our vision

10
Our Vision To develop Assi ghat as a MODEL GHAT

Upload: grazia

Post on 21-Jan-2016

19 views

Category:

Documents


0 download

DESCRIPTION

Our Vision. To develop Assi ghat as a MODEL GHAT. Present Scenario. Improper management of solid waste particularly plastics Improper sanitary facilities Problem of drinking water Inefficient management of energy Lack of civil ethics and awareness - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Our Vision

Our Vision

To develop Assi ghat as a MODEL GHAT

Page 2: Our Vision

Present Scenario • Improper management of solid waste

particularly plastics• Improper sanitary facilities • Problem of drinking water• Inefficient management of energy• Lack of civil ethics and awareness• Lack of implementation of rules• Improper allocation to shops

Page 3: Our Vision

Harmful effects

• Severe health hazards for all living beings• Great setback to tourism industries• Increase in pollution• Waste of precious energy

Page 4: Our Vision

What needs to be done• Management of solid waste– Providing and maintaining dustbins– Proper disposal of collected waste

• Renovation of existing sanitary and water facilities

• Use of solar panels for streetlights• Strict implementation of rules par say

ban of tobacco, trespassing by the parking lot owner and shopkeepers

Page 5: Our Vision

What we will do !!!• Providing dustbins• Providing technical support & scientific

reviews• Educating people and creating

awareness• Providing all sort of support regarding

implementation

Page 6: Our Vision

What we expect from you

• Regular cleaning of Ghat & proper dumping facility

• Imposition of fine• Regular assessment of progress• Need full co-operation

Page 7: Our Vision

How shall we achieve it !!!

• Proper fixation of the provided Dustbins• Banners and posters for awareness• Fine: A fixed area will be allocated and

the shopkeepers will be responsible• Rudimentary area shall be looked after

by the boatmen with collective responsibility to pay the fine

Page 8: Our Vision

Steps and deadlines• First stage– Implementing fine system– Waste management– Proper placement of dustbins and banners– Preventing trespassing to all possible levels

Expected date of completion – Mid April• Second stage– Proper sanitation and facilities– Solar streetlamp

Expected date of completion – Mid July

Page 9: Our Vision

By:• Aditya Kakkar• Akshay Ranade• Ashish Agrawal• Shivendra Pratap Singh Chauhan• Vikas Kumar Pandey

( B-Tech Part III students of IT-BHU)

Page 10: Our Vision

Thank You for your patience and

hoping best for a great job ahead