lff1f, Cflccll fbH m:R, Government of India Northern Regional Power Committee 18-A, S. Jeet Singh Marg, Katwaria Sarai, New Delhi-110016 <ir.r-011-26513265' 26868681 :26865206 mail: [email protected] www.nrpc.gov.in 13, lo . 2016 Subject: Proposed outage programme of Transmission Assets for consideration in 128th OCC Meeting-Reg. cf;qf."l4l iiTa cf;qf."l4l CfiT SIH11fcld En cf;qf."l41. iiTa Slfdlfcla 2(A&B) ,3A,38(1-7) CfiT cfiT lf{ 1 \3Ui 14 2016 oFT 10.30 cflR4l Sl'tll&1'1 \3qf1fl\Rl cfiT 128cft iiTa mwr ' cfiT if Outage programme of Generating Units proposed by Generating Companies (Annexure-!) and outage programme of Transmission Elements proposed by Generating and Transmission Companies (Annexure-11 (A&B) and Annexure3A,3B(1-7) has been up-loaded on NRPC's web-site (http://www.nrpc.gov.in). This proposed outage programme is for consideration/approval of the OCC in its 128th meeting to be held on 14th October 2016 (from 10.30 hrs.) through video conferencing wherein resources of NRLDC would be utilised. (m (Ajay Talegaonkar) 3fal&10T 1&1'1) fi4l\l16fl 1&1'1

Upload: vankhanh

Post on 09-Jun-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

'il"RCf~

\3"W~~~ 18-~. ~T.~ ~ lff1f, Cflccll fbH m:R,

~~-110016 Government of India

Northern Regional Power Committee 18-A, S. Jeet Singh Marg, Katwaria Sarai,

New Delhi-110016

<ir.r-011-26513265' 26868681 ~Fax :26865206

~l)ere- mail: [email protected]

~ebsite: www.nrpc.gov.in

~- 13, lo • . 2016

Subject: Proposed outage programme of Transmission Assets for consideration in 128th OCC Meeting-Reg.

\3cq1~'1 cf;qf."l4l iiTa \3cq1~'1 ~ ~ q{{~u1 cf;qf."l4l CfiT SIH11fcld ~ Cfl14'~~ En m~ m~ \3cql~'1 cf;qf."l41. iiTa Slfdlfcla q({~o1 ~ (ft&l~Cfl-1 ~ 2(A&B) ,3A,38(1-7) CfiT

~ Cfl14'~~ ;:J.&f.fct.~. cfiT ~~fil~c(http://www.nrpc.gov.in) lf{ ~~ ~ 1 \3Ui ~

Cfl14'~~ 14 ~, 2016 oFT 10.30 ~if cflR4l CflTrfiJf"fi~l En~ Sl'tll&1'1 fi~f"Cil( \3qf1fl\Rl cfiT

128cft ~if~ iiTa ~-Fctll"J<f ~ mwr ~ ' ~ ;:J.fit.m.~.En. cfiT ~mit \3q4l~l if

~~I

Outage programme of Generating Units proposed by Generating Companies (Annexure-!) and outage programme of Transmission Elements proposed by Generating and Transmission Companies (Annexure-11 (A&B) and Annexure3A,3B(1-7) has been up-loaded on NRPC's web-site (http://www.nrpc.gov.in). This proposed outage programme is for consideration/approval of the OCC in its 128th meeting to be held on 14th October 2016 (from 10.30 hrs.) through video conferencing wherein resources of NRLDC would be utilised.

(m C1~a1lctCfl't) (Ajay Talegaonkar)

3fal&10T ~(SI'il 1&1'1)

~ fi4l\l16fl ~. ~""' 1&1'1 fi~.-~4 ;:J11-~

Annexure – 1

PROPOSED OUTAGE OF GENERATION STATIONS FOR THE MONTH OF NOVEMBER, 2016 THDC India Limited S.No. Station Unit

No. Capacity Date of

Start Date of

Completion No. of Days Remarks

1 Koteshwar HEP 4 100 08.11.2016 23.12.2016 45 Annual Maintenance

* Remarks: For Unit # 3 maintenance schedule has already been approved in last OCC meeting from 22.09.2016 to 10.11.2016

RRVUNL S.No. Station Unit

No. Capacity Date of

Start Date of

Completion No. of Days Remarks

1 SSTPS, Suratgarh 5 250 01.11.2016 15.12.2016 45 Annual Capital

Overhaul

NTPC – NCR S.No. Station Unit

No. Capacity Date of

Start Date of

Completion No. of Days Remarks

1 Badarpur 5 - 14.11.2016 08.12.2016 - Annual Capital

Overhaul

Indraprastha Power Generation Co. Ltd. & PPCL S.No. Station Unit

No. Capacity Date of

Start Date of

Completion No. of Days Remarks

1 PPS-III Bawana PPCL STG1 - 01.11.2016 30.11.2016 30 Overhauling of Steam Turbine &

Inspection of Generator

Remarks: GT#2 of Module-1 will be available in open cycle operation during proposed period. Module-II (i.e. GT#3, GT#4 & STG#2) will be available in combined cycle. NHPC S.No. Station Unit No. Capacity Date of Start Date of

Completion No. of Days Remarks

1. Bairasuil 1 60 10-11-2016 29-11-2016 20 Annual Maintenance

2. Salal 1 115 01-10-2016 09-11-2016 40 Annual Maintenance

3. Salal 5 115 12-11-2016 21-12-2016 40 Annual Maintenance

4. Salal 6 115 01-10-2016 28-01-2017 120 Capital Maintenance

5. Tanakpur 2 31.4 15-11-2016 14-12-2016 30 Annual Maintenance

6. Uri 1 120 08-11-2016 22-11-2016 15 Annual Maintenance

7. Uri 2 120 25-11-2016 09-12-2016 15 Annual Maintenance

8. Chamera-II 1 100 14-11-2016 28-11-2016 15 Annual Maintenance

9. Dhauliganga 4 70 15-11-2016 06-12-2016 22 Annual Maintenance

10. Sewa-II 1 40 16-11-2016 03-12-2016 18 Annual Maintenance

11. Uri-II 1 60 01-11-2016 20-11-2016 20 Annual Maintenance

12. Uri-II 2 60 24-11-2016 13.12.2016 20 Annual Maintenance

13. Parbati-III 3 130 01-11-2016 15.12.2016 45 Capital Maintenance

Above shutdowns are subject to availability of water.

DATE TIME DATE TIME

1 PGCIL 800 AGRA BNC PGCIL I INTER Cont

For Integration of Pole-3 with

Pole-1 and neutral busbar

installation work at both end.

19/11/16 8:00 23/11/16 18:00 Agra

2 PGCIL 800 AGRA BNC PGCIL II INTER Cont

For Integration work of Pole-4

with Pole-1 and extension of

HV side Busbar at both end.

25/11/16 8:00 30/11/16 18:00 Agra

3 PGCIL 500 BALIA BHIWADI PGCIL I INTRA DAILYHVDC line and Terminal eqpt

AMP/ prewinter maint works.21/11/16 8:00 24/11/16 18:00

4 PGCIL 500 BALIA BHIWADI PGCIL II INTRA DAILYHVDC line and Terminal eqpt

AMP/ prewinter maint works.25/11/16 8:00 30/11/16 18:00

5 PGCIL 500 BALIA BHIWADI PGCIL I INTRA DAILYHVDC line and Terminal eqpt

AMP/ prewinter maint works.29/11/16 8:00 30/11/16 18:00

6 PGCIL 500 RIHAND DADRI PGCIL I INTRA CONTHVDC line and Terminal eqpt

AMP/ prewinter maint works.03/11/16 8:00 09/11/16 18:00 Rh/Dadri

7 PGCIL 500 RIHAND DADRI PGCIL II INTRA CONTHVDC line and Terminal eqpt

AMP/ prewinter maint works.10/11/16 8:00 15/11/16 18:00 Rh/Dadri

8 PGCIL 765 BHIWANI PHAGI PGCIL I INTRA DAILY Pre winter maintenance work 30/11/16 8:00 30/11/16 18:00 SIKAR/ Bassi

9 PGCIL 765 BHIWANI PHAGI PGCIL II INTRA DAILY

RTV Coating on HV-Bushing

of L/ Reactor one unit each

day/ swaping with Spare unit

02/11/16 8:00 05/01/16 18:00 Bhiwani

10 PGCIL 765 BHIWANI MOGA PGCIL I INTRA DAILYInstallation of Polymer

insulator in jack Bus-I.25/11/16 8:00 25/11/16 18:00 Bhiwani, 25-26 Moga

11 PGCIL 765 KANPUR JHATIKRA PGCIL S/C INTRA DAILYJumper tightening/ Prewinter

maintenance work.18/11/16 11:00 21/11/16 18:00 VK Singh KNP

12 PGCIL 765 GWALIOR PHAGI PGCIL I INTRA DAILY Pre winter maintenance work 23/11/16 8:00 23/11/16 18:00 Bassi

13 PGCIL 765 GWALIOR PHAGI PGCIL II INTRA DAILY Pre winter maintenance work 24/11/16 8:00 24/11/16 18:00 Bassi

14 PGCIL 765 AGRA FATEHPUR PGCIL INTRA DAILY

Stringing of 400KV Agra(UP)

Agra(S) D/C lines under

Lalitpur-Agra Transmission

project.

01/11/16 8:00 02/11/16 18:00

PROPOSED OUTAGE OF NLDC TRANSMISSION LINES FOR THE MONTH OF NOVEMBER, 2016ANNEXURE 2(A)

VOLT

LEVEL

(KV)

FROMS.N.CKT ID

TOREMARKSNAME OF

REQUESTING AGENCY

LINE DETAILS PROPOSED DATE AND TIME

TO S/S OWNERFROM S/SREASON

DAILY/ CONTINUOUS

INTER/

INTRA

REGION

AL

15 PGCIL 800 AGRA BNC PGCIL I INTRA DAILY

S/D of 132KV Earth Electrode

line at Agra HVDC for stringing

of 400KV Agra(UP) - Agra(S)

D/C lines under Lalitpur-Agra

transmission project. Other

pole will run in metallic return

mode

01/11/16 8:00 02/11/16 18:00

16 PGCIL 800 AGRA BNC PGCIL I INTRA DAILY

S/D of 132KV Earth Electrode

line at Agra HVDC for stringing

of 400KV Agra(UP) - Agra(S)

D/C lines under Lalitpur-Agra

transmission project. Other

pole will run in metallic return

mode

07/11/16 8:00 08/11/16 18:00

17 PGCIL 765 AGRA GWALIOR PGCIL I INTRA DAILY For Insulator Cleaning 05/11/16 8:00 07/11/16 18:00

18 PGCIL 765 AGRA GWALIOR PGCIL II INTRA DAILY For Insulator Cleaning 08/11/16 8:00 10/11/16 18:00

19 PGCIL 765 BALIA LUCK PGCIL INTRA DAILY For Insulator Cleaning 28.11.2016 9:30 1.12.2016 17:30

19SLDC

RAJASTHAN765 ANTA PHAGI RAJASTHAN II INTRA DAILY

Replacement of defective

NGR of line reactor bank of

765KV Anta Phagi II

03/11/16 8:00 03/11/16 20:00

20SLDC

RAJASTHAN220 KOTA BADOD RAJASTHAN - INTRA Cont

For Replacement of

deteriorated twin zebra bus

conductor or 220KV Bus B

which is crossing over line

conductor of 220KV Badod

and RAPP (A) feeder at 220KV

GSS Sakatpura Kota

10/11/16 7:00 11/11/16 18:00

21 SLDC UP 765 ANPARA UNNAO UP - INTRA DAILY For Insulator Cleaning 22/11/16 8:00 25/11/16 18:00

From Date From Time To Date To

TimeRequest Detail

1 NTPC [ DELHI ] Anta(NTPC)-Swaimadhopur(RVPNL)(220 kV) Powergrid Continuous Annual Bay Maintenance 11/3/2016 9:00 11/5/2016

Sno Request By Element Name Owner Name Mode Reasons

18:00

3 NTPC [ DELHI ] Anta(NTPC)-Bhilwara(RVPNL) 1(220 kV) Powergrid Continuous Annual Bay Maintenance 11/28/2016 9:00 11/30/2016

18:00

2 NTPC [ DELHI ] Anta(NTPC)-Lalsot(RVPNL) 2(220 kV) Powergrid Continuous Annual Bay Maintenance 11/21/2016 9:00 11/23/2016

18:00

5 NTPC [ DELHI ] Faridabad(NTPC)-Palla(HVPNL) 2(220 kV) Powergrid Daily Annual Bay Maintenance 11/11/2016 9:00 11/12/2016

18:00

4 NTPC [ DELHI ] Faridabad(NTPC)-Palla(HVPNL) 1(220 kV) Powergrid Daily Annual Bay Maintenance 11/9/2016 9:00 11/10/2016

18:00

18:00

7 NTPC [ DELHI ] Faridabad(NTPC)-Samaypur(BBMB) 2(220 kV) Powergrid Daily Annual Bay Maintenance 11/17/2016 9:00 11/18/2016

18:00

6 NTPC [ DELHI ] Faridabad(NTPC)-Samaypur(BBMB) 1(220 kV) Powergrid Daily Annual Bay Maintenance 11/15/2016 9:00 11/16/2016

17:00

18:008 NTPC [ DELHI ] Rihand HVDC(PG)-Rihand(NTPC) 1(400 kV) NTPC Continuous

Replacement of 20 years old CTs and

maintenance of bay equipments and

testing 11/8/2016 8:00 11/9/2016

18:00

10 NTPC [ DELHI ] Auraiya(NTPC)-Kanpur(PG) 2(400 kV) Powergrid Daily

Maintenance of bay equipments and

testing 11/15/2016 8:00 11/15/2016

9 NTPC [ DELHI ] Allahabad(PG)-Rihand(NTPC) 2(400 kV) Powergrid Daily

Maintenance of bay equipments and

testing 11/11/2016 8:00 11/12/2016

18:00

12 NTPC [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 2(220 kV) Powergrid Continuous

Complete replacement of Protection

Relay panel and Maintenance of bay

equipments and testing 11/3/2016 8:00 11/11/2016

18:00

11 NTPC [ DELHI ] Agra(PG)-Auraiya(NTPC) 2(400 kV) Powergrid Daily

Maintenance of bay equipments and

testing 11/18/2016 8:00 11/18/2016

18:00

18:00

13 NTPC [ DELHI ] Basti(UP)-Tanda(NTPC)(400 kV)

Uttar

Pradesh Daily

Maintenance of bay equipments and

testing 11/18/2016 8:00 11/19/2016

14

PROPOSED OUTAGE OF TRANSMISSION LINES FOR THE MONTH OF NOVEMBER, 2016 ANNEXURE 2B

11/16/20169:0011/16/2016

For tightening of jumpers, vibration

dampers, spacers and lopping

chopping of line & other maintenance

work of line.DailyUttrakhandKashipur-Rishikesh(400 kV)

SLDC_UTTARAKHAND [

UTTARAKHAND ]

17:0015

SLDC_UTTARAKHAND [

UTTARAKHAND ] Kashipur(UTT)-Moradabad(UP)(220 kV) Uttrakhand Daily

For tightening of jumpers, vibration

dampers, spacers and lopping

chopping of line & other maintenance

work of line. 11/17/2016 9:00 11/17/2016

POWERGRID [ DELHI ] Agra-Bassi 1(400 kV) Powergrid Daily For Insulator Cleaning work 11/17/2016 8:00 11/20/2016

18:00

17 POWERGRID [ DELHI ] Agra-Jaipur South-2(400 kV) Powergrid Daily For insulator Cleaning work 11/14/2016 8:00 11/16/2016

16 POWERGRID [ DELHI ] Agra-Jaipur South-1(400 kV) Powergrid Daily For Insulator Cleaning work 11/11/2016 8:00 11/13/2016

21 POWERGRID [ DELHI ] Ballabgarh-Kanpur 1(400 kV) Powergrid Daily For Insulator Cleaning work 11/27/2016 8:00 11/28/2016

18:00POWERGRID [ DELHI ] Agra(PG)-Auraiya(NTPC) 2(400 kV) Powergrid Daily

For polymer insulator replacement

and cleaning 11/26/2016 8:00 11/30/2016

18:00

19 POWERGRID [ DELHI ] Agra(PG)-Auraiya(NTPC) 1(400 kV)

18:0022 POWERGRID [ DELHI ] Fatehpur-Kanpur 2(400 kV) Powergrid Daily For AMP work 11/22/2016 9:30 11/22/2016

18:00

18:00

20

Powergrid Daily

For Polymer insulator replacement

and cleaning 11/21/2016 8:00 11/25/2016

18:00

18

17:30

24 POWERGRID [ DELHI ] Hisar-Moga(400 kV) Powergrid Daily

For AMP Works. (400KV Hisar-Moga-

1) 11/17/2016 9:00 11/17/2016

23 POWERGRID [ DELHI ] Jalandhar - Kurukshetra(400 kV) Powergrid Daily

To facilitate construction activities of

400 KV Kurukshetra-Malerkotla-II line

Equipment erection (i.e. CVT/LA/BPI)

along with TPP Tower and Beam

(Falling besides the induction area of

Jalandhar Line in AIS). 11/1/2016 9:30 11/3/2016

17:30

17:30

26 POWERGRID [ DELHI ] Kishenpur-Moga 2(400 kV) Powergrid Daily For AMP Works. 11/9/2016 9:00 11/9/2016

17:30

25 POWERGRID [ DELHI ] Kishenpur-Moga 1(400 kV) Powergrid Daily For AMP Works. 11/4/2016 9:00 11/4/2016

18:00

29 POWERGRID [ DELHI ] Lucknow(UP)-Singrauli(NTPC)(400 kV) Powergrid Daily For insulator cleaning work 11/12/2016 8:00 11/13/2016

18:00

28 POWERGRID [ DELHI ] Allahabad(PG)-Singrauli(NTPC) 2(400 kV) Powergrid Daily For insulator cleaning work 11/10/2016 8:00 11/11/2016

27 POWERGRID [ DELHI ] Allahabad(PG)-Singrauli(NTPC) 1(400 kV) Powergrid Daily For insulator cleaning work 11/8/2016 8:00 11/9/2016

18:00

18:00

30 POWERGRID [ DELHI ] Allahabad(PG)-Rihand(NTPC) 1(400 kV) Powergrid Daily For insulator cleaning work 11/15/2016 8:00 11/16/2016

18:00

31 POWERGRID [ DELHI ] Allahabad(PG)-Rihand(NTPC) 2(400 kV) Powergrid Daily For insulator cleaning work 11/15/2016 8:00 11/16/2016

30 POWERGRID [ DELHI ] Allahabad(PG)-Rihand(NTPC) 1(400 kV) Powergrid Daily For insulator cleaning work 11/15/2016 8:00 11/16/2016

18:00

33 POWERGRID [ DELHI ] Allahabad-Fatehpur 2(400 kV) Powergrid Daily For insulator cleaning work 11/17/2016 8:00 11/18/2016

18:00

32 POWERGRID [ DELHI ] Allahabad-Fatehpur 1(400 kV) Powergrid Daily For insulator cleaning work 11/17/2016 8:00 11/18/2016

18:00

18:00

34 POWERGRID [ DELHI ] Fatehpur-Singrauli(400kV) Powergrid Daily For insulator cleaning work 11/21/2016 8:00 11/22/2016

35 POWERGRID [ DELHI ] Fatehpur-Mainpuri 1(400 kV) Powergrid Daily For insulator cleaning work 11/5/2016 8:00 11/7/2016

18:00

37 POWERGRID [ DELHI ] Lucknow-Rosa(400 kV) Powergrid Daily Insulator cleaning 11/21/2016 9:30 11/21/2016

18:00

36 POWERGRID [ DELHI ] Fatehpur-Mainpuri 2(400 kV) Powergrid Daily For insulator cleaning work 11/8/2016 8:00 11/10/2016

17:30

39 POWERGRID [ DELHI ] Agra(PG)-Auraiya(NTPC) 2(400 kV) Powergrid Continuous

For 02 Nos. bushing replacement

work on DGA violation 11/8/2016 9:00 11/8/2016

17:30

38 POWERGRID [ DELHI ] 400KV LUCKNOW-SHAHJHNPR-II(400 kV) Powergrid Daily Insulator cleaning 11/22/2016 9:30 11/22/2016

18:00

41 POWERGRID [ DELHI ] Allahabad-Fatehpur 1(400 kV) Powergrid Daily For AMP work 11/10/2016 9:30 11/10/2016

18:00

40 POWERGRID [ DELHI ] Agra-Jaipur South-1(400 kV) Powergrid Continuous

For 02 Nos.Bushing replacement

work on DGA violation 11/9/2016 9:00 11/9/2016

18:00

43 POWERGRID [ DELHI ] Fatehpur-Kanpur-1(400 kV) Powergrid Daily For AMP work 11/15/2016 9:30 11/15/2016

18:00

42 POWERGRID [ DELHI ] Allahabad-Fatehpur 2(400 kV) Powergrid Daily For AMP work 11/8/2016 9:30 11/8/2016

17:30

45 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 2(220 kV) Powergrid Daily Insulator replacement work 11/7/2016 9:30 11/12/2016

18:00

44 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 1(220 kV) Powergrid Daily Insulator replacement work 11/1/2016 9:30 11/6/2016

17:30

17:30

47 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 4(220 kV) Powergrid Daily Insulator replacement work 11/19/2016 9:30 11/24/2016

17:30

46 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 3(220 kV) Powergrid Daily Insulator replacement work 11/13/2016 9:30 11/18/2016

18:0048 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 1(400 kV) Powergrid Continuous

Erection works of Dead end Tower

and Beam for new FSC. 11/16/2001 8:00 11/16/2001

49 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 1(400 kV) Powergrid Continuous

Erection works of Dead end Tower

and Beam for new FSC. 11/16/2008 8:00 11/16/2008

19:00

51 POWERGRID [ DELHI ] Agra-Sikar 2(400 kV) Powergrid Continuous

Jumper tightening/ Prewinter AMP

works. 11/16/2013 8:00 11/16/2014

18:00

50 POWERGRID [ DELHI ] Agra-Sikar 1(400 kV) Powergrid Continuous

Jumper tightening/ Prewinter AMP

works. 11/16/2011 8:00 11/16/2012

18:00

53 POWERGRID [ DELHI ] Neemrana-Sikar 2(400 kV) Powergrid Continuous

Jumper tightening/ Prewinter AMP

works. 11/16/2010 8:00 11/16/2010

18:00

52 POWERGRID [ DELHI ] Neemrana-Sikar 1(400 kV) Powergrid Continuous

Jumper tightening/ Prewinter AMP

works. 11/16/2009 8:00 11/16/2009

18:00

55 POWERGRID [ DELHI ] Ballabgarh-Mainpuri 1(400 kV) Powergrid Continuous

Diversion due to DFCC Rail project.It

involves erection of 01 No tower. 11/16/2014 8:00 11/16/2023

18:00

54 POWERGRID [ DELHI ] Bhiwadi-Gurgaon(400 kV) Powergrid Continuous

Diversion due to DFCC Rail project.It

involves erection of 01 No tower. 11/16/2007 8:00 11/16/2011

18:00

57 POWERGRID [ DELHI ] Koteshwar Pool(PG)-Koteshwar(THDC) 1(400 kV) Powergrid Continuous

Replacement of Isolator contacts at

Koteshwar-GIS. With Bus-I S/D 11/16/2005 8:00 11/16/2007

18:00

56 POWERGRID [ DELHI ] Ballabgarh-Mainpuri 2(400 kV) Powergrid Continuous

Diversion due to DFCC Rail project.

Erection/dismantalling of 2 towers. 11/16/2014 8:00 11/16/2023

18:00

59 POWERGRID [ DELHI ] Koteshwar Pool(PG)-Tehri(THDC) 1(220 kV) Powergrid Continuous

Replacement of Isolator contacts at

Koteshwar-GIS. With Bus-I S/D 11/16/2012 8:00 11/16/2014

18:00

58 POWERGRID [ DELHI ] Koteshwar Pool(PG)-Koteshwar(THDC) 2(400 kV) Powergrid Continuous

Replacement of Isolator contacts at

Koteshwar-GIS. With Bus-I S/D 11/16/2008 8:00 11/16/2010

18:00

61 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 1(400 kV) Powergrid Continuous

Replacement of Isolator contacts at

Koteshwar-GIS. With Bus-I S/D 11/16/2019 8:00 11/16/2021

18:00

60 POWERGRID [ DELHI ] Koteshwar Pool (PG)-Tehri(THDC) 2(220 kV) Powergrid Continuous

Replacement of Isolator contacts at

Koteshwar-GIS. With Bus-I S/D 11/16/2015 8:00 11/16/2017

18:00

63 POWERGRID [ DELHI ] Agra-Jaipur South-1(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2009 8:00 11/16/2009

18:00

62 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 2(220 kV) Powergrid Continuous

Replacement of Isolator contacts at

Koteshwar-GIS. With Bus-I S/D 11/16/2022 8:00 11/16/2024

18:00

18:00

64 POWERGRID [ DELHI ] Agra-Jaipur South-2(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2010 8:00 11/16/2010

65 POWERGRID [ DELHI ] Agra-Bassi 1(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2011 8:00 11/16/2013

18:00

67 POWERGRID [ DELHI ] Bassi-Jaipur 2(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2016 8:00 11/16/2016

18:00

66 POWERGRID [ DELHI ] Bassi-Jaipur 1(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2015 8:00 11/16/2015

18:00

69 POWERGRID [ DELHI ] Kota(PG)-Merta(RVPNL) 1(400 kV) Powergrid Continuous

Replacement of bottom Expandable

below of Line Reactor. 11/16/2023 8:00 11/16/2026

18:00

68 POWERGRID [ DELHI ] Bassi(PG)-Heerapura(RVPNL) 2(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2017 8:00 11/16/2017

18:00

71 POWERGRID [ DELHI ] Ballabgarh-Maharanibagh(400 kV) Powergrid Continuous

Shifting of towers and line diversion

for DFCC track at Loc.78-80.

Reapplied from 127OCC as per dates

agreed and confirmed by DTL. 11/16/2010 8:00 11/16/2012

18:00

70 POWERGRID [ DELHI ] Agra(PG)-Agra(UP) 1(400 kV) Powergrid Continuous

Stringing/termination and jumpering

for charging of LILO at Fatehabad. 11/16/2001 8:00 11/16/2003

18:00

73 POWERGRID [ DELHI ] Dadri(NTPC)-Maharanibagh(PG)(400 kV) Powergrid Continuous

Shifting of towers and line diversion

for DFCC track at Loc.78-80.

Reapplied from 127OCC as per dates

agreed and confirmed by DTL. 11/16/2013 8:00 11/16/2015

18:00

72 POWERGRID [ DELHI ] Dadri(NTPC)-Maharanibagh(PG)(400 kV) Powergrid Continuous

Shifting of towers and line diversion

for DFCC track at Loc.78-80.

Reapplied from 127OCC as per dates

agreed and confirmed by DTL. 11/16/2010 8:00 11/16/2012

18:00

75 POWERGRID [ DELHI ] Kanpur(PG)-Panki(UP) 1(400 kV) Powergrid Continuous

Jumper tightening/ Prewinter

maintenance work. 11/16/2007 8:00 11/16/2010

18:00

74 POWERGRID [ DELHI ] Ballabgarh-Maharanibagh(400 kV) Powergrid Continuous

Shifting of towers and line diversion

for DFCC track at Loc.78-80.

Reapplied from 127OCC as per dates

agreed and confirmed by DTL. 11/16/2013 8:00 11/16/2015

18:00

77 POWERGRID [ DELHI ] Bassi(PG)-Dausa(RVPNL) 1(220 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2004 8:00 11/16/2004

18:00

76 POWERGRID [ DELHI ] Kanpur(PG)-Panki(UP) 2(400 kV) Powergrid Continuous

Jumper tightening/ Prewinter

maintenance work. 11/16/2011 8:00 11/16/2014

18:00

18:00

79 POWERGRID [ DELHI ] Heerapura(RVPNL)-I.G.Nagar(RVPNL)(400 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2006 8:00 11/16/2006

78 POWERGRID [ DELHI ] Bassi(PG)-Dausa(RVPNL) 2(220 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2005 8:00 11/16/2005

18:00

81 POWERGRID [ DELHI ] Dausa(RVPNL)-Sawai madopur(RVPNL)(220 kV) Powergrid Continuous

Disc insulator replacemnt with

polymer string 11/16/2007 8:00 11/16/2008

18:00

80 POWERGRID [ DELHI ] Heerapura(RVPNL)-Sanganer(RVPNL)(220 kV) Powergrid Continuous Insulator cleaning/ Prewinter maint. 11/16/2007 8:00 11/16/2008

18:00

83 POWERGRID [ DELHI ] Anta(NTPC)-Bhilwara(RVPNL) 2(220 kV) Powergrid Continuous

Disc insulator replacemnt with

polymer string 11/16/2021 9:00 11/16/2026

18:00

82 POWERGRID [ DELHI ] Anta(NTPC)-Bhilwara(RVPNL) 1(220 kV) Powergrid Continuous

Disc insulator replacemnt with

polymer string 11/16/2014 8:00 11/16/2019

18:00

85 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 2(220 kV) Powergrid Continuous

OPGW stringing work. Earth peak

strengthening in 14 towers. 10/16/2020 8:00 10/16/2023

19:00

84 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 1(220 kV) Powergrid Continuous

OPGW stringing work. Earth peak

strengthening in 14 towers. 10/16/2020 8:00 10/16/2023

18:00

87 POWERGRID [ DELHI ] Cbganj(UP)-Tanakpur(NHPC) (220 kV) Powergrid Continuous Shifting on ERS for diversion work 11/16/2018 8:00 11/16/2020

18:00

86 POWERGRID [ DELHI ] Cbganj(UP)-Sitarganj(PG)(220 kV) Powergrid Continuous Shifting on ERS for diversion work 11/16/2015 8:00 11/16/2017

18:00

89 POWERGRID [ DELHI ] Cbganj(UP)-Tanakpur(NHPC) (220 kV) Powergrid Continuous Re-Stringing for final diversion. 11/16/2026 8:00 11/16/2027

18:00

88 POWERGRID [ DELHI ] Cbganj(UP)-Sitarganj(PG)(220 kV) Powergrid Continuous Re-Stringing for final diversion. 11/16/2023 8:00 11/16/2024

18:00

18:0090 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 2(220 kV) Rajasthan Daily

Jumper tightening/ Prewinter AMP

works. 11/7/2016 8:00 11/7/2016

18:00

93 POWERGRID [ DELHI ] Anta(NTPC)-Swaimadhopur(RVPNL)(220 kV) Powergrid Daily

Disc insulator replacement with

polymer string. 11/4/2016 8:00 11/6/2016

18:00

92 POWERGRID [ DELHI ] Anta(NTPC)-Lalsot(RVPNL) 2(220 kV) Powergrid Daily

Disc insulator replacement with

polymer string. 11/1/2016 8:00 11/3/2016

91 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 4(220 kV) Rajasthan Daily

Jumper tightening/ Prewinter AMP

works. 11/8/2016 8:00 11/8/2016

18:00

95 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 2(220 kV) Rajasthan Daily

Jumper tightening/ Prewinter AMP

works. 11/17/2016 8:00 11/17/2016

18:00

94 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 1(220 kV) Rajasthan Daily

Jumper tightening/ Prewinter AMP

works. 11/16/2016 8:00 11/16/2016

18:00

17:00

17:00

107 BBMB [ CHANDIGARGH ] Dasuya(PSEB)-Pong(BBMB)-1(220 kV) BBMB Daily Half yearly mtc. 11/8/2016 8:00 11/8/2016

17:00

106 BBMB [ CHANDIGARGH ] Jassor(HP)-Pong(BBMB)(220 kV) BBMB Daily

Half yearly mtc. of S/S equipment at

Pong 11/5/2016 8:00 11/5/2016

105 BBMB [ CHANDIGARGH ] Bairasuil(NHPC)-Pong(BBMB)(220 kV) Powergrid Daily Half yearly mtc. 11/4/2016 8:00 11/4/2016

109 BBMB [ CHANDIGARGH ] Baira suil(NHPC)-Pong(BBMB)(220 kV) BBMB Daily Half yearly mtc. 11/22/2016 8:00 11/24/2016

108 BBMB [ CHANDIGARGH ] Dasuya(PSEB)-Pong(BBMB)-2(220 kV) BBMB Daily Half yearly mtc. 11/9/2016 8:00 11/9/2016

17:00

17:00

112 BBMB [ CHANDIGARGH ] Hisar(BBMB)-Hisar-IA(HVPNL) 2(220 kV) Haryana Daily General 10/18/2016 8:00 10/18/2016

17:00

111 BBMB [ CHANDIGARGH ] Hisar(BBMB)-Hisar-IA(HVPNL) 1(220 kV) Haryana Daily General 10/17/2016 8:00 10/17/2016

17:00

110 BBMB [ CHANDIGARGH ]

18:00

97 POWERGRID [ DELHI ] Sikar(PG)-Sikar(RVPNL) 2(220 kV) Rajasthan Daily

Jumper tightening/ Prewinter AMP

works. 11/19/2016 8:00 11/19/2016

96 POWERGRID [ DELHI ] Sikar(PG)-Sikar(RVPNL) 1(220 kV) Rajasthan Daily

Jumper tightening/ Prewinter AMP

works. 11/18/2016 8:00 11/18/2016

18:00

18:00

98 POWERGRID [ DELHI ] Fatehpur(PG)-Naubasta(UP)(400 kV)

Uttar

Pradesh Daily

AMP work of the Line Eqipments &

Hot spot Attending Work in Y phase

line conductor 11/3/2016 9:00 11/3/2016

Stringing of 400KV Agra (UP)-

Agra(S) D/C lines under Lalitpur Agra

Transmission Project 11/5/2016 8:00 11/6/2016 18:00

101 POWERGRID [ DELHI ] Agra-Bhiwadi I (400kV) Power Grid Daily

Stringing of 400KV Agra (UP)-

Agra(S) D/C lines under Lalitpur Agra

Transmission Project 11/2/2016 8:00 11/3/2016 18:00

100 POWERGRID [ DELHI ] Agra-Bassi (400kV) Power Grid Daily

99 POWERGRID [ DELHI ] Agra-Ballabhgarh (400kV) Power Grid Daily

Diversion due to construction of

DFCC Track New Tower Erection 11/5/2016 8:00 11/19/2016 18:00

103 POWERGRID [ DELHI ] Bhiwadi-Hissar I (400kV) Power Grid Daily

Diversion due to construction of

DFCC Track New Tower Erection 11/5/2016 8:00 11/19/2016 18:00

102 POWERGRID [ DELHI ] Agra-Bhiwadi II (400kV) Power Grid Daily

Diversion due to construction of

DFCC Track New Tower Erection 11/20/2016 8:00 12/10/2016 18:00

Diversion due to construction of

DFCC Track New Tower Erection 11/20/2016 8:00 12/10/2016 18:00

104 POWERGRID [ DELHI ] Bhiwadi-Kotputli (400kV) Power Grid Daily

Jassor(HP)-Pong(BBMB)(220 kV) BBMB Daily Half yearly mtc. 11/28/2016 8:00 11/30/2016

17:00

122 Badarpur (NTPC)-Balbagarh(BBMB)1 BBMB Daily Replacement of CT and yearly MTC 11/10/2016 11/10/2016

123 Badarpur (NTPC)-Balbagarh(BBMB)2 BBMB Daily of line and equipment 11.11.2016 11.11.2016BBMB [ CHANDIGARGH ] 8:00 17:00

126 SLDC_DELHI [ DELHI ] Bawana(DTL)-Mandola(PG) 1(400 kV) Delhi Daily

S/D AT BAWANA FOR ANNUAL

MAINTENANCE AND TAN DELTA

TEST. 11/29/2016 9:30 11/29/2016

17:00112 BBMB [ CHANDIGARGH ] Hisar(BBMB)-Hisar-IA(HVPNL) 2(220 kV) Haryana Daily General 10/18/2016 8:00 10/18/2016

17:00

17:00

127 SLDC_DELHI [ DELHI ] Bawana(DTL)-Mandola(PG) 2(400 kV) Delhi Daily

S/D AT BAWANA FOR ANNUAL

MAINTENANCE AND TAN DELTA

TEST. 11/30/2016 9:30 11/30/2016

11/11/2016 9:00 11/12/2016 18:00

125 NHPC [ DELHI ] Bairasuil(NHPC)-Pong(BBMB)(220 kV) Powergrid Continuous

Pre-winter mtc. of line & yearly mtc. of

S/S equipment. 11/5/2016 8:00 11/5/2016 17:00

115 BBMB [ CHANDIGARGH ] Panipat-Narela 1(220 kV) BBMB Daily

Pre-winter mtc. of line & yearly mtc. of

S/S equipment. 11/4/2016 8:00 11/4/2016 17:00

114 BBMB [ CHANDIGARGH ] Bhiwani-Dehar(400 kV) BBMB Daily

113 BBMB [ CHANDIGARGH ] Bhiwani-Dehar(400 kV) BBMB Daily

Pre-winter 10/18/2016 8:00 10/18/2016 17:00

117 BBMB [ CHANDIGARGH ] Narela(DTL)-Rohtakroad(BBMB) 1(220 kV) BBMB Daily

Pre-winter 10/17/2016 8:00 10/17/2016 17:00

116 BBMB [ CHANDIGARGH ] Panipat-Narela 2(220 kV) BBMB Daily

Pre-winter mtc. of line & yearly mtc. of

S/S equipment. 11/9/2016 8:00 11/9/2016 17:00

119 BBMB [ CHANDIGARGH ] Ballabhgarh(BBMB)-Samaypur(BBMB) - 3(220 kV) BBMB Daily

Pre-winter mtc. of line & yearly mtc. of

S/S equipment. 11/2/2016 8:00 11/2/2016 17:00

118 BBMB [ CHANDIGARGH ] Narela(DTL)-Rohtakroad(BBMB) 2(220 kV) BBMB Daily

Pre-winter mtc. of line & yearly mtc. of

S/S equipments. 11/22/2016 8:00 11/22/2016 17:00

121 BBMB [ CHANDIGARGH ] Dadri(NTPC)-Panipat(BBMB) 2(400 kV) Powergrid Daily

Pre-winter mtc. of line & yearly mtc. of

S/S equipment. 11/15/2016 8:00 11/15/2016 17:00

120 BBMB [ CHANDIGARGH ] Dadri(NTPC)-Panipat(BBMB) 1(400 kV) Powergrid Daily

11/15/2016 8:00 11/16/2016 17:00

129 SJVNL [ HIMANCHAL PRADESH ] Jhakri(SJVNL)-Karchamwangtoo(JP) 2(220 kV) JP Hydro Daily APM for GIS Line Bay

128 SJVNL [ HIMANCHAL PRADESH ] Jhakri(SJVNL)-Karchamwangtoo(JP) 1(220 kV) JP Hydro Daily APM for GIS Line Bay

Pre-winter mtc. of line & yearly mtc. of

S/S equipments. 11/23/2016 8:00 11/23/2016 17:00

124 NHPC [ DELHI ] Bairasiul(NHPC)-Jassure(HPSEB)(220 kV) Powergrid Continuous

Maintenance of SF-6 circuit breaker 11/9/2016 9:00 11/10/2016 18:00

Maintenance of SF-6 circuit breaker

11/21/2016 8:00 11/22/2016 17:00

11/17/2016 8:00 11/18/2016 17:00

130 SJVNL [ HIMANCHAL PRADESH ] Jhakri-Panchkula 1(400 kV) Powergrid Daily APM for GIS Line Bay

19:00

144 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily

setting of panto graph isolators

related to Bus-2 and replacement of

TB's 11/24/2016 8:00 11/24/2016

143 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily

setting of panto graph isolators

related to Bus-2 and replacement of

TB's 11/23/2016 8:00 11/23/2016

19:00

11/21/2016 8:00 11/22/2016 17:00

131 SJVNL [ HIMANCHAL PRADESH ] Jhakri-Panchkula 2(400 kV) Powergrid Daily APM for GIS Line Bay

130 SJVNL [ HIMANCHAL PRADESH ] Jhakri-Panchkula 1(400 kV) Powergrid Daily APM for GIS Line Bay

11/25/2016 8:00 11/26/2016 17:00

133 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 2(400 kV) Powergrid Daily APM for GIS Line Bay

11/23/2016 8:00 11/24/2016 17:00

132 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 1(400 kV) Powergrid Daily APM for GIS Line Bay

11/28/2016 9:00 11/30/2016 16:30

135 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 2(400 kV) Powergrid Daily

Stringing of Shielding / Earth wire

from Western PHY to OG tower of

PGCIL

11/28/2016 8:00 11/29/2016 17:00

134 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 1(400 kV) Powergrid Daily

Stringing of Shielding / Earth wire

from Western PHY to OG tower of

PGCIL

11/28/2016 9:00 11/30/2016 16:30

137 SJVNL [ HIMANCHAL PRADESH ] Rampur - Nallagarh 2(400 kV) Powergrid Daily

Stringing of Shielding / Earth wire

from Western PHY to OG tower of

PGCIL

11/28/2016 9:00 11/30/2016 16:30

136 SJVNL [ HIMANCHAL PRADESH ] Rampur - Nallagarh 1(400 kV) Powergrid Daily

Stringing of Shielding / Earth wire

from Western PHY to OG tower of

PGCIL

11/2/2016 8:00 11/2/2016 19:00

139 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily

setting of panto graph isolators

related to Bus-1 and replacement of

TB's

11/28/2016 9:00 11/30/2016 16:30

138 SLDC_HARYANA [ HARYANA ] Khedar-Nuhiyawali 2(400 kV) Haryana Daily

setting of panto graph isolators

related to Bus-1 and replacement of

TB's

11/4/2016 8:00 11/4/2016 19:00

141 SLDC_HARYANA [ HARYANA ] Khedar-Kirori 1(400 kV) Haryana Daily

setting of panto graph isolators

related to Bus-1 and replacement of

TB's

11/3/2016 8:00 11/3/2016 19:00

140 SLDC_HARYANA [ HARYANA ] Khedar-Kirori 2(400 kV) Haryana Daily

setting of panto graph isolators

related to Bus-1 and replacement of

TB's

11/22/2016 8:00 11/22/2016 19:00

11/5/2016 8:00 11/5/2016 19:00

142 SLDC_HARYANA [ HARYANA ] Khedar-Nuhiyawali 2(400 kV) Haryana Daily

setting of panto graph isolators

related to Bus-2 and replacement of

TB's

19:00

146 SLDC_HARYANA [ HARYANA ] Jhajjar CLP-Kabulpur 1(400 kV) Haryana Daily General Mtc work 11/7/2016 7:00 11/7/2016

145 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily

setting of panto graph isolators

related to Bus-2 and replacement of

TB's 11/25/2016 8:00 11/25/2016

19:00

148 SLDC_HARYANA [ HARYANA ] Jhajjar CLP-Dhanonda -1(400 kV) Haryana Daily General Mtc work 11/9/2016 7:00 11/9/2016

19:00

147 SLDC_HARYANA [ HARYANA ] Jhajjar CLP-Kabulpur 2(400 kV) Haryana Daily General Mtc work 11/8/2016 7:00 11/8/2016

Haryana Daily

For checking and cleaning of

porcelain insulators 11/19/2016 9:00 11/19/2016

19:00

150 SLDC_HARYANA [ HARYANA ] Dipalpur-Kabulpur 1(400 kV) Haryana Daily

For checking and cleaning of

porcelain insulators 11/18/2016 9:00 11/18/2016

19:00

149 SLDC_HARYANA [ HARYANA ] Dhanonda-Jhajjar CLP-2(765 kV) Haryana Daily General Mtc work 11/10/2016 7:00 11/10/2016

15:00

17:00

153 SLDC_HARYANA [ HARYANA ] 400kV G.Noida(UP)-Nawada(HVPNL)(400 kV) Powergrid Daily

To replace the unhealthy and critical

400 kV isolators blades of bus -II and

TIE-II ICT - II with new spares. 11/9/2016 8:00 11/9/2016

17:00

152

16:00

155 SLDC_HARYANA [ HARYANA ] Daultabad(HVPNL)-Gurgaon(PG) -2(400 kV) Haryana Daily For tree cutting 11/4/2016 9:00 11/4/2016

154 SLDC_HARYANA [ HARYANA ] Daultabad(HVPNL)-Gurgaon(PG) -1(400 kV) Haryana Daily For tree cutting 11/2/2016 9:00 11/2/2016

SLDC_HARYANA [ HARYANA ] Hisar(PG)-Hisar-IA(HVPNL) 2(220 kV) Powergrid Continuous For replacement of C&R panel 11/2/2016 9:00 11/4/2016

17:00

151 SLDC_HARYANA [ HARYANA ] Dipalpur-Kabulpur 2(400 kV)

11/17/2016 10:00 11/17/2016

15:00

157 SLDC_RAJASTHAN [ RAJASTHAN ] BASSI(PG)-PHAGI-1(400 kV) Rajasthan Daily

Tightening of clamps & connectors of

droppers from high / jack bus to

equipments. 11/22/2016 10:00 11/23/2016

16:00

156 SLDC_HARYANA [ HARYANA ] Daultabad-Dhanonda ckt-1(400 kV) Haryana Daily To attend hot line observation 11/5/2016 11:00 11/5/2016

17:00160 SLDC_RAJASTHAN [ RAJASTHAN ] Anta-Bhilwara-1(220 kV) Rajasthan Daily Maintenance Work 11/15/2016 8:00 11/15/2016

3rd Quaterly maintenance of 400 KV

side bay EquipmentsDailyRajasthanHeerapura-Hindaun II(400 kV)SLDC_RAJASTHAN [ RAJASTHAN ]159 11/18/201610:0011/18/2016 17:00

17:00

18:00

158 SLDC_RAJASTHAN [ RAJASTHAN ] Heerapura-Merta(220 kV) Rajasthan Daily

3rd Quaterly maintenance of 400 KV

side bay Equipments

17:00

162 SLDC_RAJASTHAN [ RAJASTHAN ] Bikaner-Didwana 1(400 kV) Rajasthan Daily

CT Eerection in Deedwana Bay (Dia-

6) replacing existing BPI to CT 11/9/2016 10:00 11/13/2016

161 SLDC_RAJASTHAN [ RAJASTHAN ] Anta-Bhilwara-2(220 kV) Rajasthan Daily Maintenance Work 11/16/2016 8:00 11/16/2016

18:00

164 SLDC_RAJASTHAN [ RAJASTHAN ] Anta-Kota(220 kV) Rajasthan Daily

FOR REPLACEMENT OF

SEVERELY DETORIATED D

JUMPER OF R PHASE TOWARDS

THE LINE SIDE AND TO DO THE

QUATERLY MAINTENANCE OF

THE BREAKER AND CT. 11/17/2016 7:00 11/17/2016

17:00

163 SLDC_RAJASTHAN [ RAJASTHAN ] RAPP (A )-KOTA-1 D/C(220 kV) Rajasthan Continuous

FOR REPLACEMENT OF

SEVERELY DETORIATED WHOLE

TWIN ZEBRA BUS CONDUCTOR

OF 220 KV BUS D WHICH IS

CROSSING OVER THE LINE

CONDUCTOR OF 220 KV BAROD &

RAPP (A) FEEDERS AT 220 KV

GSS SAKATPURA KOTA. 11/10/2016 7:00 11/11/2016

18:00

166 SLDC_RAJASTHAN [ RAJASTHAN ] Chabra-Hindaun II(400 kV) Rajasthan Daily

BALANCE JUMPERING WORK AT

CTPS END . 11/15/2016 8:00 11/16/2016

18:00

165 SLDC_RAJASTHAN [ RAJASTHAN ] RAPP (A )-KOTA-3 D/C(220 kV) Rajasthan Daily

FOR REPLACEMENT OF D

JUMPER TOWARDS LINE SIDE OF

R PHASE AND TO DO THE

QUATERLY MAINTENANCE OF

THE BREAKER AND CT. 11/25/2016 7:00 11/25/2016

18:00

168 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Rajwest 1(400 kV) Rajasthan Daily Planned maintenance 11/15/2016 8:00 11/15/2016

18:00

167 SLDC_RAJASTHAN [ RAJASTHAN ] Bhilwara-Chhabra 1(400 kV) Rajasthan Continuous

For Erection of 400 KV D/C B Type

Tower B/w Loc No. 243 to 244 &

Dismentalling of 400 KV D/C A Type

tower Loc No. 244 (For Construction

of LILO of IInd CKT of 400 KV D/C

Chhabra- Dahara- Bhilwara Line 11/8/2016 8:00 11/11/2016

170 SLDC_RAJASTHAN [ RAJASTHAN ] Barmer-Rajwest 1(400 kV) Rajasthan Daily Planned maintenance 11/17/2016 8:00 11/17/2016

18:00

169 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Rajwest 2(220 kV) Rajasthan Daily Planned maintenance 11/16/2016 8:00 11/16/2016

17:00

18:00

171 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Merta 1(400 kV) Rajasthan Daily

III rd QUARTERLY MAINT.WORK

OF BAY & EQUIPMENTS 11/10/2016 9:00 11/10/2016

18:00

175 SLDC_PUNJAB Kangra - Shanan Ckt-I (132kV) Punjab Daily Mtc. of line 1.11.16 10.00 5.11.16 16.00

176 SLDC_PUNJAB Rajpura - Nakodar Ckt-I (400kV) DailyTightening of Jumpers of Deadend

Towers & Tree Cutting2.11.2016 10.00 2.11.2016 16.00

177 SLDC_PUNJAB Makhu - Nakodar Ckt-I (400kV) DailyPeriodical testing and routine

mainteanance02.11.2016 9.00 02.11.2016 17.00

178 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-I (220kV) Daily

Tightening of nut bolts of jumpers,

dampers , suspension clamps and

cleaning of Disc insulators of Tower

No 1 to 20

3.11.16 10.00 3.11.16 16.00

179 SLDC_PUNJAB Makhu - Nakodar Ckt-II (400kV) DailyPeriodical testing and routine

mainteanance04.11.2016 9.00 04.11.2016 17.00

180 SLDC_PUNJAB Moga-Nakodar (400kV) DailyTightening of Jumpers of Deadend

Towers & Tree Cutting4.11.2016 10.00 4.11.2016 16.00

181 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-II (220kV) Daily

Tightening of nut bolts of jumpers,

dampers , suspension clamps and

cleaning of Disc insulators of Tower

No 1 to 20

5.11.16 10.00 5.11.16 17.00

182 SLDC_PUNJAB Makhu (PSEB)- Amritsar (PG) Ckt-1 (400kV) DailyPeriodical testing and routine

mainteanance07.11.2016 9.00 07.11.2016 17.00

183 SLDC_PUNJAB Talwandi Sabo - Nakodar (400kV) DailyTightening of Jumpers of Deadend

Towers & Tree Cutting7.11.16 10.00 7.11.16 16.00

184 SLDC_PUNJAB Kangra - Shanan Ckt-II (132kV) Daily Mtc. of line 8.11.16 10.00 12.11.16 16.00

185 SLDC_PUNJAB Makhu (PSEB)- Amritsar (PG) Ckt-II (400kV) DailyPeriodical testing and routine

mainteanance07.11.2016 9.00 07.11.2016 17.00

17:00172 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Merta 2(400 kV) Rajasthan Daily

III rd QUARTERLY MAINT.WORK

OF BAY & EQUIPMENTS 11/11/2016 9:00 11/11/2016

17:00

17:00

174 SLDC_RAJASTHAN [ RAJASTHAN ] Bassi(PG)-Heerapura(RVPNL) 2(400 kV) Powergrid Daily

3rd Quaterly maintenance of 400 KV

side bay Equipments 11/16/2016 10:00 11/16/2016

Bassi(PG)-Heerapura(RVPNL) 1(400 kV)SLDC_RAJASTHAN [ RAJASTHAN ]173 11/15/201610:0011/15/2016

3rd Quaterly maintenance of 400 KV

side bay EquipmentsDailyPowergrid

186 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-I (220kV) Daily

Tightening of nut bolts of jumpers,

dampers , suspension clamps and

cleaning of Disc insulators of Tower

No 1 to 20

10.11.16 10.00 10.11.16 17.00

187 SLDC_PUNJAB Rajpura - Nakodar Ckt-II (400kV) DailyTightening of Jumpers of Deadend

Towers & Tree Cutting10.11.16 10.00 10.11.16 16.00

188 SLDC_PUNJAB Rajpura - Nakodar Ckt-I (400kV) DailyTightening of Jumpers of Deadend

Towers & Tree Cutting11.11.16 10.00 11.11.16 16.00

189 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-II (220kV) Daily

Tightening of nut bolts of jumpers,

dampers , suspension clamps and

cleaning of Disc insulators of Tower

No 21 to 40

12.11.16 10.00 12.11.16 17.00

190 SLDC_PUNJAB Kangra - Phathankot Ckt-I (132kV) Daily Mtc. of line 14.11.16 10.00 18.11.16 16.00

191 SLDC_PUNJAB Moga-Nakodar (400kV) DailyTightening of Jumpers of Deadend

Towers & Tree Cutting15.11.16 10.00 15.11.16 16.00

192 SLDC_PUNJAB Hamirpur - Chohal (132kV) DailyTightening of Jumpers of Deadend

Towers & Tree Cutting16.11.16 9.00 16.11.16 17.00

193 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-I (220kV) Daily

Tightening of nut bolts of jumpers,

dampers , suspension clamps and

cleaning of Disc insulators of Tower

No 41 to 60

17.11.16 10.00 17.11.16 17.00

194 SLDC_PUNJAB Talwandi Sabo - Nakodar (400kV) DailyTightening of Jumpers of Deadend

Towers & Tree Cutting18.11.16 10.00 18.11.16 16.00

195 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-II (220kV) Daily

Tightening of nut bolts of jumpers,

dampers , suspension clamps and

cleaning of Disc insulators of Tower

No 41 to 60

19.11.16 10.00 19.11.16 17.00

196 SLDC_PUNJAB Rajpura - Dhuri Ckt-II (400kV) Daily

Tightening of nut bolts of jumpers,

dampers , suspension clamps and

cleaning of Disc insulators of Tower

No 81 to 96

20.11.16 11.00 22.11.16 17.00

197 SLDC_PUNJAB Kangra - Phathankot Ckt-II (132kV) Daily Mtc. of line 21.11.16 10.00 25.11.16 16.00

198 SLDC_PUNJAB Rajpura - Nakodar Ckt-I (400kV) DailyTightening of Jumpers of Deadend

Towers & Tree Cutting22.11.16 10.00 22.11.16 16.00

199 SLDC_PUNJAB Rajpura - Dhuri Ckt-I (400kV) Daily

Tightening of nut bolts of jumpers,

dampers , suspension clamps and

cleaning of Disc insulators of Tower

No 81 to 96

23.11.16 11.00 13.12.16 17.00

200 SLDC_PUNJAB Rajpura - Nakodar Ckt-II (400kV) DailyTightening of Jumpers of Deadend

Towers & Tree Cutting25.11.16 10.00 25.11.16 16.00

201 SLDC_PUNJAB Rajpura - Nakodar Ckt-II (400kV) DailyTightening of Jumpers of Deadend

Towers & Tree Cutting28.11.16 10.00 28.11.16 16.00

202 SLDC_PUNJAB Talwandi Sabo - Nakodar (400kV) DailyGeneral maintenance ,Jumper

tightening and Tree Cutting29.11.16 9:00 29.11.16 16:00

203NRSS XXX1(B) TRANSMISSION

LTD. Rajpura - Bhiwani 1 (400kV) BBMB Daily

Stringing of new 400kV D/C

Kurukshetra Malerkotla Transmission

Line. Part of Dehar Bhiwani

Transmission Line Shutdown was

approved in OCC 126 but could not

be taken because of load issues.

10/25/2016 8:00 10/26/2016 18:00

204NRSS XXX1(B) TRANSMISSION

LTD. Patiala - Patran 1 (400kV) Powergrid Daily

Stringing of new 400kV D/C

Kurukshetra Malerkotla Transmission

Line. Part of koldam Hisar Line

10/30/2016 8:00 10/31/2016 18:00

205NRSS XXX1(B) TRANSMISSION

LTD. Rajpura - Dhuri both circuits (400kV) PSTCL Daily

Stringing of new 400kV D/C

Kurukshetra Malerkotla Transmission

Line. Part of Dehar Bhiwani

Transmission Line Shutdown was

approved in OCC 126 but could not

be taken because of load issues.

10/17/2016 8:00 10/18/2016 18:00

206 NRSS XXIX TRANSMISSION LTD.

Jalandhar (PG) - Samba (PG) 1 (Line Charged as

Jalandhar - Kishanpur Line with contingency

arrangement)

- Continuous

For removal of contingency

arrangement and restoration as it is

(as Jalandhar-Moga CKT1 and

Kishanpur Samba CKT-1) - Samba-

Kishanpur line will be charged within

48 hrs from the time of shutdown. The

shutdown in real time shall be availed

subject to confirmation of bay

readiness from Samba PG and

Jalandhar PG for termination of

400kV DC Samba Jalandhar

NRSSXXIX lines

11/3/2016 7:00 11/7/2016 7:00

207 NRSS XXIX TRANSMISSION LTD.

Jalandhar (PG) - Samba (PG) 2 (Line Charged as

Jalandhar - Kishanpur Line with contingency

arrangement)

- Continuous

For removal of contingency

arrangement and restoration as it is

(as Jalandhar-Moga CKT1 and

Kishanpur Samba CKT-1) - Samba-

Kishanpur line will be charged within

96 hrs from the time of shutdown. The

shutdown in real time shall be availed

subject to confirmation of bay

readiness from Samba PG and

Jalandhar PG for termination of

400kV DC Samba Jalandhar

NRSSXXIX lines

11/3/2016 7:00 11/7/2016 7:00

217 SLDC_UP [ UTTAR PRADESH ] 400KV Sultanpur-Obra line UP Daily

1. For dismantling of 54 Mtr. Span of

400KV Transfer Bus 2.

Replacement of Disc Insulator by

Polymer Insulator, Lopping &

Chopping of tree branches. 3. For

stringing of R,Y,B Phase 54 Mtr.

Span of 400KV Transfer Bus 11/10/2016 8:00 11/16/2016 18:00

218 SLDC_UP [ UTTAR PRADESH ] 400 KV Sultanpur- Azamgarh Line UP Daily

Replacement of Disc Insulator by

Polymer Insulator, Lopping &

Chopping of tree branches. and Other

M&R Works 11/17/2016 8:00 11/23/2016 18:00

215 SLDC_UP [ UTTAR PRADESH ]

400 KV Unnao-Bareilly line( ckt I ) Bareilly

UP Daily

Lopping Chopping of trees and

replacement of disc Insulater with

Polymer Insulater 11/7/2016 8:00 11/12/2016 18:00

216 SLDC_UP [ UTTAR PRADESH ]

400 KV Unnao-Bareilly line( ckt II ) Bareilly

UP Daily

Lopping Chopping of trees and

replacement of disc Insulater with

Polymer Insulater 11/14/2016 8:00 11/19/2016 18:00

214 SLDC_UP [ UTTAR PRADESH ]

400 KV Unnao-Lucknow Line along with 400 KV

Main Bus-A UP Daily

Complete overhauling of 29A & 29C

Isolator along with Main Bus-A 11/18/2016 8:00 11/17/2016 18:00

211 SLDC_UP [ UTTAR PRADESH ] Anpara C-Unnao(400 kV)

Uttar

Pradesh Daily Disc cleaning 11/22/2016 8:00 11/25/2016 18:00

SLDC_UP [ UTTAR PRADESH ] Dadri(NTPC)-Muradnagar(UP)(400 kV) Powergrid Continuous

Shifting of 400KV Dadri-Muradnagar

line from Muradnagar-I (Old) to

Muradnagar-II S/S (New) 11/15/2016 9:00 11/21/2016

16:00

209 SLDC_UP [ UTTAR PRADESH ] Allahabad-Fatehpur 2(400 kV) Powergrid Daily For stringing of conductor. 11/13/2016 10:00 11/14/2016

208 SLDC_UP [ UTTAR PRADESH ] Allahabad-Fatehpur 1(400 kV) Powergrid Daily For stringing of conductor. 11/13/2016 10:00 11/14/2016

Routine T&C Testing Checking &

tightening of Jumpers and Tree

cutting & Bay maintance work 11/16/2016 8:00 11/17/2016 18:00213 SLDC_UP [ UTTAR PRADESH ]

400KV Sarojininagar-PGCIL, Kursi Road line(Up to

LILO Point) UP Daily

17:00

18:00

212 SLDC_UP [ UTTAR PRADESH ] Moradabad(UP)-Muradnagar(UP)(400 kV) Powergrid Daily

Tightening of Bay/General

Maintenance 11/22/2016 8:00 11/22/2016

16:00

210

231 SLDC_UP [ UTTAR PRADESH ] 400KV Greater Noida-Nawada line & its bay UP Daily

For stringing (crossing) of 400KV

Jahangirpur Cr. Noida line. 11/11/2016 8:00 11/13/2016 18:00

232 SLDC_UP [ UTTAR PRADESH ] 400KV Dadri-Maharani Bagh Line UP Daily

For stringing (crossing) of 400KV

Jahangirpur Cr. Noida line. 11/11/2016 8:00 11/13/2016 18:00

229 SLDC_UP [ UTTAR PRADESH ] 220KV Nara-Roorkee Line UP Daily

For tree cutting, inspection of

insulators & other maintenance

works. 11/8/2016 9:00 11/9/2016 18:00

230 SLDC_UP [ UTTAR PRADESH ] 220KV Debai-NAPP Line UP Daily

For replacement of Insulators by

Polymer 11/10/2016 8:00 11/12/2016 18:00

227 SLDC_UP [ UTTAR PRADESH ] 400KV Panki-Unnao line UP Daily

for routing testing & maintenance

work. 11/24/2016 8:00 11/24/2016 18:00

228 SLDC_UP [ UTTAR PRADESH ] 400KV Muzaffarnagar-Matore Line UP Daily

For routine testing of protection and

other maintenance works. 11/4/2016 11:00 11/4/2016 16:00

225 SLDC_UP [ UTTAR PRADESH ] 400KV S/C Singrauli-Fatehpur-II line UP Daily For stringing of conductor. 11/16/2016 10:00 11/17/2016 16:00

226 SLDC_UP [ UTTAR PRADESH ] 400KV Unnao-Agra line UP Daily

Replacement of old porcelein strings

by new polymer insulator & jumper

checking & tightening. 11/17/2016 8:00 11/25/2016 18:00

223 SLDC_UP [ UTTAR PRADESH ] 400KV Sarnath-Anpara (L5) line UP Daily DFCC work 11/27/2016 8:00 12/2/2016 18:00

224 SLDC_UP [ UTTAR PRADESH ] 400KV Anpara-Mau (L6) line UP Daily DFCC work 11/27/2016 8:00 12/2/2016 18:00

221 SLDC_UP [ UTTAR PRADESH ] 220 KV Fatehpur - Unchahar - I & II UP Daily

Restringing between tower no. 04 &

05 to maintain the ground clearance

of bottom conductor as required by

DFCCIL. 11/18/2016 8:00 11/20/2016 18:00

222 SLDC_UP [ UTTAR PRADESH ] 400 KV SC Shaktinagar-Kanpur Line (PGCIL) UP Daily

Overhead quad conductor crossing

between T.No. 501 (B+0) & 502 (A+0)

of under construction LILO of 400 KV

Rewa Road-Meja line at 400 KV

Masauli. 11/21/2016 8:00 11/21/2016 18:00

219 SLDC_UP [ UTTAR PRADESH ] 400 KV Sultanpur- PGCIL Lucknow Line UP Daily

Replacement of Disc Insulator by

Polymer Insulator, Lopping &

Chopping of tree branches. and Other

M&R Works 11/16/2016 8:00 11/22/2016 18:00

220 SLDC_UP [ UTTAR PRADESH ] 400KV Gorakhpur-Azamgarh Line UP Daily

For replacement of existing porcelein

insulator with polymer insulator 11/7/2016 8:00 11/16/2016 18:00

218 SLDC_UP [ UTTAR PRADESH ] 400 KV Sultanpur- Azamgarh Line UP Daily

Replacement of Disc Insulator by

Polymer Insulator, Lopping &

Chopping of tree branches. and Other

M&R Works 11/17/2016 8:00 11/23/2016 18:00

242 SLDC_UP [ UTTAR PRADESH ] 400kv Dadri-NTPC-Mharanibagh Powergrid DAILY

400KV D/C Quad MOOSE GNOIDA-

Noida Sector 148 2.11.2016 9:00 3.11.2016 15:00

233 SLDC_UP [ UTTAR PRADESH ] 400KV Muradnagar-Muzaffarnagar Line UP Daily

Tightening of Bay/General

Maintenance 11/20/2016 8:00 11/20/2016 17:00

234 SLDC_UP [ UTTAR PRADESH ] 400KV Muzaffarnagar-Vishnuprayag Line UP Daily

For replacement of Disc Insulator with

polymer insulator 11/20/2016 9:00 11/29/2016 18:00

235 SLDC_UP [ UTTAR PRADESH ] 400KVObra-Rewa Roadline UP Continuous

For diversion work of 400kV Obra-

Rewa Roadline at Bahadraumarganj

Loc. Due to DFCC & Jumpering work

of 220 KV saranpur - Phulpur line 11/2/2016 8:00

232 SLDC_UP [ UTTAR PRADESH ] 400KV Dadri-Maharani Bagh Line UP Daily

For stringing (crossing) of 400KV

Jahangirpur Cr. Noida line. 11/11/2016 8:00 11/13/2016 18:00

11/16/2016 18:00

236 SLDC_UP [ UTTAR PRADESH ] 400KV Meja Allahabad-2 Line UP Continuous

Overhead quad conductor crossing

between T.No. 2/2 & 2/3 of under

construction LILO of 400 KV Rewa

Road-Meja line at 400 KV Masauli. 11/26/2016 9:00 11/26/2016 18:00

237 SLDC_UP [ UTTAR PRADESH ] 400KV Fatehabad Muradnagar Line UP Daily

For stringing of missing earthwire and

tightening of jumpers of tension tower

and maintenance work 11/1/2016 8:00 11/4/2016 18:00

238 SLDC_UP [ UTTAR PRADESH ] 400KV Agra Fatehabad UP Daily

For stringing of missing earthwire and

tightening of jumpers of tension tower

and maintenance work 11/5/2016 8:00 11/9/2016 18:00

239 SLDC_UP [ UTTAR PRADESH ] 400KV Panki-Rewa Road Line UP Daily For stringing of conductor 11/19/2016 10:00 11/20/2016 16:00

240 SLDC_UP [ UTTAR PRADESH ] 400KV Dadri-Dankaur Earth Electrode Line UP Daily

For stringing (crossing) of 400KV

Jahangirpur Cr. Noida line. 11/4/2016 8:00 11/6/2016 18:00

241 SLDC_UP [ UTTAR PRADESH ] 400KV Muzzafarnagar - Srinagar Line UP Daily

For replacement of Disc Insulator with

polymer insulator (during shutdown

400kv MZN-Line VPN line) 11/10/2016 9:00 11/19/2016 18:00

243 SLDC_UP [ UTTAR PRADESH ] 400KV GNOIDA -NAWADA Powergrid Daily

400KV D/C Quad MOOSE GNOIDA-

Noida Sector 148 2.11.2016 9:00 3.11.2016 15:00

245 SLDC_UP [ UTTAR PRADESH ] Lucknow-Lucknow (UP) Powergrid Daily

Routine T&C Testing Checking &

tightening of Jumpers and Tree

cutting & Bay maintance work 16.11.2016 8:00 17.11.2016 18:00

246 SLDC_UP [ UTTAR PRADESH ] Kanpur-Singrauli Power GRid Daily

Overhead QUAD Conductor crossing

between TL 445 AND 446 of under

construction LILO of 400KV Rewa

ROAD Meja LINE 1.11.2016 8:00 1.11.2016 18:00

249 Allahabad(PG)-Rihand 2 Power GRID DAILY

Overhead quad conductor

CROSSING BETWEEN tl 717&718 of

under construction LILO of 400KV

rewa road-meja line at 400KV 30.11.2016 8:00 30.11.2016 18:00

250 Allahabad(PG)-Rihand 1 Power GRID DAILY

Overhead quad conductor

CROSSING BETWEEN tl 717&718 of

under construction LILO of 400KV

rewa road-meja line at 400KV 30.11.2016 8:00 30.11.2016 18:00

251 Allahabad -Fatehpur 3 220KV Power GRID DAILY For stringing of conductor 7.11.2016 10:00 7.11.2016 16:00

252 Allahabad -Fatehpur 1 220KV Power GRID DAILY For stringing of conductor 13.11.2016 10:00 14.11.2016 16:00

SLDC_UP [ UTTAR PRADESH ]

SLDC_UP [ UTTAR PRADESH ]

244 SLDC_UP [ UTTAR PRADESH ]

400KV Dhampur-Kalagarh line (D/C) UK Interstate

Line alongwith 132KV Afzalgarh-Kalagarh Line UP Daily For maintenance work 11/16/2016 8:00 11/17/2016 18:00

247 SLDC_UP [ UTTAR PRADESH ] Lucknow(UP)-Singrauli(NTPC)(400 kV) Powergrid Daily

Overhead quad conductor crossing

between T.No. 445 (B+0) & 446

(A+25) of under construction LILO of

400 KV Rewa Road-Meja line at 400

KV Masauli. 11/17/2016 9:00 11/17/2016 18:00

248 SLDC_UP [ UTTAR PRADESH ] Kanpur(PG)-Singrauli(NTPC)(400 kV) Powergrid Daily

Overhead quad conductor crossing

between T.No. 501 (B+0) & 502 (A+0)

of under construction LILO of 400 KV

Rewa Road-Meja line at 400 KV

Masauli. 11/21/2016 8:00 11/21/2016 18:00

253 Allahabad -Fatehpur 1 220KV Power GRID DAILY For stringing of conductor 13.11.2016 10:00 14.11.2016 16:00

254 Allahabd -Kanpur 2 Power GRID DAILY For stringing of conductor 10.11.2016 10:00 11.11.2016 16:00

255 Dadri- MURADNAGAR Power GRID Continuous

Shifting of Dadri-Muradnagar line

from old to new S/S 15.11.2016 9:00 21.11.2016 18:00

256 Moradabad-Muradnagar Power GRID DAILY

Tightening of bay General

Maintainance 22.11.2016 8:00 22.11.2016 17:00

SLDC_UP [ UTTAR PRADESH ]

SLDC_UP [ UTTAR PRADESH ]

257 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 11/3/2016 9:00 11/3/2016 17:00

258 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 - - Annual Overhaul 11/4/2016 9:00 11/4/2016 17:00

259 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 11/5/2016 9:00 11/5/2016 17:00

260 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 - - Annual Overhaul 11/7/2016 9:00 11/7/2016 17:00

261 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 11/8/2016 9:00 11/8/2016 17:00

Annual Overhaul 11/9/2016 9:00 11/9/2016 17:00

11:00 11/6/2016 16:30

263 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 11/10/2016 9:00 11/10/2016 17:00

265 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 - - Annual Overhaul 11/11/2016 9:00 11/11/2016 17:00

266 HPLDS 66KV S/C Transmission Line from Shanan to Bijnee - -

Replacement of partially damaged

disc insulator of T.No. 8 11/22/2016

11/1/2016

10:00 11/22/2016 16:00

267 ADHPL 220kV Prini Nalagarh Line CKT 1 ADHPL Daily

Pre-winter preventive maintenance

work of the 220kg trans. Line which

includes tightening of tower jumpers,

checking and rectification of vibration

dampers, arcing horns, tightening of

tower body bolt/nuts, inspection and

cleaning of insulator strings,

clearance of tower beds, lopping of

trees etc. in the line corridors and

rectification of loose sags if any

262 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 - -

11:00 11/6/2016 16:30

11/29/2016 11:00 11/30/2016 16:30

Pre-winter preventive maintenance

work of the 220kg trans. Line which

includes tightening of tower jumpers,

checking and rectification of vibration

dampers, arcing horns, tightening of

tower body bolt/nuts, inspection and

cleaning of insulator strings,

clearance of tower beds, lopping of

trees etc. in the line corridors and

rectification of loose sags if anyDailyADHPL220kV Prini Nalagarh Line CKT 1ADHPL

268 ADHPL 220kV Prini Nalagarh Line CKT 1 ADHPL Daily

269 ADHPL 220kV Prini Phozal Line CKT 2A ADHPL Daily

Half yearly maintenance of 220kV

Prini switchyard which includes

overhauling of 245kV SF6 circuit

breaker's poles of line-1 (B-phase)

and bus coupler (R,B-phase) at Prini

end AND Rectification of 245kV

SF6 circuit breaker's operating

mechanism problems for Line-1 (R-

Phase) and Line-2 (Y-phase) at

Nalagarh end. 11/7/2016 9:00 11/16/2016 18:00

11/1/2016

270 11/17/2016 11:00 11/20/2016 16:30

11/22/2016 11:00 11/27/2016 16:30

267 ADHPL 220kV Prini Nalagarh Line CKT 1 ADHPL Daily

Pre-winter preventive maintenance

work of the 220kg trans. Line which

includes tightening of tower jumpers,

checking and rectification of vibration

dampers, arcing horns, tightening of

tower body bolt/nuts, inspection and

cleaning of insulator strings,

clearance of tower beds, lopping of

trees etc. in the line corridors and

rectification of loose sags if any

DATE TIME DATE TIME

1 PGCIL 765 ICT-I at BHIWANI PGCIL INTRA DAILYInstallation of Polymer

insulator. With Bus-II.09/11/16 8:00 09/11/16 18:00 Bhiwani

2 PGCIL 765 ICT-II at BHIWANI PGCIL INTRA DAILYInstallation of Polymer

insulator. With Bus-I.15/11/16 8:00 16/11/16 18:00 Bhiwani

3 PGCIL 765 BUS-I at BHIWANI PGCIL INTRA DAILYAMP work /Polymer

insulators replacement.25/11/16 8:00 25/11/16 18:00 Bhiwani

4 PGCIL 765 BUS-II at BHIWANI PGCIL INTRA DAILYAMP /Polymer insulators

replacement.07/11/16 8:00 10/11/16 18:00 Bhiwani

5 PGCIL 765 Bus Reactor-I at BHIWANI PGCIL INTRA DAILYInstallation of Polymer

insulator. With Bus-II.10/11/16 8:00 10/11/16 18:00 Jhatikara

6 PGCIL 765 BUS-I at MEERUT PGCIL INTRA DAILY

Installation of Polymer

insulators at S/S and Bus

extension work.

10/01/00 8:00 25/10/16 18:00 Jhatikara

7 PGCIL 765 BUS-II at MEERUT PGCIL INTRA DAILY

Installation of Polymer

insulators at S/S and Bus

extension work.

10/11/16 8:00 15/11/16 18:00 Bhiwani

8 PGCIL 400 BUS-1B at HVDC Agra PGCIL INTRA DAILYIntegration of 400kV Sikar-

1 Bays with 400kV Bus20/11/16 8:00 20/11/16 18:00

9 PGCIL 400 BUS-2B at HVDC Agra PGCIL INTRA DAILYIntegration of 400kV Sikar-

2 Bays with 400kV Bus21/11/16 8:00 21/11/16 18:00

PGCIL 400 BUS-1A at HVDC Agra PGCIL INTRA DAILYIntegration work for

400kVPole-3 dia 26/11/16 8:00 26/11/16 18:00

PGCIL 400 BUS-2A at HVDC Agra PGCIL INTRA DAILYIntegration work for

400kVPole-3 dia 28/11/16 8:00 28/11/16 18:00

10 PGCIL 765 702 Tie bay of ICT-I at Meerut PGCIL INTRA DAILYInstallation of Polymer

insulators at S/S.24/11/16 8:00 24/11/16 18:00

11 PGCIL 765 714 Tie bay of Gr.Noida at Meerut PGCIL INTRA DAILYInstallation of Polymer

insulators at S/S.26/11/16 8:00 26/11/16 18:00

12 PGCIL 765 708 Tie bay of ICT-I/Merut at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 18/11/16 8:00 19/11/16 18:00

13 PGCIL 765 713 Main bay of Moga at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 21/11/16 8:00 22/11/16 18:00

14 PGCIL 765 7714 Tie bay of Moga/BR-I at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 23/11/16 8:00 24/11/16 18:00

PROPOSED OUTAGE OF NLDC TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016ANNEXURE 3A

REMARKSS.N.

NAME OF REQUESTING

AGENCY

EQUIPEMENT DETAILSTOVOLT

LEVEL

(KV)

NAME OF THE ELEMENT

POWERGRID NORTHERN REGION-I

OWNER

DAILY/ CONTINUOUS

REASONPROPOSED DATE AND TIME

INTER/

INTRA

REGIONA

FROM

15 PGCIL 765 715 Main bay of B/R-1 at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 26/11/16 8:00 27/11/16 18:00

16 PGCIL 765 718 Main bay of B/R-2 at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 28/11/16 8:00 29/11/16 18:00

1 PGCIL 765 ICT-I at Bareilly PGCIL Intra Daily AMP work of ICT-I 11/14/2016 10:00 11/14/2016 18:00 Bareilly SS, NR3

2 PGCIL 765 765/400kv ICT-I Agra PGCIL INTRA cont.

For Variable

FrequiancyTan Delta

Mesurementand AMP

work

22.11.16 9:00 22.11.16 18:00 Agra

3 PGCIL 765 765/400kv ICT-II Agra PGCIL INTRA cont.

For Variable

FrequiancyTan Delta

Mesurementand AMP

work

23.11.16 9:00 23.11.16 18:00 Agra

4 PGCIL 765ICT-I Main bay at Bareilly (Bay No.

709)PGCIL INTRA DAILY AMP of CT & CB 11/15/2016 10:00 11/15/2016 18:00 Bareilly SS, NR3

5 PGCIL 765ICT-I & Line Tie bay at Bareilly (Bay

No. 708)PGCIL INTRA DAILY AMP of CT & CB 11/16/2016 10:00 11/16/2016 18:00 Bareilly SS, NR3

6 PGCIL 765765 kv Bareilly-Lucknow Line Main

Bay (Bay No. 707) BareillyPGCIL INTRA DAILY AMP of CT & CB 11/17/2016 10:00 11/17/2016 18:00 Bareilly SS, NR3

7 PGCIL 765701 Bay (Main Bay of Fatehpur-

Varanasi Line) FatehprPGCIL INTRA DAILY AMP Work

02.11.2016

9:30

02.11.2016

18:00 Fatehpur SS,

NR3

8 PGCIL 765702 Bay (Tie Bay of Fatehpur-

Varanasi Line) FatehprPGCIL INTRA DAILY AMP Work

04.11.2016

9:30

04.11.2016

18:00 Fatehpur SS,

NR3

9 PGCIL 765703 Bay (Main Bay of 765 KV ICT-1)

FatehprPGCIL INTRA DAILY AMP Work

07.11.2016 9:30 07.11.2016 18:00

Fatehpur SS,

NR3

10 PGCIL 765704 Bay (Tie bay of Fatehpur-

Sasaram Line) FatehprPGCIL INTRA DAILY AMP Work

09.11.2016 9:30 09.11.2016 18:00

Fatehpur SS,

NR3

11 PGCIL 765707 Bay (Main Bay of Fatehpur-Agra-

1 Line)PGCIL INTRA DAILY AMP Work

14.11.2016 9:30 14.11.2016 18:00

Fatehpur SS,

NR3

12 PGCIL 765 Bus Reactor-II VARANASI PGCIL INTRA DAILY

For Jumpering and

connection & testing of

110 MVAR, Spare unit

towards commissioning

06.11.16 11:00 09.11.16 18:00VARANASI (NR-

III)

13 PGCIL 765 701-Balia Line Main Bay Lucknow PGCIL INTRA DAILYFor AMP work on daily

basis 01.11.16 9:00 02.11.16 18:00 Lucknow

14 PGCIL 765702- ICT-I & Balia line Tie Bay

LucknowPGCIL INTRA DAILY

For AMP work on daily

basis 04.11.16 9:00 05.11.16 18:00 Lucknow

15 PGCIL 765707R-765Bareilly line Reactor Bay

LucknowPGCIL INTRA DAILY

For AMP work on daily

basis 10.11.16 9:00 11.11.16 18:00 Lucknow

16 PGCIL 765765kV Agra-Fatehpur ckt-2 Line

Reactor at AgraPGCIL INTRA cont.

For replacement of faulty

PRD relays.04.11.16 9:00 04.11.16 18:00 Agra

17 PGCIL 765 765kV Agra-Bus Reactor-2 PGCIL INTRA cont.For replacement of faulty

PRD relays.05.11.16 9:00 05.11.16 18:00 Agra

POWERGRID NR-3

POWERGRID NORTHERN REGION-II

DATE TIME DATE TIMEX-2

X-3

1765 kV A 14.11.16

9:0015.11.16

17:00 Daily For Annual

Maintenance

Works.

2765 kV A 16.11.16

9:00 17.11.1617:00 Daily For Annual

Maintenance

Works.

3765 kV A 18.11.16

9:00 19.11.1617:00 Daily For Annual

Maintenance

Works.

4765 kV A 21.11.16

9:00 22.11.1617:00 Daily For Annual

Maintenance

Works.

S.N.

Details of Transmission Element Category of

elemen

DURATION Daily/ Continu

ous

ReasonVoltage level

(KV)NAME OF THE ELEMENT AND

SUBSTATION

Bus Reactor-1 Tie Bay at Moga.

Bus Reactor-2 Main Bay at Moga.

Bus Reactor-2 Tie Bay at Moga.

FROM TO

For construction activity

For O&M activity

Bus Reactor-1 Main Bay at Moga.

RVPNL

Type of Shutdown

Voltage

LevelName From To From To

Daily/Continous

Basis

1 400 KV

400/220/33 KV, 315 MVA,

TR.NO.-01 , (TELk) at 400KV

GSS Hindaun

11.11.2016 11.11.2016 10:00HRS 15:30Hrs Daily Quaterly Maintenance

2 400 KV

400/220/33 KV, 315 MVA,

TR.NO.-02 , (CGL) at 400KV

GSS Hindaun

18.11.2016 18.11.2016 10:00HRS 15:30Hrs Daily Quaterly Maintenance

3 400 KV

400/220/33 KV,250 MVA,

ILT-1 (400 KV Side Bay

Equipment of Transformers)

at 400KV GSS Heerapura

21.11.2016 21.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay

Equipments

4 400 KV

400/220/33 KV,250MVA, ILT-

2 (400 KV Side Bay

Equipment of Transformers)

at 400KV GSS Heerapura

22.11.2016 22.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay

Equipments

5 400 KV

400/220/33 KV,250 MVA,

ILT-3 (400 KV Side Bay

Equipment of Transformers)

at 400KV GSS Heerapura

23.11.2016 23.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay

Equipments

6 400 KV

400/220/33 KV,315MVA, ILT-

4 (400 KV Side Bay

Equipment of Transformers)

at 400KV GSS Heerapura

24.11.2016 24.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay

Equipments

PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016Annexure-3B (1)

S.No.

Details of Transmission element Date Timings

Purpose

\\NAMITA\Users\Public\OCC 128\ANNEXURE 3B(1).xlsx Page 1

Type of Shutdown

Voltage

LevelName From To From To

Daily/Continous

Basis

S.No.

Details of Transmission element Date Timings

Purpose

7 400 KV

400/220/33 KV, 250MVA,ILT-

1 (220 KV Side Bay

Equipment of Transformers)

at 400KV GSS Heerapura

25.11.2016 25.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay

Equipments

8 400 KV

400/220/33 KV,250MVA, ILT-

2 (220 KV Side Bay

Equipment of Transformers)

at 400KV GSS Heerapura

28.11.2016 28.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay

Equipments

9 400 KV

400/220/33 KV,250MVA, ILT-

3 (220 KV Side Bay

Equipment of Transformers)

at 400KV GSS Heerapura

29.11.2016 29.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay

Equipments

10 400 KV

400/220/33 KV,315MVA, ILT-

4 (220 KV Side Bay

Equipment of Transformers)

at 400KV GSS Heerapura

30.11.2016 30.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay

Equipments

11 400 KV

400 KV/220KV 500MVA ICT-

IV at 400KV GSS

Jaisalmer(Akal)

03.11.2016 03.11.2016 10:00 Hrs 16:00 Hrs DailyII QUARTERLY MAINTANANCE OF BAY

EQUIPMENT

12 400 KV400 KV BUS REACTOR at

400KV GSS Jaisalmer(Akal)04.11.2016 04.11.2016 10:00 Hrs 16:00 Hrs Daily

II QUARTERLY MAINTANANCE OF BAY

EQUIPMENT

\\NAMITA\Users\Public\OCC 128\ANNEXURE 3B(1).xlsx Page 2

Type of Shutdown

Voltage

LevelName From To From To

Daily/Continous

Basis

S.No.

Details of Transmission element Date Timings

Purpose

13 400 KV400 KV ICT II at 400KV GSS

Jaisalmer(Akal)16.11.2016 16.11.2016 10:00 Hrs 16:00 Hrs Daily

II QUARTERLY MAINTANANCE OF BAY

EQUIPMENT

14 400 KV400 KV Main Bus-I at 400KV

GSS Bikaner01.11.2016 04.11.2016 10:00 Hrs 17:00 Hrs Continous Basis

Testing/operation of Isolator and Final alignment

of IPS tube below Main Bus-I

15 400 KV400 KV Main Bus-II at 400KV

GSS Bikaner05.11.2016 08.11.2016 10:00 Hrs 17:00 Hrs Continous Basis

Testing/operation of Isolator and Final alignment

of IPS tube below Main Bus-II

16 400 KV400 KV Main Bus-I at 400KV

GSS Bikaner15.11.2016 20.11.2016 10:00 Hrs 17:00 Hrs Continous Basis Jumpering and Misc. Work

17 400 KV400 KV Main Bus-II at 400KV

GSS Bikaner21.11.2016 26.11.2016 10:00 Hrs 17:00 Hrs Continous Basis Jumpering and Misc. Work

18 400 KV

400 KV 252 A CB OF

BIKANER LINE at 400KV GSS

Merta

07.11.16 07.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK

\\NAMITA\Users\Public\OCC 128\ANNEXURE 3B(1).xlsx Page 3

Type of Shutdown

Voltage

LevelName From To From To

Daily/Continous

Basis

S.No.

Details of Transmission element Date Timings

Purpose

19 400 KV

400 KV 252 B CB OF

BIKANER LINE at 400KV GSS

Merta

08.11.16 08.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK

20 400 KV

400 KV 352 A CB OF

JODHPUR-I LINE at 400KV

GSS Merta

09.11.16 09.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK

21 400 KV

400 KV 352 B CB OF

JODHPUR-I LINE at 400KV

GSS Merta

15.11.16 15.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK

22 400 KV

400 KV 452 ACB OF

315MVA ILT-I at 400KV GSS

Merta

16.11.16 16.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK

23 400 KV

400 KV 452 B CB OF

JODHPUR-II LINE at 400KV

GSS Merta

17.11.16 17.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK

24 400 KV

400 KV 452 T CB OF

JODHPUR-II LINE & ILT-I at

400KV GSS Merta

22.11.16 22.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK

\\NAMITA\Users\Public\OCC 128\ANNEXURE 3B(1).xlsx Page 4

Type of Shutdown

Voltage

LevelName From To From To

Daily/Continous

Basis

S.No.

Details of Transmission element Date Timings

Purpose

25 400 KV

400 KV 552 ACB OF

315MVA ILT-II at 400KV

GSS Merta

23.11.16 23.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK

26 400 KV

400 KV 552 B CB OF

RATANGARH LINE at 400KV

GSS Merta

24.11.16 24.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK

27 400 KV

400 KV TIE BAY OF BIKANER

DEEDWANA LINE at 400KV

GSS BIKANER

09.11.2016 13.11.2016 10:00 Hrs 17:00 Hrs DailyCT Eerection in Deedwana Bay (Dia-6) replacing

existing BPI to CT

28 400 KV

315MVA 400/220KV ILT 1st

ALSTOM Make Trf. at 400KV

GSS Jodhpur

12.11.16 12.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK

\\NAMITA\Users\Public\OCC 128\ANNEXURE 3B(1).xlsx Page 5

S

No.

Name of the

Requesting

agency

Voltage

Level (KV)

Name of the Element

Owner

Inter

Regional/Intra

Regional

Daily

/Continous

Reason From Date From

Time

To Date To time Remarks

1 TS Org 400

400/220KV, 500 MVA

ICT No. 2 at 400KV

Dhuri

PSTCL Inter regional Daily

Sagging work of

Interconnection of ICT-3

Bays with 220 KV Bus

Bar at 400 KV Dhuri

18.10.16 8.00 19.10.16 19.00

2 POWERGRID 400

400/220KV, 315 MVA

ICT No. 1 at 400KV

Makhu

PSTCL Inter regional Daily

Completion, Testing &

Commissioning of

HVWSS System

03.11.16 9.00 04.11.16 17.30

3 POWERGRID 400

400/220KV, 315 MVA

ICT No. 2 at 400KV

Makhu

PSTCL Inter regional Daily

Completion, Testing &

Commissioning of

HVWSS System

05.11.16 9.00 06.11.16 17.30

4 POWERGRID 400

400/220KV, 80MVAR

Reactor at 400KV

Makhu

PSTCL Inter regional Daily

Completion, Testing &

Commissioning of

HVWSS System

07.11.16 9.00 08.11.16 17.30

5 POWERGRID 400

400/220KV, 315 MVA

ICT No. 1 at 400KV

Muktsar

PSTCL Inter regional Daily

Completion, Testing &

Commissioning of

HVWSS System

10.11.16 9.00 11.11.16 17.30

6 POWERGRID 400

400/220KV, 315 MVA

ICT No. 2 at 400KV

Muktsar

PSTCL Inter regional Daily

Completion, Testing &

Commissioning of

HVWSS System

12.11.16 9.00 13.11.16 17.30

7 POWERGRID 400

400/220KV, 80MVAR

Reactor at 400KV

Muktsar

PSTCL Inter regional Daily

Completion, Testing &

Commissioning of

HVWSS System

14.11.16 9.00 15.11.16 17.30

8 POWERGRID 400

400/220KV, 315 MVA

ICT No. 1 at 400KV

Nakodar

PSTCL Inter regional Continous

Completion, Testing &

Commissioning of

HVWSS System

17.11.16 9.00 18.11.16 17.30

9 POWERGRID 400

400/220KV, 315 MVA

ICT No. 2 at 400KV

Nakodar

PSTCL Inter regional Continous

Completion, Testing &

Commissioning of

HVWSS System

19.11.16 9.00 20.11.16 17.30

10 POWERGRID 400

400/220KV, 80MVAR

Reactor at 400KV

Nakodar

PSTCL Inter regional Daily

Completion, Testing &

Commissioning of

HVWSS System

21.11.16 9.00 22.11.16 17.30

11 P&M Org 400

400/220KV, 315 MVA

ICT No. 1 at 400KV

Makhu

PSTCL Inter regional DailyPeriodical testing and

routine mainteanance23.11.16 9.00 23.11.16 17.00

PSTCL

PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016Annexure 3B (2)

12 P&M Org 400

400/220KV, 315 MVA

ICT No. 2 at 400KV

Makhu

PSTCL Inter regional DailyPeriodical testing and

routine mainteanance24.11.16 9.00 24.11.16 17.00

13 P&M Org 400

400/220KV, 80MVAR

Reactor at 400KV

Makhu

PSTCL Inter regional DailyPeriodical testing and

routine mainteanance27.11.16 10.00 27.11.16 16.00

DELHI TRANSCO LIMITED (SLDC)S.N Shutdown

TypeWork to be Carrried Reason

Voltage Level

Name Date Time Date Time

1 400 kV 315MVA ICT-5 400kV

Bus-2 of PPCL at Bawana

Daily Basis 02.11.2016 07:00 hrs 03.10.2016 17:30 hrs Annual Maintenance and tan delta

testing as per OS mannual

Load will be run through -

400kV Bus-1

2 400KV 400kV CB No 652 Tie

CB's of ICT-3 at Bawana

Daily Basis 29.11.2016 09:30 hrs 29.11.2016 13:00 Hrs Annual Maintenance and tan delta

testing as per OS mannual

315MVA ICT-3 will remain

charge through main CB752

3 400KV 400kV CB No 952 Tie

CB's of ICT-2 at Bawana

Daily Basis 30.11.2016 13:30 Hrs 30.11.2016 17:30 hrs Annual Maintenance and tan delta

testing as per OS mannual

315MVA ICT-2 will remain

charge through main CB1052

NTPC STATION - DADRI & RIHANDS.N Shutdown

TypeWork to be Carrried Reason

Voltage Level

Name Date Time Date Time

1 220KV ICT # 3 Dadri Continuous 21.11.2016 07:00 hrs 26.11.2016 18:00 Hrs Annual Maintenance

2 220KV ICT # 4 Dadri Continuous 28.11.2016 07:00 hrs 03.12.2016 18:00 Hrs Annual Maintenance

3 400KV 400/132KV IBT-1 of

Rihand STPS

Continuous 14.11.2016 - 17.11.2016 - Maintenance of IBT and Bay

Equipment

PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER., 2016Annexure 3B (3)

Details of Transmission Element From To

Details of Transmission Element From To

S.N.MODE

DATE TIME DATE TIME

1 500MVA ICT-I NIMRANA Daily 07/11/16 9:00 07/11/16 18:00 AMP work/Bushing C&tan delta

2 315MVA ICT-I NIMRANA Daily 10/11/16 9:00 10/11/16 18:00 AMP work/Bushing C&tan delta

3 315MVA ICT-I MAHRANIBAG Daily 10/11/16 9:00 10/11/16 18:00 AMP work/Bushing C&tan delta

4 315MVA ICT-II MAHRANIBAG Daily 11/11/16 9:00 11/11/16 18:00 AMP work/Bushing C&tan delta

5 315MVA ICT-II at SONIPAT Daily 17/11/16 8:00 17/11/16 18:00 AMP work/Bushing C&tan delta

6 315MVA ICT-I at ROORKI Daily 07/11/16 9:00 07/11/16 17:00 AMP work/Bushing C&tan delta

7 315MVA ICT-II at ROORKI Daily 10/11/16 9:00 10/11/16 17:00 AMP work/Bushing C&tan delta

8 100MVA ICT-I at PITHORAGRH Daily 17/11/16 8:00 17/11/16 18:00 AMP work/Bushing C&tan delta

9 400kv BUS-I at BHIWANI Daily 15/11/16 8:00 16/11/16 18:00Installation of Polymer insulator in

ICT-2 400kv jack bus & Bus1.

10 400kv BUS-II at BHIWANI Daily 17/11/16 8:00 17/11/16 18:00 AMP work/Bushing C&tan delta

11 400kv BUS-I at BHIWADI Daily 10/11/16 8:00 10/11/16 18:00 AMP work/CVT C&tan delta

12 400kv BUS-II at BHIWADI Daily 11/11/16 8:00 11/11/16 18:00 AMP work/CVT C&tan delta

13 400kv BUS-I at BHIWADI-HVDC DAILY 12/11/16 8:00 12/11/16 18:00 AMP work/CVT C&tan delta

14 400kv BUS-II at BHIWADI-HVDC DAILY 13/11/16 8:00 13/11/16 18:00 AMP work/CVT C&tan delta

15 FSC of Koteshwar-I line at Meerut DAILY 01/11/16 8:00 08/11/16 18:00Erection works of Dead end Tower

and Beam for new FSC.Merut

16 125MVAR Bus Reactor at Jaipur(S) DAILY 01/11/16 8:00 15/11/16 18:00Erection works related to 125MVAR

new Bus Reactor. JPR

17 400kv Bus Coupler Bay at GIS Gurgaon daily 11/11/16 8:00 11/11/16 18:00 AMP work/CVT C&tan delta GGN

18 Agra Line Main Bay at Ballabhgrh daily 07/11/16 8:00 28/11/16 18:00New Civil foundation & Replacement

of M&G CB. Line to remain charged.

19 400kv GIS Bus Coupler at Koteshwar Cont 19/10/16 10:00 19/10/16 18:00Replacement of Isolator contacts at

Koteshwar-GIS. With Bus-I S/D Koteshwar

20 400kv GIS Bus Coupler at Koteshwar Cont 03/10/16 9:00 03/10/16 18:00Replacement of Isolator contacts at

Koteshwar-GIS. With Bus-II S/D Koteshwar

21 Bus-I A at Agra DAILY 11/26/2016 8:00 11/26/2016 18:00Integration for 400kVPole-4 dia with

400kV Bus

22 Bus-II A at Agra DAILY 11/28/2016 8:00 11/28/2016 18:00Integration for 400kVPole-4 dia with

400kV Bus

23 Bus-I B at Agra Cont 11/20/2016 8:00 11/20/2016 18:00Integration of 400kV Sikar-1 Bays

with 400kV Bus

24 Bus-II B at Agra Cont 11/21/2016 8:00 11/21/2016 18:00Integration of 400kV Sikar-2 Bays

with 400kV Bus

25 ICT-I at Pithoragarh Daily 17.11.16 9:00 17.11.16 17:00 For AMP work

26 Main Bay of ICT-2(404) Daily 09.11.16 9:00 09.11.16 18:00 AMP work

27 Main Bay of ICT-1(407) Daily 10.11.16 9:00 10.11.16 18:00 AMP work

28Tie Bay of ICT-2 and 400KV Parichha-

1 Line(405)Daily 14.11.16 9:00 14.11.16 18:00 AMP work

29Tie Bay of ICT-1 and 400KV Fatehpur-

1 Line(408)Daily 15.11.16 9:00 15.11.16 18:00 AMP work

30Main Bay of 400KV Fatehpur-1

Line(409)Daily 18.11.16 9:00 18.11.16 18:00 AMP work

31Main Bay of 400KV Ballabhgarh-1

Line(410)Daily 19.11.16 9:00 19.11.16 18:00 AMP work

32Tie Bay of 400KV Ballabhgarh-1 Line-

1 and 400KV Fatehpur-2 Line(411)Daily 23.11.16 9:00 23.11.16 18:00 AMP work

33405-400kv Lucknow Line-2 & 400kv

Side ICT-1 Tie bayDaily 07.11.16 9:00 07.11.16 18:00 For AMP work

34 411-ICT-2 400kv Side Tie Bay Daily 08.11.16 9:00 08.11.16 18:00 For AMP work

35 Lucknow-II Main Bay (401) Daily 22.10.2016 09:30 hrs 22.10.2016 17:30 hrs For AMP work

36 Bareilly -II Main Bay (404) Daily 23.10.2016 09:30 hrs 23.10.2016 17:30 hrs For AMP work

37 Bareilly -I Tie Bay (408) Daily 24.10.2016 09:30 hrs 24.10.2016 17:30 hrs For AMP work38

39 400 KV Meerut Line-2 Main Bay at Bareilly Daily 11/8/2016 10:00 11/8/2016 18:00 Annual maintenance work

PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016Annexure 3B (4)

POWERGRID NR-1 & 3

ICT , B/R, SVC

PURPOSE REMARKSLINE/EQUIPT

DURATION FROM TO

Voltage level Name From To From To

1 2 3 4 6 7 8 9 10 11

1 400 KV

400 KV BUS COUPLER ALONG

WITH 400 KV MAIN BUS-B

Sarojaninagar

A 02.11.16 30.11.16 9:00 16:00

FOR REPLACEMENT OF 400 KV ABCB

OF BUS COUPLER BAY BY SF6

CIRCUIT BREAKER

Continuous

Basis

2 400 KV

400 KV Unnao-Lucknow Line Main

Breaker Unnao end (line remain

charge through TBC).

A 21.11.16 27.11.16 09:00 18:00Major Overhauling of Circuit Breaker of

400 KV Unnao-Lucknow Line

Continuous

Basis

3 400 KV315 MVA ICT-(I) Bareilly

A 15.11.16 14.12.16 8:00 18:00For complete overhaulling of transformer

by changing gasket and centrifuging.

Continuous

Basis

4 400 KV 400KV Bus -(I) Bareilly A 21.11.16 21.11.16 08:00 18:00

For changing the contacts of bus side

pantograph isolator Transfer bus 29-A Y-

phase

Daily Basis

5 400KV400KV Bus coupler alongwith 400KV

A bus at 400 kV SultanpurA 01.11.16 13.11.16 08:00 18:00

For erection and commissioning of New

Bus Bar Protection Panel in place of old

Bus Bar Protection Panel.

continuous

basis

6 400KV 240MVA ICT-I at Sultanpur A 02.11.16 03.11.16 08:00 18:00 For dismantling of 36 Mtr Span of 220KV

Transfer Bus and 220KV B bus.

continuous

basis

7 400KV 240MVA ICT-I at Sultanpur A 06.11.16 06.11.16 08:00 18:00 Erection of 27+36 Mtr Span of 220KV

Transfer Bus Daily Basis

8 400KV 240MVA ICT-I at Sultanpur A 07.11.16 08.11.16 08:00 18:00

1. Dismantling of 36 Mtr. Span of 220KV A

Bus 2. Complete Erection of

220KV side columns & beams. 3.

Erection of 27+36 Mtr Span of 220KV B

Bus

Continuous

Basis

9 400KV 240MVA ICT-I at Sultanpur A 09.11.16 09.11.16 08:00 18:00

1. For Erection of 220KV A Bus 2. For

dismantling of 54 Mtr. Span of 400KV

Transfer Bus

Daily Basis

PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016

Uttar Pradesh Power Transmission Corporation Limited

Sl. No.

Detail of Transmission element Category to which

transmission

element belong

(A/B/C/D)

Period Time

Reason Remark

ANNEXURE 3B (5)

10 400KV 400KV Transfer Bus Sultanpur A 09.11.16 18.11.16 08:00 18:00

For dismantling of 54 Mtr. Span, beam

structure etc. of 400KV Transfer Bus For

400KV 315MVA New Transformer Bay

erection

continuous

basis

11 400KV400KV 80MVAR Bus Reactor

SultanpurA 09.11.16 18.11.16 08:00 18:00

For dismantling of 54 Mtr. Span, beam

structure etc. of 400KV Transfer Bus For

400KV 315MVA New Transformer Bay

erection

continuous

basis

12 400KV 400KV B bus Sultanpur A 13.11.16 13.11.16 08:00 18:00 For B bus pantograph isolator maintenance

of 400KV obra BayDaily Basis

13 400KV400/220KV 240MVA ICT-I at

Sultanpur A 17.11.16 18.11.16 08:00 18:00

For stringing of R,Y,B Phase 54 Mtr. Span

of 400KV Transfer BusDaily Basis

14 400KV400KV CB-91 (ABCB) at 400KV S/s

AzamgarhA 02.11.16 17.11.16 8.00 18.00 Replacement of CB with new SF6 CB

Continous

Basis. All T/F

and lines at

400KV S/s

Azamgarh will

remain in

service.

15 400KV 240MVA 400/220KV ICT-I A 07.11.16 07.11.16 8:00 18:00 for routing testing & maintenance work.

Daily basis.

16 400KV 240MVA 400/220KV ICT-II A 17.11.16 17.11.16 8:00 18:00 for routing testing & maintenance work.

Daily basis.

17 400KV315MVA ICT T/F-III & its bay at

400KV S/S Greater NoidaA 04.11.16 06.11.16 8:00 18:00

Centrifuging of oil & General Maintenance

of BayDaily basis

18 400KV240MVA T/F-II at 400KV Sub-station,

Muradnagar-IIA 18.11.16 18.11.16 8:00 17:00 For tightening if Bay & Testing work.

Daily basis.

19 400KV 400KV AligarhMuradnagar Line A 18.11.16 18.11.16 8:00 17:00 Tightening of Bay/General MaintenanceDaily basis.

20 400KV315MVA ICT-I at 400KV Sub-station,

MuradnagarA 24.11.16 24.11.16 8:00 17:00 Tightening of Bay/General Maintenance

Daily basis.

21 400KV315MVA ICT-II at 400KV Sub-station,

MuradnagarA 26.11.16 26.11.16 8:00 17:00 Tightening of Bay/General Maintenance

Daily basis.

22 400KV315MVA ICT-III at 400KV Sub-

station, MuradnagarA 28.11.16 28.11.16 8:00 17:00 Tightening of Bay/General Maintenance

Daily basis.

DATE TIME DATE TIME

X-2

1 400 KV A 15.11.16 0900 16.11.16 1700 DailyFor Busbar stability for Dehradun-1 & 2 Bays. As it

cannot be clubbed with annual maintenance.

2 400 KV A 10.11.16 0900 11.11.16 1700 DailyReplacement of Droppers from Bus from twin to

Quad for Dehradun Bay Dia.

3 400 KV A 09.11.16 09:00 10.11.16 18:00 Daily

4 400 KV A 11.11.16 09:00 12.11.16 18:00 Daily

5 400 KV A 14.11.16 09:00 15.11.16 18:00 DailyFor equipment replacement (Isolator etc.) for

commissioning of Bus-Reacor at BBMB, Dehar.

6 400 KV A 16.11.16 09:00 17.11.16 18:00 DailyFor equipment replacement (Isolator etc.) for

commissioning of Bus-Reacor at BBMB, Dehar.

7 400 KV A 02.11.16 09:00 03.11.16 18:00 Daily

8 400 KV A 04.11.16 09:00 05.11.16 18:00 Daily

X-31 400 KV A 07.11.16 09:00 08.11.16 17:00 Daily For AMP works.

2 400 KV A 10.11.16 09:00 11.11.16 17:00 Daily For AMP works.

3 400 KV A 09.11.16 10:00 09.11.16 12:00 DailyRepetition of C&Tan Delta if IV, R-Phase bushing

on variable frequency.

4400 KV A 17.11.16 09:00 17.11.16 17:00

DailyFor replacement of 220 KV Side CT & AMP works.

5 400 KV A 11.11.16 09:00 11.11.16 18:00 Daily For AMP works.

6 400 KV A 08.11.16 10:00 08.11.16 17:00 Daily For AMP works.

7 400 KV A 14.11.16 10:00 14.11.16 17:00 Daily For MCU Testing works.

8 400 KV A 15.11.16 10:00 15.11.16 17:00 Daily For MCU Testing works.

9 400 KV 315 MVA ICT-2 at Nalagarh. A 21.11.16 09:00 21.11.16 17:00 Daily For AMP works.

10 400 KV A 22.11.16 09:00 22.11.16 17:00 Daily For AMP works.

11 400 KV A 23.11.16 09:00 23.11.16 17:00 Daily For AMP works.

12 400 KV 500 MVA ICT-1 at Moga. A 07.11.16 09:00 07.11.16 17:00 Daily For AMP works.

400 KV Bus-1 at Abdullapur.

For Bay extension work of Dadri Malerkotla Line at

Kaithal.

400 KV Bus-2 at Abdullapur.

POWERGRID NORTHERN REGION-II

PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016

S.No.Details of Transmission Element Category

of element

DURATION Daily/ Continuous ReasonVoltage

level NAME OF THE ELEMENT AND

SUBSTATIONFROM TO

For construction activity

400 KV Bus-1 at Abdullapur.

400 KV Bus-2 at Abdullapur.

315MVA ICT-1 at Abdullapur.

315 MVA ICT-2 at Kaithal.

315 MVA ICT-1 at Jalandhar.

For O&M activity

400 KV Bus-1 at New Wanpoh

400 KV Bus-2 at New Wanpoh

For Jumper connection and Bus Bar Stability for

Kishenpur - 3 & 4 Lines under construction.

Annexure 3B (6)

400 KV Bus-1 at Hamirpur.

400 KV Bus-2 at Hamirpur.

400 KV Bus-1 at Nalagarh.

400 KV Bus-2 at Nalagarh.

315 MVA ICT 1 at Hamirpur.

400 KV Bus-1 at Kaithal.

400 KV Bus-2 at at Kaithal.

400 KV Bus-1 at BBMB Dehar

400 KV Bus-2 at BBMB Dehar

13 400 KV 250 MVA ICT-2 at Moga. A 08.11.16 09:00 08.11.16 17:00 Daily For AMP works.

14 400 KV 500 MVA ICT-3 at Moga. A 09.11.16 09:00 09.11.16 17:00 Daily For AMP works.

15 400 KV 315 MVA ICT-4 at Moga. A 10.11.16 09:00 10.11.16 17:00 Daily For AMP works.

16 400 KV A 02.11.16 09:00 02.11.16 17:00 Daily For AMP works.

17 400 KV A 03.11.16 10:00 03.11.16 17:00 Daily For AMP works.

18 400 KV A 07.11.16 7:00 11.11.16 9:00 ContinuousFor replacement of 220 KV Bushing -02 No.'s due

to DGA Voilation. Rescheduled from 126 OCC.

19 400 KV A 15.11.16 10:00 15.11.16 17:00 Daily For AMP works.

20 400 KV A 16.11.16 10:00 16.11.16 17:00 Daily For AMP works.

21 400 KV A 14.11.16 09:00 19.11.16 18:00 ContinuousFor replacing DGA Violating 400 KV R-Phase

Bushing.

400 KV Bus-2 at Wagoora.

315 MVA ICT-1 at Ludhiana

315 MVA ICT-2 at Panchkula.

315 MVA ICT-1 at Panchkula.

400/220KV ICT-2 at Patiala.

400 KV Bus-1 at Wagoora.

PROPOSED OUTAGE OF TRANSMISSION ELEMENTS / LINES FOR THE MONTH OF NOVEMBER, 2016

Annexure 3B (7)

PDD J&K

Name of Division Name of G/Stn./ Trans.Lines Proposed date and time of shutdown.

1.

TLMD-II, Jammu. 220/132/33 KV Grid Station Gladni. 05-11-2016 0800 Hrs. to 1400 Hrs.

2.

G.C.D, Jammu. 320MVA,220/132/66KV G/Stn.Hiranagar including 220KV Sarna-Hiiranagar & Hiranagar-

Gladni Tr. Lines alongwith 132KV Hiranagar-Sewa-II D/C Tr. Line .

12-11-2016 0800 Hrs. to 1400 Hrs.

3.

TLCD-I, Jammu 220/132 KV G/Station Bishnah

and 220KV Hiranagar-Bishnah Trans. Line.

12-11-2016

0800 Hrs. to 1400 Hrs.

4. TLCD-II, Jammu a-220/132/33KV G/S Barn

b-220 KV D/C Barn-Kishenpur Trans. Line(BKTL)

19-11-2016

0800 Hrs. to 1400 Hrs.

5. TLMD-III, Udhampur a- 220/132/33KV G/S Ramban

b- 220KV D/C KPTL

Kishenpur-Ramban- (Ckt.-I & II)

c- 220/132/33KV Grid Station

Udhampur.

d- 220KV S/C Sarna-Udhampur

Trans. Line.

19-11-2016 0800 to 1400 Hrs.

19-11-2016 0800Hrs. to 1400 Hrs. 26-11-2016 0800 Hrs. to 1400 Hrs.

26-11-2016 0800 Hrs. to 1400Hrs.

The shutdown shall be subject to fair weather conditions.