Our Summer VacationCapital ProjectsOur Summer Vacation

byTamela, John, Dianne and Carrie

Our Summer Vacation

BHS Photo Lab

A full rehabilitation. New flooring, paint, refinished cabinets (in-house), tables, chairs, computers and IT infrastructure.

“Moving into Room 324 with the new digital lab, darkroom and studio has already started to enhance my curriculum.  First, it has given new life to my teaching, and I have been doing lots of research to see how others are teaching film photography.”

-Janet Neuhauser

before, dingy, pre-asbestos remediation

Our Summer Vacation

BHS Tennis CourtsNew playing surfaces, nets, fencing, drainage, improved ADA access, and seating replaced the old cracked/slumping lower courts that were approaching 25 years old. The upper courts also received new playing surface to match the US Open Green/Blue colors along with new bleachers, paths and improved drainage. The Courts are designed to USTA standards and also include new power and a drinking fountain. Adjacent vegetation-buffer cleaned-up and revitalized.

ugh! Old, worn-out, cracked and unplayable

Our Summer Vacation

Woodward CommonsFresh paint and base throughout, visually updated, fresh and clean.

Heavily-worn, outdated original paint (1995)

Our Summer VacationSakai PaintingWall repair and fresh paint cleans up a space that has been untouched since opening in 1999.

Before: Incredibly beaten interior walls had not been touched since 1998

Our Summer Vacation

Ordway Portables D-HRelocation of portable classrooms G/H, formerly at BHS, increases teaching space at Ordway. New paint gives the portable a fresh look. New HVAC units installed in adjacent portables D-E improve efficiency and indoor air quality.

Before at BHS

“in flight”

After at Ordway

Our Summer Vacation

Ordway Quiet RoomA new room within a room provides needed quiet space for Special Education.

Our Summer Vacation

Woodward LibraryRemoval of underutilized cabinetry and new carpet in library provides opportunity for more open floor area adjacent to windows for group study. Cabinets re-purposed for the robotics program at Woodward.

Add Woodward Library and Robotics photos

Before

After

Our Summer Vacation

K-4 STEM Program Rooms

As a part of the new K-4 STEM program, three classrooms at Blakely, Ordway and Wilkes were redefined. Over 200 individual pieces were organized for each space including storage, desks and chairs. New cabinetry was built in-house of sustainable materials in a modular fashion to aid in future repurposing.

Before: old, worn-out and ill-sized cabinets

Before

After

Our Summer Vacation

Transportation Bldg. ANew floor finish, paint, HVAC (there was none) and furnishings transformed “sad to happy.”

Ack! Help!

Before…

Our Summer Vacation

Transportation Bldg. B

Our Summer Vacation

Discovering new uses …

The GLAM Gals

and meeting new friends…

Our Summer VacationCapital ProjectsOur Summer Vacation