 11/16/2017
18:00
71 POWERGRID [ DELHI ] Ballabgarh-Maharanibagh(400 kV) Powergrid Continuous
Shifting of towers and line diversion
for DFCC track at Loc.78-80.
Reapplied from 127OCC as per dates
agreed and confirmed by DTL. 11/16/2010 8:00 11/16/2012
18:00
70 POWERGRID [ DELHI ] Agra(PG)-Agra(UP) 1(400 kV) Powergrid Continuous
Stringing/termination and jumpering
for charging of LILO at Fatehabad. 11/16/2001 8:00 11/16/2003
18:00
73 POWERGRID [ DELHI ] Dadri(NTPC)-Maharanibagh(PG)(400 kV) Powergrid Continuous
Shifting of towers and line diversion
for DFCC track at Loc.78-80.
Reapplied from 127OCC as per dates
agreed and confirmed by DTL. 11/16/2013 8:00 11/16/2015
18:00
72 POWERGRID [ DELHI ] Dadri(NTPC)-Maharanibagh(PG)(400 kV) Powergrid Continuous
Shifting of towers and line diversion
for DFCC track at Loc.78-80.
Reapplied from 127OCC as per dates
agreed and confirmed by DTL. 11/16/2010 8:00 11/16/2012
18:00
75 POWERGRID [ DELHI ] Kanpur(PG)-Panki(UP) 1(400 kV) Powergrid Continuous
Jumper tightening/ Prewinter
maintenance work. 11/16/2007 8:00 11/16/2010
18:00
74 POWERGRID [ DELHI ] Ballabgarh-Maharanibagh(400 kV) Powergrid Continuous
Shifting of towers and line diversion
for DFCC track at Loc.78-80.
Reapplied from 127OCC as per dates
agreed and confirmed by DTL. 11/16/2013 8:00 11/16/2015
18:00
77 POWERGRID [ DELHI ] Bassi(PG)-Dausa(RVPNL) 1(220 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2004 8:00 11/16/2004
18:00
76 POWERGRID [ DELHI ] Kanpur(PG)-Panki(UP) 2(400 kV) Powergrid Continuous
Jumper tightening/ Prewinter
maintenance work. 11/16/2011 8:00 11/16/2014
18:00
18:00
79 POWERGRID [ DELHI ] Heerapura(RVPNL)-I.G.Nagar(RVPNL)(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2006 8:00 11/16/2006
78 POWERGRID [ DELHI ] Bassi(PG)-Dausa(RVPNL) 2(220 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2005 8:00 11/16/2005
18:00
81 POWERGRID [ DELHI ] Dausa(RVPNL)-Sawai madopur(RVPNL)(220 kV) Powergrid Continuous
Disc insulator replacemnt with
polymer string 11/16/2007 8:00 11/16/2008
18:00
80 POWERGRID [ DELHI ] Heerapura(RVPNL)-Sanganer(RVPNL)(220 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2007 8:00 11/16/2008
18:00
83 POWERGRID [ DELHI ] Anta(NTPC)-Bhilwara(RVPNL) 2(220 kV) Powergrid Continuous
Disc insulator replacemnt with
polymer string 11/16/2021 9:00 11/16/2026
18:00
82 POWERGRID [ DELHI ] Anta(NTPC)-Bhilwara(RVPNL) 1(220 kV) Powergrid Continuous
Disc insulator replacemnt with
polymer string 11/16/2014 8:00 11/16/2019
18:00
85 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 2(220 kV) Powergrid Continuous
OPGW stringing work. Earth peak
strengthening in 14 towers. 10/16/2020 8:00 10/16/2023
19:00
84 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 1(220 kV) Powergrid Continuous
OPGW stringing work. Earth peak
strengthening in 14 towers. 10/16/2020 8:00 10/16/2023
18:00
87 POWERGRID [ DELHI ] Cbganj(UP)-Tanakpur(NHPC) (220 kV) Powergrid Continuous Shifting on ERS for diversion work 11/16/2018 8:00 11/16/2020
18:00
86 POWERGRID [ DELHI ] Cbganj(UP)-Sitarganj(PG)(220 kV) Powergrid Continuous Shifting on ERS for diversion work 11/16/2015 8:00 11/16/2017
18:00
89 POWERGRID [ DELHI ] Cbganj(UP)-Tanakpur(NHPC) (220 kV) Powergrid Continuous Re-Stringing for final diversion. 11/16/2026 8:00 11/16/2027
18:00
88 POWERGRID [ DELHI ] Cbganj(UP)-Sitarganj(PG)(220 kV) Powergrid Continuous Re-Stringing for final diversion. 11/16/2023 8:00 11/16/2024
18:00
18:0090 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 2(220 kV) Rajasthan Daily
Jumper tightening/ Prewinter AMP
works. 11/7/2016 8:00 11/7/2016
18:00
93 POWERGRID [ DELHI ] Anta(NTPC)-Swaimadhopur(RVPNL)(220 kV) Powergrid Daily
Disc insulator replacement with
polymer string. 11/4/2016 8:00 11/6/2016
18:00
92 POWERGRID [ DELHI ] Anta(NTPC)-Lalsot(RVPNL) 2(220 kV) Powergrid Daily
Disc insulator replacement with
polymer string. 11/1/2016 8:00 11/3/2016
91 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 4(220 kV) Rajasthan Daily
Jumper tightening/ Prewinter AMP
works. 11/8/2016 8:00 11/8/2016
18:00
95 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 2(220 kV) Rajasthan Daily
Jumper tightening/ Prewinter AMP
works. 11/17/2016 8:00 11/17/2016
18:00
94 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 1(220 kV) Rajasthan Daily
Jumper tightening/ Prewinter AMP
works. 11/16/2016 8:00 11/16/2016
18:00
17:00
17:00
107 BBMB [ CHANDIGARGH ] Dasuya(PSEB)-Pong(BBMB)-1(220 kV) BBMB Daily Half yearly mtc. 11/8/2016 8:00 11/8/2016
17:00
106 BBMB [ CHANDIGARGH ] Jassor(HP)-Pong(BBMB)(220 kV) BBMB Daily
Half yearly mtc. of S/S equipment at
Pong 11/5/2016 8:00 11/5/2016
105 BBMB [ CHANDIGARGH ] Bairasuil(NHPC)-Pong(BBMB)(220 kV) Powergrid Daily Half yearly mtc. 11/4/2016 8:00 11/4/2016
109 BBMB [ CHANDIGARGH ] Baira suil(NHPC)-Pong(BBMB)(220 kV) BBMB Daily Half yearly mtc. 11/22/2016 8:00 11/24/2016
108 BBMB [ CHANDIGARGH ] Dasuya(PSEB)-Pong(BBMB)-2(220 kV) BBMB Daily Half yearly mtc. 11/9/2016 8:00 11/9/2016
17:00
17:00
112 BBMB [ CHANDIGARGH ] Hisar(BBMB)-Hisar-IA(HVPNL) 2(220 kV) Haryana Daily General 10/18/2016 8:00 10/18/2016
17:00
111 BBMB [ CHANDIGARGH ] Hisar(BBMB)-Hisar-IA(HVPNL) 1(220 kV) Haryana Daily General 10/17/2016 8:00 10/17/2016
17:00
110 BBMB [ CHANDIGARGH ]
18:00
97 POWERGRID [ DELHI ] Sikar(PG)-Sikar(RVPNL) 2(220 kV) Rajasthan Daily
Jumper tightening/ Prewinter AMP
works. 11/19/2016 8:00 11/19/2016
96 POWERGRID [ DELHI ] Sikar(PG)-Sikar(RVPNL) 1(220 kV) Rajasthan Daily
Jumper tightening/ Prewinter AMP
works. 11/18/2016 8:00 11/18/2016
18:00
18:00
98 POWERGRID [ DELHI ] Fatehpur(PG)-Naubasta(UP)(400 kV)
Uttar
Pradesh Daily
AMP work of the Line Eqipments &
Hot spot Attending Work in Y phase
line conductor 11/3/2016 9:00 11/3/2016
Stringing of 400KV Agra (UP)-
Agra(S) D/C lines under Lalitpur Agra
Transmission Project 11/5/2016 8:00 11/6/2016 18:00
101 POWERGRID [ DELHI ] Agra-Bhiwadi I (400kV) Power Grid Daily
Stringing of 400KV Agra (UP)-
Agra(S) D/C lines under Lalitpur Agra
Transmission Project 11/2/2016 8:00 11/3/2016 18:00
100 POWERGRID [ DELHI ] Agra-Bassi (400kV) Power Grid Daily
99 POWERGRID [ DELHI ] Agra-Ballabhgarh (400kV) Power Grid Daily
Diversion due to construction of
DFCC Track New Tower Erection 11/5/2016 8:00 11/19/2016 18:00
103 POWERGRID [ DELHI ] Bhiwadi-Hissar I (400kV) Power Grid Daily
Diversion due to construction of
DFCC Track New Tower Erection 11/5/2016 8:00 11/19/2016 18:00
102 POWERGRID [ DELHI ] Agra-Bhiwadi II (400kV) Power Grid Daily
Diversion due to construction of
DFCC Track New Tower Erection 11/20/2016 8:00 12/10/2016 18:00
Diversion due to construction of
DFCC Track New Tower Erection 11/20/2016 8:00 12/10/2016 18:00
104 POWERGRID [ DELHI ] Bhiwadi-Kotputli (400kV) Power Grid Daily
Jassor(HP)-Pong(BBMB)(220 kV) BBMB Daily Half yearly mtc. 11/28/2016 8:00 11/30/2016
17:00
122 Badarpur (NTPC)-Balbagarh(BBMB)1 BBMB Daily Replacement of CT and yearly MTC 11/10/2016 11/10/2016
123 Badarpur (NTPC)-Balbagarh(BBMB)2 BBMB Daily of line and equipment 11.11.2016 11.11.2016BBMB [ CHANDIGARGH ] 8:00 17:00
126 SLDC_DELHI [ DELHI ] Bawana(DTL)-Mandola(PG) 1(400 kV) Delhi Daily
S/D AT BAWANA FOR ANNUAL
MAINTENANCE AND TAN DELTA
TEST. 11/29/2016 9:30 11/29/2016
17:00112 BBMB [ CHANDIGARGH ] Hisar(BBMB)-Hisar-IA(HVPNL) 2(220 kV) Haryana Daily General 10/18/2016 8:00 10/18/2016
17:00
17:00
127 SLDC_DELHI [ DELHI ] Bawana(DTL)-Mandola(PG) 2(400 kV) Delhi Daily
S/D AT BAWANA FOR ANNUAL
MAINTENANCE AND TAN DELTA
TEST. 11/30/2016 9:30 11/30/2016
11/11/2016 9:00 11/12/2016 18:00
125 NHPC [ DELHI ] Bairasuil(NHPC)-Pong(BBMB)(220 kV) Powergrid Continuous
Pre-winter mtc. of line & yearly mtc. of
S/S equipment. 11/5/2016 8:00 11/5/2016 17:00
115 BBMB [ CHANDIGARGH ] Panipat-Narela 1(220 kV) BBMB Daily
Pre-winter mtc. of line & yearly mtc. of
S/S equipment. 11/4/2016 8:00 11/4/2016 17:00
114 BBMB [ CHANDIGARGH ] Bhiwani-Dehar(400 kV) BBMB Daily
113 BBMB [ CHANDIGARGH ] Bhiwani-Dehar(400 kV) BBMB Daily
Pre-winter 10/18/2016 8:00 10/18/2016 17:00
117 BBMB [ CHANDIGARGH ] Narela(DTL)-Rohtakroad(BBMB) 1(220 kV) BBMB Daily
Pre-winter 10/17/2016 8:00 10/17/2016 17:00
116 BBMB [ CHANDIGARGH ] Panipat-Narela 2(220 kV) BBMB Daily
Pre-winter mtc. of line & yearly mtc. of
S/S equipment. 11/9/2016 8:00 11/9/2016 17:00
119 BBMB [ CHANDIGARGH ] Ballabhgarh(BBMB)-Samaypur(BBMB) - 3(220 kV) BBMB Daily
Pre-winter mtc. of line & yearly mtc. of
S/S equipment. 11/2/2016 8:00 11/2/2016 17:00
118 BBMB [ CHANDIGARGH ] Narela(DTL)-Rohtakroad(BBMB) 2(220 kV) BBMB Daily
Pre-winter mtc. of line & yearly mtc. of
S/S equipments. 11/22/2016 8:00 11/22/2016 17:00
121 BBMB [ CHANDIGARGH ] Dadri(NTPC)-Panipat(BBMB) 2(400 kV) Powergrid Daily
Pre-winter mtc. of line & yearly mtc. of
S/S equipment. 11/15/2016 8:00 11/15/2016 17:00
120 BBMB [ CHANDIGARGH ] Dadri(NTPC)-Panipat(BBMB) 1(400 kV) Powergrid Daily
11/15/2016 8:00 11/16/2016 17:00
129 SJVNL [ HIMANCHAL PRADESH ] Jhakri(SJVNL)-Karchamwangtoo(JP) 2(220 kV) JP Hydro Daily APM for GIS Line Bay
128 SJVNL [ HIMANCHAL PRADESH ] Jhakri(SJVNL)-Karchamwangtoo(JP) 1(220 kV) JP Hydro Daily APM for GIS Line Bay
Pre-winter mtc. of line & yearly mtc. of
S/S equipments. 11/23/2016 8:00 11/23/2016 17:00
124 NHPC [ DELHI ] Bairasiul(NHPC)-Jassure(HPSEB)(220 kV) Powergrid Continuous
Maintenance of SF-6 circuit breaker 11/9/2016 9:00 11/10/2016 18:00
Maintenance of SF-6 circuit breaker
11/21/2016 8:00 11/22/2016 17:00
11/17/2016 8:00 11/18/2016 17:00
130 SJVNL [ HIMANCHAL PRADESH ] Jhakri-Panchkula 1(400 kV) Powergrid Daily APM for GIS Line Bay
19:00
144 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily
setting of panto graph isolators
related to Bus-2 and replacement of
TB's 11/24/2016 8:00 11/24/2016
143 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily
setting of panto graph isolators
related to Bus-2 and replacement of
TB's 11/23/2016 8:00 11/23/2016
19:00
11/21/2016 8:00 11/22/2016 17:00
131 SJVNL [ HIMANCHAL PRADESH ] Jhakri-Panchkula 2(400 kV) Powergrid Daily APM for GIS Line Bay
130 SJVNL [ HIMANCHAL PRADESH ] Jhakri-Panchkula 1(400 kV) Powergrid Daily APM for GIS Line Bay
11/25/2016 8:00 11/26/2016 17:00
133 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 2(400 kV) Powergrid Daily APM for GIS Line Bay
11/23/2016 8:00 11/24/2016 17:00
132 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 1(400 kV) Powergrid Daily APM for GIS Line Bay
11/28/2016 9:00 11/30/2016 16:30
135 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 2(400 kV) Powergrid Daily
Stringing of Shielding / Earth wire
from Western PHY to OG tower of
PGCIL
11/28/2016 8:00 11/29/2016 17:00
134 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 1(400 kV) Powergrid Daily
Stringing of Shielding / Earth wire
from Western PHY to OG tower of
PGCIL
11/28/2016 9:00 11/30/2016 16:30
137 SJVNL [ HIMANCHAL PRADESH ] Rampur - Nallagarh 2(400 kV) Powergrid Daily
Stringing of Shielding / Earth wire
from Western PHY to OG tower of
PGCIL
11/28/2016 9:00 11/30/2016 16:30
136 SJVNL [ HIMANCHAL PRADESH ] Rampur - Nallagarh 1(400 kV) Powergrid Daily
Stringing of Shielding / Earth wire
from Western PHY to OG tower of
PGCIL
11/2/2016 8:00 11/2/2016 19:00
139 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily
setting of panto graph isolators
related to Bus-1 and replacement of
TB's
11/28/2016 9:00 11/30/2016 16:30
138 SLDC_HARYANA [ HARYANA ] Khedar-Nuhiyawali 2(400 kV) Haryana Daily
setting of panto graph isolators
related to Bus-1 and replacement of
TB's
11/4/2016 8:00 11/4/2016 19:00
141 SLDC_HARYANA [ HARYANA ] Khedar-Kirori 1(400 kV) Haryana Daily
setting of panto graph isolators
related to Bus-1 and replacement of
TB's
11/3/2016 8:00 11/3/2016 19:00
140 SLDC_HARYANA [ HARYANA ] Khedar-Kirori 2(400 kV) Haryana Daily
setting of panto graph isolators
related to Bus-1 and replacement of
TB's
11/22/2016 8:00 11/22/2016 19:00
11/5/2016 8:00 11/5/2016 19:00
142 SLDC_HARYANA [ HARYANA ] Khedar-Nuhiyawali 2(400 kV) Haryana Daily
setting of panto graph isolators
related to Bus-2 and replacement of
TB's
19:00
146 SLDC_HARYANA [ HARYANA ] Jhajjar CLP-Kabulpur 1(400 kV) Haryana Daily General Mtc work 11/7/2016 7:00 11/7/2016
145 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily
setting of panto graph isolators
related to Bus-2 and replacement of
TB's 11/25/2016 8:00 11/25/2016
19:00
148 SLDC_HARYANA [ HARYANA ] Jhajjar CLP-Dhanonda -1(400 kV) Haryana Daily General Mtc work 11/9/2016 7:00 11/9/2016
19:00
147 SLDC_HARYANA [ HARYANA ] Jhajjar CLP-Kabulpur 2(400 kV) Haryana Daily General Mtc work 11/8/2016 7:00 11/8/2016
Haryana Daily
For checking and cleaning of
porcelain insulators 11/19/2016 9:00 11/19/2016
19:00
150 SLDC_HARYANA [ HARYANA ] Dipalpur-Kabulpur 1(400 kV) Haryana Daily
For checking and cleaning of
porcelain insulators 11/18/2016 9:00 11/18/2016
19:00
149 SLDC_HARYANA [ HARYANA ] Dhanonda-Jhajjar CLP-2(765 kV) Haryana Daily General Mtc work 11/10/2016 7:00 11/10/2016
15:00
17:00
153 SLDC_HARYANA [ HARYANA ] 400kV G.Noida(UP)-Nawada(HVPNL)(400 kV) Powergrid Daily
To replace the unhealthy and critical
400 kV isolators blades of bus -II and
TIE-II ICT - II with new spares. 11/9/2016 8:00 11/9/2016
17:00
152
16:00
155 SLDC_HARYANA [ HARYANA ] Daultabad(HVPNL)-Gurgaon(PG) -2(400 kV) Haryana Daily For tree cutting 11/4/2016 9:00 11/4/2016
154 SLDC_HARYANA [ HARYANA ] Daultabad(HVPNL)-Gurgaon(PG) -1(400 kV) Haryana Daily For tree cutting 11/2/2016 9:00 11/2/2016
SLDC_HARYANA [ HARYANA ] Hisar(PG)-Hisar-IA(HVPNL) 2(220 kV) Powergrid Continuous For replacement of C&R panel 11/2/2016 9:00 11/4/2016
17:00
151 SLDC_HARYANA [ HARYANA ] Dipalpur-Kabulpur 2(400 kV)
11/17/2016 10:00 11/17/2016
15:00
157 SLDC_RAJASTHAN [ RAJASTHAN ] BASSI(PG)-PHAGI-1(400 kV) Rajasthan Daily
Tightening of clamps & connectors of
droppers from high / jack bus to
equipments. 11/22/2016 10:00 11/23/2016
16:00
156 SLDC_HARYANA [ HARYANA ] Daultabad-Dhanonda ckt-1(400 kV) Haryana Daily To attend hot line observation 11/5/2016 11:00 11/5/2016
17:00160 SLDC_RAJASTHAN [ RAJASTHAN ] Anta-Bhilwara-1(220 kV) Rajasthan Daily Maintenance Work 11/15/2016 8:00 11/15/2016
3rd Quaterly maintenance of 400 KV
side bay EquipmentsDailyRajasthanHeerapura-Hindaun II(400 kV)SLDC_RAJASTHAN [ RAJASTHAN ]159 11/18/201610:0011/18/2016 17:00
17:00
18:00
158 SLDC_RAJASTHAN [ RAJASTHAN ] Heerapura-Merta(220 kV) Rajasthan Daily
3rd Quaterly maintenance of 400 KV
side bay Equipments
17:00
162 SLDC_RAJASTHAN [ RAJASTHAN ] Bikaner-Didwana 1(400 kV) Rajasthan Daily
CT Eerection in Deedwana Bay (Dia-
6) replacing existing BPI to CT 11/9/2016 10:00 11/13/2016
161 SLDC_RAJASTHAN [ RAJASTHAN ] Anta-Bhilwara-2(220 kV) Rajasthan Daily Maintenance Work 11/16/2016 8:00 11/16/2016
18:00
164 SLDC_RAJASTHAN [ RAJASTHAN ] Anta-Kota(220 kV) Rajasthan Daily
FOR REPLACEMENT OF
SEVERELY DETORIATED D
JUMPER OF R PHASE TOWARDS
THE LINE SIDE AND TO DO THE
QUATERLY MAINTENANCE OF
THE BREAKER AND CT. 11/17/2016 7:00 11/17/2016
17:00
163 SLDC_RAJASTHAN [ RAJASTHAN ] RAPP (A )-KOTA-1 D/C(220 kV) Rajasthan Continuous
FOR REPLACEMENT OF
SEVERELY DETORIATED WHOLE
TWIN ZEBRA BUS CONDUCTOR
OF 220 KV BUS D WHICH IS
CROSSING OVER THE LINE
CONDUCTOR OF 220 KV BAROD &
RAPP (A) FEEDERS AT 220 KV
GSS SAKATPURA KOTA. 11/10/2016 7:00 11/11/2016
18:00
166 SLDC_RAJASTHAN [ RAJASTHAN ] Chabra-Hindaun II(400 kV) Rajasthan Daily
BALANCE JUMPERING WORK AT
CTPS END . 11/15/2016 8:00 11/16/2016
18:00
165 SLDC_RAJASTHAN [ RAJASTHAN ] RAPP (A )-KOTA-3 D/C(220 kV) Rajasthan Daily
FOR REPLACEMENT OF D
JUMPER TOWARDS LINE SIDE OF
R PHASE AND TO DO THE
QUATERLY MAINTENANCE OF
THE BREAKER AND CT. 11/25/2016 7:00 11/25/2016
18:00
168 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Rajwest 1(400 kV) Rajasthan Daily Planned maintenance 11/15/2016 8:00 11/15/2016
18:00
167 SLDC_RAJASTHAN [ RAJASTHAN ] Bhilwara-Chhabra 1(400 kV) Rajasthan Continuous
For Erection of 400 KV D/C B Type
Tower B/w Loc No. 243 to 244 &
Dismentalling of 400 KV D/C A Type
tower Loc No. 244 (For Construction
of LILO of IInd CKT of 400 KV D/C
Chhabra- Dahara- Bhilwara Line 11/8/2016 8:00 11/11/2016
170 SLDC_RAJASTHAN [ RAJASTHAN ] Barmer-Rajwest 1(400 kV) Rajasthan Daily Planned maintenance 11/17/2016 8:00 11/17/2016
18:00
169 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Rajwest 2(220 kV) Rajasthan Daily Planned maintenance 11/16/2016 8:00 11/16/2016
17:00
18:00
171 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Merta 1(400 kV) Rajasthan Daily
III rd QUARTERLY MAINT.WORK
OF BAY & EQUIPMENTS 11/10/2016 9:00 11/10/2016
18:00
175 SLDC_PUNJAB Kangra - Shanan Ckt-I (132kV) Punjab Daily Mtc. of line 1.11.16 10.00 5.11.16 16.00
176 SLDC_PUNJAB Rajpura - Nakodar Ckt-I (400kV) DailyTightening of Jumpers of Deadend
Towers & Tree Cutting2.11.2016 10.00 2.11.2016 16.00
177 SLDC_PUNJAB Makhu - Nakodar Ckt-I (400kV) DailyPeriodical testing and routine
mainteanance02.11.2016 9.00 02.11.2016 17.00
178 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-I (220kV) Daily
Tightening of nut bolts of jumpers,
dampers , suspension clamps and
cleaning of Disc insulators of Tower
No 1 to 20
3.11.16 10.00 3.11.16 16.00
179 SLDC_PUNJAB Makhu - Nakodar Ckt-II (400kV) DailyPeriodical testing and routine
mainteanance04.11.2016 9.00 04.11.2016 17.00
180 SLDC_PUNJAB Moga-Nakodar (400kV) DailyTightening of Jumpers of Deadend
Towers & Tree Cutting4.11.2016 10.00 4.11.2016 16.00
181 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-II (220kV) Daily
Tightening of nut bolts of jumpers,
dampers , suspension clamps and
cleaning of Disc insulators of Tower
No 1 to 20
5.11.16 10.00 5.11.16 17.00
182 SLDC_PUNJAB Makhu (PSEB)- Amritsar (PG) Ckt-1 (400kV) DailyPeriodical testing and routine
mainteanance07.11.2016 9.00 07.11.2016 17.00
183 SLDC_PUNJAB Talwandi Sabo - Nakodar (400kV) DailyTightening of Jumpers of Deadend
Towers & Tree Cutting7.11.16 10.00 7.11.16 16.00
184 SLDC_PUNJAB Kangra - Shanan Ckt-II (132kV) Daily Mtc. of line 8.11.16 10.00 12.11.16 16.00
185 SLDC_PUNJAB Makhu (PSEB)- Amritsar (PG) Ckt-II (400kV) DailyPeriodical testing and routine
mainteanance07.11.2016 9.00 07.11.2016 17.00
17:00172 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Merta 2(400 kV) Rajasthan Daily
III rd QUARTERLY MAINT.WORK
OF BAY & EQUIPMENTS 11/11/2016 9:00 11/11/2016
17:00
17:00
174 SLDC_RAJASTHAN [ RAJASTHAN ] Bassi(PG)-Heerapura(RVPNL) 2(400 kV) Powergrid Daily
3rd Quaterly maintenance of 400 KV
side bay Equipments 11/16/2016 10:00 11/16/2016
Bassi(PG)-Heerapura(RVPNL) 1(400 kV)SLDC_RAJASTHAN [ RAJASTHAN ]173 11/15/201610:0011/15/2016
3rd Quaterly maintenance of 400 KV
side bay EquipmentsDailyPowergrid
186 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-I (220kV) Daily
Tightening of nut bolts of jumpers,
dampers , suspension clamps and
cleaning of Disc insulators of Tower
No 1 to 20
10.11.16 10.00 10.11.16 17.00
187 SLDC_PUNJAB Rajpura - Nakodar Ckt-II (400kV) DailyTightening of Jumpers of Deadend
Towers & Tree Cutting10.11.16 10.00 10.11.16 16.00
188 SLDC_PUNJAB Rajpura - Nakodar Ckt-I (400kV) DailyTightening of Jumpers of Deadend
Towers & Tree Cutting11.11.16 10.00 11.11.16 16.00
189 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-II (220kV) Daily
Tightening of nut bolts of jumpers,
dampers , suspension clamps and
cleaning of Disc insulators of Tower
No 21 to 40
12.11.16 10.00 12.11.16 17.00
190 SLDC_PUNJAB Kangra - Phathankot Ckt-I (132kV) Daily Mtc. of line 14.11.16 10.00 18.11.16 16.00
191 SLDC_PUNJAB Moga-Nakodar (400kV) DailyTightening of Jumpers of Deadend
Towers & Tree Cutting15.11.16 10.00 15.11.16 16.00
192 SLDC_PUNJAB Hamirpur - Chohal (132kV) DailyTightening of Jumpers of Deadend
Towers & Tree Cutting16.11.16 9.00 16.11.16 17.00
193 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-I (220kV) Daily
Tightening of nut bolts of jumpers,
dampers , suspension clamps and
cleaning of Disc insulators of Tower
No 41 to 60
17.11.16 10.00 17.11.16 17.00
194 SLDC_PUNJAB Talwandi Sabo - Nakodar (400kV) DailyTightening of Jumpers of Deadend
Towers & Tree Cutting18.11.16 10.00 18.11.16 16.00
195 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-II (220kV) Daily
Tightening of nut bolts of jumpers,
dampers , suspension clamps and
cleaning of Disc insulators of Tower
No 41 to 60
19.11.16 10.00 19.11.16 17.00
196 SLDC_PUNJAB Rajpura - Dhuri Ckt-II (400kV) Daily
Tightening of nut bolts of jumpers,
dampers , suspension clamps and
cleaning of Disc insulators of Tower
No 81 to 96
20.11.16 11.00 22.11.16 17.00
197 SLDC_PUNJAB Kangra - Phathankot Ckt-II (132kV) Daily Mtc. of line 21.11.16 10.00 25.11.16 16.00
198 SLDC_PUNJAB Rajpura - Nakodar Ckt-I (400kV) DailyTightening of Jumpers of Deadend
Towers & Tree Cutting22.11.16 10.00 22.11.16 16.00
199 SLDC_PUNJAB Rajpura - Dhuri Ckt-I (400kV) Daily
Tightening of nut bolts of jumpers,
dampers , suspension clamps and
cleaning of Disc insulators of Tower
No 81 to 96
23.11.16 11.00 13.12.16 17.00
200 SLDC_PUNJAB Rajpura - Nakodar Ckt-II (400kV) DailyTightening of Jumpers of Deadend
Towers & Tree Cutting25.11.16 10.00 25.11.16 16.00
201 SLDC_PUNJAB Rajpura - Nakodar Ckt-II (400kV) DailyTightening of Jumpers of Deadend
Towers & Tree Cutting28.11.16 10.00 28.11.16 16.00
202 SLDC_PUNJAB Talwandi Sabo - Nakodar (400kV) DailyGeneral maintenance ,Jumper
tightening and Tree Cutting29.11.16 9:00 29.11.16 16:00
203NRSS XXX1(B) TRANSMISSION
LTD. Rajpura - Bhiwani 1 (400kV) BBMB Daily
Stringing of new 400kV D/C
Kurukshetra Malerkotla Transmission
Line. Part of Dehar Bhiwani
Transmission Line Shutdown was
approved in OCC 126 but could not
be taken because of load issues.
10/25/2016 8:00 10/26/2016 18:00
204NRSS XXX1(B) TRANSMISSION
LTD. Patiala - Patran 1 (400kV) Powergrid Daily
Stringing of new 400kV D/C
Kurukshetra Malerkotla Transmission
Line. Part of koldam Hisar Line
10/30/2016 8:00 10/31/2016 18:00
205NRSS XXX1(B) TRANSMISSION
LTD. Rajpura - Dhuri both circuits (400kV) PSTCL Daily
Stringing of new 400kV D/C
Kurukshetra Malerkotla Transmission
Line. Part of Dehar Bhiwani
Transmission Line Shutdown was
approved in OCC 126 but could not
be taken because of load issues.
10/17/2016 8:00 10/18/2016 18:00
206 NRSS XXIX TRANSMISSION LTD.
Jalandhar (PG) - Samba (PG) 1 (Line Charged as
Jalandhar - Kishanpur Line with contingency
arrangement)
- Continuous
For removal of contingency
arrangement and restoration as it is
(as Jalandhar-Moga CKT1 and
Kishanpur Samba CKT-1) - Samba-
Kishanpur line will be charged within
48 hrs from the time of shutdown. The
shutdown in real time shall be availed
subject to confirmation of bay
readiness from Samba PG and
Jalandhar PG for termination of
400kV DC Samba Jalandhar
NRSSXXIX lines
11/3/2016 7:00 11/7/2016 7:00
207 NRSS XXIX TRANSMISSION LTD.
Jalandhar (PG) - Samba (PG) 2 (Line Charged as
Jalandhar - Kishanpur Line with contingency
arrangement)
- Continuous
For removal of contingency
arrangement and restoration as it is
(as Jalandhar-Moga CKT1 and
Kishanpur Samba CKT-1) - Samba-
Kishanpur line will be charged within
96 hrs from the time of shutdown. The
shutdown in real time shall be availed
subject to confirmation of bay
readiness from Samba PG and
Jalandhar PG for termination of
400kV DC Samba Jalandhar
NRSSXXIX lines
11/3/2016 7:00 11/7/2016 7:00
217 SLDC_UP [ UTTAR PRADESH ] 400KV Sultanpur-Obra line UP Daily
1. For dismantling of 54 Mtr. Span of
400KV Transfer Bus 2.
Replacement of Disc Insulator by
Polymer Insulator, Lopping &
Chopping of tree branches. 3. For
stringing of R,Y,B Phase 54 Mtr.
Span of 400KV Transfer Bus 11/10/2016 8:00 11/16/2016 18:00
218 SLDC_UP [ UTTAR PRADESH ] 400 KV Sultanpur- Azamgarh Line UP Daily
Replacement of Disc Insulator by
Polymer Insulator, Lopping &
Chopping of tree branches. and Other
M&R Works 11/17/2016 8:00 11/23/2016 18:00
215 SLDC_UP [ UTTAR PRADESH ]
400 KV Unnao-Bareilly line( ckt I ) Bareilly
UP Daily
Lopping Chopping of trees and
replacement of disc Insulater with
Polymer Insulater 11/7/2016 8:00 11/12/2016 18:00
216 SLDC_UP [ UTTAR PRADESH ]
400 KV Unnao-Bareilly line( ckt II ) Bareilly
UP Daily
Lopping Chopping of trees and
replacement of disc Insulater with
Polymer Insulater 11/14/2016 8:00 11/19/2016 18:00
214 SLDC_UP [ UTTAR PRADESH ]
400 KV Unnao-Lucknow Line along with 400 KV
Main Bus-A UP Daily
Complete overhauling of 29A & 29C
Isolator along with Main Bus-A 11/18/2016 8:00 11/17/2016 18:00
211 SLDC_UP [ UTTAR PRADESH ] Anpara C-Unnao(400 kV)
Uttar
Pradesh Daily Disc cleaning 11/22/2016 8:00 11/25/2016 18:00
SLDC_UP [ UTTAR PRADESH ] Dadri(NTPC)-Muradnagar(UP)(400 kV) Powergrid Continuous
Shifting of 400KV Dadri-Muradnagar
line from Muradnagar-I (Old) to
Muradnagar-II S/S (New) 11/15/2016 9:00 11/21/2016
16:00
209 SLDC_UP [ UTTAR PRADESH ] Allahabad-Fatehpur 2(400 kV) Powergrid Daily For stringing of conductor. 11/13/2016 10:00 11/14/2016
208 SLDC_UP [ UTTAR PRADESH ] Allahabad-Fatehpur 1(400 kV) Powergrid Daily For stringing of conductor. 11/13/2016 10:00 11/14/2016
Routine T&C Testing Checking &
tightening of Jumpers and Tree
cutting & Bay maintance work 11/16/2016 8:00 11/17/2016 18:00213 SLDC_UP [ UTTAR PRADESH ]
400KV Sarojininagar-PGCIL, Kursi Road line(Up to
LILO Point) UP Daily
17:00
18:00
212 SLDC_UP [ UTTAR PRADESH ] Moradabad(UP)-Muradnagar(UP)(400 kV) Powergrid Daily
Tightening of Bay/General
Maintenance 11/22/2016 8:00 11/22/2016
16:00
210
231 SLDC_UP [ UTTAR PRADESH ] 400KV Greater Noida-Nawada line & its bay UP Daily
For stringing (crossing) of 400KV
Jahangirpur Cr. Noida line. 11/11/2016 8:00 11/13/2016 18:00
232 SLDC_UP [ UTTAR PRADESH ] 400KV Dadri-Maharani Bagh Line UP Daily
For stringing (crossing) of 400KV
Jahangirpur Cr. Noida line. 11/11/2016 8:00 11/13/2016 18:00
229 SLDC_UP [ UTTAR PRADESH ] 220KV Nara-Roorkee Line UP Daily
For tree cutting, inspection of
insulators & other maintenance
works. 11/8/2016 9:00 11/9/2016 18:00
230 SLDC_UP [ UTTAR PRADESH ] 220KV Debai-NAPP Line UP Daily
For replacement of Insulators by
Polymer 11/10/2016 8:00 11/12/2016 18:00
227 SLDC_UP [ UTTAR PRADESH ] 400KV Panki-Unnao line UP Daily
for routing testing & maintenance
work. 11/24/2016 8:00 11/24/2016 18:00
228 SLDC_UP [ UTTAR PRADESH ] 400KV Muzaffarnagar-Matore Line UP Daily
For routine testing of protection and
other maintenance works. 11/4/2016 11:00 11/4/2016 16:00
225 SLDC_UP [ UTTAR PRADESH ] 400KV S/C Singrauli-Fatehpur-II line UP Daily For stringing of conductor. 11/16/2016 10:00 11/17/2016 16:00
226 SLDC_UP [ UTTAR PRADESH ] 400KV Unnao-Agra line UP Daily
Replacement of old porcelein strings
by new polymer insulator & jumper
checking & tightening. 11/17/2016 8:00 11/25/2016 18:00
223 SLDC_UP [ UTTAR PRADESH ] 400KV Sarnath-Anpara (L5) line UP Daily DFCC work 11/27/2016 8:00 12/2/2016 18:00
224 SLDC_UP [ UTTAR PRADESH ] 400KV Anpara-Mau (L6) line UP Daily DFCC work 11/27/2016 8:00 12/2/2016 18:00
221 SLDC_UP [ UTTAR PRADESH ] 220 KV Fatehpur - Unchahar - I & II UP Daily
Restringing between tower no. 04 &
05 to maintain the ground clearance
of bottom conductor as required by
DFCCIL. 11/18/2016 8:00 11/20/2016 18:00
222 SLDC_UP [ UTTAR PRADESH ] 400 KV SC Shaktinagar-Kanpur Line (PGCIL) UP Daily
Overhead quad conductor crossing
between T.No. 501 (B+0) & 502 (A+0)
of under construction LILO of 400 KV
Rewa Road-Meja line at 400 KV
Masauli. 11/21/2016 8:00 11/21/2016 18:00
219 SLDC_UP [ UTTAR PRADESH ] 400 KV Sultanpur- PGCIL Lucknow Line UP Daily
Replacement of Disc Insulator by
Polymer Insulator, Lopping &
Chopping of tree branches. and Other
M&R Works 11/16/2016 8:00 11/22/2016 18:00
220 SLDC_UP [ UTTAR PRADESH ] 400KV Gorakhpur-Azamgarh Line UP Daily
For replacement of existing porcelein
insulator with polymer insulator 11/7/2016 8:00 11/16/2016 18:00
218 SLDC_UP [ UTTAR PRADESH ] 400 KV Sultanpur- Azamgarh Line UP Daily
Replacement of Disc Insulator by
Polymer Insulator, Lopping &
Chopping of tree branches. and Other
M&R Works 11/17/2016 8:00 11/23/2016 18:00
242 SLDC_UP [ UTTAR PRADESH ] 400kv Dadri-NTPC-Mharanibagh Powergrid DAILY
400KV D/C Quad MOOSE GNOIDA-
Noida Sector 148 2.11.2016 9:00 3.11.2016 15:00
233 SLDC_UP [ UTTAR PRADESH ] 400KV Muradnagar-Muzaffarnagar Line UP Daily
Tightening of Bay/General
Maintenance 11/20/2016 8:00 11/20/2016 17:00
234 SLDC_UP [ UTTAR PRADESH ] 400KV Muzaffarnagar-Vishnuprayag Line UP Daily
For replacement of Disc Insulator with
polymer insulator 11/20/2016 9:00 11/29/2016 18:00
235 SLDC_UP [ UTTAR PRADESH ] 400KVObra-Rewa Roadline UP Continuous
For diversion work of 400kV Obra-
Rewa Roadline at Bahadraumarganj
Loc. Due to DFCC & Jumpering work
of 220 KV saranpur - Phulpur line 11/2/2016 8:00
232 SLDC_UP [ UTTAR PRADESH ] 400KV Dadri-Maharani Bagh Line UP Daily
For stringing (crossing) of 400KV
Jahangirpur Cr. Noida line. 11/11/2016 8:00 11/13/2016 18:00
11/16/2016 18:00
236 SLDC_UP [ UTTAR PRADESH ] 400KV Meja Allahabad-2 Line UP Continuous
Overhead quad conductor crossing
between T.No. 2/2 & 2/3 of under
construction LILO of 400 KV Rewa
Road-Meja line at 400 KV Masauli. 11/26/2016 9:00 11/26/2016 18:00
237 SLDC_UP [ UTTAR PRADESH ] 400KV Fatehabad Muradnagar Line UP Daily
For stringing of missing earthwire and
tightening of jumpers of tension tower
and maintenance work 11/1/2016 8:00 11/4/2016 18:00
238 SLDC_UP [ UTTAR PRADESH ] 400KV Agra Fatehabad UP Daily
For stringing of missing earthwire and
tightening of jumpers of tension tower
and maintenance work 11/5/2016 8:00 11/9/2016 18:00
239 SLDC_UP [ UTTAR PRADESH ] 400KV Panki-Rewa Road Line UP Daily For stringing of conductor 11/19/2016 10:00 11/20/2016 16:00
240 SLDC_UP [ UTTAR PRADESH ] 400KV Dadri-Dankaur Earth Electrode Line UP Daily
For stringing (crossing) of 400KV
Jahangirpur Cr. Noida line. 11/4/2016 8:00 11/6/2016 18:00
241 SLDC_UP [ UTTAR PRADESH ] 400KV Muzzafarnagar - Srinagar Line UP Daily
For replacement of Disc Insulator with
polymer insulator (during shutdown
400kv MZN-Line VPN line) 11/10/2016 9:00 11/19/2016 18:00
243 SLDC_UP [ UTTAR PRADESH ] 400KV GNOIDA -NAWADA Powergrid Daily
400KV D/C Quad MOOSE GNOIDA-
Noida Sector 148 2.11.2016 9:00 3.11.2016 15:00
245 SLDC_UP [ UTTAR PRADESH ] Lucknow-Lucknow (UP) Powergrid Daily
Routine T&C Testing Checking &
tightening of Jumpers and Tree
cutting & Bay maintance work 16.11.2016 8:00 17.11.2016 18:00
246 SLDC_UP [ UTTAR PRADESH ] Kanpur-Singrauli Power GRid Daily
Overhead QUAD Conductor crossing
between TL 445 AND 446 of under
construction LILO of 400KV Rewa
ROAD Meja LINE 1.11.2016 8:00 1.11.2016 18:00
249 Allahabad(PG)-Rihand 2 Power GRID DAILY
Overhead quad conductor
CROSSING BETWEEN tl 717&718 of
under construction LILO of 400KV
rewa road-meja line at 400KV 30.11.2016 8:00 30.11.2016 18:00
250 Allahabad(PG)-Rihand 1 Power GRID DAILY
Overhead quad conductor
CROSSING BETWEEN tl 717&718 of
under construction LILO of 400KV
rewa road-meja line at 400KV 30.11.2016 8:00 30.11.2016 18:00
251 Allahabad -Fatehpur 3 220KV Power GRID DAILY For stringing of conductor 7.11.2016 10:00 7.11.2016 16:00
252 Allahabad -Fatehpur 1 220KV Power GRID DAILY For stringing of conductor 13.11.2016 10:00 14.11.2016 16:00
SLDC_UP [ UTTAR PRADESH ]
SLDC_UP [ UTTAR PRADESH ]
244 SLDC_UP [ UTTAR PRADESH ]
400KV Dhampur-Kalagarh line (D/C) UK Interstate
Line alongwith 132KV Afzalgarh-Kalagarh Line UP Daily For maintenance work 11/16/2016 8:00 11/17/2016 18:00
247 SLDC_UP [ UTTAR PRADESH ] Lucknow(UP)-Singrauli(NTPC)(400 kV) Powergrid Daily
Overhead quad conductor crossing
between T.No. 445 (B+0) & 446
(A+25) of under construction LILO of
400 KV Rewa Road-Meja line at 400
KV Masauli. 11/17/2016 9:00 11/17/2016 18:00
248 SLDC_UP [ UTTAR PRADESH ] Kanpur(PG)-Singrauli(NTPC)(400 kV) Powergrid Daily
Overhead quad conductor crossing
between T.No. 501 (B+0) & 502 (A+0)
of under construction LILO of 400 KV
Rewa Road-Meja line at 400 KV
Masauli. 11/21/2016 8:00 11/21/2016 18:00
253 Allahabad -Fatehpur 1 220KV Power GRID DAILY For stringing of conductor 13.11.2016 10:00 14.11.2016 16:00
254 Allahabd -Kanpur 2 Power GRID DAILY For stringing of conductor 10.11.2016 10:00 11.11.2016 16:00
255 Dadri- MURADNAGAR Power GRID Continuous
Shifting of Dadri-Muradnagar line
from old to new S/S 15.11.2016 9:00 21.11.2016 18:00
256 Moradabad-Muradnagar Power GRID DAILY
Tightening of bay General
Maintainance 22.11.2016 8:00 22.11.2016 17:00
SLDC_UP [ UTTAR PRADESH ]
SLDC_UP [ UTTAR PRADESH ]
257 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 11/3/2016 9:00 11/3/2016 17:00
258 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 - - Annual Overhaul 11/4/2016 9:00 11/4/2016 17:00
259 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 11/5/2016 9:00 11/5/2016 17:00
260 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 - - Annual Overhaul 11/7/2016 9:00 11/7/2016 17:00
261 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 11/8/2016 9:00 11/8/2016 17:00
Annual Overhaul 11/9/2016 9:00 11/9/2016 17:00
11:00 11/6/2016 16:30
263 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 11/10/2016 9:00 11/10/2016 17:00
265 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 - - Annual Overhaul 11/11/2016 9:00 11/11/2016 17:00
266 HPLDS 66KV S/C Transmission Line from Shanan to Bijnee - -
Replacement of partially damaged
disc insulator of T.No. 8 11/22/2016
11/1/2016
10:00 11/22/2016 16:00
267 ADHPL 220kV Prini Nalagarh Line CKT 1 ADHPL Daily
Pre-winter preventive maintenance
work of the 220kg trans. Line which
includes tightening of tower jumpers,
checking and rectification of vibration
dampers, arcing horns, tightening of
tower body bolt/nuts, inspection and
cleaning of insulator strings,
clearance of tower beds, lopping of
trees etc. in the line corridors and
rectification of loose sags if any
262 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 - -
11:00 11/6/2016 16:30
11/29/2016 11:00 11/30/2016 16:30
Pre-winter preventive maintenance
work of the 220kg trans. Line which
includes tightening of tower jumpers,
checking and rectification of vibration
dampers, arcing horns, tightening of
tower body bolt/nuts, inspection and
cleaning of insulator strings,
clearance of tower beds, lopping of
trees etc. in the line corridors and
rectification of loose sags if anyDailyADHPL220kV Prini Nalagarh Line CKT 1ADHPL
268 ADHPL 220kV Prini Nalagarh Line CKT 1 ADHPL Daily
269 ADHPL 220kV Prini Phozal Line CKT 2A ADHPL Daily
Half yearly maintenance of 220kV
Prini switchyard which includes
overhauling of 245kV SF6 circuit
breaker's poles of line-1 (B-phase)
and bus coupler (R,B-phase) at Prini
end AND Rectification of 245kV
SF6 circuit breaker's operating
mechanism problems for Line-1 (R-
Phase) and Line-2 (Y-phase) at
Nalagarh end. 11/7/2016 9:00 11/16/2016 18:00
11/1/2016
270 11/17/2016 11:00 11/20/2016 16:30
11/22/2016 11:00 11/27/2016 16:30
267 ADHPL 220kV Prini Nalagarh Line CKT 1 ADHPL Daily
Pre-winter preventive maintenance
work of the 220kg trans. Line which
includes tightening of tower jumpers,
checking and rectification of vibration
dampers, arcing horns, tightening of
tower body bolt/nuts, inspection and
cleaning of insulator strings,
clearance of tower beds, lopping of
trees etc. in the line corridors and
rectification of loose sags if any
DATE TIME DATE TIME
1 PGCIL 765 ICT-I at BHIWANI PGCIL INTRA DAILYInstallation of Polymer
insulator. With Bus-II.09/11/16 8:00 09/11/16 18:00 Bhiwani
2 PGCIL 765 ICT-II at BHIWANI PGCIL INTRA DAILYInstallation of Polymer
insulator. With Bus-I.15/11/16 8:00 16/11/16 18:00 Bhiwani
3 PGCIL 765 BUS-I at BHIWANI PGCIL INTRA DAILYAMP work /Polymer
insulators replacement.25/11/16 8:00 25/11/16 18:00 Bhiwani
4 PGCIL 765 BUS-II at BHIWANI PGCIL INTRA DAILYAMP /Polymer insulators
replacement.07/11/16 8:00 10/11/16 18:00 Bhiwani
5 PGCIL 765 Bus Reactor-I at BHIWANI PGCIL INTRA DAILYInstallation of Polymer
insulator. With Bus-II.10/11/16 8:00 10/11/16 18:00 Jhatikara
6 PGCIL 765 BUS-I at MEERUT PGCIL INTRA DAILY
Installation of Polymer
insulators at S/S and Bus
extension work.
10/01/00 8:00 25/10/16 18:00 Jhatikara
7 PGCIL 765 BUS-II at MEERUT PGCIL INTRA DAILY
Installation of Polymer
insulators at S/S and Bus
extension work.
10/11/16 8:00 15/11/16 18:00 Bhiwani
8 PGCIL 400 BUS-1B at HVDC Agra PGCIL INTRA DAILYIntegration of 400kV Sikar-
1 Bays with 400kV Bus20/11/16 8:00 20/11/16 18:00
9 PGCIL 400 BUS-2B at HVDC Agra PGCIL INTRA DAILYIntegration of 400kV Sikar-
2 Bays with 400kV Bus21/11/16 8:00 21/11/16 18:00
PGCIL 400 BUS-1A at HVDC Agra PGCIL INTRA DAILYIntegration work for
400kVPole-3 dia 26/11/16 8:00 26/11/16 18:00
PGCIL 400 BUS-2A at HVDC Agra PGCIL INTRA DAILYIntegration work for
400kVPole-3 dia 28/11/16 8:00 28/11/16 18:00
10 PGCIL 765 702 Tie bay of ICT-I at Meerut PGCIL INTRA DAILYInstallation of Polymer
insulators at S/S.24/11/16 8:00 24/11/16 18:00
11 PGCIL 765 714 Tie bay of Gr.Noida at Meerut PGCIL INTRA DAILYInstallation of Polymer
insulators at S/S.26/11/16 8:00 26/11/16 18:00
12 PGCIL 765 708 Tie bay of ICT-I/Merut at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 18/11/16 8:00 19/11/16 18:00
13 PGCIL 765 713 Main bay of Moga at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 21/11/16 8:00 22/11/16 18:00
14 PGCIL 765 7714 Tie bay of Moga/BR-I at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 23/11/16 8:00 24/11/16 18:00
PROPOSED OUTAGE OF NLDC TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016ANNEXURE 3A
REMARKSS.N.
NAME OF REQUESTING
AGENCY
EQUIPEMENT DETAILSTOVOLT
LEVEL
(KV)
NAME OF THE ELEMENT
POWERGRID NORTHERN REGION-I
OWNER
DAILY/ CONTINUOUS
REASONPROPOSED DATE AND TIME
INTER/
INTRA
REGIONA
FROM
15 PGCIL 765 715 Main bay of B/R-1 at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 26/11/16 8:00 27/11/16 18:00
16 PGCIL 765 718 Main bay of B/R-2 at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 28/11/16 8:00 29/11/16 18:00
1 PGCIL 765 ICT-I at Bareilly PGCIL Intra Daily AMP work of ICT-I 11/14/2016 10:00 11/14/2016 18:00 Bareilly SS, NR3
2 PGCIL 765 765/400kv ICT-I Agra PGCIL INTRA cont.
For Variable
FrequiancyTan Delta
Mesurementand AMP
work
22.11.16 9:00 22.11.16 18:00 Agra
3 PGCIL 765 765/400kv ICT-II Agra PGCIL INTRA cont.
For Variable
FrequiancyTan Delta
Mesurementand AMP
work
23.11.16 9:00 23.11.16 18:00 Agra
4 PGCIL 765ICT-I Main bay at Bareilly (Bay No.
709)PGCIL INTRA DAILY AMP of CT & CB 11/15/2016 10:00 11/15/2016 18:00 Bareilly SS, NR3
5 PGCIL 765ICT-I & Line Tie bay at Bareilly (Bay
No. 708)PGCIL INTRA DAILY AMP of CT & CB 11/16/2016 10:00 11/16/2016 18:00 Bareilly SS, NR3
6 PGCIL 765765 kv Bareilly-Lucknow Line Main
Bay (Bay No. 707) BareillyPGCIL INTRA DAILY AMP of CT & CB 11/17/2016 10:00 11/17/2016 18:00 Bareilly SS, NR3
7 PGCIL 765701 Bay (Main Bay of Fatehpur-
Varanasi Line) FatehprPGCIL INTRA DAILY AMP Work
02.11.2016
9:30
02.11.2016
18:00 Fatehpur SS,
NR3
8 PGCIL 765702 Bay (Tie Bay of Fatehpur-
Varanasi Line) FatehprPGCIL INTRA DAILY AMP Work
04.11.2016
9:30
04.11.2016
18:00 Fatehpur SS,
NR3
9 PGCIL 765703 Bay (Main Bay of 765 KV ICT-1)
FatehprPGCIL INTRA DAILY AMP Work
07.11.2016 9:30 07.11.2016 18:00
Fatehpur SS,
NR3
10 PGCIL 765704 Bay (Tie bay of Fatehpur-
Sasaram Line) FatehprPGCIL INTRA DAILY AMP Work
09.11.2016 9:30 09.11.2016 18:00
Fatehpur SS,
NR3
11 PGCIL 765707 Bay (Main Bay of Fatehpur-Agra-
1 Line)PGCIL INTRA DAILY AMP Work
14.11.2016 9:30 14.11.2016 18:00
Fatehpur SS,
NR3
12 PGCIL 765 Bus Reactor-II VARANASI PGCIL INTRA DAILY
For Jumpering and
connection & testing of
110 MVAR, Spare unit
towards commissioning
06.11.16 11:00 09.11.16 18:00VARANASI (NR-
III)
13 PGCIL 765 701-Balia Line Main Bay Lucknow PGCIL INTRA DAILYFor AMP work on daily
basis 01.11.16 9:00 02.11.16 18:00 Lucknow
14 PGCIL 765702- ICT-I & Balia line Tie Bay
LucknowPGCIL INTRA DAILY
For AMP work on daily
basis 04.11.16 9:00 05.11.16 18:00 Lucknow
15 PGCIL 765707R-765Bareilly line Reactor Bay
LucknowPGCIL INTRA DAILY
For AMP work on daily
basis 10.11.16 9:00 11.11.16 18:00 Lucknow
16 PGCIL 765765kV Agra-Fatehpur ckt-2 Line
Reactor at AgraPGCIL INTRA cont.
For replacement of faulty
PRD relays.04.11.16 9:00 04.11.16 18:00 Agra
17 PGCIL 765 765kV Agra-Bus Reactor-2 PGCIL INTRA cont.For replacement of faulty
PRD relays.05.11.16 9:00 05.11.16 18:00 Agra
POWERGRID NR-3
POWERGRID NORTHERN REGION-II
DATE TIME DATE TIMEX-2
X-3
1765 kV A 14.11.16
9:0015.11.16
17:00 Daily For Annual
Maintenance
Works.
2765 kV A 16.11.16
9:00 17.11.1617:00 Daily For Annual
Maintenance
Works.
3765 kV A 18.11.16
9:00 19.11.1617:00 Daily For Annual
Maintenance
Works.
4765 kV A 21.11.16
9:00 22.11.1617:00 Daily For Annual
Maintenance
Works.
S.N.
Details of Transmission Element Category of
elemen
DURATION Daily/ Continu
ous
ReasonVoltage level
(KV)NAME OF THE ELEMENT AND
SUBSTATION
Bus Reactor-1 Tie Bay at Moga.
Bus Reactor-2 Main Bay at Moga.
Bus Reactor-2 Tie Bay at Moga.
FROM TO
For construction activity
For O&M activity
Bus Reactor-1 Main Bay at Moga.
RVPNL
Type of Shutdown
Voltage
LevelName From To From To
Daily/Continous
Basis
1 400 KV
400/220/33 KV, 315 MVA,
TR.NO.-01 , (TELk) at 400KV
GSS Hindaun
11.11.2016 11.11.2016 10:00HRS 15:30Hrs Daily Quaterly Maintenance
2 400 KV
400/220/33 KV, 315 MVA,
TR.NO.-02 , (CGL) at 400KV
GSS Hindaun
18.11.2016 18.11.2016 10:00HRS 15:30Hrs Daily Quaterly Maintenance
3 400 KV
400/220/33 KV,250 MVA,
ILT-1 (400 KV Side Bay
Equipment of Transformers)
at 400KV GSS Heerapura
21.11.2016 21.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay
Equipments
4 400 KV
400/220/33 KV,250MVA, ILT-
2 (400 KV Side Bay
Equipment of Transformers)
at 400KV GSS Heerapura
22.11.2016 22.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay
Equipments
5 400 KV
400/220/33 KV,250 MVA,
ILT-3 (400 KV Side Bay
Equipment of Transformers)
at 400KV GSS Heerapura
23.11.2016 23.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay
Equipments
6 400 KV
400/220/33 KV,315MVA, ILT-
4 (400 KV Side Bay
Equipment of Transformers)
at 400KV GSS Heerapura
24.11.2016 24.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay
Equipments
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016Annexure-3B (1)
S.No.
Details of Transmission element Date Timings
Purpose
\\NAMITA\Users\Public\OCC 128\ANNEXURE 3B(1).xlsx Page 1
Type of Shutdown
Voltage
LevelName From To From To
Daily/Continous
Basis
S.No.
Details of Transmission element Date Timings
Purpose
7 400 KV
400/220/33 KV, 250MVA,ILT-
1 (220 KV Side Bay
Equipment of Transformers)
at 400KV GSS Heerapura
25.11.2016 25.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay
Equipments
8 400 KV
400/220/33 KV,250MVA, ILT-
2 (220 KV Side Bay
Equipment of Transformers)
at 400KV GSS Heerapura
28.11.2016 28.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay
Equipments
9 400 KV
400/220/33 KV,250MVA, ILT-
3 (220 KV Side Bay
Equipment of Transformers)
at 400KV GSS Heerapura
29.11.2016 29.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay
Equipments
10 400 KV
400/220/33 KV,315MVA, ILT-
4 (220 KV Side Bay
Equipment of Transformers)
at 400KV GSS Heerapura
30.11.2016 30.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay
Equipments
11 400 KV
400 KV/220KV 500MVA ICT-
IV at 400KV GSS
Jaisalmer(Akal)
03.11.2016 03.11.2016 10:00 Hrs 16:00 Hrs DailyII QUARTERLY MAINTANANCE OF BAY
EQUIPMENT
12 400 KV400 KV BUS REACTOR at
400KV GSS Jaisalmer(Akal)04.11.2016 04.11.2016 10:00 Hrs 16:00 Hrs Daily
II QUARTERLY MAINTANANCE OF BAY
EQUIPMENT
\\NAMITA\Users\Public\OCC 128\ANNEXURE 3B(1).xlsx Page 2
Type of Shutdown
Voltage
LevelName From To From To
Daily/Continous
Basis
S.No.
Details of Transmission element Date Timings
Purpose
13 400 KV400 KV ICT II at 400KV GSS
Jaisalmer(Akal)16.11.2016 16.11.2016 10:00 Hrs 16:00 Hrs Daily
II QUARTERLY MAINTANANCE OF BAY
EQUIPMENT
14 400 KV400 KV Main Bus-I at 400KV
GSS Bikaner01.11.2016 04.11.2016 10:00 Hrs 17:00 Hrs Continous Basis
Testing/operation of Isolator and Final alignment
of IPS tube below Main Bus-I
15 400 KV400 KV Main Bus-II at 400KV
GSS Bikaner05.11.2016 08.11.2016 10:00 Hrs 17:00 Hrs Continous Basis
Testing/operation of Isolator and Final alignment
of IPS tube below Main Bus-II
16 400 KV400 KV Main Bus-I at 400KV
GSS Bikaner15.11.2016 20.11.2016 10:00 Hrs 17:00 Hrs Continous Basis Jumpering and Misc. Work
17 400 KV400 KV Main Bus-II at 400KV
GSS Bikaner21.11.2016 26.11.2016 10:00 Hrs 17:00 Hrs Continous Basis Jumpering and Misc. Work
18 400 KV
400 KV 252 A CB OF
BIKANER LINE at 400KV GSS
Merta
07.11.16 07.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
\\NAMITA\Users\Public\OCC 128\ANNEXURE 3B(1).xlsx Page 3
Type of Shutdown
Voltage
LevelName From To From To
Daily/Continous
Basis
S.No.
Details of Transmission element Date Timings
Purpose
19 400 KV
400 KV 252 B CB OF
BIKANER LINE at 400KV GSS
Merta
08.11.16 08.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
20 400 KV
400 KV 352 A CB OF
JODHPUR-I LINE at 400KV
GSS Merta
09.11.16 09.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
21 400 KV
400 KV 352 B CB OF
JODHPUR-I LINE at 400KV
GSS Merta
15.11.16 15.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
22 400 KV
400 KV 452 ACB OF
315MVA ILT-I at 400KV GSS
Merta
16.11.16 16.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
23 400 KV
400 KV 452 B CB OF
JODHPUR-II LINE at 400KV
GSS Merta
17.11.16 17.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
24 400 KV
400 KV 452 T CB OF
JODHPUR-II LINE & ILT-I at
400KV GSS Merta
22.11.16 22.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
\\NAMITA\Users\Public\OCC 128\ANNEXURE 3B(1).xlsx Page 4
Type of Shutdown
Voltage
LevelName From To From To
Daily/Continous
Basis
S.No.
Details of Transmission element Date Timings
Purpose
25 400 KV
400 KV 552 ACB OF
315MVA ILT-II at 400KV
GSS Merta
23.11.16 23.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
26 400 KV
400 KV 552 B CB OF
RATANGARH LINE at 400KV
GSS Merta
24.11.16 24.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
27 400 KV
400 KV TIE BAY OF BIKANER
DEEDWANA LINE at 400KV
GSS BIKANER
09.11.2016 13.11.2016 10:00 Hrs 17:00 Hrs DailyCT Eerection in Deedwana Bay (Dia-6) replacing
existing BPI to CT
28 400 KV
315MVA 400/220KV ILT 1st
ALSTOM Make Trf. at 400KV
GSS Jodhpur
12.11.16 12.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
\\NAMITA\Users\Public\OCC 128\ANNEXURE 3B(1).xlsx Page 5
S
No.
Name of the
Requesting
agency
Voltage
Level (KV)
Name of the Element
Owner
Inter
Regional/Intra
Regional
Daily
/Continous
Reason From Date From
Time
To Date To time Remarks
1 TS Org 400
400/220KV, 500 MVA
ICT No. 2 at 400KV
Dhuri
PSTCL Inter regional Daily
Sagging work of
Interconnection of ICT-3
Bays with 220 KV Bus
Bar at 400 KV Dhuri
18.10.16 8.00 19.10.16 19.00
2 POWERGRID 400
400/220KV, 315 MVA
ICT No. 1 at 400KV
Makhu
PSTCL Inter regional Daily
Completion, Testing &
Commissioning of
HVWSS System
03.11.16 9.00 04.11.16 17.30
3 POWERGRID 400
400/220KV, 315 MVA
ICT No. 2 at 400KV
Makhu
PSTCL Inter regional Daily
Completion, Testing &
Commissioning of
HVWSS System
05.11.16 9.00 06.11.16 17.30
4 POWERGRID 400
400/220KV, 80MVAR
Reactor at 400KV
Makhu
PSTCL Inter regional Daily
Completion, Testing &
Commissioning of
HVWSS System
07.11.16 9.00 08.11.16 17.30
5 POWERGRID 400
400/220KV, 315 MVA
ICT No. 1 at 400KV
Muktsar
PSTCL Inter regional Daily
Completion, Testing &
Commissioning of
HVWSS System
10.11.16 9.00 11.11.16 17.30
6 POWERGRID 400
400/220KV, 315 MVA
ICT No. 2 at 400KV
Muktsar
PSTCL Inter regional Daily
Completion, Testing &
Commissioning of
HVWSS System
12.11.16 9.00 13.11.16 17.30
7 POWERGRID 400
400/220KV, 80MVAR
Reactor at 400KV
Muktsar
PSTCL Inter regional Daily
Completion, Testing &
Commissioning of
HVWSS System
14.11.16 9.00 15.11.16 17.30
8 POWERGRID 400
400/220KV, 315 MVA
ICT No. 1 at 400KV
Nakodar
PSTCL Inter regional Continous
Completion, Testing &
Commissioning of
HVWSS System
17.11.16 9.00 18.11.16 17.30
9 POWERGRID 400
400/220KV, 315 MVA
ICT No. 2 at 400KV
Nakodar
PSTCL Inter regional Continous
Completion, Testing &
Commissioning of
HVWSS System
19.11.16 9.00 20.11.16 17.30
10 POWERGRID 400
400/220KV, 80MVAR
Reactor at 400KV
Nakodar
PSTCL Inter regional Daily
Completion, Testing &
Commissioning of
HVWSS System
21.11.16 9.00 22.11.16 17.30
11 P&M Org 400
400/220KV, 315 MVA
ICT No. 1 at 400KV
Makhu
PSTCL Inter regional DailyPeriodical testing and
routine mainteanance23.11.16 9.00 23.11.16 17.00
PSTCL
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016Annexure 3B (2)
12 P&M Org 400
400/220KV, 315 MVA
ICT No. 2 at 400KV
Makhu
PSTCL Inter regional DailyPeriodical testing and
routine mainteanance24.11.16 9.00 24.11.16 17.00
13 P&M Org 400
400/220KV, 80MVAR
Reactor at 400KV
Makhu
PSTCL Inter regional DailyPeriodical testing and
routine mainteanance27.11.16 10.00 27.11.16 16.00
DELHI TRANSCO LIMITED (SLDC)S.N Shutdown
TypeWork to be Carrried Reason
Voltage Level
Name Date Time Date Time
1 400 kV 315MVA ICT-5 400kV
Bus-2 of PPCL at Bawana
Daily Basis 02.11.2016 07:00 hrs 03.10.2016 17:30 hrs Annual Maintenance and tan delta
testing as per OS mannual
Load will be run through -
400kV Bus-1
2 400KV 400kV CB No 652 Tie
CB's of ICT-3 at Bawana
Daily Basis 29.11.2016 09:30 hrs 29.11.2016 13:00 Hrs Annual Maintenance and tan delta
testing as per OS mannual
315MVA ICT-3 will remain
charge through main CB752
3 400KV 400kV CB No 952 Tie
CB's of ICT-2 at Bawana
Daily Basis 30.11.2016 13:30 Hrs 30.11.2016 17:30 hrs Annual Maintenance and tan delta
testing as per OS mannual
315MVA ICT-2 will remain
charge through main CB1052
NTPC STATION - DADRI & RIHANDS.N Shutdown
TypeWork to be Carrried Reason
Voltage Level
Name Date Time Date Time
1 220KV ICT # 3 Dadri Continuous 21.11.2016 07:00 hrs 26.11.2016 18:00 Hrs Annual Maintenance
2 220KV ICT # 4 Dadri Continuous 28.11.2016 07:00 hrs 03.12.2016 18:00 Hrs Annual Maintenance
3 400KV 400/132KV IBT-1 of
Rihand STPS
Continuous 14.11.2016 - 17.11.2016 - Maintenance of IBT and Bay
Equipment
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER., 2016Annexure 3B (3)
Details of Transmission Element From To
Details of Transmission Element From To
S.N.MODE
DATE TIME DATE TIME
1 500MVA ICT-I NIMRANA Daily 07/11/16 9:00 07/11/16 18:00 AMP work/Bushing C&tan delta
2 315MVA ICT-I NIMRANA Daily 10/11/16 9:00 10/11/16 18:00 AMP work/Bushing C&tan delta
3 315MVA ICT-I MAHRANIBAG Daily 10/11/16 9:00 10/11/16 18:00 AMP work/Bushing C&tan delta
4 315MVA ICT-II MAHRANIBAG Daily 11/11/16 9:00 11/11/16 18:00 AMP work/Bushing C&tan delta
5 315MVA ICT-II at SONIPAT Daily 17/11/16 8:00 17/11/16 18:00 AMP work/Bushing C&tan delta
6 315MVA ICT-I at ROORKI Daily 07/11/16 9:00 07/11/16 17:00 AMP work/Bushing C&tan delta
7 315MVA ICT-II at ROORKI Daily 10/11/16 9:00 10/11/16 17:00 AMP work/Bushing C&tan delta
8 100MVA ICT-I at PITHORAGRH Daily 17/11/16 8:00 17/11/16 18:00 AMP work/Bushing C&tan delta
9 400kv BUS-I at BHIWANI Daily 15/11/16 8:00 16/11/16 18:00Installation of Polymer insulator in
ICT-2 400kv jack bus & Bus1.
10 400kv BUS-II at BHIWANI Daily 17/11/16 8:00 17/11/16 18:00 AMP work/Bushing C&tan delta
11 400kv BUS-I at BHIWADI Daily 10/11/16 8:00 10/11/16 18:00 AMP work/CVT C&tan delta
12 400kv BUS-II at BHIWADI Daily 11/11/16 8:00 11/11/16 18:00 AMP work/CVT C&tan delta
13 400kv BUS-I at BHIWADI-HVDC DAILY 12/11/16 8:00 12/11/16 18:00 AMP work/CVT C&tan delta
14 400kv BUS-II at BHIWADI-HVDC DAILY 13/11/16 8:00 13/11/16 18:00 AMP work/CVT C&tan delta
15 FSC of Koteshwar-I line at Meerut DAILY 01/11/16 8:00 08/11/16 18:00Erection works of Dead end Tower
and Beam for new FSC.Merut
16 125MVAR Bus Reactor at Jaipur(S) DAILY 01/11/16 8:00 15/11/16 18:00Erection works related to 125MVAR
new Bus Reactor. JPR
17 400kv Bus Coupler Bay at GIS Gurgaon daily 11/11/16 8:00 11/11/16 18:00 AMP work/CVT C&tan delta GGN
18 Agra Line Main Bay at Ballabhgrh daily 07/11/16 8:00 28/11/16 18:00New Civil foundation & Replacement
of M&G CB. Line to remain charged.
19 400kv GIS Bus Coupler at Koteshwar Cont 19/10/16 10:00 19/10/16 18:00Replacement of Isolator contacts at
Koteshwar-GIS. With Bus-I S/D Koteshwar
20 400kv GIS Bus Coupler at Koteshwar Cont 03/10/16 9:00 03/10/16 18:00Replacement of Isolator contacts at
Koteshwar-GIS. With Bus-II S/D Koteshwar
21 Bus-I A at Agra DAILY 11/26/2016 8:00 11/26/2016 18:00Integration for 400kVPole-4 dia with
400kV Bus
22 Bus-II A at Agra DAILY 11/28/2016 8:00 11/28/2016 18:00Integration for 400kVPole-4 dia with
400kV Bus
23 Bus-I B at Agra Cont 11/20/2016 8:00 11/20/2016 18:00Integration of 400kV Sikar-1 Bays
with 400kV Bus
24 Bus-II B at Agra Cont 11/21/2016 8:00 11/21/2016 18:00Integration of 400kV Sikar-2 Bays
with 400kV Bus
25 ICT-I at Pithoragarh Daily 17.11.16 9:00 17.11.16 17:00 For AMP work
26 Main Bay of ICT-2(404) Daily 09.11.16 9:00 09.11.16 18:00 AMP work
27 Main Bay of ICT-1(407) Daily 10.11.16 9:00 10.11.16 18:00 AMP work
28Tie Bay of ICT-2 and 400KV Parichha-
1 Line(405)Daily 14.11.16 9:00 14.11.16 18:00 AMP work
29Tie Bay of ICT-1 and 400KV Fatehpur-
1 Line(408)Daily 15.11.16 9:00 15.11.16 18:00 AMP work
30Main Bay of 400KV Fatehpur-1
Line(409)Daily 18.11.16 9:00 18.11.16 18:00 AMP work
31Main Bay of 400KV Ballabhgarh-1
Line(410)Daily 19.11.16 9:00 19.11.16 18:00 AMP work
32Tie Bay of 400KV Ballabhgarh-1 Line-
1 and 400KV Fatehpur-2 Line(411)Daily 23.11.16 9:00 23.11.16 18:00 AMP work
33405-400kv Lucknow Line-2 & 400kv
Side ICT-1 Tie bayDaily 07.11.16 9:00 07.11.16 18:00 For AMP work
34 411-ICT-2 400kv Side Tie Bay Daily 08.11.16 9:00 08.11.16 18:00 For AMP work
35 Lucknow-II Main Bay (401) Daily 22.10.2016 09:30 hrs 22.10.2016 17:30 hrs For AMP work
36 Bareilly -II Main Bay (404) Daily 23.10.2016 09:30 hrs 23.10.2016 17:30 hrs For AMP work
37 Bareilly -I Tie Bay (408) Daily 24.10.2016 09:30 hrs 24.10.2016 17:30 hrs For AMP work38
39 400 KV Meerut Line-2 Main Bay at Bareilly Daily 11/8/2016 10:00 11/8/2016 18:00 Annual maintenance work
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016Annexure 3B (4)
POWERGRID NR-1 & 3
ICT , B/R, SVC
PURPOSE REMARKSLINE/EQUIPT
DURATION FROM TO
Voltage level Name From To From To
1 2 3 4 6 7 8 9 10 11
1 400 KV
400 KV BUS COUPLER ALONG
WITH 400 KV MAIN BUS-B
Sarojaninagar
A 02.11.16 30.11.16 9:00 16:00
FOR REPLACEMENT OF 400 KV ABCB
OF BUS COUPLER BAY BY SF6
CIRCUIT BREAKER
Continuous
Basis
2 400 KV
400 KV Unnao-Lucknow Line Main
Breaker Unnao end (line remain
charge through TBC).
A 21.11.16 27.11.16 09:00 18:00Major Overhauling of Circuit Breaker of
400 KV Unnao-Lucknow Line
Continuous
Basis
3 400 KV315 MVA ICT-(I) Bareilly
A 15.11.16 14.12.16 8:00 18:00For complete overhaulling of transformer
by changing gasket and centrifuging.
Continuous
Basis
4 400 KV 400KV Bus -(I) Bareilly A 21.11.16 21.11.16 08:00 18:00
For changing the contacts of bus side
pantograph isolator Transfer bus 29-A Y-
phase
Daily Basis
5 400KV400KV Bus coupler alongwith 400KV
A bus at 400 kV SultanpurA 01.11.16 13.11.16 08:00 18:00
For erection and commissioning of New
Bus Bar Protection Panel in place of old
Bus Bar Protection Panel.
continuous
basis
6 400KV 240MVA ICT-I at Sultanpur A 02.11.16 03.11.16 08:00 18:00 For dismantling of 36 Mtr Span of 220KV
Transfer Bus and 220KV B bus.
continuous
basis
7 400KV 240MVA ICT-I at Sultanpur A 06.11.16 06.11.16 08:00 18:00 Erection of 27+36 Mtr Span of 220KV
Transfer Bus Daily Basis
8 400KV 240MVA ICT-I at Sultanpur A 07.11.16 08.11.16 08:00 18:00
1. Dismantling of 36 Mtr. Span of 220KV A
Bus 2. Complete Erection of
220KV side columns & beams. 3.
Erection of 27+36 Mtr Span of 220KV B
Bus
Continuous
Basis
9 400KV 240MVA ICT-I at Sultanpur A 09.11.16 09.11.16 08:00 18:00
1. For Erection of 220KV A Bus 2. For
dismantling of 54 Mtr. Span of 400KV
Transfer Bus
Daily Basis
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016
Uttar Pradesh Power Transmission Corporation Limited
Sl. No.
Detail of Transmission element Category to which
transmission
element belong
(A/B/C/D)
Period Time
Reason Remark
ANNEXURE 3B (5)
10 400KV 400KV Transfer Bus Sultanpur A 09.11.16 18.11.16 08:00 18:00
For dismantling of 54 Mtr. Span, beam
structure etc. of 400KV Transfer Bus For
400KV 315MVA New Transformer Bay
erection
continuous
basis
11 400KV400KV 80MVAR Bus Reactor
SultanpurA 09.11.16 18.11.16 08:00 18:00
For dismantling of 54 Mtr. Span, beam
structure etc. of 400KV Transfer Bus For
400KV 315MVA New Transformer Bay
erection
continuous
basis
12 400KV 400KV B bus Sultanpur A 13.11.16 13.11.16 08:00 18:00 For B bus pantograph isolator maintenance
of 400KV obra BayDaily Basis
13 400KV400/220KV 240MVA ICT-I at
Sultanpur A 17.11.16 18.11.16 08:00 18:00
For stringing of R,Y,B Phase 54 Mtr. Span
of 400KV Transfer BusDaily Basis
14 400KV400KV CB-91 (ABCB) at 400KV S/s
AzamgarhA 02.11.16 17.11.16 8.00 18.00 Replacement of CB with new SF6 CB
Continous
Basis. All T/F
and lines at
400KV S/s
Azamgarh will
remain in
service.
15 400KV 240MVA 400/220KV ICT-I A 07.11.16 07.11.16 8:00 18:00 for routing testing & maintenance work.
Daily basis.
16 400KV 240MVA 400/220KV ICT-II A 17.11.16 17.11.16 8:00 18:00 for routing testing & maintenance work.
Daily basis.
17 400KV315MVA ICT T/F-III & its bay at
400KV S/S Greater NoidaA 04.11.16 06.11.16 8:00 18:00
Centrifuging of oil & General Maintenance
of BayDaily basis
18 400KV240MVA T/F-II at 400KV Sub-station,
Muradnagar-IIA 18.11.16 18.11.16 8:00 17:00 For tightening if Bay & Testing work.
Daily basis.
19 400KV 400KV AligarhMuradnagar Line A 18.11.16 18.11.16 8:00 17:00 Tightening of Bay/General MaintenanceDaily basis.
20 400KV315MVA ICT-I at 400KV Sub-station,
MuradnagarA 24.11.16 24.11.16 8:00 17:00 Tightening of Bay/General Maintenance
Daily basis.
21 400KV315MVA ICT-II at 400KV Sub-station,
MuradnagarA 26.11.16 26.11.16 8:00 17:00 Tightening of Bay/General Maintenance
Daily basis.
22 400KV315MVA ICT-III at 400KV Sub-
station, MuradnagarA 28.11.16 28.11.16 8:00 17:00 Tightening of Bay/General Maintenance
Daily basis.
DATE TIME DATE TIME
X-2
1 400 KV A 15.11.16 0900 16.11.16 1700 DailyFor Busbar stability for Dehradun-1 & 2 Bays. As it
cannot be clubbed with annual maintenance.
2 400 KV A 10.11.16 0900 11.11.16 1700 DailyReplacement of Droppers from Bus from twin to
Quad for Dehradun Bay Dia.
3 400 KV A 09.11.16 09:00 10.11.16 18:00 Daily
4 400 KV A 11.11.16 09:00 12.11.16 18:00 Daily
5 400 KV A 14.11.16 09:00 15.11.16 18:00 DailyFor equipment replacement (Isolator etc.) for
commissioning of Bus-Reacor at BBMB, Dehar.
6 400 KV A 16.11.16 09:00 17.11.16 18:00 DailyFor equipment replacement (Isolator etc.) for
commissioning of Bus-Reacor at BBMB, Dehar.
7 400 KV A 02.11.16 09:00 03.11.16 18:00 Daily
8 400 KV A 04.11.16 09:00 05.11.16 18:00 Daily
X-31 400 KV A 07.11.16 09:00 08.11.16 17:00 Daily For AMP works.
2 400 KV A 10.11.16 09:00 11.11.16 17:00 Daily For AMP works.
3 400 KV A 09.11.16 10:00 09.11.16 12:00 DailyRepetition of C&Tan Delta if IV, R-Phase bushing
on variable frequency.
4400 KV A 17.11.16 09:00 17.11.16 17:00
DailyFor replacement of 220 KV Side CT & AMP works.
5 400 KV A 11.11.16 09:00 11.11.16 18:00 Daily For AMP works.
6 400 KV A 08.11.16 10:00 08.11.16 17:00 Daily For AMP works.
7 400 KV A 14.11.16 10:00 14.11.16 17:00 Daily For MCU Testing works.
8 400 KV A 15.11.16 10:00 15.11.16 17:00 Daily For MCU Testing works.
9 400 KV 315 MVA ICT-2 at Nalagarh. A 21.11.16 09:00 21.11.16 17:00 Daily For AMP works.
10 400 KV A 22.11.16 09:00 22.11.16 17:00 Daily For AMP works.
11 400 KV A 23.11.16 09:00 23.11.16 17:00 Daily For AMP works.
12 400 KV 500 MVA ICT-1 at Moga. A 07.11.16 09:00 07.11.16 17:00 Daily For AMP works.
400 KV Bus-1 at Abdullapur.
For Bay extension work of Dadri Malerkotla Line at
Kaithal.
400 KV Bus-2 at Abdullapur.
POWERGRID NORTHERN REGION-II
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016
S.No.Details of Transmission Element Category
of element
DURATION Daily/ Continuous ReasonVoltage
level NAME OF THE ELEMENT AND
SUBSTATIONFROM TO
For construction activity
400 KV Bus-1 at Abdullapur.
400 KV Bus-2 at Abdullapur.
315MVA ICT-1 at Abdullapur.
315 MVA ICT-2 at Kaithal.
315 MVA ICT-1 at Jalandhar.
For O&M activity
400 KV Bus-1 at New Wanpoh
400 KV Bus-2 at New Wanpoh
For Jumper connection and Bus Bar Stability for
Kishenpur - 3 & 4 Lines under construction.
Annexure 3B (6)
400 KV Bus-1 at Hamirpur.
400 KV Bus-2 at Hamirpur.
400 KV Bus-1 at Nalagarh.
400 KV Bus-2 at Nalagarh.
315 MVA ICT 1 at Hamirpur.
400 KV Bus-1 at Kaithal.
400 KV Bus-2 at at Kaithal.
400 KV Bus-1 at BBMB Dehar
400 KV Bus-2 at BBMB Dehar
13 400 KV 250 MVA ICT-2 at Moga. A 08.11.16 09:00 08.11.16 17:00 Daily For AMP works.
14 400 KV 500 MVA ICT-3 at Moga. A 09.11.16 09:00 09.11.16 17:00 Daily For AMP works.
15 400 KV 315 MVA ICT-4 at Moga. A 10.11.16 09:00 10.11.16 17:00 Daily For AMP works.
16 400 KV A 02.11.16 09:00 02.11.16 17:00 Daily For AMP works.
17 400 KV A 03.11.16 10:00 03.11.16 17:00 Daily For AMP works.
18 400 KV A 07.11.16 7:00 11.11.16 9:00 ContinuousFor replacement of 220 KV Bushing -02 No.'s due
to DGA Voilation. Rescheduled from 126 OCC.
19 400 KV A 15.11.16 10:00 15.11.16 17:00 Daily For AMP works.
20 400 KV A 16.11.16 10:00 16.11.16 17:00 Daily For AMP works.
21 400 KV A 14.11.16 09:00 19.11.16 18:00 ContinuousFor replacing DGA Violating 400 KV R-Phase
Bushing.
400 KV Bus-2 at Wagoora.
315 MVA ICT-1 at Ludhiana
315 MVA ICT-2 at Panchkula.
315 MVA ICT-1 at Panchkula.
400/220KV ICT-2 at Patiala.
400 KV Bus-1 at Wagoora.
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS / LINES FOR THE MONTH OF NOVEMBER, 2016
Annexure 3B (7)
PDD J&K
Name of Division Name of G/Stn./ Trans.Lines Proposed date and time of shutdown.
1.
TLMD-II, Jammu. 220/132/33 KV Grid Station Gladni. 05-11-2016 0800 Hrs. to 1400 Hrs.
2.
G.C.D, Jammu. 320MVA,220/132/66KV G/Stn.Hiranagar including 220KV Sarna-Hiiranagar & Hiranagar-
Gladni Tr. Lines alongwith 132KV Hiranagar-Sewa-II D/C Tr. Line .
12-11-2016 0800 Hrs. to 1400 Hrs.
3.
TLCD-I, Jammu 220/132 KV G/Station Bishnah
and 220KV Hiranagar-Bishnah Trans. Line.
12-11-2016
0800 Hrs. to 1400 Hrs.
4. TLCD-II, Jammu a-220/132/33KV G/S Barn
b-220 KV D/C Barn-Kishenpur Trans. Line(BKTL)
19-11-2016
0800 Hrs. to 1400 Hrs.
5. TLMD-III, Udhampur a- 220/132/33KV G/S Ramban
b- 220KV D/C KPTL
Kishenpur-Ramban- (Ckt.-I & II)
c- 220/132/33KV Grid Station
Udhampur.
d- 220KV S/C Sarna-Udhampur
Trans. Line.
19-11-2016 0800 to 1400 Hrs.
19-11-2016 0800Hrs. to 1400 Hrs. 26-11-2016 0800 Hrs. to 1400 Hrs.
26-11-2016 0800 Hrs. to 1400Hrs.
The shutdown shall be subject to fair weather conditions.