Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 2 of 42
Contents
INTRODUCTION
1. TOP MANAGEMENT
1.1 Main drivers and assumptions
1.2 Sizing
2. ENGINEERING
2.1 Main drivers and assumptions
2.2 Sizing
2.3 Lower levels sizing
3. STRATEGY AND INVESTMENTS
3.1 Main drivers and assumptions
3.2 Sizing
3.3 Lower levels sizing
4. EXTERNAL RELATIONS
4.1 Main drivers and assumptions
4.2 Sizing
4.3 Lower levels sizing
5. LEGAL
5.1 Main drivers and assumptions
5.2 Sizing
5.3 Lower levels sizing
6. ADMINISTRATION, FINANCE & CONTROL
6.1 Main drivers and assumptions
6.2 Sizing
6.3 Lower levels sizing
-
7/24/2019 Organization Sizing Detail
3/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 3 of 42
7. PROCUREMENT, LOGISTICS & WAREHOUSING
7.1 Main drivers and assumptions
7.2 Sizing
7.3 Lower levels sizing
8. TARIFFS & EEA RELATIONS
8.1 Main drivers and assumptions
8.2 Sizing
8.3 Lower levels sizing
9. ICT
9.1 Main drivers and assumptions
9.2 Sizing
9.3 Lower levels sizing
10. HR
10.1 Main drivers and assumptions
10.2 Sizing
10.3 Lower levels sizing
11. EHS & QUALITY
11.1 Main drivers and assumptions
11.2 Sizing
11.3 Lower levels sizing
12. PROPERTY & GENERAL SERVICES
12.1 Main drivers and assumptions
12.2 Sizing
12.3 Lower levels sizing
13. ENERGY MANAGEMENT
-
7/24/2019 Organization Sizing Detail
4/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 4 of 42
13.1 Main drivers and assumptions
13.2 Sizing
13.3 Lower levels sizing
14. GENERATION
14.1 Main drivers and assumptions
14.2 Sizing
14.3 Lower levels sizing
15. TRANSMISSION
15.1 Main drivers and assumptions
15.2 Sizing
15.3 Lower levels sizing
16. DISTRIBUTION
16.1 Main drivers and assumptions
16.2 Sizing
16.3 Lower levels sizing
17. SUPPLY
17.1 Main drivers and assumptions
17.2 Sizing
17.3 Lower levels sizing
18. UEAP
18.1 Main drivers and assumptions
18.2 Sizing
18.3 Lower levels sizing
19. CONSTRUCTIONS
19.1 Main drivers and assumptions
-
7/24/2019 Organization Sizing Detail
5/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 5 of 42
19.2 Sizing
19.3 Lower levels sizing
20. EQUIPMENT PRODUCTION
20.1 Main drivers and assumptions
20.2 Sizing
20.3 Lower levels sizing
21. ORGANIZATION OVERVIEW
21.1 Sizing
-
7/24/2019 Organization Sizing Detail
6/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 6 of 42
IntroductionIn order to create a world class electric utility company, the organizational
structure for the new EEPU has been developed on the basis of international best
practices.
The present document is aimed at defining the sizing of EEPU organization to allow
the implementation of the new structure by the new management.
The estimation of the organization sizing has required the definition of main general
drivers for the new company, like:
growth of the electricity consumption from 3.3 TWh (2009/2010A) to18.9 TWh
(2014/2015E);
increase in installed capacity from 2.0 GW (2010-17 plants) to 7.86 GW (2015-36 plants);
increase in the transmission network from 11,369 Km (2010A) to 15,326 Km
(2015E);
increase in the distribution network from 126,000 Km (2009/2010A) to
282,000 Km (2014/2015E);
increase in the nr. of customers from M 1.9 to M 4.0;
growth of total revenue to $M 800;
On the basis of the above mentioned drivers, main assumptions have beendeveloped and applied to EEPU organization to estimate the dimension of each
function of the new structure.
These assumptions have been defined on the basis of Bain expertise in organization
design projects and referring to international benchmarks for electric utilities
companies, mainly from:
APQC Open Standards Benchmark;
Market data.
Assumptions are directly related to international benchmarks and best practices.
APQC Benchmarks have been analyzed and adapted on the basis of data taken from
other comparable Electric Utility organizations analyzed in B&C previous projects1. In
this way we managed to take the most of APQC standards and B&C experience in
Best in Class corporations.
&
-
7/24/2019 Organization Sizing Detail
7/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 7 of 42
Changes on organization sizing could occur as a consequence of a change in the
company general drivers (e.g. electricity consumption growth, increase in
transmission network, etc) and will be performed following the assumptions
defined for each function. As an example: following an increase of 5 in the # of
generation plants (driver) the # of Maintenance and Works managers will increase of5 units following the assumption Plant Maintenance and Works Manager per plant:
1.
The following sections are dedicated to EEPU organizational functions, describing
main drivers and assumptions employed and the estimated size of the division.
Since, as requested from TPO management, the organizational sizing has been
estimated on the basis of international benchmarks without considering the as-is
organization, it could be necessary to adjust the provided values to consider
Ethiopian regulations and eventual current constraints. As a general assumption thesizing model requires a proper implementation of the proper IT systems and the
right mix of managerial capabilities and professional skills
-
7/24/2019 Organization Sizing Detail
8/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 8 of 42
1. TOP MANAGEMENT
1.1 Main drivers and assumptions
The sizing for the top management has been estimated on the basis of the
following assumptions: Nr. of chiefs for each top position: 1;
Secretary for each chief: 1.
1.2 Sizing
The top management is composed of 6 resources, distributed as shown in the
Figure 1:
CEO: 2 FTE (Chief and secretary);
CFO: 2 FTE (Chief and secretary);
CSM: 2 FTE (Chief and secretary).
Figure 1
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent1
Top ManagementOverview
CEO
CFOCorporate Service
Manager
1+1
1+1 1+1
Tot. FTE:
6
-
7/24/2019 Organization Sizing Detail
9/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 9 of 42
2. ENGINEERING
2.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Secretary for the director of the function: 1;
Average % of function FTE on total FTE: 0.6%;
Equal distribution of resources among Generation, Transmission and
Distribution projects.
2.2 Sizing
On the basis of the described references and assumptions, the sizing for the
Engineering division has been estimated in 57 resources, distributed in the
following way (Figure 2): Engineering: 2 FTE (Director and secretary);
Generation: 19 FTE;
Transmission: 18 FTE;
Distribution: 18 FTE.
Figure 2
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent2
EngineeringOverview
Engineering
CEO
Generation Transm.
ProjectMgmtOffice
ProjectMgmtOffice
Distrib.
ProjectMgmtOffice
1+1
19 18 18
Tot. FTE:
57
-
7/24/2019 Organization Sizing Detail
10/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 10 of 42
2.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
Engineering Director 1
Secretary 1
Engineering Generation Manager 1
Generation Electrical Engineer 7
Generation Environmental Engineer 1
Generation Civil Engineer 5
Generation Electro-Mechanical Engineer 2
Generation Geologist 3
Engineering Transmission Manager 1
Transmission Electrical Engineer 7
Transmission Environmental Engineer 1
Transmission Civil Engineer 4
Transmission Electro-Mechanical Engineer 2
Transmission Geologist 3
Engineering Distribution Manager 1
Distribution Electrical Engineer 10
Distribution Environmental Engineer 1
Distribution Civil Engineer 4
Distribution Electro-Mechanical Engineer 2
PMO Manager *
*PMO Managers sizing depends on the number of ongoing projects.
-
7/24/2019 Organization Sizing Detail
11/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 11 of 42
3. STRATEGY AND INVESTMENTS
3.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Secretary for the director of the function: 1;
Average % of function FTE on total FTE: 0.2%.
3.2 Sizing
Using the above mentioned drivers, the requirement for the Strategy and
Investments function has been estimated in 17 resources (Figure 3), employed
in:
Strategy and Investments: 2 FTE (Director and secretary);
Business Divisions: 15 FTE.
Figure 3
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent3
Strategy and InvestmentsOverview
Strategy andinvestments
CEO
BusinessDivisions
1+1
15
Tot. FTE:
17
-
7/24/2019 Organization Sizing Detail
12/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 12 of 42
3.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
Strategy and investments director 1
Secretary 1
Strategy and investments energy management manager 1
Strategy and investments Sr. business analyst (En. Man) 1
Strategy and investments business analyst (En. Man) 1
Strategy and investments energy generation manager 1
Strategy and investments Sr. business analyst (Gen.) 2
Strategy and investments business analyst (Gen.) 1
Strategy and investments energy transmission manager 1
Strategy and investments Sr. business analyst (Transm.) 2
Strategy and investments business analyst (Transm.) 1
Strategy and investments energy distribution manager 1
Strategy and investments Sr. business analyst (Distr.) 2
Strategy and investments business analyst (Distr.) 1
-
7/24/2019 Organization Sizing Detail
13/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 13 of 42
4. EXTERNAL RELATIONS
4.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Secretary for the director of the function: 1;
Average % of function FTE on total FTE: 0.25%;
Average nr. of function FTE per $B1 revenues: ~30;
Average % of function FTE involved in Institutional Relations: 65%.
4.2 Sizing
On the basis of the described assumptions, the estimated size of the function
External Relations is 26 resources (Figure 4), distributed in the following way:
External Relations: 2 FTE (Director and secretary); Institutional Relations: 16 FTE;
Public Relations: 8 FTE.
Figura 4
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent4
External RelationsOverview
ExternalRelations
CEO
InstitutionalRelations
Public Relations
1+1
16 8
Tot. FTE:
26
-
7/24/2019 Organization Sizing Detail
14/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 14 of 42
4.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
External Relations Director 1
External Relations Directors secretary 1
Institutional Relations Manager 1
Strategy and planning officer (sr.) 1
Strategy and planning officer (analyst) 1
Strategy and planning officer (jr.) 1
Communication officer (superintendent) 1
Communication officer (analyst) 4
Communication officer (jr.) 1
IR analyst (superintendent) 2
IR analyst (analyst) 2
IR analyst (jr.) 2
Public Relations Manager 1
Communication officer (senior) 2
Communication officer (community specialist) 2
Communication officer (media specialist) 2
Event coordinator 1
-
7/24/2019 Organization Sizing Detail
15/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 15 of 42
5. LEGAL
5.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Secretary for the director of the function: 1;
Average % of function FTE on total FTE: 0.3%;
Average % of function FTE on staff FTE: 1.7% (to be comprised between
0.9% and 5.8%);
Average % of legal FTE involved in Staff & Projects offices: 35%.
5.2 Sizing
On the basis of the applied drivers and assumptions, the legal function is
composed of 30 resources, distributed among the offices in the following way(Figure 5):
Legal: 2 FTE (Director and secretary)
Staff & Projects: 9 FTE;
Business Divisions: 18 FTE.
Figura 5
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent5
Legal
Overview
Legal
CEO
Staff &
projects
Line
functions
Business
Divisions
1+1
10 18
Tot. FTE:
30
-
7/24/2019 Organization Sizing Detail
16/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 16 of 42
5.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
Legal Director 1
Legal Directors secretary 1
Staff & Projects Manager (Legal) 1
Legal Clerk 2
Staff & Projects Lawyer (sr.) 2
Staff & Projects Lawyer (jr.) 5
Business Divisions Manager (Legal) 7
Business Division Lawyer 11
-
7/24/2019 Organization Sizing Detail
17/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 17 of 42
6. ADMINISTRATION, FINANCE & CONTROL
6.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Nr. of director of the function: 1;
Nr. of manager for each 3rd-level office: 1;
Secretary for the director of the function: 1;
Average nr. of payroll FTE per 1,000 employees: 4.6;
Average nr. of Finance & Treasury FTE per $B1 revenues: 32.5;
Average nr. of Administration FTE per $B1 revenues: 193.8;
Average % of Administration FTE involved in Staff & Projects offices:
19%;
Average nr. of Planning & Control FTE (director, staff & projects,business divisions) per $B1 revenues: 31.2;
Average nr. of Project Control FTE per $B1 revenues: 7.5;
Average nr. of Taxes FTE per $B1 revenues: 12,5;
Average % of Administration, Finance & Control FTE on staff FTE: 16%;
Nr. of manager for Credit Management function: 2.
6.2 Sizing
The previous assumptions lead to an estimated need of 274 FTE for the
Administration, Finance & Control function, employed in (Figure 6):
Admin. Finance & control: 2 FTE (Director and secretary);
Finance, Treasury and Payroll: 1 FTE;
Payroll: 47 FTE;
Finance & Treasury: 26 FTE;
Administration: 1 FTE;
Administration Staff & Projects: 30 FTE;
Administration Business Divisions: 124 FTE;
Planning & Control: 1 FTE;
Planning & Control Staff: 12 FTE;
Planning & Control Business Divisions: 12 FTE;
Project Control: 6 FTE;
Taxes: 10 FTE;
Credit Management: 2 FTE.
-
7/24/2019 Organization Sizing Detail
18/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 18 of 42
Figure 6
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent6
Administration, Finance and ControlOverview
Admin. Finance& Control
CFO
Finance,Treasury &
PayrollAdministration Planning &
control
Creditmanagement
PayrollFinance &Treasury
Staff &projects
BusinessDivisions
BusinessDivisions Staff
BusinessDivisions
BusinessDivisions
Taxes
Projectcontrol
1+1
1
47 26
1
30 124
1
12 12 6
10 2
Tot. FTE:
274
-
7/24/2019 Organization Sizing Detail
19/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 19 of 42
6.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
Administration, Finance & Control Director 1
Secretary 1
Administration Manager 1
Administration Staff & Projects Supervisor 1
Administration Staff & Projects Senior Accounting Analyst 2
Administration Staff & Projects Senior Financial Officer 4
Administration Staff & Projects Financial Officer 15
Administration Staff & Projects Administrative Clerk 8
Administration Business Divisions Supervisor 7
Administration Business Divisions Senior Accounting Analyst 7
Administration Business Divisions Senior Financial Officer 7
Administration Business Divisions Financial Officer 77
Administration Business Divisions Administrative Clerk 26
Finance, Treasury and Payroll Manager 1
Payroll Supervisor 1
Payroll Analyst 3
Payroll Financial Officer 8
Payroll Assistant Accountant 35
Finance & Treasury Supervisor 1
Finance & Treasury Analyst 3
Finance & Treasury Senior Officer 5
Finance & Treasury Officer 17
Planning & Control Manager 1
Planning & Control Staff Supervisor 1
Planning & Control Staff Analyst 2Planning & Control Staff Senior Financial Officer 2
Planning & Control Staff Financial Officer 7
Planning & Control Business Divisions Supervisor 7
Planning & Control Business Divisions Analyst 1
Planning & Control Business Divisions Senior Financial Officer 1
Planning & Control Business Divisions Financial Officer 3
Project Control Supervisor 1
Project Control Senior Project Accountant 1
Project Control Project Accountant 4Taxes Manager 1
Taxes Senior Financial Officer 1
-
7/24/2019 Organization Sizing Detail
20/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 20 of 42
Taxes Assistant Accountant 8
Credit Manager (Finance) 1
Credit Management (Finance) Financial Accountant 1
-
7/24/2019 Organization Sizing Detail
21/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 21 of 42
7. PROCUREMENT, LOGISTICS & WAREHOUSING
7.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Number of Regional Unit: 15;
Number of plant: 36;
Nr. of director of the function: 1;
Nr. of manager for each 3rd-level office: 1;
Secretary for the director of the function: 1;
Average staff purchasing FTE as a % of purchasing FTE: 20%;
Procurement FTE per plant: 1,0;
Procurement FTE per Regional Unit: 4,5;
Average Logistics & Warehousing FTEs as a % of purchasing: 5,0%; Average Purchasing FTE as a % of total company FTE: ~1,6%.
7.2 Sizing
The previous assumptions lead to an estimated need of 152 FTE for the
Procurement, Logistics & Warehousing function, employed in (Figure 7):
Procurement, Logistics & Warehousing Director: 2 FTE (Director and
secretary);
Procurement Manager: 1 FTE;
Procurement Staff and Projects Supervisor : 31 FTE;
Procurement Business Divisions Supervisor : 4 FTE;
Buyer Generation: 36 FTE;
Buyer Distribution: 23 FTE;
Buyer Transmission: 23 FTE;
Buyer Supply: 23 FTE;
Logistics & Warehousing Manager: 1 FTE;
Logistics & Warehousing Central Warehouse Supervisor: 8 FTE.
-
7/24/2019 Organization Sizing Detail
22/66
-
7/24/2019 Organization Sizing Detail
23/66
-
7/24/2019 Organization Sizing Detail
24/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 24 of 42
8. TARIFFS & EEA RELATIONS
8.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Secretary for the director of the function: 1;
Nr. of estimated required FTE to perform tariffs regulation requirements
and manage relations with EEA: 9.
8.2 Sizing
On the basis of the illustrated assumptions, the Tariffs & EEA Relations
function is constituted of 10 resources (Figure 8):
Tariffs & EEA Relations: 10 FTE (1 Director, 1 secretary and 8 officers).
Figure 8
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be re lied on by any 3rd party without Bain's prior written consent7
Tariffs and EEA relationsOverview
Tariffs and EEArelations
CFO
1+9
Tot. FTE:
10
-
7/24/2019 Organization Sizing Detail
25/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 25 of 42
8.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
Tariffs and EEA relations director 1
Secretary 1
Senior pricing analyst 2
Pricing analyst 6
-
7/24/2019 Organization Sizing Detail
26/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 26 of 42
9. ICT
9.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Number of Regional Unit: 15;
Number of plant: 36;
Total EEPU Annual Sales (estimate): 800 M$;
Nr. of director of the function: 1;
Nr. of manager for each 3rd-level office: 1;
Secretary for the director of the function: 1;
IT FTEs for developing, maintaining and deploying IT solutions per $1
billion revenue: 45;
IT FTEs for developing, maintaining and deploying IT solutions per $1billion revenue: 30;
IT FTEs for IT security and compliance per $1 billion revenue: 18;
IT Operations & Support FTE per Regional Unit: 1,5;
IT Operations & Support FTE per plant: 1;
IT Operations & Support FTE per Regional Unit: 1;
IT Operations & Support FTE per Regional Unit: 1;
IT Operations & Support FTE per Regional Unit: 1.
9.2
SizingThe previous assumptions lead to an estimated need of 181 FTE for the ICT
function, employed in (Figure 9):
ICT Director (Director and secretary): 2 FTE;
IT Applications Manager: 36 FTE;
IT Infrastructure Manager: 24 FTE;
IT Security and Compliance Manager: 14 FTE;
IT Operations & Support Manager: 1 FTE;
IT Operations & Support Staff Supervisor: 23 FTE;
IT Operations & Support Line Functions Supervisor: 81 FTE.
-
7/24/2019 Organization Sizing Detail
27/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 27 of 42
Figure 8
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent2
ICTOverview
ICT
ApplicationsInfrastructures(HW & network)
IT operations &support
IT security andcompliance
Corporategeneral
manager
Staff Linefunctions
Linefunctions
1+1
Tot. FTE:
181
1 36 24 14
8123
-
7/24/2019 Organization Sizing Detail
28/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 28 of 42
9.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
ICT Director 1
ICT Director's secretary 1
IT Applications Manager 1
IT Applications Officer sr. 8
IT Applications Officer analyst 12
IT Applications Officer jr. 15
IT Infrastructure Manager 1
IT Infrastructure Officer (sr.) 7
IT Infrastructure Officer (analyst) 8
IT Infrastructure Officer (jr.) 8
IT Security and Compliance Manager 1
IT Security and Compliance Officer sr. 4
IT Security and Compliance Officer analyst 4
IT Security and Compliance Officer jr. 5
IT Operations & Support Manager 1
Staff Supervisor (IT Operations and Support) 1
Staff Officer (sr.) 4
Staff Officer (analyst) 6
Staff Officer (jr.) 8
Staff System Administrator 4
Line Functions Supervisor (IT Operations and Support) 7
Line function Officer (sr.) 18
Line function Officer (jr.) 44
Line function System Administrator 12
-
7/24/2019 Organization Sizing Detail
29/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 29 of 42
10. HR
10.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Number of Regional Unit: 15;
Total EEPU Annual Sales (estimate): 800 M$;
Nr. of director of the function: 1;
Nr. of manager for each 3rd-level office: 1;
Secretary for the director of the function: 1;
Number of employees per "Hiring and Development" Staff FTE: 143,75;
Number of employees per "Hiring and Development" Function FTE:
143,75;
Number of Organization FTEs per $1 billion revenue: 10; Labor Relations FTE per Regional Unit: 1;
Number of employees per "HR administration" FTE: 236,6;
HR-to-Employee Ratios: 1,4%;
Number of employees serviced by HR function FTEs: 75.
10.2 Sizing
The previous assumptions lead to an estimated need of 141 FTE for the HR
function, employed in (Figure 10):
Human Resources Director (Director and secretary): 2 FTE;
Hiring and Development Manager: 1 FTE;
Hiring and Development Staff & Projects Supervisor : 12 FTE;
Hiring and Development Line Functions Supervisor : 59 FTE;
Organization Manager: 8 FTE;
Labor Relations Manager: 15 FTE;
Administrative Activities Manager: 1 FTE;
Administrative Activities Staff & Projects Supervisor: 7 FTE;
Administrative Activities Line Functions Supervisor: 36 FTE.
-
7/24/2019 Organization Sizing Detail
30/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 30 of 42
Figure 9
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent8
Human ResourcesOverview
Tot. FTE:
141
HR
Corporate
ServiceManager
Hiring andDevelopment
OrganizationLabor
RelationsAdministrative
activities
Staff &Projects
Linefunctions
Staff &Projects
Linefunctions
Linefunctions
Linefunctions
1+1
1 8 15 1
12 59 7 36
-
7/24/2019 Organization Sizing Detail
31/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 31 of 42
10.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
Human Resources Director 1
Human Resources Directors Secretary 1
Hiring and Development Manager 1
Staff & Projects Supervisor (Hiring and Development) 1
Staff & Projects - Clerk 2
Staff & Projects - Administrative Officer (control) 1
Staff & Projects - Administrative Officer (hiring) 1
Staff & Projects - Administrative Officer (career m.) 1
Staff & Projects - Administrative Assistant 6
Line Functions Supervisor (Hiring and Development) 7
Line functions - Clerk 7
Line Functions - Administrative Officer (control) 7
Line Functions - Administrative Officer (hiring) 7
Line Functions - Administrative Officer (career m.) 7
Line Functions - Administrative Assistant 14
Line Functions Development Officer 10
Organization Manager 1
Senior Analyst 2
KM Officer 3
Administrative Officer 2
Labor Relations Manager 1
Administrative officer 2
Lawyer 4
Administrative assistant 7
Secretary 1Administrative activities manager 1
Staff & Projects Supervisor (Administrative Activities) 1
Staff & Projects Administrative officer (sr.) 1
Staff & Projects Administrative officer (jr.) 1
Staff & Projects Administrative assistant 1
Staff & Projects Data officer 3
Line Functions Supervisor (Administrative Activities) 7
Line Functions Administrative officer (sr.) 7
Line Functions Administrative officer (jr.) 7Line Functions Administrative assistant 8
Line Functions Data officer 7
-
7/24/2019 Organization Sizing Detail
32/66
Ethiopian Electric Power
Organization Sizing
11.1 Main drivers and a
The sizing for the func
assumptions: Secretary for the
Average % of fun
Average % of fun
Average % of fun
Average % of fun
Average % of fun
Number of H&S F
11.2
SizingOn the basis of the d
composed of 21 resou
Figure 11:
EHS & Quality: 2
Quality: 4 FTE;
Environment: 4 F
Health & Safety:
H&S Staff and Pro
H&S Line Function
This information is confidential and was prepared i l l li i i li
EHS and QualiOverview
Corporation business processes and organization desi
1. EHS & QUALITY
ssumptions
ion has been estimated on the b
irector of the function: 1;
tion FTE on total FTE: 0.2%;
tion FTE on staff FTE: 1.2%;
tion FTE involved in Quality office:
tion FTE involved in Environment o
tion FTE involved in H&S office: 55
E to manage H&S for staff function
escribed assumptions, the EHS &
rces, distributed among the offic
TE (Director and secretary);
E;
FTE;
jects: 1 FTE;
s: 9 FTE.
Figure 11
i i i i i i l by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's i i
ty
EHS andQuality
CorporateService
Manager
Quality Environment Health & Safety
Linefunctions
Staff andprojects
Linefunctions
1+1
4 4 1
1 9
T
gn project
Page 32 of 42
sis of the following
20%;
ffice: 20%;
%;
s and projects: 1
Quality function is
s as illustrated in
i i prior written consent8
t. FTE:
21
-
7/24/2019 Organization Sizing Detail
33/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 33 of 42
11.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
EHS and Quality Director 1
EHS and Quality Directors Secretary 1
Quality Manager 1
Quality Analyst 3
Environment Manager 1
Environmentalist 1
Economist 1
Administrative Officer 1
Health & Safety Manager 1
Staff & Projects Supervisor (Health and Safety) 3
Line Functions Supervisor (Health and Safety) 7
-
7/24/2019 Organization Sizing Detail
34/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 34 of 42
12. PROPERTY & GENERAL SERVICES
12.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Secretary for the director of the function: 1;
Secretary for each manager with responsibility on more than 100
employees: 1;
Average % of General Activities FTE on total FTE: 0.6%;
Average % of Facility Management FTE on staff FTE: 1.7%;
Average nr. of Fleet Management FTE per $B1 revenues: 140;
Average % of Asset Management FTE on staff FTE: 0.3%;
Average nr. of Asset Management FTE per $B1 revenues: 140;
Average % of Security Management FTE on total FTE: 5%.
12.2 Sizing
The property & General Services function has been estimated to require 825
resources, distributed among function offices in the following way (Figure 12):
Property & General Services: 2 FTE (Director and secretary);
General activities: 60 FTE;
Facility Management: 30 FTE (1 Manager, 29 officers);
Fleet Management: 113 FTE (1 Manager, 1 Secretary, 111 employees);
Property Management: 2 FTE (Director and secretary);
Asset Management: 5 FTE;
Asset Maintenance: 112 FTE;
Security Management: 501 FTE (1 Manager, 1 secretary, 499
employees).
-
7/24/2019 Organization Sizing Detail
35/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 35 of 42
Figure 12
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent9
Property & General ServicesOverview
Property &GeneralServices
Corporate
ServiceManager
Generalactivities
FacilityManagement
FleetManagement
Assetmaintenance
Propertymanagement
Assetmanagement
SecurityManagement
1+1
60 30 1+
112
1+
1
1+
500
5 112
Tot. FTE:
825
-
7/24/2019 Organization Sizing Detail
36/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 36 of 42
12.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
Property and general services director 1
Secretary 1
General activities manager 1
Mail service officer 5
Mail clerk 30
Archive officer 5
Archivist 19
Facility manager 1
Facility site officer 15
Facility site operator 14
Property manager 1
Secretary 1
Asset management supervisor 1
Technical asset officer 2
Civil asset officer 2
Asset maintenance supervisor 1
Asset maintenance officer 11
Asset maintenance operator 100
Fleet manager 1
Secretary 1
Fleet administration officer 5
Fleet administration clerk 16
Automotive superintendent 15
Automotive inspector 75
Security manager 1
Secretary 1
Security officer 10
Security guards 466
Administrative officer 16
Economist 2
Risk analyst 4
Geologist 1
-
7/24/2019 Organization Sizing Detail
37/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 37 of 42
13. ENERGY MANAGEMENT
13.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions:
Nr. of director of the function: 1;
Secretary for the director of the function: 1;
Nr. of manager for each 3rd-level office: 1;
Expected annual production (GWh): 29.000;
Number of ICS fuel based plant: 5;
Number of SCS fuel based plant: 10;
Contract FTE per contract type (i.e. energy purchase, energy sale, fuel
purchase): 2;
Energy produced (GWh) per Energy Portfolio FTE: 1.841;
Fuel Logistic FTE per ICS fuel based plant: 1;
Fuel Warehouse FTE per ICS and SCS fuel based plant: 1;
Contract administration FTE per contract type (i.e. energy purchase,
energy sale, fuel purchase): 1.
13.2
SizingOn the basis of the described assumptions, the Energy Management function is
composed of 42 resources, distributed among the offices as illustrated in
Figure 13:
Chief of Energy Management: 2 FTE (Director and secretary);
Energy and Fuel Contracts Director: 9 FTE;
Energy Portfolio & Logistics Director: 2 FTE;
Energy Portfolio Manager: 16 FTE;
Fuel Logistics & Warehousing Manager: 15 FTE;
Fuel Warehouse Supervisor: 5 FTE; Administrative Support Manager: 3 FTE.
-
7/24/2019 Organization Sizing Detail
38/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 38 of 42
Figure 10
This information is confidential and was prepared by Bain & Company solely for the use of our client; i t is not to b e relied on by any 3rd party without Bain's prior written consent15
Energy ManagementOverview
Energy and fuelcontracts
Administrativesupport
En. Portfolio &Logistics
Fuel logistics &Warehousing
EnergyManagement
CEO
Warehouse
PortfolioManagement
1+1
6+3 1+1
516
15
3
Tot. FTE:
52
-
7/24/2019 Organization Sizing Detail
39/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 39 of 42
13.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
Chief of Energy Management 1
Secretary of Chief of Energy Management 1
Energy and Fuel Contracts Director 1
Secretary of Energy and Fuel Contracts Director 1
Energy and Fuel contract managers 7
Energy Portfolio & Logistics Director 1
Secretary of Energy Portfolio & Logistics Director 1
Energy Portfolio Manager 1
Senior portfolio management Engineer 15
Fuel Logistics & Warehousing Manager 5
Fuel Warehouse Supervisor (ICS & SCS) 15
Administrative Support Manager 3
-
7/24/2019 Organization Sizing Detail
40/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 40 of 42
14. GENERATION
14.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Number of plant: 36;
Number of Regional Unit: 15;
Expected annual production (GWh): 29.000;
Total installed capacity (MW): 7.860;
Nr. of director of the function: 1;
Nr. of manager for each 3rd-level office: 1;
Secretary for the director of the function: 1;
Average logistic FTEs as a % of generation FTEs: 2,35%;
Installed capacity (MW) per generation engineering FTE: 260; Plant director FTE per plant: 2;
Energy produced (GWh) per plant Operation Control & Planning FTE:
185;
Energy produced (GWh) per plant operations FTE: 28;
Warehouse FTE per Plant: 1,5;
Plant Maintenance and Works Manager per plant: 1;
Installed capacity (MW) per plant Electrical Works FTE: 44;
Installed capacity (MW) per plant Mechanical Works FTE: 36;
Installed capacity (MW) per plant Construction Works FTE: 56.
-
7/24/2019 Organization Sizing Detail
41/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 41 of 42
14.2 Sizing
The previous assumptions lead to an estimated need of 1.544 FTE for the
Generation function, employed in (Figure 14):
Chief of Generation Operations (Chief and secretary): 2 FTE; Generation Logistics & Warehousing Manager: 36 FTE;
Generation Technical Area & Engineering Director: 30 FTE;
Plant Director: 72 FTE;
Plant Operation Control & Planning Manager: 102 FTE;
Plant Operations Manager: 675 FTE;
Plant Warehouse Supervisor: 54 FTE;
Plant Maintenance and Works Manager: 36 FTE;
Plant Electrical Works Supervisor: 179 FTE;
Plant Mechanical Works Supervisor: 218 FTE;
Plant Construction Works Supervisor: 140 FTE.
Figure 11
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent5
GenerationOverview
PlantPlant
Generationoperations
CEO
Technical Area &Engineering
OperationsMaintenance and
works
Op. Control &Planning
Logistics &Warehousing
Warehouse
Electrical worksMechanical
worksConstruction
works
1+1
Tot. FTE:
1.544
3036
36+36
102
179 140218
3654675
-
7/24/2019 Organization Sizing Detail
42/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 42 of 42
14.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
Chief of Generation Operations 1
Secretary 1
Generation Logistics & Warehousing Manager 1
Logistics officer 35
Generation Technical Area & Engineering Director 1
Generation Operations Electrical Engineer 8
Generation Operations Environmental Engineer 2
Generation Operations Electro-Mechanical Engineer 9
Generation Operations Civil Engineer 8
Generation Operations Geologist 2
Plant Director 36
Secretary 36
Plant Operation Control & Planning Manager 36
Senior Plant Operation Control & Planning Engineer 18
Plant Operation Control & Planning Engineer 48
Plant Operations Manager 36
Senior Plant Operation Engineer 180
Plant Operation Engineer 459
Plant Warehouse Supervisor 1
Warehouse officer 36
Incoming material officer 11
Material return administrator 6
Plant Maintenance and Works Manager 36
Plant Electrical Works Supervisor 36
Senior Generation Electrical Maintenance Operator 36Generation Electrical Maintenance Operator 107
Plant Mechanical Works Supervisor 36
Senior Generation Mechanical Maintenance Operator 36
Generation Mechanical Maintenance Operator 146
Plant Construction Works Supervisor 36
Senior Generation Constructions Maintenance Operator 36
Generation Constructions Maintenance Operator 68
-
7/24/2019 Organization Sizing Detail
43/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 43 of 42
15. TRANSMISSION
15.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions:
Number of Regional Unit: 15;
Average new transmission network per year: 773;
Number of Transmission substations: 128;
Total Transmission Network length (Km): 15.236;
Point of Distribution (Transmission): 1.000;
Expected annual production (GWh): 29.000;
Nr. of director of the function: 1;
Nr. of manager for each 3rd-level office: 1; Secretary for the director of the function: 1;
Annual dispatched energy (GWh) per dispatching FTE: 1.074;
Average logistic FTEs as a % of transmission FTEs: 4,0%;
Network km per Maintenance & Conduction Engineers: 900;
Network km per Technical Meter Engineers: 300;
New network km per Project Engineers: 25;
Network km per Control room FTE: 500;
Network and Substations Manager per Regional Unit: 1;
Network km per Network and Substations Engineers: 300;
Number of operators per substation: 4;
Network km per Emergency & Maintenance FTE: 100;
Warehouse FTE per Regional Unit: 3;
Transmission Meter Manager per Regional Unit: 1;
Control operators per Regional Unit: 0,25;
Number of metering operations FTE per Regional Unit: 3;
Number of readers per Regional Unit: 2.
-
7/24/2019 Organization Sizing Detail
44/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 44 of 42
15.2 Sizing
The previous assumptions lead to an estimated need of 1.095 FTE for the
Transmission function, employed in (Figure 15):
Chief of Transmission Operations (Chief and secretary): 2 FTE;
Dispatching Director: 27 FTE;
Transmission Logistics & Warehousing Manager: 36 FTE;
Transmission Technical Area & Engineering Director (Director and
secretary): 2 FTE;
Transmission Maintenance & Conduction Manager: 17 FTE;
Transmission Technical Meter Manager: 51 FTE;
Transmission Engineering Manager: 31 FTE;
Transmission Control Room and Technical Call Center Manager: 30 FTE;
Transmission Regional Unit Director (Director and secretary): 30 FTE;
Transmission Network and Substations Manager: 15 FTE;
Transmission Network and Substations Engineering Supervisor: 51 FTE;
Transmission Substations Supervisor: 512 FTE;
Transmission Emergency & Maintenance Supervisor: 152 FTE;
Transmission Warehouse Supervisor: 45 FTE;
Transmission Meter Manager: 15 FTE;
Transmission Control Supervisor: 4 FTE;
Transmission Operations Supervisor: 45 FTE;
Transmission Reading Supervisor: 30 FTE.
-
7/24/2019 Organization Sizing Detail
45/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 45 of 42
Figure 12
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent11
Substations
TransmissionOverview
Tot. FTE:
1.095
Transmissionoperations
CEO
Technical Area& Engineering
Regional unitdirection
Maintenance& conduction
Metermanagement
EngineeringControl room
and callcenter
Metermanagement
EngineeringEmergency &Maintenance
Control Operations Reading
Network andsubstations
Dispatching
Logistics &Warehousing
WarehouseWarehouse
1+1
27
36
1+1
17 51 31 30
15+15
15
51 512 152
45
15
4 45 30
-
7/24/2019 Organization Sizing Detail
46/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 46 of 42
15.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO and
Ethiopian context peculiarities.
ROLE # FTE
Chief of Transmission Operations 1
Secretary 1
Dispatching Director 1
Senior Transmission Dispatching Engineer 5
Transmission Dispatching Engineer 21
Transmission Logistics & Warehousing Manager 1Logistics officer 35
Transmission Regional Unit Director 15
Secretary 15
Transmission Technical Area & Engineering Director 1
Secretary 1
Transmission Maintenance & Conduction Manager 1
Senior Transmission Maintenance & Conduction Engineer 4
Transmission Maintenance & Conduction Engineer 12
Transmission Technical Meter Manager 1Senior Transmission Meter Management Engineer 10
Transmission Meter Management Engineer 40
Transmission Engineering Manager 1
Transmission Operations Electrical Engineer 9
Transmission Operations Environmental Engineer 2
Transmission Operations Electro-Mechanical Engineer 9
Transmission Operations Civil Engineer 8
Transmission Operations Geologist 2
Trans. Control Room and Technical Call Center Manager 1Senior Control Room and Call Center Operator 5
Control Room and Call Center Operator 24
Transmission Network and Substations Manager 15
Trans. Network and Substations Engineering Supervisor 15
Transmission Network & Substation Civil Engineer 21
Transmission Network & Substation Electrical Engineer 15
Transmission Substations Supervisor 15
Senior Transmission Substation Electrical Engineer 125
Transmission Substation Electrical Engineer 372Transmission Emergency & Maintenance Supervisor 15
Senior Trans. Emergency & Maintenance Electrical Engineer 34
-
7/24/2019 Organization Sizing Detail
47/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 47 of 42
Transmission Emergency & Maintenance Electrical Engineer 103
Transmission Warehouse Supervisor 1
Warehouse officer 29
Incoming material officer 9
Material return administrator 6Transmission Meter Manager 15
Transmission Control Supervisor 1
Transmission Meter Managment Control Senior Expert 3
Transmission Operations Supervisor 15
Senior Transmission Operation Electrical Engineer 5
Transmission Operation Electrical Engineer 25
Transmission Reading Supervisor 15
Senior Transmission Meter Reading Expert 3
Transmission Meter Reading Expert 12
-
7/24/2019 Organization Sizing Detail
48/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 48 of 42
16. DISTRIBUTION
16.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Number of Regional Unit: 15;
Average new connection per year: 420.000;
Average new distribution network per year: 31.200;
Total Distribution Network length (Km): 282.000;
Point of Distribution (Distribution): 4.000.000;
Number of Medium Voltage substations (estimate): 600;
Nr. of director of the function: 1;
Nr. of manager for each 3rd-level office: 1;
Secretary for the director of the function: 1; Average logistic FTEs as a % of distribution FTEs: 2,0%;
Network km per Maintenance & Conduction Engineers: 10.000;
Network km per Technical Meter Engineers: 7.000;
New network km per Project Engineers: 600;
Network km per Control room FTE: 10.000;
Network and Substations Manager per Regional Unit: 1;
Network km per Network and Substations Engineers: 6.000;
Number of operators per substation: 1,15;
Medium voltage network km per Emergency & Maintenance FTE: 360;
Low voltage network km per Emergency & Maintenance FTE: 330;
Warehouse FTE per Regional Unit: 3;
Distribution Meter Manager per Regional Unit: 1;
Control operators per Regional Unit: 2;
Number of metering operations FTE per new connections per year: 700;
Meter reading per FTE per month: 1750;
Meter reading frequency (months): 3.
-
7/24/2019 Organization Sizing Detail
49/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 49 of 42
16.2 Sizing
The previous assumptions lead to an estimated need of 3.318 FTE for the
Distribution function, employed in (Figure 16):
Chief of Distribution Operations (Chief and secretary): 2 FTE;
Distribution Logistics & Warehousing Manager: 75 FTE;
Distribution Technical Area & Engineering Director (Director and
secretary): 2 FTE;
Distribution Maintenance & Conduction Manager: 28 FTE;
Distribution Technical Meter Manager: 40 FTE;
Distribution Engineering Manager: 36 FTE;
Distribution Control Room and Technical Call Center Manager: 28 FTE;
Distribution Regional Unit Director (Director and secretary): 30 FTE;
Distribution Network and Substations Manager: 15 FTE;
Distribution Network and Substations Engineering Supervisor: 70 FTE;
Distribution Substations Supervisor: 690 FTE;
Distribution Emergency & Maintenance Supervisor (MV): 46 FTE;
Distribution Emergency & Maintenance Supervisor (LV): 804 FTE;
Distribution Warehouse Supervisor: 45 FTE;
Distribution Meter Manager: 15 FTE;
Distribution Control Supervisor: 30 FTE;
Distribution Operations Supervisor: 600 FTE;
Distribution Reading Supervisor: 762 FTE.
-
7/24/2019 Organization Sizing Detail
50/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 50 of 42
Figure 13
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent7
DistributionOverview
Distributionoperations
CEO
Technical Area &Engineering
Regional unitdirection
Maintenance &conduction
Metermanagement
EngineeringControl room
and call center
Metermanagement
Network andsubstations
Engineering SubstationsEmergency &
Maintenance (MV)Emergency &
Maintenance (LV)Control Operations Reading
Logistics &Warehousing
Warehouse
1+1
15+15
1515
70 690 46 804 45 30 600 762
75 1+1
28 40 36 28
Tot. FTE:
3.318
-
7/24/2019 Organization Sizing Detail
51/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 51 of 42
16.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO and
Ethiopian context peculiarities.
ROLE # FTE
Chief of Distribution Operations 1
Secretary 1
Distribution Logistics & Warehousing Manager 1
Logistics officer 74
Distribution Technical Area & Engineering Director 1
Secretary 1Distribution Maintenance & Conduction Manager 1
Electrical Engineer Senior 3
Electrical Engineer Junior 5
Civil Engineer Senior 3
Civil Engineer Junior 5
Mechanical Engineer Senior 3
Mechanical Engineer Junior 5
Analyst 3
Distribution Technical Meter Manager 1Technical engineer 8
Electrician 19
Sr. Technical Engineer 12
Distribution Engineering Manager 36
Distr. Control Room and Technical Call Center Manager 1
Technical engineer 6
Electrician 13
Sr. Technical Engineer 8
Distribution Regional Unit Director 15Secretary 15
Distribution Network and Substations Manager 15
Distr. Network and Substations Engineering Supervisor 70
Distribution Substations Supervisor 60
Distribution Substations Electrical Engineer 100
Distribution Substations Electrician 370
Distribution Substations Mechanical Engineer 80
Distribution Substations Civil Engineer 80
Distribution Emergency & Maintenance Supervisor (MV) 5Distribution Substations Electrical Engineer 10
Distribution Substations Electrician 15
-
7/24/2019 Organization Sizing Detail
52/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 52 of 42
Distribution Substations Mechanical Engineer 8
Distribution Substations Civil Engineer 8
Distribution Emergency & Maintenance Supervisor (LV) 90
Distribution Substations Electrical Engineer 120
Distribution Substations Electrician 390Distribution Substations Mechanical Engineer 102
Distribution Substations Civil Engineer 102
Distribution Warehouse Supervisor 1
Warehouse officer 29
Incoming material officer 9
Material return administrator 6
Distribution Meter Manager 15
Distribution Control Supervisor 15
Meter Management Control Analyst 15Distribution Operations Supervisor 15
Meter Management Operations Electrical Engineer 60
Meter Management Operations Electrician 375
Meter Management Operations Sr. Civil Engineer 15
Meter Management Operations Jr. Civil Engineer 60
Meter Management Operations Sr. Mechanical Engineer 15
Meter Management Operations Jr. Mechanical Engineer 60
Distribution Reading Supervisor 15
Meter Management Reading Sr. reader 180
Meter Management Reading Jr. reader 567
-
7/24/2019 Organization Sizing Detail
53/66
-
7/24/2019 Organization Sizing Detail
54/66
Ethiopian Electric Power
Organization Sizing
This information is confidential and was prepared by i l l l i i i l i
SupplyOverview
Marketing &Reporting
Operativemarketing
Strategicmarketing
Cal
3
Corporation business processes and organization desi
Figure 17
i i i i i i l Bain & Company solel y f or the use o f our cl ient; it i s not to be rel ied on by any 3 rd pa rty wi thout i ' i i
Supply
Direction
CEO
Operati
BillingOperating
reporting andplanning
Back Office
Central mgmtof key
accountsl center
Regional unit
direction
District Office
Regionalmgmt of key
accounts
Mass market
1+1
1+1
5 1+
159
1+
275
26 1+1
34
1+1
15+15
1310
gn project
Page 54 of 42
i Bain's prior written consent12
ns
Creditanagement
Tot. FTE:
1.899
1+1
41
-
7/24/2019 Organization Sizing Detail
55/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 55 of 42
17.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.
ROLE # FTE
Chief of supply 1
Secretary 1
Marketing and reporting director 1
Secretary 1
Strategic marketing manager 1
Senior expert strategic marketing 1
Strategic marketing analyst 1
Operating reporting and planning manager 1
Senior sales and planning analyst 1
Sales planning analyst 3
Operative marketing manager 1
Product portfolio analyst 2
Customer data analyst 1
Communication officer 1
Supply operations director 1
Secretary 1
Billing manager 1
Senior billing operator 15
Billing operator 35
Billing assistant accountant 109
Credit manager 1
Credit management senior financial officer 7
Credit management financial officer 33
Back office supervisor 1
Secretary 1Back office analyst 2
Back office representative 272
Call center supervisor 1
Call center operator 25
Key account director 1
Secretary 1
Regional key account manager 34
Director of mass market 1
Secretary 1Regional unit manager 15
Secretary 15
-
7/24/2019 Organization Sizing Detail
56/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 56 of 42
District office supervisor 300
Customer service representative 1010
-
7/24/2019 Organization Sizing Detail
57/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 57 of 42
18. UEAP
18.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions:
Nr. of director of the function: 1;
Nr. of manager for each 3rd-level office: 1;
Secretary for the director of the function: 1;
New distribution network per year managed by UEAP (estimate): 9.360;
Average Planning FTEs as a % of total FTEs: 0,04;
New network km per Project Engineers: 500;
New network km per Logistics & Warehouse: 200;
New network km per Project Manager: 150;
18.2 Sizing
The previous assumptions lead to an estimated need of 135 FTE for the UEAP
function, employed in (Figure 18):
Chief of Universal Electric Access Program (Chief and secretary):: 2 FTE;
UEAP Planning Manager: 5 FTE;
Engineering Manager: 19 FTE;
UEAP Logistics & Warehousing Manager: 47 FTE; Government Financed Projects Manager: 31 FTE;
International Financed Projects Manager: 31 FTE.
-
7/24/2019 Organization Sizing Detail
58/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 58 of 42
Figure 18
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent9
UEAPOverview
Engineering
UEAP
CEO
Planning
Intern. financedprojects
Gov. financedprojects
Logistics &Warehousing
1+1
47
5
19
3131
Tot. FTE:
135
-
7/24/2019 Organization Sizing Detail
59/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 59 of 42
18.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO and
Ethiopian context peculiarities.
ROLE # FTE
Chief of Universal Electric Access Program 1
Secretary 1
Logistics & Warehousing 1
UEAP Warehouse supervisor 10UEAP Logistics officer 36
Planning Manager (UEAP) 1
Planning Officer 4
Engineering Manager (UEAP) 1
UEAP Division Electrical Engineer 9
UEAP Division Electro-Mechanical Engineer 5
UEAP Division Civil Engineer 3
UEAP Division Environmental Engineer 1
Government Financed Projects Manager 1UEAP Government Projects Senior Electrical Engineer 18
UEAP Government Projects Senior Civil Engineer 7
UEAP Govt. Projects Senior Electro-Mechanical Engineer 5
International Financed Projects Manager 1
UEAP Int'l Financed Projects Senior Electrical Engineer 18
UEAP Int'l Financed Projects Senior Civil Engineer 7
UEAP Int'l Financed Projects Sr. Electro-Mechanical Engineer 5
-
7/24/2019 Organization Sizing Detail
60/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 60 of 42
19. CONSTRUCTIONS
19.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Nr. of chief of the function: 1;
Nr. of directors for each 3rd-level office: 1;
Secretary for the chief of the function: 1;
Secretary for each 3rd-level director: 1;
New transmission line Km per year: 773;
Average Km managed by each Transmission & Substation FTE: 12;
New distribution line Km per year: 31.200;
Average Km managed by each Distribution Constructions FTE: 666;
Average % of Transmission & Substations FTE employed in Civil work:55%;
Average % of Distribution FTE employed in Civil work: 20%.
19.2 Sizing
The previous assumptions lead to an estimated need of 113 FTE for the
Constructions function, employed in (Figure 19):
Chief of Constructions: 2 FTE (Chief and secretary);
Transmission & Substations Constructions Director: 2 FTE (Chief andsecretary);
Civil Constructions Manager (Transmission & Substations): 34 FTE;
Electro-Mechanical Constructions Manager (Transmission & Substations):
28 FTE;
Distribution Constructions Director: 2 FTE (Chief and secretary);
Civil Constructions Manager (Distribution): 9 FTE;
Electro-Mechanical Constructions Manager (Distribution): 36 FTE.
-
7/24/2019 Organization Sizing Detail
61/66
Ethiopian Electric Power
Organization Sizing
This information is confidential and was prepared i l l li i i li
ConstructionsOverview
Transmission& Substations
1+73
Corporation business processes and organization desi
Figure 19
i i i i i i l by Bain & Company solely for the use o f our c lient; i t is not to be rel ied on by any 3rd party without Bain' i i
CEO
Constructions
Distribution
1+1
1+36
gn project
Page 61 of 42
i i prior written consent110
-
7/24/2019 Organization Sizing Detail
62/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 62 of 42
19.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO and
Ethiopian context peculiarities.
ROLE # FTE
Chief of Constructions 1
Secretary 1
Transmission & Substations Constructions Director 1
Secretary 1
Trans. & Subs. Constructions Electro-Mechanical Engineer 13
Trans. & Subs. Constructions Civil Engineer 13Trans. & Subs. Constructions Electro-Mechanical Technician 40
Trans. & Subs. Civil Constructions Worker 6
Distribution Constructions Director 1
Secretary 1
Distribution Constructions Electro-Mechanical Engineer 8
Distribution Constructions Civil Engineer 3
Distribution Constructions Electro-Mechanical Technician 20
Distribution Civil Constructions Worker 4
-
7/24/2019 Organization Sizing Detail
63/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 63 of 42
20. Equipment Production
20.1 Main drivers and assumptions
The sizing for the function has been estimated on the basis of the following
assumptions: Nr. of chief of the function: 1;
Secretary for the chief of the function: 1;
New distribution network km per year: 31.200;
Average new network km managed per Equipment Production FTE: 110;
Average Customer Management FTEs as a % of Production FTEs: 20%;
Average Equipment Production Logistics & Warehousing FTEs as a % of
Production FTEs: 7%;
Average Product Development FTEs as a % of Production FTEs: 14%;
Average Production & Planning FTEs as a % of Production FTEs: 58%.
20.2 Sizing
The previous assumptions lead to an estimated need of 284 FTE for the
Equipment Production function, employed in (Figure 20):
Chief of Equipment Production: 2 FTE (Chief and secretary);
Equipment Production Customer Manager: 57 FTE;
Logistics & Warehousing Manager: 20 FTE;
Product Development Manager: 40 FTE; Production & Planning Manager: 165 FTE.
-
7/24/2019 Organization Sizing Detail
64/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 64 of 42
Figure 20
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent20
Equipment ProductionOverview
Equipmentproduction
CEO
Productdevelopment
Logistics andwarehousing
Productionand planning
Customermanagement
Tot. FTE:
284
20
165
2
57
40
-
7/24/2019 Organization Sizing Detail
65/66
Ethiopian Electric Power Corporation business processes and organization design project
Organization Sizing Page 65 of 42
20.3 Lower levels sizing
The following table presents the estimated sizing to be adopted for lower levels
of the organization. The estimation has been performed on the basis of
international best practices and benchmark and of Bain experience with
utilities sector companies. Proposed sizing takes into account EEPCO and
Ethiopian context peculiarities.
ROLE # FTE
Chief of Equipment Production 1
Secretary 1
Equipment Production Customer Management Director 1
Equipment Production Senior Customer Manager 15
Equipment Production Customer Manager 41
Logistics & Warehousing Manager 20Product Development Director 1
Senior Product Development Electrical Engineer 3
Product Development Electrical Engineer 12
Senior Product Development Mechanical Engineer 3
Product Development Mechanical Engineer 11
Senior Product Development Civil Engineer 2
Product Development Civil Engineer 8
Production & Planning Director 1
Secretary 1Senior Production Planner 5
Production Planner 10
Production Engineer 15
Production Worker 98
Maintenance Planner 5
Maintenance Worker 30
-
7/24/2019 Organization Sizing Detail
66/66
Ethiopian Electric Power Corporation business processes and organization design project
21. ORGANIZATION OVERVIEW
21.1 Sizing
EEPU organization has been estimated to require 10.175 resources, distributed
in the following way (Figure 21):
CEO: 2 FTE;
Engineering: 57 FTE;
Strategy & Investments: 17 FTE;
External Relations: 26 FTE;
Legal: 30 FTE;
CFO: 2 FTE;
Administration, Finance & Control: 274 FTE;
Procurement, Logistics & Warehousing: 152 FTE; Tariffs & EEA Relations: 10 FTE;
Corporate Service Manager: 2 FTE;
ICT: 181 FTE;
HR: 141 FTE;
EHS & Quality: 21 FTE;
Property & General Services: 825 FTE;
Energy Management: 52 FTE;
Generation Operations: 1.544 FTE;
Transmission Operations: 1.095 FTE; Distribution Operations: 3.318 FTE;
Supply: 1.900 FTE;
UEAP: 135 FTE;
Constructions: 113 FTE;
Equipment Production: 284 FTE.