os group assignment ucd2f1106dit{se} ucd2f1106dit asd

Upload: sagaaboyz-mg-r

Post on 02-Mar-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/26/2019 Os Group Assignment Ucd2f1106dit{Se} Ucd2f1106dit Asd

    1/4

    Asia Pacific Institute of Information TechnologyDiploma in Computing and Information Technology

    Operating SystemsResearch Project

    Intakes : CD!"#$%&DIT'S() * CD!"#$%&DITDate Assigned :

    Date Due :

    +ecturer : Akansha ,andhana

    Statement of the Case study

    As a group (3 members, to be assigned by your lecturer) you are required to investigate, install,analyse and document features of a specific Operating System. You are required to document the

    results of your groups !or" in a professional and systematic manner, in the form of a

    computerised report.

    Stages of the project

    #) $esearch and %nvestigation

    &) %nstallation

    3) Analysis

    ') resentation

    Choices of Operating Systems

    lease select only one of the follo!ing operating systems (obile or *es"top)+

    #) -%/01 /%0

    &) 2indo!s (acceptable versions ista, 2indo!s 4 or latest)

    3) ac1%OS

    ') Android obile Operating System

    5) Any other operating system (sub6ect to approval from your lecturer)

    L1-OS Page 1 of 4

  • 7/26/2019 Os Group Assignment Ucd2f1106dit{Se} Ucd2f1106dit Asd

    2/4

    Research and Investigation

    #) %ntroduction to the Operating System

    &) System hard!are requirements for the chosen operating system. 7.g. 8/, memory and

    hard dis" space.

    3) %nvestigate and compare the emory anagement !ith another Operating System in

    terms of tas" manager or any other application.

    Analysis

    #) /ser %nterface

    &) rocess 8ontrol anagement

    3) *eadloc" anagement

    ') emory anagement

    5) Secondary *is" Scheduling anagement

    9) Standard Support

    Guidelines for the Report

    Your completed document should meet the follo!ing requirements+

    # :able of 8ontents for every detailed chapter1section.

    & ;antt chart for the case study.

    3 2or"load atri< (brea"do!n of tas"s among the members)

    ' ain *ocument (structured into chapters1sections !ith an introduction, chapter#, =. ,

    and conclusion)

    5 -imitations17

  • 7/26/2019 Os Group Assignment Ucd2f1106dit{Se} Ucd2f1106dit Asd

    3/4

    9 Appendices (*ata 8harts, Screen 8aptures)

    4 inutes of 2ee"ly eetings

    > ?ibliography or $eferences

    @ 2ord -imit Around 35' !ords

    No

    Group Number #

    Team Member Names

    Researchand

    ation(30)

    Installation(20)

    Docum

    entation(10)

    Refe

    rencing

    (10)

    GroupMarks(70)

    An

    alysis(15)

    Presentation(15)

    Ind.

    Marks(30)

    To

    tal(100)

    1

    2

    3

    Students are required to print the table belo! on the cover sheet of the documentation

    Assessment Criteria:

    $esearch and %nvestigation (;roup) 3B

    %nstallation (;roup) &B

    *ocumentation (;roup) #B

    $eferencing (;roup) #B

    Analysis (%ndividual) #5B

    resentation (%ndividual) #5B

    Marking Criteria:

    istinction

    *emonstrated comprehensive research !ith detailed evidence. o errors !ere encountered !ith

    regards to the installation of the operating system on the computer. Cigh level of analysis

    performed, e

  • 7/26/2019 Os Group Assignment Ucd2f1106dit{Se} Ucd2f1106dit Asd

    4/4

    Credit

    Adequate research conducted !ith fair detail of evidence presented. inor errors !ere

    encountered !ith regards to the installation of the operating system on the computer. oderate

    level of understanding and "no!ledge displayed !ith regard to facilities and services of the

    operating system. ;ood level of documentation presented. -anguage proficiency, presentations"ills and communication s"ills !ere good. Duestions posed !ere ans!ered fairly !ell.

    !ass

    -o! level research conducted. Some evidence of research displayed. 7rrors !ere encountered

    !ith regard to the installation of the operating system on the computer. ?asic level of

    understanding and analysis displayed !ith regards to the operating systems facilities and

    services. Satisfactory level of documentation. Satisfactory level of presentation and

    communication s"ills. Duestions posed !ere ans!ered !ith minor errors.

    !lease "ote

    # All submissions (*ocumentation E hard copy) should be made on or before the due date.

    :his should also include a softcopy of your report in the form of a 8* or floppy dis"ette.

    & Any late submissions after the deadline !ill not be entertained. A Fero () mar" !ill be

    a!arded for late submission, unless e