organization sizing detail

Upload: wescribd

Post on 22-Feb-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/24/2019 Organization Sizing Detail

    1/66

    Ethiopian E

    Tran

    Electric

    Processes

    Organization si

    Addis Ababa,

    ectric Power Corp

    formation Program

    ower Utility Busin

    and Organization D

    zing

    ay 24th2011

    ration

    ss

    esign

  • 7/24/2019 Organization Sizing Detail

    2/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 2 of 42

    Contents

    INTRODUCTION

    1. TOP MANAGEMENT

    1.1 Main drivers and assumptions

    1.2 Sizing

    2. ENGINEERING

    2.1 Main drivers and assumptions

    2.2 Sizing

    2.3 Lower levels sizing

    3. STRATEGY AND INVESTMENTS

    3.1 Main drivers and assumptions

    3.2 Sizing

    3.3 Lower levels sizing

    4. EXTERNAL RELATIONS

    4.1 Main drivers and assumptions

    4.2 Sizing

    4.3 Lower levels sizing

    5. LEGAL

    5.1 Main drivers and assumptions

    5.2 Sizing

    5.3 Lower levels sizing

    6. ADMINISTRATION, FINANCE & CONTROL

    6.1 Main drivers and assumptions

    6.2 Sizing

    6.3 Lower levels sizing

  • 7/24/2019 Organization Sizing Detail

    3/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 3 of 42

    7. PROCUREMENT, LOGISTICS & WAREHOUSING

    7.1 Main drivers and assumptions

    7.2 Sizing

    7.3 Lower levels sizing

    8. TARIFFS & EEA RELATIONS

    8.1 Main drivers and assumptions

    8.2 Sizing

    8.3 Lower levels sizing

    9. ICT

    9.1 Main drivers and assumptions

    9.2 Sizing

    9.3 Lower levels sizing

    10. HR

    10.1 Main drivers and assumptions

    10.2 Sizing

    10.3 Lower levels sizing

    11. EHS & QUALITY

    11.1 Main drivers and assumptions

    11.2 Sizing

    11.3 Lower levels sizing

    12. PROPERTY & GENERAL SERVICES

    12.1 Main drivers and assumptions

    12.2 Sizing

    12.3 Lower levels sizing

    13. ENERGY MANAGEMENT

  • 7/24/2019 Organization Sizing Detail

    4/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 4 of 42

    13.1 Main drivers and assumptions

    13.2 Sizing

    13.3 Lower levels sizing

    14. GENERATION

    14.1 Main drivers and assumptions

    14.2 Sizing

    14.3 Lower levels sizing

    15. TRANSMISSION

    15.1 Main drivers and assumptions

    15.2 Sizing

    15.3 Lower levels sizing

    16. DISTRIBUTION

    16.1 Main drivers and assumptions

    16.2 Sizing

    16.3 Lower levels sizing

    17. SUPPLY

    17.1 Main drivers and assumptions

    17.2 Sizing

    17.3 Lower levels sizing

    18. UEAP

    18.1 Main drivers and assumptions

    18.2 Sizing

    18.3 Lower levels sizing

    19. CONSTRUCTIONS

    19.1 Main drivers and assumptions

  • 7/24/2019 Organization Sizing Detail

    5/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 5 of 42

    19.2 Sizing

    19.3 Lower levels sizing

    20. EQUIPMENT PRODUCTION

    20.1 Main drivers and assumptions

    20.2 Sizing

    20.3 Lower levels sizing

    21. ORGANIZATION OVERVIEW

    21.1 Sizing

  • 7/24/2019 Organization Sizing Detail

    6/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 6 of 42

    IntroductionIn order to create a world class electric utility company, the organizational

    structure for the new EEPU has been developed on the basis of international best

    practices.

    The present document is aimed at defining the sizing of EEPU organization to allow

    the implementation of the new structure by the new management.

    The estimation of the organization sizing has required the definition of main general

    drivers for the new company, like:

    growth of the electricity consumption from 3.3 TWh (2009/2010A) to18.9 TWh

    (2014/2015E);

    increase in installed capacity from 2.0 GW (2010-17 plants) to 7.86 GW (2015-36 plants);

    increase in the transmission network from 11,369 Km (2010A) to 15,326 Km

    (2015E);

    increase in the distribution network from 126,000 Km (2009/2010A) to

    282,000 Km (2014/2015E);

    increase in the nr. of customers from M 1.9 to M 4.0;

    growth of total revenue to $M 800;

    On the basis of the above mentioned drivers, main assumptions have beendeveloped and applied to EEPU organization to estimate the dimension of each

    function of the new structure.

    These assumptions have been defined on the basis of Bain expertise in organization

    design projects and referring to international benchmarks for electric utilities

    companies, mainly from:

    APQC Open Standards Benchmark;

    Market data.

    Assumptions are directly related to international benchmarks and best practices.

    APQC Benchmarks have been analyzed and adapted on the basis of data taken from

    other comparable Electric Utility organizations analyzed in B&C previous projects1. In

    this way we managed to take the most of APQC standards and B&C experience in

    Best in Class corporations.

    &

  • 7/24/2019 Organization Sizing Detail

    7/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 7 of 42

    Changes on organization sizing could occur as a consequence of a change in the

    company general drivers (e.g. electricity consumption growth, increase in

    transmission network, etc) and will be performed following the assumptions

    defined for each function. As an example: following an increase of 5 in the # of

    generation plants (driver) the # of Maintenance and Works managers will increase of5 units following the assumption Plant Maintenance and Works Manager per plant:

    1.

    The following sections are dedicated to EEPU organizational functions, describing

    main drivers and assumptions employed and the estimated size of the division.

    Since, as requested from TPO management, the organizational sizing has been

    estimated on the basis of international benchmarks without considering the as-is

    organization, it could be necessary to adjust the provided values to consider

    Ethiopian regulations and eventual current constraints. As a general assumption thesizing model requires a proper implementation of the proper IT systems and the

    right mix of managerial capabilities and professional skills

  • 7/24/2019 Organization Sizing Detail

    8/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 8 of 42

    1. TOP MANAGEMENT

    1.1 Main drivers and assumptions

    The sizing for the top management has been estimated on the basis of the

    following assumptions: Nr. of chiefs for each top position: 1;

    Secretary for each chief: 1.

    1.2 Sizing

    The top management is composed of 6 resources, distributed as shown in the

    Figure 1:

    CEO: 2 FTE (Chief and secretary);

    CFO: 2 FTE (Chief and secretary);

    CSM: 2 FTE (Chief and secretary).

    Figure 1

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent1

    Top ManagementOverview

    CEO

    CFOCorporate Service

    Manager

    1+1

    1+1 1+1

    Tot. FTE:

    6

  • 7/24/2019 Organization Sizing Detail

    9/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 9 of 42

    2. ENGINEERING

    2.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Secretary for the director of the function: 1;

    Average % of function FTE on total FTE: 0.6%;

    Equal distribution of resources among Generation, Transmission and

    Distribution projects.

    2.2 Sizing

    On the basis of the described references and assumptions, the sizing for the

    Engineering division has been estimated in 57 resources, distributed in the

    following way (Figure 2): Engineering: 2 FTE (Director and secretary);

    Generation: 19 FTE;

    Transmission: 18 FTE;

    Distribution: 18 FTE.

    Figure 2

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent2

    EngineeringOverview

    Engineering

    CEO

    Generation Transm.

    ProjectMgmtOffice

    ProjectMgmtOffice

    Distrib.

    ProjectMgmtOffice

    1+1

    19 18 18

    Tot. FTE:

    57

  • 7/24/2019 Organization Sizing Detail

    10/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 10 of 42

    2.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    Engineering Director 1

    Secretary 1

    Engineering Generation Manager 1

    Generation Electrical Engineer 7

    Generation Environmental Engineer 1

    Generation Civil Engineer 5

    Generation Electro-Mechanical Engineer 2

    Generation Geologist 3

    Engineering Transmission Manager 1

    Transmission Electrical Engineer 7

    Transmission Environmental Engineer 1

    Transmission Civil Engineer 4

    Transmission Electro-Mechanical Engineer 2

    Transmission Geologist 3

    Engineering Distribution Manager 1

    Distribution Electrical Engineer 10

    Distribution Environmental Engineer 1

    Distribution Civil Engineer 4

    Distribution Electro-Mechanical Engineer 2

    PMO Manager *

    *PMO Managers sizing depends on the number of ongoing projects.

  • 7/24/2019 Organization Sizing Detail

    11/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 11 of 42

    3. STRATEGY AND INVESTMENTS

    3.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Secretary for the director of the function: 1;

    Average % of function FTE on total FTE: 0.2%.

    3.2 Sizing

    Using the above mentioned drivers, the requirement for the Strategy and

    Investments function has been estimated in 17 resources (Figure 3), employed

    in:

    Strategy and Investments: 2 FTE (Director and secretary);

    Business Divisions: 15 FTE.

    Figure 3

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent3

    Strategy and InvestmentsOverview

    Strategy andinvestments

    CEO

    BusinessDivisions

    1+1

    15

    Tot. FTE:

    17

  • 7/24/2019 Organization Sizing Detail

    12/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 12 of 42

    3.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    Strategy and investments director 1

    Secretary 1

    Strategy and investments energy management manager 1

    Strategy and investments Sr. business analyst (En. Man) 1

    Strategy and investments business analyst (En. Man) 1

    Strategy and investments energy generation manager 1

    Strategy and investments Sr. business analyst (Gen.) 2

    Strategy and investments business analyst (Gen.) 1

    Strategy and investments energy transmission manager 1

    Strategy and investments Sr. business analyst (Transm.) 2

    Strategy and investments business analyst (Transm.) 1

    Strategy and investments energy distribution manager 1

    Strategy and investments Sr. business analyst (Distr.) 2

    Strategy and investments business analyst (Distr.) 1

  • 7/24/2019 Organization Sizing Detail

    13/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 13 of 42

    4. EXTERNAL RELATIONS

    4.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Secretary for the director of the function: 1;

    Average % of function FTE on total FTE: 0.25%;

    Average nr. of function FTE per $B1 revenues: ~30;

    Average % of function FTE involved in Institutional Relations: 65%.

    4.2 Sizing

    On the basis of the described assumptions, the estimated size of the function

    External Relations is 26 resources (Figure 4), distributed in the following way:

    External Relations: 2 FTE (Director and secretary); Institutional Relations: 16 FTE;

    Public Relations: 8 FTE.

    Figura 4

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent4

    External RelationsOverview

    ExternalRelations

    CEO

    InstitutionalRelations

    Public Relations

    1+1

    16 8

    Tot. FTE:

    26

  • 7/24/2019 Organization Sizing Detail

    14/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 14 of 42

    4.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    External Relations Director 1

    External Relations Directors secretary 1

    Institutional Relations Manager 1

    Strategy and planning officer (sr.) 1

    Strategy and planning officer (analyst) 1

    Strategy and planning officer (jr.) 1

    Communication officer (superintendent) 1

    Communication officer (analyst) 4

    Communication officer (jr.) 1

    IR analyst (superintendent) 2

    IR analyst (analyst) 2

    IR analyst (jr.) 2

    Public Relations Manager 1

    Communication officer (senior) 2

    Communication officer (community specialist) 2

    Communication officer (media specialist) 2

    Event coordinator 1

  • 7/24/2019 Organization Sizing Detail

    15/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 15 of 42

    5. LEGAL

    5.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Secretary for the director of the function: 1;

    Average % of function FTE on total FTE: 0.3%;

    Average % of function FTE on staff FTE: 1.7% (to be comprised between

    0.9% and 5.8%);

    Average % of legal FTE involved in Staff & Projects offices: 35%.

    5.2 Sizing

    On the basis of the applied drivers and assumptions, the legal function is

    composed of 30 resources, distributed among the offices in the following way(Figure 5):

    Legal: 2 FTE (Director and secretary)

    Staff & Projects: 9 FTE;

    Business Divisions: 18 FTE.

    Figura 5

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent5

    Legal

    Overview

    Legal

    CEO

    Staff &

    projects

    Line

    functions

    Business

    Divisions

    1+1

    10 18

    Tot. FTE:

    30

  • 7/24/2019 Organization Sizing Detail

    16/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 16 of 42

    5.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    Legal Director 1

    Legal Directors secretary 1

    Staff & Projects Manager (Legal) 1

    Legal Clerk 2

    Staff & Projects Lawyer (sr.) 2

    Staff & Projects Lawyer (jr.) 5

    Business Divisions Manager (Legal) 7

    Business Division Lawyer 11

  • 7/24/2019 Organization Sizing Detail

    17/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 17 of 42

    6. ADMINISTRATION, FINANCE & CONTROL

    6.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Nr. of director of the function: 1;

    Nr. of manager for each 3rd-level office: 1;

    Secretary for the director of the function: 1;

    Average nr. of payroll FTE per 1,000 employees: 4.6;

    Average nr. of Finance & Treasury FTE per $B1 revenues: 32.5;

    Average nr. of Administration FTE per $B1 revenues: 193.8;

    Average % of Administration FTE involved in Staff & Projects offices:

    19%;

    Average nr. of Planning & Control FTE (director, staff & projects,business divisions) per $B1 revenues: 31.2;

    Average nr. of Project Control FTE per $B1 revenues: 7.5;

    Average nr. of Taxes FTE per $B1 revenues: 12,5;

    Average % of Administration, Finance & Control FTE on staff FTE: 16%;

    Nr. of manager for Credit Management function: 2.

    6.2 Sizing

    The previous assumptions lead to an estimated need of 274 FTE for the

    Administration, Finance & Control function, employed in (Figure 6):

    Admin. Finance & control: 2 FTE (Director and secretary);

    Finance, Treasury and Payroll: 1 FTE;

    Payroll: 47 FTE;

    Finance & Treasury: 26 FTE;

    Administration: 1 FTE;

    Administration Staff & Projects: 30 FTE;

    Administration Business Divisions: 124 FTE;

    Planning & Control: 1 FTE;

    Planning & Control Staff: 12 FTE;

    Planning & Control Business Divisions: 12 FTE;

    Project Control: 6 FTE;

    Taxes: 10 FTE;

    Credit Management: 2 FTE.

  • 7/24/2019 Organization Sizing Detail

    18/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 18 of 42

    Figure 6

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent6

    Administration, Finance and ControlOverview

    Admin. Finance& Control

    CFO

    Finance,Treasury &

    PayrollAdministration Planning &

    control

    Creditmanagement

    PayrollFinance &Treasury

    Staff &projects

    BusinessDivisions

    BusinessDivisions Staff

    BusinessDivisions

    BusinessDivisions

    Taxes

    Projectcontrol

    1+1

    1

    47 26

    1

    30 124

    1

    12 12 6

    10 2

    Tot. FTE:

    274

  • 7/24/2019 Organization Sizing Detail

    19/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 19 of 42

    6.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    Administration, Finance & Control Director 1

    Secretary 1

    Administration Manager 1

    Administration Staff & Projects Supervisor 1

    Administration Staff & Projects Senior Accounting Analyst 2

    Administration Staff & Projects Senior Financial Officer 4

    Administration Staff & Projects Financial Officer 15

    Administration Staff & Projects Administrative Clerk 8

    Administration Business Divisions Supervisor 7

    Administration Business Divisions Senior Accounting Analyst 7

    Administration Business Divisions Senior Financial Officer 7

    Administration Business Divisions Financial Officer 77

    Administration Business Divisions Administrative Clerk 26

    Finance, Treasury and Payroll Manager 1

    Payroll Supervisor 1

    Payroll Analyst 3

    Payroll Financial Officer 8

    Payroll Assistant Accountant 35

    Finance & Treasury Supervisor 1

    Finance & Treasury Analyst 3

    Finance & Treasury Senior Officer 5

    Finance & Treasury Officer 17

    Planning & Control Manager 1

    Planning & Control Staff Supervisor 1

    Planning & Control Staff Analyst 2Planning & Control Staff Senior Financial Officer 2

    Planning & Control Staff Financial Officer 7

    Planning & Control Business Divisions Supervisor 7

    Planning & Control Business Divisions Analyst 1

    Planning & Control Business Divisions Senior Financial Officer 1

    Planning & Control Business Divisions Financial Officer 3

    Project Control Supervisor 1

    Project Control Senior Project Accountant 1

    Project Control Project Accountant 4Taxes Manager 1

    Taxes Senior Financial Officer 1

  • 7/24/2019 Organization Sizing Detail

    20/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 20 of 42

    Taxes Assistant Accountant 8

    Credit Manager (Finance) 1

    Credit Management (Finance) Financial Accountant 1

  • 7/24/2019 Organization Sizing Detail

    21/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 21 of 42

    7. PROCUREMENT, LOGISTICS & WAREHOUSING

    7.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Number of Regional Unit: 15;

    Number of plant: 36;

    Nr. of director of the function: 1;

    Nr. of manager for each 3rd-level office: 1;

    Secretary for the director of the function: 1;

    Average staff purchasing FTE as a % of purchasing FTE: 20%;

    Procurement FTE per plant: 1,0;

    Procurement FTE per Regional Unit: 4,5;

    Average Logistics & Warehousing FTEs as a % of purchasing: 5,0%; Average Purchasing FTE as a % of total company FTE: ~1,6%.

    7.2 Sizing

    The previous assumptions lead to an estimated need of 152 FTE for the

    Procurement, Logistics & Warehousing function, employed in (Figure 7):

    Procurement, Logistics & Warehousing Director: 2 FTE (Director and

    secretary);

    Procurement Manager: 1 FTE;

    Procurement Staff and Projects Supervisor : 31 FTE;

    Procurement Business Divisions Supervisor : 4 FTE;

    Buyer Generation: 36 FTE;

    Buyer Distribution: 23 FTE;

    Buyer Transmission: 23 FTE;

    Buyer Supply: 23 FTE;

    Logistics & Warehousing Manager: 1 FTE;

    Logistics & Warehousing Central Warehouse Supervisor: 8 FTE.

  • 7/24/2019 Organization Sizing Detail

    22/66

  • 7/24/2019 Organization Sizing Detail

    23/66

  • 7/24/2019 Organization Sizing Detail

    24/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 24 of 42

    8. TARIFFS & EEA RELATIONS

    8.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Secretary for the director of the function: 1;

    Nr. of estimated required FTE to perform tariffs regulation requirements

    and manage relations with EEA: 9.

    8.2 Sizing

    On the basis of the illustrated assumptions, the Tariffs & EEA Relations

    function is constituted of 10 resources (Figure 8):

    Tariffs & EEA Relations: 10 FTE (1 Director, 1 secretary and 8 officers).

    Figure 8

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be re lied on by any 3rd party without Bain's prior written consent7

    Tariffs and EEA relationsOverview

    Tariffs and EEArelations

    CFO

    1+9

    Tot. FTE:

    10

  • 7/24/2019 Organization Sizing Detail

    25/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 25 of 42

    8.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    Tariffs and EEA relations director 1

    Secretary 1

    Senior pricing analyst 2

    Pricing analyst 6

  • 7/24/2019 Organization Sizing Detail

    26/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 26 of 42

    9. ICT

    9.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Number of Regional Unit: 15;

    Number of plant: 36;

    Total EEPU Annual Sales (estimate): 800 M$;

    Nr. of director of the function: 1;

    Nr. of manager for each 3rd-level office: 1;

    Secretary for the director of the function: 1;

    IT FTEs for developing, maintaining and deploying IT solutions per $1

    billion revenue: 45;

    IT FTEs for developing, maintaining and deploying IT solutions per $1billion revenue: 30;

    IT FTEs for IT security and compliance per $1 billion revenue: 18;

    IT Operations & Support FTE per Regional Unit: 1,5;

    IT Operations & Support FTE per plant: 1;

    IT Operations & Support FTE per Regional Unit: 1;

    IT Operations & Support FTE per Regional Unit: 1;

    IT Operations & Support FTE per Regional Unit: 1.

    9.2

    SizingThe previous assumptions lead to an estimated need of 181 FTE for the ICT

    function, employed in (Figure 9):

    ICT Director (Director and secretary): 2 FTE;

    IT Applications Manager: 36 FTE;

    IT Infrastructure Manager: 24 FTE;

    IT Security and Compliance Manager: 14 FTE;

    IT Operations & Support Manager: 1 FTE;

    IT Operations & Support Staff Supervisor: 23 FTE;

    IT Operations & Support Line Functions Supervisor: 81 FTE.

  • 7/24/2019 Organization Sizing Detail

    27/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 27 of 42

    Figure 8

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent2

    ICTOverview

    ICT

    ApplicationsInfrastructures(HW & network)

    IT operations &support

    IT security andcompliance

    Corporategeneral

    manager

    Staff Linefunctions

    Linefunctions

    1+1

    Tot. FTE:

    181

    1 36 24 14

    8123

  • 7/24/2019 Organization Sizing Detail

    28/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 28 of 42

    9.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    ICT Director 1

    ICT Director's secretary 1

    IT Applications Manager 1

    IT Applications Officer sr. 8

    IT Applications Officer analyst 12

    IT Applications Officer jr. 15

    IT Infrastructure Manager 1

    IT Infrastructure Officer (sr.) 7

    IT Infrastructure Officer (analyst) 8

    IT Infrastructure Officer (jr.) 8

    IT Security and Compliance Manager 1

    IT Security and Compliance Officer sr. 4

    IT Security and Compliance Officer analyst 4

    IT Security and Compliance Officer jr. 5

    IT Operations & Support Manager 1

    Staff Supervisor (IT Operations and Support) 1

    Staff Officer (sr.) 4

    Staff Officer (analyst) 6

    Staff Officer (jr.) 8

    Staff System Administrator 4

    Line Functions Supervisor (IT Operations and Support) 7

    Line function Officer (sr.) 18

    Line function Officer (jr.) 44

    Line function System Administrator 12

  • 7/24/2019 Organization Sizing Detail

    29/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 29 of 42

    10. HR

    10.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Number of Regional Unit: 15;

    Total EEPU Annual Sales (estimate): 800 M$;

    Nr. of director of the function: 1;

    Nr. of manager for each 3rd-level office: 1;

    Secretary for the director of the function: 1;

    Number of employees per "Hiring and Development" Staff FTE: 143,75;

    Number of employees per "Hiring and Development" Function FTE:

    143,75;

    Number of Organization FTEs per $1 billion revenue: 10; Labor Relations FTE per Regional Unit: 1;

    Number of employees per "HR administration" FTE: 236,6;

    HR-to-Employee Ratios: 1,4%;

    Number of employees serviced by HR function FTEs: 75.

    10.2 Sizing

    The previous assumptions lead to an estimated need of 141 FTE for the HR

    function, employed in (Figure 10):

    Human Resources Director (Director and secretary): 2 FTE;

    Hiring and Development Manager: 1 FTE;

    Hiring and Development Staff & Projects Supervisor : 12 FTE;

    Hiring and Development Line Functions Supervisor : 59 FTE;

    Organization Manager: 8 FTE;

    Labor Relations Manager: 15 FTE;

    Administrative Activities Manager: 1 FTE;

    Administrative Activities Staff & Projects Supervisor: 7 FTE;

    Administrative Activities Line Functions Supervisor: 36 FTE.

  • 7/24/2019 Organization Sizing Detail

    30/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 30 of 42

    Figure 9

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent8

    Human ResourcesOverview

    Tot. FTE:

    141

    HR

    Corporate

    ServiceManager

    Hiring andDevelopment

    OrganizationLabor

    RelationsAdministrative

    activities

    Staff &Projects

    Linefunctions

    Staff &Projects

    Linefunctions

    Linefunctions

    Linefunctions

    1+1

    1 8 15 1

    12 59 7 36

  • 7/24/2019 Organization Sizing Detail

    31/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 31 of 42

    10.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    Human Resources Director 1

    Human Resources Directors Secretary 1

    Hiring and Development Manager 1

    Staff & Projects Supervisor (Hiring and Development) 1

    Staff & Projects - Clerk 2

    Staff & Projects - Administrative Officer (control) 1

    Staff & Projects - Administrative Officer (hiring) 1

    Staff & Projects - Administrative Officer (career m.) 1

    Staff & Projects - Administrative Assistant 6

    Line Functions Supervisor (Hiring and Development) 7

    Line functions - Clerk 7

    Line Functions - Administrative Officer (control) 7

    Line Functions - Administrative Officer (hiring) 7

    Line Functions - Administrative Officer (career m.) 7

    Line Functions - Administrative Assistant 14

    Line Functions Development Officer 10

    Organization Manager 1

    Senior Analyst 2

    KM Officer 3

    Administrative Officer 2

    Labor Relations Manager 1

    Administrative officer 2

    Lawyer 4

    Administrative assistant 7

    Secretary 1Administrative activities manager 1

    Staff & Projects Supervisor (Administrative Activities) 1

    Staff & Projects Administrative officer (sr.) 1

    Staff & Projects Administrative officer (jr.) 1

    Staff & Projects Administrative assistant 1

    Staff & Projects Data officer 3

    Line Functions Supervisor (Administrative Activities) 7

    Line Functions Administrative officer (sr.) 7

    Line Functions Administrative officer (jr.) 7Line Functions Administrative assistant 8

    Line Functions Data officer 7

  • 7/24/2019 Organization Sizing Detail

    32/66

    Ethiopian Electric Power

    Organization Sizing

    11.1 Main drivers and a

    The sizing for the func

    assumptions: Secretary for the

    Average % of fun

    Average % of fun

    Average % of fun

    Average % of fun

    Average % of fun

    Number of H&S F

    11.2

    SizingOn the basis of the d

    composed of 21 resou

    Figure 11:

    EHS & Quality: 2

    Quality: 4 FTE;

    Environment: 4 F

    Health & Safety:

    H&S Staff and Pro

    H&S Line Function

    This information is confidential and was prepared i l l li i i li

    EHS and QualiOverview

    Corporation business processes and organization desi

    1. EHS & QUALITY

    ssumptions

    ion has been estimated on the b

    irector of the function: 1;

    tion FTE on total FTE: 0.2%;

    tion FTE on staff FTE: 1.2%;

    tion FTE involved in Quality office:

    tion FTE involved in Environment o

    tion FTE involved in H&S office: 55

    E to manage H&S for staff function

    escribed assumptions, the EHS &

    rces, distributed among the offic

    TE (Director and secretary);

    E;

    FTE;

    jects: 1 FTE;

    s: 9 FTE.

    Figure 11

    i i i i i i l by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's i i

    ty

    EHS andQuality

    CorporateService

    Manager

    Quality Environment Health & Safety

    Linefunctions

    Staff andprojects

    Linefunctions

    1+1

    4 4 1

    1 9

    T

    gn project

    Page 32 of 42

    sis of the following

    20%;

    ffice: 20%;

    %;

    s and projects: 1

    Quality function is

    s as illustrated in

    i i prior written consent8

    t. FTE:

    21

  • 7/24/2019 Organization Sizing Detail

    33/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 33 of 42

    11.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    EHS and Quality Director 1

    EHS and Quality Directors Secretary 1

    Quality Manager 1

    Quality Analyst 3

    Environment Manager 1

    Environmentalist 1

    Economist 1

    Administrative Officer 1

    Health & Safety Manager 1

    Staff & Projects Supervisor (Health and Safety) 3

    Line Functions Supervisor (Health and Safety) 7

  • 7/24/2019 Organization Sizing Detail

    34/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 34 of 42

    12. PROPERTY & GENERAL SERVICES

    12.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Secretary for the director of the function: 1;

    Secretary for each manager with responsibility on more than 100

    employees: 1;

    Average % of General Activities FTE on total FTE: 0.6%;

    Average % of Facility Management FTE on staff FTE: 1.7%;

    Average nr. of Fleet Management FTE per $B1 revenues: 140;

    Average % of Asset Management FTE on staff FTE: 0.3%;

    Average nr. of Asset Management FTE per $B1 revenues: 140;

    Average % of Security Management FTE on total FTE: 5%.

    12.2 Sizing

    The property & General Services function has been estimated to require 825

    resources, distributed among function offices in the following way (Figure 12):

    Property & General Services: 2 FTE (Director and secretary);

    General activities: 60 FTE;

    Facility Management: 30 FTE (1 Manager, 29 officers);

    Fleet Management: 113 FTE (1 Manager, 1 Secretary, 111 employees);

    Property Management: 2 FTE (Director and secretary);

    Asset Management: 5 FTE;

    Asset Maintenance: 112 FTE;

    Security Management: 501 FTE (1 Manager, 1 secretary, 499

    employees).

  • 7/24/2019 Organization Sizing Detail

    35/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 35 of 42

    Figure 12

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent9

    Property & General ServicesOverview

    Property &GeneralServices

    Corporate

    ServiceManager

    Generalactivities

    FacilityManagement

    FleetManagement

    Assetmaintenance

    Propertymanagement

    Assetmanagement

    SecurityManagement

    1+1

    60 30 1+

    112

    1+

    1

    1+

    500

    5 112

    Tot. FTE:

    825

  • 7/24/2019 Organization Sizing Detail

    36/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 36 of 42

    12.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    Property and general services director 1

    Secretary 1

    General activities manager 1

    Mail service officer 5

    Mail clerk 30

    Archive officer 5

    Archivist 19

    Facility manager 1

    Facility site officer 15

    Facility site operator 14

    Property manager 1

    Secretary 1

    Asset management supervisor 1

    Technical asset officer 2

    Civil asset officer 2

    Asset maintenance supervisor 1

    Asset maintenance officer 11

    Asset maintenance operator 100

    Fleet manager 1

    Secretary 1

    Fleet administration officer 5

    Fleet administration clerk 16

    Automotive superintendent 15

    Automotive inspector 75

    Security manager 1

    Secretary 1

    Security officer 10

    Security guards 466

    Administrative officer 16

    Economist 2

    Risk analyst 4

    Geologist 1

  • 7/24/2019 Organization Sizing Detail

    37/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 37 of 42

    13. ENERGY MANAGEMENT

    13.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions:

    Nr. of director of the function: 1;

    Secretary for the director of the function: 1;

    Nr. of manager for each 3rd-level office: 1;

    Expected annual production (GWh): 29.000;

    Number of ICS fuel based plant: 5;

    Number of SCS fuel based plant: 10;

    Contract FTE per contract type (i.e. energy purchase, energy sale, fuel

    purchase): 2;

    Energy produced (GWh) per Energy Portfolio FTE: 1.841;

    Fuel Logistic FTE per ICS fuel based plant: 1;

    Fuel Warehouse FTE per ICS and SCS fuel based plant: 1;

    Contract administration FTE per contract type (i.e. energy purchase,

    energy sale, fuel purchase): 1.

    13.2

    SizingOn the basis of the described assumptions, the Energy Management function is

    composed of 42 resources, distributed among the offices as illustrated in

    Figure 13:

    Chief of Energy Management: 2 FTE (Director and secretary);

    Energy and Fuel Contracts Director: 9 FTE;

    Energy Portfolio & Logistics Director: 2 FTE;

    Energy Portfolio Manager: 16 FTE;

    Fuel Logistics & Warehousing Manager: 15 FTE;

    Fuel Warehouse Supervisor: 5 FTE; Administrative Support Manager: 3 FTE.

  • 7/24/2019 Organization Sizing Detail

    38/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 38 of 42

    Figure 10

    This information is confidential and was prepared by Bain & Company solely for the use of our client; i t is not to b e relied on by any 3rd party without Bain's prior written consent15

    Energy ManagementOverview

    Energy and fuelcontracts

    Administrativesupport

    En. Portfolio &Logistics

    Fuel logistics &Warehousing

    EnergyManagement

    CEO

    Warehouse

    PortfolioManagement

    1+1

    6+3 1+1

    516

    15

    3

    Tot. FTE:

    52

  • 7/24/2019 Organization Sizing Detail

    39/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 39 of 42

    13.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    Chief of Energy Management 1

    Secretary of Chief of Energy Management 1

    Energy and Fuel Contracts Director 1

    Secretary of Energy and Fuel Contracts Director 1

    Energy and Fuel contract managers 7

    Energy Portfolio & Logistics Director 1

    Secretary of Energy Portfolio & Logistics Director 1

    Energy Portfolio Manager 1

    Senior portfolio management Engineer 15

    Fuel Logistics & Warehousing Manager 5

    Fuel Warehouse Supervisor (ICS & SCS) 15

    Administrative Support Manager 3

  • 7/24/2019 Organization Sizing Detail

    40/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 40 of 42

    14. GENERATION

    14.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Number of plant: 36;

    Number of Regional Unit: 15;

    Expected annual production (GWh): 29.000;

    Total installed capacity (MW): 7.860;

    Nr. of director of the function: 1;

    Nr. of manager for each 3rd-level office: 1;

    Secretary for the director of the function: 1;

    Average logistic FTEs as a % of generation FTEs: 2,35%;

    Installed capacity (MW) per generation engineering FTE: 260; Plant director FTE per plant: 2;

    Energy produced (GWh) per plant Operation Control & Planning FTE:

    185;

    Energy produced (GWh) per plant operations FTE: 28;

    Warehouse FTE per Plant: 1,5;

    Plant Maintenance and Works Manager per plant: 1;

    Installed capacity (MW) per plant Electrical Works FTE: 44;

    Installed capacity (MW) per plant Mechanical Works FTE: 36;

    Installed capacity (MW) per plant Construction Works FTE: 56.

  • 7/24/2019 Organization Sizing Detail

    41/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 41 of 42

    14.2 Sizing

    The previous assumptions lead to an estimated need of 1.544 FTE for the

    Generation function, employed in (Figure 14):

    Chief of Generation Operations (Chief and secretary): 2 FTE; Generation Logistics & Warehousing Manager: 36 FTE;

    Generation Technical Area & Engineering Director: 30 FTE;

    Plant Director: 72 FTE;

    Plant Operation Control & Planning Manager: 102 FTE;

    Plant Operations Manager: 675 FTE;

    Plant Warehouse Supervisor: 54 FTE;

    Plant Maintenance and Works Manager: 36 FTE;

    Plant Electrical Works Supervisor: 179 FTE;

    Plant Mechanical Works Supervisor: 218 FTE;

    Plant Construction Works Supervisor: 140 FTE.

    Figure 11

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent5

    GenerationOverview

    PlantPlant

    Generationoperations

    CEO

    Technical Area &Engineering

    OperationsMaintenance and

    works

    Op. Control &Planning

    Logistics &Warehousing

    Warehouse

    Electrical worksMechanical

    worksConstruction

    works

    1+1

    Tot. FTE:

    1.544

    3036

    36+36

    102

    179 140218

    3654675

  • 7/24/2019 Organization Sizing Detail

    42/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 42 of 42

    14.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    Chief of Generation Operations 1

    Secretary 1

    Generation Logistics & Warehousing Manager 1

    Logistics officer 35

    Generation Technical Area & Engineering Director 1

    Generation Operations Electrical Engineer 8

    Generation Operations Environmental Engineer 2

    Generation Operations Electro-Mechanical Engineer 9

    Generation Operations Civil Engineer 8

    Generation Operations Geologist 2

    Plant Director 36

    Secretary 36

    Plant Operation Control & Planning Manager 36

    Senior Plant Operation Control & Planning Engineer 18

    Plant Operation Control & Planning Engineer 48

    Plant Operations Manager 36

    Senior Plant Operation Engineer 180

    Plant Operation Engineer 459

    Plant Warehouse Supervisor 1

    Warehouse officer 36

    Incoming material officer 11

    Material return administrator 6

    Plant Maintenance and Works Manager 36

    Plant Electrical Works Supervisor 36

    Senior Generation Electrical Maintenance Operator 36Generation Electrical Maintenance Operator 107

    Plant Mechanical Works Supervisor 36

    Senior Generation Mechanical Maintenance Operator 36

    Generation Mechanical Maintenance Operator 146

    Plant Construction Works Supervisor 36

    Senior Generation Constructions Maintenance Operator 36

    Generation Constructions Maintenance Operator 68

  • 7/24/2019 Organization Sizing Detail

    43/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 43 of 42

    15. TRANSMISSION

    15.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions:

    Number of Regional Unit: 15;

    Average new transmission network per year: 773;

    Number of Transmission substations: 128;

    Total Transmission Network length (Km): 15.236;

    Point of Distribution (Transmission): 1.000;

    Expected annual production (GWh): 29.000;

    Nr. of director of the function: 1;

    Nr. of manager for each 3rd-level office: 1; Secretary for the director of the function: 1;

    Annual dispatched energy (GWh) per dispatching FTE: 1.074;

    Average logistic FTEs as a % of transmission FTEs: 4,0%;

    Network km per Maintenance & Conduction Engineers: 900;

    Network km per Technical Meter Engineers: 300;

    New network km per Project Engineers: 25;

    Network km per Control room FTE: 500;

    Network and Substations Manager per Regional Unit: 1;

    Network km per Network and Substations Engineers: 300;

    Number of operators per substation: 4;

    Network km per Emergency & Maintenance FTE: 100;

    Warehouse FTE per Regional Unit: 3;

    Transmission Meter Manager per Regional Unit: 1;

    Control operators per Regional Unit: 0,25;

    Number of metering operations FTE per Regional Unit: 3;

    Number of readers per Regional Unit: 2.

  • 7/24/2019 Organization Sizing Detail

    44/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 44 of 42

    15.2 Sizing

    The previous assumptions lead to an estimated need of 1.095 FTE for the

    Transmission function, employed in (Figure 15):

    Chief of Transmission Operations (Chief and secretary): 2 FTE;

    Dispatching Director: 27 FTE;

    Transmission Logistics & Warehousing Manager: 36 FTE;

    Transmission Technical Area & Engineering Director (Director and

    secretary): 2 FTE;

    Transmission Maintenance & Conduction Manager: 17 FTE;

    Transmission Technical Meter Manager: 51 FTE;

    Transmission Engineering Manager: 31 FTE;

    Transmission Control Room and Technical Call Center Manager: 30 FTE;

    Transmission Regional Unit Director (Director and secretary): 30 FTE;

    Transmission Network and Substations Manager: 15 FTE;

    Transmission Network and Substations Engineering Supervisor: 51 FTE;

    Transmission Substations Supervisor: 512 FTE;

    Transmission Emergency & Maintenance Supervisor: 152 FTE;

    Transmission Warehouse Supervisor: 45 FTE;

    Transmission Meter Manager: 15 FTE;

    Transmission Control Supervisor: 4 FTE;

    Transmission Operations Supervisor: 45 FTE;

    Transmission Reading Supervisor: 30 FTE.

  • 7/24/2019 Organization Sizing Detail

    45/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 45 of 42

    Figure 12

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent11

    Substations

    TransmissionOverview

    Tot. FTE:

    1.095

    Transmissionoperations

    CEO

    Technical Area& Engineering

    Regional unitdirection

    Maintenance& conduction

    Metermanagement

    EngineeringControl room

    and callcenter

    Metermanagement

    EngineeringEmergency &Maintenance

    Control Operations Reading

    Network andsubstations

    Dispatching

    Logistics &Warehousing

    WarehouseWarehouse

    1+1

    27

    36

    1+1

    17 51 31 30

    15+15

    15

    51 512 152

    45

    15

    4 45 30

  • 7/24/2019 Organization Sizing Detail

    46/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 46 of 42

    15.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO and

    Ethiopian context peculiarities.

    ROLE # FTE

    Chief of Transmission Operations 1

    Secretary 1

    Dispatching Director 1

    Senior Transmission Dispatching Engineer 5

    Transmission Dispatching Engineer 21

    Transmission Logistics & Warehousing Manager 1Logistics officer 35

    Transmission Regional Unit Director 15

    Secretary 15

    Transmission Technical Area & Engineering Director 1

    Secretary 1

    Transmission Maintenance & Conduction Manager 1

    Senior Transmission Maintenance & Conduction Engineer 4

    Transmission Maintenance & Conduction Engineer 12

    Transmission Technical Meter Manager 1Senior Transmission Meter Management Engineer 10

    Transmission Meter Management Engineer 40

    Transmission Engineering Manager 1

    Transmission Operations Electrical Engineer 9

    Transmission Operations Environmental Engineer 2

    Transmission Operations Electro-Mechanical Engineer 9

    Transmission Operations Civil Engineer 8

    Transmission Operations Geologist 2

    Trans. Control Room and Technical Call Center Manager 1Senior Control Room and Call Center Operator 5

    Control Room and Call Center Operator 24

    Transmission Network and Substations Manager 15

    Trans. Network and Substations Engineering Supervisor 15

    Transmission Network & Substation Civil Engineer 21

    Transmission Network & Substation Electrical Engineer 15

    Transmission Substations Supervisor 15

    Senior Transmission Substation Electrical Engineer 125

    Transmission Substation Electrical Engineer 372Transmission Emergency & Maintenance Supervisor 15

    Senior Trans. Emergency & Maintenance Electrical Engineer 34

  • 7/24/2019 Organization Sizing Detail

    47/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 47 of 42

    Transmission Emergency & Maintenance Electrical Engineer 103

    Transmission Warehouse Supervisor 1

    Warehouse officer 29

    Incoming material officer 9

    Material return administrator 6Transmission Meter Manager 15

    Transmission Control Supervisor 1

    Transmission Meter Managment Control Senior Expert 3

    Transmission Operations Supervisor 15

    Senior Transmission Operation Electrical Engineer 5

    Transmission Operation Electrical Engineer 25

    Transmission Reading Supervisor 15

    Senior Transmission Meter Reading Expert 3

    Transmission Meter Reading Expert 12

  • 7/24/2019 Organization Sizing Detail

    48/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 48 of 42

    16. DISTRIBUTION

    16.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Number of Regional Unit: 15;

    Average new connection per year: 420.000;

    Average new distribution network per year: 31.200;

    Total Distribution Network length (Km): 282.000;

    Point of Distribution (Distribution): 4.000.000;

    Number of Medium Voltage substations (estimate): 600;

    Nr. of director of the function: 1;

    Nr. of manager for each 3rd-level office: 1;

    Secretary for the director of the function: 1; Average logistic FTEs as a % of distribution FTEs: 2,0%;

    Network km per Maintenance & Conduction Engineers: 10.000;

    Network km per Technical Meter Engineers: 7.000;

    New network km per Project Engineers: 600;

    Network km per Control room FTE: 10.000;

    Network and Substations Manager per Regional Unit: 1;

    Network km per Network and Substations Engineers: 6.000;

    Number of operators per substation: 1,15;

    Medium voltage network km per Emergency & Maintenance FTE: 360;

    Low voltage network km per Emergency & Maintenance FTE: 330;

    Warehouse FTE per Regional Unit: 3;

    Distribution Meter Manager per Regional Unit: 1;

    Control operators per Regional Unit: 2;

    Number of metering operations FTE per new connections per year: 700;

    Meter reading per FTE per month: 1750;

    Meter reading frequency (months): 3.

  • 7/24/2019 Organization Sizing Detail

    49/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 49 of 42

    16.2 Sizing

    The previous assumptions lead to an estimated need of 3.318 FTE for the

    Distribution function, employed in (Figure 16):

    Chief of Distribution Operations (Chief and secretary): 2 FTE;

    Distribution Logistics & Warehousing Manager: 75 FTE;

    Distribution Technical Area & Engineering Director (Director and

    secretary): 2 FTE;

    Distribution Maintenance & Conduction Manager: 28 FTE;

    Distribution Technical Meter Manager: 40 FTE;

    Distribution Engineering Manager: 36 FTE;

    Distribution Control Room and Technical Call Center Manager: 28 FTE;

    Distribution Regional Unit Director (Director and secretary): 30 FTE;

    Distribution Network and Substations Manager: 15 FTE;

    Distribution Network and Substations Engineering Supervisor: 70 FTE;

    Distribution Substations Supervisor: 690 FTE;

    Distribution Emergency & Maintenance Supervisor (MV): 46 FTE;

    Distribution Emergency & Maintenance Supervisor (LV): 804 FTE;

    Distribution Warehouse Supervisor: 45 FTE;

    Distribution Meter Manager: 15 FTE;

    Distribution Control Supervisor: 30 FTE;

    Distribution Operations Supervisor: 600 FTE;

    Distribution Reading Supervisor: 762 FTE.

  • 7/24/2019 Organization Sizing Detail

    50/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 50 of 42

    Figure 13

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent7

    DistributionOverview

    Distributionoperations

    CEO

    Technical Area &Engineering

    Regional unitdirection

    Maintenance &conduction

    Metermanagement

    EngineeringControl room

    and call center

    Metermanagement

    Network andsubstations

    Engineering SubstationsEmergency &

    Maintenance (MV)Emergency &

    Maintenance (LV)Control Operations Reading

    Logistics &Warehousing

    Warehouse

    1+1

    15+15

    1515

    70 690 46 804 45 30 600 762

    75 1+1

    28 40 36 28

    Tot. FTE:

    3.318

  • 7/24/2019 Organization Sizing Detail

    51/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 51 of 42

    16.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO and

    Ethiopian context peculiarities.

    ROLE # FTE

    Chief of Distribution Operations 1

    Secretary 1

    Distribution Logistics & Warehousing Manager 1

    Logistics officer 74

    Distribution Technical Area & Engineering Director 1

    Secretary 1Distribution Maintenance & Conduction Manager 1

    Electrical Engineer Senior 3

    Electrical Engineer Junior 5

    Civil Engineer Senior 3

    Civil Engineer Junior 5

    Mechanical Engineer Senior 3

    Mechanical Engineer Junior 5

    Analyst 3

    Distribution Technical Meter Manager 1Technical engineer 8

    Electrician 19

    Sr. Technical Engineer 12

    Distribution Engineering Manager 36

    Distr. Control Room and Technical Call Center Manager 1

    Technical engineer 6

    Electrician 13

    Sr. Technical Engineer 8

    Distribution Regional Unit Director 15Secretary 15

    Distribution Network and Substations Manager 15

    Distr. Network and Substations Engineering Supervisor 70

    Distribution Substations Supervisor 60

    Distribution Substations Electrical Engineer 100

    Distribution Substations Electrician 370

    Distribution Substations Mechanical Engineer 80

    Distribution Substations Civil Engineer 80

    Distribution Emergency & Maintenance Supervisor (MV) 5Distribution Substations Electrical Engineer 10

    Distribution Substations Electrician 15

  • 7/24/2019 Organization Sizing Detail

    52/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 52 of 42

    Distribution Substations Mechanical Engineer 8

    Distribution Substations Civil Engineer 8

    Distribution Emergency & Maintenance Supervisor (LV) 90

    Distribution Substations Electrical Engineer 120

    Distribution Substations Electrician 390Distribution Substations Mechanical Engineer 102

    Distribution Substations Civil Engineer 102

    Distribution Warehouse Supervisor 1

    Warehouse officer 29

    Incoming material officer 9

    Material return administrator 6

    Distribution Meter Manager 15

    Distribution Control Supervisor 15

    Meter Management Control Analyst 15Distribution Operations Supervisor 15

    Meter Management Operations Electrical Engineer 60

    Meter Management Operations Electrician 375

    Meter Management Operations Sr. Civil Engineer 15

    Meter Management Operations Jr. Civil Engineer 60

    Meter Management Operations Sr. Mechanical Engineer 15

    Meter Management Operations Jr. Mechanical Engineer 60

    Distribution Reading Supervisor 15

    Meter Management Reading Sr. reader 180

    Meter Management Reading Jr. reader 567

  • 7/24/2019 Organization Sizing Detail

    53/66

  • 7/24/2019 Organization Sizing Detail

    54/66

    Ethiopian Electric Power

    Organization Sizing

    This information is confidential and was prepared by i l l l i i i l i

    SupplyOverview

    Marketing &Reporting

    Operativemarketing

    Strategicmarketing

    Cal

    3

    Corporation business processes and organization desi

    Figure 17

    i i i i i i l Bain & Company solel y f or the use o f our cl ient; it i s not to be rel ied on by any 3 rd pa rty wi thout i ' i i

    Supply

    Direction

    CEO

    Operati

    BillingOperating

    reporting andplanning

    Back Office

    Central mgmtof key

    accountsl center

    Regional unit

    direction

    District Office

    Regionalmgmt of key

    accounts

    Mass market

    1+1

    1+1

    5 1+

    159

    1+

    275

    26 1+1

    34

    1+1

    15+15

    1310

    gn project

    Page 54 of 42

    i Bain's prior written consent12

    ns

    Creditanagement

    Tot. FTE:

    1.899

    1+1

    41

  • 7/24/2019 Organization Sizing Detail

    55/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 55 of 42

    17.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO andEthiopian context peculiarities.

    ROLE # FTE

    Chief of supply 1

    Secretary 1

    Marketing and reporting director 1

    Secretary 1

    Strategic marketing manager 1

    Senior expert strategic marketing 1

    Strategic marketing analyst 1

    Operating reporting and planning manager 1

    Senior sales and planning analyst 1

    Sales planning analyst 3

    Operative marketing manager 1

    Product portfolio analyst 2

    Customer data analyst 1

    Communication officer 1

    Supply operations director 1

    Secretary 1

    Billing manager 1

    Senior billing operator 15

    Billing operator 35

    Billing assistant accountant 109

    Credit manager 1

    Credit management senior financial officer 7

    Credit management financial officer 33

    Back office supervisor 1

    Secretary 1Back office analyst 2

    Back office representative 272

    Call center supervisor 1

    Call center operator 25

    Key account director 1

    Secretary 1

    Regional key account manager 34

    Director of mass market 1

    Secretary 1Regional unit manager 15

    Secretary 15

  • 7/24/2019 Organization Sizing Detail

    56/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 56 of 42

    District office supervisor 300

    Customer service representative 1010

  • 7/24/2019 Organization Sizing Detail

    57/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 57 of 42

    18. UEAP

    18.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions:

    Nr. of director of the function: 1;

    Nr. of manager for each 3rd-level office: 1;

    Secretary for the director of the function: 1;

    New distribution network per year managed by UEAP (estimate): 9.360;

    Average Planning FTEs as a % of total FTEs: 0,04;

    New network km per Project Engineers: 500;

    New network km per Logistics & Warehouse: 200;

    New network km per Project Manager: 150;

    18.2 Sizing

    The previous assumptions lead to an estimated need of 135 FTE for the UEAP

    function, employed in (Figure 18):

    Chief of Universal Electric Access Program (Chief and secretary):: 2 FTE;

    UEAP Planning Manager: 5 FTE;

    Engineering Manager: 19 FTE;

    UEAP Logistics & Warehousing Manager: 47 FTE; Government Financed Projects Manager: 31 FTE;

    International Financed Projects Manager: 31 FTE.

  • 7/24/2019 Organization Sizing Detail

    58/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 58 of 42

    Figure 18

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent9

    UEAPOverview

    Engineering

    UEAP

    CEO

    Planning

    Intern. financedprojects

    Gov. financedprojects

    Logistics &Warehousing

    1+1

    47

    5

    19

    3131

    Tot. FTE:

    135

  • 7/24/2019 Organization Sizing Detail

    59/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 59 of 42

    18.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO and

    Ethiopian context peculiarities.

    ROLE # FTE

    Chief of Universal Electric Access Program 1

    Secretary 1

    Logistics & Warehousing 1

    UEAP Warehouse supervisor 10UEAP Logistics officer 36

    Planning Manager (UEAP) 1

    Planning Officer 4

    Engineering Manager (UEAP) 1

    UEAP Division Electrical Engineer 9

    UEAP Division Electro-Mechanical Engineer 5

    UEAP Division Civil Engineer 3

    UEAP Division Environmental Engineer 1

    Government Financed Projects Manager 1UEAP Government Projects Senior Electrical Engineer 18

    UEAP Government Projects Senior Civil Engineer 7

    UEAP Govt. Projects Senior Electro-Mechanical Engineer 5

    International Financed Projects Manager 1

    UEAP Int'l Financed Projects Senior Electrical Engineer 18

    UEAP Int'l Financed Projects Senior Civil Engineer 7

    UEAP Int'l Financed Projects Sr. Electro-Mechanical Engineer 5

  • 7/24/2019 Organization Sizing Detail

    60/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 60 of 42

    19. CONSTRUCTIONS

    19.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Nr. of chief of the function: 1;

    Nr. of directors for each 3rd-level office: 1;

    Secretary for the chief of the function: 1;

    Secretary for each 3rd-level director: 1;

    New transmission line Km per year: 773;

    Average Km managed by each Transmission & Substation FTE: 12;

    New distribution line Km per year: 31.200;

    Average Km managed by each Distribution Constructions FTE: 666;

    Average % of Transmission & Substations FTE employed in Civil work:55%;

    Average % of Distribution FTE employed in Civil work: 20%.

    19.2 Sizing

    The previous assumptions lead to an estimated need of 113 FTE for the

    Constructions function, employed in (Figure 19):

    Chief of Constructions: 2 FTE (Chief and secretary);

    Transmission & Substations Constructions Director: 2 FTE (Chief andsecretary);

    Civil Constructions Manager (Transmission & Substations): 34 FTE;

    Electro-Mechanical Constructions Manager (Transmission & Substations):

    28 FTE;

    Distribution Constructions Director: 2 FTE (Chief and secretary);

    Civil Constructions Manager (Distribution): 9 FTE;

    Electro-Mechanical Constructions Manager (Distribution): 36 FTE.

  • 7/24/2019 Organization Sizing Detail

    61/66

    Ethiopian Electric Power

    Organization Sizing

    This information is confidential and was prepared i l l li i i li

    ConstructionsOverview

    Transmission& Substations

    1+73

    Corporation business processes and organization desi

    Figure 19

    i i i i i i l by Bain & Company solely for the use o f our c lient; i t is not to be rel ied on by any 3rd party without Bain' i i

    CEO

    Constructions

    Distribution

    1+1

    1+36

    gn project

    Page 61 of 42

    i i prior written consent110

  • 7/24/2019 Organization Sizing Detail

    62/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 62 of 42

    19.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO and

    Ethiopian context peculiarities.

    ROLE # FTE

    Chief of Constructions 1

    Secretary 1

    Transmission & Substations Constructions Director 1

    Secretary 1

    Trans. & Subs. Constructions Electro-Mechanical Engineer 13

    Trans. & Subs. Constructions Civil Engineer 13Trans. & Subs. Constructions Electro-Mechanical Technician 40

    Trans. & Subs. Civil Constructions Worker 6

    Distribution Constructions Director 1

    Secretary 1

    Distribution Constructions Electro-Mechanical Engineer 8

    Distribution Constructions Civil Engineer 3

    Distribution Constructions Electro-Mechanical Technician 20

    Distribution Civil Constructions Worker 4

  • 7/24/2019 Organization Sizing Detail

    63/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 63 of 42

    20. Equipment Production

    20.1 Main drivers and assumptions

    The sizing for the function has been estimated on the basis of the following

    assumptions: Nr. of chief of the function: 1;

    Secretary for the chief of the function: 1;

    New distribution network km per year: 31.200;

    Average new network km managed per Equipment Production FTE: 110;

    Average Customer Management FTEs as a % of Production FTEs: 20%;

    Average Equipment Production Logistics & Warehousing FTEs as a % of

    Production FTEs: 7%;

    Average Product Development FTEs as a % of Production FTEs: 14%;

    Average Production & Planning FTEs as a % of Production FTEs: 58%.

    20.2 Sizing

    The previous assumptions lead to an estimated need of 284 FTE for the

    Equipment Production function, employed in (Figure 20):

    Chief of Equipment Production: 2 FTE (Chief and secretary);

    Equipment Production Customer Manager: 57 FTE;

    Logistics & Warehousing Manager: 20 FTE;

    Product Development Manager: 40 FTE; Production & Planning Manager: 165 FTE.

  • 7/24/2019 Organization Sizing Detail

    64/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 64 of 42

    Figure 20

    This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without Bain's prior written consent20

    Equipment ProductionOverview

    Equipmentproduction

    CEO

    Productdevelopment

    Logistics andwarehousing

    Productionand planning

    Customermanagement

    Tot. FTE:

    284

    20

    165

    2

    57

    40

  • 7/24/2019 Organization Sizing Detail

    65/66

    Ethiopian Electric Power Corporation business processes and organization design project

    Organization Sizing Page 65 of 42

    20.3 Lower levels sizing

    The following table presents the estimated sizing to be adopted for lower levels

    of the organization. The estimation has been performed on the basis of

    international best practices and benchmark and of Bain experience with

    utilities sector companies. Proposed sizing takes into account EEPCO and

    Ethiopian context peculiarities.

    ROLE # FTE

    Chief of Equipment Production 1

    Secretary 1

    Equipment Production Customer Management Director 1

    Equipment Production Senior Customer Manager 15

    Equipment Production Customer Manager 41

    Logistics & Warehousing Manager 20Product Development Director 1

    Senior Product Development Electrical Engineer 3

    Product Development Electrical Engineer 12

    Senior Product Development Mechanical Engineer 3

    Product Development Mechanical Engineer 11

    Senior Product Development Civil Engineer 2

    Product Development Civil Engineer 8

    Production & Planning Director 1

    Secretary 1Senior Production Planner 5

    Production Planner 10

    Production Engineer 15

    Production Worker 98

    Maintenance Planner 5

    Maintenance Worker 30

  • 7/24/2019 Organization Sizing Detail

    66/66

    Ethiopian Electric Power Corporation business processes and organization design project

    21. ORGANIZATION OVERVIEW

    21.1 Sizing

    EEPU organization has been estimated to require 10.175 resources, distributed

    in the following way (Figure 21):

    CEO: 2 FTE;

    Engineering: 57 FTE;

    Strategy & Investments: 17 FTE;

    External Relations: 26 FTE;

    Legal: 30 FTE;

    CFO: 2 FTE;

    Administration, Finance & Control: 274 FTE;

    Procurement, Logistics & Warehousing: 152 FTE; Tariffs & EEA Relations: 10 FTE;

    Corporate Service Manager: 2 FTE;

    ICT: 181 FTE;

    HR: 141 FTE;

    EHS & Quality: 21 FTE;

    Property & General Services: 825 FTE;

    Energy Management: 52 FTE;

    Generation Operations: 1.544 FTE;

    Transmission Operations: 1.095 FTE; Distribution Operations: 3.318 FTE;

    Supply: 1.900 FTE;

    UEAP: 135 FTE;

    Constructions: 113 FTE;

    Equipment Production: 284 FTE.